WHEREAS, bids presented for review were:
Berwald Roofing $194,419
Central Roofing 79,424
John A. Dalsin $127,777
G &S Roofing 99,331
introduced the following resolution and moved
EDA RESOLUTION NO. 2003 -05
RESOLUTION AWARDING A CONTRACT TO CENTRAL ROOFING FOR THE
REPAIR OF THE PRE FUNCTION ROOF ON THE HIPPODROME BUILDING
AT THE EARLE BROWN HERITAGE CENTER
WHEREAS, the originally installed rubber membrane roof on the Pre function area of
the Hippodrome has deteriorated causing leaks inside the lobby which are creating safety issues; and
WHEREAS, Inspec, Inc., hired by Economic Development Authority Resolution on
March 24, 2003, to oversee the repair work, has determined that replacement of the roof is required;
and
WHEREAS, said work is to be performed during the period June 26 through July 10,
WHEREAS, bids have been solicited for the replacement of the roof and such bids
were opened and reviewed on June 10, 2003; and
NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority
in and for the City of Brooklyn Center to award central roofing the bid for the partial re- roofing of
the Hippodrome at a cost of $79,424, with construction observation to be provided by Inspec, Inc.
1- 1 4.d4W ‘4 e,-f a-ekx
Presi nt
The motion for the adoption of the foregoing resolution was duly seconded by commissioner
Bob Peppe
and upon vote being taken thereon, the following voted in favor thereof:
Myrna Kragness, Kay Lasman, and Bob Peppe;
and the following voted against the same: none;
whereupon said resolution was declared duly passed and adopted.