HomeMy WebLinkAbout1975-085 CCR Member Maurice Britts introduced the following resolution and
moved its adoption:
RESOLUTION NO. 75-85
RESOLUTION ACCEPTING BID FOR REINFORCED CONCRETE PIPE
WHEREAS, the Director of Public Works and the City Clerk have reported that
on April 16, 1975, at 11:00 a.m., they opened and tabulated bids received for the
furnishing of reinforced concrete pipe and that said bids were as follows:
15 RCP 12" RCP 27" 39"
Class 4 Class 4 C.B. C.B.
Bidder Per ft. Per ft. Per ft. Bases ea.
Elk River Concrete $4.18 $3.41 $14.19 $16.64
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, that the bid of Elk River Concrete for the furnishing of reinforced
concrete pipe in accordance with the specifications is deemed to be the best bid
submitted by a responsible bidder and said bi is h re accepte
May 1, 1975
Date Mayor
ATTEST:
L v
C lerk
The motion for the adoption of the foregoing resolution was duly seconded by
member Tony Kuefler and upon vote being taken thereon the
following voted in favor thereof: Philip Cohen, Maurice Britts Tony Kuefler,
Bill Fignar and Robert Jensen;
and the following voted against the same: none,
whereupon said resolution was declared duly passed and adopted.