Loading...
HomeMy WebLinkAbout1988 05-11 EBFAAGENDA Earle Brown Farm Committee May 11, 1988 Council Chambers 1. Call to Order: 7:30 a.m. 2. Roll Call 3. Approval of Minutes a. October 21, 1987 b. November 25, 1987 4. Design Review 5. Senior Program 6. Other Business 7. Adjournment HESKIN RESOURCE GROUP, INC. PROJECTED COSTS - FROM SCHEMATIC DRAWINGS 11 WINSOR/FARICY ARCHITECT EARLE BROWN FARM Building Construction Costs Site General $ 568,215 Bed b Breakfast 9650737 Barn "D" Storage 283,913 Barn "G" 294,937 D 8 G Link 42,486 Blacksmith Shop 233,852 Barn "H" 242,198 Shop b H Link 45,234 Stable Restaurant 829,927 Hippodrome 204800761 Bunk House 28,826 Pump House 22.438 Site Improvements Sewer and Water (In Building Costs) Landscaping Signage Allowance Streets/Parking/Grading Walkways (In Building Costs) Site Lighting (In Building Costs) Parking Ramp Office Tenant Improvements Allowance (17,050 s.f. @ $25) Furniture and Equipment Kitchen Equipment Bed 8 Breakfast 30,000 Hippodrome 310,000 Stable Restaurant 98.000 438,000 Bed $ Breakfast Furniture (est) 400,000 Convention Center N.I.C. Audio (Built in) 40,000 Audio Visual Equipment hj.C. June 8, 1988 6,038,524 105,910 40,000 6,184,434 N. I.C. 426,250 518,000 PROJECTED COSTS - FROM SCHEMATIC DRAWINGS #1 cont. June 8, 1988 Fees and Other Costs Accousticai Consultant 5,000 Architects and Engineers - Winsor/Faricy 292,000 Landscape/Civil Engineer - Westwood 35,000 Construction Management - Heskin 365,000 Construction Supervisor - McGough 1460-250 Soil Testing 12,000 Survey 12,000 Kitchen Consultant - Robert Rippee 20,000 Interior Design 40,000 Permits, SAC, WAC By Owner Historic Registration Costs N.I.C. Insurance 350000 Real Estate Taxes By Owner Contingency Total Projected Costs Parking Ramp Alternate 11 (Single Level) Alternate #2 (Two Level) 2 962,250 250.000 $8,340,934 $1,575,000 12,371,500 TOTAL DEVELOPMENT 1 1 1 1 1 6/8/88 Estimate Development Cost Trust Fund (Minimum) Pre Opening Furniture, Fixtures, and Equipment Total Development Cost Financing Needs Total Development Cost Less Trust Fund (Minimum) Less Available Revenue $8,340,934 750,000 350,000 400.000 *$9,840,934 1 1 1 1 1 1 1 1 1 1 $9,840,934 750.000 $9,090,934 3.896.991 $5,193,943 *Does not include parking ramp, permits, taxes, or SAC charges Scaled Down Development 1 1 1 1 1 1 1 1 1 6/22/88 Estimate Development Cost Trust Fund Pre Opening Furniture, Fixtures, and Equipment Total Development Cost Financing Needs Total Development Cost Less Trust Fund Less Available Revenue $6,933,850 750,000 350,000 425.000 *$8,458,850 $8,458,850 750.000 $7,708,850 3.896.991 **$3,811,859 *Does not include parking ramp, permits, taxes, or SAC charges **Does not include funds for completion of office space, restaurant kitchen, or ' tenant improvements 1 EDA FUNDS Fund Balance $211121616 CDBG (Block Grant) *200,000 Contract for Deed Interest 48,375 1988 Excess Tax Increment 456,000 1989 Excess Tax Increment *930,000 Investment Interest 150.000 $3,896,991 ' Contract for Deed (6/90) 327.000 $4,223,991 ' *Would require an amendment to our current CDBG program but is eligible **Would be used for Trust Fund 1 1 1 1 1 1