RESOLUTION NO. 93 -197
Member Celia Scott introduced the following resolution and
moved its adoption:
RESOLUTION ESTABLISHING IMPROVEMENT PROJECT NO. 1993 -24, WELL
NO. 6 MAINTENANCE, AND IMPROVEMENT PROJECT NO. 1993 -26, WELL
NO. 8 MAINTENANCE, CONTRACT 1993 -J, APPROVING PLANS AND
SPECIFICATIONS, AND AUTHORIZING ADVERTISEMENT FOR BIDS
WHEREAS, the City Engineer has reported to the City Council of the
need for routine well maintenance; and
WHEREAS, the City does not possess the parts or equipment necessary
to perform the more specialized repairs; and
WHEREAS, the City Engineer has developed plans and specifications for
these repairs and replacements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL of the City of
Brooklyn Center, Minnesota, that:
1. Improvement Project No. 1993 -24, Well No. 6 Maintenance, and
Improvement Project No. 1993 -26, Well No. 8 Maintenance, are hereby
established.
2. Said plans and specifications as prepared by the City Engineer are
hereby approved.
3. The Deputy City Clerk shall prepare and cause to be inserted in the
official newspaper and in the Construction Bulletin an advertisement
for bids for the making of such improvement in accordance with the
approved plans and specifications. The advertisement shall be
published in accordance with Minnesota Statutes, shall specify the
work to be done and shall state the time and location at which bids
will be opened by the Deputy City Clerk and the City Manager or their
designees. Any bidder whose responsibility is questioned during
consideration of the bid will be given an opportunity to address the
Council on the issue of responsibility. No bids will be considered
unless sealed and filed with the Deputy City Clerk and accompanied by
a cash deposit, cashier's check, bid bond, or certified check payable
to the City Clerk for 5 percent of the amount of such bid.
4. The estimated project costs for Improvement Project No. 1993 -24, Well
No. 6 Maintenance are established as follows:
1
1
RESOLUTION NO. 93 197
ATTEST:
November 8, 1993
Date
Contract
Contingency (15
Subtotal Construction
Staff Engineering (8
Admin. Legal (27.)
Total Est. Project Cost 12,650
Improvement Project 1993 -23
5. The estimated project costs for Improvement Project No. 1993 -26, Well
No. 8 Maintenance are established as follows:
Contract
Contingency (15
Subtotal Construction
Staff Engineering (8
Admin. Legal (2
8,000
1.200
9,200
736
S 184
Total Est. Project Cost 10,120
Improvement Project 1993 -26
6. All costs relating to this project shall be charged to the Public
Utility Fund.
aana2fEnit04.
Deputy Clerk
10,000
1.500
11,500
920
S 230
J
Todd Paulson, Mayor
The motion for the adoption of the foregoing resolution was duly seconded by
member Barb Kalligher and upon vote being taken thereon, the
following voted in favor thereof:
Todd Paulson, Celia Scott, Dave Rosene, and Barb Kalligher;
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.