HomeMy WebLinkAbout1980-237 CCR Member Bill Fignar introduced the following resolution
and moved its adoption:
RESOLUTION NO. 80 237
RESOLUTION PERTAINING TO CHANGE ORDER TO PAVING CONTRACT 1980-G
(HUMBOIDT AVENUE NORTH AND SHINGTF CREEK PARKWAY)
WHEREAS, the City Engineer has determined that the use of two inch
concrete median will not provide required strength to withstand impact loading
of vehicles inadvertantly mounting its curb nor required durability to prevent
deterioration due to weathering; and
WHEREAS, the City Engineer has determined that three inch concrete
median will provide needed strength and durability according to the requirements
of MN /DOT design criteria.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that the Director of Public Works is hereby authorized
to issue Change Order No. 2 to Contract 1980 -G providing for the installation of
three inch concrete median at all locations on Humboldt Avenue North and Shingle
Creek Parkway previously scheduled for the installation of two inch concrete median.
It is estimated that said change order will result in an increase of $8,421.20 in
the contract amount for Contract 1980 -G, $810.70 for Humboldt Avenue North (S.P.
109- 108 -02), and $7,610.50 for Shingle Creek Parkway (S.P. 109 109 -17). It is
intended that there be State Aid participation in this work, and that the above
amount be appropriated from the Municipal State Aid Fund.
.1,11.1"
October 6, 1980_
Date •r
ATTEST: 41101011w
Clerk
The motion for the adoption of the foregoing resolution was duly seconded by
member Gene Lhotka and upon vote being taken thereon, the
following voted in favor thereof: Dean Nyquist, Tony Kuefler, Bill Fignar,
Gene Lhotka, and Celia Scott;
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.