HomeMy WebLinkAbout1994-114 CCR1
Member Celia Scott introduced the following resolution and
moved its adoption:
RESOLUTION NO. 94 -114
RESOLUTION ESTABLISHING IMPROVEMENT PROJECT NO. 1994 -25,
PEDESTRIAN BRIDGE REPAIR IN GARDEN CITY PARK AND AT
COUNTY ROAD 10, APPROPRIATING FUNDS, APPROVING PLANS AND
SPECIFICATIONS. AND AUTHORIZING ADVERTISEMENT FOR BIDS,
WHEREAS, the condition of the trail approaches at various pedestrian bridges
creates a non compliant condition with respect to the Americans With Disabilities Act, and is
generally hazardous to pedestrians; and
WHEREAS, the City Engineer has determined that repairs are required at the
approaches of certain pedestrian bridges that cross Shingle Creek; and
WHEREAS, the required repairs are beyond the scope of usual maintenance
performed by City forces; and
WHEREAS, the City Engineer has prepared plans and specifications for the
proposed work.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that:
1. Improvement Project No. 1994 -25, Pedestrian Bridge Repair in Garden
City Park and at County Road 10, is hereby established.
2. Said plans and specifications for Improvement Project No. 1994 -25, as
prepared by the City Engineer, are hereby approved.
3. The Deputy City Clerk shall prepare and cause to be inserted in the
official newspaper and in the Construction Bulletin an advertisement for
bids for the making of such improvement in accordance with the approved
plans and specifications. The advertisement shall be published in
accordance with Minnesota Statutes, shall specify the work to be done and
shall state the time and location at which bids will be opened by the
Deputy City Clerk and the City Manager or their designees. Any bidder
whose responsibility is questioned during consideration of the bid will be
given an opportunity to address the Council on the issue of responsibility.
No bids will be considered unless sealed and filed with the Deputy City
Clerk and accompanied by a cash deposit, cashier's check, bid bond, or
certified check payable to the City Clerk for 5 percent of the amount of
such bid.
1
1
RESOLUTION NO. 94 -114
4. The estimated project costs for Improvement Project No. 1994 -25,
Pedestrian Bridge Repair in Garden City Park and at County Road 10, are
established as follows:
June 13, 1994
Date
Contract
Contingency (15
Subtotal Construction
Staff Engineering (10
Admin. Legal (3
Total Est. Project Cost
ATTEST: &IAK 14tAA
Deputy Clerk
$65,000
9.750
$74,750
7,480
2.240
$84,470
5. All costs related to Improvement Project No. 1994 -25, Pedestrian Bridge
Repair in Garden City Park and at County Road 10, shall be charged to
the Capital Improvement Fund.
Todd Paulson, Mayor
The motion for the adoption of the foregoing resolution was duly seconded by member
Kristen Mann and upon vote being taken thereon, the following voted in
favor thereof:
Todd Paulson, Celia Scott, Dave Rosene, Barb Kalligher, and Kristen Mann;
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.