HomeMy WebLinkAbout1997-213 CCRMember Robert Peppe introduced the following resolution and
moved its adoption:
RESOLUTION NO. 97-213
RESOLUTION ESTABLISHING 1998 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, Resolution No. 85-34 established residential street and storm drainage
special assessment rates for street reconstruction projects; and
WHEREAS, the residential assessment rates are annually reviewed and approved
by the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the proposed street assesment rates for 1998 are equivalent to 37
percent of an average project cost; and
WHEREAS, the R-4, R-5, R-6 and R-7 zoned districts should be assessed based on
an evaluation of project cost and project benefit.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL of the City
of Brooklyn Center, Minnesota, that:
1. The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in R-1, R-2 or R-3 zoned districts. These
rates shall also be applied to parcels of property in other land use zones when such
parcels (a) are being used as one-family or two-family residential sites at the time
the assessment roll is levied; and (b) could not be subdivided under the then-
existing Subdivision Ordinance.
2. The residential assessment rates for street reconstruction effective January 1, 1998
shall be as follows:
Land Use 1998 Assessment Rates
R-1 zoned, used as one-family $2,060 per lot (street)
site that cannot be subdivided $ 670 per lot (storm drainage)
Resolution No. A7-213
j,,Zpd t Tse
R-2 zoned, or used as a two-family
site that cannot be subdivided
R-3 zoned
1998 Assessment Rates
$27.47 per front foot with a
$2,060 per lot minimum (street)
$8.93 per front foot with a
$670 per lot minimum (storm)
Assessable froa-x-$27.47 (street)
Number of residential units
Assessable frontage x $8.93 (storm)
Number of residential units
3. The residential assessment rates for street reconstruction shall not apply to R-4, R-
5, R-6, or R-7 zoned districts. The assessment rates for street reconstruction for R-
4, R-5, R-6, or R-7 zoned property shall be based on an evaluation of the project
cost and the project benefit for each project.
November 24, 1997
Date Mayor U
ATTEST: X
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member,
Kathleen Carmody and upon vote being taken thereon, the following voted in favor
thereof: Myrna Kragness, Kathleen Carmody, Kay La.sman, and Robert Peppe;
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.