HomeMy WebLinkAbout2021-123 CCRMember Elliott introduced the 1`61lowing resolution and irloved its adoption: Rl"SOLUTION NO. 2021-123 RF'SOLUTION APPROVING CHANG11" ORDER NOS. 1-7. IMPROVEMENT l-)ROJl` ' CO� TN2021-05, BROOKLYN BOULFIVARD CORRIDOR PROJI"CT PHASI, I IMPROVEMI-XI'S Wl IFRFIAS, pursuant to a written contract signed with the City of Brooklyn Ccriter, Minnesota, Park Construction Company ot'Minneapolis, Minnesota, was instructed to complete additional work as ittanized on Change Order Nos. 1-7 for Improvement Projject No. 1 2021-05, Brooklyn Boulevard Corridor Prqject phase 2 finprovelrientsl and Wl IFIRFAS, Change Order I in the arn0LIIII of $4,951 .96 is for removing and replacing a section ot'ehain link 1ence at the SE corner ot'Brooklyn Blvd and 65"' Ave that the plans identified as a 54[ tall fence that was actual a 641 tall fence in the field; and Wl IFRE'AS, CIiange Order 2 in the amount of'-$8.480 (deduct) is for using on - site grantilar bedding matcrial in liar od'irriporting Fine Aggregate Bedding materials Ior use on RCT storm sewer: and WI I FR F ' AS, Change Order 3 in (lie amount of $7,374.40 is for installationf' o temporary pedestrian crossings with push buttons and pedestrian indicators on the south legs of the temporary signal systcnis at the intersections ot'63"' Avc and 65"' Ave, and Wl IFRFAS. Change Order 4 in the amount ot'-$1.535 (dedUCI) is fbi- installation ot'double-wall I IDPFI pipe meeting re(jUirCuIeutS Of'Spec 3247, in lieu ol"I'T pert' pipe drains, at locations specified in the Plan: and W11FRFAS, Change Order 5 in the amount of' $35.870,25 is tor replacing a segment of* sagging sanitary sewer along Brooklyn 111vo] South ot'65"' Ave, removing 2 existing gate valves north of' 62 ... 1 Avenue. rcrnoving as portion of a 23" casing pipe at the waterinain offset near Brooklyn Blvd Sta. 124 r-60, and elimination of' an outside sanitary service drop at sanitary manhole 805�, and W11FIRFIAS. Change Order 6 in the amount of $0 is Ior installation of Proco ProFIex Series 790 "Light Weight" Check Valve meeting requirements of Spec 2503, in lieu of' Series CMUF-SI, slip -in CheckMate Ultraflex Valves as manutactured by Tidetlex Technologies*r , at locations specified in the Plan, and MIFF' Change Order 7 in the aMOUnt of $9,929,60 is Im costs associated with the utility dclays cxperienced by the Contractor per spccification 1806.2,B(2) which included de -mobilization and rc-mobilization ot'equipment, and inefficiencies in certain work completed prior to the I'Lill relocation ol'the identified utilitim, and RESOLUTION No. 2021-123 WHEREAS, said additional work was not included in the original contract, but was dectned necessary to properly complete the improvements. NOW, THFREFORF, BF IT Ill SOLVED by the City COUncil of' the City of Brooklyn Center. Minnesota, that Change Order Nos. I through 7 in the amount of $48,117.21 t'or Improvement No, 2021-05 is hereby approved. The revised contract aniount is as l'ollows: Original Contract AMOUnt, $12,222.88030 Revised Contract Amount October:4 P21 Date AA " ITST: City Clerk The, rnotion Im the adoption of the foregoing resolution was duly seconded by member Lawrence -Anderson and upon vote being taken thereon. the following voted in t1avor thereof" Butler, F ' Ifical, Graves and the followh ring voted against the same: None whereupon said resolution was declared only passed and adopted.