Loading...
HomeMy WebLinkAbout2003-005 EDAR1 its adoption: 2003; and June 16, 2003 Date Commissioner Kay Lasman WHEREAS, bids presented for review were: Berwald Roofing $194,419 Central Roofing 79,424 John A. Dalsin $127,777 G &S Roofing 99,331 introduced the following resolution and moved EDA RESOLUTION NO. 2003 -05 RESOLUTION AWARDING A CONTRACT TO CENTRAL ROOFING FOR THE REPAIR OF THE PRE FUNCTION ROOF ON THE HIPPODROME BUILDING AT THE EARLE BROWN HERITAGE CENTER WHEREAS, the originally installed rubber membrane roof on the Pre function area of the Hippodrome has deteriorated causing leaks inside the lobby which are creating safety issues; and WHEREAS, Inspec, Inc., hired by Economic Development Authority Resolution on March 24, 2003, to oversee the repair work, has determined that replacement of the roof is required; and WHEREAS, said work is to be performed during the period June 26 through July 10, WHEREAS, bids have been solicited for the replacement of the roof and such bids were opened and reviewed on June 10, 2003; and NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority in and for the City of Brooklyn Center to award central roofing the bid for the partial re- roofing of the Hippodrome at a cost of $79,424, with construction observation to be provided by Inspec, Inc. 1- 1 4.d4W ‘4 e,-f a-ekx Presi nt The motion for the adoption of the foregoing resolution was duly seconded by commissioner Bob Peppe and upon vote being taken thereon, the following voted in favor thereof: Myrna Kragness, Kay Lasman, and Bob Peppe; and the following voted against the same: none; whereupon said resolution was declared duly passed and adopted.