Loading...
HomeMy WebLinkAbout1990-146 CCR1 Member Celia Scott introduced the following resolution and moved its adoption: RESOLUTION NO. 90 -146 RESOLUTION DECLARING COST TO BE ASSESSED AND PROVIDING FOR HEARING ON PROPOSED ASSESSMENTS FOR IMPROVEMENT PROJECT NOS. 1989 -26 (FREEWAY BOULEVARD /65TH /66TH AVENUES) AND 1989 -27 (HUMBOLDT AVENUE NORTH FROM 65TH TO 69TH AVENUES) WHEREAS, a contract has been let for street improvements on Freeway Boulevard /65th /66th Avenues from Shingle Creek to T. H. 252 and to Humboldt Avenue North from 65th to 69th Avenues; and WHEREAS, because of the nature of the improvements made this contract has been divided into three separate segments for purposes of calculating special assessment rates; and WHEREAS, Segment 1989 -26A is defined as Freeway Boulevard from Shingle Creek to Humboldt Avenue North, Segment 1989 -26B is defined as 65th /66th Avenues North from Humboldt Avenue North to T.H. 252, and Segment 1989 -27 is defined as Humboldt Avenue from 65th to 69th Avenues North; and WHEREAS, the cost to be assessed to the properties of Segment 1989 -26A is estimated to be: Contract 309,216.12 5% contingency 15,460.81 Right of Way 6,500.00 Engineering (staff) 25,974.15 Engineering (other) 8,314.41 Administrative 3,246.77 Legal 3,246.77 Capitalized Interest 3.115.83 Special Assessments Public Utility Fund Regular MSA #2613 Local MSA #2611 TOTAL 375,074.86 223,643.05 41,279.26 282,456.78 (172.304.23) TOTAL 375,074.86 1 1 RESOLUTION NO. 90 -146 WHEREAS, the cost to be assessed to the properties of Segment 1989 -26B is estimated to be: Contract 260,211.61 5% contingency 13,010.58 Right of Way 18,000.00 Overhead Power Reloc. 58,645.00 Engineering (staff) 21,857.78 Engineering (other) 7,082.65 Administrative 2,732.22 Legal 2,732.22 Capitalized Interest 3,115.83 Special Assessments Public Utility Fund Regular MSA #2613 Local MSA #2611 Special Assessments Regular MSA #2613 Local MSA #2611 TOTAL 387,387.89 213,666.12 49,409.23 291,642.37 (167,329.83) TOTAL 387,387.89 WHEREAS, the cost to be assessed to the properties of Segment 1989 -27 is estimated to be: Contract 164,714.96 5% contingency 8,235.75 Right of Way 38,706.55 Engineering (staff) 13,836.06 Engineering (other) 2,010.00 Administrative 1,729.51 Legal 1,729.51 Capitalized Interest 3.115.83 TOTAL 234,078.16 95,100.00 97,901.42 41.076.74 TOTAL 234,078.16 WHEREAS, the City Clerk, with the assistance of the Director of Public Works, has prepared a proposed assessment roll for each segment showing the proposed amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land within the district affected, without regard to cash valuation, as provided by law: 1 1 1 RESOLUTION NO. 90 -146 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL of the City of Brooklyn Center, Minnesota, that: ATTEST: 1. That portion of the cost to be assessed against benefitted property owners is declared to be, for segment 1989 -26A $223,643.05, for segment 1989 -26B $213,666.12, and for Segment 1989 -27 $95,100.00. 2. A hearing shall be held on the 10th day of September, 1990, in the City Hall at 8:00 P.M. to pass upon such assessments and at such time and place all persons owning property affected by such improvements will be given an opportunity to be heard with reference to such assessments. 3. The City Clerk is directed to cause a notice of the hearing on the proposed assessments to be published once in the official newspaper at least two weeks prior to the hearing, and he shall state in the notice the total cost of the improvements. 4. The City Clerk shall cause mailed notice to be given to the owner of each parcel described in the assessment rolls not less than two weeks prior to the hearing. July 23, 1990 Date Clerk May The motion for theadoption of the foregoing resolution was duly seconded by member Jerry Pedlar and upon vote being taken thereon, the following voted in favor thereof: Dean Nyquist, Celia Scott, Todd Paulson, Jerry Pedlar, and Philip Cohen; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted.