HomeMy WebLinkAbout1981-123 CCRMember Gene Lhotka introduced the following resolution and moved
its adoption:
RESOLUTION NO. 81 -123
RESOLUTION ESTABLISHING A SCHEDULE FOR PLANNING AND
INSPECTION DEPARTMENT FEES
WHEREAS, Chapters 3, 15, 34, and 35 of the City Ordinances establishes
fees to be charged for building permits, plumbing permits, electrical system
permits, mechanical system permits, sign permits, as well as various Planning
Commission fees; and
WHEREAS, these fees are collected by the Planning and Inspection
Department as a part of the application process; and
WHEREAS, the City Council has determined that it would be less cumber-
some and a better method of ensuring a uniform fee structure to set forth these
fees in a single fee schedule; and
WHEREAS, Chapters 3, 15, 34, and 35 of the City Ordinances have been
amended to authorize the setting of various fees by City Council resolution
rather than by ordinance; and
WHEREAS, the City Council desires to amend Resolution No. 80 -214, in
part, to increase the fees charged for sewer or water connections and sewer or
water disconnections.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center to adopt the following fee schedules;
PLANNING AND INSPECTION DEPARTMENT FEE SCHEDULE
1. Building Permit Fees
Building permit fees shall be based on the valuation of each building.
The building valuation shall be computed using the up -to -date average
construction cost per square foot established from time to time by the
State Building Inspector.
Valuation Fee
500.00
10.00
1,000.00
17.50
2,000.00
32.50
10,000.00
80.50
25,000.00
170.50
50,000.00
283.00
75,000.00
358.00
100,000.00
433.00
500,000.00
1,433.00
1
2,683.00
Also, 2 the amount of permit fee is collected for
Plan -Check fee on all plans except one and two
family residences (including townhouses as one
family residences).
RESOLUTION NO. 81 -123
u
Automatic Sprinklers, 1st floor 50.00
Each additional floor 15.00
2. Plumbing Permit Fees
Plumbing permit fees shall be computed on the basis of the number of plumbing
fixtures and devices and of the type of system or plumbing work as set forth
below. A plumbing fixture is defined as a device intended to be connected
to the plumbing system, such as any sink bath tub, or any other such devices.
(a)
Minimum Fee
15.00
(b)
Plumbing fixtures installed
7.50
(c)
Plumbing fixture opening for future installation
5.00
(d)
Catch basin installed
12.50
(e)
Water heater installed
7.50
(f)
Ground run to building
12.50
(g)
Rainwater leader
7.50
(h)
Installation of water treating or filter device
10.00
(i)
Potable water well drilling
20.00
(j)
Irrigation connection
20.00
(k)
Sewer or Water connection
25.00 /conn.
(1)
Sewer or Water disconnection
25.00 /disconn.
(m)
Repair or alteration of existing plumbing or water
3% of estimated
distribution system
cost
(n)
New single family dwelling plumbing system (including
45.00
fixtures, devices, openings, and water piping)
(o)
Fire Suppression Systems
Standpipes, 1 -3 floors
25.00
Each additional floor
3.00
Fee
(p) A plumbing permit shall be required for gas piping; the permit fees are
set forth below. (Fees for gas fitting of appliances and heating systems
are set forth under Mechanical System Permit Fees contained in this
schedule.
�I
Up to 2 -inch diameter pipe
1 -3 openings
Each additional opening
Amends Resolution No. 80 -214
Fee
4.50
2.00
RESOLUTION NO. 81 -123
Plumbing Permit Fees continued
Fee
2 -inch and over diameter pipe
1 -3 openings 12.50
Each additional opening 2.50
3. Electrical System Permit Fees
Electrical system permit fees shall be calculated and paid according to the
following:
Fee
(a) Minimum Permit 15.00
(b) Services, changes of services, temporary services, additions,
alterations or repairs on either primary or secondary services
shall be computed separately as indicated below. In the case
of services in excess of 230 volts, the following fee amounts
shall be doubled.
0 to and including 60 amp capacity 6.00
61 to and including 100 amp capacity 7,50
101 to and including 200 amp capcity 9.00
For each additional 100 amp capacity or fraction thereof 4.00
(c) The fee for circuits installation of, additions to, alterations
of, or repairs of each circuit or sub feeder shall be computed
separately, including circuits fed from sub feeders and in-
cluding the equipment served, except as provided for in items
(d) through W. In the case of services in excess of 230
volts, the following fee amounts shall be doubled.
0 to and including 30 amp capacity (maximum number of 0 to 30
amp in any one cabinet) 2.00
31 to and including 100 amp capacity 4.00
For each additional 100 amp capacity or fraction thereof 1.50
(d) New single family dwelling electrical system (including service,
feeders, circuits, fixtures and equipment) 45.00
(e) The fee on a new multiple family dwelling building shall be $20.00 per
dwelling unit for the first 20 units and $10.00 per dwelling unit for
the balance of the units.
(f) In addition to other fees, all transformers and generators for light,
heat, and power shall be computed separately at $5.00 per unit plus
.30 per KVA up to and including 100 KVA and $.30 per KVA for 101
KVA and over. The maximum fee for any transformer or generator in
this category shall be $50.00.
RESOLUTION NO. 81 -123
Electrical Permit Fees continued
(g) In addition to other fees,all transformers for signs and outline light-
ing shall be computed at $7.50 for the first 500 KVA or fraction thereof
per unit, plus $.25 for each 100 VA or fraction thereof in excess of
500 VA per unit.
(h) In addition to other fees, (except dwellings) remote control., signal
circuits of less than 50 volts shall be computed at $6.00 per each
ten openings or devices of each system plus $.75 for each additional
ten or fraction thereof.
(i) For special inspections or services, or for reinspections of improper
work, the Building Official may impose such additional charges as are
reasonably related to the cost of providing the service.
4. Mechanical System Permit Fees
Mechanical system permit fees shall be calculated and collected according to
the following:
(a) Installation, alteration, reconstruction, or repair of any heating,
ventilating, comfort cooling, or refrigeration equipment, shall be
computed on the basis of the estimated cost of the proposed work
except as herein provided.
Up to and including $500
Over $500, but not over $50,000
Over $50,000
Fee
10.00
2% of valuation
1% of valuation
(b) A mechanical permit shall be required for gas pipe fitting for connection
to any gas burning device, except as herein provided; the fees are set
forth below. (Fees for gas piping are additional and are set forth
under Plumbing System Permit Fees contained in this schedule).
The appropriate fee for gas water heaters shall be applied to the
plumbing permit rather than a mechanical permit.
The permit fee for installing each gas stove, range, water heater,
process burner, or similar gas burning device not used in connection
with a heating system shall be:
Input (B.T.U'S)
Fee
Not exceeding 99,999 10.00
100,000 199,999 15.00
200,000 399,999 27.00
400,000 599,999 38.00
600,000 999,999 50.00
Over 999,999 use gas burner /heating system schedule below.
The permit fee for installing gas burners and fittings for use in con-
nection with a heating system shall be:
RESOLUTION NO. 81 -123
[1
Mechanical System Permit Fees continued
Input (B.T.U'S)
Up to 999,999 use gas appliance /nonheating schedule above.
1,000,000 2,499,999
2,500,000 9,999,999
10,000,000 49,999,999
50,000,000 74,999,999
75,000,000 and over
Fee
84.00
100.00
144.00
184.00
244.00
(c) A mechanical permit shall be required for the installation, for the
removal, and for the replacement of any in- ground or above- ground tanks
or vessels and related piping used for the storage of gaseous or liquid
fuels or chemicals. Permit fees shall be:
Fee
Above ground new installation 30.00
In- ground new installation 40.00
Above ground removal 20.00
In- ground removal 30.00
Replace like tank to existing system 30.00
(d) It is not intended that permits shall be required for portable heating,
ventilating, comfort cooling, or refrigeration equipment, nor for the
replacement of any component part or assembly of an appliance which
does not alter its original approval and which complies with other
applicable requirements of the Building Code.
5. Sign Permit Fees
Sign permit fees shall be collected before issuance of any sign permit required
under the provisions of the Sign Ordinance and shall be calculated according
to the following:
(a) The fee for any permanent freestanding or non freestanding sign shall
be $25.00 for the first fifty (50) square feet of gross area or
fraction thereof and $10.00 for each:additonal fifty (50) square feet
of gross area or fraction thereof.
(b) The fee for permits for the installation of any electrical wiring for
any sign shall conform to the electrical system fee schedule contained
herein.
6. Planning Commission Fees
Planning Commission fees shall be submitted at the time applications are
executed according to the following;
Fee
(a)
Rezonings
175.00
(b)
Site and Building Plans
100.00
(c)
Preliminary Plat
50.00 plus
5.00 each lot
(d)
Variance
50.00
(e)
Special Use Permit
50.00
(f)
Extension of Special Use Permit
25.00
(g)
Appeal
25.00
RESOLUTION NO. 81 -123
Planning Commission Fees continued
In addition to the above fees, the applicant shall sign an agreement, on forms
provided by the City, to pay the cost of all engineering, planning and legal
consulting expenses incurred by the City in processing the above applications.
BE IF FURTHER RESOLVED that the above schedule of Planning and Inspection
Department Fees shall become effective on June 28, 1981.
June 8. 1981 e G�.+a._� F
Date Mayor
ATTEST:'��.
Clerk
The motion for the adoption of the foregoing resolution was duly
seconded by member Bill Fignar and upon vote being taken thereon, the following
voted in favor thereof Mayor Dean Nyquist, Tony Kuefler, Bill Fignar, Gene Lohtka,
and Celia Scott;
and the following voted against the same; none,
whereupon said resolution was declared duly passed and adopted.
1
r
J