Loading...
HomeMy WebLinkAbout1986-123 CCRMember Bill Hawes introduced the following resolution and moved its adoption: 11 RESOLUTION NO. 86 -123 RESOLUTION AMENDING THE SCHEDULE FOR PLANNING AND INSPECTION DEPARTMENT FEES WHEREAS, Chapters 3, 15, 34, and 35 of the City Ordinances require the payment of fees for building permits, plumbing permits, electrical system permits, mechanical system permits, sign permits, Planning Commission applications, flood plain use permits, and administrative land use permits; and WHEREAS, Chapters 3, 15, 34 and 35 of the City Ordinances further authorize the setting of various fees by City Council resolution; and WHEREAS, City Council Resolution Nos. 81 -123 (adopted 6/8/81) and 83 -65 (adopted 4/11/83) together comprise a schedule of fees collected by the Planning and Inspection Department; and WHEREAS, the City Council finds it appropriate to modify and update the fees contained in said resolutions and to adopt a new fee schedule. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center to adopt the following fee schedule: PLANNING AND INSPECTION DEPARTMENT FEE SCHEDULE 1. Building Permit Fees Building permit fees shall be based on the valuation of each building. The building valuation shall be computed using the up -to -date average construction cost per square foot established from time to time by the State Building Inspector. Valuation $1.00 to $500.00 $501.00 to $2,000.00 $2,001.00 to $25,000.00 $25,001.00 to $50,000.00 $50,001.00 to $100,000.00 $100,001.00 to $500,000.00 Fee $15.00 $15.00 for the first $500.00 plus $2.00 for each additional $100.00 or fraction thereof, to and including $2,000.00 $45.00 for the first $2,000.00 plus $9.00 for each additional $1,000.00 or fraction thereof, to and including $25,000.00 $252.00 for the first $25,000.00 plus $6.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $414.50 for the first $50,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $639.50 for the first $100,000.00 plus $3.50 for each additional $1,000.00 or fraction thereof, to and including $500,000.00 RESOLUTION NO. 86 -123 Building Permit Fees continued $500,001.00 to $1,000,000.00 $2039.50 for the first $500,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $3539.50 for the first $1,000,000.00 plus $2.00 for each additional $1,000.00 or fraction thereof Also, a Plan -Check fee of 65% of the amount of the permit fee is collected except for one and two family residences (including townhouses as on family residences). 2. Plumbing Permit Fees Plumbing permit fees shall be computed on the basis of the number of plumbing fixtures and devices and of the type of system or plumbing work as set forth below. A plumbing fixture is defined as a device intended to be connected to the plumbing system, such as any sink, bathtub, or any other such devices. Fee (a) Minimum Fee 18.75 (b) Plumbing fixtures installed 10.00 (c) Plumbing fixture opening for future installation 6.25 (d) Catch basin installed 15.00 (e) Water heater installed 10.00 (f) Ground run to building 15.00 (g) Rainwater leader 10.00 (h) Installation of water treating or filter device 12.50 (i) Potable water well drilling 25.00 (j) Irrigation connection 25.00 (k) Sewer or Water connection 31.25 /conn. (1) Sewer or Water disconnection 31.25 /dis- conn. (m) Repair or alteration of existing plumbing or water 31 of distribution system estimated cost (n) New single family dwelling plumbing system (including 55.00 fixtures, devices, openings, and water piping) RESOLUTION NO. 86 -123 Plumbing Permit Fees continued (o) Fire Suppression Systems Standpipes, 1 -3 floors 30.00 Each additional floor 3.75 Automatic Sprinklers, 1st floor 62.50 Each additional floor 18.75 Up to 2 -inch diameter pipe 1 -3 openings 5.75 Each additional opening 2.50 2 -inch and over diameter pipe 1 -3 openings 15.00 Each additional opening 3.25 (p) A plumbing permit shall be required for gas piping; the permit fees are set forth below. (Fees for gas fitting of appliances and heating systems are set forth under Mechanical System Permit Fees contained in this schedule. 3. Electrical System Permit Fees n Electrical system permit fees shall be calculated and paid according to the following: Fee (a) Minimum Permit 18.75 (b) Services, changes of services, temporary services additions, alterations or repairs on either primary or secondary services shall be computed separately as indicated below. In the case of services in excess of 250 volts, the following fee amounts Eh be doubled. 0 to and including 60 amp capacity 61 to and including 100 amp capacity 7.50 10.00 101 to and including 200 amp capacity 12.00 For each additional 100 amp capacity or fraction thereof 5.00 0 (c) The fee for circuits installation of, additions to, alterations of, or repairs of each circuit or sub feeder shall be computed separately, including circuits fed from sub feeders and including the equipment served, except as provided for in items (d) through (h). In the case of services of 250 volts, the following fee amounts shall be doubled. 0 to and including 30 amp capacity (maximum number of 0 to 30 amp in any one cabinet) 2.50 31 to and including 100 amp capacity 5.00 RESOLUTION NO. 86 -123 Electrical System Permit Fees continued For each additional 100 amp capacity or fraction thereof 2.00 (d) New single family dwelling electrical system (including 55.00 service, feeders, circuits, fixtures and equipment) (e) The fee on a new multiple family dwelling building shall be $25.00 per dwelling unit for the first 20units and $12.50 per dwelling unit for the balance of the units. (f) In addition to other fees, each permit for wiring, installing and connecting transformers and generators for light, heat and power shall be computed separately at $6.25 per unit for the first 25 KVA or fraction thereof; plus $.40 for each KVA or fraction thereof, in excess of 25 KVA, but not exceeding 200 KVA; plus $.40 for each 10 KVA in in excess of 200 KVA. (g) In addition to other fees, all transformers for signs and outline lighting shall be computed at $10.00 for the first 500 VA or fraction thereof per unit, plus $.30 for each 100 VA or fraction thereof in excess of 500 VA. (h) In addition to other fees, (except dwellings) remote control, signal circuits of less than 50 volts shall be computed at $7.50 per each ten openings or devices of each system plus $1.00 for each additional ten or fraction thereof. (i) For special inspections or services, or for reinspections of improper work, the Building Official may impose such additional charges as are reasonably related to the cost of providing the service. 4. Mechanical System Permit Fees Mechanical system permit fees shall be calculated and collected according to the following: (a) Installation, alteration, reconstruction, or repair of any heating, ventilating, comfort cooling, or refrigeration equipment, shall be computed on the basis of the estimated cost of the proposed work except as herein provided. Fee Up to and including $500 $12.50 Over $500, but not over $50,000 2% of valuation Over $50,000 1% of valuation (b) A mechanical permit shall be required for gas pipe fitting for connection to any gas burning device, except as herein provided; the fees are set forth below. (Fees for gas piping are additional and are set forth under Plumbing System Permit Fees contained in this schedule). The appropriate fee for gas water heaters shall be applied to the plumbing permit rather than a mechanical permit. The permit fee for installing each gas stove, range, water heater, process burner, or similar gas burning device not used in connection with a heating system shall be: RESOLUTION NO. 86 -123 Mechanical System Permit Fees continued Input (B.T.U'S) Fee Not exceeding 99,999 $12.50 100,000 199,999 18.75 200,000 399,999 33.75 400,000 599,999 47.50 600,000 999,999 62.50 Over 999,999 use gas burner /heating system schedule below. The permit fee for installing gas burners and fittings for use in connection with a heating system shall be: Input (B.T.U'S) Up to 999,999 use gas appliance /nonheating schedule above. 1,000,000 2,499,999 2,500,000 9,999,999 10,000,000 1 49,999,999 50,000,000 74,999,999 75,000,000 and over $105.00 125.00 180.00 230.00 305.00 (c) A mechanical permit shall be required for the installation, for the removal, and for the replacement of any in- ground or above ground tanks or vessels and related piping used for the storage of gaseous or liquid fuels or chemicals. Permit fees shall be: 1 Above ground new installation $37.50 In- ground new installation 50.00 Above ground removal 25.00 In- ground removal 37.50 Replace like tank to existing system 37.50 (d) It is not intended that permits shall be required for portable heating, ventilating, comfort cooling, or refrigeration equipment, nor for the replacement of any component part or assembly of an appliance which does not alter its original approval and which complies with other applicable requirements of the Building Code. 5. Sign Permit Fees Sign permit fees shall be collected before issuance of any sign permit required under the provision of the Sign Ordinance and shall be calculated according to the following: �7 (a) The fee for any permanent freestanding or non freestanding sign 5 sq. ft. in area or less shall be $10.00. (b) The fee for any permanent freestanding or non freestanding sign over 5 sq. ft. in area shall be $30.00 for the first fifty (50) square feet of gross area or fraction thereof and $12.50 for each additional fifty (50)square feet of gross area or fraction thereof RESOLUTION NO. 86 -123 Sign Permit Fees continued (c) The fee for permits for the installation of any electrical wiring for any sign shall conform to the electrical system fee schedule contained herein. 6. Planning Commission Fees Planning Commission fees shall be collected at the time applications are executed according to the following: In addition to the above fees, the applicant shall sign an agreement, on forms provided by the City, to pay the cost of all engineering, planning and legal consulting expenses incurred by the City in processing the above applications. 7. Administrative Land Use Permit Fees Administrative Land Use Permit fees for temporary activity shall be collected before the issuance of any such permit required under the provisions of the Zoning Ordinance according to the following: (a) Out -of -door Church functions, civic functions, $10 /10 days charities, carnivals, etc. (b) Off -site signs for civic functions or community $10 /10 days events per location (c) Out -of -door nursery and garden center sales and $25/30 weeks displays (d) Miscellaneous out -of -door sales, displays or $10 /10 days promotional events (e) Miscellaneous out -of -door sales, displays or $10/30 days promotional events for gasoline service stations (f) Car wash fund raisers $10 /10 days 8. Flood Plain Use Permit Fees Flood Plain Use Permit Fees shall be collected before the issuance of any flood plain use permit required under the provisions of the Zoning Ordinance and shall be calculated according to the following: Fee (a) Rezonings $350.00 (b) Site and Building Plans 250.00 (c) Preliminary Plat 100.00 (d) Variance 50.00 (e) Special Use Permit 50.00 (f) Extension of Special Use Permit 25.00 (g) Appeal 50.00 (h) Determination 50.00 In addition to the above fees, the applicant shall sign an agreement, on forms provided by the City, to pay the cost of all engineering, planning and legal consulting expenses incurred by the City in processing the above applications. 7. Administrative Land Use Permit Fees Administrative Land Use Permit fees for temporary activity shall be collected before the issuance of any such permit required under the provisions of the Zoning Ordinance according to the following: (a) Out -of -door Church functions, civic functions, $10 /10 days charities, carnivals, etc. (b) Off -site signs for civic functions or community $10 /10 days events per location (c) Out -of -door nursery and garden center sales and $25/30 weeks displays (d) Miscellaneous out -of -door sales, displays or $10 /10 days promotional events (e) Miscellaneous out -of -door sales, displays or $10/30 days promotional events for gasoline service stations (f) Car wash fund raisers $10 /10 days 8. Flood Plain Use Permit Fees Flood Plain Use Permit Fees shall be collected before the issuance of any flood plain use permit required under the provisions of the Zoning Ordinance and shall be calculated according to the following: RESOLUTION NO. 86 -123 Flood Plain Use Permit Fees continued Area Up to 10,000 sq. ft. From 10,000 sq. ft. to 1 acre From 1 acre to 5 acres Over 5 acres Fee $12.50 $1.25/1,000 sq. ft. $25.00 /acre $18.75 /acre BE IT FURTHER RESOLVED that the above schedule of Planning and Inspection Department Fees shall become effective on Monday, September 29, 1986. August 11, 1986 Date ATTEST: 2t 0 Clerk Mayor Pro tem The motion for the adoption of the foregoing resolution was duly seconded by member Celia Scott and upon vote being taken thereon, the following voted in favor thereof; Gene Lhotka, Celia Scott, Bill Hawes, and Rich Theis; and the following voted against the same: none, whereupon said resolution was declared duly passed and adopted. 1