HomeMy WebLinkAbout2019 05-16 PCP PLANNING COMMISSION AGENDA
CITY OF BROOKLYN CENTER
May 16th, 2019
1. Call to Order: 7:00 PM
2. Roll Call
3. Approval of Regular Meeting Agenda
a. Motion to Approve Planning Commission Regular Session Meeting Agenda for
May 16 th, 2019.
4. Approval of Minutes
a. Motion to Approve April 11, 2019 Regular Session Meeting Minutes
5. Chairperson's Explanation
The Planning Commission is an advisory body. One of the Commission's functions is to
hold public hearings. In the matters concerned in these hearings, the Commission makes
recommendations to the City Council. The City Council makes all final decisions in these
matters.
6. Planning Items
Planning Commission Application No. 2019-006 (Public Hearing)
Developer: Real Estate Equities
Project Address: 5801 Xerxes Avenue North
Summary: The Applicant is requesting a Planned Unit Development
(PUD) and Zoning Map amendment to remove this property
from the Central Commerce Overlay District in order to
construct a total of 267 new dwelling units in a two-building
development on approximately 4.8 acres
b. Planning Commission Application No. 2019-007
Applicant: Nate Reinhardt (City of Brooklyn Center)
Project Address: 1350 Shingle Creek Crossing
Summary: The Applicant is requesting site and building plan review for
construction of a new municipal liquor store in the Shingle
Creek Crossing Development.
7. Discussion Items
a. City Council Meeting Updates
8. Other Business
None.
9. Adjournment
PC Minutes
04-11-19 -1- DRAFT
MINUTES OF THE PROCEEDINGS OF THE PLANNING COMMISSION
OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF
HENNEPIN AND THE STATE OF MINNESOTA
APRIL 11, 2019
1. CALL TO ORDER
The Planning Commission meeting was called to order by Chair Christensen at 7:00 p.m.
2. ROLL CALL
Chair Randall Christensen, Commissioners Alexander Koenig, Jack MacMillan, Stephen
Schonning, Rochelle Sweeney, and Susan Tade were present. City Planner and Zoning
Administrator Ginny McIntosh, Community Development Director Meg Beekman, City
Engineer Mike Albers, and Mary M ullen, TimeSaver Off Site Secretarial, Inc. were also present.
3. APPROVAL OF AGENDA – APRIL 11, 2019
There was a motion by Commissioner Tade, seconded by Commissioner Schonning, to approve
the agenda for the April 11, 2019 meeting as presented. The motion passed unanimously.
4. APPROVAL OF MINUTES
a. March 14, 2019 Regular Session Meeting Minutes
There was a motion by Commissioner Koenig, seconded by Commissioner Sweeney, to approve
the minutes of the March 14, 2019 meeting as presented. The motion passed unanimously.
b. March 21, 2019 Special Session Meeting Minutes
There was a motion by Commissioner Schonning, seconded by Commissioner MacMillan, to
approve the minutes of the March 21, 2019 meeting as presented. The motion passed
unanimously.
5. CHAIR’S EXPLANATION
Chair Christensen explained the Planning Commission’s role as an advisory body. One of the
Commission’s functions is to hold public hearings. In the matters concerned in these hearings,
the Commission makes recommendations to the City Council. The City Council makes all final
decisions in these matters.
6. PLANNING APPLICATION ITEMS
6a) Planning Commission Application No. 2019-005
Applicant: Mike Albers
PC Minutes
04-11-19 -2- DRAFT
Property Address: 5139 Brooklyn Boulevard
Summary: The applicant is requesting preliminary and final plat
approval of the currently un-platted Subject Property
located in the vicinity of 5139 Brooklyn Boulevard. This
request is associated with improvements underway as part
of Brooklyn Boulevard Corridor Project Phase I.
Ms. McIntosh request Planning Commission consideration of preliminary and final plat approval
for Brookdale Covenant Addition, 5139 Brooklyn Boulevard. She stated the City Council
authorized a land exchange agreement in December 2017 with Brooklyn Covenant Church to
complete improvements as part of Phase 1 of the Brooklyn Boulevard Corridor project. She
added certain vacations are required on the east side of the property for streetscape projects that
will improve roadway safety, enhance traffic improvements, and develop trails and sidewalks.
She noted a new traffic signal is planned for Lilac Drive and Highway 100.
Ms. McIntosh stated the City is the applicant in this case and is requesting to plat what is
currently 5139 Brooklyn Boulevard with the stipulation that the Lila Drive parcel would be re-
platted and deeds recorded to reflect all changes on the property.
Ms. McIntosh stated a public hearing is required and has been published in the Sun Post on
March 28, 2019, as well as notices sent to surrounding properties.
Ms. McIntosh stated the City will work with Hennepin County to complete vacation of the
County’s interest in the Brooklyn Boulevard right of way. She added separate encroachment
agreements might be required. She noted a certified Abstract of Title must be provided before
submission to the County.
Ms. McIntosh stated City Staff are requesting that the Planning Commission recommend City
Council approval of the preliminary and final plat. She added approval would be contingent
upon compliance with conditions in City Engineer’s report, Exhibit C, Platting Ordinance, and
Hennepin County requirements.
OPEN TO PUBLIC COMMENTS – APPLICATION NO. 2019-005
Chair Christensen recognized residents in the audience who wished to speak on this matter and
called for comments from the public.
There was a motion by Commissioner Sweeney, seconded by Commissioner Tade, to open the
public hearing on Application No. 2019-005, at 7:13 p.m. The motion passed unanimously.
There were no other individuals in attendance who wished to make comments at this time.
MOTION TO CLOSE PUBLIC COMMENTS (HEARING)
PC Minutes
04-11-19 -3- DRAFT
There was a motion by Commissioner MacMillan, seconded by Commissioner Koenig, to close
the public hearing on Application No. 2019-005 at 7:14 p.m. The motion passed unanimously.
The Commissioners interposed no objections to approval of the Application.
ACTION TO RECOMMEND APPROVAL OF PLANNING COMMISSION APPLICATION
NO. 2019-005 SUBMITTED BY MIKE ALBERS FOR PRELIMINARY AND FINAL PLAT
APPROVAL FOR BROOKDALE COVENANT ADDITION AND DEDICATION OF
CERTAIN RIGHT-OF-WAY
There was a motion by Commissioner Koenig, seconded by Commissioner Sweeney, to
recommend approval of Planning Commission Application 2019-005 Submitted by Mike Albers
for Preliminary and Final Plat Approval for Brookdale Covenant Addition and Dedication of
Certain Right-Of-Way.
Voting in favor: Chair Christensen, Commissioners, Koenig, MacMillan, Schonning, Sweeney,
and Tade.
And the following voted against the same: None
The motion passed unanimously.
The Council will consider the application at its April 22, 2019 meeting. The Applicant must be
present. Major changes to the application as reviewed by the Planning Commission will require
that the application be returned to the Commission for reconsideration.
6b) Concept Review: Redevelopment of Former Jerry’s Foods Site
Applicant: Real Estate Equities
Property Address: 5801 Xerxes Avenue North
Summary: Proposal to construct approximately 270 new dwelling
units in a two-building development on approximately 4.8
acres. The units would comprise a mix of senior and
workforce housing.
Meg Beekman stated a concept review is being requested by Real Estate Equities, the developer
of the former Jerry’s Foods site. She added the intention is to review the concept before the
applicant makes formal application for land use approvals. She noted the Planning Commission
has the opportunity to provide feedback on the site plan and layout and provide input on use and
other details.
Ms. Beekman stated this will be a non-binding discussion, and no vote or action will be taken.
She added a similar concept review was also held by the City Council at a recent meeting, and
input was provided to the developer.
Ms. Beekman stated the proposal is for two multi-family residential buildings with
approximately 267 units at the former Jerry’s Foods site at 5801 Xerxes Avenue N. She added
PC Minutes
04-11-19 -4- DRAFT
the site is approximately 5 acres and has been vacant for quite some time. She noted the
proposal is for a mix of affordable independent senior living and workforce units with rents
affordable at 50-60% Area Median Income (AMI), or between $47,000-$66,000 per year.
Ms. Beekman stated the developer has submitted an application package that includes a request
for Tax Increment Financing (TIF). She added City Staff is reviewing the application. She
added the total cost of the development will be $60 million, a combination of public financing,
bonds, TIF, low income tax credits, and other sources. She added the current market value of the
site is $1.6 million, and after construction, it will generate approximately $360,000 in annual
property taxes. She noted the developer is finalizing the site plan and preparing land use
applications, including a PUD request and amendment to the Central Commerce Overlay
District.
Ms. Beekman stated the requests will be ready for presentation to the Planning Commission at
their May 2019 meeting, at which a public hearing will be held for the Zoning code amendment.
She noted the City’s public finance consultants are reviewing REE’s financing package.
Ms. McIntosh introduced Alex Bisanz, representing the developer, Real Estate Equities.
Mr. Bisanz thanked the Planning Commission for their review of this project. He added The
Planning Commission’s feedback and comments are requested before the final plan submittal
which is planned for May 2019. He presented an overview of the project, a mix of 127
workforce housing units and 143 senior living units.
Mr. Bisanz stated he is a Partner at Real Estate Equities (REE), a local development company
since 1972. He added they have a portfolio that includes developments in Minnesota, Illinois
and Wisconsin. He noted REE currently has over 10,000 units, and 1,200 units currently under
construction.
Mr. Bisanz stated the apartment rents will be in the 50-70% (AMI) range. He added the
proposed development is in an exceptional location, with transit, retail, amenities and proximity
to downtown Minneapolis. He noted this development is a large investment for REE and will be
something the City of Brooklyn Center and its residents can be proud of. He added REE plans to
own and manage the property for the long term.
Mr. Bisanz stated 270 affordable units are proposed – 39 – 1-bedroom; 52 – 2-bedroom; and 36 –
3-bedroom units. He added the senior component will have 95 – 1-bedroom and 48 – 2-bedroom
units. He noted the combined parking ratio will be 1.26, with 200 underground and 139 surface
spaces, for a total of 339 spaces.
Mr. Bisanz stated the development will have an on-site management team, secure entrance for
residents, package receiving and storage area, community spaces, and potential for a rooftop
PC Minutes
04-11-19 -5- DRAFT
patio. He added the senior component will have an arts and crafts center. He noted there will be
secure underground parking available for both buildings.
Mr. Bisanz stated another REE development, Press House, is located in the renovated Pioneer
Press building, and is approximately 75% leased. He added this building was vacant for many
years, and the community will be a good fit for its downtown St. Paul neighborhood. He noted
the unit types and finishes are very comparable to what will be developed in Brooklyn Center.
Mr. Bisanz stated REE recently closed on the Winslow, an affordable senior housing community
in West St. Paul. He added that site has many features in common with the proposed
development, including style, number of units and walkable proximity to retail, amenities and
transit. He noted two projects are currently under way in Rochester.
Commissioner MacMillan requested clarification regarding parking spaces per unit. Mr. Bisanz
stated underground spaces will be available for $75, and $15 for storage spaces. He added
surface parking will be free.
Commissioner MacMillan asked whether there will be enough storage bays for all the units.
Petro Megits, Kaas Wilson Architects, stated there will be storage for approximately 1/3 of
residents, and the senior component will have more available storage. He added the family units
will be larger and have more closet space than senior apartments.
Commissioner Tade asked whether REE has a portfolio that is predominantly affordable and
senior housing. Mr. Bisanz stated REE currently manages many older properties, which are
naturally affordable housing. He added their portfolio is approximately 40% market rate and
60% affordable housing.
Chair Christensen stated underground parking might be difficult at this location. Mr. Bisanz
stated REE has done research including soil borings and geotechnical evaluations, and the
current design with underground parking is based on evaluation of that research.
Mr. Bisanz stated the City Council mentioned the water table at a recent meeting when they
reviewed the proposed development, and REE engaged Braun Intertec to begin researching the
issue right away.
Commissioner MacMillan asked whether there will be balconies. Mr. Bisanz stated the
possibility has been discussed. He added the West St. Paul development does not have
balconies, but a combination of both is a possibility. He noted people often end up using their
balconies for additional storage which can be problematic.
Mr. Megits stated balconies are being considered along Bass Lake Road, but space is limited on
the interior courtyard. He added good on-site property management is important when residents
have balconies.
PC Minutes
04-11-19 -6- DRAFT
Mr. Bisanz stated the proposed rooftop deck would probably have great views of downtown
Minneapolis. He added the Luxe Apartments which just opened in Brooklyn Center have a
perfect view of the downtown skyline. Ms. Beekman stated the REE team could try to get a tour
of the Luxe, although it is fully leased.
Ms. McIntosh stated the tot lot and pond area have been moved from the previous plans. Mr.
Bisanz confirmed this, adding a dog run is also planned.
Ms. Beekman asked where the front entrance of the building will be located. Mr. Megits stated
the main entrance is planned at the central courtyard space, and each building will have their
own main entry.
Commissioner MacMillan asked whether there will be gated access only to the parking lot. Mr.
Megits stated that is not typically done with senior housing as access needs to be open for
transportation providers. He stressed the importance of creating spaces that are part of the
community, rather than giving the appearance of keeping people out.
Commissioner MacMillan stated this is a very active and busy area, and he can envision the
parking lot becoming a cut-through to avoid traffic. He added there could also be activity that is
not desirable. Mr. Megits stated security cameras and lighting are planned for the parking areas,
as well as access-controlled fobbed entrances to the buildings. He added a speed bump could be
considered to deter cut-through traffic. He noted gates are not being considered.
Mr. Bisanz stated security issues can be combatted with lighting, interior and exterior cameras
and good on-site management, as well as thorough screening of potential residents. He added
REE builds strong relationships with local police, to create open and ongoing dialogue.
Commissioner MacMillan requested clarification regarding senior living age guidelines. Mr.
Bisanz stated the senior component will be for adults aged 55 and over. He added this includes
retired, independent seniors living on a fixed income. Mr. Megits stated the senior component
will not be assisted living, but there will be staff and activities.
Commissioner MacMillan asked whether rents will be subsidized. Mr. Bisanz stated Section 8
tenant vouchers will be accommodated to a certain percentage, but there is project-based Section
8.
Ms. Beekman stated the construction will be the same quality as market-rate construction. She
added the units will be rented at 40-60% less than market rate, which creates a gap in the
financing structure. She noted this is filled with a number of different public financing sources,
including tax exempt bonds, low-income housing credits, and State subsidized funding.
PC Minutes
04-11-19 -7- DRAFT
Commissioner Tade asked whether the developer applies for subsidies. Ms. Beekman confirmed
this, although the City helps with TIF financing.
Mr. Bisanz stated REE obtained a bonding allocation for the workforce portion of the project to
ensure economic feasibility, as bond rating is very competitive due to increased construction
projects. He added bonds for the senior portion will be obtained in August 2019.
Commissioner Tade stated she is glad to see a development at this location, which has been
vacant for some time. She added she feels that Brooklyn Center has a lot of affordable and
senior housing. She asked whether the developer is concerned about being able to fill both the
senior living and workforce components. She noted she wants the development to be successful.
Commissioner Tade stated the 2040 Comprehensive Plan guides this area for mixed use. She
asked whether the developer had considered retail on the main floor, which would provide a
different look and feel. She noted she is pleased with the development although it is different
from what has been considered for that area in the past.
Mr. Bisanz stated retail component is not an option for low-income tax development projects,
and this development is no exception. He added they have surveyed and researched the market,
and the market data shows a strong demand for both types of housing.
Ms. Beekman stated there is no other independent affordable senior living development in
Brooklyn Center. She added the Sanctuary is a n assisted living development. Ms. McIntosh
stated Maranatha added 20 units that are also independent living. Ms. Beekman stated the
Maranatha units are not affordable.
Commissioner Tade asked whether tenants need to qualify for affordable housing. Mr. Bisanz
confirmed that rigorous underwriting is State-mandated. He added this is handled by REE’s
Compliance Department.
Commissioner MacMillan stated he hopes REE can create an appealing community amenity,
especially since they plan to continue to manage it for 20 years.
Chair Christensen agreed, adding a new apartment complex, regardless of its format, will help to
enhance the image of the neighborhood and the City in general. He added there has not been a
new apartment building in Brooklyn Center since 1971.
Mr. Megits agreed, adding high density areas attract retail and spending, which provides
economic stimulus that is beneficial for the City.
Mr. Bisanz stated other recent development projects in Brooklyn Center were a motivation for
REE to propose this development.
PC Minutes
04-11-19 -8- DRAFT
Commissioner Schonning stated he was originally opposed to the development. He added he
now agrees that this is a great place for apartments, as there are not many uses that would work
there. He noted this is a very walkable part of the community with nearby retail and amenities.
Commissioner Schonning stated there are many challenges in the community. He added a new
apartment complex with many new residents will create a positive change by turning the
neighborhood from an empty lot to a community. He noted he appreciates the buildings’
appearance, and he is glad the developers will be around for a long time.
Commissioner Koening requested clarification regarding the zoning change from commercially
zoned mixed retail to residential use. He asked what effect that will have on the tax base, in
terms of what the City is trying to accomplish.
Ms. Beekman stated calculations determine an appropriate balance of commercial, mixed and
residential use for this District. She added the end goal will be to have a balance of use.
Ms. Beekman stated the Police Dept has involved in discussions regarding this project and will
continue to review the plans with the developer. She added Police Department staff are certified
in Crime Prevention Through Environmental Design, which takes into consideration
landscaping, lighting, location of buildings and amenities.
Ms. Beekman stated Metro Transit has put significant investment into the transit hub, including
site improvements as well as on-site Police staffing, and the City can leverage from this
investment. She added the C-line officially opens on June 8, 2019 with 12 new officers,
including four officers stationed throughout the day, 7 days a week. She noted this has resulted
in a marked decrease in the number of police calls.
Chair Christensen suggested the garage entrance on the site might be more appropriate on the
east side, where there is less foot traffic. He expressed his overall support for the project. He
added he looks forward to seeing the results.
Ms. Beekman stated the deadline for REE to submit their preliminary plans is April 16, 2019.
She introduced Jane Kansier, Senior Planner with Bolton & Menk, who will be working with
City Staff on planning issues during Ms. McIntosh’s absence. She stated Ms. Kansier has been
working with City Staff on the Zoning Code update.
Mr. Megits stated, with regard to comparable affordable senior properties, there is generally a
waiting list due to shortage of available senior living units.
Chair Christensen stated he would like to see additional community space in the senior living
component, as many seniors like to reserve space for family parties. Mr. Bisanz agreed, adding
both buildings will have community spaces, but the senior building will have larger space so they
can stay active and enjoy their home and their community.
PC Minutes
04-11-19 -9- DRAFT
Mr. Megits stressed the importance of incorporating development aspects that will create a sense
of family and community for the residents of the senior living component.
7. DISCUSSION ITEMS
a. City Council Meeting Updates
Ms. Beekman stated the City Council approved three Preliminary Development Agreements
(PDA) at their last meeting. She added Centra Homes is proposing a residential development
called Eastbrook Estates on an 8-acre EDA-owned property at Highway 252 and 68th Avenue N.
She noted this PDA covered a revised site plan based on negotiations with adjacent property
owners and issues with City right of way encroachment.
Ms. Beekman stated the development was reduced from 35 lots to 30-32 lots, and the builder
anticipates moving forward with the preliminary final plat.
Ms. Beekman stated the second PDA renewal was from Alatus LLC for Phase 1 development in
the Opportunity Site. She added City Staff meets with Alatus weekly to review the extremely
high-level framework of land use and transportation. She noted Three Rivers Park District has
been involved in discussions regarding trail connections in the site, and significant park space
that the District would acquire and maintain as a regional park.
Ms. Beekman stated the public engagement process continues, with the next design workshop to
be held Wednesday April 17, 2019. She added the developer will be there, along with an
affordable housing developer, to provide additional input and information. She noted both
rooms are reserved, and City Staff are anticipating a lot of attendees.
Commissioner Sweeney asked whether the various developers talk to each other about what they
are proposing, and if they are aware of each other’s plans. Ms. Beekman confirmed this, adding
Mr. Bisanz had made reference to the Alatus development, as well as Mr. Soderbergh. She
added they are in contact with each other.
Commissioner Tade asked about the balance of affordable housing, and whether this
development will have an impact on the Alatus development. Ms. Beekman stated that is a
question of policy, and at present no affordability requirement has been placed on the
Opportunity site.
Chair Christensen asked whether this is addressed in the 2030 Comprehensive Plan. Ms.
Beekman stated there is nothing related to affordability but that will be identified in the master
planning process. She added there could be a mix of senior and workforce housing, but there are
also many other options.
PC Minutes
04-11-19 -10- DRAFT
Commissioner Tade stated she is thrilled that there will be development at this location. She
added she would support market-rate development to have options other than low-income
housing.
Ms. Beekman stated the third development is with Brady Real Estate Development for an
81,000-square foot office building on EDA-owned property at 1601 James Circle. She added the
City Council rejected a proposal from an electrical union to develop the property. She noted the
proposed use would be for a business tech incubator, and an anchor tenant has been identified.
Ms. Beekman stated the developer wants to leverage the Opportunity Zone status of the property.
She added a cooperation agreement is being sought between the developer and the owner of the
former Earle Brown Bowl, for collaborative use of the properties and to increase building size
and parking allocation.
Commissioner Schonning stated he appreciates the use of a single parking area for separate
parking use during the day and at night.
b. Reminder: LISC | CDI Workshops #3 and #4 for Opportunity Site at Brookdale
Library (April 17 and May 1, 2019)
Ms. McIntosh stated a flyer regarding the Opportunity Site design workshops is available for
distribution. She added City Staff is hoping to get a diverse group for the two remaining
meetings.
Ms. Beekman stated food will be provided by the new Jamaican restaurant. She encouraged the
Planning Commissioners and all residents to attend. Commissioner Sweeney stated she will not
be available to attend.
c. Upcoming City of Brooklyn Center Neighborhood Engagement Program
Meetings
Ms. McIntosh stated Communication Coordinator Angel Smith is organizing the Neighborhood
Engagement Program, a series of neighborhood meetings that are designed to help residents get
to know other people in their neighborhood. She added City Staff will provide support to bring
neighbors together through engagement opportunities. She noted the City’s Neighborhood
Liaisons will be facilitating the meetings, and Ms. Smith is the main contact.
Ms. McIntosh stated most meeting locations have been determined, but meetings scheduled in
May 2019 are yet to be determined. She urged residents to attend their Neighborhood
Engagement Meeting.
Commissioner Schonning stated he attended a neighborhood meeting with his wife, and it was a
very positive experience. He added meeting attendees felt a sense of community, and potentially
PC Minutes
04-11-19 -11- DRAFT
planting a seed that can grow into something interesting. He noted it will be fun to see how it
works out, and recommended residents attend their neighborhood meeting,
8. OTHER BUSINESS
Chair Christensen requested clarification regarding the open seat on the Planning Commission.
Ms. McIntosh stated at least 2 applications have been received. She agreed to follow up with
City Clerk Barb Suciu.
9. ADJOURNMENT
There was a motion by Commissioner MacMillan, seconded by Commissioner Sweeney, to
adjourn the Planning Commission meeting. The motion passed unanimously. The meeting
adjourned at 8:48 p.m.
_______________________________ _______________________________
Ginny McIntosh, Secretary Randall Christensen, Chair
App. No. 2019-006
PC 05/16/2019
Page 1
Planning Commission Report
Meeting Date: May 16, 2019
Application No. 2019-006
Applicant: Real Estate Equities
Location: 5801 Xerxes Avenue N (Former Jerry’s Food Site)
Request: Proposed Planned Unit Development (PUD) to allow multifamily residential in
current C2 zoning district and Amendment to Zoning Map to Remove the Site
from the Central Commerce Overlay District
Requested Action
Real Estate Equities (“REE) is requesting review and consideration of Planned Unit Development (PUD)
to allow the development of the property located at 5801 Xerxes Avenue North with two multifamily
buildings for senior and workforce housing. The proposal also includes an amendment to the Zoning
Map to remove the site from the Central Commerce Overlay District. Exhibit A includes a project
narrative and plans.
As part of the application process, a public hearing notice was published in the Brooklyn Center Sun Post
on May 2, 2019, and notices were mailed to owners of property within 350’ of the site (Exhibit B). The
City has received one written comment regarding the proposal, which is attached (Exhibit E).
Background
City staff has been meeting with REE to discuss the development of the former Jerry's Food site
(“Subject Property”) at the corner of County Road 10 and Xerxes Ave North. The Subject Property has
been vacant since 2003. This location works well for the proposed housing due to its access to the
Brooklyn Center Transit Station and the future C-Line BRT, and its proximity to retail and other services.
Map 2: 1971 Imagery of Subject Property
Source: MHAPO (Minnesota Historical Aerial Photographs Online).
• Application Filed: 04/16/2019
• Review Period (60-day) Deadline: 06/14/2019
• Extension Declared: N/A
• Extended Review Period Deadline: N/A
App. No. 2019-006
PC 05/16/2019
Page 2
The Subject Property is currently owned by the ILEX Group Inc., and REE, the developer, plans to acquire
the site and develop 270 senior and workforce affordable apartments. The 270 affordable senior and
workforce apartments will be 100% affordable and will consist of one, two, and three bedrooms
apartments. The project will have a full-time onsite management team to manage the property and
service the tenants to the best of their ability. Some of the amenities of the project will include:
clubroom and fitness center, arts and crafts room, dedicated package storage, and underground
parking. On top of these amenities each unit will be furnished with in-unit washer & dryer, solid surface
countertops, nine-foot ceilings, and stainless-steel appliances.
At the January 28, 2019, City Council work session, REE presented a concept development proposal for
the Subject Property. The developer also presented a concept review for the site to the Planning
Commission at its April 11, 2019 meeting. Both the City Council and the Planning Commission provided
input on the project, including comments about sustainability, open space and community gathering
space, and safety and security.
Site Data:
2040 Land Use Plan: TOD (Transit Oriented District)
Neighborhood: Centennial
Current Zoning: C2 (Commerce) and Central Commerce Overlay
Site Area: 4.79 Acres
Surrounding Area:
Direction 2040 Land Use Plan Zoning Existing Land Use
North TOD C1A (Service Office) District and
Central Commerce Overlay
Commercial
South TOD C2 (Commerce) District and Central
Commerce Overlay
Commercial
East TOD C2 (Commerce) District and Central
Commerce Overlay
Commercial
West TOD C1A (Service Office) District and
Central Commerce Overlay
Office
App. No. 2019-006
PC 05/16/2019
Page 3
Map 1: Subject Property Location (5801 Xerxes Ave)
Source: Hennepin County GIS
Proposal Evaluation
Zoning Map Amendment:
Overlay districts generally apply an extra level of regulations or development criteria above the standard
underlying zoning district. The Central Commerce Overlay District is an area roughly bounded by I-694
on the north, Highway 100 on the south and east, Brooklyn Boulevard on the west, and Shingle Creek on
the north. The Central Commerce Overlay District includes a specific list of permitted uses. Residential
uses are not listed, which means they are not permitted within the overlay district. As part of the
ongoing Zoning Code update, the Central Commerce Overlay District will be revised or removed;
however, since that work is not yet complete, the proposal includes the removal of this property from
the overlay district.
Map 3: Central Commerce Overlay District
App. No. 2019-006
PC 05/16/2019
Page 4
The applicant is requesting an amendment to the Zoning Map to remove the Subject Property from the
Central Commerce Overlay District. The 2040 Comprehensive Plan designates the Subject Property for
Transit Oriented Development (TOD) uses.
Map 4: 2040 Future Land Use Plan
The TOD is a new land use designation, planned for a mix of residential, commercial, office and retail
uses generally located within a ½-mile of the Brooklyn Center Transit Station. Density of new residential
development in the TOD is expected to be between 31 and 130 units per acre. The proposed
development of the Subject Property is consistent with the TOD designation.
Planned Unit Development:
As part of the ongoing Zoning Code update, new zoning districts will be created included one or more
TOD districts, which will conform to the TOD future land use designation in the 2040 Comprehensive
Plan. However, that work is not yet complete, and there is not an existing zoning district which this
project fits within. As such, the Applicant is requesting a Planned Unit Development (PUD), which allows
flexibility within the zoning code to allow for developments which would not be allowed under the
existing regulations. PUDs are often used to achieve a higher quality development, or achieve other City
goals, in exchange for zoning flexibility from the City Code.
Site Design
The proposed development includes two multifamily buildings, containing a total of 270 units. The
buildings are arranged on the north and south side of the lots, with a parking lot in the center. There is a
dog run, a tot lot, a community herb garden and a shared outdoor grilling area on the site.
App. No. 2019-006
PC 05/16/2019
Page 5
Figure 1: Site Plan
The north building is planned for senior independent living, is 5 stories in height, and includes 143 units.
The south building is planned for workforce housing, is 4 stories in height and includes 127 units. The
buildings consist of a mixture of 1, 2 and 3-bedroom units. All units include washer/dryers, solid surface
countertops, stainless steel appliances, and high-quality cabinets. Building amenities include community
rooms, rooftop patios, fitness centers, and on-site management team and underground parking.
Setbacks
The proposed plan identifies a building setback of 15’ on all four sides. At its closest point, the north
building is located approximately 22’ from the property line along Northway Drive, and 15’ from the
property line on Xerxes Avenue. The south building is located approximately 26’ from the Bass Lake
Road right-of-way.
Architectural Materials
The City’ s Architectural Design Guidelines require at least 50-percent of each elevation (face) of the
building be constructed of Class I materials, with the remainder constructed of Class II materials. Each of
the buildings are designed with brick, prefinished metal siding and lap siding, which conforms to the
Design Guidelines.
Access and Parking
The Subject Property is bounded by Xerxes Avenue on the east, Northway Drive on the north and west,
and Bass Lake Road on the south. Driveway access to the property is proposed from Xerxes Avenue on
the west and Northway Drive on the east. The driveways provide access to both the underground garage
and surface parking. The driveways and parking aisles meet the minimum 24’ width.
There are a total of 270 dwelling units in the two buildings. Section 35-704 of the Zoning Ordinance
requires two parking spaces per dwelling unit, indicating the developer would ordinarily need to supply
540 parking spaces to satisfy the Zoning Ordinance. According to the site and floor plans submitted, a
total of 340 parking spots, or 1.26 spaces per unit, are proposed.
A 2018 survey of available parking spaces at other multi-family rental properties by staff revealed few
properties in the City meet the current requirement of two parking spaces per dwelling unit. The lack of
App. No. 2019-006
PC 05/16/2019
Page 6
parking citations issued by the police at apartment complexes with fewer than two parking spaces per
unit the City comparable to this proposed development seems to indicate theses complexes are not
burdened by a lack of parking.
It is anticipated that residents will utilize the nearby transit center, with access to several high frequency
lines as well as the new BRT C-Line, which opens on June 8, 2019. Sidewalks are located along Xerxes
Avenue and Bass Lake Road, providing access to the transit station and to the retail area south of Bass
Lake Road. The front entrance of the senior building, located on the north half of the site, is located on
the south side of the building facing the parking lot. It is easily accessible to the adjacent sidewalks.
The front entrance to the south building also faces the parking lot, on the north side of the building. It
would be beneficial to provide another entrance along the south side of the building, with a pedestrian
access to the existing sidewalk on Bass Lake Road.
Lighting
The Zoning Code requires, “all exterior lighting shall be provided with lenses, reflectors, or shades, so as
to concentrate illumination of the property of the owner or operator of said illumination devices.” The
submitted photometric plan notes lighting that will be downcast and identifies a total of 24 new fixture
locations on the Subject Property. This includes the installation of 13, downcast, wall mounted or
recessed lights, 3 bollard lights, and 8, 20’ light poles.
Per the City Zoning Code, lighting shall not exceed three (3) foot candles measured at property lines
abutting residentially zoned property, or 10 foot candles measured at the property lines abutting the
street right-of-way or non-residentially zoned properties. As is specified, no glare shall emanate from or
be visible beyond the boundaries of the illuminated premises. The photometric plan indicates the
fixtures are consistent with the Zoning Code requirements.
Trash
Trash facilities will be located in the garage. Containers will be brought up to the drive on pick-up day
and returned to the garage soon after pick-up.
Screening
All ground mounted equipment (e.g., transformers, mechanical) shall be effectively screened from
adjacent public rights-of-way and properties by a solid wall or fence constructed of wood, masonry, or
other durable materials that are complementary to the materials used on the primary building. Per
Chapter 12 (Building Maintenance and Occupancy) of the City Code, roof-mounted equipment shall also
be screened from view through use of parapets, wall/ fencing materials, or paint to match surrounding
colors when visible from the public right-of-way.
Per Section 35-711 (Parking Lot Screening), “All open off-street parking areas having more than six
spaces and all off-street loading and unloading spaces shall be effectively screened from any abutting
residential lots by a solid wall or opaque fence six feet high, or by such other device as may be approved
by the City Council.” The proposed off-street parking is not adjacent to any residential lots.
Landscaping
The project submittal includes a landscape plan and planting schedule, Although City Code does not
have any specific requirements on the species of landscaping, and the City has operated under and held
new and redeveloped areas to complying with the City’s adopted Landscape Point System policy, which
App. No. 2019-006
PC 05/16/2019
Page 7
assigns points to a given site based on the acreage of a development.
The point system requires multi-family residential sites to provide a specific amount or number of
landscaping units, and is based on the maximum percentage of certain materials (i.e., 50% shade trees;
40% coniferous trees; 35% decorative trees; and 25% shrubs). Given a “Multi-Family Residential” use
and assuming an approximately 4.79 acre parcel for the proposed development, the property would
have to accrue 390 points. (2 acres * 90 + 2.79 acres * 75 = 389.25 points).
Planting Type Minimum Size Points Per Planting Maximum Points
(%)
Points Accrued
Shade (Deciduous)
Trees
2 ½” diameter 10 50% or 195 points 190
(19 trees * 10 points)
Coniferous (Evergreen)
Trees
5’ height 6 40% or 156 points 126
(21 trees * 6 points)
Decorative
(Ornamental) Trees
1” diameter 1.5 35% or 136.5 points 25.5
(17 trees * 1.5 points)
Shrubs 12” diameter 0.5 25% or 97.5 points
49
(98 shrubs * .5 points)
Total 390.5 points
Based on a review of the Landscape Plan, dated April 16. 2019, the plan meets and exceeds the
minimum requirements under the Landscape Point System Policy at 390.5 points achieved.
The City has engaged a consultant to develop a beautification and public art master plan. One of the
outcomes of this work will be recommendations on the role of private development in contributing to
public art. In collaboration with that process, and in consideration of flexibility in setbacks and reduced
parking, the City’s public art consultant reviewed the proposal and suggests a portion of the landscaping
budget go towards creative placemaking that would enhance the pedestrian connection to transit. This
could be done through public art or other methods that would enhance safety and walkability.
Engineering Review:
Andrew Hogg, Assistant City Engineer, reviewed plans and provided a comment memo, dated May 10,
2019 (Exhibit D). Most of the comments pertain to the need for plan corrections and additional details.
The major comments require the need for sidewalk easements. These state,
• Provide a corner clip dedication of ROW at the intersection with Xerxes to preserve adequate
sight distance for approaching vehicles at this intersection.
• Provide dedication of sidewalk easement along bass Lake Road 3’ from existing sidewalk edge.
All engineering comments must be addressed prior to the issuance of any permits for land disturbing
activity.
Fire Inspection/Building Review:
The plans are currently under review. Fire Inspection and Building review comments will be provided to
the Planning Commission separately.
Police Review:
The Applicant met with the Police Chief and the Crime Prevention Officer on May 10, 2019. The Police
stressed the need for safety equipment within the building, including access control on entry doors, on-
App. No. 2019-006
PC 05/16/2019
Page 8
site cameras, and on-site security. According to the Police Chief, the presence of on-site security when
the buildings first open sets the stage and expectations for the site. It may not be necessary to maintain
this presence at all times.
The Police Department also recommended the outdoor gathering spaces be located along Northway
Drive, or on the west side of the site, rather than along Xerxes Avenue, the busier street.
The Police Department also encouraged a perimeter barrier. This barrier could include wrought iron
fencing or hostile landscaping (rose bushes or other thorny bushes).
SIGNS
There are no signs identified on the proposed plans. Any signage must comply with the Sign Code
requirements for multiple family dwellings and cluster developments as outlined in Chapter 34 of the
City Code. The Applicant will need to apply for and receive issuance of a sign permit to install any new
signage.
Based on staff findings, staff recommends Planning Commission recommendation of the amendment
to the Zoning Map removing the Subject Property from the Central Commerce Overlay District and
approval of the anticipated site improvements for the Subject Property located at 5801 Xerxes Avenue
North, subject to the Applicant complying with the Approval Conditions as noted below.
APPROVAL CONDITIONS
Staff recommends the following conditions be attached to any positive recommendation on the
approval of Planning Commission Application No. 2019-006 for the Subject Property located at 5801
Xerxes Avenue N:
1. PUD / Site Improvement Review:
All requested alterations will need to be approved by City staff with respect to applicable codes
prior to the issuance of permits, and fire related building code items shall be reviewed and
approved by the Fire Chief.
a. Any significant changes or modifications made to this request can only be made by an
amendment to the approved Planned Unit Development plans and documents as
approved by the City Council.
i. The site plan shall be revised to includes a main entry, or a more prominent
entry on the south side of the south building. A sidewalk connection shall be
provided to the sidewalk along Bass Lake Road.
ii. The Applicant shall identify safety features ….
b. The Applicant must revise the site and building plans to include a resident exit/entrance
along the south side of the south building and a pedestrian access to the sidewalk along
Bass Lake Road.
c. The Applicant must submit separate applications for any sign permits to the City for
review and permits.
2. Agreements:
a. The Applicant must enter into a PUD agreement with the City of Brooklyn Center. This
agreement is to be reviewed and approved by the City Attorney prior to the issuance of
building permits. The agreement shall further assure compliance with the development
plans submitted with this application.
b. A Performance Agreement with supporting financial guarantee approved by the City
App. No. 2019-006
PC 05/16/2019
Page 9
shall be executed upon any approval of the to-be submitted building permit for site
improvements, which ensures the Subject Property will be constructed, developed, and
maintained in conformance with the plans, specifications, and standards.
c. The Developer shall submit an as-built survey of the property, improvements, and utility
service lines prior to release of any Performance Agreement financial guarantee.
3. Engineering Review: The Applicant agrees to comply with all conditions or provisions noted in
the City Engineer’ s Review memorandums, dated May 10, 2019(Exhibit D).
a. Final grading, drainage, utility, and erosion control plans and any other site engineering
related issues are subject to review and approval by the City Engineer for City site and
building plan approval and prior to the issuance of permits.
b. Provide a corner clip dedication of ROW at the intersection with Xerxes to preserve
adequate sight distance for approaching vehicles at this intersection.
c. Provide dedication of sidewalk easement along bass Lake Road 3’ from existing sidewalk
edge.
d. Utility Facilities Easement Agreement is required.
4. Fire Inspector/ Building Official Review: The Applicant shall work to ensure all applicable 2015
Minnesota Fire Code requirements have been met as part of any site plan approval.
5. The building plans are subject to review and approval by the Building Official with respect to
applicable codes prior to the issuance of permits.
6. Final grading, drainage, utility and erosion control plans and any other site engineering elated
issues are subject to review and approval by the City Engineer prior to the issuance of permits.
7. Landscaping: All landscaped areas shall include approved irrigation systems to facilitate site
maintenance.
a. The contractor shall submit irrigation shop drawings for review and approval prior to
installation.
b. The Applicant shall work with the City’s public art consultant, or similar, to provide a
plan for creative placemaking to enhance the pedestrian access to transit.
8. Lighting: The Applicant shall provide a lighting plan that identifies all existing and proposed
lighting for the parking lots and building. The lighting plan shall include a site wide photometric
plan that is in conformance with the lighting provisions as noted under the City Zoning
Ordinance and in consideration of the City’ s Architectural Design Guidelines. Fixture
specifications shall be provided prior to issuance of any building permits.
9. Signage: The Applicant shall submit a Sign Permit Application for any proposed signage (e.g.,
wall, freestanding).
a. All signage is subject to Chapter 34 of the City Code of Ordinances and shall be approved
under separate sign permits.
RECOMMENDATION
Based on the above-noted findings, staff recommends the following motion:
Motion to approve a Resolution recommending that the City Council approve the amendment to the
Zoning Ordinance and Zoning Map removing the property at 5801 Xerxes Avenue North from the Central
Commerce Overlay District, and approval of the Planned Unit Development plans and documents and
approval of the anticipated site improvements for the Subject Property located at 5801 Xerxes Avenue
North, based on the submitted plans and findings of fact, as amended by the Conditions of Approval in the
May 16, 2019, Planning Commission Report.
App. No. 2019-006
PC 05/16/2019
Page 10
Attachments
Exhibit A - City Submittal for 5801 Xerxes Avenue North by Real Estate Equities, LLC, dated April 16,
2019
Exhibit B- Public Hearing Notice for, published by Brooklyn Center Sun Post, dated May 2, 2019.
Exhibit C- Select City Council Work Session Minutes, dated January 28, 2019.
Exhibit D- Review Memorandum, prepared by Assistant City Engineer Andrew Hogg, dated May 10,
2019.
Exhibit E – Public Comments received.
Brooklyn Center Council Presentation
Rent Structure:
Unit Type Set Aside SF Gross Rent Utility Allowance Net Rent
Senior
1 Bed/1 Bath 60% 713 $1,125 $78 $1,047
2 Bed/2 Bath 60% 1,200 $1,350 $95 $1,255
Workforce
1 Bed/1 Bath 60% 712 $1,125 $78 $1,047
2 Bed/2 Bath 60% 1,021 $1,350 $95 $1,255
3 Bed/2 Bath 60% 1,326 $1,560 $113 $1,447
• Residents can also pay $75 for parking stalls as well as an additional $15 for storage.
Project Summary:
• Continued communication with staff to identify overall project timelines.
• Updated project design/renderings.
• Braun Intertec completed Phase I, Phase II, and Geo Reports.
• Discussing terms with lenders and investors and ready to execute with them once we get approval on TIF
to move forward with term sheets.
• Traffic Study completed; shows no traffic or parking issues with development.
Project Highlights/Amenities:
Unit Finishes/Amenities: In Unit washer/dryer, solid surface countertops, 9 ft ceilings, full stainless-steel
appliance package, and high-quality cabinetry.
Building Amenities: Full on-site management team, secure entrance with Luxor package storage system,
community room, rooftop patios, fitness centers, office/conference room, underground parking. As well as a
resident community herb garden with gaszebo, dog run, tot lot, and shared outdoor grilling area.
Sustainable Aspects/Exterior Materials: Masonry, Concrete Fibor Board, Wood Look CFB, Metal Panel Accents. As
well as, solar panels implemented on roof of building, Energy Star Windows, low-flow fixtures/LED lighting, and
High Efficiency HVAC.
Safety/Security Provisions: REE plans to propose secure entrance/exits with controlled key FOB access. As well as,
numerous security cameras, a highly visible/well lit parking area, and a full on -site management team.
Project Demand:
• Marquette Advisors Report projects 3,078 additional affordable housing units needed by 2020 in
Minneapolis/St. Paul first ring suburb submarket.
• Vacancy rate in Brooklyn Center is 2.2%.
• Market research indicates that Brooklyn Center and surrounding Hennepin and Anoka areas have notable
production shortfalls of affordable senior/workforce housing units.
Parking Data:
• REE West Saint Paul Senior Property (The Winslow)
o Price: $65.00
• Senior Affordable Property (The Legends at Silver Lake)
o Price: $80.00
• Senior Affordable Property (The Legends of Columbia Heights)
o Price: $75.00
Project Investment:
• TIF Request $4,601,450
• First Mortgage $34,442,331
• Tax Credit Equity $20,863,865
• Developer Equity (Deferred Developer Fee) $5,579,785
• Total Development Cost $60,885,982
kw kaas
wilson
architects
REE Brooklyn Center - Xerxes Workforce and Senior Housing
Xerxes Ave N & Bass Lake Rd, Brooklyn Center, MN May 13, 2019
Parking Counts
Seniors garage parking = 87 stalls
Seniors surface parking = 43 stalls
Total Seniors parking = 130 stalls
Workforce garage parking = 111 stalls
Workforcee surface parking = 99 stalls
Total Workfoce parking = 210 stalls
Total garage parking = 198 stalls
Total surface parking = 142 stalls
Total parking count total = 340 stalls
kw kaas
wilson
architects
REE Brooklyn Center - Xerxes Workforce and Senior Housing
Xerxes Ave N & Bass Lake Rd, Brooklyn Center, MN April 16, 2019
Workforce Housing - View from Bass Lake Road & Xerxes Avenue N.
kw kaas
wilson
architects
REE Brooklyn Center - Xerxes Workforce and Senior Housing
Xerxes Ave N & Bass Lake Rd, Brooklyn Center, MN April 16, 2019
Senior Housing - View from Southeast
N
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
S
U
R
V
E
Y
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
S
1
8
6
5
0
-
A
L
T
A
Pl
o
t
t
e
d
:
02
/
1
3
/
2
0
1
9
6
:
3
6
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
5801 Xerxes
Avenue No.
Real Estate Equities
579 Selby Avenue
St. Paul, MN 55102
Brooklyn Center, MN
ALTA/NSPS
Land Title
Survey
1 of 1
DESCRIPTION OF PROPERTY SURVEYED
(Per Schedule A of the herein referenced Title Commitment)
Tract B, REGISTERED LAND SURVEY NO. 1262, Hennepin County, Minnesota.
Being Registered land as evidenced by Certificate of Title No. 1432398
TITLE COMMITMENT EXCEPTIONS
(Per Schedule B, Part II of the herein referenced Title Commitment)
The property depicted on this survey and the easements of record shown hereon are the same as the property and the
easements described in the Commitment for Title Insurance issued by Guaranty Commercial Title, Inc., File No. 64592,
effective date November 4, 2018. The numbers below correspond to those in the title commitment.
1 - 5 and 10 - 14 do not require comment.
6.Easement for highway purposes acquired by Village of Brooklyn Center over subject property, together with the right
to construct and maintain temporary snow fences on lands adjacent thereto, as evidenced by Highway Easement,
recorded as Document No. 720391.
Easement rights to erect portable snow fences were released by Document No. 942638.
Shown hereon.
7.Limited right of access exists from premises to County Road No. 10. Partial right of access was acquired by The County
of Hennepin as evidenced by Document No. 855383.
Shown hereon.
8.Roadway easement(s) over subject property in favor of City of Brooklyn Center, as created in Document No. 925610.
Shown hereon.
9.Water main easement(s) over subject property in favor of City of Brooklyn Center, as created in Document No. 926027.
Shown hereon.
ALTA/NSPS OPTIONAL TABLE A NOTES
(The following items refer to Table A optional survey responsibilities and specifications)
1.Monuments placed (or a reference monument or witness to the corner) at all major corners of the boundary of the
property, unless already marked or referenced by existing monuments or witnesses to the corner are shown hereon.
2.The address, if disclosed in documents provided to or obtained by the surveyor, or observed while conducting the
fieldwork is 5801 Xerxes Avenue North, Brooklyn Park, Minnesota 55430.
3.This property is contained in Zone X (area of minimal flooding) per Flood Insurance Rate Map No. 27053C0212F,
Community Panel No. 270151-012-F, effective date of November 4, 2016.
4.The Gross land area is 265,066 +/- square feet or 5.87 +/- acres.
6.(a) Any current zoning classification, setback requirements, height and floor space area restrictions, and parking
requirements, shown hereon, are per a report or letter provided to the surveyor by City of Brooklyn Center dated
January 24, 2019, for the subject property are as follows:
Zone C2 (Commerce District) and (Central Commerce Overlay District);
Setbacks: Front 35 feet, Corner 20 feet, Interior 10 Feet; Rear 40 feet;
Height: No restrictions;
7.(a) There are no observable buildings on this site.
8.Substantial features observed in the process of conducting fieldwork, are shown hereon.
9.There are no striped parking stalls on this site.
10.(a) There are no observable buildings on this site.
11.We have shown underground utilities on and/or serving the surveyed property per Gopher State One-Call Ticket Nos.
183400005 and 183400007. The following utilities and municipalities were notified:
ARVIG (218)346-5500 CITY OF BROOKLYN CENTER WATER (763)585-7100
BROOKLYN CENTER SANITARY (763)585-7100 BROOKLYN CENTER STORM (763)585-7100
BROOKLYN CENTER TRAFFIC SIGNAL (763)585-7100 BROOKLYN CENTER PARK ELECTRIC (763)585-7100
BROOKLYN CENTER STREET LIGHTS (763)585-7100 BROOKLYN CENTER IRRIGATION (763)585-7100
COMCAST (800)778-9140 CENTURYLINK - CTLQL (855)742-6062
HENNEPIN COUNTY PUBLIC WORKS (406)541-9571 MCI (800)624-9675
MASTEC NORTH AMERICA, INC.(800)778-9140 CENTER POINT ENERGY (800)778-9140
XCEL ENERGY (800)848-7558 ZAYO BANDWIDTH (888)267-1063
i. Utility operators do not consistently respond to locate requests through the Gopher State One Call service for
surveying purposes such as this. Those utility operators that do respond, often will not locate utilities from their
main line to the customer's structure or facility. They consider those utilities “private” installations that are outside
their jurisdiction. These “private” utilities on the surveyed property or adjoining properties, may not be located
since most operators will not mark such "private" utilities. A private utility locator may be contacted to investigate
these utilities further, if requested by the client.
ii. Maps provided by those notified above, either along with a field location or in lieu of such a location, are very often
inaccurate or inconclusive. EXTREME CAUTION MUST BE EXERCISED BEFORE AN EXCAVATION TAKES PLACE
ON OR NEAR THIS SITE. BEFORE DIGGING, YOU ARE REQUIRED BY LAW TO NOTIFY GOPHER STATE ONE
CALL AT LEAST 48 HOURS IN ADVANCE AT 811 or (651) 454-0002.
13.The names of the adjoining owners, as shown hereon, are based on information obtained from current tax records.
16.We are not aware of any evidence of recent earth moving work, building construction or building additions observed in
the process of conducting our field work.
17.We are not aware of any proposed changes in street right of way lines or evidence of recent street or sidewalk
construction or repairs observed in the process of conducting our field work.
18.We have not been provided with any information on wetland delineation markers, as determined by a qualified
specialist.
19.We are not aware of any plottable offsite (i.e., appurtenant) easements or servitudes for this site.
SURVEY REPORT
1.The Surveyor was not provided utility easement documents for the subject property except for those shown on the
Survey.
2.Snow and ice conditions during winter months may obscure otherwise visible evidence of on site improvements and/or
utilities.
3.The bearings for this survey are based on the REGISTERED LAND SURVEY NO. 1262.
4.Trees shown hereon are measured in inches at breast height.
CERTIFICATION
To Real Estate Equities, LLC, a Minnesota limited liability company; ILEX Group, Inc., a Minnesota corporation; Guaranty
Commercial Title, Inc. and Old Republic National Title Insurance Company:
This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2016 Minimum
Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and
includes Items 1 - 4, 6(a), 7(a), 8, 9, 10(a), 11, 13, 16, 17, 18, 19 and 20 of Table A thereof. The field work was completed on
December 19, 2018.
Date of Plat or Map: February 13, 2019
______________________________________________
Henry D. Nelson, PLS Minnesota License No. 17255
hnelson@loucksinc.com
SCALE IN FEET
0 30
01/04/19 SURVEY ISSUED
02/13/19 ZONING LETTER
SPOT ELEVATION
SIGN
LIGHT POLE
WATER MANHOLE / WELL
CATCH BASIN
CONTOUR
CONCRETE CURB
STORM SEWER
SANITARY SEWER
WATERMAIN
CONCRETE
ELECTRIC TRANSFORMER
ELECTRIC MANHOLE
TELEPHONE MANHOLE
HAND HOLE UG TELEPHONE (MARKED)
SANITARY SEWER SERVICE
WATER SERVICE
TRAFFIC SIGNAL
OAK
CONIFEROUS TREE
DECIDUOUS TREE
MISC FRUIT
CLEANOUT
CURB STOP
TOP OF CURB
SET 1/2 INCH X 14 INCH IRON
MONUMENT, MARKED "LS 17255"
FOUND OPEN IRON MONUMENT
SET NAIL
FOUND CAST IRON MONUMENT
RESTRICTED ACCESS
VAULT
PAVERS
FOUND PK NAIL
IRON FENCE
12 SCHEDULE B II ITEM
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
UNLESS SHOWN OTHERWISE
MAPLE
TREE
BITUMINOUS2 X 2 CONCRETE BASE
9
7
6
8
8
SURVEY LEGEND
Henry D. Nelson - PLS
License No.
Date
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Land Surveyor under the laws of
the State of
Field Crew
Project Lead
Drawn By
Checked By
Loucks Project No.
SHEET INDEX
Minnesota.
17255
18-650
HDN
SFM
HDN
TRAVIS
01/04/19
SITE
UG FIBER OPTIC (MAPPED)
UG GAS (MAPPED)
UG ELECTRIC (MAPPED)
UG TELEPHONE (MAPPED)
BM#1
In Brooklyn Center, at northeast corner of northbound lane
Bridge No. 27040 over Shingle Creek, 1.35 miles southeast
along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of
northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east
of Xerxes Avenue N., as shown hereon.
ELEVATION = 857.74 FT (NAVD'88)
BUILDING SET-BACK LINE
REMOVE CONCRETE
APRON
REMOVE CURB
REMOVE CURB
REMOVE/SALVAGE
PAVERS (SEE SITE PLAN
FOR PROPOSED LOCATIONS)
REMOVE SECTION
OF SIDEWALK
REMOVE CATCH BASIN
AND SECTION OF 12" RCP
REMOVE EXISTING
BITUMINOUS PAVEMENT
AND BASE MATERIAL
REMOVE RAISED CONCRETE
PARKING ISLANDS (TYP.)
REMOVE CONCRETE
DRIVE AND ADJACENT
CURBING
REMOVE 12" RCP
STORM PIPE
REMOVE CATCH
BASIN
REMOVE 12" RCP
STORM PIPE
REMOVE CATCH
BASIN
REMOVE 15" RCP
STORM PIPE
REMOVE CONCRETE
DRIVE AND ADJACENT
CURBING
REMOVE CURB/GUTTER
AND BASE MATERIAL
REMOVE
CATCH
BASIN
REMOVE 15" RCP
STORM PIPE
REMOVE
CONCRETE LIGHT
BASES WITHIN
PARKING LOT
TYP.
REMOVE SIGN
REMOVE CONCRETE
SIDEWALK AND BASE
MATERIAL
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
1
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
5
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
DEMOLITION
PLAN
C1-1
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
PROJECT BENCHMARK
REMOVE EXISTING CURB & GUTTER,
RETAINING WALLS, FENCE, ETC.
REMOVE EXISTING CONCRETE PAVING,
SIDEWALKS, ETC.
REMOVE EXISTING BITUMINOUS PAVING
DEMOLITION LEGEND:
1.CONTRACTOR SHALL REMOVE AND/OR RELOCATE EXISTING PRIVATE UTILITIES AS
NECESSARY. CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY COMPANIES.
2.CONTRACTOR SHALL PROTECT SURFACE AND SUBSURFACE FEATURES NOT NOTED FOR
REMOVAL.
3.CONTRACTOR TO CLEAR AND GRUB EXISTING VEGETATION WITHIN CONSTRUCTION
LIMITS, STRIP TOP SOIL, AND STOCKPILE ON-SITE. REFER TO GRADING PLAN AND
EROSION CONTROL PLAN FOR SEDIMENT AND EROSION CONTROL REQUIREMENTS.
4.CLEAR AND GRUB AND REMOVE ALL TREES, VEGETATION AND SITE DEBRIS PRIOR TO
GRADING. ALL REMOVED MATERIAL SHALL BE HAULED FROM THE SITE DAILY. ALL
CLEARING AND GRUBBING AND REMOVALS SHALL BE PERFORMED PER THE CONTRACT
SPECIFICATIONS. EROSION CONTROL MEASURES SHALL BE IMMEDIATELY ESTABLISHED
UPON REMOVAL. SEE THE EROSION CONTROL PLAN.
5.CONTRACTOR SHALL REMOVE ALL SITE SURFACE FEATURES WITHIN REMOVAL LIMITS
UNLESS OTHERWISE NOTED.
SITE DEMOLITION NOTES
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
8.7'18.0'
8.0'
9.0'
24.0'
24.0'24.0'
24.0'
39.0'
18.0'
18.0'
18.0'
18.0'
18.0'
18.0'
24.0'
GA
R
A
G
E
EN
T
R
Y
GA
R
A
G
E
EN
T
R
Y
FR
O
N
T
EN
T
R
Y
FR
O
N
T
EN
T
R
Y
TOT
LOT DOG
RUN
CONCRETE
APRON
CONCRETE
APRON
H.C.
SIGNAGE
TYP.
5' WIDE
CONCRETE
WALK TYP.
CONCRETE
STEPS W/
RAILING
PERGOLA
(SEE ARCH PLANS)
SEE ARCH PLANS
FOR ALL
STOOP INFO
CURB &
GUTTER
TO MATCH
EXISTING
CURB & GUTTER
TO MATCH EXISTING
24.0'
PROPOSE CONCRETE
BLOCK WALL W/
PROTECTIVE FENCE
15.0'
15.0'
15.0'
15.0'
26.1'
28.0'
27.6'
22.2'
27.1'
43.6'
29.0'
41.0'
15.0'
H.C.
SIGNAGE
TYP.
19
21
219
15
6
8
3 6
8
96
11
10'R
10'R
10'R
10'R
10'R
10'R 12'R
32'R
10'R
5'R
3'R
3'R 3'R
3'R3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
7'R
7'R
7'R
7'R
7'R
10'R
10'R
10'R
10'R
PED.
RAMP
PED.
RAMP
PED.
RAMP
3' CURB TAPER
TO FLUSH
3' CURB TAPER
TO FLUSH
PED.
RAMP
3'R
3'R
3' CURB TAPER
TO FLUSH
PED.
RAMP
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
2
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
5
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
SITE PLAN
C2-1
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
PROJECT BENCHMARK
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
3
7
3
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
3
DIRECTION OF FLOW 1.0%
972.5
1.ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH THE
DETAILS SHOWN PER THE DETAIL SHEET(S) AND STATE/LOCAL JURISDICTION REQUIREMENTS.
2.ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE PROVIDED PER CURRENT ADA STANDARDS AND LOCAL/STATE
REQUIREMENTS.
3.ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED.
4.ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL UNLESS OTHERWISE NOTED.
CURRENT ZONING:C2 (COMMERCE) DISTRICT
PROPOSED ZONING:PLANNED UNIT DEVELOPMENT
PROPERTY AREA:208,896 SF (4.796 AC)
EXISTING IMPERVIOUS AREA:183,462 SF (4.212 AC) (87.8%)
PROPOSED IMPERVIOUS AREA:135,156 SF (3.103 AC) (64.7%)
TOTAL ABOVE GROUND PARKING: 142 STALLS PROVIDED
TOTAL UNDERGROUND PARKING: SEE ARCHITECTURAL PLANS
1.MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR TO COMMENCING ANY GRADING,
EXCAVATION OR UNDERGROUND WORK.
2.THE CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND TOPOGRAPHIC FEATURES
PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY
DISCREPANCIES OR VARIATIONS FROM THE PLANS.
3.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES
DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO
ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT.
4.THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL DEVICES SUCH AS
BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC WHERE
NECESSARY. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER PRIOR TO PLACEMENT. TRAFFIC CONTROL
DEVICES SHALL CONFORM TO THE APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION STANDARDS.
5.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND
COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING
THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS.
6.ALL CONSTRUCTION PERMITS, APPLICATIONS AND FEES ARE THE RESPONSIBILITY OF THE CONTRACTOR.
7.ALL ENTRANCES AND CONNECTIONS TO CITY STREETS SHALL BE CONSTRUCTED PER THE REQUIREMENTS OF THE STATE AND
LOCAL JURISDICTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND NOTIFICATIONS AS REQUIRED.
8.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY. ALL TRAFFIC CONTROL SHALL
BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS OF THE MINNESOTA MANUAL OF
UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE CITY. THIS SHALL INCLUDE ALL SIGNAGE, BARRICADES, FLASHERS
AND FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES.
DENOTES CONCRETE PAVEMENT
DENOTES HEAVY DUTY BITUMINOUS PAVEMENT
DENOTES LIGHT DUTY BITUMINOUS PAVEMENT
SITE NOTES
SITE DATA
GENERAL NOTES
PAVEMENT LEGEND
1.THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING AN APARTMENT BUILDING, SURFACE
PAVEMENTS, AND UTILITIES.
2.THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS:
1.INSTALL VEHICLE TRACKING BMP
2.INSTALL PERIMETER EROSION CONTROL AROUND SITE
3.CLEAR AND GRUB SITE
4.STRIP AND STOCKPILE TOPSOIL
5.REMOVE PAVEMENTS AND UTILITIES
6.CONSTRUCT STORMWATER MANAGEMENT FACILITY/FACILITIES
7.ROUGH GRADE SITE
8.IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE
9.INSTALL UTILITIES
10.INSTALL BUILDING FOUNDATIONS
11.INSTALL CURB AND GUTTER
12.INSTALL PAVEMENTS AND WALKS
13.INSTALL MINOR UTILITIES
14.FINAL GRADE SITE
15.REMOVE ACCUMULATED SEDIMENT FROM STORMWATER SYSTEMS
16.SEED AND MULCH
17.WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT FENCE AND
RESEED ANY AREAS DISTURBED BY THE REMOVAL.
3.SITE DATA:
AREA OF DISTURBANCE:5.0 AC
PRE-CONSTRUCTION IMPERVIOUS AREA:4.2 AC
POST-CONSTRUCTION IMPERVIOUS AREA:3.1AC
GENERAL SOIL TYPE:SEE GEOTECHNICAL EVALUATION REPORT
4.THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT
FENCE, ETC. BEFORE CONSTRUCTION BEGINS.
5.ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) SHALL BE STABILIZED BY SEEDING OR SODDING
(ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR OTHER EQUIVALENT
CONTROL MEASURE.
6.ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE LENGTHS
CAN NOT BE GREATER THAN 75 FEET.
7.ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE ARE
STABILIZED. INLET PROTECTION WITH IN RIGHT OF WAY TO BE CONSISTANTLY MONITORED TO MAKE SURE
INLET PROTECTION IS IN GOOD WORKING ORDER AND EMERGENCY OVERFLOWS ARE NOT BLOCKED BY
DEBRIS.
8.TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN
SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT
SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEPMT EX: CLEAN AGGREGATE
STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES.
9.SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF NOT
POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMP'S.
10.SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
11.EXTERNAL WASHING OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED AREA OF THE SITE.
RUNOFF MUST BE PROPERLY CONTAINED.
12.NO ENGINE DEGREASING IS ALLOWED ON SITE.
13.THE OWNER WHO SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE AND IS RESPONSIBLE FOR
COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE OPERATOR (CONTRACTOR) WHO
SIGNS THE NPDES PERMIT APPLICATION IS A PERMITTEE FOR PARTS II.B., PART II.C, PART II.B-F, PART V, PART
IV AND APPLICABLE CONSTRUCTION ACTIVITY REQUIREMENTS FOUND IN APPENDIX A, PART C. OF THE
NPDES PERMIT AND IS JOINTLY RESPONSIBLE WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS
OF THE PERMIT.
14.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE OF
TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER ONE OR
MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET:
A.FINAL STABILIZATION, PER NPDES PERMIT PART IV.G. HAS BEEN ACHIEVED ON ALL PORTIONS OF THE
SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE.
B.TRANSFER OF OWNERSHIP AS DESCRIBED IN THE PERMIT.
15. INSPECTIONS
A.INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS REQUIRED.
B.EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24
HOUR RAIN EVENT.
C.STABILIZED AREAS: ONCE EVERY 30 DAYS
D.FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING
CONSTRUCTION.
E.INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE
NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S)
CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE
ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR
PERIOD.
16. MINIMUM MAINTENANCE
A.SILT FENCE TO BE REPAIRED, REPLACED, SUPPLEMENTED WHEN NONFUNCTIONAL, OR 1/3 FULL;
WITHIN 24 HOURS
B.SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME.
REMOVAL MUST BE COMPLETE WITHIN 72 HOURS OF DISCOVERY.
C.SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN DAYS
D.CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITH 24 HOURS.
E.PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS GREATER
THAN 12" IN 24 HOURS
F.STREETS TO BE SWEPT AS NECESSARY TO LIMIT DEBRIS FROM REACHING STORM INLETS WITH IN
RIGHT OF WAY.
G.CONTRACTOR SHALL BE RESPONSIBLE TO INSPECT AND MAINTAIN INLET PROTECTION PLACED
WITHIN THE PUBLIC RIGHT OF WAY UNTIL FINAL STABILIZATION IS ACHIEVED. CONTRACTOR SHALL
CONSISTENTLY MAKE SURE INLET PROTECTION IS IN GOOD WORKING ORDER AND EMERGENCY
OVERFLOWS ARE NOT BLOCKED OF DEBRIS.
17.THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE
KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL
CONTROL OF THE SITE AS SITE CONDITIONS REQUIRE, OR AT THE DIRECTION OF THE CITY.
18.OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL INSPECTIONS
AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND REQUIRED
CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS. THESE
RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION.
19.SWPPP MUST BE AMENDED WHEN:
A.THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL CONDITIONS
THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE
B.INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING WATER
QUALITY STANDARDS.
C.THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT
CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT.
19.CONCRETE WASHOUT AREA
A.CONTRACTOR TO PROVIDE PREFABRICATED CONCRETE WASH-OUT CONTAINER WITH RAIN
PROTECTION PER PLAN.
B.CONCRETE WASH-OUT TO BE IDENTIFIED WITH SIGNAGE STATING "CONCRETE WASHOUT AREA DO
NOT OVERFILL".
C.CONCRETE WASHOUT WATER NEEDS TO BE PUMPED WITHIN 24 HOURS OF STANDING WATER IN
WASHOUT AREA.
20.IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE
CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER.
21.PIPE OULTETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
HOURS AFTER CONNECTION TO A SURFACE WATER.
22.FINAL STABILIZATION
FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACVTIVITIES HAVE BEEN COMPLETED AND THAT
DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF THE
EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL TEMPORARY
BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED FROM PERMANENT
CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO DESIGN CAPACITY.
23.RESPONSIBILITIES
A.THE OWNER MUST IDENTIFY A PERSON WHO WILL OVERSEE THE SWPPP IMPLEMENTATION AND THE
PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE:
CONTACT: __________________________________
COMPANY: __________________________________
PHONE: __________________________________
B.THE CITY REQUIRES THAT WSB & ASSOCIATES TO PREFORM NPDES INSPECTIONS DURING THE
CONSTRUCTION PHASE. THE COST OF THE INSPECTIONS WILL BE PAID FOR BY THE OWNER. THIS IS A
REQUIREMENT FOR RELEASE OF THE BUILDING PERMIT.
CONTACT:__________________________________
COMPANY: WSB & ASSOCIATES
PHONE: __________________________________
24.THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR AS-BUILT
DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS.
SWPPP NOTES
SITE VICINITY MAP
CONSTRUCTION STORMWATER SPECIAL WATERS SEARCH MAP
N
ESTIMATED QUANTITIES
DESCRIPTION UNIT
TEMPORARY ROCK CONSTRUCTION ENTRANCEEA
SILT FENCE LF
INLET PROTECTION EA
QUANTITY
1
1,720
18
EROSION CONTROL BLANKET SF -
SILT FENCE
PRE-ASSEMBLED OR MACHINE SLICED
FLOW
6"
6"
NOTES:
1.PLACE BOTTOM EDGE OF FENCE INTO 6 IN DEEP TRENCH
AND BACKFILL IMMEDIATELY.
2.POSTS SHALL BE:
·6 FT MAX. SPACING.
·2 IN X 2IN HARDWOOD, OR STANDARD STEEL T-TYPE
FENCE POSTS.
·5' MIN. LENGTH POSTS, DRIVEN 2 FT INTO THE
GROUND.
3.ATTACH FABRIC TO WOOD POST WITH A MIN. OF 5, 1
INCH LONG STAPLES.
4.ATTACH FABRIC TO STEEL POST WITH A MIN. OF 3 ZIP
TIES IN TOP 8 INCHES OF FABRIC.
GEOTEXTILE FABRIC
PER MNDOT 3886
GEOTEXTILE
FABRIC PER
MNDOT 3886
DRAWN 2/2016
LOUCKS PLATE NO.
3000LOUCKS
HARD SURFACE PUBLIC ROAD
2' MINIMUM
1" TO 2" WASHED ROCK
50
'
M
I
N
I
M
U
M
AS R
E
Q
U
I
R
E
D
4
:
1
4:1
6" MINIMUM
ROCK ENTRANCE TO
CONSTRUCTION SITE
NOTES:
1.ROCK SIZE SHOULD BE 1" TO 2" IN SIZE SUCH AS MN/DOT CA-1 OR
CA-2 COURSE AGGREGATE. (WASHED)
2.A GEOTEXTILE FABRIC MAY BE USED UNDER THE ROCK TO PREVENT
MIGRATION OF THE UNDERLYING SOIL INTO THE STONE.
DRAWN 2/2016
LOUCKS PLATE NO.
3004LOUCKS
INLET PROTECTION -
EXISTING STORM STRUCTURES
HIGH-FLOW
FABRIC
CURB
DEFLECTOR PLATE
OVERFLOW 1-CENTER
OF FILTER ASSEMBLY
OVERFLOW 2 - TOP
OF CURB BOX
POLYESTER
SLEEVE
MANHOLE
COVER ASSEMBLY
FILTER
ASSEMBLY
27"
27" SEDIMENT CONTROL BARRIER
2'X3' SEDIMENT CONTROL BARRIER
ROAD DRAIN HIGH-FLOW
INLET PROTECTION CURB
AND GUTTER MODEL
WIMCO ROAD DRAIN, OR APPROVED EQUAL
DRAWN 2/2016
LOUCKS PLATE NO.
3011LOUCKS
BIO-ROLLS LF -
N
APPROXIMATE
LOCATION OF
PROJECT SITE*
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
2
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
7
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
STORMWATER
POLLUTION
PREVENTION
PLAN
C3-3
8
8
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
4
4
4
4
4
4
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
CONNECT 6" DOMESTIC AND
6" FIRE SERVICE TO EXISTING
8" WATER MAIN PER CITY
STANDARDS WITH GATE
VALVES
6" FIREWATER SERVICE
(VERIFY LOCATION
& INV. W/
MECHANICAL)
6" DOMESTIC
WATER SERVICE
(VERIFY LOCATION
& INV. W/ MECHANICAL)
6" FIRE
WATER SERVICE AND GATE VALVE
(VERIFY LOCATION & INV. W/
MECHANICAL)
6" DOMESTIC WATER SERVICE
(VERIFY LOCATION & INV. W/
MECHANICAL)
CONNECT 6" DOMESTIC AND
6" FIRE SERVICE TO EXISTING
8" WATER MAIN PER CITY
STANDARDS WITH GATE
VALVES
6x6 TEE
6" DIP
6" DIP
FIRE HYDRANT
AND GATE VALE
8" SANITARY SERVICE
INV=842.38
(VERIFY LOCATION
& INVERT W/ MECHANICAL)
CONNECT INTO EXISTING
SANITARY WYE PER CITY
STANDARDS AT INV=841.30
SANITARY MAIN INV=841.00
FIELD VERIFY EXACT LOCATION
AND INVERT
54 LF - 8" PVC
@ 2.00%
8" SANITARY SERVICE
INV=842.85
(VERIFY LOCATION
& INVERT W/ MECHANICAL)
CONNECT INTO EXISTING
SANITARY WYE PER CITY
STANDARDS AT INV=842.75
SANITARY MAIN INV=842.45
FIELD VERIFY EXACT LOCATION
AND INVERT
51 LF - 8" PVC
@ 2.00%
CONNECT INTO EXISTING
SANITARY WYE PER CITY
STANDARDS AT INV=843.79
SANITARY MAIN INV=843.49
FIELD VERIFY EXACT LOCATION
AND INVERT
35 LF - 8" PVC
@ 2.00%
SAN MH 1
RIM=856.50
INV=844.49
8" SANITARY SERVICE
INV=845.15
(VERIFY LOCATION
& INVERT W/ MECHANICAL)
33 LF - 8" PVC
@ 2.00%
152 LF - 8" PVC
@ 0.60%
337 LF - 8" PVC
@ 0.60%
SAN MH 2
RIM=858.00
INV=845.40
SAN MH 3
RIM=856.10
INV=847.42
7 LF - 8" PVC
@ 0.60%
8" SANITARY SERVICE
INV=847.28 (VERIFY LOCATION
& INVERT W/ MECHANICAL)
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
4
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
7
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
SANITARY
SEWER AND
WATERMAIN
PLAN
C4-1
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
PROJECT BENCHMARK
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
3
7
3
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
3
DIRECTION OF FLOW 1.0%
972.5
1. ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND
INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS,THE MINNESOTA PLUMBING CODE,
THE LOCAL GOVERNING UNIT , AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY
ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), 2013 EDITION.
2.ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL. ALL
COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION AND
THE GEOTECHNICAL REPORT.
3.ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE REQUIREMENTS OF THE
STATE AND LOCAL JURISDICTIONS. THE CITY DEPARTMENT OF ENGINEERING AND BUILDING
INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE NOTIFIED AT LEAST 48
HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, OR WORK IMPACTING PUBLIC
UTILITIES.
4.ALL STORM SEWER , SANITARY SEWER AND WATER SERVICES SHALL TERMINATE 5' FROM THE
BUILDING FACE UNLESS OTHERWISE NOTED.
5.A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS
REQUIRED FOR ALL UTILITES UNLESS OTHERWISE NOTED.
6.ALL NEW WATERMAIN AND SERVICES MUST HAVE A MINIMUM OF 7.5 FEET OF COVER. EXTRA DEPTH
MAY BE REQUIRED TO MAINTAIN A MINIMUM 18" VERTICAL SEPARATION TO SANITARY OR STORM
SEWER LINES. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS WITH
SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF WATER AND
SANITARY SEWER LINES SHALL BE PROVIDED WHERE 7.5 FEET MINIMUM DEPTH CAN NOT BE
ATTAINED.
7.ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB OR EDGE OF PAVEMENT
UNLESS OTHERWISE NOTED.
8.PROPOSED PIPE MATERIALS:
WATERMAIN CL 52 DIP 6" TO 8" DIAMETER
SANITARY SEWER PVC SDR 35 & SCH 40 6" TO 8" DIAMETER
9. CONTRACTOR AND MANHOLE FABRICATOR SHALL SUMP (LOWER) ALL STORM SEWER CATCH BASIN
CASTINGS WITHIN PAVED AREAS 0.16 FEET OR 2-INCHES BELOW THE RIM ELEVATION DEPICTED ON
THE UTILITY PLAN.
10.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY.
ALL TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER
THE REQUIREMENTS OF THE MINNESOTA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
(MMUTCD) AND THE CITY. THIS SHALL INCLUDE ALL SIGNAGE, BARRICADES, FLASHERS AND
FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD
CLOSURES SHALL BE PERMITTED WITHOUT THE EXPRESSED AUTHORITY OF OF THE CITY.
11.CONNECTIONS TO EXISTING MANHOLES SHALL BE MADE BY CORE DRILLING THE MANHOLE AT THE
PROPOSED INVERT ELEVATIONS AND INSTALLING A RUBBER BOOT. GROUT IN THE BOOT AND AN
INVERT FOR THE NEW SEWER LINE.
12.WATERMAIN PIPE SHALL BE DIP CLASS 52, INSTALLED WITH 7.5 FEET OF COVER TO TOP PIPE.
FITTINGS SHALL BE COMPACT TYPE. PIPE AND FITTINGS SHALL HAVE A CEMENT MORTAR LINING.
CONDUCTIVITY SHALL BE PROVIDED BY WELDED STRAPS ACROSS EACH JOIN.T
13.TRENCH COMPACTION SHALL BE 95% STANDARD PROCTOR DENSITY IN THE AREA FROM THE PIPE
ZONE TO WITHIN 3 FEET OF FINISHED GRADE AND 100% IN FINAL 3 FEET OF THE BACKFILL TO
FINISH GRADE.
UTILITY NOTES
855.49
854.70
855.33
855.66
853.31
853.15
849.70 850.00
849.70
853.00
853.31
853.89
854.37
856.11
856.81 860.24
860.09
860.25
860.10
860.03
860.18
859.01
858.66
858.82
857.26
856.86
856.51
851.87
851.50
851.40
851.30
851.93
856.42
856.34
856.75
857.50
858.00
859.94859.94
859.94
860.10
860.10
859.95
859.91
859.91860.10
857.05
856.75
857.02
854.71
855.06
854.15
853.84
853.07852.60
849.70
849.70
852.48
853.27
851.44
850.83
855.65
855.71
855.82
856.24
856.09
856.00
858.30
857.17
857.34
857.64
857.61
858.05
857.75
858.99
859.70
859.50
859.64
859.73
857.68
857.29
850.00
856.50
858.00
858.50
861.00
861.00
861.00
858.50
858.50
855.00
860.00
857.00
859.00
86
0
8
5
7
8
5
8
8
5
9
85
1
85
2
853
858.46
858.55
854.58
3.5
%
2.3
%
2.8
%
1.6
%
2.9
%
856
857
858
859
8
5
8
8
5
9
858.50
2.9
%
85
5
85
2
85
3
85
4
85
6
858
859
858
855
85
3
85
4
85
5
85
385
4
8
5
6
8
5
2
85
3
8
5
6
857
85
6
858
859
85
8
85
9
85
8
858
857
856
855
8
8
856.50
857.11
855
854
856
857 85
3
85
4
8
5
5
856
856
855
856
855
852853854856
852
853
854
85
9
86
1
3.0
%
4.6
%
4.6
%
3
.
0
%
3.6%
1.5
%
1.5
%
3.8%
3.7%
6.6
%
1.8
%
4.0
%
1.8
%
9.4
%
9.0
%
3.5
%
4.0
%
6.6%PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
4.7
%
857.15857
859857.31
857.35
854.85
854.77
854.23
85
5
85
4
1
.
4
%
859.74
3.
0
%
3
.
7
%
1.
5
%
2.
6
%4.4%
2.5%
GW=855.00
GW=852.50
TW=858.00
GW=853.00
TW=858.00
GW=857.00
TW=857.00
TW=858.50
861.00
855.00
857.00857.00
854.00
857.50
861.00
855
85
4
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
856.50
TIE INTO
EXISTING CURB
MATCH EXISTING
CURB STYLE IN
RIGHT OF WAY
TIE INTO
EXISTING
CURB
TIE INTO
EXISTING
CURB
TIE INTO
EXISTING
CURB
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
6
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
GRADING
PLAN
C3-1
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
1.SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING,
OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.
2.CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS
IN GUTTERS SHALL BE SUMPED 0.10 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT
SUMPED ELEVATIONS.
3.ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4 INCHES OF PREMIUM TOP SOIL
AND SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR
UNTIL VEGETATION IS ESTABLISHED. VERIFY WITH LANDSCAPE PLAN.
4.FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT TOP FACE OF WALL (NOT TOP OF
WALL), "GW" EQUALS SURFACE GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF BURIED
WALL COURSES).
5.REFER TO THE REPORT OF GEOTECHNICAL EXPLORATION AND REVIEW (REPORT NO.16.61753.100),
DATED 12/08/16 AS PREPARED BY NORTHERN TECHNOLOGIES INC. FOR AN EXISTING SUBSURFACE
SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS.
6.SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS.
7.SEE UTILITY PLAN FOR WATER, STORM AND SANITARY SEWER INFORMATION.
8.SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS.
9.THE CONTRACTOR ALONG WITH THE OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND
APPROVALS FROM GOVERNING AUTHORITIES, INCLUDING ANY CITY PERMITS AND THE NPDES
PERMIT FROM THE MPCA.
10.INSTALL EROSION CONTROL AND TREE PROTECTION MEASURES BEFORE BEGINNING SITE GRADING
ACTIVITIES. SOME EROSION CONTROLS SUCH AS BALE CHECKS AND TEMPORARY SILT PONDS MAY
BE INSTALLED AS GRADING OCCURS IN SPECIFIC AREAS. MAINTAIN EROSION CONTROLS
THROUGHOUT THE GRADING PROCESS AND REMOVE WHEN TURF HAS BEEN ESTABLISHED.
11.THE CONTRACTOR SHALL ADHERE TO ALL REQUIREMENTS OF THE MPCA NPDES PERMIT. THE AREA
TO BE DISTURBED SHALL BE MINIMIZED AND TURF SHALL BE ESTABLISHED WITHIN THE TIME
REQUIRED.
12.GRADES SHOWN ARE FINISHED GRADES.
13.FINAL GRADING TOLERANCES ARE +/-0.1 FEET TO FINISH GRADES.
14.UNDER PAVEMENTS COMPACT THE UPPER 3 FEET OF SUBGRADE TO 100% STANDARD PROCTOR
DENSITY AT OPTIMUM MOISTURE CONTENT AND 95% STANDARD PROCTOR DENSITY BLOW THE
UPPER 3 FEET OF SUBGRADE. OUTSIDE PAVEMENT AREAS COMPACT EMBANKMENTS TO 95%
STANDARD PROCTOR DENSITY.
15. WORKING HOURS ARE 7:00 AM - 10:00 PM, MONDAY - SATURDAY. A 48 HOUR NOTICED IS
REQUIRED FOR SATURDAY WORK.
16.THE CONTRACTOR MUST HAVE A CITY LICENSE.
17.A CITY RIGHT-OF-WAY PERMIT IS REQUIRED PRIOR TO WORKING WITHIN CITY ROW.
18.TURF REINFORCEMENT MAT (TRM) SHALL BE LANDLOK 450, AS MANUFACTURED BY PROPEX
GEOSOLUTIONS, OR APPROVED EQUAL. THE CONTRACTOR SHALL FOLLOW ALL OF THE
MANUFACTURERS INSTRUCTIONS FOR INSTALLATION.
19.STRUCTURAL RETAINING WALL, FENCING AND HANDRAIL DESIGN BY OTHERS. REFER TO
ARCHITECTURAL PLANS.
GRADING & DRAINAGE SPECIFICATIONS
PROJECT BENCHMARK
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
3
7
3
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
3
DIRECTION OF FLOW 1.0%
972.5
8
8
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
4
4
4
4
4
4
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
60" STORM VAULT
(8) 160' - 60"
PERFORATED CMP
@ 0.00% WITH (2) HEADERS
INV=848.00
ROCK INV=847.50
(SEE DETAIL)
ROOF DRAIN
INV=852.35
SEE MECHANICAL
35 LF - 12" STORM
@ 1.00%
12" INV=852.00
ROOF DRAIN
INV=852.35
SEE MECHANICAL
35 LF - 12" STORM
@ 1.00%
12" INV=852.00
TRENCH DRAIN
DISCHARGE PIPE.
INV=851.66
SEE MECHANICAL
TRENCH DRAIN 1
RIM=849.70
INV=848.20 W
INV=847.20 E
TO BE BROUGHT INSIDE
AND PUMPED OUT. SEE
MECHANICAL
CBMH 1
RIM=854.58
INV=851.50 SW (12")
INV=851.30 E (15")
4' SUMP=847.30
16 LF - 12" STORM
@ 1.00%
15" INV=850.4755 LF - 15" STORM
@ 1.50%
TRENCH DRAIN 2
RIM=849.70
INV=848.20 N
INV=847.20 S
TO BE BROUGHT INSIDE
AND PUMPED OUT. SEE
MECHANICAL TRENCH DRAIN
DISCHARGE PIPE.
INV=852.66
SEE MECHANICAL
CBMH 2
RIM=856.00
INV=851.00 SW (18")
INV=851.20 NW (15")
4' SUMP=847.00
18" INV=850.50
37 LF - 18" STORM
@ 1.35%
CBMH 3
RIM=855.65
INV=851.64 SE (15")
INV=851.84 NW (12")
29 LF - 15" STORM
@ 1.50%
55 LF - 12" STORM
@ 1.50%
ROOF DRAIN
INV=854.67
SEE MECHANICAL
67 LF - 12" STORM
@ 1.00%
CBMH 4
RIM=858.46
INV=854.00 N (12")
INV=854.00 S (12")
42 LF - 12" STORM
@ 1.50%
CB 5
RIM=857.11
INV=854.00
44 LF - 12" STORM
@ 1.00%
CBMH 6
RIM=856.50
INV=853.56
38 LF - 12" STORM
@ 1.00%
CB 7
RIM=856.47
INV=853.00
19 LF - 12" STORM
@ 1.50%
CBMH 8
RIM=856.66
INV=853.18 SE (12")
INV=852.71 N (12")
INV=852.51 W (15")
58 LF - 15" STORM
@ 1.50%
CBMH 9
RIM=857.16
INV=851.64 E (15")
INV=853.29 N (12")
INV=851.44 S (18")
4'SUMP=47.44
18" INV=850.50
38 LF - 18" STORM
@ 2.47%
15" INV=850.00
STMH 10
RIM=858.78
INV=849.89
48 LF - 15" STORM
@ 1.50%
148 LF - 15" STORM
@ 1.50%
7 LF - 15" STORM
@ 1.55%
STMH 11
RIM=858.17
INV=847.59
CONNECT INTO
EXISTING STUB AT
INV=846.85
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
4
-
2
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
1
:
1
5
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
STORM
SEWER
PLAN
C4-2
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
PROJECT BENCHMARK
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
3
7
3
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
3
DIRECTION OF FLOW 1.0%
972.5
1. ALL SANITARY SEWER, STORM SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND
INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS,THE MINNESOTA PLUMBING CODE,
THE LOCAL GOVERNING UNIT , AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY
ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), 2013 EDITION.
2.ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL. ALL
COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION AND
THE GEOTECHNICAL REPORT.
3.ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE REQUIREMENTS OF THE
STATE AND LOCAL JURISDICTIONS. THE CITY DEPARTMENT OF ENGINEERING AND BUILDING
INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE NOTIFIED AT LEAST 48
HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, OR WORK IMPACTING PUBLIC
UTILITIES.
4.ALL STORM SEWER , SANITARY SEWER AND WATER SERVICES SHALL TERMINATE 5' FROM THE
BUILDING FACE UNLESS OTHERWISE NOTED.
5.A MINIMUM OF 18 INCHES OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS
REQUIRED FOR ALL UTILITES UNLESS OTHERWISE NOTED.
6.ALL NEW WATERMAIN AND SERVICES MUST HAVE A MINIMUM OF 7.5 FEET OF COVER. EXTRA DEPTH
MAY BE REQUIRED TO MAINTAIN A MINIMUM 18" VERTICAL SEPARATION TO SANITARY OR STORM
SEWER LINES. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS WITH
SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF WATER AND
SANITARY SEWER LINES SHALL BE PROVIDED WHERE 7.5 FEET MINIMUM DEPTH CAN NOT BE
ATTAINED.
7.ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB OR EDGE OF PAVEMENT
UNLESS OTHERWISE NOTED.
8.PROPOSED PIPE MATERIALS:
WATERMAIN CL 52 DIP 6" TO 8" DIAMETER
SANITARY SEWER PVC SDR 35 & SCH 40 6" TO 8" DIAMETER
9. CONTRACTOR AND MANHOLE FABRICATOR SHALL SUMP (LOWER) ALL STORM SEWER CATCH BASIN
CASTINGS WITHIN PAVED AREAS 0.16 FEET OR 2-INCHES BELOW THE RIM ELEVATION DEPICTED ON
THE UTILITY PLAN.
10.ALL STREET REPAIRS AND PATCHING SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CITY.
ALL TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER
THE REQUIREMENTS OF THE MINNESOTA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
(MMUTCD) AND THE CITY. THIS SHALL INCLUDE ALL SIGNAGE, BARRICADES, FLASHERS AND
FLAGGERS AS NEEDED. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES. NO ROAD
CLOSURES SHALL BE PERMITTED WITHOUT THE EXPRESSED AUTHORITY OF OF THE CITY.
11.CONNECTIONS TO EXISTING MANHOLES SHALL BE MADE BY CORE DRILLING THE MANHOLE AT THE
PROPOSED INVERT ELEVATIONS AND INSTALLING A RUBBER BOOT. GROUT IN THE BOOT AND AN
INVERT FOR THE NEW SEWER LINE.
12.WATERMAIN PIPE SHALL BE DIP CLASS 52, INSTALLED WITH 7.5 FEET OF COVER TO TOP PIPE.
FITTINGS SHALL BE COMPACT TYPE. PIPE AND FITTINGS SHALL HAVE A CEMENT MORTAR LINING.
CONDUCTIVITY SHALL BE PROVIDED BY WELDED STRAPS ACROSS EACH JOIN.T
13.TRENCH COMPACTION SHALL BE 95% STANDARD PROCTOR DENSITY IN THE AREA FROM THE PIPE
ZONE TO WITHIN 3 FEET OF FINISHED GRADE AND 100% IN FINAL 3 FEET OF THE BACKFILL TO
FINISH GRADE.
UTILITY NOTES
86
0
8
5
7
8
5
8
8
5
9
85
1
85
2
853
856
857
858
859
8
5
8
8
5
9
85
5
85
2
85
3
85
4
85
6
858
859
858
855
85
3
85
4
85
5
85
385
4
8
5
6
8
5
2
85
3
8
5
6
857
85
6
858
859
85
8
85
9
85
8
858
857
856
855
8
8
855
854
856
857 85
3
85
4
8
5
5
856
856
855
856
855
852853854856
852
853
854
85
9
86
1
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
857
859
85
5
85
4
855
85
4
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
SILT FENCE TYP.
(SEE DETAIL)
INLET
PROTECTION TYP.
(SEE DETAIL)
INLET
PROTECTION TYP.
(SEE DETAIL)
ROCK
CONSTRUCTION
ENTRANCE
(SEE DETAIL)
SILT FENCE TYP.
(SEE DETAIL)
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
2
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
6
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
STORMWATER
POLLUTION
PREVENTION
PLAN
C3-2
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
BM#1
In Brooklyn Center, at northeast corner of northbound lane Bridge No. 27040 over Shingle
Creek, 1.35 miles southeast along Trunk Hwy 100 fromn the junction of Trunk Hwy100 &
I-94, at Trunk Hwy milepoint 14.55, 25.0 feet southeast of northbound Trunk Hwy 100.
ELEVATION = 846.58 FT (NAVD'88)
BM#2
Top nut of hydrant on Northway Drive approx. 250 feet east of Xerxes Avenue N., as shown
hereon.
ELEVATION = 857.74 FT (NAVD'88)
PROJECT BENCHMARK
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
3
7
3
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
3
DIRECTION OF FLOW 1.0%
972.5
INLET PROTECTION
SILT FENCE
ROCK CONSTRUCTION
ENTRANCE
SWPPP LEGEND
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
7
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
CIVIL
DETAILS
C8-1
3
3/4"/FT SLOPE
7"
3" RAD.
1
12
6"
8"
13
1
/
2
"
6"
1/2" RAD.
BATTERED CONCRETE B612
CURB & GUTTER
DIMENSIONS TO FACE
OF CURB ON PLANS ARE
TO THIS LINE
CONSTRUCT WITH REVERSE SLOPE GUTTER WHERE
THE PAVEMENT SLOPES AWAY FROM CURB.
SPECIFICATION NOTES:
1.UPON COMPLETION, CURBING SHOULD BE SPRAYED WITH A
MEMBRANE CURING COMPOUND PER MNDOT 3754.
2.EXPANSION JOINTS AT MAX. SPACING OF 200'.
3.CONSTRUCT IN ACCORDANCE WITH MNDOT 2531.
DRAWN 2/2016
LOUCKS PLATE NO.
2010LOUCKS
1.5" BIT. WEAR COURSE,
MN/DOT 2360 SPWEA240B
TACK COAT, MN/DOT 2357
1.5" BIT. NON-WEAR COURSE,
MN/DOT 2360 SPNWB230B
8" AGG. BASE, CLASS 5 OR 2 MN/DOT 3138
APPROVED SUBGRADE
FINISHED GRADE
STANDARD BITUMINOUS
PAVEMENT SECTION
PAVEMENT SECTION BASED ON AMERICAN
ENGINEERING & TESTING, INC.
GEOTECHNICAL REPORT #01-06913
DRAWN 12/2016
LOUCKS PLATE NO.
2031LOUCKS
2" BIT. WEAR COURSE,
MN/DOT 2360 SPWEA240B
TACK COAT, MN/DOT 2357
2" BIT. NON-WEAR COURSE,
MN/DOT 2360 SPNWB230B
10" AGG. BASE, CLASS 5 OR 2 MN/DOT 3138
APPROVED SUBGRADE
FINISHED GRADE
HEAVY DUTY BITUMINOUS
PAVEMENT SECTION
DRAWN 12/2016
LOUCKS PLATE NO.
2032LOUCKS
6" COMPACTED AGGREGATE BASE CL. 5 OR 2
MN/DOT 3138
APPROVED SUBGRADE
CONCRETE PAVEMENT
SECTION
NOTES:
1.CONCRETE 7" THICK OR LESS SHALL BE REINFORCED WITH WELDED WIRE
FABRIC OR REINFORCING BARS. CONCRETE 8" THICK OR GREATER SHALL BE
REINFORCED PER GEOTECHNICAL RECOMMENDATIONS.
2.SAWED OR FORMED CONTROL JOINTS SHOULD BE INCLUDED FOR EACH
225 SQUARE FEET OF AREA OR LESS (15 FEET BY 15 FEET).
3.SAW CUTS SHOULD NOT CUT THROUGH THE WELDED WIRE FABRIC OR
REINFORCING STEEL AND DOWELS SHOULD BE UTILIZED AT FORMED
AND/OR COLD JOINTS.
DRAWN 12/2016
LOUCKS PLATE NO.
2033LOUCKS CONCRETE SIDEWALK
SECTION
4" CONCRETE WALK
MN/DOT 2521
4" GRANULAR MATERIAL
MN/DOT 3149 OR ON
SITE NFS MATERIAL WITH
APPROVAL FROM THE
GEOTECHNICAL
ENGINEER
DRAWN 12/2016
LOUCKS PLATE NO.
2034LOUCKS
1'
-
0
"
ACCESSIBLE ROUTE
L
SE
E
P
L
A
N
8'-0"8'-0"8'-0"9'-0"
C
18
'
-
0
"
C
TYPICAL ADA PARKING
4" WIDE PAINTED
LINES, TRAFFIC
WHITE
4" WIDE PAINTED LINES,
18" O.C., @ 45 TRAFFIC
WHITE
(AISLE TO CONTAIN THE
DESIGNATION "NO
PARKING" COMPLYING
WITH MSBC 1341.0502)
HANDICAP SIGN (TYP)
(SIGN TO COMPLY WITH MINNESOTA
RULES 1341.0502
DRAWN 12/2016
LOUCKS PLATE NO.
2036LOUCKS
TC=0
GL=-0.5
TC=0
GL=0
TC=0
GL=0
TC=0
GL=-0.5
1'
-
0
"
ACCESSIBLE ROUTE
SE
E
P
L
A
N
HANDICAP SIGN/BOLLARD (TYP)
(SIGN TO COMPLY WITH MINNESOTA RULES
1341.0502
TC=0
GL=0
TC=0
GL=0
TC=0
GL=0
TC=0
GL=0
B612 CURB
& GUTTER
FLAT CURB
TC=0
GL=-0.5
TC=0
GL=-0.5
TC=0
GL=-0.5
FLAT CURB
B612 CURB
& GUTTER
B612 CURB
& GUTTER
FULL HEIGHT CURB WITH FLAT CURB AT ACCESS AISLE
FULL HEIGHT CURB ENTIRE WIDTH OF HC STALLS
TYPICAL ADA WHEELCHAIR
SYMBOL & PARKING SIGN
40
"
"PARKING BY DISABLED
PERMIT ONLY"
ATTACH SIGN TO POST
WITH APPROPRIATE
STAINLESS STEEL BOLTS,
WASHERS & NUTS.
(TYP. AT TOP &
BOTTOM OF SIGN)
"VAN ACCESSIBLE"
SIGN
GRADE
NOTES:
1.PROVIDE (1) SIGN PER STALL
2.HC SIGNAGE PER
MINNESOTA RULES
1341.0502
3.SEE DETAIL 2042 FOR SIGN
INSTALLATION.
PROVIDE PAINTED
INTERNATIONAL SYMBOL OF
ACCESSIBILITY AT EACH
DESIGNATED HANDICAP
PARKING STALL. CENTER
SYMBOL IN STALL.
HC SIGNAGE PER MINNESOTA
RULES 1341.0502
ALL LINES 4" WIDE
8" DIAMETER
WHEELCHAIR SYMBOL
NOT TO SCALE
HANDICAP PARKING SIGN
NOT TO SCALE
67.5°
5°
60
"
-
6
6
"
"NO PARKING"
ATTACH SIGN TO POST
WITH APPROPRIATE
STAINLESS STEEL BOLTS,
WASHERS & NUTS.
(TYP. AT TOP &
BOTTOM OF SIGN)
GRADE
NOTES:
1.PROVIDE (1) SIGN PER ACCESS
AISLE
2.HC SIGNAGE PER MINNESOTA
RULES 1341.0502
3.SEE DETAIL 2042 FOR SIGN
INSTALLATION.
HANDICAP ACCESS AISLE
NO PARKING SIGN
NOT TO SCALE
60
"
-
6
6
"
DRAWN 12/2016
LOUCKS PLATE NO.
2037LOUCKS
36"
VAN
ACCESSIBLE
PARKING
VEHICLE ID
REQUIRED
UP TO $200 FINE
FOR VIOLATION
3' TR
A
N
S
I
T
I
O
N
3' TA
P
E
R
1"
EX
P
A
N
S
I
O
N
J
O
I
N
T
2 NO. 4, 3' LONG, EPOXY COATED
REBARS SHALL BE INSTALLED ON
EACH SIDE OF THE CASTING. REBARS
AND EPOXY COATING PER MN/DOT
SPEC. 3301.
TYPICAL NEENAH R-3067
CASTING.
6"±
CATCH BASIN CASTING
INSTALLATION
B612 TO CASTING
DESIGN GUTTER
LINE GRADE
EXPANSION
JOINTEXPANSION
JOINT
3' MIN. TRANSITION
B612 CURB & GUTTER
TOP CURB
NOTE: B612 CURB AND GUTTER TO BE
FORMED INTO A B618 TYPE CURB AT
CATCH BASIN CASTING.
B612 CONCRETE CURB AND
GUTTER
3' MIN. TRANSITION
B612 CURB & GUTTER
2 NO. 4, 3' LONG, EPOXY COATED
REBARS SHALL BE INSTALLED ON
EACH SIDE OF THE CASTING. REBARS
AND EPOXY COATING PER MN/DOT
SPEC. 3301.
DRAWN 12/2016
LOUCKS PLATE NO.
4312LOUCKS
1'
-
4
"
VA
R
I
A
B
L
E
6"
3"
6"
4.0'
OUTLET FLOW
3'
M
I
N
.
2"
0"-8"
2"
NYLOPLAST SNOUT STRUCTURE
OR APPROVED EQUAL.
CONCRETE
ADJUSTING RINGS,
MIN. 4" - MAX. 10"
NOTE:
24"x36" SLAB OPENING FOR NEENAH R-3067 CASTING WITH D.L., D.R. OR TYPE V GRATE.
27" ɸ SLAB OPENING FOR NEENAH R-3250 & R-1733 CASTING.
SUMP CATCH BASIN /
MANHOLE
MINIMUM SLAB THICKNESS IS 6" FOR 14'
DEPTH. INCREASE THICKNESS 1" FOR 4' OF
DEPTH GREATER THAN 14'.
PRECAST CONCRETE MANHOLE SECTIONS
WITH "O"-RING RUBBER GASKETS.
SLAB TOP TO BE SET IN
A MORTAR BED.
6" PRECAST REINFORCED
CONCRETE SLAB.
STEPS 16" O.C. ON DOWNSTREAM SIDE.
EXTRUDED ALUMINUM OR STEEL
REINFORCED COPOLYMER PLASTIC.
6"
DRAWN 2/2016
LOUCKS PLATE NO.
4304LOUCKS
PAVEMENT SECTION BASED ON AMERICAN
ENGINEERING & TESTING, INC.
GEOTECHNICAL REPORT #01-06913
7" 4,000 PSI CONCRETE (MN/DOT
2301) WITH BROOM FINISH & 6X6
W2.9xW2.9 WWF
APPLY ANTI-SPALLING COMPOUND
TO FINISHED GRADE
Sheet: 1
File: s:\acad\details\cities\brooklyn center\101 hydrant and gate valve.pdf
Missing or invalid reference
Sheet: 1
File: S:\ACAD\Details\Cities\Brooklyn Center\102 gate valve and bo[.pdf
Missing or invalid reference
Sheet: 1
File: s:\acad\details\cities\brooklyn center\103 blocking or joint restraint.pdf
Missing or invalid reference
Sheet: 1
File: s:\acad\details\cities\brooklyn center\201 Manhole sanitary sewer.pdf
Missing or invalid reference
Sheet: 1
File: s:\acad\details\cities\brooklyn center\220 Pipe Bedding Classification B.pdf
Missing or invalid reference
Sheet: 1
File: s:\acad\details\cities\brooklyn center\221 Pipe Bedding Classification C.pdf
Missing or invalid reference
Sheet: 1
File: s:\acad\details\cities\brooklyn center\301 Manhole storm sewer.pdf
Missing or invalid reference
8
8
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
PROPOSED
BUILDING
961.00 F.F.E.
950.00 G.F.E.
4
4
4
4
4
4
8
8
8
8
8
8
8
88
8
8
8
8
8
8
8
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
1
AP
1
AP
1
BS
1
AP
1
RR
1
AP
2
TH
3
SSC
3
TH
2
TH
1
SKH
1
GL
1
TH
1
SKH
1
SKH
3
SSC
1
AP
1
BS
1
RR
1
BS
1
SSC
1
BS
1
SSC
1
SKH
1
SKH
1
SGM
1
SGM
1
SGM
1
SGM
1
SKH
1
SGM
1
BS
1
SCP
1
BS
1
BS
1
SCP
1
SCP
1
SCP
1
AP
1
SCP1
BS
1
SCP
1
SKH
1
SKH
1
SKH
1
BS
1
SKH
1
GL
1
TH
FOUNDATION PLANTINGS
(SEE PLANT PALETTE)
EDGER TYP.
GARAGE
ENTRY
GARAGE
ENTRY
ROCK COBBLE
OVER FABRIC
ROCK COBBLE
OVER FABRIC
DECIDUOUS TREES QTY COMMON NAME BOTANICAL NAME CONT SIZE SIZE
GL 2 GREENSPIRE LINDEN Tilia cordata `Greenspire`B & B 2.5"Cal
RR 2 RENAISSANCE REFLECTION BIRCH Betula papyrifera `Renaissance Reflection`B & B 8` HGT
SGM 5 SIENNA GLEN MAPLE Acer freemanii `Sienna Glen`B & B 2.5"Cal
SKH 10 SKYLINE HONEYLOCUST Gleditsia triacanthos `Skycole`B & B 2.5"Cal
EVERGREEN TREES QTY COMMON NAME BOTANICAL NAME CONT SIZE SIZE
AP 6 AUSTRIAN PINE
FULL FORM
Pinus nigra B & B 5` HGT
BS 9 BLACK HILLS SPRUCE
FULL FORM
Picea glauca `Densata`B & B 5` HGT
SCP 6 SCOTCH PINE
FULL FORM
Pinus sylvestris B & B 5` HGT
ORNAMENTAL TREES QTY COMMON NAME BOTANICAL NAME CONT SIZE SIZE
SSC 8 SPRING SNOW CRABAPPLE Malus x `Spring Snow`B & B 1.5"Cal
TH 9 THORNLESS HAWTHORN Crataegus crus-galli `Inermis`B & B 1.5"Cal
PLANT SCHEDULE
LOUCKS
W:
\
2
0
1
8
\
1
8
6
5
0
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
1
-
1
Pl
o
t
t
e
d
:
04
/
1
6
/
2
0
1
9
1
0
:
4
8
A
M
7200 Hemlock Lane, Suite 300
Maple Grove, MN 55369
763.424.5505
www.loucksinc.com
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
BROOKLYN
CENTER
APARTMENTS
REAL ESTATE EQUITIES
579 Shelby Ave, St. Paul, MN 55102
BROOKLYN CENTER, MN
04/11/19 CHECK SET
04/16/19 CITY SUBMITTAL
C1-1 DEMOLITION PLAN
C2-1 SITE PLAN
C3-1 GRADING PLAN
C3-2 SWPPP
C3-3 SWPPP
C4-1 SANITARY & WATEMAIN
C4-2 STORM SEWER
C8-1 CIVIL DETAILS
L1-1 LANDSCAPE PLAN
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
PJ Disch - PE
Project Lead
Drawn By
Checked By
Loucks Project No.
49933
18650
PJD
DDL
PJD
04/16/19
-
N
SCALE IN FEET
0 30 60
LANDSCAPE
PLAN
L1-1
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
PERENNIAL PLANTING
SCALE: 3/4" = 1'-0"Perennial.Dwg
LOOSEN ROOTS OF
PLANT MATERIAL PRIOR
MULCH - 3" MIN. DEPTH
- SEE NOTES OR SPECS.
EDGER - SEE NOTES OR SPECS.
12" DEPTH (MIN). LOAM PLANTING
SOIL - SEE NOTES OR SPECS.
VARIES
SEE PLAN
TO PLANTING
EDGE VARIES - SEE PLAN
2
L1-1
REFER TO PLAN
18" MIN.
SCALE: 3/4" = 1'-0"
SHRUB PLANTING DETAIL
SHRUBS TO BE PLACED SO THAT
TOP OF CONTAINER SITS FLUSH
WITH PROPOSED GRADE.
MULCH - 3" DEPTH - SEE NOTES OR SPEC.
LANDSCAPE FABRIC - SEE NOTES OR SPEC.
EDGING MATERIAL - SEE NOTES OR SPEC.
EDGE VARIES - REFER TO PLAN
PLANTING SOIL - SEE NOTES OR SPEC.
LOOSEN ROOTS OF ALL
CONTAINERIZED PLANTS.
SCARIFY BOTTOM AND SIDES OF
HOLE PRIOR TO PLANTING
BUILDING WALL (TYP)
1
L1-1
GENERAL NOTES
CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL INSPECT SITE AND BECOME FAMILIAR WITH EXISTING
CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK.
VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES
WHICH MAY COMPROMISE THE DESIGN AND/OR INTENT OF THE PROJECT'S LAYOUT.
ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED.
CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING
OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER.
CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE
NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION / MATERIAL INSTALLATION BEGINS (MINIMUM 10' - 0" CLEARANCE).
ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO
REMAIN.
EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO
LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND
NOTIFY LANDSCAPE ARCHITECT OF SAME.
LANDSCAPE INSTALLATION:
COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH
OTHER CONTRACTORS WORKING ON SITE.
NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS
BEEN COMPLETED IN THE IMMEDIATE AREA.
WHERE SOD/SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD/SEED SHALL BE HELD
1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC.
SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO
RECEIVE SOD. SEED SHALL BE INSTALLED AND MULCHED AS PER MNDOT SPECS.
SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL BE LAID
PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER
THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE GROUND.
ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN
STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. UNLESS
NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED
MINIMUM SHRUB HEIGHT OR WIDTH. ORNAMENTAL TREES SHALL HAVE NO V CROTCHES
AND SHALL BEGIN BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND
BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE FINISHED
GRADE.
ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE SALES SHALL NOT BE
USED. ALL CONIFEROUS TREES SHALL BE FULL FORM, NATURAL TO THE SPECIES, WITHOUT
PRUNING.
PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST.
SPECIFICATIONS TAKE PRECEDENCE OVER NOTES.
NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED
OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE
SUBMISSION OF A BID AND/OR QUOTATION.
ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON PLAN.
ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD.
SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED.
ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A 27-3-3 SLOW
RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER THE MANUFACTURER'S
INSTRUCTIONS. PLANTS MAY BE TREATED FOR SUMMER AND FALL INSTALLATION WITH
AN APPLICATION OF GRANULAR 27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER
SHRUB WITH AN ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE
TREE SAUCER.
ALL PLANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS, AND/OR VINES
SHALL RECEIVE A MINIMUM OF 12" DEPTH OF PLANTING SOIL CONSISTING OF AT LEAST 45
PARTS TOPSOIL, 45 PARTS PEAT OR MANURE AND 10 PARTS SAND.
ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL FLAGGING AND
LABELS FROM PLANTS.
WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN CALIPER THAN
THE TREE BEING PROTECTED OR QUALITY, HEAVY, WATERPROOF CREPE PAPER
MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL
PRIOR TO 12-1 AND REMOVE ALL WRAPPING AFTER 5-1.
BLACK METAL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND ANNUALS
WHERE BED MEETS SOD/SEED UNLESS NOTED OTHERWISE.
ALL SHRUB AND PERENNIAL BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD
MULCH AND FIBER MAT WEED BARRIER. (COLOR: TBD)
ALL TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD MULCH RING WITH NO MULCH IN
DIRECT CONTACT WITH TREE TRUNK. (COLOR: TBD)
SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER MANUFACTURER'S
RECOMMENDATIONS UNDER ALL MULCHED AREAS.
MAINTENANCE STRIPS TO HAVE EDGER AND MULCH AS SPECIFIED/INDICATED ON
DRAWING OR IN SPECIFICATION.
IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY DEFICIENCIES IN THE
PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER SITE CONDITION WHICH MIGHT
NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING
THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO
PROCUREMENT AND/OR INSTALLATION.
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE
INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED
MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE
WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE
PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION
AND DISEASE/PEST CONTROL.
CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR
FROM THE DATE OF OWNER ACCEPTANCE.
WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON
THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF
PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE
CONSIDERED.
UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT MATERIAL
INSTALLATION AND SEED/SOD PLACEMENT IS FROM THE TIME GROUND HAS THAWED TO
JUNE 15.
FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER 1. FALL
SEEDING FROM AUGUST 15 - SEPTEMBER 15; DORMANT SEEDING IN THE FALL SHALL NOT
OCCUR PRIOR TO NOVEMBER 1. FALL CONIFEROUS PLANTING MAY OCCUR FROM
AUGUST 15 - OCTOBER 1 AND DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL
NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT RECOMMENDED. ANY
ADJUSTMENT MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION THAT SOIL AND
COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND
AROUND THE BUILDING SITE.
Deciduous Tree.DWG
DECIDUOUS TREE PLANTING DETAIL
SCALE: 1/2" = 1'-0"
2x ROOT BALL WIDTH
CONTRACTOR IS RESPONSIBLE FOR TESTING
PERCOLATION RATES PRIOR TO PLANTING.NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IFPOOR DRAINAGE EXISTS.
SET PLANT ON UNDISTURBED NATIVE SOIL
SCARIFY BOTTOM AND SIDES OF HOLE PRIORTO PLANTING
EDGE VARIES - SEE PLAN
WOOD STAKE (OPTIONAL)
MULCH - 4" DEEP. NO MULCH IN CONTACT
WITH TRUNK - SEE NOTES OR SPECS.
ROOT FLARE EVEN WITH OR JUST ABOVE GRADE.
SAFETY FLAGGING - ONE PER WIRE
TREE WRAP TO FIRST BRANCH
16"x2" POLYPROPYLENE OR POLYETHYLENE STRAP
WATER TREE THOROUGHLY DURING PLANTING
OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS ANDSATURATE SOIL WITH WATER. DO NOT COMPACTMORE THAN NECESSARY TO MAINTAIN PLUMB.
CUT BACK WIRE BASKET
PRUNE DAMAGED AND CROSSING BRANCHESAFTER PLANTING IS COMPLETE.
THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING ALL TREES IN A PLUMB POSITIONTHROUGH THE WARRANTY PERIOD. STAKING ISSUGGESTED, BUT NOT REQUIRED. ANY STAKING
MUST CONFORM WITH PRACTICES AS DEFINED INA.N.A. GUIDELINES FOR STANDARD PRACTICES
BACKFILL WITH IN SITU TOPSOIL
4
L1-1Coniferous Tree.DWG
CONIFEROUS TREE PLANTING DETAIL
SCALE: 1/2" = 1'-0"
2 x ROOT BALL WIDTH
THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING ALL TREES IN A PLUMB POSITION
THROUGH THE WARRANTY PERIOD. STAKING IS
SUGGESTED, BUT NOT REQUIRED. ANY STAKING
MUST CONFORM WITH PRACTICES AS DEFINED IN
A.N.A. GUIDELINES FOR STANDARD PRACTICES.
PRUNE ANY DAMAGED BRANCHES AFTER
PLANTING IS COMPLETE.
16"x2" POLYPROPYLENE OR POLYETHYLENE STRAP
SAFETY FLAGGING - ONE PER WIRE
BACKFILL WITH IN SITU TOPSOIL
WOOD STAKE (OPTIONAL)
EDGE VARIES - SEE PLAN
CONTRACTOR IS RESPONSIBLE FOR TESTING
PERCOLATION RATES PRIOR TO PLANTING.
NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY
IF POOR DRAINAGE EXISTS.
ROOT BALL SET ON UNDISTURBED SUBGRADE
SCARIFY BOTTOM AND SIDES OF
HOLE PRIOR TO PLANTING
WATER TREE THOROUGHLY DURING PLANTING
OPERATIONS. PLACE BACKFILL IN 8-12" LIFTS AND
SATURATE SOIL WITH WATER. DO NOT COMPACT
MORE THAN NECESSARY TO MAINTAIN PLUMB.
MULCH - 4" DEEP - SEE NOTES OR SPECS. MULCH
MUST NOT BE IN CONTACT WITH TRUNK.
3
L1-1
IRRIGATION NOTES:
VERIFY EXISTING/PROPOSED IRRIGATION SYSTEM LAYOUT AND CONFIRM
COMPLETE LIMITS OF IRRIGATION PRIOR TO SUPPLYING SHOP DRAWINGS.
LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN
IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE SCOPE OF
WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE
ARCHITECT PRIOR TO ORDER AND/OR INSTALLATION. IT SHALL BE THE
LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL
SODDED/SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING
THOSE AREAS DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION.
THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN
IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND
TO PLANT MATERIAL GROWTH REQUIREMENTS.
IRRIGATION SYSTEM IS NOT TO SPRINKLE ACROSS PAVEMENT. THE SYSTEM
SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION SYSTEM.
PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED
REGULARLY UNTIL PLANTING/SOD/SEED HAS BEEN ESTABLISHED.
LANDSCAPE REQUIREMENTS:
SITE AREA: 4.80 ACRES
PROPOSED TYPE OF DEVELOPMENT: MULTI-FAMILY RESIDENTIAL
POINTS REQUIRED PER LANDSCAPE POINT SYSTEEM:
(90 * 2 = 180)& (75 * 2.8 = 210)180 + 210 = 390 POINTS PREQUIRED
TOTAL OVERSTORY TREES (50% MAX):19 * 10 = 190 POINTS
TOTAL CONIFEROUS TREES (40% MAX):21 * 6 = 126 POINTS
TOTAL DECORATIVE TREES (35% MAX):17 * 1.5 = 25.5 POINTS
TOTAL SHRUBS (25% MAX):98 * 0.5 = 49 POINTS
TOTAL POINTS REQUIRED:390 POINTS
TOTAL POINTS PROPOSED:390.5 POINTS
NOTE: A VARIETY OF PERENNIALS WILL BE INCLUDED TO COMPIMENT THE SHRUBS
AROUND THE BUILDING FOUNDATION.
TURF GRASS
FOUNDATION PLANTING BED - TO
INCLUDE FULL COMPLIMENT OF
SHRUBS AND PERENNIALS. INFO TO BE
DISPLAYED IN FUTURE SUBMITTAL
BASS LAKE RD
XE
R
X
E
S
A
V
E
N
N O R T H W A Y B L V D
Schema 1 Legend
1BR/1BA
2BR/2BA
3BR/2BA
Amenity
Core/Stairs
N
SENIOR LIVING
Transformer
Transformer
Tot Lot
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
276 ft²
Stairs
968 ft²
Core
276 ft²
Stairs
694 ft²
Unit 1-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,326 ft²
Unit 4-1
712 ft²
Unit 1-0
712 ft²
Unit 1-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,326 ft²
Unit 4-1
1,326 ft²
Unit 4-1
Patio
Patio
738 ft²
Lounge
994 ft²
Unit 3-0
994 ft²
Unit 3-0
712 ft²
Unit 1-0
694 ft²
Unit 1-0
717 ft²
Fitness
411 ft²
Entry
306 ft²
Office
712 ft²
Unit 1-0712 ft²
Unit 1-0
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
994 ft²
Unit 3-0
1,309 ft²
Core
712 ft²
Unit 1-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
Dog Run
1,021 ft²
Unit 3-1
3,405 ft²
Corridor
kaas
wilson
architects
Site Plan - Level 1
1" = 30'-0" 1 Level 1
18101 -Unit Mix by Floor
Name
Unit
Type Count Area Level Unit Type
Level 1
Unit 1-0 1BR/1BA 8 Level 1 1BR
Unit 3-0 2BR/2BA 12 994 ft² Level 1 2 BR
Unit 3-1 2BR/2BA 1 1,021 ft² Level 1 2 BR
Unit 4-0 3BR/2BA 6 1,337 ft² Level 1 3 BR
Unit 4-1 3BR/2BA 3 1,326 ft² Level 1 3 BR
30
Level 2
Unit 1-0 1BR/1BA 11 712 ft² Level 2 1BR
Unit 3-0 2BR/2BA 12 994 ft² Level 2 2 BR
Unit 3-1 2BR/2BA 1 1,020 ft² Level 2 2 BR
Unit 4-0 3BR/2BA 6 1,337 ft² Level 2 3 BR
Unit 4-1 3BR/2BA 3 1,326 ft² Level 2 3 BR
33
Level 3
Unit 1-0 1BR/1BA 11 712 ft² Level 3 1BR
Unit 3-0 2BR/2BA 12 994 ft² Level 3 2 BR
Unit 3-1 2BR/2BA 1 1,020 ft² Level 3 2 BR
Unit 4-0 3BR/2BA 6 1,337 ft² Level 3 3 BR
Unit 4-1 3BR/2BA 3 1,326 ft² Level 3 3 BR
33
Level 4
Unit 1-0 1BR/1BA 9 712 ft² Level 4 1BR
Unit 3-0 2BR/2BA 12 994 ft² Level 4 2 BR
Unit 3-1 2BR/2BA 1 1,021 ft² Level 4 2 BR
Unit 4-0 3BR/2BA 6 1,337 ft² Level 4 3 BR
Unit 4-1 3BR/2BA 3 1,326 ft² Level 4 3 BR
31
Grand total 127
18101 -Unit Mix by Type
Name
Unit
Type Count Area Total Area
1BR/1BA
Unit 1-0 1BR/1BA 39 27,744 ft²
39 27,744 ft²
2BR/2BA
Unit 3-0 2BR/2BA 48 994 ft² 47,697 ft²
Unit 3-1 2BR/2BA 4 4,082 ft²
52 51,780 ft²
3BR/2BA
Unit 4-0 3BR/2BA 24 1,337 ft² 32,094 ft²
Unit 4-1 3BR/2BA 12 1,326 ft² 15,914 ft²
36 48,008 ft²
Grand total 127 127,532 ft²
Schema 1 Legend
Core/Stairs
Garage
39,245 ft²
Garage
206 ft²
Stairs
6
29
6
13
44
Area Well
Garage Exhaust
Area Well
Garage Intake
Mech/Elec
Core
SENIOR LIVING
13
Core
Bikes &
Storage
206 ft²
Stairs
kaas
wilson
architects
Level -1
1" = 30'-0" 1 Level -1
Schema 1 Legend
1BR/1BA
2BR/2BA
3BR/2BA
Core/Stairs
SENIOR LIVING
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
1,326 ft²
Unit 4-1
1,337 ft²
Unit 4-0
276 ft²
Stairs
968 ft²
Core
1,326 ft²
Unit 4-1
1,326 ft²
Unit 4-1
1,337 ft²
Unit 4-0
276 ft²
Stairs
994 ft²
Unit 3-0
712 ft²
Unit 1-0
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0994 ft²
Unit 3-0
994 ft²
Unit 3-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0994 ft²
Unit 3-0
994 ft²
Unit 3-0994 ft²
Unit 3-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0994 ft²
Unit 3-0
712 ft²
Unit 1-0
1,309 ft²
Core 1,020 ft²
Unit 3-1
3,431 ft²
Corridor
kaas
wilson
architects
Level 2-3
1" = 30'-0" 1 Level 2
SENIOR LIVING
712 ft²
Unit 1-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
712 ft²
Unit 1-0
1,326 ft²
Unit 4-1
968 ft²
Core
276 ft²
Stairs
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,326 ft²
Unit 4-1
994 ft²
Unit 3-0
994 ft²
Unit 3-0
712 ft²
Unit 1-0
717 ft²
Club Room
717 ft²
Rooftop Patio
712 ft²
Unit 1-0
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,326 ft²
Unit 4-1
1,337 ft²
Unit 4-0
3,420 ft²
Corridor
994 ft²
Unit 3-0
994 ft²
Unit 3-0
1,337 ft²
Unit 4-0
1,337 ft²
Unit 4-0
994 ft²
Unit 3-0
1,337 ft²
Unit 4-0
276 ft²
Stairs
994 ft²
Unit 3-0
994 ft²
Unit 3-0
712 ft²
Unit 1-0
994 ft²
Unit 3-0
1,309 ft²
Core
712 ft²
Unit 1-0
712 ft²
Unit 1-0
1,021 ft²
Unit 3-1
Schema 1 Legend
1BR/1BA
2BR/2BA
3BR/2BA
Amenity
Core/Stairs
Corridor
Patio
kaas
wilson
architects
Level 4
1" = 30'-0" 1 Level 4
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.1 5.0 7.3 8.0 4.1 7.5 7.5 8.2 5.1
SD_500
3
SD_500 5
SD_500
6
SD_500
4
SD_500 1
SD_500
2
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
7.3 5.0 5.1 8.0 7.5 7.5 4.1 7.5 8.2 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.1 8.0 7.3 5.0 5.0 4.1 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
7.3 5.1 5.0 4.1 5.0 7.5 8.0
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.1 5.0 4.1 5.0 8.0 4.1 7.5 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level -1
89'-4"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.0 8.0 5.1 4.1 5.0 8.0 4.1 7.3 7.5
EXTERIOR MATERIAL TAG KEY
5.0 PREFIN MTL SIDING W/ VERTICAL SEAM -COLOR:
BLACK
7.3 CFB LAP SIDING -6" AND 4" EXPOSURE -COLOR:
TAUPE
5.1 PREFIN MTL SIDING -CORTEN STEEL
7.5 CFB TRIM 5/4 BOARD -COLOR : BLACK
MASONRY:
METALS:
OPENINGS:
SIDING:
WOOD:
8.0 VINYL WINDOW -COLOR: BLACK
8.2 ALUMINUM STOREFRONT GLAZING -COLOR: BLACK
6.1 WOOD TRELLIS -COLOR: TBD
4.1 BRICK -COLOR: SAND
kaas
wilson
architects
Exterior Elevations
3/32" = 1'-0" 3 1 - N 1b - ENTRY
3/32" = 1'-0" 2 10 - N 1a
3/32" = 1'-0" 1 9 - E 2
3/32" = 1'-0" 5 2 - W 1
3/32" = 1'-0" 6 3 - N 2
3/32" = 1'-0" 4 8 - N 3
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.0 7.3 5.1 7.5 7.5 4.1 8.0 7.5 8.2 6.1
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
8.2 8.0 5.1 7.3 7.5 4.1 7.5
SD_501
3
SD_501
1
SD_501 4
SD_501
2
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
7.3 5.1 5.0 4.1 5.0 5.1 7.5 8.0
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
5.1 5.0 4.1 8.0 7.5 4.1 5.1
EXTERIOR MATERIAL TAG KEY
5.0 PREFIN MTL SIDING W/ VERTICAL SEAM -COLOR:
BLACK
7.3 CFB LAP SIDING -6" AND 4" EXPOSURE -COLOR:
TAUPE
5.1 PREFIN MTL SIDING -CORTEN STEEL
7.5 CFB TRIM 5/4 BOARD -COLOR : BLACK
MASONRY:
METALS:
OPENINGS:
SIDING:
WOOD:
8.0 VINYL WINDOW -COLOR: BLACK
8.2 ALUMINUM STOREFRONT GLAZING -COLOR: BLACK
6.1 WOOD TRELLIS -COLOR: TBD
4.1 BRICK -COLOR: SAND
kaas
wilson
architects
Exterior Elevations
3/32" = 1'-0" 1 5 - S 1a
3/32" = 1'-0" 2 6 - S 1b
3/32" = 1'-0" 3 4 - E 1
3/32" = 1'-0" 4 7 - W 2
Schema 1 Legend
1BR/1BA
2BR/2BA
Amenity
Core/Stairs
Corridor
Office
N
Patio
WORKFORCE LIVING
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1 772 ft²
Unit 1-1
276 ft²
Stair 772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
773 ft²
Core
942 ft²
Unit 1-2
779 ft²
Lounge
772 ft²
Unit 1-1
442 ft²
Entry
331 ft²
Office
697 ft²
Fitness
1,074 ft²
Clubroom
1,034 ft²
Hobby
772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1
718 ft²
Core
772 ft²
Unit 1-1
713 ft²
Unit 1-0
771 ft²
Unit 1-1
1,200 ft²
Unit 3-2
1,049 ft²
Unit 3-0
1,049 ft²
Unit 3-0
276 ft²
Stair
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1
1,049 ft²
Unit 3-0
TOT LOT DOG RUN
kaas
wilson
architects
Level 1
1" = 30'-0" 1 Level 1
18101 -Unit Mix by Floor
Name
Unit
Type Count Area Level Unit Type
Level 1
Unit 1-0 1BR/1BA 1 713 ft² Level 1 1 BR
Unit 1-1 1BR/1BA 15 Level 1 1BR
Unit 1-2 1BR/1BA 1 942 ft² Level 1 1BR
Unit 3-0 2BR/2BA 3 1,049 ft² Level 1 2 BR
Unit 3-1 2BR/2BA 4 1,137 ft² Level 1 2 BR
Unit 3-2 2BR/2BA 1 1,200 ft² Level 1 2 BR
25
Level 2
Unit 1-0 1BR/1BA 2 713 ft² Level 2 1 BR
Unit 1-1 1BR/1BA 17 Level 2 1BR
Unit 1-2 1BR/1BA 1 942 ft² Level 2 1BR
Unit 3-0 2BR/2BA 5 1,049 ft² Level 2 2 BR
Unit 3-1 2BR/2BA 4 1,137 ft² Level 2 2 BR
Unit 3-2 2BR/2BA 1 1,200 ft² Level 2 2 BR
30
Level 3
Unit 1-0 1BR/1BA 2 713 ft² Level 3 1 BR
Unit 1-1 1BR/1BA 17 Level 3 1BR
Unit 1-2 1BR/1BA 1 942 ft² Level 3 1BR
Unit 3-0 2BR/2BA 5 1,049 ft² Level 3 2 BR
Unit 3-1 2BR/2BA 4 1,137 ft² Level 3 2 BR
Unit 3-2 2BR/2BA 1 1,200 ft² Level 3 2 BR
30
Level 4
Unit 1-0 1BR/1BA 2 713 ft² Level 4 1 BR
Unit 1-1 1BR/1BA 17 Level 4 1BR
Unit 1-2 1BR/1BA 1 942 ft² Level 4 1BR
Unit 3-0 2BR/2BA 5 1,049 ft² Level 4 2 BR
Unit 3-1 2BR/2BA 4 1,137 ft² Level 4 2 BR
Unit 3-2 2BR/2BA 1 1,200 ft² Level 4 2 BR
30
Level 5
Unit 1-0 1BR/1BA 2 713 ft² Level 5 1 BR
Unit 1-1 1BR/1BA 15 Level 5 1BR
Unit 1-2 1BR/1BA 1 942 ft² Level 5 1BR
Unit 3-0 2BR/2BA 5 1,049 ft² Level 5 2 BR
Unit 3-1 2BR/2BA 4 1,137 ft² Level 5 2 BR
Unit 3-2 2BR/2BA 1 1,200 ft² Level 5 2 BR
28
Grand total 143
18101 -Unit Mix by Type
Name
Unit
Type Count Area Total Area
1BR/1BA
Unit 1-0 1BR/1BA 9 713 ft² 6,418 ft²
Unit 1-1 1BR/1BA 81 62,496 ft²
Unit 1-2 1BR/1BA 5 942 ft² 4,709 ft²
95 73,624 ft²
2BR/2BA
Unit 3-0 2BR/2BA 23 1,049 ft² 24,126 ft²
Unit 3-1 2BR/2BA 20 1,137 ft² 22,731 ft²
Unit 3-2 2BR/2BA 5 1,200 ft² 6,001 ft²
48 52,858 ft²
Grand total 143 126,482 ft²
Schema 1 Legend
Core/Stairs
Garage
206 ft²
Stair
30,433 ft²
Garage
13
3
3
22
14
17
15
Area Well
Garage Exhaust
Elec./
Mech
Bikes &
Storage
529 ft²
Core
483 ft²
Core
SD_500
3
Area Well
Garage Intake
206 ft²
Stair
WORKFORCE LIVING
kaas
wilson
architects
Level -1
1" = 30'-0" 1 Level -1
Schema 1 Legend
1BR/1BA
2BR/2BA
Core/Stairs
Corridor
718 ft²
Core
1,200 ft²
Unit 3-2
276 ft²
Stair
771 ft²
Unit 1-1
772 ft²
Unit 1-1
753 ft²
Core
772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,049 ft²
Unit 3-0
276 ft²
Stair
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1
1,049 ft²
Unit 3-0
1,049 ft²
Unit 3-0
772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,049 ft²
Unit 3-0
772 ft²
Unit 1-1
713 ft²
Unit 1-0
713 ft²
Unit 1-0
942 ft²
Unit 1-2
772 ft²
Unit 1-1
1,049 ft²
Unit 3-0
772 ft²
Unit 1-1
2,849 ft²
Corridor
WORKFORCE
kaas
wilson
architects
Level 2-4
1" = 30'-0" 1 Level 2
Schema 1 Legend
1BR/1BA
2BR/2BA
Amenity
Core/Stairs
Corridor
Patio
722 ft²
Club Room 807 ft²
Rooftop Patio
718 ft²
Core
1,200 ft²
Unit 3-2
276 ft²
Stair
771 ft²
Unit 1-1
772 ft²
Unit 1-1
753 ft²
Core
772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,049 ft²
Unit 3-0
276 ft²
Stair
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1
1,049 ft²
Unit 3-0
1,049 ft²
Unit 3-0
772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,137 ft²
Unit 3-1
1,137 ft²
Unit 3-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1
772 ft²
Unit 1-1 772 ft²
Unit 1-1
772 ft²
Unit 1-1
1,049 ft²
Unit 3-0
1,049 ft²
Unit 3-0
713 ft²
Unit 1-0
713 ft²
Unit 1-0
942 ft²
Unit 1-2
772 ft²
Unit 1-1
2,843 ft²
Corridor
WORKFORCE
kaas
wilson
architects
Level 5
1" = 30'-0" 1 Level 5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
7.3 5.1 7.5 7.5 5.1 5.0 4.1 6.1 8.2 8.0
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
8.0 7.3 5.0 8.0 7.3 5.1 7.5 8.2 4.1
SD_500
1
SD_500
2
SD_501
3
SD_500
3
Level 1
100'-0"
Level 2
110'-7 7/8"
Level -1
89'-4"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
5.1 4.1 7.3 5.0 8.0 7.5 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
4.1 5.1 7.3 5.0 8.0 4.1 7.5
EXTERIOR MATERIAL TAG KEY
5.0 PREFIN MTL SIDING W/ VERTICAL SEAM -COLOR:
BLACK
7.3 CFB LAP SIDING -6" AND 4" EXPOSURE -COLOR:
TAUPE
5.1 PREFIN MTL SIDING -CORTEN STEEL
7.5 CFB TRIM 5/4 BOARD -COLOR : BLACK
MASONRY:
METALS:
OPENINGS:
SIDING:
WOOD:
8.0 VINYL WINDOW -COLOR: BLACK
8.2 ALUMINUM STOREFRONT GLAZING -COLOR: BLACK
6.1 WOOD TRELLIS -COLOR: TBD
4.1 BRICK -COLOR: SAND
kaas
wilson
architects
Exterior Elevations
3/32" = 1'-0" 1 1 - S 1
3/32" = 1'-0" 2 2 - SE 1
3/32" = 1'-0" 3 3 - SW 1
3/32" = 1'-0" 4 4 - NW 1
SD_501
1
SD_501 2
SD_501 4
SD_501
3
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
8.2 8.0 7.5 7.5 5.1 7.3 4.1 5.0
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
5.1 5.0 4.1 8.0 7.3 7.5 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
8.2 5.0 5.1 8.0 7.3 7.5
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
151'-8 5/8"
Level 5
142'-7 1/2"
5.0 5.1 8.0 7.3 5.0 4.1 7.5
EXTERIOR MATERIAL TAG KEY
5.0 PREFIN MTL SIDING W/ VERTICAL SEAM -COLOR:
BLACK
7.3 CFB LAP SIDING -6" AND 4" EXPOSURE -COLOR:
TAUPE
5.1 PREFIN MTL SIDING -CORTEN STEEL
7.5 CFB TRIM 5/4 BOARD -COLOR : BLACK
MASONRY:
METALS:
OPENINGS:
SIDING:
WOOD:
8.0 VINYL WINDOW -COLOR: BLACK
8.2 ALUMINUM STOREFRONT GLAZING -COLOR: BLACK
6.1 WOOD TRELLIS -COLOR: TBD
4.1 BRICK -COLOR: SAND
kaas
wilson
architects
Exterior Elevations
3/32" = 1'-0" 1 5 - N 1
3/32" = 1'-0" 2 6 - E 2
3/32" = 1'-0" 4 8 - W 2
3/32" = 1'-0" 3 7 - S 3
PAGE 1 OF 1 Drawn By: SANDY Date:4/23/2019 Scale: AS NOTED Revisions # Date Comments
GE
N
E
R
A
L
N
O
T
E
S
:
A.
P
U
L
S
E
P
R
O
D
U
C
T
S
D
O
E
S
N
O
T
A
S
S
U
M
E
R
E
S
P
O
N
S
I
B
I
L
I
T
Y
FO
R
T
H
E
I
N
T
E
R
P
R
E
T
A
T
I
O
N
O
F
T
H
I
S
C
A
L
C
U
L
A
T
I
O
N
O
R
CO
M
P
L
A
I
N
C
E
T
O
T
H
E
L
O
C
A
L
,
S
T
A
T
E
,
O
R
F
E
D
E
R
A
L
LI
G
H
T
N
G
C
O
D
E
S
O
R
O
R
D
I
N
A
N
C
E
S
.
B.
L
I
G
H
T
I
N
G
L
A
Y
O
U
T
I
S
N
O
T
I
N
T
E
N
D
E
D
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
DO
C
U
M
E
N
T
S
B
U
T
O
N
L
Y
T
O
I
L
L
U
S
T
R
A
T
E
T
H
E
P
E
R
F
O
R
M
A
N
C
E
OF
T
H
E
P
R
O
D
U
C
T
.
C.
A
L
L
R
E
A
D
I
N
G
S
/
C
A
L
C
U
L
A
T
I
O
N
S
S
H
O
W
N
A
R
E
S
H
O
W
N
O
N
OB
J
E
C
T
S
/
S
U
R
F
A
C
E
S
.
REAL ESTATE EQUITIES BROOKLYN CENTER, MNChecked By: ROSS
0.
9
0
0
LU
M
A
R
K
P
R
V
-
A
6
0
-
D
-
U
N
V
-
T
5
-
B
Z
M
O
U
N
T
O
N
2
0
F
T
P
O
L
E
W
I
T
H
2F
T
B
A
S
E
32
6
19610
2
BB
SI
N
G
L
E
0.
9
0
0
LU
M
A
R
K
P
R
V
-
A
6
0
-
D
-
U
N
V
-
T
4
-
B
Z
M
O
U
N
T
O
N
2
0
F
T
P
O
L
E
W
I
T
H
2F
T
B
A
S
E
16
3
18935
Lu
m
i
n
a
i
r
e
S
c
h
e
d
u
l
e
Sy
m
b
o
l
Qt
y
La
b
e
l
Ca
l
c
u
l
a
t
i
o
n
S
u
m
m
a
r
y
La
b
e
l
Ca
l
c
T
y
p
e
Un
i
t
s
Av
g
Ar
r
a
n
g
e
m
e
n
t
LL
F
De
s
c
r
i
p
t
i
o
n
Ar
r
.
W
a
t
t
s
Lum. Lumens
Ma
x
Mi
n
Av
g
/
M
i
n
Ma
x
/
M
i
n
SI
T
E
G
R
O
U
N
D
Il
l
u
m
i
n
a
n
c
e
Fc
1.
7
6
20
.
9
0.
0
N.
A
.
N.
A
.
PA
R
K
I
N
G
4
AA
2
BA
C
K
-
B
A
C
K
2
CC
SI
N
G
L
E
0.
9
0
0
LU
M
A
R
K
P
R
V
-
A
6
0
-
D
-
U
N
V
-
T
2
-
B
Z
-
H
S
S
M
O
U
N
T
O
N
2
0
F
T
P
O
L
E
W
IT
H
2
F
T
B
A
S
E
16
3
17424
2
DD
SI
N
G
L
E
0.
9
0
0
LU
M
A
R
K
X
T
O
R
3
B
W
A
L
L
M
O
U
N
T
A
T
1
0
F
T
25
.
5
2751
9
FF
SI
N
G
L
E
0.
6
4
8
AT
L
A
N
T
I
C
C
O
M
6
-
S
Y
L
1
1
-
4
0
K
-
C
L
_
6
C
M
P
R
R
E
C
E
E
S
E
D
A
T
9
F
T
(
L
LF
A
D
J
U
S
T
F
O
R
1
2
2
3
L
U
M
E
N
S
)
9.
9
1707
3
GG
SI
N
G
L
E
0.
9
0
0
LU
M
I
E
R
E
3
0
3
-
B
1
-
L
E
D
B
2
-
4
0
0
0
-
U
N
V
-
T
2
-
D
I
M
1
0
-
B
K
M
O
U
N
T
A
T
3.
5
F
T
15
.
5
1433
2
HH
SI
N
G
L
E
3.
1
5
0
VO
L
U
M
E
L
I
G
H
T
I
N
G
V
6
4
6
-
7
9
W
A
L
L
M
O
U
N
T
A
T
7
F
T
(
L
L
F
A
D
J
U
ST
F
O
R
2
5
8
2
L
U
M
E
N
S
)
47
.
6
735
Il
l
u
m
i
n
a
n
c
e
Fc
2.
6
4
5.
1
1.
0
2.
6
4
5.
1
0
Pl
a
n
V
i
e
w
Sc
a
l
e
:
1
i
n
c
h
=
4
0
F
t
.
PR
O
P
O
S
E
D
BU
I
L
D
I
N
G
96
1
.
0
0
F
.
F
.
E
.
95
0
.
0
0
G
.
F
.
E
.
PR
O
P
O
S
E
D
BU
I
L
D
I
N
G
96
1
.
0
0
F
.
F
.
E
.
95
0
.
0
0
G
.
F
.
E
.
AA
2
AA
2
AA
2
AA2
BB
BB
CC
DD
DD
CC
FF
FF
FF
FF
FF
GG
GG
GG
HH
HH
FF
FF
FF
FF
2.
8
2.
2
2.
1
2.
3
2.
3
2.
9
3.
1
3.
1
2.
5
2.5
2.
8
3.
0
3.
4
3.
9
4.
0
3.
3
3.
2
3.
1
0.8
0.
0
0.
0
0.
0
0.
0
0.
0
0.0 0.0
2.
3
0.6 2.3 0.9 1.1 1.5 1.9 2.4 2.6
3.
0
0.0 3.1 0.8 0.9 1.1 1.4 1.8 2.3
3.
3
3.2 0.0 2.9
2.
7
2.
3
1.
9
1.
4
1.
3
1.
4
2.9
0.
0
2.
8
2.
4
2.
2
1.
9
1.
6
1.
1
1.
1
0.0
0.
0
0.0
0.
0
0.
0
0.
0
0.
0
0.
0
0.0
0.
0
0.
0
0.
0
0.
5
2.
2
11
.
9
2.
6
0.
0
0.
0
0.
0
0.
0
0.
9
0.
0
0.
0
0.
0
0.0 0.0 0.0 0.0
0.
0
3.
4
0.0
3.
9
4.
1
4.
0
4.
0
3.
7
3.
4
0.
4
3.
6
0.
6
2.
7
2.
2
1.
9
1.
7
1.
6
1.
3
1.1
3.
4
1.
6
0.9
4.
3
5.
0
4.
2
3.
1
2.
6
2.
4
4.
5
1.
8
5.
1
1.
2
0.
8
0.
5
0.
0
0.
7
0.
0
1.
2
2.
1
3.
2
0.
0
1.4 1.7 1.9 2.0 2.0
2.
1
4.
4
2.
3
0.9
4.
5
3.
9
4.
1
4.
2
5.
1
4.
2
4.
1
2.
1
2.
6
1.
4
1.
6
1.
8
1.
9
2.
0
2.
1
0.0
2.
4
1.
3
3.
1
3.
5
3.
5
3.
6
3.
5
3.
3
2.
5
2.
2
3.5
1.
3
0.0 1.2 1.2 1.7 2.1 2.7
1.
3
3.5
1.
2
3.6
3.
6
3.
0
2.
4
1.
9
1.
5
1.
0
3.3
2.
2
1.
9
2.
9
2.
4
2.
2
1.
8
1.
6
1.
5
3.7
1.
9
3.6
2.
3
2.
3
2.
3
2.
3
2.
4
2.
6
2.
9
1.
6
0.0
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
3.
4
0.0
1.
3
0.0 1.2 1.7 2.2 2.9 3.6 3.6 0.0 0.0
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
0.0 0.0
1.
5
0.0 0.0 1.1 1.2 1.6 2.0 2.5
0.
0
2.
7
3.
2
1.
0
1.
2
1.
4
1.
9
2.
0
2.
3
0.
0
2.
3
1.
1
3.
1
3.
2
3.
0
2.
8
2.
5
2.
1
3.5
2.
3
0.
9
3.2
3.
3
3.
6
3.
5
3.
4
3.
1
2.
4
2.
4
1.
2
2.
3
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
1.
8
1.
2
1.
4
3.6
3.
4
2.
8
2.
2
1.
6
1.
3
2.
9
1.
1
3.5
1.
1
1.
2
1.
3
1.
6
1.
8
1.
9
2.
1
1.
2
1.
2
1.
8
0.
9
0.
4
0.
1
0.
1
0.
0
1.
3
1.
0
5.
3
1.
0
0.
9
8.
3
4.
1
0.
8
0.
6
3.
4
2.
7
0.
4
3.
1
2.
6
1.
6
1.
0
0.
5
0.
3
0.
1
3.
4
0.
3
5.
5
0.
5
0.
6
1.
0
1.
6
2.
5
3.
8
1.
7
0.
1
1.
1
1.
5
1.
6
1.
4
1.
3
1.
2
1.
2
0.
9
1.
2
1.
5
0.
9
0.
9
0.
9
1.
0
1.
2
1.
8
2.
9
1.
1
0.
1
2.
8
4.
2
5.
9
6.
9
6.
6
5.
5
2.
4
1.
4
0.
2
1.
3
0.
0
0.
0
0.
0
2.
1
1.
5
1.
3
0.
8
0.
8
0.
2
0.
4
0.
3
0.
2
0.
1
0.
1
0.
1
2.
0
0.
1
0.
1
0.
2
0.
2
0.
3
0.
3
0.
3
0.
2
4.
4
0.
1
0.
1
0.
1
0.
0
0.
1
0.
1
0.
0
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
1
0.
2
0.
1
0.
2
1.
3
0.
5
0.
7
0.
9
1.
5
1.
2
0.
8
0.
3
0.
3
0.
3
1.
4
0.
8
0.
4
0.
4
0.
5
0.
6
6.
2
0.
5
0.
5
1.
3
0.
2
0.
2
0.
2
0.
3
0.
3
0.
3
0.
4
0.
7
0.
3
0.
4
0.
3
0.
2
10
.
6
2.
0
0.
4
0.
2
0.
6
3.
5
1.4
1.
5
2.
1
10
.
9
3.
2
4.
2
1.
3
3.
7
1.0
3.
3
3.
1
3.
1
3.
2
3.
5
3.
8
3.
5
3.
4
0.
0
4.
6
1.
5
1.
2
0.
4
0.
3
0.
4
0.
3
1.2
0.
0
1.1
0.
0
0.
0
0.
0
0.
0
0.
0
0.
0
2.
1
0.
1
1.4
3.
0
0.
0
0.
0
0.0 0.0 0.0 0.8
0.
0
1.2
0.
0
1.5 1.7
1.
8
1.
9
2.
2
3.
0
3.
4
1.1
0.
4
1.
2
1.
7
1.
5
1.
4
1.
4
1.
2
1.
0
0.
0
0.
3
2.
5
1.
0
2.
1
0.
9
0.
1
0.
0
0.
0
0.
0
0.
7
1.
6
2.
0
2.
1
2.
1
2.
0
2.
0
2.
0
1.
4
1.
7
8.
8
1.
4
1.
1
1.
0
1.
0
1.
1
1.
3
1.
7
1.
9
0.
0
3.
7
5.
1
2.
7
0.
7
0.
1
0.
0
0.
0
2.
1
0.
0
18
.
4
0.
0
0.
0
8.
9
15
.
9
2.
4
16
.
0
4.
2
0.
0
2.
9
2.
5
2.
7
8.
1
2.
7
2.
7
2.
7
2.
7
5.
1
2.
7
7.
1
2.
7
2.
4
2.
1
1.
7
1.
4
1.
2
1.
2
2.
7
0.
0
7.
1
1.
8
1.
0
0.
3
0.
1
0.
0
0.
0
20
.
9
0.
0
3.
6
0.
0
0.
0
0.
0
1.2 1.2
1.
7
4.
5
0.
0
1.
8
3.
5
3.
6
3.
5
3.
2
2.
6
2.
3
0.7
2.
0
2.3
1.
5
1.
4
1.
1
1.
0
0.
9
0.3
3.
4
2.
2
0.5
0.
9
0.3 0.6 0.9 1.4 1.7 0.9
3.
5
0.6
3.
0
0.5 0.5 0.6 0.8 1.1 1.7 0.8 0.7 0.3
2.
0
1.
8
1.
6
1.
4
1.
2
2.
4
0.5
0.
9
3.
3
0.4 0.4 0.4 0.2 0.2 0.2 0.2
3.
0
0.9 0.7 0.4 0.4 0.3 0.3 0.3 0.4
2.
4
0.6
2.
9
1.5 2.0
2.
5
2.
8
3.
1
3.
2
1.
1
0.5
2.
9
3.
0
3.
5
3.
6
3.
7
3.
8
3.
8
1.
1
3.
1
1.6
2.
6
2.
5
2.
6
2.
5
2.
2
1.
8
1.
4
3.
3
4.8
1.
0
0.
7
0.0 0.1 0.4 1.0 2.3 2.4 6.2 2.0 3.1 2.0 1.3 1.1 1.1 1.2
1.
0
4.2
2.
5
1.
2
3.
1
3.
6
3.
7
3.
6
3.
6
3.
5
1.9
2.
7
1.3
2.
3
2.
1
2.
0
1.
8
1.
6
1.
3
0.3
2.
9
3.1
1.
0
0.
9
1.
0
0.1 0.3 0.6 1.2 2.4 3.1
1.
1
1.8 1.1 0.8 0.7 0.7 0.8 1.0 2.0
13
.
5
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.
7
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.0
0.
8
0.
7
0.
7
0.
7
0.
6
0.
7
0.
7
0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.
6
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.1 0.1 0.1 0.2 0.1 0.2 0.0 0.9 0.2
1.
5
1.
7
1.
9
2.
0
1.
9
1.
7
1.
4
0.1
2.
3
1.
2
0.3 1.3 1.6
2.
0
2.
2
2.
4
0.1
2.
6
0.2
1.
9
1.
6
1.
4
1.
2
1.
1
1.
1
1.
0
2.
6
1.
0
1.
2
0.0 0.0 0.1 0.1 0.0 0.0
1.
0
0.
9
0.
9
1.
0
0.
9
0.
8
0.
7
0.
7
0.0 0.0 1.0 0.9 0.3
1.
0
0.1 0.1 0.1 0.1 0.1 0.0 0.1
1.
1
1.
1
1.
4
1.
4
1.
4
1.
3
1.
1
1.
0
0.1 0.0
1.
2
0.
9
0.
7
0.
5
0.
0
0.0
2.
3
0.0
2.
6
1.8 2.5 2.7 2.8 3.0 3.2
3.
1
0.0
2.
8
2.8
2.
5
2.
8
3.
4
3.
5
3.
4
3.
3
1.
6
2.
9
2.
0
2.
8
2.
9
3.
0
3.
1
3.
2
3.
2
2.
5
3.
2
0.0
2.
8
1.
7
1.
3
1.
0
0.
7
0.
6
0.
5
2.
5
0.0
2.
6
0.0 0.0 0.2 0.6 2.3 2.9
0.
9
0.0
3.
8
2.
3
2.
5
2.
6
2.
6
2.
7
3.
1
3.
5
2.
2
3.
7
2.
6
3.
7
3.
1
2.
8
2.
6
2.
5
2.
5
2.
5
3.
8
2.
9
1.6 2.1 2.8 3.4 3.5 3.8
2.
3
3.
4
0.0
2.
5
2.
4
2.
1
1.
9
1.
9
2.
1
2.
4
3.7
0.
0
0.
1
3.
5
3.
4
3.
1
2.
4
1.
9
1.
4
1.2
14
.
1
0.0
0.
0
0.
0
0.
0
0.
0
0.0 0.0
2.
8
1.
1
2.9
2.
8
0.0 0.0 0.0 0.0 0.0 1.6
0.
0
2.5
0.
0
3.2 3.5 3.6
3.
4
2.
9
2.
6
2.
4
1.9
3.
6
2.7
2.
7
2.
7
2.
7
2.
7
2.
9
3.
3
0.
0
3.
6
3.
0
3.
4
2.
9
2.
2
1.
8
1.
4
1.
0
1.
2
3.
6
2.
5
3.
4
3.
4
3.
5
3.
7
3.
6
3.
6
0.0
3.
1
3.
4
2.
1
1.
9
1.
6
1.
5
1.
3
1.
1
0.
9
3.
6
2.5 2.9 0.2 1.6 4.2 6.3 7.6 6.0
3.
3
2.9
3.
3
2.3 2.3 2.5
2.
9
3.
4
3.
5
0.0 4.1
3.
2
0.
8
3.
8
3.
8
3.
7
3.
4
3.
4
3.
2
3.
5
3.
1
2.
9
3.
2
2.
8
2.
3
1.
8
1.
6
1.
3
3.
7
3.
1
4.8 0.0 0.0 0.1 0.2 0.9 3.2 6.5
3.
8
6.5
0.
7
3.1 1.9 1.5 1.7 1.9 2.1 2.4 6.7
0.
7
2.
2
2.
1
2.
0
2.
0
1.
8
1.
6
0.1
0.
9
3.
0
0.
6
0.
6
0.0 0.0 0.0 0.0 0.0
1.
2
3.
0
2.8 2.8
2.
9
2.
9
2.
8
2.
7
2.
7
2.
3
2.
9
2.
6
3.
3
3.
7
3.
8
3.
7
3.
8
3.
6
2.1
2.
8
1.
7
0.2
3.
7
3.
7
3.
4
2.
7
2.
4
2.
1
4.
0
1.
8
3.
6
1.
5
1.
3
1.
1
0.
9
0.
8
0.0 0.0
1.
9
2.
9
1.
0
5.0 5.1 3.9 3.1 2.7 2.6
3.
9
2.7 0.7
3.
1
3.
1
2.
9
2.
9
3.
0
3.
2
3.
3
2.6
1
f
c
1
f
c
1
f
c
1 fc 1 fc 1 fc
1
f
c
1
f
c
1
f
c
1
f
c
1
f
c
0.
5
f
c
0.
5
f
c
0.5 fc 0.5 fc
0.
5
f
c
0.
5
f
c
0.
2
5
f
c
0.25 fc 0.25 fc
0.
2
5
f
c
TY
P
E
A
A
2
,
B
B
&
C
C
TY
P
E
D
D
TY
P
E
F
F
TY
P
E
G
G
TY
P
E
H
H
M E M O R A N D U M
DATE: May 9, 2019
TO: Jane Kansier, Senior Urban Planner
FROM: Andrew Hogg, Assistant City Engineer
SUBJECT: Preliminary Site Plan – Brooklyn Center Residential Development
Public Works staff reviewed the following documents submitted for review for the proposed
Brooklyn Center Residential Development, located at 5801 Xerxes Ave N:
Preliminary Plans dated April 16, 2019
Subject to final staff Site Plan approval, the referenced plans must be revised in accordance with the
following comments/revisions and approved prior to issuance of Land Alteration permit.
C1-1 – Title Plan
1. Add title sheet.
C1-1 – Removals Plan
2. Show all removals needed for existing utilities.
C2-1 – Site Plan
3. Use City Detail for City driveway aprons.
C3 – Grading Plan
4. All roadway embankment material installed within pavement patching areas of existing
roadways shall be placed in lifts not to exceed 8-inches and compacted to a minimum of 100
percent of maximum density regardless of depth below the final pavement surface. The
Engineer shall take a minimum of three (3) compaction tests at varying elevations within the
pavement patch area.
C4-1 – Utility Plan
5. Install sanitary manholes on main in Northway Drive and connect 8” sanitary service into
manholes. Use City details.
C4-2 – Utility Plan
6. Stormwater from dog run drains directly into storm drain with no treatment. Address steps to
prevent waste from entering the storm system.
C8-1, 8-2, 8-3 – Detail Sheets
7. All work performed and materials used for construction of utilities must conform to the City
standard specifications and details. The City’s standard details must be included in the plan.
8. Missing details.
Brooklyn Center Residential Development Site Plan
Review Memo, May 9 , 2019
Miscellaneous
9. See redlines for additional Site Plan comments.
10. Provide irrigation plan.
11. Provide detailed vehicle turning and tracking movement diagrams for delivery vehicles and
garbage trucks demonstrating specific and actual routes.
12. Applicant should address the recommendations of the traffic study, conducted by Spack
Consulting dated February 15, 2019.
13. Upon project completion the applicant must submit an as-built survey of the property,
improvements and utility service lines and structures; and provide certified record drawings of
all project plan sheets depicting any associated private and/or public improvements, revisions
and adjustments prior to issuance of the certificate of occupancy. The as-built survey must also
verify that all propert y corners have been established and are in place at the completion of the
project as determined and directed by the Cit y Engineer.
14. Inspection for the private site improvements must be performed by the developer’s
design/project engineer. Upon project completion, the design/project engineer must formally
certify through a letter that the project was built in conformance with the approved plans and
under the design/project engineer’s immediate and direct supervision. The engineer must be
certified in the State of Minnesota and must certify all required as-built drawings (which are
separate from the as-built survey).
15. The total disturbed area exceeds one acre, an NPDES permit is required. In addition, the total
disturbed area is less than five acres; the City of Brooklyn Center will review site using Shingle
Creek Watershed Commission rules for stormwater management. Stormwater management plan
is incomplete; please submit sub-catchment DA-2p calculations to allow for complete review.
16. Provide a corner clip dedication of ROW at the intersection with Xerxes to preserve adequate
sight distance for approaching vehicles at this intersection.
17. Provide dedication of sidewalk easement along bass Lake Road 3’ from existing sidewalk edge.
18. Utility Facilities Easement Agreement is required.
Prior to Issuance of a Land Alteration
19. Final construction/demolition plans and specifications need to be received and approved by the
City Engineer in form and format as determined by the City. The final plan must comply with the
approved preliminary plan and/or as amended, as required by the City Engineer.
20. A letter of credit or a cash escrow in the amount of 100 percent of the estimated cost as
determined by City staff shall be deposited with the City.
21. During construction of the site improvements and until the permanent turf and plantings are
established, the developer will be required to reimburse the City for the administration and
engineering inspection efforts. Please submit a deposit of $2,500 that the City can draw upon on
a monthly basis.
22. A Construction Management Plan and Agreement is required that addresses general construction
activities and management provisions, traffic control provisions, emergency management
provisions, storm water pollution prevention plan provisions, tree protection provisions, general
public welfare and safety provisions, definition of responsibility p rovisions, temporar y parking
provisions, overall site condition provisions and non-compliance provisions. A separate $2,500
deposit will be required as part of the non-compliance provision.
Brooklyn Center Residential Development Site Plan
Review Memo, May 9 , 2019
Anticipated Permitting
23. A City Land Disturbance permit is required.
24. A MPCA NPDES permit is required.
25. Other permits not listed may be required and is the responsibility of the developer to obtain and
warrant.
26. Copies of all required permits must be provided to the City prior to issuance of applicable
building and land disturbance permits.
27. A preconstruction conference must be scheduled and held with City staff and other entities
designated by the City.
The aforementioned comments are provided based on the information submitted by the applicant at
the time of this review. Other guarantees and site development conditions may be further
prescribed throughout the project as warranted and determined b y the City.
App. No. 2019-007
PC 05/16/2019
Page 1
Planning Commission Report
Meeting Date: May 16, 2019
Application No. 2019-007
Applicant: Nate Reinhardt (City of Brooklyn Center)
Location: 1350 Shingle Creek Crossing
Request: Site and Building Plan Approval
Requested Action
Nate Reinhardt, Director of Fiscal Resources (“The Applicant”), on behalf of the City of Brooklyn Center
(“The City”) is requesting review and consideration of a site and building plan application for the
construction of a new municipal liquor store at Shingle Creek Crossing on the pad site of Lot 5, Block 1,
5th Addition. The City is proposing to construct an approximately 9,600 square foot municipal liquor
store at the site, with the option to further construct an additional approximately 4,000 square foot
attached retail bay. In addition to the building construction, the proposal includes parking lot and
landscaping improvements, and the installation of traffic calming measures near the site. The current
liquor store at 5625 Xerxes Avenue (“BC Liquor #1”) would relocate to the new location at Shingle Creek
Crossing after construction is completed. The new location would provide for more parking, a more
secure internal layout of the liquor store, better visibility for the store, and more secure back loading
area for deliveries. Attached to this Planning Commission report are the application and submitted plans
(Exhibit A).
Background
Previously, staff presented on the potential relocation of liquor store from 5625 Xerxes Avenue to 1350
Shingle Creek Crossing at the January 14, 2019 City Council work session. The City acquired that parcel of
land located at 1350 Shingle Creek Crossing to build the new liquor store at that location after the City
Council approved their purchase agreement with Gatlin Development at the January 28th meeting.
• Application Filed: 04/16/2018
• Review Period (60-day) Deadline: 06/15/2019
• Extension Declared: N/A
• Extended Review Period Deadline: N/A
App. No. 2019-007
PC 05/16/2019
Page 2
Hennepin County geographic information systems (GIS) department. Joe Hartmann. May 9th, 2019.
The 1.42 acre site has space to accommodate a building up to 13,600 square feet, but the preliminary
floor plan for the new liquor store is 9,582 square feet, leaving 3,727 square feet available that would be
owned by the City of Brooklyn Center. This additional square footage could be used for future
expansion, lease or sale. In addition to the new liquor store construction, Gatlin Development will
provide the City with a $90,000 contribution to complete the remaining parking lot, utility connections
for water, sewer and storm water, and final grades for the building and adjacent sidewalk areas. These
improvements will service the proposed Liquor Store and the three remaining pad sites in the area.
Site Data:
2040 Land Use Plan: TOD (Transit Oriented District)
Neighborhood: Centennial
Current Zoning: PUD/C2 (Planned Unit Development/Commercial Park) District
Site Area: Approximately 1.42 Acres
Surrounding Area:
Direction 2040 Land Use Plan Zoning Existing Land Use
North TOD PUD/C2 Commercial
South TOD PUD/C2 Commercial
East TOD PUD/C2 Commercial
West TOD PUD/C2 Commercial
App. No. 2019-007
PC 05/16/2019
Page 3
Proposal Evaluation
Zoning Review:
The proposed use is in conformance with the PUD/C2 zoning classification for the property. Liquor
stores are a permitted use within the Shingle Creek Crossing shopping center.
Master PUD
The Shingle Creek Crossing PUD was approved on May 23, 2011, which provided for the
overall redevelopment of the former Brookdale Mall properties. The redevelopment would
phase in approximately 403,000 sf. of new retail commercial and restaurant uses, and included
the new daylighting and waterway features of Single Creek running through the site.
The proposed municipal liquor store would be constructed on the Building I site, which was
approved for a 13,600 retail pad. The proposed municipal liquor store conforms with the approved
Master PUD, and would complete the parking lot construction on that site of the development.
Traffic and Circulation
A traffic and parking study was completed by Kimley Horn as part of the analysis of the site. The
consultants recommended a number of traffic calming improvements to reduce vehicle speeds and
increase pedestrian safety. Raised pedestrian cross walks are proposed at two locations, as well as
additional decorative fencing and plantings to guide pedestrians to crosswalks.
App. No. 2019-007
PC 05/16/2019
Page 4
The City is also requesting approval from Walmart and Sears to reduce the number of travel lanes in
front of the building, which would narrow the roadway, improving pedestrian crossing conditions. Due
to covenants on the property, both Sears and Walmart must give consent before changes to the primary
circulation system can be made.
Landscaping
Per City requirements, the Applicant will need to ensure an irrigation system is installed as part of the
landscape installations. Drawings are to be submitted to the City once the location of the system has
been determined and as part of any approval of the project and building permit submittal.
Although the project submittal includes a landscape plan and planting schedule, City Code does not have
any specific requirements on the species of landscaping. The City has adopted a Landscape Point System
policy, which assigns points to a given site based on the use of and acreage of a development.
Along with the City’s Landscape Point System Policy, Shingle Creek Crossing has its own landscaping
guidelines. In particular, their landscaping guidelines explain that ‘unity of design shall be achieved by
repetition of certain plant varieties’ on their sites.
The City’s Landscape Point System Policy requires the liquor store site to provide a specific amount or
number of landscaping units, and is based on the maximum percentage of certain materials (i.e., 50%
shade trees; 40% coniferous trees; 35% decorative trees; and 25% shrubs). Given a “Retail/Service” use
and assuming an approximately 1.42 acre site, the Applicant would need to achieve a minimum of 113.4
points (80 points per acre for a development under 2 acres).
The landscaping plan provided by the Applicant indicates on their planting schedule that there are 20
overstory shade trees, no coniferous trees, no ornamental trees, and 24 shrubs. According to the
Landscape Point System policy, there is a maximum percentage of coniferous and ornamental trees
allowed, but there is no minimum. It was indicated to staff that the deciduous trees in the planting
App. No. 2019-007
PC 05/16/2019
Page 5
schedule were chosen specifically due to their change of colors in the fall; the Blaze Maple and Golden
Gingko trees were chosen in particular for their red and yellow colors, which dominate the planting
schedule. In addition to the proposed deciduous trees and shrub plantings, the Applicant also intends to
incorporate Karl Foerster grasses, catmint, and daylilies along the front of the building.
Planting Type Minimum Size Points Per Planting Maximum Points
(%)
Points Accrued
Shade (Deciduous)
Trees
2 ½” diameter 10 50% or 57 points 200 points
(20 deciduous trees *
10 points)
Coniferous (Evergreen)
Trees
5’ height 6 40% or 46 points 0 points
Decorative
(Ornamental) Trees
1” diameter 1.5 35% or 40 points 0 points
Shrubs 12” diameter 0.5 25% or 29 points 12 points
(24 shrubs * 0.5
points)
Total 212 points
Based on a review of the Landscape Plan, the proposed plan would not meet the minimum
requirements under the Landscape Point System Policy. Although the plan would accrue enough points
to meet requirements, there are no evergreen trees or decorative trees envisioned in the plan. The
proportion of shade trees exceed the maximum percentage allowed. Staff recommends that as a
condition of approval, the landscaping plan be amended to substitute some coniferous and decorative
trees for the shade trees and shrubs proposed so that the landscaping plan would meet the minimum
points required overall and the maximum points allowed for each category. Any changes to the
landscaping plan would also need to heed the Architectural Design Guidelines for Shingle Creek
Crossing.
Lighting
Per the City Zoning Code, “all exterior lighting shall be provided with lenses, reflectors, or shades, so as
to concentrate illumination of the property of the owner or operator of said illumination devices.” The
submitted photometric plan notes lighting poles will be 39 feet tall with a mounting height of 42 feet,
round, tapered, black steel poles with metal halide fixtures.
Per the City Zoning Code, lighting shall not exceed three (3) foot candles measured at property lines
abutting residentially zoned property, or 10 foot candles measured at the property lines abutting the
street right-of-way or non-residentially zoned properties. As is specified, no glare shall emanate from or
be visible beyond the boundaries of the illuminated premises. According to the Photometric Plan of the
west lot, the proposed lighting fixtures would be comparable to the existing lighting fixtures and the
proposed lighting fixtures for pedestrians along the south and west side of the lot. The preliminary
review of the photometric plan indicates all new lighting will meet or exceed the foot candle or
allowable light spill-over required by City Code.
Parking
Section 35-704 (Minimum Parking Spaces Required) would require a minimum of 53 parking spaces for
the new building given it is defined under our ordinance as a retail store or center (approximately 9,600
square feet; 11 spaces for the first 2,000 square feet and 5.5 spaces for each additional 1,000 square
feet; 7,600 / 1000 * 5.5 = 41.8 or approximately 42 spaces + 11 spaces = 53 spaces). The current
App. No. 2019-007
PC 05/16/2019
Page 6
proposal would provide 90 spaces in the parking lot. If the City did pursue the additional retail bay
construction, to incorporate the entire 13,600 square feet, it would require a minimum of 75 parking
spaces (11 spaces for the first 2,000 square feet and 5.5 spaces for each additional 1,000 square feet;
11,600 / 1000 * 5.5 = 63.8 or approximately 64 spaces +11 spaces = 75 spaces). Depending on the use of
the remaining 3,727 square feet, staff finds that the additional unused parking spaces should be
adequate to provide enough parking for future retail uses.
Gross Floor
Area
1st 2,000 Square Feet Additional 1,000 Square Feet Parking Spaces
Required
9,600 11 42 53
13,600 11 64 75
Signage
According to the City Sign Ordinance, Chapter 34-140: “Attached establishments or enterprises clustered
in a shopping center complex or in a multitenant office or industrial building may have wall signs and
projecting signs subject to the following: i) Each establishment or enterprise may have such signs on
each of its exterior walls, provided the aggregate area of such signs does not exceed 15% of the wall
supporting the signs; ii) In lieu of the above, the aggregate of the establishments or enterprises may
have a wall or projecting sign on each wall identifying the tenants collectively, or identifying the complex
or building; provided the area of each sign does not exceed 15% of the area of the wall supporting it.”
Under the agreement with Gatlin development, the city has the right to use panels on the existing pylon
signs for signage, but the Applicant has also proposed wall signage on the façade of the building. Given
this is the only establishment currently proposed in this multi-tenant site and the three remaining pad
sites in the area are not being utilized, the liquor store could utilize the entire aggregate area available
for all three sites, granted that the signs do not exceed 15% of the area of the wall supporting it. After
consultation with the City, the Applicant is aware that 150 square feet of signage per building front is
permitted at this location, based on the area of the wall supporting it.
Brad Bennett. Property Manager for Gatlin Development Company. Joe Hartmann. May 9th 2019.
Currently, the sign plan is forthcoming with the Applicant researching potential designs for the exterior
signage on the building, and the Applicant has conveyed to staff that they are pursuing designs that will
utilize internal lighting as opposed to a gooseneck design as initially planned. Upon consultation with the
Applicant, staff have determined that the forthcoming sign plan will incorporate text (“Beer / Wine /
Spirits”) displayed on both sides of the store front overhead. Staff recommends that as a condition of
App. No. 2019-007
PC 05/16/2019
Page 7
approval, the Applicant submit and receive approval for a Sign Plan that follows the City Sign
Ordinance and the Architectural Design Guidelines for Shingle Creek Crossing.
Waste Enclosures
Per Chapter 12 (Building Maintenance and Occupancy) of the City Code, “the trash area shall be
effectively screened from adjacent public rights-of-way and properties by a solid wall or fence
constructed of wood, masonry, or other durable materials that are complementary to the materials
used on the primary building.”
At the current site on Xerxes Avenue, the waste enclosure is highly visible from the street, but the new
location on Shingle Creek Crossing would provide for a more secure location for the waste enclosures,
situated behind the building in an area that is not readily accessible to the public. The Applicant
provided a site plan featuring the design of a new trash enclosure that will be located behind the
building. The plans reference two 6-yard dumpsters stored within the area of the gated enclosure
proposed, which appears to be adequate storage capacity for a retail establishment of that size. If the
liquor store demonstrates that it regularly exceeds that capacity, additional storage capacity may be
required.
Fire Inspector/Building Official Review: The Applicant shall work to ensure all Minnesota Fire Code
requirements have been met as part of any building and site plan approval. The Applicant shall work
with the Fire Inspector to ensure the site plan meets Minnesota Fire Code provisions, including, but not
limited to: maximum distance from fire hydrants, emergency access, fire sprinkler systems, etc.
Engineering/Pubic Works Review: As per the Assistant City Engineer’s memorandum dated May 9th and
subject to final staff Site Plan approval, the Applicant must apply for a Land Disturbance permit be
revised in accordance with the referenced plans and approved prior to any construction. During the
construction process, the Assistant City Engineer identified the need for site fencing to keep pedestrians
out of construction areas.
The memo provided by Assistant City Engineer requires the Applicant to provide storm water BMP’s
quantities. If the total disturbed area exceeds one acre, an NPDES permit is required. Storm water
requirements for the site where approved with the overall site improvements.
The memo also calls for the Applicant to provide detailed vehicle turning and tracking movement
diagrams for delivery vehicles and garbage trucks demonstrating specific and actual routes on the street.
Based on staff findings, staff recommends Planning Commission recommend City Council approval of
the requested Site and Building Plan for a municipal liquor store in the Shingle Creek Crossing
development; subject to the Applicant complying with the comments outlined in the Assistant City
Engineer’s memorandum dated May 9th, 2019 (Exhibit B), any outstanding comments remaining from
previous memorandums, and any conditions as outlined in the Approval Conditions section of this
Staff Report.
CONDITIONS OF APPROVAL
Staff recommends the following conditions be attached to any positive recommendation on the
approval of Planning Commission Application No. 2019-007 for the Subject Property to be located at
1350 Shingle Creek Crossing:
App. No. 2019-007
PC 05/16/2019
Page 8
1. Developer/Applicant agrees to comply with all conditions or provisions noted in the City
Engineer’s Review memo, dated May 9th, 2019.
2. The building plans are subject to review and approval by the Building Official with
respect to applicable codes prior to the issuance of permits.
3. Final grading, drainage, utility and erosion control plans and any other site engineering
elated issues are subject to review and approval by the City Engineer prior to the issuance
of permits.
4. The Applicant shall amend the landscaping plan to come into compliance under the provisions of
the Landscape Point System Policy to substitute coniferous and decorative trees for some of the
shade trees and shrubs proposed so that the landscaping plan would meet the minimum points
required overall and the maximum points allowed for each category.
5. The Applicant shall submit a Sign Permit Application for any proposed signage (e.g., wall,
freestanding) as part of the development proposal.
a. Approval of wall signs is subject to the review and approval of detailed sign plans as part
of the City’s building and site plan review process through Planning Commission and City
Council.
b. All other signage not otherwise approved is subject to Chapter 34 of the City Code of
Ordinances and shall be approved under separate sign permits.
6. The Applicant shall submit an as built survey of the property, improvements and utility
service lines upon completion of the project.
7. Any major changes or modifications made to this PUD Development/Site and Building
Plan can only be made by an amendment to this PUD, which shall include an updated
Development/Site Plan if necessary.
8.
RECOMMENDATION
Motion to adopt a Resolution recommending approval of Planning Case 2019-007 for a Site and Building
Plan approval at Shingle Creek Crossing, based on the submitted plans and findings of fact, as amended
by the Conditions of Approval in the May 16, 2019 Planning Commission Report.
Attachments
Attachments
Exhibit A- Application, Memo, and Submitted Plans, prepared by Nate Reinhardt (City of Brooklyn Center), and
dated April 16th, 2019.
Exhibit B- Memorandum, prepared by Assistant City Engineer Andrew Hogg, and dated May 9th 2019.
Applicant Information:
Name:
Address:
Office Phone: Cell:
Email: FAX:
Property Owner Information* (if different from Applicant):
Name:
Property Owner Address:
Office Phone: Cell:
Email: FAX:
2019 Planning Commission Application
Project Information:
Provide a general description of your project and request(s):
Address/Location of Property:
Legal Description of Property:
Application Type (Mark all that Apply)
Comprehensive Plan Amendment $1,050 Appeal $200
Rezoning $1,050 Zoning Code Text Amendment $500
Special/Interim Use Permit $250 Special/Interim Use Permit Amendment $150
Site and Building Plan Review $750 Variance $200
Planned Unit Development $1,800 Planned Unit Development Amendment $700
Preliminary Plat $400 Final Plat $200
IMPORTANT: All applications may be subject to additional fees for reimbursement of costs incurred by the City for filing, reviewing,
and processing applications in the form of an escrow to the City.
Application Fee: $ Escrow Amount: $ Receipt No:
For Office Use Only
Date Received:
Date Application Complete:
Letter of Completeness:
PC App No.
For Office Use Only
Escrows: All Planning Commission Applications shall be subject to a $1,000 escrow deposit. Costs expended in
reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to
the escrow may include attorney and consulting fees and/or mailing and public notice costs. The escrow amount
may be reduced or increased by the City Planner on a project by project basis. If at any time a required cash escrow
is depleted the applicant shall deposit additional escrow funds as determined by the City. Unused portions of an
escrow deposit shall be returned to the Applicant upon successful implementation of an approved application.
Complete/Incomplete Applications: A preliminary meeting with City Staff is required prior to the submission of a
Planning Commission Application. No application will be considered complete prior to such meeting. Once an
application is submitted, City Staff shall have fifteen (15) business days to determine if the application is complete.
An incomplete application will delay process of the request. If incomplete, City Staff will notify the Applicant in
writing that the application is incomplete and what information is needed in order to make the application
complete. Once an application has been deemed complete it will be placed on the next available Planning
Commission agenda.
Meeting Schedule: The deadline for submittal of Planning Commission Applications is outlined in the below
schedule. Failure to submit all application materials, fees, and escrows by 4:30 p.m. on the application submittal
deadline may delay the review process. Planning Commission meetings are typically held the Thursday following the
second Monday of each month at 7:00 p.m. If a recommendation is made by the Planning Commission regarding the
application it will typically be placed on the agenda of the next City Council meeting, which are held the fourth
Monday of each month at 7:00 p.m. Meetings are held in the City Council Chambers at Brooklyn Center City Hall.
Additional meetings and/or work sessions may be scheduled as necessary for the review of an application.
2019 Application Schedule (subject to change)
Application Submittal Deadline
(30-Days Prior to Meeting)
Planning Commission
Meeting Dates
City Council Meeting Dates
(for application review)
December 18 (2018) January 17 January 28
January 15 February 14 February 25
February 12 March 14 March 25
March 12 April 11 April 22
April 16 May 16 May 28 (Tuesday)
May 14 June 13 June 24
June 11 July 11 July 22
July 16 August 15 August 26
August 13 September 12 September 23
September 17 October 17 October 28
October 15 November 14 November 25
November 12 December 12 January 13 (2020)
Note: The above schedule is outlined for those submitting Planning Commission applications and does not outline all
City Council meetings scheduled. Please access the City of Brooklyn Center’s website at
www.cityofbrooklyncenter.org to receive up to date meeting dates and notices of any changes made to this
schedule. Individuals may also review and download meeting agendas and packets from the city website.
Meeting Attendance: In order for the Planning Commission and City Council to consider any application, the
Applicant or a designated representative must be present at the scheduled meeting(s). If not, the matter may be
tabled until the next available agenda.
Acknowledgement and Signature:
The undersigned acknowledges that they understand that before a Planning Commission application can be deemed
complete, all required fees and escrows must be paid to the City. By signing and submitting this application, the
Applicant agrees to pay to the City of Brooklyn Center the actual costs incurred for expenses reasonably and
necessarily required by the City for the review, filing, and processing of the application. Such costs will be in addition
to the application fee described herein. Withdrawal of the application will not relieve the applicant of the obligation
to pay costs incurred prior to withdrawal. Any administrative fees paid as part of the submission of this application
are nonrefundable.
___________________________________________________ ______________________
Property Owner Signature (Required) Date
___________________________________________________ ______________________
Applicant Signature (If different than Property Owner) Date
SITE IMPROVEMENT PLANS
FOR
SHINGLE CREEK CROSSING
LOCATED AT
SECTION 2, TOWNSHIP 118N, RANGE 21W
PARCEL ID# 03-118-21-41-0044
1.THE SITEWORK FOR THIS PROJECT SHALL MEET OR EXCEED THE "SITE
SPECIFIC SPECIFICATIONS."
2.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY
CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR
TO CONTRACT COMPLETION AND THE FINAL CONNECTION OF SERVICES.
ALERT TO CONTRACTOR:
PREPARED BY:
VICINITY
N.T.S.NORTH
STORMWATER
FIRE PREVENTION
PLANNING AND ZONING
ENGINEERING
BUILDING DIVISION
ENVIRONMENTAL
HENNEPIN COUNTY
HEALTH DEPT.
PROJECT LOCATION
UTILITY RESPONSIBILITY MATRIX FOR THIS PROJECT
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
OWNER/DEVELOPER
CITY OF BROOKLYN CENTER
6301 SHINGLE CREEK PARKWAY
BROOKLYN CENTER, MN 55430
PHONE: (763) 569-3710
CONTACT: TOM AGNES
EMAIL: TAGNES@CI.BROOKLYN-CENTER.MN.US
CIVIL ENGINEER
LUCAS C. PAYNE, P.E.
KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100
SAINT PAUL, MINNESOTA 55114
PHONE: (651) 645-4197
EMAIL: LUKE.PAYNE@KIMLEY-HORN.COM
LANDSCAPE ARCHITECT
TODD HALUNEN, RLA
KIMLEY-HORN AND ASSOCIATES, INC.
767 EUSTIS STREET, SUITE 100
SAINT PAUL, MINNESOTA 55114
PHONE: (651) 645-4197
EMAIL: TODD.HALUNEN@KIMLEY-HORN.COM
ALL CONTRACTORS MUST CONTACT
GOPHER STATE CALL ONE
MN TOLL FREE 1-800-252-1166
BEFORE CONSTRUCTION BEGINS
TWIN CITY AREA 651-454-0002
XERXES AVENUE NORTH AND COUNTY ROAD 10
BROOKLYN CENTER, MINNESOTA
ARCHITECT
KATHY ANDERSON, AIA
ARCHITECTURAL CONSORTIUM
901 NORTH THIRD STREET, SUITE 220
MINNEAPOLIS, MN 55401
PHONE: (612) 436-4030
FAX: (612) 692-9960
PROJECT TEAM
GEOTECHNICAL ENGINEER
STEVE MARTIN, P.E.
BRAUN INTERTEC CORPORATION
1826 BUERKLE ROAD
SAINT PAUL, MN 55110
(651) 487-3245
FAX (651) 487-1812
ENVIRONMENTAL/
HAZARDOUS MATERIALS
BRAUN INTERTEC CORPORATION
11001 HAMPSHIRE AVENUE SOUTH
MINNEAPOLIS, MN 55438
(952) 995-2000
FAX (952) 995-2020
NOTE
PLEASE REFER TO THE FOLLOWING REPORTS PREPARED BY BRAUN INTERTEC
CORPORATION FOR GEOTECHNICAL INFORMATION:
·GEOTECHNICAL EVALUATION REPORT
SHINGLE CREEK CROSSING DATED JUNE 9, 2011 AND THE ADDENDUM DATED
MAY 2, 2012.
1350 SHINGLE CREEK CROSSING:
CO
V
E
R
S
H
E
E
T
6010
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
DRAWING INDEX
SHEET NO.SHEET TITLE
6010 COVER SHEET
6020 EROSION & SEDIMENTATION CONTROL PLAN PHASE 1
6021 EROSION & SEDIMENTATION CONTROL PLAN PHASE 2
6022 EROSION & SEDIMENTATION CONTROL DETAILS
6023 EROSION & SEDIMENTATION CONTROL DETAILS
6031 EXISTING CONDITIONS & DEMOLITION PLAN
6040 SITE PLAN
6041 SITE DETAILS
6042 SITE DETAILS
6043 SITE DETAILS
6051 GRADING & DRAINAGE PLAN
6052 DETAILED GRADING & DRAINAGE PLAN
6053 GRADING & DRAINAGE DETAILS
6061 UTILITY PLAN
6062 DETAILED UTILITY PLAN
6063 UTILITY DETAILS
6101 LANDSCAPE PLAN
6102 LANDSCAPE DETAILS
FOR:
MUNICIPAL LIQUOR
6081 PHOTOMETRICS PLAN - PREVIOUSLY APPROVED
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
B
R
B
R
B
R
BR
B
R
B
R
B
R
B
R
BR
B
R
B
R
B
R
B
R
B
R
BR BR
LEGEND
LIMITS OF DISTURBANCE, OFFSET 3' FOR CLARITY
EXISTING DRAINAGE PATTERNS
BR
PROPERTY LINE
0.0%
ROCK ENTRANCE, SEE DETAIL
INLET PROTECTION, SEE DETAIL
SILT FENCE, SEE DETAIL
BIOROLL - FILTREXX SEDIMENT
CONTROL, SEE DETAIL
EXISTING DRAINAGE DIRECTION
EXISTING CONTOUR
CONTRACTOR TO COORDINATE PHASING OF WORK
WITH THE ENGINEER AND/OR OWNER'S
REPRESENTATIVE. CONTRACTOR SHALL CONTAIN ALL
WORK WITHIN THE LIMITS OF DISTURBANCE, WHICH
INCLUDES STORAGE OF MATERIALS AND EQUIPMENT.
CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
AREAS AFFECTED BY WORK TO A CONDITION AS
GOOD AS EXISTING OR BETTER.
GOPHER STATE ONE CALL
FLOOD ZONE NOTE:
THE PROPERTY APPEARS TO BE SITUATED IN FLOOD
ZONE "X" AND FLOOD ZONE "AE", PURSUANT TO
F.E.M.A. COMMUNITY PANEL NUMBER 270151 0212 E,
REVISION DATE SEPTEMBER 02, 2004.
ON-SITE LIMITS OF DISTURBANCE TO END AT THE
PROPERTY LINE. REINFORCED SILT FENCE AND TREE
PROTECTION FENCE TO BE CONSTRUCTED JUST
INSIDE THE PROPERTY LINE AND OUTSIDE OF ALL
PROPOSED IMPROVEMENTS.
THE PRESENCE OF GROUNDWATER SHOULD BE
ANTICIPATED ON THIS PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR ADDRESSING
THIS ISSUE.
VICINITY MAP, USGS QUAD MAP, OPERATION TIME
SCHEDULE, ALL GENERAL EROSION AND SEDIMENT
CONTROL NOTES, MAINTENANCE NOTES AND
SEQUENCE NOTES ARE ON SHEET 6022 - EROSION AND
SEDIMENTATION CONTROL DETAILS.
ACREAGE SUMMARY -
MUNICIPAL LIQUOR
(TO NEAREST HUNDRETH ACRE)
ON-SITE DISTURBED AREA
OFF-SITE DISTURBED AREA
IMPERVIOUS AREA AT COMPLETION (WITHIN LOD)
PERVIOUS AREA AT COMPLETION (WITHIN LOD)
1.02
0.59
1.29
0.31
TOTAL PROPERTY AREA 1.42
TOTAL LIMITS OF DISTURBED AREA (LOD)1.61
ER
O
S
I
O
N
&
SE
D
I
M
E
N
T
A
T
I
O
N
CO
N
T
R
O
L
P
L
A
N
P
H
A
S
E
1
6020
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
LEGEND
INLET PROTECTION, SEE DETAIL
SILT FENCE, SEE DETAIL
LIMITS OF DISTURBANCE, OFFSET 3' FOR CLARITY
BIOROLL, SEE DETAILBR
PROPERTY LINE
925
0.0%
LANDSCAPED AREA, SEE LANDSCAPE PLANS
CONCRETE SIDEWALK
ASPHALT PAVEMENT
ARCHITECTURAL APRON
ROCK ENTRANCE, SEE DETAIL
EXISTING CONTOUR
PROPOSED CONTOUR
CONTRACTOR TO COORDINATE PHASING OF WORK
WITH THE ENGINEER AND/OR OWNER'S
REPRESENTATIVE. CONTRACTOR SHALL CONTAIN ALL
WORK WITHIN THE LIMITS OF DISTURBANCE, WHICH
INCLUDES STORAGE OF MATERIALS AND EQUIPMENT.
CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL
AREAS AFFECTED BY WORK TO A CONDITION AS
GOOD AS EXISTING OR BETTER.
GOPHER STATE ONE CALL
FLOOD ZONE NOTE:
THE PROPERTY APPEARS TO BE SITUATED IN FLOOD
ZONE "X" AND FLOOD ZONE "AE", PURSUANT TO
F.E.M.A. COMMUNITY PANEL NUMBER 270151 0212 E,
REVISION DATE SEPTEMBER 02, 2004.
ON-SITE LIMITS OF DISTURBANCE TO END AT THE
PROPERTY LINE. REINFORCED SILT FENCE AND TREE
PROTECTION FENCE TO BE CONSTRUCTED JUST
INSIDE THE PROPERTY LINE AND OUTSIDE OF ALL
PROPOSED IMPROVEMENTS.
THE PRESENCE OF GROUNDWATER SHOULD BE
ANTICIPATED ON THIS PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR ADDRESSING
THIS ISSUE.
VICINITY MAP, USGS QUAD MAP, OPERATION TIME
SCHEDULE, ALL GENERAL EROSION AND SEDIMENT
CONTROL NOTES, MAINTENANCE NOTES AND
SEQUENCE NOTES ARE ON SHEET 6022 - EROSION AND
SEDIMENTATION CONTROL DETAILS.
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
B
R
B
R
B
R
BR
B
R
B
R
B
R
B
R
BR
B
R
B
R
B
R
B
R
B
R
BR BR
1
.
8
4
%
2.68%
1
.
3
1
%
2
.
4
7
%
5.6
7
%
850
8
5
1
85
1
851
852
85
2
85
2
851
8
5
1
85
1
8
5
0
85
2
852
ACREAGE SUMMARY -
MUNICIPAL LIQUOR
(TO NEAREST HUNDRETH ACRE)
ON-SITE DISTURBED AREA
OFF-SITE DISTURBED AREA
IMPERVIOUS AREA AT COMPLETION (WITHIN LOD)
PERVIOUS AREA AT COMPLETION (WITHIN LOD)
1.02
0.59
1.29
0.31
TOTAL PROPERTY AREA 1.42
TOTAL LIMITS OF DISTURBED AREA (LOD)1.61
ER
O
S
I
O
N
&
SE
D
I
M
E
N
T
A
T
I
O
N
CO
N
T
R
O
L
P
L
A
N
P
H
A
S
E
2
6021
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
GENERAL EROSION AND SEDIMENT CONTROL NOTES
A.THE STORMWATER POLLUTION PREVENTION PLAN IS COMPRISED OF THE SITE MAPS, DETAIL SHEETS, THE PLAN
NARRATIVE, ATTACHMENTS INCLUDED IN SPECIFICATIONS AND ALL SUBSEQUENT REPORTS AND RELATED
DOCUMENTS.
B.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH STORMWATER POLLUTION PREVENTION SHALL
OBTAIN A COPY OF THE STORMWATER POLLUTION PREVENTION PLAN AND THE STATE OF MINNESOTA NATIONAL
POLLUTANT DISCHARGE ELIMINATION SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH
THEIR CONTENTS.
C.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AS REQUIRED BY THE SWPPP. ADDITIONAL
BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL
COST OF OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION.
D.BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL
REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL
CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER.
E.SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY
IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES.
F.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE
GENERAL PERMIT.
G.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL
ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE PARKING AREA, AND AREA
FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES. CONSTRUCT A BERM
DOWNSTREAM IN ACCORDANCE WITH SPECIFICATION SECTION 02370.
H.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE DETAINED
AND PROPERLY TREATED OR DISPOSED.
I.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE
OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND LEAKS.
J.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR
TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
K.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS SHALL BE DEPOSITED INTO SEALED
CONTAINERS. MATERIALS SHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND
OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE.
L.ALL STORMWATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE STORM WATER
POLLUTION PREVENTION PLAN, SHALL BE INITIATED AS SOON AS PRACTICABLE.
M.ALL DENUDED AREAS THAT WILL BE INACTIVE FOR 7 DAYS OR MORE, MUST BE STABILIZED TEMPORARILY WITH
THE USE OF FAST-GERMINATING ANNUAL GRASS/GRAIN VARIETIES, STRAW/HAY MULCH, WOOD CELLULOSE
FIBERS, TACKIFIERS, NETTING OR BLANKETS AS SHOWN ON SITE MAP.
N.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE
PERMANENTLY STABILIZED AS SHOWN ON THE PLANS. THESE AREAS SHALL BE SEEDED, SODDED, AND/OR
VEGETATED NO LATER THAN 7 DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING IN THESE AREAS.
CHANNELS MUST BE STABILIZED WITHIN 24 HOURS. REFER TO THE SITE/GRADING PLAN AND/OR LANDSCAPE
PLAN.
O.IF VEHICLES SHOW SIGNS OF TRACKING AND/OR DIRT, THEN IMMEDIATELY THE TIRES MUST BE WASHED
BEFORE THE VEHICLES ENTER A PUBLIC ROAD. IF WASHING IS USED, PROVISIONS MUST BE MADE TO
INTERCEPT THE WASH WATER AND TRAP THE SEDIMENT BEFORE IT IS CARRIED OFF THE SITE. ONLY USE
APPROVED CONSTRUCTION INGRESS/EGRESS LOCATIONS.
P.ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM
DRAINS MUST BE REMOVED IMMEDIATELY.
Q.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT IN THE DETENTION
POND AND ANY SEDIMENT THAT MAY HAVE COLLECTED IN THE STORM SEWER DRAINAGE SYSTEMS IN
CONJUNCTION WITH THE STABILIZATION OF THE SITE.
R.ON-SITE & OFFSITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND
SEDIMENTATION THROUGH IMPLEMENTATION OF BEST MANAGEMENT PRACTICES. STOCKPILE AND BORROW
AREA LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT
REQUIREMENTS.
S.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF
VELOCITIES AND EROSION.
T.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ADJUSTING THE EROSION AND SEDIMENT CONTROL MEASURES (SILT FENCES, ETC.) TO
PREVENT EROSION AND POLLUTANT DISCHARGE.
U.SEE SITE PLAN FOR PERMANENT AND TEMPORARY SIGNAGE.
V.GENERAL CONTRACTOR IS TO DESIGNATE/IDENTIFY AREAS ON THE SITE MAPS, INSIDE OF THE LIMITS OF
DISTURBANCE, FOR WASTE DISPOSAL AND DELIVERY AND MATERIAL STORAGE.
W.REFER TO SWPPP FOR REPORTABLE SPILL QUANTITIES OF PETROLEUM PRODUCTS AND/OR HAZARDOUS
WASTES.
X.CONTRACTOR TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE WITH EROSION CONTROL SEQUENCING
SHOWN ON THE SITE MAP. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL
BE PERMITTED.
Y.THE SITE RECEIVING WATER IS SHINGLE CREEK WHICH IS AN IMPAIRED WATER. CONTRACTOR SHALL FOLLOW
ALL MPCA REQUIREMENTS FOR IMPAIRED WATERS DURING CONSTRUCTION.
Z.SWEEP ADJACENT PAVED AREAS AS NEEDED OR DIRECTED BY THE CITY ENGINEER.
AA.SWEEP DAILY OR AS REQUIRED BY CITY ENGINEER.
BB. SWPPP INSPECTION REPORTS SHALL BE SUBMITTED DIGITALLY TO THE ENGINEERING DEPARTMENT WITHIN 12
HOURS OF COMPLETION.
BMP MAINTENANCE EROSION NOTES
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION
PREVENTION PLAN, SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO LONGER REQUIRED FOR A
COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL
MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON IN ACCORDANCE WITH THE CONTRACT DOCUMENTS OR
THE APPLICABLE PERMIT, WHICHEVER IS MORE STRINGENT, AND REPAIRED IN ACCORDANCE WITH THE
FOLLOWING.
1.INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACES IF THEY SHOW SIGNS OF
UNDERMINING OR DETERIORATION.
2.ALL SEEDED AREAS SHALL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS
SHOULD BE FERTILIZED, WATERED, AND RESEEDED AS NEEDED.
3.SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE
REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-HALF THE HEIGHT OF THE SILT FENCE.
4.THE CONSTRUCTION EXITS SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR
FLOW OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE
CONSTRUCTION EXITS AS CONDITIONS DEMAND.
5.THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR
PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AS
CONDITIONS DEMAND.
6.OUTLET STRUCTURES IN THE SEDIMENTATION BASINS SHALL BE MAINTAINED IN OPERATIONAL CONDITIONS
AT ALL TIMES. SEDIMENT SHALL BE REMOVED FROM SEDIMENT BASINS OR TRAPS WHEN THE DESIGN
CAPACITY HAS BEEN REDUCED BY 50%.
7.PRIOR TO LEAVING THE SITE, ALL VEHICLES SHALL BE CLEANED OR DEBRIS. ANY DEBRIS AND/OR
SEDIMENT REACHING THE PUBLIC STREET SHALL BE CLEANED IMMEDIATELY BY A METHOD OTHER THAN
FLUSHING.
8.ALL MAINTENANCE OPERATIONS SHALL BE DONE WITHIN 24 HOURS AFTER THE DISCOVERY, OR AS SOON
AS FIELD CONDITIONS ALLOW.
SODDING/SEEDING NOTES
SOD:
1.PROVIDE SOD SPECIES, DEVELOPED PRIMARILY OF BLUE GRASS AND FESCUE SEED, SUITABLE AS LAWN
TURF FOR THE REGION. SOD SHALL BE STRONGLY ROOTED, 2-YEARS OF AGE MINIMUM, WEED, DISEASE,
PEST FREE AND UNIFORM IN THICKNESS.
2.DO NOT PLACE TOPSOIL UNTIL SUBGRADE HAS BEEN APPROVED IN ACCORDANCE WITH SECTION 02300.
3.BEFORE PLACING TOPSOIL, RAKE SUBSURFACE CLEAR OF STONES, DEBRIS AND ROOTS. DISK, DRAG,
HARROW, HARLEY OR RAKE SUBGRADE TO A DEPTH OF 2"-4" AND REMOVE STONES LARGER THAN 1-1/2" TO
PROVIDE BOND FOR TOPSOIL.
4.SPREAD TOPSOIL TO A DEPTH OF 4" BUT NOT LESS THAN REQUIRED TO MEET FINISH GRADES AFTER LIGHT
ROLLING AND NATURAL SETTLEMENT. ADJUST DEPTH OF TOPSOIL IN AREAS ADJACENT TO PAVED
SURFACES OR CURBS TO ALLOW FOR THE PLACEMENT OF SOD.
5.INCORPORATE SOIL AMENDMENTS AND COMMERCIAL FERTILIZER INTO THE TOP 4" OF TOPSOIL TO ACHIEVE
THE SPECIFIED TOPSOIL REQUIREMENTS. TILL SOIL TO A HOMOGENOUS MIXTURE.
6.GRADE AREAS TO FINISH GRADES, FILLING AS NEEDED OR REMOVING SURPLUS TOPSOIL. FLOAT AREAS TO
SMOOTH, UNIFORM GRADES AS INDICATED ON DRAWINGS.
7.CUT AND LAY SOD ON SAME DAY. ONLY HEALTHY VIGOROUS GROWING SOD SHALL BE LAID. WIDE MACHINE
LAID ROLES ARE ACCEPTABLE.
8.LAY SOD ACROSS SLOPE AND TIGHTLY TOGETHER TO RESULT IN SOLID COVERAGE FREE OF GAPS.
9.ROLL NEW SOD TO SET OR PRESS SOD INTO UNDERLYING SOIL.
10.ALL FINISHED SODDING SHALL BE SMOOTH AND FREE OF LUMPS AND DEPRESSIONS.
11.AFTER SODDING HAS BEEN COMPLETED, CLEAN UP AND THOROUGHLY WATER NEWLY-SODDED AREAS
IMMEDIATELY.
12.CONTRACTOR IS RESPONSIBLE FOR SOD WATERING FOR 30 DAYS AFTER PLACEMENT.
SEED:
13.REFER TO LANDSCAPE PLANS AND SPECIFICATIONS FOR PERMANENT SEEDING.
BEST MANAGEMENT PRACTICES SEQUENCE
NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY
DOWN, PORTA-POTTY, WHEEL WASH, STOCKPILE AREA, CONCRETE WASHOUT, MASON'S AREA, FUEL AND
MATERIAL STORAGE CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATEDLY DENOTE THEM ON THE
SITE MAPS AND NOTE ANY CHANGES IN LOCATIONS AS THEY OCCUR THROUGHOUT THE CONSTRUCTION
PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE
SITE MAPS.
PHASE 1
1.INSTALL STABILIZED CONSTRUCTION EXITS, 'NO CONSTRUCTION TRAFFIC' SIGNS, AND SWPPP
INFORMATION SIGN.
2.INSTALL CONSTRUCTION AND SILT FENCES ON THE SITE (CLEAR ONLY THOSE AREAS NECESSARY TO
INSTALL CONSTRUCTION AND SILT FENCE) AND INLET PROTECTION ON EXISTING INLETS.
3.PREPARE TEMPORARY PARKING AND STORAGE AREA.
4.INSTALL AND STABILIZE HYDRAULIC CONTROL STRUCTURES (DIKES, SWALES, CHECK DAMS, ETC.).
5.BEGIN CLEARING AND GRUBBING AND DEMOLITION OF THE SITE IN THOSE AREAS PERTINENT TO THE
CURRENT LIMITS OF CONSTRUCTION.
6.BEGIN GRADING THE SITE.
7.START CONSTRUCTION OF BULDING PAD AND STRUCTURES.
8.SEED CONSTRUCTION PHASE 4 AREAS, PROVIDE AND MAINTAIN EROSION CONTROL FOR ANY STOCKPILE
AREAS, AND MAINTAIN EROSION CONTROL MEASURES UNTIL CONSTRUCTION PHASE II WORK BEGINS.
PHASE 2
1.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED AREAS THAT WILL BE INACTIVE FOR 7
DAYS OR MORE. INSTALL EROSION CONTROL BLANKET ON SLOPES GREATER THAN 3:1.
2.INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, CURBS AND GUTTERS.
3.INSTALL INLET PROTECTION AT ALL STORM SEWER STRUTURES AS EACH INLET STRUCTURE IS
INSTALLED.
4.PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE.
5.PREPARE SITE FOR PAVING/OVERLAY WITHIN THE CURRENT LIMITS OF CONSTRUCTION.
6.PAVE SITE.
7.INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES.
8.COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS INCLUDING
OUTLOTS.
9.OBTAIN CONCURRENCE WITH THE OWNER THAT THE SITE HAS BEEN FULLY STABILIZED THEN:
A.REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES,
B.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF BMPS, AND
C.ASK THE OWNER TO CONTACT THE CEC TO COMPLETE THE CEC ON SITE INSPECTION AND REPORT.
10.CONTINUE DAILY INSPECTION REPORTS UNTIL THE FINAL DAILY INSPECTION REPORT, MARKED 'READY
TO TERMINATE PERMIT', IS SIGNED BY THE CONSTRUCTION MANAGER AND THE NOT HAS BEEN
SUBMITTED.
NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION-RELATED ACTIVITIES CONCURRENTLY
ONLY IF ALL PRECEDING BMPS HAVE BEEN COMPLETELY INSTALLED. BMP-RELATED STEPS IN THE ABOVE
SEQUENCE ARE ITALICIZED FOR CLARITY.
SITE: BROOKDALE
BROOKLYN CENTER, MN
LAT: 45° 03' 40"N LONG: 93° 19' 03" W
SITE LOCATION MAP
NOT TO SCALE
SECTION 2 - TOWNSHIP 188N - RANGE 21W
USGS QUAD MAP
NOT TO SCALE
1 MILE INFLUENCE ZONE
ULTIMATE RECEIVING WATER:
SHINGLE CREEK
1 MILE INFLUENCE ZONE
SITE: BROOKDALE
BROOKLYN CENTER, MN
LAT: 45° 03' 40"N LONG: 93° 19' 03" W
REGIONAL STORMWATER
FACILITIES
ENVIRONMENTAL NOTES
1.A CONSTRUCTION CONTINGENCY PLAN (CCP) HAS BEEN
PREPARED FOR THE SITE BY BRAUN INTERTEC DATED 05/27/2011
ALL CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH
THE "CCP" AS APPROVED BY THE MPCA.
A.THE SITE MAY CONTAIN CONTAMINATED GROUNDWATER
AND SOILS AS A RESULT OF CLOSED LUSTS (LEAKING
UNDERGROUND STORAGE TANKS), FORMER DRY CLEANER,
AND DRO. AS A RESULT, SCREENINGS MUST BE
PERFORMED BY A BRAUN INTERTEC TECNICIAN ON SOILS
UNCOVERED AS A RESULT OF DEMOLITION AND DURING
EXCAVATION OF CONTAMINATED SOILS.
B.SOIL VAPOR INTRUSION INVESTIGATIONS MUST BE
COMPLETED PRIOR TO BUILDING CONSTRUCTION TO
DETERMINE WHETHER SOIL VAPOR INTRUSION MITIGATION
IS NECESSARY.
C.PRIOR TO ANY DEWATERING, THE CONTRACTOR SHALL
PREPARE A SPECIAL DISCHARGE APPLICATION AND SUBMIT
AND OBTAIN APPROVAL FROM METROPOLITAN COUNCIL,
CITY OF BROOKLYN CENTER, AND THE MPCA.
D.DUST CONTROL MUST BE IMPLEMENTED WHEN
NECESSARY AS WELL AS PROPER DECONTAMINATION
PRACTICES SUCH AS ROCK APRONS AT THE EXITS, STREET
SWEEPING, ETC.
2.SHINGLE CREEK IS AN IMPAIRED WATER ACCORDING TO THE
MPCA. ALL CONSTRUCTION SHALL FOLLOW THE GENERAL
PERMIT REQUIREMENTS FOR IMPAIRED WATERS AND IN
ACCORDANCE WITH THE SWPPP.
ULTIMATE RECEIVING WATER:
SHINGLE CREEK
ER
O
S
I
O
N
&
SE
D
I
M
E
N
T
A
T
I
O
N
CO
N
T
R
O
L
D
E
T
A
I
L
S
6022
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
SWPPP INFORMATION
1.
3B.
3A.
4.
5.
2.
SECTION NTS
PLAN NTS
FILTREXX® SEDIMENT CONTROL
NTS
®™
™
®™
BIOROLL SCHEDULE
BIOROLL SECTION TYPE SECTION LENGTH
(FT.)
DRAINAGE AREA
(AC.)
AVERAGE SLOPE
OF AREA (%)
1 BIOROLL 110 0.17 2
2 BIOROLL 110 0.64 2
3 BIOROLL 219 0.47 2
4 BIOROLL 1043 3.89 2
ER
O
S
I
O
N
&
SE
D
I
M
E
N
T
A
T
I
O
N
CO
N
T
R
O
L
D
E
T
A
I
L
S
6023
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
REMOVE BITUMINOUS SURFACE
REMOVE CONCRETE SURFACE
REMOVE TREE
REMOVE CONCRETE CURB & GUTTER
REMOVE UTILITY LINES
CLEARING & GRUBBING
REMOVE FENCE
LEGEND
PROTECT EXISTING TREE, UTILITY
STRUCTURE, ETC.
FULL DEPTH SAWCUT
DEMOLITION NOTES:
1.AN NPDES PERMIT WAS OBTAINED BY THE DEVELOPER. SITE DEMOLITION SHALL NOT COMMENCE UNTIL THE APPROPRIATE BMP'S ARE
CONSTRUCTED AND SUBSEQUENTLY APPROVED BY THE ENGINEER.
2.THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION, REMOVAL AND DISPOSAL (IN A LOCATION APPROVED BY ALL GOVERNING AUTHORITIES)
OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE, STRUCTURES, UTILITIES, ETC. SUCH THAT THE
IMPROVEMENTS SHOWN ON THE PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND
BROUGHT TO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER THE SPECIFICATIONS.
3.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL DEBRIS FROM THE SITE THAT IS NOT BEING RECYCLED OR OTHERWISE REUSED AND
DISPOSING THE DEBRIS IN A LAWFUL MANNER. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR DEMOLITION AND
DISPOSAL.
4.THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO ADJACENT PROPERTIES AT ALL TIMES, INCLUDING BUT NOT LIMITED TO SEARS,
KOHL'S, WALMART, AND APPLEBEES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE DEVELOPER AND
COORDINATION WITH ADJACENT PROPERTIES AND THE CITY.
5.THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE
CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY
COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR THEIR SERVICES. THE CONTRACTOR IS RESPONSIBLE
FOR PAYING ALL FEES AND CHARGES.
6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO THE EXISTING BUILDINGS PRIOR TO DEMOLITION OF
THE BUILDINGS. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED TEMPORARY UTILITIES NECESSARY DURING CONSTRUCTION.
7.THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN ON THE PLAN HAVE BEEN DETERMINED FROM THE BEST INFORMATION AVAILABLE AND ARE
GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START
OF ANY DEMOLITION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR LOCATIONS OF EXISTING UTILITIES WITHIN ALL
AREAS OF PROPOSED WORK.
8.ALL EXISTING SEWERS, PIPING AND UTILITIES SHOWN ARE NOT TO BE INTERPRETED AS THE EXACT LOCATION, OR AS THE ONLY OBSTACLES THAT
MAY OCCUR ON THE SITE. VERIFY EXISTING CONDITIONS AND PROCEED WITH CAUTION AROUND ANY ANTICIPATED FEATURES. GIVE NOTICE TO ALL
UTILITY COMPANIES REGARDING DESTRUCTION AND REMOVAL OF ALL SERVICE LINES AND CAP ALL LINES BEFORE PROCEEDING WITH THE WORK.
9.ELECTRICAL, TELEPHONE, CABLE, WATER, FIBER OPTIC CABLE AND/OR GAS LINES NEEDING TO BE REMOVED OR RELOCATED SHALL BE
COORDINATED WITH THE AFFECTED UTILITY COMPANY. ADEQUATE TIME SHALL BE PROVIDED FOR RELOCATION AND CLOSE COORDINATION WITH
THE UTILITY COMPANY IS NECESSARY TO PROVIDE A SMOOTH TRANSITION IN UTILITY SERVICE. CONTRACTOR SHALL PAY CLOSE ATTENTION TO
EXISTING UTILITIES WITHIN ANY ROAD RIGHT-OF-WAY DURING CONSTRUCTION.
10.CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES WITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST
MANAGEMENT PRACTICES) AS APPROVED BY THE DEVELOPER. MAINTENANCE OF TRAFFIC FOR OFFSITE WORK SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR AND IN ACCORDANCE WITH THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MN MUTCD), INCLUDING THE
FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS.
11.CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING DEMOLITION OF THE EXISTING FACILITIES.
REFER TO CONSTRUCTION MANAGEMENT PLAN FOR ADDITIONAL INFORMATION.
12.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED WHERE NECESSARY, PER THE EROSION CONTROL
PLANS AND SPECIFICATIONS.
13.CONTRACTOR MAY LIMIT SAW-CUT AND PAVEMENT REMOVAL TO ONLY THOSE AREAS WHERE IT IS REQUIRED AS SHOWN ON THESE CONSTRUCTION
PLANS BUT IF ANY DAMAGE IS INCURRED ON ANY OF THE SURROUNDING PAVEMENT, ETC. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IT'S
REMOVAL AND REPAIR.
14.THE CONTRACTOR SHALL COORDINATE WATER MAIN WORK WITH THE FIRE DEPT. AND THE CITY UTILITY DEPARTMENT TO PLAN PROPOSED
IMPROVEMENTS AND TO ENSURE ADEQUATE FIRE PROTECTION IS CONSTANTLY AVAILABLE TO THE SITE THROUGHOUT THIS SPECIFIC WORK AND
THROUGH ALL PHASES OF CONSTRUCTION. CONTRACTOR WILL BE RESPONSIBLE FOR ARRANGING/PROVIDING ANY REQUIRED WATER MAIN SHUT
OFFS WITH THE CITY DURING CONSTRUCTION. ANY COSTS ASSOCIATED WITH WATER MAIN SHUT OFFS WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND NO EXTRA COMPENSATION WILL BE PROVIDED.
15.CONTRACTOR TO USE EXTREME CAUTION DURING DEMOLITION OF THE EXISTING STRUCTURE ADJACENT TO EXISTING STRUCTURES TO REMAIN.
DAMAGE TO ALL EXISTING CONDITIONS TO REMAIN WILL BE REPLACED AT CONTRACTOR'S EXPENSE.
16.BITUMINOUS AND CONCRETE PAVEMENTS, WITHIN THE LIMITS OF DISTURBANCE, SHALL BE REMOVED AS INDICATED ON THE PLANS.
17. ALL UTILITIES SHOWN ARE EXISTING UTILITIES.
18. THE CONTRACTOR SHALL ENSURE PROPER SITE DRAINAGE BY UTILIZING TEMPORARY DRAINAGE PIPING AND/OR OTHER MEANS THROUGHOUT
DURATION OF PROJECT, UNTIL PROPOSED DRAINAGE SYSTEM IS INSTALLED.
19. ALL UTILITIES SHALL BE DISCONNECTED PER CITY SPECIFICATIONS BEFORE BUILDING DEMOLITION BEGINS.
20. CONTRACTOR SHALL SUBMIT TRAFFIC CONTROL PLAN TO THE CITY FOR APPROVAL FOR ALL WORK THAT IMPACTS TRAFFIC WITHIN THE
RIGHT-OF-WAY.
21. GRAVITY SEWERS TO REMAIN SHALL BE BULKHEADED WHERE EXISTING CONNECTIONS ARE REMOVED. SANITARY INVERTS SHALL BE
RECONSTRUCTED.
22. CONTRACTOR SHALL NOT STOCKPILE OR STORE MATERIAL WITHIN PUBLIC UTILITY EASEMENTS.
APPROXIMATE LIMITS OF PAVEMENT
REMOVALS. CONTRACTOR TO REMOVE
EXISTING PAVEMENT TO EDGE OF TURF
F
F
F
F
F
F F F F F F
FFFF
F
F
A A A
A
A
A
A
A
A
C
D
A
A
A
A
A
C
D
D
D
D D
DD
D
D
D
B
BA
B
B
B
B
B
B
B
B
B
B
B
G
G
E
E
E
E
E
E
EE
E
E
E
E
H
H
H
H
H
H
HH
I
B
I
I
I
I
I
I
I
I
APPROXIMATE LIMITS OF PAVEMENT
REMOVALS. CONTRACTOR TO REMOVE
EXISTING PAVEMENT TO EDGE OF TURF
B
B
DEMOLITION LEGEND
A PROTECT EXISTING TREE
B PROTECT EXISTING CURB & GUTTER
C PROTECT EXISTING FIRE HYDRANT
D PROTECT EXISTING STORM OR SANITARY
STRUCTURES
E PROTECT EXISTING PAVEMENT
F PROTECT EXISTING LIGHT POLE
G REMOVE LIGHT POLE
H PROTECT EXISTING SIDEWALK
I FULL DEPTH SAWCUT
EX
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
&
DE
M
O
L
I
T
I
O
N
P
L
A
N
6031
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
SYMBOL LEGEND:
PROPOSED PARKING SPACES (SWSL)#
STANDARD PARKING STALL
PROPOSED LIGHT POLE (SEE LIGHTING PLAN
FOR FIXTURE LEGEND)
PROPERTY LINE
ADA STRIPING
PAVEMENT HATCH LEGEND:
PROPOSED CONCRETE SIDEWALK
PROPOSED CURB
PROPOSED STANDARD DUTY ASPHALT
PROPOSED HEAVY DUTY ASPHALT
EXISTING HEAVY DUTY ASPHALT
EXISTING LIGHT POLE
PEDESTRIAN CURB RAMP. SEE DETAIL.
ARCHITECTURAL APRON
LANDSCAPE AREA, SEE LANDSCAPE PLANS
PROPOSED HEAVY DUTY CONCRETE PAVEMENT
DETECTABLE WARNING STRIPS
1. CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS.
2. CONTRACTOR SHALL MATCH PROPOSED CURB AND GUTTER, CONCRETE AND PAVEMENT TO EXISTING IN GRADE AND ALIGNMENT.
3. CONTRACTOR SHALL REMOVE EXISTING PAVEMENT AND CONCRETE IN ACCORDANCE WITH SPECIFICATIONS.
4. THE EARTHWORK FOR ALL BUILDING FOUNDATIONS AND SLABS SHALL BE IN ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS.
5. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR ACTUAL BUILDING AND SIDEWALK DIMENSIONS, PORCH AND RAMP LOCATIONS.
6. GENERAL CONTRACTOR IS TO COORDINATE WITH APPROPRIATE UTILITY COMPANIES PRIOR TO CONSTRUCTION, ADJUSTMENT OR RELOCATION
OF EXISTING UTILITIES AS DESIGNATED ON PLANS.
7. CONTRACTOR SHALL PROVIDE PIPE BOLLARDS FOR PROTECTION OF ALL ABOVE GROUND UTILITIES AND APPURTENANCES IN DRIVE AREAS.
8. CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS AND SPECIFICATIONS FOR ACTUAL LOCATION OF ALL UTILITY ENTRANCES, TO INCLUDE,
SANITARY SEWER LATERALS, DOMESTIC AND FIRE PROTECTION WATER SERVICE, ELECTRICAL, NATURAL GAS AND TELEPHONE SERVICE.
CONTRACTOR SHALL COORDINATE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO AVOID CONFLICTS AND ASSURE PROPER DEPTHS
ARE ACHIEVED, AS WELL AS COORDINATE WITH ANY UTILITY COMPANIES FOR APPROVED LOCATIONS AND SCHEDULING OF
TIE-INS/CONNECTIONS TO THEIR FACILITIES.
9. CONSTRUCTION SHALL COMPLY WITH ALL GOVERNING CODES AND BE CONSTRUCTED TO SAME.
10. CONTRACTOR IS RESPONSIBLE FOR REPAIRING THE DAMAGE DONE TO ANY EXISTING ITEM DURING CONSTRUCTION, SUCH AS, BUT NOT
LIMITED TO, DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO, OR BETTER THAN, EXISTING CONDITIONS.
CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND NOTIFY CONSTRUCTION MANAGER PRIOR TO CONSTRUCTION
START.
11. CONTRACTOR SHALL TOUCH-UP PAINT AS NECESSARY ON ALL LIGHT POLE BASES, FIRE HYDRANTS AND CURBS WHICH ARE CURRENTLY
PAINTED AND WITHIN THE LIMITS OF THE FOOD COURT IMPROVEMENTS. COST SHALL BE INCLUDED IN THE BASE BID.
13. CONTRACTOR TO REMOVE OR RELOCATE, WHEN APPLICABLE, ALL EXISTING BUILDINGS, FOUNDATIONS, BASEMENTS, CONNECTING
IMPROVEMENTS, DRAIN PIPES, SANITARY SEWER PIPES, POWER POLES, AND GUY WIRES, WATER METERS AND WATER LINES, WELLS,
SIDEWALKS, SIGN POLES, UNDERGROUND GAS, SEPTIC TANKS AND ASPHALT, SHOWN AND NOT SHOWN, WITHIN CONSTRUCTION LIMITS AND
WHERE NEEDED,TO ALLOW FOR NEW CONSTRUCTION AS SHOWN.
14. CONTRACTOR SHALL FOLLOW ALL LOCAL, STATE AND FEDERAL REGULATIONS IN DISPOSING OF DEMOLISHED MATERIALS REMOVED FROM THIS
SITE.
15. ALL PAINT USED FOR PARKING STRIPING SHALL BE PER CITY OF BROOKLYN CENTER SPECIFICATIONS.
16. DIMENSIONS SHOWN ARE TO FACE OF CURB UNLESS NOTED OTHERWISE.
17. CONTRACTOR TO REFER TO LANDSCAPING AND IRRIGATION PLAN FOR RELOCATIONS AND ADDITIONS.
19. PLANS SUBMITTED FOR PERMITTING SHALL MEET THE CITY'S CODES AND ALL APPLICABLE BUILDING CODES IN EFFECT AT THE TIME.
20. ALL PARKING ISLAND OUTSIDE CURBED RADII ARE TO BE 10'. INSIDE RADII TO BE 3', UNLESS OTHERWISE NOTED.
21. ALL LIGHT FIXTURES SHALL BE METAL HALIDE.
SITE PLAN NOTES
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
9
9
10
13
15
15
35.0'PRO
P
E
R
T
Y
S
E
T
B
A
C
K
9.0'
TYP
24
.
0
'
TY
P
.
36
.
0
'
TY
P
.
18
.
0
'
TY
P
.
18
.
0
'
TY
P
.
24
.
0
'
TY
P
.
36
.
0
'
TY
P
.
24
.
0
'
TY
P
.
9.0'
TYP
9.5'
2
0
.
8
'
25
.
2
'
12.6'12.0'
9.0'11.9'
22
.
6
'
25.0'
24.0'
28.0'
34.9'
91
.
7
'
23
.
3
'
10.0'8.0'
3.
9
'
5.5'
A
A
E
D
D
D
D
B
E
E
E
E
E
M
P
P
T
T
T
T
T
L
J
J
H
I
K
V
K
S
E
D
AA
Q
Q
A
A
H
H
H
R
R
R
R
H
H
H
H
H
R
R
F
V
V
V
V
V
V V
9.0'
9.0'9.0'
18
.
0
'
CONTRACTOR TO ENSURE ADA PARKING
STALLS MEET 2010 NATIONAL ACCESSIBLE
DESIGN STANDARDS. SURROUNDING
PAVEMENT RESTORATION AS REQUIRED.
10.0'UTILI
T
Y
E
A
S
M
E
N
T
U
B
B
B
B
B
H
H
H
W
X
L
D
M
L
JD
K
F
F
F
F
F
F
F
F F F F F F
FFFF
F
9.0'9.0'
G
G
V
F
E
N
Y
N
6
.
0
'
X
Z
T
T
K
B
B
B
AA
H
R
B
F
L
O
O
O
EXISTING FIRE HYDRANT TO REMAIN. PROTECT IN PLACE
SALVAGE AND REPLACE STOP SIGN 30"X30" (R1-1)(TYP.)
I
J
LIGHT POLE. SEE LIGHTING PLAN AND DETAIL SHEET.
PROPOSED CONCRETE SIDWALK. ALL SIDEWALKS 6' WIDE UNLESS
NOTED OTHERWISE. SEE DETAIL SHEET.
L
PAVEMENT MARKINGS AS REQUIRED. SEE DETAIL.
N
PEDESTRIAN CROSSWALK 6' WIDE UNLESS OTHERWISE NOTED.
O
STANDARD DUTY ASPHALT PAVINGP
CONNECT TO EXISTING SIDEWALK
WITH FLUSH TRANSITIONQ
HEAVY DUTY ASPHALT PAVINGR
TRASH ENCLOSURE WITH HEAVY DUTY CONCRETE PAVEMENT. SEE
ARCHITECTURAL PLANS FOR DETAIL.S
T
U
EXISTING SIDEWALK TO REMAIN
V
EXISTING 60° STANDARD PARKING SPACE DIMENSION
9' x 20' (TYP.) - SWSL/4" - RESTRIPE IF NECESSARY
AREA STRIPED AT SYSL/4" AT 45' @ 2 O.C.
K
HANIDCAP PARKING SIGN PER LATEST MUTCD STANDARDS
M
LANDSCAPED AREA, SEE LANDSCAPE PLANS. CONTRACTOR TO
PROVIDE MIN. 4" TOPSOIL
A
SITE LEGEND
ADA CURB RAMP
EXISTING PARKING TO REMAIN
C
D
E PROPOSED TYPE MNDOT B618 CURB.
MATCH EXISTING CURB AND GUTTERB
F EXISTING LIGHT POLE TO REMAIN. PROTECT IN PLACE
G
H
LIMITS OF PAVEMENT IMPROVEMENTS. CONTRACTOR TO CONNECT
TO EXISTING PAVEMENT WITH FLUSH TRANSITION SUCH THAT
EXISTING DRAINAGE PATTERNS REMAIN INTACT
90° STANDARD PARKING SPACE DIMENSION 9'X18' (TYP.) -
SWSL/4"
TRANSFORMER PADW
X BOLLARD. SEE DETAIL
Y CONCRETE APRON, SEE STRUCTURAL PLANS FOR DETAIL
Z ORNAMENTAL FENCE, SEE SITE DETAILS
RAISED PEDESTRIAN CROSSWALK. SEE SITE DETAILS.AA
DETECTABLE WARNING STRIPSBB
BUILDING RATIO
T 1.54 ACRES 5,500 SQ. FT.55 SPACES 10.00
R 1.03 ACRES 5,400 SQ. FT.56 SPACES 10.37
1.42 ACRES 13,230 SQ. FT.58 SPACES 4.38
1,2,3,4,5 7.63 ACRES 79,508 SQ. FT. 381 SPACES
10 0.92 ACRES 6,000 SQ. FT.
BUILDINGS
LOT 1, BLOCK 1
LOT
6,7,8 2.07 ACRES 12,141 SQ. FT.60 SPACES
LOT 2, BLOCK 1
LOT 3, BLOCK 1
LOT 4, BLOCK 1
SITE DATA TABLE
LOT AREA PARKING PROVIDED
9
4.79
33 SPACES 5.50
4.94
LOT 5, BLOCK 1
LOT 6, BLOCK 1
SI
T
E
P
L
A
N
6040
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
(MIN.)(SEE SITE PLAN FOR DIMENSIONS)
SI
T
E
D
E
T
A
I
L
S
6041
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
C H
F
E
L
PBM ASSEMBLY DETAIL
SHOWN ON 1508HR
J
R
S
’
SI
T
E
D
E
T
A
I
L
S
6042
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
JIDA
PP
F
KK
D
OO
B
MM
K
H
G
V
W
SI
T
E
D
E
T
A
I
L
S
6043
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
LEGEND
PROPERTY LINE
EXISTING CONTOURS
PROPOSED CONTOURS
EXISTING PRIVATE STORM SEWER
EXISTING STORM SEWER INLET
EXISTING STORM SEWER MANHOLE
BREAKLINE
LIMITS OF DISTURBANCE, OFFSET 3' FOR CLARITY
PROPOSED PAVEMENT LIMITS, SEE SHEET 6040 - SITE
PLAN FOR PAVEMENT TYPES
THE PRESENCE OF GROUNDWATER SHOULD BE
ANTICIPATED ON THIS PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR ADDRESSING
THIS ISSUE. REFERENCE THE CONSTRUCTION
CONTINGENCY PLAN BY BRAUN INTERTEC DATED
05/27/2011 FOR GROUNDWATER DEWATERING
REQUIREMENTS.
GOPHER STATE CALL ONE
WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET
WEATHER, PROVIDE ADEQUATE DEWATERING, DRAINAGE AND
GROUNDWATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO
THE PROJECT SPECIFICATIONS.
1.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS
IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE
INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY
COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN
ON THE PLANS.
2.ALL CUT OR FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED.
3.EXISTING PIPES AND STRUCTURES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS.
4.EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT.
5.PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT.
6.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO
REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER.
7.THE CONTRACTOR SHALL ADHERE TO ALL TERMS AND CONDITIONS AS OUTLINED IN THE EPA OR APPLICABLE STATE GENERAL N.P.D.E.S.
PERMIT FOR STORM WATER DISCHARGE ASSOCIATED WITH CONSTRUCTION ACTIVITIES AND THE WALMART SPECIAL CONDITIONS, SECTION 8,
ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. THIS APPLIES TO WALMART BUILT PROJECTS ONLY.
8.CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE.
9.TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT
EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A
TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW.
10.ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY
STABILIZATION BLANKET TO ALL SLOPES 3H:1V OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH
GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED.
11.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME.
12.CONTRACTOR SHALL EXCAVATE EXISTING PAVEMENT/SIDEWALK AREAS THAT ARE TO BE LANDSCAPED A MINIMUM OF 30" OR AS DEEP AS
NECESSARY TO ENSURE ALL STONE BASE / PAVEMENT MATERIAL IS REMOVED (WHICHEVER IS GREATER) AND BACKFILL WITH CLEAN/
DRAINING SAND TO WITHIN 4" OF TOP OF CURB TO ENSURE PROPER SOIL FOR PLANT MATERIALS.
13.CONTRACTOR TO REVIEW DNR AND MPCA DEWATERING PERMIT REQUIREMENTS AND SHALL OBTAIN PERMIT IF REQUIRED FOR SITE
CONDITIONS.
14.THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL REGRADE WASHOUTS WHERE THEY OCCUR AFTER
EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS.
15.ALL AREAS INDICATED AS PAVEMENT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL PAVEMENT SECTIONS AS INDICATED ON
THE DRAWINGS.
16.WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL SAWCUT THE FULL DEPTH OF
PAVEMENT FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING
OR AS INDICATED.
17.WHERE NEW PAVEMENT MEETS THE EXISTING PAVEMENT, THE CONTRACTOR SHALL SAWCUT THE FULL DEPTH OF EXISTING PAVEMENT FOR A
SMOOTH AND STRAIGHT JOINT AND MATCH THE EXISTING PAVEMENT ELEVATION WITH THE PROPOSED PAVEMENT UNLESS OTHERWISE
INDICATED.
18.FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL JURISDICTIONAL AGENCY. IN
THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST
STRINGENT SHALL GOVERN.
19.THE CONTRACTOR SHALL ENSURE THAT ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT OVER-COMPACTED AND DO NOT
CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON
THE SITE TO BE PLANTED AND SHALL BE PROPERLY DISPOSED OF IN A LEGAL MANNER.
20.ALL MATERIALS AND CONSTRUCTION WITHIN THE MNDOT AND HENNEPIN COUNTY RIGHT-OF-WAY SHALL CONFORM TO THE LATEST MNDOT
DESIGN STANDARDS AND LATEST STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
21.ALL SPOT ELEVATIONS/CONTOURS ARE TO PAVED FINISHED GRADE AT FLOWLINE UNLESS OTHERWISE NOTED.
PAVING, GRADING, AND DRAINAGE NOTES:
CONTRACTOR TO ADJUST EXISTING
STRUCTURES TO FINAL GRADE.
GRADING LEGEND
10" STORM LEADERS AT MIN. 1.0% SLOPE (TYP.) CONTRACTOR TO PROVIDE 3" THICK
INSULATION BY 5' WIDE CENTERED ON ROOF DRAIN PER DETAIL IF LESS THAN 5' OF
COVER. REFER TO MEP PLAN FOR INVERT ELEVATIONS AT BUILDING.
A
APPROXIMATE LIMIT OF PAVEMENT RESTORATION. CONTRACTOR TO REPLACE IN KIND
ALL PAVEMENT REMOVED OR DAMAGED DURING CONSTRUCTION AND MAINTAIN EXISTING
DRAINAGE PATTERNS.
B
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
F.F.E. = 853.0
F.F.E. = 853.0
F.F.E. = 853.0
F.F.E. = 853.0
F.F.E. = 853.0
F
.
F
.
E
.
=
8
5
3
.
0
F
.
F
.
E
.
=
8
5
3
.
0
F
.
F
.
E
.
=
8
5
3
.
0
F
.
F
.
E
.
=
8
5
3
.
0
F
.
F
.
E
.
=
8
5
3
.
0
F
.
F
.
E
.
=
8
5
3
.
0
850
850
85
1
85
1
8
5
1
851
851
851
851
852
852
852
852
852
853
853
853
853
F.F.E. = 852.60
F.F.E. = 852.0
F.F.E. = 852.0 850
849
85
1
85
1
85
1
85
2
1.
2
6
%
3.
1
9
%
3.92
%
1
.
8
4
%
1.4
2
%
1
.
3
4
%
0.68%
1.
3
7
%
3.1
4
%
1.
6
8
%
2.52
%
4.46
%
1.7
2
%
851
8
5
1
852
852
853
85
2
852
85
1
85
1
8
5
1
85
2
B
B
B
A
A
1.09%
1.09%
0.83%
5.3
6
%
6.7
6
%
1.14%
1
.
8
5
%
0.
5
5
%
A
1
.
9
5
%
1.5
0
%
2
.
4
2
%
8
5
2
852
85
2
85
2
852
ME:852.05
ME:852.31
ME:852.62
ME:851.29
ME:850.93
ME:851.68
ME:850.61
ME:850.42
ME:850.04
ME:849.30
ME:849.62
ME:849.64
ME:849.86
ME:850.40ME:851.03
ME:851.14
849.86
849.69
849.92
850.46
851.00
851.01
850.71
850.56
850.52
850.54
850.82
850.61
850.54
850.58
850.69
851.77
851.64
851.72
851.80
851.56
851.32
851.43
851.46
849.10
848.96
849.15
849.69
850.07
850.09
850.03
850.88
850.78
850.95
851.07
851.25
851.19
851.81
851.92
851.86851.73
851.77 851.90
850.46
850.57
850.64
850.67
850.45
850.52
850.58
ME:851.35
ME:851.37 ME:851.24 ME:851.99
ME:852.08
ME:852.61
ME:852.25
ME:852.83
852.70
ME:852.64
ME:852.63
852.70
ME:852.60
ME:851.98
ME:852.02
ME:851.94ME:851.92
ME:851.86
ME:851.87
ME:852.48
ME:851.98
ME:852.25
ME:852.70
ME:852.93
ME:853.03
852.65
852.54
852.54
852.70
852.70
852.62
852.62
ME:852.97
851.72
851.68
ME:852.03
851.59
ME:851.67
ME:851.69
ME:851.97
LP:850.05
851.12
851.18
851.16
ME:851.76
ME:851.90
852.70
852.70
ME:852.60
ME:852.61
ME:852.60
ME:852.60
ME:852.60
852.49
852.34
852.98853.00
ME:852.51
ME:851.97
ME:851.80
ME:851.48
ME:851.22
CONTRACTOR TO REPAIR
UNDERMINED STRUCTURE AND
REPLACE PAVEMENT IN KIND
ME:851.92
ME:851.19
ME:851.86
ME:851.99
ME:851.55
ME:851.46
ME:851.03
ME:851.64
ME:850.63
852
1.
7
5
%
4
.
3
7
%
7.
2
7
%
5.32%
1.85%
1.9
5
%
4.55%
GR
A
D
I
N
G
&
D
R
A
I
N
A
G
E
PL
A
N
6051
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
INSET A. SEE SHEET 6052
5
6
T
H
A
V
E
N
1.
2
6
%
2.0
7
%
1.
6
8
%
1.
7
8
%
2.8
9
%
1.
5
0
%
1.1
3
%
5.3
6
%
6.7
6
%
0.8
6
%
85
1
.
5
851.5
852.0
85
2
.
0
852.5
85
1
.
5
85
2
.
0
85
2
.
5
8
5
2
.
5
8
5
1
.
5
8
5
2
.
0
1
.
5
2
%
1.
3
9
%
4.79%
1.
2
8
%
4.78%
852.65
852.56 852.00
852.69
ME:852.05
852.51
852.46
852.41
852.36
852.63 852.66
852.32
852.33 852.57
852.04 852.38
851.98
ME:852.31
ME:852.62
ME:851.29
ME:852.25
ME:852.83
852.70
ME:852.64
ME:851.98
ME:852.97
ME:852.51
ME:851.97
ME:851.80
ME:851.48
ME:851.22
851.57
851.50
851.39
851.35
ME:851.92
ME:851.26
ME:851.29
ME:851.19
ME:851.86
ME:851.99
ME:851.55
ME:851.46
ME:851.03
ME:851.64
ME:850.63
852.09
852.61
852.54
852.36
852.51
852.49
852.49
852.49
0.6
4
%
0.3
2
%
2.8
9
%
1.
4
0
%
852
.
5
851.
0
851.5
852
.
0
851.89
4.
7
0
%
4
.
7
4
%
1.
7
5
%
0.60%
2.
2
7
%
1.1
9
%
2.
2
5
%
851.34
851.26
851.16
851.01
851.18
851.11
850.74
4.37%
7.
4
2
%
7.1
3
%
5.29%
1.85%
0.76%
2.
2
6
%
6.7
2
%
1
.
9
2
%
851.15
851.48
851.80
851.87
851.73
851.66
851.37
851.26
5.5
6
%
1.10%
851.45
2
.
5
0
%
3
.
3
6
%
1.
1
4
%
6.59%
3.
3
2
%
0
.
7
7
%
11
.
5
8
%
3.31
%
3.13%
3.64%
3
.
4
1
%
2.
3
8
%
PROPOSED BUILDING 9
9,653 S.F.
FFE= 852.7
DE
T
A
I
L
E
D
G
R
A
D
I
N
G
&
DR
A
I
N
A
G
E
P
L
A
N
6052
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
INSET A
GR
A
D
I
N
G
&
D
R
A
I
N
A
G
E
DE
T
A
I
L
S
6053
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
LEGEND
PROPERTY LINE
UNDERGROUND TELEPHONE
UNDERGROUND ELECTRIC/POWER
UNDERGROUND CONDUIT
SANITARY SEWER PIPE
PRIVATE WATER PIPING
GAS PIPING
STORM SEWER PIPE
GATE VALVE IN VALVE BOX (MUST BE H20
TRAFFIC RATED IN PAVEMENT AREAS)
FIRE HYDRANT
REDUCER
POST INDICATOR VALVE
SANITARY SEWER MANHOLE
CLEAN-OUT
STORM SEWER STRUCTURE
POWER POLE
GAS METER
PIPE BOLLARD
SEWER/WATER PLUG
EXISTING GAS PIPING
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING UNDERGROUND ELECTRIC
EXISTING COMMUNICATIONS
EXISTING EASEMENT
1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED UTILITIES.
2.CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE.
3.SANITARY SEWER PIPE AND FITTINGS SHALL BE PVC SDR35 PER ASTM D3034.
4.PRIVATE WATER LINES SHALL BE AS FOLLOWS UNLESS OTHERWISE SHOWN:
4" TO 12", PVC, AWWA C900 RATED DR 18 CLASS 150 PER ASTM D2241 OR DUCTILE IRON PIPE, PRESSURE CLASS 350 PER AWWA C151. 3" AND
SMALLER, EITHER COPPER TUBE TYPE "K" (SOFT) PER ASTM B88 OR PVC, SDR21 RATING, PER AWWA C900 AND ASTM D2241.
5.MINIMUM TRENCH WIDTH SHALL BE 3 FEET ON ALL WATER, SANITARY AND STORM SEWER PIPING, SEE DETAIL SHEET.
6.ALL WATER JOINTS THAT REQUIRE A CHANGE IN DIRECTION ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING AS CALLED OUT IN
SPECIFICATIONS.
7.ALL UTILITIES SHOULD BE KEPT TEN (10') APART (PARALLEL) OR WHEN CROSSING 18" VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE
EDGE OF PIPE).
8.CONTRACTOR SHALL MAINTAIN A MINIMUM OF 7'-6" COVER ON ALL WATERLINES. INSULATION SHALL BE PROVIDED IF THIS IS NOT ACHIEVABLE.
9.IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (EXISTING AND PROPOSED), THE
SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATER LINE SHALL
HAVE MECHANICAL JOINTS WITH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18" CLEARANCE. MEETING
REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (AWWA C-151) (CLASS 50).
10.LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED, AS-BUILT LOCATED (IF REQUIRED) AND APPROVED BEFORE BACKFILLING.
11.TOPS OF EXISTING MANHOLES SHALL BE RAISED OR LOWERED AS NECESSARY TO BE FLUSH WITH PROPOSED PAVEMENT ELEVATIONS, AND TO BE 6"
ABOVE FINISHED GROUND ELEVATIONS WITH WATER TIGHT LIDS.
12.ALL CONCRETE FOR ENCASEMENTS SHALL HAVE A MINIMUM 28 DAY COMPRESSION STRENGTH AT 3000 P.S.I.
13.DRAWINGS MAY NOT SHOW ALL EXISTING UTILITIES.
14.ALL WET UTILITY POINTS OF CONNECTION SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO TRENCHING. GRAVITY UTILITY CONNECTIONS SHALL
BE POTHOLED OR DIPPED TO VERIFY INVERTS AT POINT OF CONNECTION AND ENSURE DESIGN SLOPES PROVIDED ON THE PLANS CAN BE ACHEIVED.
WHERE THERE IS A CONFLICT BETWEEN FIELD CONDITIONS AND THE PLANS, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY.
15.REFER TO INTERIOR PLUMBING DRAWINGS FOR EXACT TIE-IN LOCATION AND SIZE OF ALL UTILITIES.
16.CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH THE SPECIFICATIONS OF THE LOCAL AUTHORITIES (CITY OF BROOKLYN CENTER) WITH
REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SANITARY SEWER LINES.
17.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS
BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT
TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS
BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE
ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS.
18.ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO
ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICE.
19.CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS.
20.ALL WATER MAIN AND SANITARY SEWER UTILITY EXTENSIONS, REMOVAL AND RELOCATIONS SHALL MEET THE CITY OF BROOKLYN CENTER DESIGN
STANDARDS.
21.DEWATERING SHALL BE PROVIDED BY THE CONTRACTOR, IF REQUIRED DUE TO SEASONAL GROUND WATER VARIATIONS, IN ACCORDANCE WITH THE
SPECIFICATIONS AND THE MNDNR TEMPORARY WATER APPROPRIATIONS GENERAL PERMIT.
22.CONTRACTOR SHALL COORDINATE WITH THE STORE MANAGER OF OPERATING BUSINESSES, UTILITY COMPANIES AND THE CITY OF BROOKLYN
CENTER TO MAINTAIN UTILITY SERVICE TO OPERATING BUSINESSES AT ALL TIMES DURING CONSTRUCTION.
23.DIAL BEFORE YOU DIG. CALL 1-800-252-1166 FOR LOCATION OF UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION. IN THE TWIN CITY AREA
CALL 651-454-0002.
24.THE SITEWORK CONTRACTOR SHALL REFER TO ELECTRICAL PLANS AND SPECIFICATIONS FOR SITE LIGHTING WIRE AND CONDUIT DESIGN. SEE
PHOTOMETRICS PLAN FOR LIGHT POLE AND BASE INFORMATION.
25.BACKFLOW DEVICES (DDCV AND PRZ ASSEMBLIES) AND METERS ARE LOCATED IN THE INTERIOR OF THE BUILDING. REF. ARCH. PLANS.
26.ALL UTILITIES ARE PRIVATE UNLESS SPECIFICALLY NOTED AS PUBLIC.
27.ALL UTILITY WORK PERFORMED AND MATERIALS USED SHALL CONFORM TO THE CITY OF BROOKLYN CENTER'S STANDARD SPECIFICATIONS AND
DETAILS.
28.ALL WATERMAIN CONNECTIONS TO CITY WATERMAIN SHALL BE INSPECTED BY CITY PERSONNEL.
29.NEW WATERMAIN GATE VALVES SHALL BE INSTALLED AT ALL CITY WATERMAIN SERVICE LOCATIONS.
30.ALL SANITARY SEWER CONNECTIONS TO CITY MAIN SHALL BE INSPECTED BY CITY PERSONNEL.
31.HYDRANTS SHALL BE LOCATED AT 3' FROM BACK OF CURB.
32.NEW INVERTS SHALL BE CONSTRUCTED WHERE CONNECTIONS TO EXISTING PUBLIC SANITARY MANHOLES ARE MADE.
33.ALL CONNECTIONS TO EXISTING WATERMAIN 4" AND LARGER SHALL USE MUELLER CO. STAINLESS STEEL TAPPING SLEEVES MODEL H-304.
UTILITY NOTES
KEYNOTE LEGEND
PROPOSED GAS SERVICEA
PROPOSED ELECTRIC SERVICEB
PROPOSED TRANSFORMER CONTRACTOR TO COORDINATE FINAL
LOCATION WITH UTILITY PROVIDERC
PROPOSED 2" DOMESTIC WATER SERVICE SERVICED
PROPOSED 6" FIRE WATER SERVICEE
- - NOT USED - -F
PROPOSED 45° BENDG
PROPOSED FIRE DEPARTMENT CONNECTIONH
PROPOSED 4" PVC SANITARY SEWER SERVICE @ 2%.I
CONNECT SANITARY SERVICE TO EXISTING CLEANOUT.
CONTRACTOR TO FIELD VERIFY EXISTING INVERT ELEVATIONS
ROOF DRAIN, SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONSK
8" PVC ROOF DRAIN LEADER @ 1%. SEE SHEET 6051 FOR DETAILL
PROPOSED LIGHT POLEM
J
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
M
M
175.6 LF OF 8" PVC AT 0.4%MH - 313
IE: 845.10
CONFIRM GAS LOCATION.
CONTRACTOR TO COORDINATE
GAS SERVICE RELOCATION WITH
UTILITY PROVIDER AS NECESSARY
4" PVC SANITARY
SEWER SERVICE
4" PVC SANITARY
SEWER SERVICE
6" FIRE WATER
SERVICE
2" WATER
SERVICE
POWER SERVICE
GAS SERVICE
CONNECT TO EXISTING
SANITARY SEWER. CONFIRM
INVERT ELEVATION PRIOR
TO CONSTRUCTION
8" PVC ROOF
DRAIN LEADER
8" PVC ROOF
DRAIN LEADER
TRANSFORMER
EXISTING ABANDONED
STORM PIPE TO REMAIN
PROPOSED STORM SEWER
CATCH BASIN PER CITY OF
BROOKLYN CENTER DETAIL
CORE DRILL AND CONNECT PROPOSED
STORM SEWER TO EXISTING SEWER
MAIN. APPROXIMATE IE = 844.35.
CONTRACTOR TO FIELD VERIFY INVERT
PRIOR TO SEWER INSTALLATION 8" PVC AT 1%
MIN. SLOPE
UT
I
L
I
T
Y
P
L
A
N
6061
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
INSET A. SEE SHEET 6062
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
B
C
E
D
H
G
J
I
K
L
CO - 1
IE: 846.51
CONNECT PROPOSED SANITARY SEWER
TO EXISTING STUB. APPROXIMATE IE =
845.92. CONTRACTOR TO FIELD VERIFY
INVERT PRIOR TO SEWER INSTALLATION
CONNECT PROPOSED STORM SEWER
TO EXISTING STUB. APPROXIMATE IE =
847.35. CONTRACTOR TO FIELD VERIFY
INVERT PRIOR TO SEWER INSTALLATION
G
G
G
G
G
K
A
I
B
B
LEGEND
PROPERTY LINE
UNDERGROUND TELEPHONE
UNDERGROUND ELECTRIC/POWER
UNDERGROUND CONDUIT
SANITARY SEWER PIPE
PRIVATE WATER PIPING
GAS PIPING
STORM SEWER PIPE
GATE VALVE IN VALVE BOX (MUST BE H20
TRAFFIC RATED IN PAVEMENT AREAS)
FIRE HYDRANT
REDUCER
POST INDICATOR VALVE
SANITARY SEWER MANHOLE
CLEAN-OUT
STORM SEWER STRUCTURE
POWER POLE
GAS METER
PIPE BOLLARD
SEWER/WATER PLUG
EXISTING GAS PIPING
EXISTING STORM SEWER
EXISTING SANITARY SEWER
EXISTING UNDERGROUND ELECTRIC
EXISTING COMMUNICATIONS
EXISTING EASEMENT
KEYNOTE LEGEND
PROPOSED GAS SERVICEA
PROPOSED ELECTRIC SERVICEB
PROPOSED TRANSFORMER CONTRACTOR TO COORDINATE FINAL
LOCATION WITH UTILITY PROVIDERC
PROPOSED 2" DOMESTIC WATER SERVICE SERVICED
PROPOSED 6" FIRE WATER SERVICEE
- - NOT USED - -F
PROPOSED 45° BENDG
PROPOSED FIRE DEPARTMENT CONNECTIONH
PROPOSED 4" PVC SANITARY SEWER SERVICE @ 2%.I
CONNECT SANITARY SERVICE TO EXISTING CLEANOUT.
CONTRACTOR TO FIELD VERIFY EXISTING INVERT ELEVATIONS
ROOF DRAIN, SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONSK
8" PVC ROOF DRAIN LEADER @ 1%. SEE SHEET 6051 FOR DETAILL
PROPOSED LIGHT POLEM
J
DE
T
A
I
L
E
D
U
T
I
L
I
T
Y
P
L
A
N
6062
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
INSET A
UT
I
L
I
T
Y
D
E
T
A
I
L
S
6063
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
X
E
R
X
E
S
A
V
E
N
O
R
T
H
H A V E N
X E R X E S A V E N O R T H
GOPHER STATE CALL ONE
SITE KEY
N.T.S.
Luminaire Schedule
Symbol Qty Label Arrangement Description LLF Lumens/Lamp Arr. Lum. Lumens Arr. Watts
0 BV D180 GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 173304 2160
0 BV-3HSS ROTATED 2 IN 90 GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 94478 2160
0 FV-3HSS SINGLE GFR-2-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 45676 1080
0 KV 3 @ 90 DEGREES GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 259956 3240
11 A SINGLE GB-5-100-CMH-F 16' POLE 0.790 9000 5766 129
1 B 3 @ 90 DEGREES GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 259956 3240
6 C D180 GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 173304 2160
0 C-3HSS ROTATED 2 IN 90 GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 94478 2160
1 D SINGLE GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 86652 1080
1 D-3HSS SINGLE GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 47239 1080
0 E SINGLE GFR-2-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 72875 1080
5 E-3HSS SINGLE GFR-2-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 45676 1080
0 F SINGLE GFR-3-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 63036 1080
5 WM-18 SINGLE GBWM-3-400-PSMHR 18' MH 0.750 40000 26912 452
2 WM-14.67 SINGLE GBWM-3-400-PSMHR 14.67' MH 0.750 40000 26912 452
PHOTOMETRIC NOTES:
A.CAST IN PLACE CONCRETE BASES WILL BE USED FOR
LIGHT POLE BASE FOUNDATIONS.
B.SEE SITE DETAILS FOR LIGHT POLE AND BASE DETAIL.
C.REFER TO SITE LIGHTING ELECTRICAL PLAN BY OTHERS.
D.LIGHT FIXTURES SHALL BE METAL HALIDE.
E.LIGHT POLES SHALL BE 39 FEET TALL, ROUND,
TAPERED, BLACK, STEEL POLES WITH A FIXTURE
MOUNTING HEIGHT OF 42 FEET. (REF. CUT SHEET)
PROPOSED PARKING LOT
LIGHTING
PROPOSED PEDESTRIAN
LIGHTING
EXISTING PARKING LOT
LIGHTING
EXISTING PEDESTRIAN
LIGHTING
1 FC
3 FC
5 FC
LIGHT POLE &
FIXTURES
10 FC (FOOT
CANDLES)
NORTH
SCALE FEET
0 60 120
P H O T O M E T R I C S
P L A N
6081
S H I N G L E
C R E E K
C R O S S I N G
B R O O K L Y N
C E N T E R
B U I L D I N G
9 ,1 0 ,R ,T
2 - GNK
1 - GNK
5 - GSL
3 - GSL1 - GNK
2 - GNK
2 - ABM
17 - BES
3 - DBH
3 - KFG
3 - GOJ
3 - KFG
3 - DBH
3 - KFG
2 - GOJ
5 - WLC
26 - BES
A
A
A
C
B
A
A
A
A
A
MODIFY EXISTING IRRIGATION SYSTEM AND
SOD ALL DISTURBED AREAS
17 - BES
3 - KFG
3 - GOJ
10 - KKC
4 - ABM
B
30 - DAY
D
B
A
D
B
A
A
A
A
A
A
15 - KFG
10 - POT
2 - GNK
1 - GNK
5 - GSL
3 - GSL1 - GNK
2 - GNK
2 - ABM
17 - BES
3 - DBH
3 - KFG
3 - GOJ
3 - KFG
3 - DBH
3 - KFG
2 - GOJ
5 - WLC
26 - BES
A
A
A
C
B
A
A
A
A
A
MODIFY EXISTING IRRIGATION SYSTEM AND
SOD ALL DISTURBED AREAS
17 - BES
3 - KFG
3 - GOJ
10 - KKC
4 - ABM
B
30 - DAY
D
B
A
D
B
A
A
A
A
A
A
15 - KFG
10 - POT
EXISTING SEARS
5
6
T
H
A
V
E
N
XE
R
X
E
S
A
V
E
N
O
R
T
H
BUILDING 1
BUILDING 2
BUILDING 3
BUILDING 4
BUILDING 5
BUILDING 6
BUILDING 7
BUILDING 8
FUTURE
BUILDING
10
FUTURE
BUILDING T
FUTURE
BUILDING R
FUTURE
TENANT
FFE=852.7
PROPOSED
BUILDING 9
9,653 S.F.
FFE= 852.7
A
LANDSCAPE KEYNOTES
SOD (TYP.)
DOUBLE SHREDDED HARDWOOD MULCH (TYP.)
MAINTENANCE STRIP (TYP.)
EDGER
A
B
C
D
A
LANDSCAPE KEYNOTES
SOD (TYP.)
DOUBLE SHREDDED HARDWOOD MULCH (TYP.)
MAINTENANCE STRIP (TYP.)
EDGER
A
B
C
D
LANDSCAPE LEGEND
EXISTING DECIDUOUS TREE (TYP.)
EXISTING CONIFEROUS TREE (TYP.)
EDGER (TYP.)
APPROXIMATE LIMITS OF SOD / IRRIGATION,
SOD ALL DISTURBED AREAS (TYP.)
LANDSCAPE LEGEND
EXISTING DECIDUOUS TREE (TYP.)
EXISTING CONIFEROUS TREE (TYP.)
EDGER (TYP.)
APPROXIMATE LIMITS OF SOD / IRRIGATION,
SOD ALL DISTURBED AREAS (TYP.)
OVERSTORY TREES CODE QTY BOTANICAL NAME COMMON NAME CONT CAL SIZE
ABM 6 ACER X FREEMANII `AUTUMN BLAZE`AUTUMN BLAZE MAPLE B & B 2.5" CAL.
GNK 6 GINKGO BILOBA `AUTUMN GOLD` TM AUTUMN GOLD GINKGO TREE B & B 2.5" CAL.
GSL 8 TILIA CORDATA `GREENSPIRE`GREENSPIRE LITTLELEAF LINDEN B & B 2.5" CAL.
CONIFEROUS SHRUBS CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
GOJ 8 JUNIPERUS VIRGINIANA `GREY OWL`GREY OWL JUNIPER #5 CONT.4` O.C.
DECIDUOUS SHRUBS CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
DBH 6 DIERVILLA LONICERA DWARF BUSH HONEYSUCKLE #5 CONT.3` O.C.
POT 10 POTENTILLA FRUTICOSA `HATCHLISS`BELLA BELLISSIMA POTENTILLA #2 CONT.
GRASSES CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
KFG 27 CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`KARL FOERSTER FEATHER REED GRASS#1 CONT 30" OC
GROUND COVERS CODE QTY BOTANICAL NAME COMMON NAME CONT SIZE SPACING SPACING
BES 60 RUDBECKIA FULGIDA `GOLDSTURM`BLACK-EYED SUSAN #1 CONT 18" OC 18" o.c.
DAY 30 HEMEROCALLIS X `APRICOT SPARKLES`APRICOT SPARKLES DAYLILY #1 CONT.15" OC 15" o.c.
KKC 10 NEPETA X FAASSENII `KIT KAT`KIT KAT CATMINT #1 CONT 18" OC 18" o.c.
WLC 5 NEPETA X FAASSENII `WALKERS LOW`WALKERS LOW CATMINT #1 CONT 30" OC 30" o.c.
PLANT SCHEDULE
OVERSTORY TREES CODE QTY BOTANICAL NAME COMMON NAME CONT CAL SIZE
ABM 6 ACER X FREEMANII `AUTUMN BLAZE`AUTUMN BLAZE MAPLE B & B 2.5" CAL.
GNK 6 GINKGO BILOBA `AUTUMN GOLD` TM AUTUMN GOLD GINKGO TREE B & B 2.5" CAL.
GSL 8 TILIA CORDATA `GREENSPIRE`GREENSPIRE LITTLELEAF LINDEN B & B 2.5" CAL.
CONIFEROUS SHRUBS CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
GOJ 8 JUNIPERUS VIRGINIANA `GREY OWL`GREY OWL JUNIPER #5 CONT.4` O.C.
DECIDUOUS SHRUBS CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
DBH 6 DIERVILLA LONICERA DWARF BUSH HONEYSUCKLE #5 CONT.3` O.C.
POT 10 POTENTILLA FRUTICOSA `HATCHLISS`BELLA BELLISSIMA POTENTILLA #2 CONT.
GRASSES CODE QTY BOTANICAL NAME COMMON NAME CONT SPACING SIZE
KFG 27 CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER`KARL FOERSTER FEATHER REED GRASS#1 CONT 30" OC
GROUND COVERS CODE QTY BOTANICAL NAME COMMON NAME CONT SIZE SPACING SPACING
BES 60 RUDBECKIA FULGIDA `GOLDSTURM`BLACK-EYED SUSAN #1 CONT 18" OC 18" o.c.
DAY 30 HEMEROCALLIS X `APRICOT SPARKLES`APRICOT SPARKLES DAYLILY #1 CONT.15" OC 15" o.c.
KKC 10 NEPETA X FAASSENII `KIT KAT`KIT KAT CATMINT #1 CONT 18" OC 18" o.c.
WLC 5 NEPETA X FAASSENII `WALKERS LOW`WALKERS LOW CATMINT #1 CONT 30" OC 30" o.c.
PLANT SCHEDULE
LA
N
D
S
C
A
P
E
P
L
A
N
6101
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
N
O
R
T
H
LA
N
D
S
C
A
P
E
D
E
T
A
I
L
S
6102
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
MU
N
I
C
I
P
A
L
L
I
Q
U
O
R
DOUBLE SHREDDED HARDWOOD MULCH
NOTES:
2X ROOT BALL WIDTH
SOD
4" TOPSOIL
PREPARED PLANTING BED AND
BACKFILL SOIL
(THOROUGHLY LOOSENED)
NOTES:
1.SCARIFY SIDES AND BOTTOM OF HOLE.
2.PROCEED WITH CORRECTIVE PRUNING OF TOP AND ROOT.
3.REMOVE CONTAINER AND SCORE OUTSIDE OF SOIL MASS TO REDIRECT
AND PREVENT CIRCLING FIBROUS ROOTS. REMOVE OR CORRECT STEM
GIRDLING ROOTS.
4.PLUMB AND BACKFILL WITH PLANTING SOIL.
5.WATER THOROUGHLY WITHIN 2 HOURS TO SETTLE PLANTS AND FILL
VOIDS.
6.BACK FILL VOIDS AND WATER SECOND TIME.
7.PLACE MULCH WITHIN 48 HOURS OF THE SECOND WATERING UNLESS
SOIL MOISTURE IS EXCESSIVE.
8.MIX IN 3-4" OF ORGANIC COMPOST.
1.SCARIFY SIDES AND BOTTOM OF HOLE.
2.PROCEED WITH CORRECTIVE PRUNING.
3.SET PLANT ON UNDISTURBED NATIVE SOIL OR
THOROUGHLY COMPACTED PLANTING SOIL.
INSTALL PLANT SO THE ROOT FLARE IS AT OR UP
TO 2" ABOVE THE FINISHED GRADE WITH BURLAP
AND WIRE BASKET, (IF USED), INTACT.
4.SLIT REMAINING TREATED BURLAP AT 6"
INTERVALS.
5.BACKFILL TO WITHIN APPROXIMATELY 12" OF THE
TOP OF THE ROOTBALL, THEN WATER PLANT.
REMOVE THE TOP 1/3 OF THE BASKET OR THE TOP
TWO HORIZONTAL RINGS WHICHEVER IS
GREATER. REMOVE ALL BURLAP AND NAILS FROM
THE TOP 1/3 OF THE BALL. REMOVE ALL TWINE.
REMOVE OR CORRECT STEM GIRDLING ROOTS.
6.PLUMB AND BACKFILL WITH PLANTING SOIL.
7.WATER THOROUGHLY WITHIN 2 HOURS TO
SETTLE PLANTS AND FILL VOIDS.
8.BACK FILL VOIDS AND WATER SECOND TIME.
9.PLACE MULCH WITHIN 48 HOURS OF THE SECOND
WATERING UNLESS SOIL MOISTURE IS EXCESSIVE.
10.FINAL LOCATION OF TREE TO BE APPROVED BY
OWNER.
PLANTING SOIL
ON CENTER SPACING
AS STATED ON PLAN.
EXTEND HOLE EXCAVATION WIDTH
A MINIMUM OF 6" BEYOND
THE PLANTS ROOT SYSTEM.
FINISHED GRADE
EDGER, AS SPECIFIED
TREE PLANTING DETAIL
SCALE: N.T.S.61021 SHRUB / PERENNIAL PLANTING DETAIL
SCALE: N.T.S.61022
1/
2
"
FINISHED GRADE AT LAWN,
1/2" BELOW TOP OF DIVIDER.
LAWN SIDE
"BLACK DIAMOND" EDGING BY
VALEEY VIEW SPECIALTIES CO.
USE 20 FT. LENGTHS. USE
KNURLED CONNECTOR AT SPLICES,
USE CORNER, TEE, VEE, OR WIDE
ANBLE CONNECTORS AT ANGLE
10" X 7/8" METAL ANCHOR
STAKES AT 48" O.C., AND AT
CHANGES.
EACH END.
PLASTIC DIVIDER:
FINISHED GRADE AT
SHRUBS/ PERENNIALS, 1" BELOW TOP
OF DIVIDER.
PLANTING BED
1"
POLY EDGER DETAIL
SCALE: N.T.S.61023 SPADED EDGE DETAIL
SCALE: 1-1/2"=1'61024
MULCH AT PLANTING AREA
SPADED EDGE "V" SHAPED, 4" WIDTH,
4" DEPTH, MORE VERTICAL ON LAWN
SIDE
LAWN GRASS
FINISHED GRADE
BUILDING, EXTERIOR WALL
PROVIDE POSITIVE DRAINAGE
AWAY FROM BUILDING
SPECIFIED ROCK MULCH
2' MAINTENANCE STRIP
EDGER, AS SPECIFIED
SOIL MIX TO BE MINIMUM
OF 4" BELOW EDGING TOP
TO ALLOW FOR ADEQUATE
LIP FOR MULCH.
SPECIFIED SOIL MIX
FINISH GRADE FOR LAWN
MAINTENANCE STRIP DETAIL
SCALE: 1-1/2"=1'61025
4"
1"
1.CONTRACTOR SHALL CONTACT COMMON GROUND ALLIANCE AT 811 OR CALL811.COM TO
VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY PLANTS
OR LANDSCAPE MATERIAL.
2.ACTUAL LOCATION OF PLANT MATERIAL IS SUBJECT TO FIELD AND SITE CONDITIONS.
3.NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND CONSTRUCTION HAS BEEN
COMPLETED IN THE IMMEDIATE AREA.
4.ALL SUBSTITUTIONS MUST BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO
SUBMISSION OF ANY BID AND/OR QUOTE BY THE LANDSCAPE CONTRACTOR.
5.CONTRACTOR SHALL PROVIDE TWO YEAR GUARANTEE OF ALL PLANT MATERIALS. THE
GUARANTEE BEGINS ON THE DATE OF THE LANDSCAPE ARCHITECT'S OR OWNER'S WRITTEN
ACCEPTANCE OF THE INITIAL PLANTING. REPLACEMENT PLANT MATERIAL SHALL HAVE A ONE
YEAR GUARANTEE COMMENCING UPON PLANTING.
6.ALL PLANTS TO BE SPECIMEN GRADE, MINNESOTA-GROWN AND/OR HARDY. SPECIMEN GRADE
SHALL ADHERE TO, BUT IS NOT LIMITED BY, THE FOLLOWING STANDARDS:
ALL PLANTS SHALL BE FREE FROM DISEASE, PESTS, WOUNDS, SCARS, ETC.
ALL PLANTS SHALL BE FREE FROM NOTICEABLE GAPS, HOLES, OR DEFORMITIES.
ALL PLANTS SHALL BE FREE FROM BROKEN OR DEAD BRANCHES.
ALL PLANTS SHALL HAVE HEAVY, HEALTHY BRANCHING AND LEAFING.
CONIFEROUS TREES SHALL HAVE AN ESTABLISHED MAIN LEADER AND A HEIGHT TO WIDTH
RATIO OF NO LESS THAN 5:3.
7.PLANTS TO MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2014 OR MOST
CURRENT VERSION) REQUIREMENTS FOR SIZE AND TYPE SPECIFIED.
8.PLANTS TO BE INSTALLED AS PER MNLA & ANSI STANDARD PLANTING PRACTICES.
9.PLANTS SHALL BE IMMEDIATELY PLANTED UPON ARRIVAL AT SITE. PROPERLY HEEL-IN
MATERIALS IF NECESSARY; TEMPORARY ONLY.
10.PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR/ROOT FLAIR IS LOCATED AT THE
TOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE CASE, SOIL SHALL BE REMOVED
DOWN TO THE ROOT COLLAR/ROOT FLAIR. WHEN THE BALLED & BURLAP TREE IS PLANTED, THE
ROOT COLLAR/ROOT FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.
11.OPEN TOP OF BURLAP ON BB MATERIALS; REMOVE POT ON POTTED PLANTS; SPLIT AND BREAK
APART PEAT POTS.
12.PRUNE PLANTS AS NECESSARY - PER STANDARD NURSERY PRACTICE AND TO CORRECT POOR
BRANCHING OF EXISTING AND PROPOSED TREES.
13.WRAP ALL SMOOTH-BARKED TREES - FASTEN TOP AND BOTTOM. REMOVE BY APRIL 1ST.
14.STAKING OF TREES AS REQUIRED; REPOSITION, PLUMB AND STAKE IF NOT PLUMB AFTER ONE
YEAR.
15.THE NEED FOR SOIL AMENDMENTS SHALL BE DETERMINED UPON SITE SOIL CONDITIONS PRIOR
TO PLANTING. LANDSCAPE CONTRACTOR SHALL NOTIFY LANDSCAPE ARCHITECT FOR THE
NEED OF ANY SOIL AMENDMENTS.
16.BACKFILL SOIL AND TOPSOIL TO ADHERE TO MN/DOT STANDARD SPECIFICATION 3877 (SELECT
TOPSOIL BORROW) AND TO BE EXISTING TOP SOIL FROM SITE FREE OF ROOTS, ROCKS LARGER
THAN ONE INCH, SUBSOIL DEBRIS, AND LARGE WEEDS UNLESS SPECIFIED OTHERWISE.
MINIMUM 4" DEPTH TOPSOIL FOR ALL LAWN GRASS AREAS AND 12" DEPTH TOPSOIL FOR TREE,
SHRUBS, AND PERENNIALS.
17.MULCH TO BE AT ALL TREE, SHRUB, PERENNIAL, AND MAINTENANCE AREAS. TREE AND SHRUB
PLANTING BEDS SHALL HAVE 4" DEPTH OF DOUBLE SHREDDED HARDWOOD MULCH. DOUBLE
SHREDDED HARDWOOD MULCH TO BE USED AROUND ALL PLANTS WITHIN TURF AREAS.
PERENNIAL AND ORNAMENTAL GRASS BEDS SHALL HAVE 2" DEPTH DOUBLE SHREDDED
HARDWOOD MULCH. MULCH TO BE FREE OF DELETERIOUS MATERIAL AND COLORED RED, OR
APPROVED EQUAL. ROCK MULCH TO BE BUFF LIMESTONE, 1 1/2" TO 3" DIAMETER, AT MINIMUM
3" DEPTH, OR APPROVED EQUAL. ROCK MULCH TO BE ON COMMERCIAL GRADE FILTER FABRIC,
BY TYPAR, OR APPROVED EQUAL WITH NO EXPOSURE. MULCH AND FABRIC TO BE APPROVED
BY OWNER PRIOR TO INSTALLATION. MULCH TO MATCH EXISTING CONDITIONS (WHERE
APPLICABLE).
18.EDGING TO BE COMMERCIAL GRADE VALLEY-VIEW BLACK DIAMOND (OR EQUAL) POLY EDGING
OR SPADED EDGE, AS INDICATED. POLY EDGING SHALL BE PLACED WITH SMOOTH CURVES AND
STAKED WITH METAL SPIKES NO GREATER THAN 4 FOOT ON CENTER WITH BASE OF TOP BEAD
AT GRADE, FOR MOWERS TO CUT ABOVE WITHOUT DAMAGE. UTILIZE CURBS AND SIDEWALKS
FOR EDGING WHERE POSSIBLE. SPADED EDGE TO PROVIDE V-SHAPED DEPTH AND WIDTH TO
CREATE SEPARATION BETWEEN MULCH AND GRASS. INDIVIDUAL TREE, SHRUB, OR
RAIN-GARDEN BEDS TO BE SPADED EDGE, UNLESS NOTED OTHERWISE. EDGING TO MATCH
EXISTING CONDITIONS (WHERE APPLICABLE).
19.ALL DISTURBED AREAS TO BE SODDED OR SEEDED, UNLESS OTHERWISE NOTED. PARKING LOT
ISLANDS TO BE SODDED WITH SHREDDED HARDWOOD MULCH AROUND ALL TREES AND
SHRUBS. SOD TO BE STANDARD MINNESOTA GROWN AND HARDY BLUEGRASS MIX, FREE OF
LAWN WEEDS. ALL TOPSOIL AREAS TO BE RAKED TO REMOVE DEBRIS AND ENSURE DRAINAGE.
SLOPES OF 3:1 OR GREATER SHALL BE STAKED. SEED AS SPECIFIED AND PER MN/DOT
SPECIFICATIONS. IF NOT INDICATED ON LANDSCAPE PLAN, SEE EROSION CONTROL PLAN.
20.PROVIDE IRRIGATION TO ALL PLANTED AREAS ON SITE. IRRIGATION SYSTEM TO BE
DESIGN/BUILD BY LANDSCAPE CONTRACTOR. LANDSCAPE CONTRACTOR TO PROVIDE SHOP
DRAWINGS TO LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION OF IRRIGATION
SYSTEM. CONTRACTOR TO PROVIDE OPERATION MANUALS, AS-BUILT PLANS, AND NORMAL
PROGRAMMING. SYSTEM SHALL BE WINTERIZED AND HAVE SPRING STARTUP DURING FIRST
YEAR OF OPERATION. SYSTEM SHALL HAVE ONE-YEAR WARRANTY ON ALL PARTS AND LABOR.
ALL INFORMATION ABOUT INSTALLATION AND SCHEDULING CAN BE OBTAINED FROM THE
GENERAL CONTRACTOR.
21.CONTRACTOR SHALL PROVIDE NECESSARY WATERING OF PLANT MATERIALS UNTIL THE PLANT
IS FULLY ESTABLISHED OR IRRIGATION SYSTEM IS OPERATIONAL. OWNER WILL NOT PROVIDE
WATER FOR CONTRACTOR.
22.REPAIR, REPLACE, OR PROVIDE SOD/SEED AS REQUIRED FOR ANY ROADWAY BOULEVARD
AREAS ADJACENT TO THE SITE DISTURBED DURING CONSTRUCTION.
23.REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO OWNER.
LANDSCAPE NOTES
X
E
R
X
E
S
A
V
E
N
O
R
T
H
H A V E N
X E R X E S A V E N O R T H
GOPHER STATE CALL ONE
SITE KEY
N.T.S.
Luminaire Schedule
Symbol Qty Label Arrangement Description LLF Lumens/Lamp Arr. Lum. Lumens Arr. Watts
0 BV D180 GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 173304 2160
0 BV-3HSS ROTATED 2 IN 90 GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 94478 2160
0 FV-3HSS SINGLE GFR-2-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 45676 1080
0 KV 3 @ 90 DEGREES GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 259956 3240
11 A SINGLE GB-5-100-CMH-F 16' POLE 0.790 9000 5766 129
1 B 3 @ 90 DEGREES GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 259956 3240
6 C D180 GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 173304 2160
0 C-3HSS ROTATED 2 IN 90 GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 94478 2160
1 D SINGLE GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 86652 1080
1 D-3HSS SINGLE GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 47239 1080
0 E SINGLE GFR-2-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 72875 1080
5 E-3HSS SINGLE GFR-2-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 45676 1080
0 F SINGLE GFR-3-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 63036 1080
5 WM-18 SINGLE GBWM-3-400-PSMHR 18' MH 0.750 40000 26912 452
2 WM-14.67 SINGLE GBWM-3-400-PSMHR 14.67' MH 0.750 40000 26912 452
PHOTOMETRIC NOTES:
A.CAST IN PLACE CONCRETE BASES WILL BE USED FOR
LIGHT POLE BASE FOUNDATIONS.
B.SEE SITE DETAILS FOR LIGHT POLE AND BASE DETAIL.
C.REFER TO SITE LIGHTING ELECTRICAL PLAN BY OTHERS.
D.LIGHT FIXTURES SHALL BE METAL HALIDE.
E.LIGHT POLES SHALL BE 39 FEET TALL, ROUND,
TAPERED, BLACK, STEEL POLES WITH A FIXTURE
MOUNTING HEIGHT OF 42 FEET. (REF. CUT SHEET)
PROPOSED PARKING LOT
LIGHTING
PROPOSED PEDESTRIAN
LIGHTING
EXISTING PARKING LOT
LIGHTING
EXISTING PEDESTRIAN
LIGHTING
1 FC
3 FC
5 FC
LIGHT POLE &
FIXTURES
10 FC (FOOT
CANDLES)
NORTH
SCALE FEET
0 60 120
P H O T O M E T R I C S
P L A N
6081
S H I N G L E
C R E E K
C R O S S I N G
B R O O K L Y N
C E N T E R
B U I L D I N G
9 ,1 0 ,R ,T