HomeMy WebLinkAbout1996-209 CCRits adoption:
as follows:
Member Debra Hilstrom introduced the following resolution and moved
RESOLUTION NO. 96 -209
RESOLUTION ESTABLISHING IMPROVEMENT PROJECT NOS. 1997 -01, 02, AND
03, ORCHARD LANE WEST STREET, STORM DRAINAGE, AND UTILITY
IMPROVEMENTS, AND ACCEPTING QUOTATIONS FOR SANITARY AND
STORM SEWER TELEVISING
WHEREAS, the City's Pavement Management Program indicates that many of the
streets in an area of the City known as Orchard Lane West can no longer benefit from sealcoating
and other routine maintenance, and should be considered for reconstruction; and
WHEREAS, a detailed storm drainage analysis of the subwatershed in which
Orchard Lane West is located indicates that substantial drainage improvements should be
considered for this area to relieve drainage capacity problems; and
WHEREAS, documentation demonstrates a history of concerns and problems
relating to the water distribution system in this neighborhood, including circulation and water
quality; and
WHEREAS, available records indicate identifiable amounts of deterioration and
repair needs for the sanitary sewer system in this area; and
WHEREAS, the Council desires to consider street, drainage, and utility
improvements in this neighborhood to be constructed in 1997; and
WHEREAS, quotations have been obtained for additional sewer televising services
Visu -Sewer Clean and Seal, Inc. $4,402.00
Infratech $4,407.50
Buchen Environmental $5,959.00
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota that:
1. Improvement Project Nos. 1997 -01, 02, and 03, Orchard Lane West Street,
Storm Drainage, and Utility Improvements are hereby established. The
project area includes all streets in the City west of Orchard Lane North and
South of I- 94/694.
2. The proposal as submitted by Visu -Sewer Clean and Seal, Inc. of St. Louis
Park, MN in the amount of $4,402.00 to perform sanitary and storm sewer
televising in this project area is hereby accepted.
1
1
RESOLUTION NO. 96 -209
ATTEST:
3. City staff is hereby authorized and directed to assemble and develop such
information as necessary to develop a reliable needs evaluation and cost
estimates, financing options, and feasibility reports for the above
established projects.
4. Staff is hereby authorized and directed to conduct informational meetings
as necessary in the above described neighborhood to introduce the proposed
project, and to present the fmdings of the preliminary reports.
5. Staff is hereby directed to report the results of said informational meetings
to the City Council for further consideration of possible improvement
projects.
October 15, 1996 C%
Date 0 May
Ittiboy( s-6,4„tom
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
Kristen Mann and upon vote being taken thereon, the following voted in favor
thereof: Myrna Kragness, Kathleen, Carmody, Debra Hilstrom, Kristen Mann and
Charles F. Nichols, Sr.
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.