Loading...
HomeMy WebLinkAboutPC SITE & BLDG 3280 NORTHWAY DR— BROOKLYN CROSSING OFFICE PAID PHASE III BLDG. A NORTHWAY DRIVE' BROOKLYN CENTER, MINNE50TA TI FF.I AIR -K, IL N A o � � Ku-- uK Its'! sm Corporation 2575 Universityy Ave. W., Suite 156 StPauI,MN 55114-1024 651/646-1717 FAX651/646-24o4 : Regis t r a t l o n: HEREBY CERTIFY THAT THI5 PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY. DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFFESSIONAL ARGIi1TECT UNDER THE LAWS OF THE STATE OF MINNESOTA SITE LOCATION MAP S ate ITE DATA D P : Reg. No.: I PROJECT PARTICIPANTS GENERAL INFORMATION SHEET INDEX Drawn By: Suzanne Berndt OWNER CIVIL ENGINEER AO COVER SHEET PROPOSED USE: OFFICE GSM CORPORATION ULTEIG ENGINEERS CIVIL Checked B : � BROOKLYN ADDRESS: 2515 UNIVERSITY AVE. H„ #150 y Dave NIsneW5kl �T�Tr7� TO BE DETERMINED 5T. PAUL, MN 55114-1024 5201 EAST RIVER ROAD, SUITE 308 GI UTILITY AND GRADING PLAN CENTER ER MINNEAPOLIS, MN LI LANDSCAPE PLAN Project Manager: Randy Ramerdink LEGAL DE50RIPTION: BROOKLYN GROSSING THIRD ADDITION (651) 646-Illi FAX (65I) 646-2404 (765) 5i1-2500 FAX (763) 5i1-I168 BLOCK I: LOT 2 DAVE KUMMER, PROJECT MANAGER HALTER GR ARCHITECTURAL EGORY L.L,S. Date: April 2cith, 2002 I52 4 ZONING: G la - SERVICE/OFFICE DISTRICT ALO OVERALL SITE PLAN O ARCHITECT STRUCTURAL ENGINEER All PRELIMINARY SITE PLAN 4 SITE LIGHTING R e v I s 1 o n s � BUILDING SUMMARY G5M CORPORATION NELSON-RUDIE 8 ASSOCIATES A2.0 PRELIMINARY FLOOR PLAN BUILDING 25"15 UNIVERSITY AVE. W., #150 2635 UNIVERSITY A G L ING A GROSS AVE, W SUITE IS PLAN 5 ST. PAUL MN 5 - O A4.0 PRELIMINARY 5114 1024 ST. PAUL, MN 55114-1024 ELEVATIONS City 5ubmisslon May end, 2002 SIT r� SQUARE FOOTAGE: I0,564 5.F, (651) 646-17Ii FAX (651) 646-2404 (651) 644-2400 FAX (65I) 641-4I20 cti DAVE WI5NEHSKI, ARCHITECT DENNI5 NELSON, P.E. ,Z OCCUPANCY GROUP: B/M BASS LAKE ROAD NORTFIWgy DR CONSTRUCTION TYPE: IIN LANDSCAPE ARGHITEGT ALLOWABLE AREA: BRODSHO CONSULTING BA510 ALLOWABLE: 689 NORTHRIDGE COURT o 12,000 5.F. EAGAN MN 5 0 5123 10 XXX FAX XXX O OCCUPANT LOAD DEBBIE BRODSHO ,- _r 100% OFFICE 10384 S.F. I:100� T ,� �y E, BROOKDALE 104 OGG. e� ! e _y`` t�,� L61 SHOPPING O MECHANICAL/ELECTRICAL CENTER 1�0 EXIT WIDTH REQUIRED: I: DE51GN/BUILD By Brooklyn Center Plamiing Commission EXIT WIDTH PROVIDED: ©ateS��px_ Chmn.:2 n 24'-O" ALLOWABLE HEIGHT: 2 STORIES 551-011 PROP05ED HEIGHT: I STORY 16-&' SPRINKLER SYSTEM: LIGHT HAZARD OFFICE .42 G.P.M. FOR THE M05T P r o j e c t N o. xx-xxxx REMOTE 2,000 50. FT. Shoot Title COVER SHEET Sheet No. AO -- .- LEGEND 0 2 • denotes Iron Monument Found Z Q E denotes 1 /2" x 1 4" Iron Monument -with plastic cap Q marked 'Gregory LS 14889" to be set within one year of the recording date of this plat accessible route slopes must not exceed 5% in the U running direction or 2% in the cross direction 858.10 proposed spot elevation , \O existing spot elevation - "'" - - ' - Oa' 0 7 _ O..__..._.- O -- h� ALE IN FEET proposed flow direction ,�t` - .._.-. �--___`-_ , .,.::.� .__. \ } ..-_._-__- .-..1- -- . I._ ._ Dr\rL'� O . .. .--i: ...4 N.: \ ` i/ ! 2t.,_ \i C"Q ...F \O RJ(^�� .- J'�. __ _-C_..-, -" ._-. �._ ,fw W i- ^ �hj tx i. a j 856.35 existing flow direction i. L b'' r' %` h� b� }_ _ _:. _ _ _. 852.75 5 b b 856.02 - Orientation of this bearing system ' _.------- - 852.22 -REMOVE EXIST. CURB is Grid North, Minnesota State Plane f, REMOVE -EXIST. -CURB ___ NECE R 00REMOVE- EXIST: 'C BCoordinateSystem, South Zone. % � ��•�,SSAAS NECESSARY L �� 0 h \ b It ^ r r �h�q., / zrry _.-._. _ .. [AS irrrrzevvarrw.'r' '. 1 F \�1 rj 4J� BENCHMARK: INFORMATION '' '' r rb - rrYrrecrrruir 5 ) MORE INFOOjrb �� Q?� - __ :c _.,y0 -_ . f 857.25 ,\'S 857.15 �' o� ,j A,tb Itt- -.. x 856.75 y 77/I O 0 7777 rC�N i/ III Q ^S' �N ITTT I I 8s7.2s AI f D , 858.10 858.60 o zt WLO I ,._. 1, °,' ° 12 CURB (TYP) r /I LEGAL DESCRIPTION t }1 \ .....-5, +. .r \ .. I Ipg�c`U lb � Z N Lot 2, Block 1 Brooklyn Crossing. - ` 5 '! �� / / / R / ,iI 3rd Addition, Hennepin County, \\ �� 5\ \/ / °° / o J CPs { 1bb '� �i1 ` LO Minnesota. _ b� \' ,,: ; • \ 7 89 4 / MOV UNDATIONEXISTING ,0.I ( y` / 4 0 (V / b I/ �� 111 OWNER AND SUBDIVIDER , t`-i' i5,\. a \ °.a . ,, ., 8 I 'I ,,I IItI� C� to C) O. %S CSM Corporation M Lakeside Limited Partnership !- //' 5 V '� I Oii. W M `. 2575 University .Ave, W ! \ \! ,a I W Suite 1 50 857.39J ' ,.. ` FOUNDATIONSTING 858.00 8`Dg.40 V T. ^� �� �. _ (,� j lj ' fl 11 !� p � O St. Paul, MN 55114-1024 V i\ ° 858.70 85 ✓ SAN TE & REROVICE.EPILUG'III Contact Suzanne Berndt `854 09 - \ p, ti� 1 Ofi y 4 651-646-1717 I //�/` WIT IN 10 OF CURB 5 ; ° / C Q / . ° REM VE EXIST. PIV & �� II - 5 V FF-H59.00 SER ICE LINE. PLUG TEE /I�d' �� { I 4 858.00 I/ I `,. ' V h ( 85 \ LOCATE & REUSE EXIST. ° ' SAN. SWR. SERVICE. COORD. h� 859.10 \\ 0� > 4<_ LO v... \ <V W/MECH o1�P�g��/ b8.70 857.75 I i:' `sue 858.75 ) \ jj bib ,. tta \/ Q- / ° 4) �r`J---.-_` _ 7.20 LGL1LL11 1 b 1 1� 858.3 �� � 858.00 ADAPT EXIST. WATER /, a o� off^ Op ���<'. f „rr?rr �r„ �� 857.68 : �� SITE Y SERVICE. COORD.cc CO / '� Fjrb'1 -J j�j>/7ci`r'r ,. 857.20 I' 7,r,; • h� ,-'Sh `j W MECH \, • ry r r, {h Ors ° Li Bass Lake R ad w \ \ ^ri r \% t` 857.40 r r \-: ` �b A REMOVE -EXIST:.. CURB 858.10 - ASNECESSARY 4 �o r r 857:33/ t` 0 856.37 \ m 854.30 �L 5a„ r �h • v.._._- ST 2.82 �0 b� _ _. s" 6 85 O d \ Co. co O 0 0� _ h „- k 1 I I"i l I c� LU VICINITY MAP .- NO SCALE �<D n ti J o 0� \ ` o ®©® .rdi 0® M \ M��� A O W - U W I p. r W.N. y,rczo ❑R CD U Q WO rN.W F 6j LJ ZQf W" O qZ 4N¢2 U F• K L]2 waxQ NO pKW4 W W W Q a ti a o W a PROJECT 00-7200 SHEET v I e - -- ----- -_ - - -- -11 - 1, -- - -- - --T --- - --. 1- - -- - -- -- --- ��— -- I I -1____ _._._.. __I--'_---`-- -L i___.- ___ -___ I _.. I -.'-L -:-1-._____ ---1_-- - I _.__. -__._ _.__. _ -_ __._ _..WI_. _-,- — I -- _I _-- _--- __ ___ - __ __ -- �'ROi`'�1'G I T lsl IVY PA JTL PA NP GAG KPG r _ 8 4 2 B ONE - 5 Z 2 TG TG 3 55J TG 4 5 3 ® o ® ON 3 50D KFO 2 3 LANDSCAPE REQUIREMENTS Site Area (construction limits used to define site) 44,421 S. F. 44,421 S. F. / 43,560 = 1.02 Acres 1.02 Aces x 80 landscape points = 81.6 Required landscape points = 81.6 Provided landscape points = 102 QTY. KEY BOTANICAL NAME COMMON NAME SIZE/ROOT TREES 2 NWM Acer rubrum 'Northwoods' Northwood Red Maple �Xlo = 1° 2 -1 " B /2 B& 2 PA Fraxinus pennsylvanica 'Patmore' Patmore Ash OLD 2-1/2" B&B 2 JTL Syringa reticulata Japanese Tree Lilac I.5 = 3 1'-0" B&B 4 NP Pinus resinosa Norway Pine 5'-0 B&B SHRUBS 2 AH Hydrangea arborescens 'Annabelle' Annabelle Hydrangea Kw5 — 5 Gal. Pot 5 DN Physocarpus opulifolius Monlo Diabolo Ninebark 5 Gal. Pot 3 CAC Viburnum trilobum 'Bailey Compact' Compact American Cron berry3.-rs 5 Gal. Pot 8 DWE Euonymus alatus 'Compactus' Dwarf Burning Bush • 5 -- 4 5 Gal. Pot 20 BSJ Juniperus squamdto 'Blue Star' Blue Star Juniper' aoK s = 10 5 Gal. Pot 14 TY Taxus x media 'Tauntonii' Taunton Yew �`� x _ 7 5 Gal. Pot 18 TG Thuja occidentalis 'Techny' Techny Arborvitae, globe formK6-;=y 2 Gal. Pot 17 KFG Calamogrostis x acutifloro 'Karl Forester' Karl Forester Feather Reed Gross 2 Gal. Pot LIMITS OF GONSTRUGTION ::DD C �a I8 POLYPROPYLENE OR Iv>a a POLYETHYLENE (40 MIL. 1-1/2" WIDE SRAP TYP.) 7 DOUBLE - 0 i rr 0"Ai ,' WRAP TO FIRST I BRANCH TURNBUCKLE WITH DOUBLE STRAND GAUGETREE 14 8' STEEL STAKE �, �Rm �u +7 ram. �, "•'' a1 la r y �i FINAL GRADE .PLANT . 7 GRADE t l 2 LAYER OF SHREDDED HARDWOOD H IN SAUCER -EXTEND PAST STAKE " OUTSIDEI TREE IIIIII=�111111� ��5 r II Il�lllgll�lllIl BACKFILL WITH PLANTING SOIL III IIIIII—IIIIII` II'� IIIIII-Iillil IIIIII_ —IIIIII_IIIIII= IIIIII_III IIIIII!- IIIIII IIIIII—I r,-IIIIII=IIIIII MAINTAIN PEDESTAL OF Ilhalllllls r119 IILI==' •: SOIL IIIIII-IIIIII- III—IIIIII111=111111 IIIIII Illllli 11TIII=III��III�=���_ III IIIIIIIIIII�IIIIII IIIIII=IIIIII=IIIIII=IIIIII=IIIIII=I .111=IIIIII=IIIIIIJI�IINII IIIIIIIIIII IIIIIIIIII� IIIIIIII�I� IIIIII Inlllll IIIIIIIIIII m .,r==IIIIII=IIIIII=11 11111 (IIIIII IIIIII IIIIII=1- Jh011 --I =11011_Illlll IIIIII- I�IIIII LIIIIII IIRIf111111 1IJ=II'II NOTES: TWO ALTERNATE METHODS OF TREE STAKING ARE SHOWN. R IS THE CONTRACTOR'S OPTION TO STAKE TREES: HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD, SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS OTHERWISE NOTED. NO MULCH TO BE IN CONTACT WITH TRUNK. CONIFEROUS TREE PLANTING DETAIL m PLANTING NOTES: Contractor shall provide one year guarantee of all plant materials. The guarantee begins on the date of the Landscape Architect's written acceptance of the initial 2 planting. Replacement plant materials shall also have a one year guarantee (n 3 commencing upon planting. in O All plants to be northern —grown and hardy. , p Plants to be installed as per standard AAN planting practices. W Use minimum 12" loam planting soil on trees and 6" on shrubs (sides and bottom). o; Contractor shall verify locations with all utililies prior to installation of plants. ti All landscaping and sod areas shall be irrigated with an underground sprinkler. Q O Staking of trees optional; reposition if not plumb after one year. Wrap all smooth —barked trees —fasten top and bottom. Remove by April 1. Open top of burlap on BB materials; remove pot on potted plants; split and break apart peat pots. Prune plants as necessary — per standard nursery practice. Owner shall be responsible for maintenance after acceptance of the work by the Owner. 0 Plants shall be immediately planted upon arrival at site. Properly heel —in Z materials if necessary; temporary only. J All disturbed areas to be sodded unless otherwise noted; sod to be standard (n s CV northern —grown and hardy bluegrass mix. ZZ U 00 Planting beds for shrubs shall have (4 oz. min.) weed barrier fabric, 4° of mulch I U e (5 N 00 dam" Lo and valley —view poly edging. The edging shall be placed with smooth curves. � 10 0 Rock mulch 4" deep shall be provided in all planting beds adjacent to sidewalks 2 g 2 Z LO d and driveways. Rock mulch shall be 1/2" Bryan Red rock. tO Q o Z Z Ld LO (O Areas immediately around ornamental grasses has have mulch but shall not have < ZZ weed barrier fabric applied so as to hinder spreading growth. m d Shredded hardwood bark mulch shall be used around all trees not within a shrub bed. � o Z ® ICU Z �J � o to zo V >M � SCALE IN FEET =j ® > Mom< 18" POLYPROPYLENE OR POLYETHYLENE (40 MIL. 1-1/2" WIDE SRAP TYP.) E DOUBLE STRAND 14 GA. WIRE - 3' 0 120' INTERVAL (TYP.) dj o � U ` N —TREE WRAP TO FIRST BRANCH o o TURNBUCKLE WITH DOUBLE STRAND / —p E J O N 14 GAUGE WIRE - 3 PER TREE 4'-6' LAYER OF SHREDDED HARDWOOD >. v n m c MULCH IN SAUCER -EXTEND PAST STAKE C �_ W U 4"-6" LAYER OF SHREDDED HARDWOOD FINAL GRADE OF PLANT TO L _ W MULCH IN SAUCER -EXTEND PAST STAKE EQUAL ORIGINAL GRADE oa T O _FINAL GRADE OF PLANT TO Q EQUAL ORIGINAL GRADE as o 0 m o N /-2"4"00" STAKES SET 120 APART. a i E N OUTSIDE THE BALL AT ANGLE - 3 PER - _ c a TREE - - BACKFILL WITH PLANTING SOIL p - a•-' O BACKFILL WITH PLANTING SOIL N m - MAINTAIN PEDESTAL OF UNDISTURBED SOIL . O 0 Y 10 18" min t MAINTAIN PEDESTAL OF +" C O O m (n pr) UNDISTURBED SOIL _ r� �N 1 — - — o - �2� y .` IZ L m o - - - IZ Q' Z In TIT II- - - - CENTERING OF SHRUB IN BED TO TAKE PRECEDENCE ' OVER DIMENSION FROM t d L Q) W NOTES: NOTES: HAND LOOSEN ROOTS OF CONTAINERIZED MATERIAL (TYP.). EDGE - P Q. � TWO ALTERNATE METHODS OF TREE STAKING ARE SHOWN. SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING, IT IS THE CONTRACTOR'S OPTION TO STAKE TREES: HOWEVER, THE CONTRACTOR - IS RESPONSIBLE FOR THE MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT �N THE GUARANTEE PERIOD. Z SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. 1 W = U > Cn g0�¢Lo yQ Q� U d DECIDUOUS TREE PLANTING DETAIL PROJECT SHRUB PLANTING DETAIL 00-7200 L I SHEET a 25 311 EXI5TING PARKING 1 EXI TIN& 21 L HT RE EXI5TING PARKING `v �r8 P C( 47 \ \ \ \ \ \ I 51 TE PLAN �� SCALE: I" = 40'-0" NO TH / SITE/BUILDING DATA PHASE III GRAPHIC SYMBOLS BROOKLYN CROSSING OFFICE PARK LOT 2: BLDG S.F. PARKING REQUIRED BLOCK 1: LOT 1 AND 2 ZONE C 1a PROPOSED: PROPOSED BUILDING BUILDING A 80'-8" x 128' = 10,384 S.F. 10,325 S.F./200 52 STALLS BLOCK 1—LOT 2: 181,754 S.F. 4.17 ACRES EXISTING: EXISTING BUILDING BUILDING B 60' x 120' = 7,200 S.F. 7,200 S.F./200 = 36 STALLS' PARKING REQUIREMENTS: G.F.A. BUILDING C 60' x 140' = 8,400 S.F. 8,400 S.F./200 = 42 STALLS OFFICE BUILDING BUILDING E 60' x 100' = 6,000 S.F. 6.000 S.F./200 = 30 STALLS 0 — 20,000 S.F. 200 20,000-220,000 S.F. .0005 G.F.A. + 190 TOTAL 31,984 S.F. 160 STALLS PARKING PROVIDED 177 STALLS TYPICAL PARKING STALL DIMENSIONS: 8'-8" WIDTH TYPICAL 19;-6" LENGTH TYPICAL LOT 1: BROOKLET CROSSING OFFICE PARK PHASE III BLDG. A NORTHWAY DRIVE BROOKLYN CENTER, MINNESOTA giBl-- CSM Corporation 2575 Universityy Ave. W., Suite 150 St. Paul, MN 55114-1024 651/646-1717 FAX 651/646-2404 SPECIFICATION OR REPORT WA5 PREPARED 15Y ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY RE&STERED PROFFESSIONAL ARCHITECT UNDER THE LAWS OF THE 5TATE OF MINNE50TA Date: Reg. No.: Drawn By: 5uzonne Berndt Project Manager: Randy Ramardink Date: April 24th, 2002 R e v i s i o n s City 5ubmisslon May 2nd, 2002 18 —0 LENGTH @ EDGE OF LOTS EXISTING: 4) ALL CURB RADIUS ARE 3'-0" U.N.O. TYPICAL DRIVE LANES _ 24 —0 U.N.O. OFFICE TOWER ,�uA` 25411, 5 STORY Q 11,039 S.F. 55,193 S.F. (55'1-93 c�0005)--++— 90= 21-8 STALLS TOTAL 55,193 S.F. ;1q3 _', ' -24-8 ST-ALLS �51193+190 PARKING PROVIDED ,pt>oSx 255 STALLS e13 — PROJECT TOTAL: 87,177 S.F. Project Na.,XX-XXXX TOTAL EXISTING PARKING 372 STALLS - TOTAL PROPOSED PARKING 60 STALLS 5 h o e t T 1 t I e TOTAL PARKING 432 STALLS TOTAL REQUIRED PARKING 8- STALLS 51TE PLAN ACCESSIBLE SPACES REQUIRED 9 STALLS ACCESSIBLE SPACES PROVIDED 11 STALLS I EXISTING PROPERTY LINE EXISTING CURB TYP. " EXISTING CURB 15`.6 TO BE REMOVED USE EXISTING CURB GUT 5b'-O 24'-0" VERIFY LOCATION -- — — — — -—� ----------------------------11— --- --------- R_5 --- --- R=5' EXI5TIN6 FOUNDATION R-3' R=5 - R=5' TO BE REMOVED — _- _ EXISTING TRASH ENCLOSURE � - ' TO REMAIN-6 FT. HIGH SOLID i I ISO p I i �\ \ OPAQUE WOOD FENCE. REST TO MATCH BUILDING. 9" � I 20'-01, 2; /� 20'-O" 21-0' II 20 -O \1 I I I I W ® all (P /' II CP II I I: III 13! PROPOSED \\ I p it I {' 4Iii i N \ i\ BUILDING A \ \ \ \ 10,584 S.F. 1 I\ �� l'/ i1 \ \\ NEW CURB TYP. II 25.-0.. I 1 '-O" \ XISTING CURB O REMAIN _ - --- -- -- 1 \ EX157�NG FOUNDATION \ \\\\ R5' I TO B@ REMOVED R=5 --- _ \ R_ry,� \ \ /7' ' _ EXISTING CURBEXISTING CURB \\ TO REMAIN TYP. TO BE REMOVED p EXISTING CURB OUT \\ \ b TO BE REMOVED /CONSTRUCTION LIMITS SITE PLAN ALI SCALE: I" = 20'-0" NO TH TING �6HT F 1 ,5 2 SITE LIGHTING PLAN ALI SCALE: I" = 20'-0" (N103TH GENERAL NOTES I. ALL DIMENSIONS ARE TO THE FACE OF CURB U.N.O.. 2. FOR LANDSCAPE INFORMATION SEE CIVIL. 3 GENERAL CONTRACTOR TO COORDINATE CIVIL AND SITE CONDITIONS AND NOTIFY PROJECT MANAGER OF DISCREPANCY PRIOR TO BID TIME. 4. LOCATION OF YELLOW CURBING FOR FIRE LANE TO BE DETERMINED BY FIRE MARSHALL. ELECTRICAL FIXTURE SCHEDULE MARK MANUFACTURERS CATALOG NUMBER VOLTS LAMPS TOTAL I MOUNTING REMARKS WATTS HEIGHT L1 LUMARK MHWL - 400 - MT 250 1-250W-MH 250 18'-8 WALLPACK WALL MOUNT - LIGHT DIRECTED DOWNWARD L2 JPL SERIES 21 LUMINAIRE 277 (1) 250W-MH 250 25' SITE LIGHTING SINGLE HEAD TYPE III DISTRIBUTION EXISTING 1 .5 __j BROOKLET CROSSING OFFICE PARK PHASE III BLDG. A NORTHWAY DRIVE ` BROOKLYN CENTER," M I NNE50TA I I i GCSM Corporation 2575 Universityy Ave. W., Suite 150 St. Paul, MN 55114-1024 6511646-1717 FAX651IC46-2404 ReglSI:ratIoIn Ills I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WA5 PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AMA DULY RE615TERED PROFFESSIONAL ARCHITECT UNDER THE LAW5 OF THE STATE OF MINNESOTA - Date: Reg. No.: Drawn By: Suzanne Berndt Checked By: Dave Wlsnemkl Project Manager: Bondy Rouwerdlnk Date: April 24th, 2002 R e v I s I o In s city 5ubmisslon May 2nd, 2002 r o j e c t N o. XX-XXXX Sheet T I t I e ' 51TE PLAN SITE LIGHTING PLAN 5heet No. (��:) BU I LP I NG PLAN A2 50ALE: 115" = 1'-0" NORTH TRUE NORTH ROOKL" CR®S S1NG OFFICE PARK PHASE III BLDG. A � NORTHWAY DRIVE BROOKLYN CENTER, MINNESOTA SM Corporation 2575 Universityy Ave. W., Suite 150 St. Paul, MN 55114-1024 651/646-1717 FAX65116462404 Reg is t r a t i o n I HEREBY CERTIFY THAT THIS PLAN, 5PECIFICATION OR REPORT WAS PREPARED ElY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY RMSISTERED PROFFESSIONAL ARCHITECT UNDER THE LAWS OF THE STATE OF MINNESOTA Date: Reg. No.: Drawn By: Suzanne Berndt Checked By: Dave Wlsnewskl Project Manager: Randy Ravwerdink April 2gth, 2002 R e v i s I o n s Glty Submission May 2nd, 2002 P r o j e c t N a. XX-XXXX S h e e t T I t l e FLOOR PLAN Sheet Na. A:2 A q p p PREPIN15HED METAL GAP FLASHING FACE BRICK: COLOR TO MATCH EXISTING B, G E E BUILDINGS BRICK SOLDIER COURSE GLAZING IN ANODIZED ALUMINUM FRAMING ❑❑❑� ❑❑❑� ❑❑❑ FACE BRICK: COLOR TO ❑❑❑ MATCH EXISTING B, G d E EUILDINb5 GRADE WEST ELEVATION A4 SCALE: I/a" = I'-O" A q p A PREFINI5HED METAL GAP FLASHING FACE BRICK: COLOR TO MATCH EXISTING B, C d E BJILDINC75 BRICK SOLDIER COURSE GLAZING IN ANODIZED ALUMINUM FRAMING FACE BRICK: COLOR TO L_iLEIEIIJ�E]E]EliBUILDINGS MATCH EXISTING B, G d E - GRADE s EA5T ELEVATION A4 5CALE: 1/8" = 1'-0" PREFINI5HED METAL GAP FLASHING FACE BRICK: COLOR TO MATCH EXISTING B, G k E BUILDINGS BRICK SOLDIER COURSE GLAZING IN ANODIZED ALUMINUM FRAMING ❑❑❑ FAGS BRICK: COLOR TO _ — — DEFT MATCH EXISTING B, G 4E BUILDINGS GRADE BROOKLYN CROSSING OFFICIE PARK PHASE III BILDG. A NORTHNANr DRIVE BROOKLYN CENTER, MINNESOTA i GSM[ Corporation 2575 Univemilyy Ave. W., Suite 150 St. Paul, MN 55114-1024 651/646-1717 FAX6511646-2404. I Reg Is t r a t i on: I HEREBY CERTIFY THAT THIS PLAN, SPEGIFIGATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED PROFFESSIONAL ARCHITECT UNDER THE LAWS OF THE STATE OF MINNE50TA Date: Reg. No.: Drawn By Suzanne Berndt Checked By: Dave V`Usnewskl 3 SOUTH ELEVATION ATION Project Manager: Randy Romerdink A4 SCALE: 1/8" = 1'-0" Date: April 24th, 2002 Revisions A A R A City 5ubmisslon May 2nd, 2002 PREFINI5HED METAL GAP FLA5HING FACE BRICK: COLOR TO MATCH EXISTING 5,0 4 E BUILDINGS i BRICK SOLDIER COURSE GLAZING IN ANODIZED Tff---- - ALUMINUM FRAMING B, G 3 E ❑_ _ _ Ell—] MATT EX15TIN6 PAGE BRICK: COLOR TO III BUILD GS _ _ GRADE I 4 NORTH ELEVATION A4 SCALE: I/8" = I'-O" P r o j e c t N o. XX-XXXX Sheet Title ELEVATI ON5 I' Sheet No. l .i'r4 i v'