Loading...
HomeMy WebLinkAbout1999-172 CCRMember Debra Hilstrom introduced the following resolution and moved its adoption: RESOLUTION NO. 99-172 RESOLUTION AMENDING THE SCHEDULE FOR PLANNING AND INSPECTION FEES WHEREAS, Chapter 3, 12, 15, 34 and 35 of the City Ordinances requires the payment of fees for building permits, plumbing permits, mechanical system permits, sewer and water permits, fire suppression permits, sign permits, building maintenance and occupancy reinspections, Planning Commission applications, flood plain use permits and administrative land use permits; and WHEREAS, Chapter 3, 12, 15, 34 and 35 of the City Ordinances further authorizes the setting of various fees by City Council resolution; and WHEREAS, City Council Resolution Nos. 86-123 (adopted 8/11/86), 89-224 (adopted 11/27/89), 90-33 (adopted 2/26/0, 95-174 (adopted 8/14/95), and 98-228 (adopted . 12/14/98), together comprise a schedule of fees collected by Community Development; and WHEREAS, the City Council fmds it appropriate to modify and update the fees contained in said resolutions and to adopt a new fee schedule. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center to adopt the following fee schedule. Planning and Inspection Fee Schedule 1. Building Permit Fees Building permit fees shall be based on the valuation of estimated building costs. The building valuation shall be computed using the up-to-date average construction cost per square foot established from time to time by the State Building Inspector. q&atian Egg $1 to $1,000 $38.75 $1,001 to $2,000 $38.75 for the first $1,000 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000 Resolution No. 99-172 $25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000 $50,001 to $100,000 $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000 $100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000 $500,000 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000 $1,000,001 and up $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereof A plan check fee of 32.5 % of the amount of the permit fee is collected for one- and two-family residences (including townhouses as one-family residences). For all other permits, the plan check fee is 65 % of the amount of the permit. 2. Plumbing Permit Fees Plumbing permit fees shall be computed as set forth below. a. Minimum fee b. Repair or alteration of existing system c. New residential or commercial building 3. Sewer and Water Permit Fees Description and Fee a. Sewer % water connection b. Sewer Q_r water disconnection c. Commercial sewer and water connection d. Residential sewer and water connection e. Commercial/Industrial fire line $ 25.00 2% of estimated cost 2% of estimated cost $ 31.25 $ 31.25 $ 108.75 $ 77.50 $ 31.25 Resolution No. 99-172 4. Fire Suppression Permit Fees pescription and Fee a. Fire Sprinkler System (New) - First ten heads - Additional ten heads or fraction thereof Standpipes (each) Fire pump (including testing) Alteration, Repair of Existing System - For each $500 valuation or fraction thereof - Minimum fee $ 40.00 $ 8.00 $ 50.00 $200.00 $ 17.00 $ 35.00 Fire Suppression Plan Review - New commercial construction 65 % of base permit fee* * Plan review fees based on UBC Section 1073, Plan Review Fees. 5. Mechanical System Permit Fee Mechanical system permit fees shall be calculated and collected according to the following: 1 a. A mechanical permit shall be required for the installation, for the removal and for the replacement of any in-ground or above-ground tanks, vessels and related piping used for the storage of gaseous or liquid fuels or chemicals. Installation, alteration, reconstruction or repair of any heating, ventilating, comfort cooling or refrigeration equipment requires a mechanical permit. Permit fees shall be computed on the basis of the estimated cost of the proposed work except as herein provided. $0 to $500 $ 25.00 $501 to $50,000 $ 25.00 plus 2% of value of any amount in excess of $500 Over $50,000 $1,012.50 plus 1 % of value of any amount in excess of $50,000. b. A mechanical permit shall be required for gas pipe fitting for connection to any gas burning device, except as herein provided; the fees are set forth below. The appropriate fee for gas water heaters shall be applied to the plumbing rather than a mechanical permit. Resolution No. 99-172 Descrintion and Fees 2" and less diameter pipe - 1-3 fixtures $ 5.75 each - Additional Openings $ 2.50 each 2" and over diameter pipe - 1-3 fixtures $ 15.00 each - Additional opening $ 3.25 each c. It is not intended that permits shall be required for portable heating ventilating, comfort cooling or refrigeration equipment, nor for the replacement of any component part or assembly of an appliance which does not alter its original approval and which complies with other applicable requirements of the Building Code. 6. Reinspection Fees Reinspection fees shall be collected for each inspection or reinspection when such portion of work for which inspection is called is not complete or when corrections called for are not made. The applicant shall pay the reinspection fee as set forth below: Reinspection Fee $ 47.00 per hour* (One hour minimum.) *Reinspection fee based on UBC Section 108.8, Reinspections. 7. Building Maintenance and Occupancy Ordinance Fees Reinspection $ 25.00 Appeal $ 50.00 8. Sign Permit Fees Sign permit fees shall be collected before issuance of any sign permit required under the provision of the Sign Ordinance and shall be calculated according to the following: a. The fee for any permanent freestanding or non-freestanding sign five square feet in area or less shall be $25.00. b. The fee for any permanent freestanding or non freestanding sign over five square feet in area shall be $30.00 for the first 50 square feet of gross area or fraction thereof and $12.50 for each additional 50 square feet of gross area or fraction thereof. c. The fee for permits for the installation of any electrical wiring for any sign shall conform to the State Board of Electricity fee schedule and shall be obtained through the State Board of Electricity. Resolution No. 99-172 9. Planning Commission Fees Planning Commission fees shall be collected at the time applications are executed according to the following: Description and Fee a. Rezoning $700.00 b. Site and Building Plan 500.00 c. Preliminary Plat 200.00 d. Variance 100.00 e. Special Use Permit 100.00 f. Extension of Special Use Permit 50.00 g. Appeal 100.00 h. Determination 100.00 L Planned Unit Development 1200.00 In addition to the above fees, the applicant shall sign an agreement, on forms provided by the City, to pay the cost of all engineering, planning and legal consulting expenses incurred by the City in processing the above applications. 10. Administrative Land Use Permit Fees Administrative Land Use Permit fees for temporary activity shall be collected before the issuance of any such permit required under the provisions of the Zoning Ordinance according to the following: Descrintion_Wd Fee a. Out-of-door church functions, civic functions, charities, carnivals, etc. b. Off-site signs for civic functions or community events. c. Out-of-door nursery and garden center sales and displays. d. Miscellaneous out-of-door sales, displays or promotional events. e. Miscellaneous out-of-door sales, displays or promotional events for gasoline service stations. f. Car wash fund raisers. $25.00/10 days $25.00/10 days $50.00/30 days $25.00/10 days $25.00/30 days $25.00/10 days Resolution No. 99-172 11. Flood Plain Use Permit Fees Flood Plain Use Permit fees shall be collected before the issuance of any flood plain use permit required under the provisions of the Zoning Ordinance and shall be calculated according to the following: Area F" Up to 1 acre $ 25.00 1 acre to 5 acres $ 25.00/acre Over 5 acres $125.00 plus $18.75/acre for each acre or fraction thereof over 5 acres BE IT FURTHER RESOLVED that the above schedule of Planning and Inspection fees shall become effective on December .17 , 1999 Date Mayor O ATTEST: City Clerk The motion for the adoption of the foregoing resolution was duly seconded by member Kay Lasman and upon vote being taken thereon, the following voted in favor thereof: Myrna Kragness, Debra Kilstrom, Kay Lasman, Ed Nelson, and Robert Peppe; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted.