Loading...
HomeMy WebLinkAbout1996-209 CCRits adoption: as follows: Member Debra Hilstrom introduced the following resolution and moved RESOLUTION NO. 96 -209 RESOLUTION ESTABLISHING IMPROVEMENT PROJECT NOS. 1997 -01, 02, AND 03, ORCHARD LANE WEST STREET, STORM DRAINAGE, AND UTILITY IMPROVEMENTS, AND ACCEPTING QUOTATIONS FOR SANITARY AND STORM SEWER TELEVISING WHEREAS, the City's Pavement Management Program indicates that many of the streets in an area of the City known as Orchard Lane West can no longer benefit from sealcoating and other routine maintenance, and should be considered for reconstruction; and WHEREAS, a detailed storm drainage analysis of the subwatershed in which Orchard Lane West is located indicates that substantial drainage improvements should be considered for this area to relieve drainage capacity problems; and WHEREAS, documentation demonstrates a history of concerns and problems relating to the water distribution system in this neighborhood, including circulation and water quality; and WHEREAS, available records indicate identifiable amounts of deterioration and repair needs for the sanitary sewer system in this area; and WHEREAS, the Council desires to consider street, drainage, and utility improvements in this neighborhood to be constructed in 1997; and WHEREAS, quotations have been obtained for additional sewer televising services Visu -Sewer Clean and Seal, Inc. $4,402.00 Infratech $4,407.50 Buchen Environmental $5,959.00 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center, Minnesota that: 1. Improvement Project Nos. 1997 -01, 02, and 03, Orchard Lane West Street, Storm Drainage, and Utility Improvements are hereby established. The project area includes all streets in the City west of Orchard Lane North and South of I- 94/694. 2. The proposal as submitted by Visu -Sewer Clean and Seal, Inc. of St. Louis Park, MN in the amount of $4,402.00 to perform sanitary and storm sewer televising in this project area is hereby accepted. 1 1 RESOLUTION NO. 96 -209 ATTEST: 3. City staff is hereby authorized and directed to assemble and develop such information as necessary to develop a reliable needs evaluation and cost estimates, financing options, and feasibility reports for the above established projects. 4. Staff is hereby authorized and directed to conduct informational meetings as necessary in the above described neighborhood to introduce the proposed project, and to present the fmdings of the preliminary reports. 5. Staff is hereby directed to report the results of said informational meetings to the City Council for further consideration of possible improvement projects. October 15, 1996 C% Date 0 May Ittiboy( s-6,4„tom City Clerk The motion for the adoption of the foregoing resolution was duly seconded by member Kristen Mann and upon vote being taken thereon, the following voted in favor thereof: Myrna Kragness, Kathleen, Carmody, Debra Hilstrom, Kristen Mann and Charles F. Nichols, Sr. and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted.