Loading...
HomeMy WebLinkAbout2006 02-27 EDAP EDA MEETING City of Brooklyn Center February 27, 2006 AGENDA 1. Call to Order —The EDA requests that attendees turn off cell phones and pagers during the meeting. 2. Roll Call 3. Approval of Agenda and Consent Agenda —The following items are considered to be routine by the Economic Development Authority (EDA) and will be enacted by one motion. There will be no separate discussion of these items unless a Commissioner so requests, in which event the item will be removed from the consent agenda and considered at the end of Commission Consideration Items. a. Approval of Minutes —Commissioners not present at meetings will be recorded as abstaining from the vote on the minutes. 1. January 9, 2006 Regular Session 4. Commission Consideration Items a. Resolution Selecting the No Waiver Option for Statutory Tort Liability •Requested Commission Action: -Motion to adopt resolution. b. Resolution Directing Solicitation of Development Proposals for the Former Northbrook/Hmong American Shopping Center Site •Requested Commission Action: -Motion to adopt resolution. 5. Adjournment EDA Agenda Item No. 3 MINUTES OF THE PROCEEDINGS OF THE ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPIN AND THE STATE OF MINNESOTA REGULAR SESSION JANUARY 9, 2006 CITY HALL COUNCIL CHAMBERS 1. CALL TO ORDER The Brooklyn Center Economic Development Authority (EDA) met in Regular Session and was called to order at 8:31 p.m. by President Myrna Kragness. 2. ROLL CALL President Myrna Kragness, Commissioners Kathleen Carmody, Kay Lasman, Diane Niesen, and Mary O'Connor. Also present: Executive Director Michael McCauley, Assistant City Manager/Director of Operations Curt Boganey, City Attorney Charlie LeFevere, and Deputy City Clerk Camille Yungerberg. 3. APPROVAL OF AGENDA AND CONSENT AGENDA Commissioner Lasman moved and Commissioner Carmody seconded to approve the agenda and consent agenda and the following item was approved: 3a. ArrROVAL OF MINUTES 1. December 12, 2005 Regular Session Motion passed unanimously. 4. COMMISSION CONSIDERATION ITEMS 4a. RESOLUTION ELECTING OFFICERS FOR THE ECONOMIC DEVELOPMENT AUTHORITY IN AND FOR THE CITY OF BROOKLYN CENTER RESOLUTION NO. 2006-01 President Myrna Kragness read RESOLUTION NO. 2006-01 Electing Officers for the Economic Development Authority in and far the City of Brooklyn Center. Commissioner Carmody moved and Commissioner Lasman seconded the adoption of I O 1 /09/06 -1- DRAFT RESOLUTION NO. 2006-0 l Electing Officers for the Economic Development Authority in and for the City of Brooklyn Center. Commissioner O'Connor stated the Resolution mentions three different positions, combining two pasitions into one. She stated a preference for three separate positions. Commissioner Carmody responded by explaining that the Vice President conducts the meeting in the absence of the President. Commissioner O' Connor voted against the same. Motion passed. 5. ADJOURNMENT Commissioner Carmody moved and Commissioner Lasman seconded adjaurnment of the meeting at 8:35 p.m. Motion passed unanimously. President i O l /09/06 -2- DRAFT EDA A enda Item No. 4a g �lemorandum Date: 10 February 2006 To: Michael McCauley City Manager From: Daniel Jordet Director of Fiscal Support Services Re: Statutory Tort Liability Limits Each year the Economic Development Authority must choose whether to waive the statutory limitations on tort liability. If these limitations are waived, additional insurance should be purchased to cover potential liabilities. To this point, the EDA has chosen not to waive the statutory limitations on tort liability. This has saved the EDA about 7,000 each year in additional tort liability insurance premium payments. Staff requests consideration of the attached resolution by the EDA at its next regular City meeting. LEAGUE OF MINNESOTA CITIES INSURANCE TRUST LIABILITY COVERAGE WANER FORM Cities obtaining liability coverage from the League of Minnesota Cities Insurance Trust must decide whether or not to waive the statutory tort liability limits to the extent of the coverage purchased. The decision to waive or not to waive the statutory limits has the following effects: o If the city does not waive the statutory fort limits, an individual ciaimant would be able to recover no more than $300,OOO.on any claim to which the statutory tort limits apply. The total which all claimants would be able to recover for a single occurrence to which the statutory tort limits apply would be limited to $1,000,000. These statutory tort limits would apply regardless of whether or not the city purchases the optional excess liability coverage. If the city waives the stafutory tort limits and does not purchase excess liability coverage, a single claimant could potentially recover up to $1,000,000. on a single occurrence. The total which all claimants would be able to recover for a single occurrence to which the statutory tort limits apply would also be limited to $1,000,000., regardless of the number of claimants. o!f the city waives the statutory tort limits and purchases excess liability coverage, a single claimant could potentially recover an amount up to the limit of the coverage purchased. The total which all claimants would be able to recover for a single occurrence to which the statutory tort limits apply would also be limited to the amount of coverage purchased, regardless of the number of claimants. Claims to which the statutory municipal tort limits do not apply are not affected by this decision. This decision must be made by the city council. Cities purchasing coverage must complete and return this form to LMCIT before the effective date of the coverage. For further information, contact LMCIT. You may also wish to discuss these issues with your city attorney. Brooklvn Center EDA and HRA accepts liability coverage limits of from the League of Minnesota Cities Insurance Trust (LMCIT). Check one: The city DOES NOT WAIVE the monetary limits on municipal tort liability established by Minnesota Statutes 466.04. The city WAIVES the monetary limits on tort liability established by Minnesota Statutes 466.04, to the extent of the limits of the liability coverage obtained from LMCIT. Date of city council meeting Signature/Date Position Return this completed form to LMCIT, 145 UniversityAve. W,, St, Paul, MN. 55103-2044 LMCIT (11/00)(Rev. 11/03) Page 1 of 1 Commissioner introduced the following resolution and moved its adoption: EDA RESOLUTION NO. RESOLUTION SELECTING THE NO WAIVER OPTION FOR STATUTORY TORT LIABILITY WHEREAS, the Economic Development Authority of the City of Brooklyn Center has an option to waive its protection under the tort liability limitation contained in Minnesota Statutes 466.04; and WHEREAS, the statutory tort limit is 300,000 per individual and an aggregate of $1,000,000 per incident; and WHEREAS, the EDA has opted not to waive its rights to limited tort liability in past years and is required to make a declaration of its intention every year. NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority in and for the City of Brooklyn Center that the City does not waive the monetary limits on municipal limit tort liability established by Minnesota Statues 466.02. Februarv 27, 2006 Date President The motion for the adoption of the foregoing resolution was duly seconded by commissioner and upon vote being taken thereon, the followmg voted m favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. EDA Agenda Item No. 4b I Commissioner introduced the following resolution and moved its adoption: EDA RESOLUTION NO. RESOLUTION DIRECTING SOLICITATION OF DEVELOPMENT PROPOSALS FOR THE FORMER NORTHBROOK/HMONG AMERICAN SHOPPING CENTER SITE WHEREAS, the Opportunity Site Task Force has studied the Northbrook/Hmong American Shopping Center Site; and WHEREAS, the Opportunity Site Task Force has conducted an Open House soliciting public input on proposed development standards for the redevelopment of the Northbrook/Hmong American Shopping Center Site; and WHEREAS, the Opportunity Site Task Force has made its report to the City Council of the City of Brooklyn Center with its recommendations for development standards and guidelines for the Northbrook/Hmong American Shopping Center Site; and WHEREAS, a Request for Proposals has been developed that solicit development proposals for the Northbrook/Hmong American Shopping Center Site that would be evaluated based on the standards and guidelines recommended by the Opportunity Site Task Force. NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority in and for the City of Brooklyn Center, Minnesota, that the development standards and guidelines recommended by the Opportunity Site Task Force for the Northbrook/Hmong American Shopping Center Site be and hereby are approved by the Economic Development Authority. BE IT FURTHER RESOLVED that the staff of the Economic Development Authority be and hereby are directed to solicit proposals for the redevelopment of the Northbrook/Hmong American Shopping Center Site consistent with the recommendations made by the Task Force. Februarv 27, 2006 Date President The motion for the adoption of the foregoing resolution was duly seconded by commissioner and upon vote being taken thereon, the following voted in favor thereo£ and the following voted against the same: whereupon said resolution was declared duly passed and adopted. Cfry o! BROOKL f lY CENTBB Lo�an and 57�h Redeve%pr���� City of Brookiyn Center, Minnesota ��c����t �Q� F�����sa�s Coordinated by �pportunity Site Task Force Assisted by Damon FarberAssociates Elness Swenson Graham Arahitecfs �enshcwf Associates Stanley Consultants Visuaf Gomm�nieations February 27�', 2006 1 1 1 •�t f �ty x s^ t z r'' SingleFamilyHousing -.+Retail x a.:..� k r Multi Family Housing �r�` r i .4, d C �io Once o 0 o r� Pro]ect Area Boundary TM�,�� 4 ,,.r �r" y ,�y r CWturaf ci ��S rv�'...�,w,. ,%r� "���g��� s 4. ry "F� �x'`�� 1 f i�� 1 j f f r r �t z���, �r �r{ >z1�� z� s 4� �b r s z ,�t°�`� s �I E 1 �,i�� r �lr�".�« r �q� i g' t i �'r� .,��C�b"'U nrr^s R ���mPo y`Y° r�'', �a r,',� y s 'r t x �i 3,` ,9 r s �`+�'r.�, t r 3 r' a �+N^,sr' M i!h r i.�.. F S `�t A Y i +M f �����j 3�'�, �.�.°v .T "z�. F d^° y S i r D e� a� a ti �i�. R t w`�� i� x� ri^ y i i. 1�`- �,r �s� f A k y a e r �i k w -r Y C� u�,�" r'� r f .r,� �F 3 u s 1 r y R s f� r L7 r .,rz rl �j, F �r d" ,2� i a�., j �,�''�,�o; c rr P! r' y C'% i �r�, t� ��r�'����� �J'� g t j �..r�� -�����t €�:e• �.-f, 2 &a �.as J� §'r��� Rt.�.ffi"'�' y y E �k�i+J l�` I��j�'"'K �)i �q�"" 4 ^M.�{ S� -ar"'.�'t� �,R e�",�° �j� R�"J ��[7�`tn a- m ,:r, r �If��� „x TM. r.� ,a�` -,4�*» t R K i �3 r E 1° ..,w, e „�r r �i i a r'�'� -�3 n J� �r..: �4 ..�n i �w,�.�;,i�.��� f ��J ,t..« W���; ni� 3 �r g ,r v t R f KEa�af'� t 1 J( ��,�aA "T" 's F R� ts M' -:a y, 3 s 9� i z ��i �""`�If „F 1� i y R I�R' '�mv t J Rs� s� R" '��h�R 't t+ t .j f f y �s�,;�� x r� �lc x n Y t �r 'd►R��� t j ",�s v yi �s�� ��"+f t �v!�R. "�,a s r .F��: C i Logan and 57thRedevelopment (ntroduction/Project Nistory design that responds to the objectives defined by the community. The City of Brooklyn Center is located approximately 8 miles north of downtown Site Facts Minneapolis, Minnesota along Interstate 94. Although largely developed, Brooklyn Center The Logan and 57th site is located on the continues to attract new businesses. Within the northwest corner of County Road 10 and Logan past two years, the City has experienced Avenue, adjacent to Highway 100. The site is unprecedented growth in its business sector, in Zoned G2 but is guided in the City's no small part due to its attractive location and Comprehensive Plan as Retail Business (RB), hsalthy economic climate. Affordable housing in Medium Density Residential (MDR) and Mixed a strong housing market, quality schools, family Use (MIX). All zoning questions will be recceational opportunities and community spirit forwarded to and answered by Ron Warren, all contribute to attracting new residents. P�anning and Zoning Coordinator. The current lot size is approximately 8.49 acres, as noted The Logan and 57th Redevelopment is an on the Hennepin County survey departmenYs exceptional opportunity to take part in the fi►st website. An existing power line easement runs stages of revitalization within the core east west through the site and possible future I commercial area of the Ciry. The Task Force improvements by MnDOT to the north bound that generated the development guidelines for highway 100 on ramp make the useable land the Opportunity Site across Highway 100 also slightly less. guided the redevelopment vision for this parcel. The City of Brooklyn Center adopted the Development Guidelines for the Logan and 57th Redevelopment in February 2006. It was the culmination of an extensive planning process involving multiple Task Force meetings, meetings with a developer's panel to help direct the design standards for a variety of potential types of redevelopment to address market requirements, two public meetings, and a presentation to the City Council. The Primary intent of this Redevelopment Project is to create a development that is complementary to the adjacent neighborhood and embodies the principles of a quality redevelopment, The Redevelopment Area prov'sdes a range of possib{e uses and develops a form and character of development that is independent of those uses. The Development Guidelines suggest building and site design features that are essential to a quality site 2 City of Brooklyn Center I Logan and 57th Redevelopment Existing Status of Land Development Objectives All buildings and structures have been removed The development objectives for the Logan and from the site, induding all known hazardous 57th Redevelopment as approved by the waste materials (ACM's, fluorescent bulbs, Opportunity Site Task Force are as follows: ballasts, mercury switches, etc.) from buildings and on-site structures. Objectives A Phase 11 environmental investigation was The development of a quality projeet completed for the site, and included the using quality materials that will result in following: enduring vafue and economic viability for a substantial useful life. Subsurface assessment activities were completed in the vicinity of a former on-site Promote 100% owner occupied dry cleaner. No significant soil contamination housing (for projects including housing related to the former dry cleaner remains on elements). site. Some Residual groundwater contamination related to the former dry For proposals including office and/or j cleaning business remains on site. rental uses, expand employment Subsurface assessment activities were opportunities. I undertaken on the southem most portions of Enhance the scale and character of the site where two gasoline stations were the adjacent neighborhood through the located. Residual petroleum contamination use of appropriate design standards. from the stations exists and, if encountered during development, the impacted soils would need to be managed appropriately. Increase the City's tax base. A complete copy of the Phase II environmental The Opportunity Site Task Force will be asked assessment on the site is avaitable for review to review and comment on the design. The City upon request. of Brooklyn Center will have final design approval. Neighborhood input may also be Estimated Fair Reuse Value or Asking solicited. The Logan and 57th Devetopment Guidelines (Exhibit A) provides additional Price guiding information. An estimated fair reuse value of the arcel has P Developers are encouraged to be creative in been identified, estimating the value at the design of ftature tand uses to better integrate $2,750,000 to $3,000,000 or approximately with the neighborhood and maximize the $7.43 to $8.10 per square foot. The City of screening of parking stalls from public view and Brooklyn Cenfer reserves the right to revalue enhance the public street frontage available for the site based on responses to the RFP and the development a�d street access. specific proposals submitted. County Road 10 is a typical commercial corridor that supports primarily commercial uses west of 3 City of Brooklyn Center Logan and 57th Redevelopment Logan Avenue generating a high volume of Prospective responders may only direct traffic and pedestrian activity. Parking is an area questions in writing to the appropriate that must be addressed both on and off-street. department contact person. Proposal Deadtine All questions and requests for information regarding this RFP should be directed to: Proposal submission Brad Hoffman, Community Development Director Proposers must submit copies of their City of Brooklyn Center proposals as fotlows: one unbound 'copy, twenty 6301 Shingle Creek Parkway bound copies and one electronic version in Brooklyn Center, MN 55430-2199 Microsoft compatible or PDF format on diskette Email: bhoffman@ci.brooklyn-center.mn.us or CD. Proposals must be on standard 8'/Z" by Fax: (763) 569-3360 11" paper. All supporting documentation musf be on paper no larger than 11" by 17". All questions are due no later than Thursday, Proposals and supporting documentation must May 25, 2005. Questions will be answered in be submitted in a sealed envelope labeled writing and posted on the i "Logan and 57th Redevelopment Project" faxed Ciry of Brooklyn Center Web site proposals will not be accepted. Submissions will (www.ci.brooklvn-center.mn.usl. not be returned. The department contact cannot vary the terms Pr000sals shall be delivered to the Citv on or of the RFP. An optional pre-proposal meeting before: and tour of the property is scheduled for 9 a.m. on Wednesday, April 12, 2006. Please contact 4:00 p.m. Central Standard Time, Thursday, Brad Hoffman, Community Development June 1, 2006, Director, in writing if your team is interested in attending. Delivered to: City of Brooklyn Center Department of Community Development 6301 Shingfe Creek Parkway Brooklyn Center, MN 55430-2199 This deadline will not be extended. Proposals received after the deadline will not be accepted. It is neither the City of Brooklyn Center's responsibility nor practice to acknowledge receipt of any proposal. It is the responder's responsibility to assure that a proposal is received in a timely manner. RFP Inquiries Q City of Brooklyn Center Logan and 57th Redevelopment Prop�sal Contents commercial/office deve�opment is proposed, information should be included about the Proposals must include the followina: anticipated type ofi tenants expected. 1. Cover Page 3. Identification That includes the followina information: An identification of the entities that will be involved, a description of the roles they will play Developer's name, mailing address and (e.g., developer, architect, building owner, website. property manager, tenant, protessional consultant) a�d a summary of the team's past Developer's current tegal status: corporation, experience in working together. A description of partnership, sole proprietor, etc. each of the entities' experience in devetoping similar projects must be included, induding Federal ID number or Social Security number. �ocation, type of development, proposer's role(s), cost of project, funding sources, status State ID number. of project, and information about any continued financial or operating interest in each. Include specific previous relevant experience with Contact person's name, title, phone number, public entities, including reference contact fax number, e-mail address. information. Signature of authorized corporate officer for The City may ask for supporting documentation each entity proposing as a partnership or substantiating claims of previous experience. team. Summarize any lawsuits to which the responder 2. Descri tion or any principals of the responder have been a p party. Identify the principal person who will speak for the development team and any other A description (narrative, preliminary schematic key participants who will be involved in plans, site plan and elevations) of the proposed negotiating the project terms. Specify whether development (e.g., size of building(s) and the development entity is or intends to form a square footage of specific components, nature corporation, a general or limited partnership, a of use(s), number of parking spaces, joint venture or other type of business anticipated materials and design sryfe, association to carry out the proposed circulation pattems, loading/service provisions) development. The developer must also provide to be built on the site. If the development is two years of financial statements, which may be proposed to be phased, the narrative should submitted confidentially to the Community clearly define the components and timing of Development director under separate cover with each phase and indicate the nature of the developer's response to the RFP. Design conditions upon which construction of consultants on the team must be licensed in the subsequent phases would be based. If State of Minnesota and contractors must be residential development is proposed, the Iicensed to work in the City of Brooklyn Center; proposal should include information abput the the submission must include a certification that bedroom compositions, rents and/or sales identified team members meet these prices and amenities/ services included. ff requirements. 5 City of Brooktyn Center Logan and 57th Redevelopment 4. Capital Pro Forma the taxable value upon completion and annual real estate taxes. A preliminary capital pro forma showing the detailed sources and uses of funds (debt, equity 8. Proposed Timeframe and other) to acquire a parcel from the City of Brooklyn Center and construct the development A proposed timeframe for the development, (including any tenant improvements). including identification of any conditions that information as to the status of securing those must be met before the proposal can become a funds should be included and inclusion of a reality. The schedule should include the time conditional financing commitment is strongly needed to obtain financing, complete design encouraged. Clearly indicate any public and secure permits and approvals, prepare the assistance to be requested. If the project site, start and complete construction, and start includes multiple uses, the capital pro forma and complete lease-up and/or sellout. should be broken down for the component uses (commercial, housing, office, etc.). 9. "Consent for Release of Response Data" 5. Operating Pro Forma An executed "Consent for Release of Response An operating pro forma, if the project includes Data" form (Exhibit D). Proposals that do not multiple uses, should be developed and broken include an executed "Consent for Release of down for the component uses. Detailed pro Response Data" form shall be considered formas (separate commercial vs. housing) in a incomplete which will be grounds for rejection of format acceptable to the City will be required the entire proposal. during the negotiation of a redevelopment agreement. 10. Other Information I 6. Market Study Any other information that would help City staff I understand and evaluate the concept. j Submit a market study or other information documenting the market that the project is The contents of the proposal and any intending to attract and the supply and demand clarification to the contents submitted by the for the proposed mixed-use elements, including successful proposer may become part of the identification of developments competing for the contractual obligation and be incorporated by same market(s). reference into the redevelopment contract between the selected developer and the City of 7. Description of the Public Benefits Brooklyn Center. Developers responding to this RFP are not required to provide a good faith A description of the public benefits that will deposit on the land with their proposals. result from the development, e.g., the number and types of housing units, the creation or The developer whose proposal is ultimately retention of jobs (including the estimated selected by the City of Brooklyn Center will be number, type and wage levels), tax base granted exclusive development rights for nine enhancement, the provision of retail goods and months to negotiate a redevelopment contract services, etc. This should include an estimate of and project delivery modet wi#h the City. 6 City of Brooklyn Center Logan and 57th Redevelopment Evaluation Criteria 9. The public benefits that would be provided by the project, including the proposed land price In reviewing potential development concepts, and housing that provide a mix of affordable the following criteria are among those that will owner occupied and higher cost units. be considered: 10. Overall quality of the submission. 1. The experience and the financial and organizational capacity of the developer in 11. Project Schedule successfully planning and completing development projects of a similar type and The City may, in its sole discretion, expand or scale, on time and within budget. reduce the criteria upon which it bases its final decisions regarding selection of the developer 2. The extent to which the proposed for this parcel. development is in compliance with the Logan and 57th Development Guidelines and other relevant planning documents for the area. 3. The extent to which the proposed development accomplishes a higher standard of architectural quality and addresses urban design issues identified in the Development �I Guidelines. 4. The extent to which the proposal presents creative development concepts in terms of urban design relationship of the site to the neighborhood and commercial district on County Road 10 and the relationship of the I public realm to the private realm. I 5. The proposal creates a strong relationship among uses within the site and uses in the surrounding blocks. 6. The proposal is consistent with the development objectives/guidelines. 7. The market and financial feasibility of the project. 8. The anticipated ability of the project to secure necessary public and private funds. 7 City of Brooklyn Center Logan and 57th Redevelopment Citizen Participation public investment, staff will determine what types of further analysis, underwriting and/or The City of Brooklyn is committed to a citizen other processes are required. Unless further participation process for development projects analysis indicates that the selected proposal is impacting neighborhoods. The City values infeasible, staff will negotiate the terms of the advice and input from the public obtained proposed transaction during this period. If through this process. Under the Minnesota redevelopment contract terms can be mutually Government Data Practices Act, Minnesota agreed upon and any further analysis Statutes Ch. 13, public disclosure of RFP completed, staff will return to the City Council response data prior to execution af a contract is as appropriate for final approval of a restricted. In order to meet the City's citizen development agreement.. participation goals, the City requires each proposer to execute and submit a"Consent for The City reserves the right to reject any or a/l Release of Response Data" foRn as attached to proposals or parts of proposals, to negotiate this RFP as Exhibit D. modifications of proposals submitted, and to negotiate specific work elements with a Not withstanding the foregoing, if proposers are proposer into a project of lesser or greater being asked to provide financial statements as magnitude than described in this RFP or the part of the RFP response, proposers may proposer's reply. submit such financial statements confidentially under separate cover pursuant to the Minnesota Government Data Practices Act. Review/Selection Process City staff will review proposals received by the due date. Input may also be sought from the adjacent neighborhood, the appointed task force, and community as a whole. Some or all I of the proposers may be requested to present their proposals to the task force and/or neighborhood. This review process will be comple#ed by July 1, 2006. The staff will then make its recommendation of the developer that it believes best meets the City's objectives. If the City Council selects a development proposal that does not entail any additional public investment, staff will proceed to negotiate with the selected developer the terms of the project delivery model, redevelopment contract and proposed land sale. If the selected proposal requests additional g Ciiy of Brooklyn Center Logan and 57th Redevelopment Timing without Iimitation, the payment of prevailing wages for construction, the preparation of It is the City's intention that an exclusive affirmative action plans, competitive bidding, development rights agreement be executed with compliance with the Small and Underutilized the selected developer by August 1, 2006 and Business Enterprise program or equivalent that construction of the project would begin by federal program, and Business Subsidy 2007 AcULiving Wage Policy, and reporting requirements for those programs. Following is the anticipated timeline: Some of the sta�dard requirements are further discussed below, but the following list is not Optional pre-proposal meeting and tour: exhaustive. Proposers unfamiliar with these April 12, 2006 standard requirements are urged to seek further information. Submission deadline for proposals: June 1, I 2006 1. Depending upon the level and purpose of public assistance that may be received, Review and evaluation of proposals and provisions of the Minnesota Business Subsidy recommendation to the City Council: By Act may also apply to the project. Should these I July 1, 2006 requirements apply, they will be incorporated into the development agreement. Discussion and final action on exclusive development rights by the City Council: By 2. The development must be in conformance August 1, 2006 with the Uniform Federal Accessibility Standards as published on April 1, 1988. Final development plans approved by City: Developers must describe the accessibility February 2007 design for people with disabilities of each of the code-required handicapped-accessible units, Break Ground on Redevelopment: Spring any proposed housing development (e.g. roll-in 2007 showers), the mix of accessible units in the project and where they are located, and any Project Complete: Summer 2009 appropriate safety features for vision- and hearing-impaired people. City Contracting Requirements The selected developer will be initially granted exclusive rights, for a limited periad of time, to negotiate with the City of Brooklyn Center to develop a redevelopment contract and project delivery model that will compfy with any applicable City requirements. These requirements vary depending upon the type of development and the source and amount of public investment, if any, and may include, g City of Broaklyn Center logan and 57th Redevelopment 3. Soil Conditions: harmless from any and all claims or lawsuits that may arise from the Candidate's activities The property wil! be sold "as-is" and it will be under the provisions of the development the developer's responsibility to correct and pay agreement, that are attributable to the aets or for a!I costs associated with soil issues. Any omissions, including breach of specific environmental reports in the City's possession contractual duties of the Respondent or the regarding the property may be reviewed during RespondenYs independent contractors, agents, normal business hours at City offices by making employees or officers. arrangements with the department contact person. Any potential proposer may,also reasonably conduct its own environmental testing of the property by contacting the department contact person, entering into a Right of Entry Agreernent with the City and providing the requisite insurance coverage. 4. Rezoning Responsibility: It is the selected developer's responsibility to undertake and finance any rezoning, variance and use permits necessary for approval of the proposed development. 5. Utilities: It is the selected developer's responsibility to identify the locations of all existing utilities and to provide for the instailation of electricity, gas, water, sewer service and other utilities servicing the site from the public mains to the individual units. 6. Construction Standards: I Development must meet FHA minimum property standards and all Minnesota state fire and building codes and projects will be reviewed for energy efficiency. 7. Hold Harmless: The Respondent shall agree to defend, indemnify and hold the City of Brooklyn Center 10 City ot Brooklyn Center t_."�': .a.�s..: �"„e=� 3 j r i P u r w a� r 4 h2 r fi r` r �z'� FutureRounda-bout' -Ov¢rheadPowerLines t- f g-�=-�"�,� x x r� „w r� �----�-�e=�a-�-.�.. y f I �Y. n Property Lines Powertlne EasemeM P +r� ��M� t� s�'� 5 s d ^tTi�'1!'t'''(�"'' f �Q� f 4 t�� 1 4� t ..r k tY f� a yy s I �G Cy\ r t,. F� .s, a'� t fi �4't� �+r \i e 1" _i�` �•iG�rAMa�''il� �tv� d :�.,.�a }�✓',,r����' �t`^,;» t a r 1� t�, s .�f �F.+" t,p'�► ,�C` ,f �7 �r wa�-� s ,a k (P` G a a� �g .alf ,v" 6 '�5t n y v^ r� e i 1 Y "d .k�' aTdfl r 1 s p ..1 =sa}`� p M e t y z g f `i �t n _V g l'L' I r L x ��5, F ,581"N'AVE N r ,�4 I r '3 w; p j,� .r,'`-,/;,.� t �hT ��J r i'« f .N y"'�� I �t �y� (.~Y�! f ���'f ry s V! 5 'i�, ,ro�,.,,,,. u. '`�"l a 1� ,a E:`•'1 r+D �„ae',, ��a` a ���k f .d M `Q K ��;'�r �1� +'.t ��W s p r �i�� k�� �,��3 r .�,j�rM �s. F T t�r t e a .l�, w GUG 7.:. '�O� f r. `i "St*` t :'�"T ��t� S e v a�" ,Y�`��"`� s. li �*7!..,„�� r�.+_ MS {Y f P s�� �`'���d{ r z m Fb �'"k ti 8 r r i -i u.,�. 3.. a t w 4 -r t y m ,J3° m .v +�1.%Sc 'b C.' ��Sx'���$�?� ��"�'�'�St.at� i' m�°e'1F�(;�it� :i" �m �I ;f s N i t g y �""'t .`r.:�� ,r r �.c� f t t h 3 z s� 3 �i� t 8, f� q eg,�j, z ,h�� t tx G r I F+,c 5 a rp`:� I' j t �����p r a �r l s�, �'di i� ti �w'.!W it�r+r`� s 'r �6W I tr '�r� r t �......�.r�.�. t x 3 �f F" N ��.4 1 �t <1 i t x f r "x c _��j.l�`►.�.�.,. t 1w r w s a T: Y w i d M ".?w�a",R-."a" -..a.""" e.. -x�� vt g{ a ,F.. d' ,f�� y p .y,o w `a .d�'.¢�y' �j a N a l<�.. °'r<�` i"' 'zfi i w r as r. 4 C Logan and 57#h Redevelopment I �i i Z City of Brooklyn Center Logan and 57th Redevelopment Exnibit o Form of Consent for Release of Response Data 20_ City of Brooklyn Center Department of Community Development 6301 Shingle Creek Parkway Brooklyn Center, MN 55430-2199 Re: Request for Proposals Consent for Release of Response Data on behalf of hereby consents to the release of its development proposal in response to the Request for Proposals and waives any claims it may have under Minnesota Statutes Section 13.08 against the City of Brooklyn Center for making such information public. 13 City of Brooklyn Center Cir,r• of BROOKLYN CENTER LO�c?/'1 c�/7Ar �7t�1 D�ve%prnen� Gu�de%ir��s City of Brooklyn Center, Minnesota ��C�1�?1� R���: Coordinated by Opportunity Site Task Force Assisted by Qamon FarberAssociates Elness Swenson Graham ArchEtects Benshoof Assoeiates Stanley Consultants Visuat Communications February 27 2006 Logan and 57�h Development Guidelines TABLE OF CONTENTS C. Standards for Private Development A. Introduction C. I. Intent of the Standards 16 A. I. Intent of the Guidelines 1 C. I. a. Structure of the Standards.............................. 16 C. I. b. Project Overview ...........................................17 A.II. Background 2 C. II. Area Guidetines ...........................................17 A. III. Existing Conditions 2 C. Ii, a. Overview............................:........................ 17 C. FI. b. Site Development Standards 19 A. IV. Range of Possible Uses ................................4 C. II. c. Architectural Guidelines................................. 20 A. V. Purpose. What are the Guidelines 8 C. I11. Review and Approval Process...................... 22 A. VI. Application 8 B. Systems Guideline B .I. Context 10 B II. Open Space 10 B. Ilf. Transportation System 11 I B. III. a. Access to/from TH 100 11 B. III. b. Alignments of Internal Roadways ......................11 and Locations of Intersections on Logan Ave. N. B. III. c. Public Transit Provisions .................................11 B. III. d. Bicycle/Pedestrian Provisions 12 B. IV. Storm Water Management System 12 B V. Utilities 13 B. VI. Mix of Uses 13 B. VII. Parking Strategy 14 Logan and 57 Development Guidelines INTRODUCTION A. 1 intent of the Guidelines The Logan and 57th Site represents a great opportuniry to revitalize a formerly blighted ���,a��,����. R�'�a I�� '�""R R��� u, property within the City of Brooklyn Center. The I� p location of the site avails itself to integrate the site 4 �4 with the adjacent neighborhood, inciuding: the I W trail system to the north, commercial uses to the south and residential uses to the east. The °'f 'F Logan and 57th Development Guidelines propose �s# recommendations to reinforce �and guide public/private investment in a manner that will u enhance and strengthen the viability ofthe area and reinforce the neighborhood character of the Logan and 57th Site. In the fall of 2005, Team Brooklyn Center, led by I Damon FarberAssociafes, was asked by the City of Brooklyn Center to continue working with the community task force previously charged with developing Guidelines for the portion of the Opportunity Site across Highway 100. The purpose of the Guidelines for the Logan and 57th site is to establish an appropriate ftamework for the redevelopment incorporating any number I I I of uses which ensure: A comprehensive vision for the 8.4 acre site, including the pattern, form and character in the interest of creating a cohesive site development r. integrated with the neighborhood s A set of design standards to guide the architectural quality of the overall development 1 Logan and 57th Development Guidelines While subject to the foliowing regulations and meetings and multiple meetings with government Guidelines, the alternative concept plans are agencies have ail contributed to the development 3.sao^^or flexible to respond to physical site constraints, of a well supported guideline for transforming this ���i users' needs, community desires and a changing under performing retail area into a vibrant mixed- market. The plans allow for variations in the use neighborhood. design of the building layout, parking q1 46,50 ADT configuration, storm water ponding and a variety A. III Existing Conditions ,��4� of housing types to meet City statutes, regulations i i I and Guidelines. The Logan and 57th site boundaries are Highway 1 100 on the west, Logan Avenue North on the A. II Background east, 59"' Avenue on the north and 57th Avenue N. on the south. The site has been cleared of its The Logan and 57th Site, like many suburban previous uses, and environmental investigations f shopping malls, had deteriorated over the past are complete. The site is well served by transit few decades to a point that it was classified as with stops on 57th Avenue N. and Logan Avenue urban blight. The image below depicts the si#e as N: Access to the site will be reduced from the it was in the summer of 2003. former configuration of multiple driveways to serve the strip retail centers. There is significant tax benefit to be derived from a major redevelopment of the area. The introduction of Transportation Conidors residential uses will produce additional benefit and increased value to the City of Brooklyn Center. Transportation, Transit 8� Trails The existing site has a number of strengths and weaknesses in regard to the existing transportation system. The following summary identifies issues addressed in the redevelopment concepts. Existing Conditions Three existing driveways on 57th Avenue N. and four existing driveways on Logan Avenue N. provide vehicular access to the opportunity site; Former Development Cor�figuration There are sidewalks on both sides of 57th The City of Brooklyn Center acquired the property Avenue N., but Logan Avenue N. has only one on in 2005 and cleared the site in the fall and winter the east side of the street; and of that year. This document, along with the RFP is the culmination of a 6 month planning process Bus stops located on both sides of 57th that started in September of 2005. Four meetings Avenue N. and on the west side of Logan Avenue with the community task foree, two public N. provide links to public transportation. 2 I Logan and 57th Development Guidelines Issues and Opportunities sT+;, Route 24M 12 Tn s/Da There are three driveways on 57th Avenue N. that are not consistent with Hennepin County a� standards and cause greater than desired traffic I� conflicts. Prefer one driveway located opposite R� r� Lilac Drive. The absence of a sidewalk on west side of Logan Avenue N. limits pedestrian access. A provision to link the existing sidewalk to 57th Avenue, the pedestrian bridge and Earie Brown Elementary School on the north side of 59�' Rou1e 782 Avenue North would benefit pedestrians a r�i ame Ro��s 24 51 Trl sl0a There is no access to the site at the intersection of the northbound ramp for TH 100 and John Martin Drive. The site is adjacent to the northbound ramp for TH 100 and its intersection with John Martin Drive, but presently has no Existing Public Transit and Trails I access at this location. Access standards and grade differences can limit such access 7 �I I opportunity. Nonetheless, opportunity may be I�'� available to investigate such possibilities Public Transit 8 T�ails V Transit stops on Logan Avenue N. and 57th a Avenue N, should be maintained. Storm Water 8� Utilities The site is well served by utilities. Loeated between three of the city's water towers, the site has access to an existing 8 inch supply line of potable water. Sanitary sewer is also located in al( roadways adjacent to the site. The site is relatively flat and served by an existing storm wate� piping system. Future development must address storm water within the project site, thus improving the overall water quality within the Location of Utility Easement and Proposed Round-about watershed. 3 Logan and 57�h Development Guidelines emphasis on pedestrian oriented streetscapes, Opportunitles diverse housing options, adequate ope� space, environmental responsibilities and quality A number of additional opportunities emerged architecture. after the analysis of existing conditions and dialogue with the task force. These opportunities More specificaliv, the Development Guidelines fostered the ne� stage of the process that are intended to: includes the exploration of altemative 4�- development concepts for the site that will: Ensure the compatible integration of retail, office and residential uses with the existing Enhance pedestrian connections neighborhood; i Use storm water as an amenity Ensure the compatible integration of a variety I of housing types including, but not limited to, Minimize impact to neighborhood townhouses and medium density residential uses; Improve access to transportation Maintain a scale and organization of development that emphasizes sensitivity to the Provide additional buffering along pedestrian environment; Highway 100 Minimize the visual impact of automobiles on Maintain access to public transit the neighborhood by using enclosed parking and substantial vegetation and architectural buffers at A. IV Range of Possible Uses public streets; A number of goals emerged during the initial Townhouse style housing meetings with the Task Force that have been refined through the analysis of existing conditions and plan development. They were cultivated with an eye toward providing the development community a clear and concise understanding of the community's vision for the project. A system was needed to set standards for the overall project yet allow enough flexibility for developers to tailor their portion of the project toward the needs of the end users. The Guidelines set standards for urban design relationships to ensure the scale and character of redevelopment that the cornmunity expects, while still allowing the developer to arrive at creative solutions that meet the needs of the community and their financial responsibilities. The intent of the Logan and 57th Development Guidelines is to provide a comfortable, safe development with 4 Logan and 57t^ Development Guidelines Provide for public open space that incorporates storm water management with visual and y r°'" recreational amenities; �a �a� y ��'y�.°-s�.�'���r�` �it .�X .i.t ,w ....r TM�R i� 'k4�r Safe and Convenient On-Street Parking h a Provide effective access to and from 57th Avenue N; Storm Water as Vsual Amenity Provide safe, effective and understandable Ensure the compatibility of new construction access via the regional roadw�y system; �th respect to the specific character of their Minimize the need for vehicles to travel on city immediate context I roads by providing compatible neighborhood commercial uses within close proximity to Encourage active ground floor uses such as residents. Integrate public translt within easy restaurants, shops and se►vices to animate the walking distance of commerclal and residential street along 57th Avenue N; and i uses; Provide a convenient and safe network of Meet applicable for access to/from the regional sidewalks and trails within and around the roadway system; redevelopment area. Provide effective physical and visual Exploration of Alternatives connectivity with the nearby neiqhborhood; A number of altematives were explored to test Implement Crime Prevention through how #he goals and vision identified by the task Environmental Design (CPT�D) concepts in final force could be i�corporated within the design; neighborhood. The following summarizes the themes and approaches used to i(lustrate the Provide a high level of safety for motorists, range of acceptable uses on the site. pedestrians, and bicyclists. Fulfill related development obJeCtives to include on-street parking and incorporate traffic calming measures; 5 Logan and 57t^ Development Guidelines h '�3 4 �u� �,i`. o% '4 d 4 �I+: S �y Y 'g L� 5 ��y�, �k,. I ai Y z k ���v an" i :Ei "�e f a r' ,�r y ��a'� z �a� �fi` r` �`�%�S Y �,�'e''� a r r�r��s� �."r'�, �y s r: �s �,.r s r f F re w N S �i� •i 6 9 a S It �i� ,p� 4� Y �P x 4 a 4 y s� s LL^ r t x �?t �s� y c y t �,�`'a��` s' 1R g 4 r r Y F i �k�Y��, t AVY� k if �r,e� p ,,�s� t� r �a t a,�,. �'c'=�r„�rr..d"'�"'.:,w �-e��� a i.'"` e��'�:."�,�Z�^"��::w:.�,, f. r x MM ,+...v e,_.. q I i I Office Concept 1 Office Concept 2 Housing Concept 1 I This concept strives to maximize office space This alternative iliustrates 63,000 square feet of This concept provides approx. 48 units of both (78,000 square feet) and provide adequate office space with visibility from Highway 1 OO and lower and higher density housing for a total of 96 paricing and storm water capacity while integrating separation from the surrounding neighborhood housing units. Green space serves as a visual the building into the neighborhood. The building while providing green spaCe as a buffer and amenity, buffers the highway and provides the addresses the comer of Logan and 57th Avenue amenity. The office building is centralized within focal point for many of the units wlthin the higher N. and provides an opportunity for a gateway the parking areas thus minimizing the distance density housing. Higher density housing is plaza into the neighborhood. The storm water required to walk from the furthest paricing space located further from the surrounding residential ponds and associated green space buffer the to the iront door. uses. Lower density housing located along Logan parking from the residents across �ogan and Avenue N. provides a transition into the single provide a visual amenity. family residential across the strest. Resident parking would be enclosed while visitor parking would be alloWed on-street along the drives within the parcel and on the west side of Logan Avenue N. 6 Logan and 57��� Development Guidelines t k F d r Oe�,F� F 1� ���r r# ,u 2'% a d't �r 7 4 i r F 4 L N'' e s x i�" z� t �:d� f '`d i x x �Pt a����`"r t f i:�� fi a y' a y, a de%,y 4 �t� t� y t�'" ,r N� r �„�r 4� Y 3 ��,a�` `v�� 'N� R �n� �r.�..s �c.� r r r� r r k P M r' �,�r ,x r �ap yn,` V, �:i"�X"' t� r,�. �„r s ra t r .r k� r s1�". a F i Housing Concept 2 Mixed Use Concept 1 Mixed Use Concept 2 This alternative provides approximately 96 units This concept includes 9,600 square feet of This alternative features mora extensive retail of both lower and higher density housing. Green Retail/Commercial and 80 residential units. The (26,000 square feet) within the mixed use space and storm water ponds serve to buffer the commercial use is concentrated at the scenario. 60 residential units are shown within highway and provide the focal point for many of intersection of Logan and 57th Avenue within a the mixed use buildings and the buitdings which I� the units within the higher density housing and mixed use building that includes residential units. surround the storm water pond. �ower density serves as a visual amen+ty for the neighborhood. This building provides a transition from the higher residential addresses the neighborhood across Higher density housing is located along 57th density building near the intersection of the Logan Avenue N. Parking for the residentiak uses Avenue N. with lower density housing to the north ftontage road for Highway 100 and 57th Avenue is covered with on-street parking for visitors and closer to the single family homes across Logan N., and the lower density uses which are located parking loks for those utilizing the commercial Avenue N. Residential parking would be within the northern part of the site closer to the amenities. enclosed while visitor parking would be allowed existing single family residential homes. on-street along the drives within the parcel and on the west slde of Logan Avenue N. 7 i Lagan and 57th Development Guidelines Public Open House The Systems Guideline describes the seven Encouraging a diversity of architectural styles; distinct items of the overall infrastructure A neighborhood meeting was held on December framework. 4, 2005 to gather input on potentiaf Providing design flexibility instead of aesthetic redevelopment scenarios. Each attendee was control; Context encouraged to fill out a survey regarding the Open Space concepts and infoRnation provided. The following Creating a pedestrian-oriented environment; and Transportation Systems is a summary of their input. Storm Water Systems Providing investor and property owner Utilities Survey Result Summary: confidence through design continuity. Mix of Uses Pa�4cing Strategy Survey Results indicate a primary preference for The Development Guidelines achieve the above Mixed-Use and a secondary preference for through standards for new construction that The Second document, Standards for Private Housing. No one indicated a preference for either regulate site design, building placement and Development, is intended to provide guidance to office concept. Housing types preferred incfuded building design. They a{so inc{ude an expianation private developers as they take responsibility for high quality, owner-occupied town homes. of the general and specific design principles design of the site. It will help assure that the Neighbors indicated a desire to include retail and promoted by each aspect of the Guidelines, as private development that takes on the Logan and commercial uses like restaurant, grocery, coffee Well as a variety of images describing appropriate 57th Site will fulfill the City's goals and objectives shop and personal care along with dry cleaner, design solutions to implement those principles. for redevelopment. The Standards for Private florist and convenience type amenities. Development deal with the individual buildings I This approach values creativity and allows for within the Logan and 57th Area. I Considerations that citizens felt were especially numerous design solutions for any particular important were having services housed in project. The Community Development Director attractive buildings creating a desirable place to and Planning Commission are responsible for the live or shop. Concerns about the storm water and administration of the Development Guidelines. drainage were expressed. Projects in the Logan and 57th Site area must comply with the Development Guidelines as well A. V Purpose. What are the Guidelines? as the provisions of the City Code. Compliance will be determined as part of the site plan review process. The purpose of the Logan and 57th Development Guidelines is to set basic parameters, describe A. VI Application preferences and illustrate design intent. The Development Guidelines are established to ensure that public and private development The format and content of these Guidelines are projects implement the Goals, Objectives, Policies specifically tailored for use as a reference. They and Character envisioned by the community. are organized into two separate chapters intended to be used by potential developers, the The Guidelines �rovide a framework for: Systems Guideline and the Standards for Private Development. Enhancing the quality of the built environment; The first document, Systems Guideline, provides Achieving quality contextual design; design guidance for all elements of the public infrastructure. It outlines issues and provides Achieving design that imptements the vision design standards that apply to the entire Logan developed by the task force; and 57th Site redevelopment area. 8 r� t �'3 s A ln� J�� f f.- ._-e. '_._°r Y t� `5 :t j a x f k r .r a r r a y `v y r- f i9 i }�C f�� F i �x:� -�+t��:�' a;. 4.. i r �f}� E-cf i y 7 x i.,.� i, r.... E3 3. y �.r A• �"a S� r� ti r s t y i n'> w`� x a� i f� x :......�«vrt i�r�n� v �'.wa �n ay;svl c�x"C'r<a��xxrac.-+_ ...m ,,.«`�t ±Yr _.t, j". q i 1 f Logan and 57t�� Development Guidelines B. Systems Guideline B. I. Context B. II. Mix of Uses The Systems Guideline describes the elements of Although unique, the Logan and 57th Site is not The Guidellne identifies a ratlge of possible uses the public infrastructure. The Systems Guideline intended to be a stand alone area within the City; within the project area. A horizontal and vertical outlines issues and provides guidance for instead it will be a part of, and connect with mix of architectural elements is desired. standards that apply to the entire Logan and 57th immediate local, city-wide and regional systems. Complimentary housing styles and scales should Site. It is inte�ded as an attachment to the The project must provide reasonable links to be incorporaied into the northern half of the master plan document itself. The Systems these systems as a primary design objective. project. New uses should relnforce the public Guideline will deai with the seven distinct items open spaCe and activity at street-level. identified in A.VI. Guideline Recommendations Possible uses that will be consldered include These seven items represent the organizing To insure that the Logan and 57th Site o��, residential and commetCial. elements that give shape and form to the public redevelopment takes full advantage of local and elements of the site. It is intended that they will regional systems, development should: The public task force felt big box retail, car be adopted by the City as part of the Design dealerships and grocery stores with the Guidelines, become part of City policy and be Provide safe, easily recognized linkages to city exceptiott of smaller footprint specialty grocers implemented by the City and/or with City and regional systems; would not express the desired character of the I participation with the work of private developers. neighborhood. The Systems Guideline will identify and guide the Coordinate with, and improve, the utility way the Logan and 57th Site will be developed. network; They will prescribe Design Standards for all kw t visible surface elements of the public Maintain transit service and stops and add "4� in fras tructure inc lu ding street an d roa dway additional transit service and amenities to r'� design, streetscape and landscape design, encourage their use; pedestrian spaces, connectivity between private and public spaces, parking strategies and policy, Integrate with and complement the existing etc. Systems Guideline will prescribe everything (and future) street organi2ation; in the public realm from curb sections and paving materials to street lights, park benches, waste Become an integral part of the city and county receptacles, tree species and other site drainage/storm water management plan; components. Provide access to parks and open space to all Ground (evel shops with residentiaf above add street Logan and 57th Site redevelopment area Ieve1 interest residents; and Provide additional landscape elements including coniferous material to visually buffer Highway 100 from the site particula�ly on the north side of the site. 10 Logan and 57th Development Guidelines Guideline Recommendations B. 111. c. Public Transit Provisions Promote vertical mixed use adjacent to 57th I I The plan envisions strengthening existing public Avenue N. Provide flexibility for developers transit services in the area in order to enhance wishing to be creative with potentiat retail uses in accessibility and provide viable choices of travel other areas of the project. i� mode for persons who will live, woric, and/or recreate in the project area. Accommodate 'big box' uses, only if they are innovative and integrate open facades with Three �rinci�al transit nrovisions in the auidelines smaller alternative retail uses. are: Reinforce pedestrian activity at the street level. a) Maintain existing stops on Logan and 57th Avenue N. A TrafflC Cirde will provides It'nproved Traffic Flow and a B. III. Transportation System Unique Gateway to the Site b) Provide attractive, conveniently located bus stops, which include amenities such as The transportation system for the project area B� Alignments t�f Internal shelters whenever possible primarily on consists of three principal components: site Roadways and Locations of Intersections 57th Avenue N. access, internal streets and public transit on Logan Avenue N. provisions. It is important that all three components of the overall transportation system The master plan includes a combination of both c) Provide a majority of residents living in the function in an effective and well integrated "fixed" locations for certain roadways and area to be within one-half block of a transit manner to achieve the fundamental goals of the interseCtions and flexibility for other roadway stop. guidelines. Principal design guidelines for each of alignments and intersectiolls. these three components are: d) Prepare development plan to coordinate Principal items that are fixed due to existing with and to encourage use of transit B. Ifl. a. Access to/from TH 100 constY�lnts are: services along 57th Avenue N. and along I Logan Avenue N. Access between the site and TH100 presently is Provide sidewalk on west side of Logan provided throuq�h the full access interchange at Avenue N. to extend between 57th and 59"' TH100 and 57` Avenue North in the southwest Avenue North. corner of the site. Motorists using this interchange then can directly access the site via Provide just one driveway on 57th Avenue, driveways on 57"' Avenue N on Logan Avenue N. which Should be located Opposite Lilac Dnve. Direct access to/from the intersection of John Martin Drive with the no�thbound TH100 ramps is Provide one, two, or three driveways on Logan Avenue N., with the southeYh-most drivewa a discouraged, but can be considered if significant Y needs and benefits are identified. Such access �ocated at least 200 feet north of 57th Avenue N. would require approval from MN/DOT. Public Transit will continue to senrice the area 11 Logan and 57�h Development Guidelines Guideline Recommendations B. III. d. Bicycle/Pedestrian Provisions Parkina Guideline encouraaes the followina: The plan seeks to encourage bicycle and Locate off-street surface parking lots out of pedestrian movements and to accommodate sight from the major streets, either behind or to these movements in a safe manner. the side of primary buildings. Two soecific features included in the �lan are: Provide a combination of fencing, landscapi�g and landform to screen parking and service areas a) New sidewalk on west side of Logan from major streets and important views. Avenue N. to connect the pedestrian bridge to the north and 57th Avenue N. to the Work with the City to review existing standards south. to promote flexibility including hours for on-street Parking lot screening parking, security and enforcement practices, b) No pedestrian connections to John Martin permit parking by residents or metering. Drive are anticipated because the existing bridge does not have a pedestrian I component. B. IV. Parking Strategy 9 Balancin the realities of car-related necessities /m�' (streets, pa�lcing and service) with future transit service and the desired character is a significant ,r'• challenge. The goal is to provide adequate parking while promoting new strategies that support the overalt needs of the Logan and 57th Site. Parking will be provided through a k' combination of on-street spaces, off-street surFace lots and underground lots to support the w: rv. i:,it:,�;...�' I mix of uses. �If�!` Liner stores or other street level uses should be integrated into parking design along important street frontages. Adequate and efficient parking strategies 12 I Logan and 57t�� Development Guidelines B. V. Open Space III B. VI. Storm Water Management System The overall design ftamework o# Logan and 57th should provide access to trail connections and A comprehensive storm water management green space for residents within the site. system for the project is essential for the future perfoRnance and function of the site and for n�� w„�.�- preserving the capacity and improving the water U- quality of the watershed. The project will handle v� storm water on site. Storm water ponds should x be integrated into the site as amenities. The project should comply with City requirements, I Shingle Creek Watershed Management Organization rules and the Minnesota Pollution Control Agency's Protecting Water Quality in Urban Areas documents. Alternative water treatment applications should be explored to minimize capital costs and future maintenance and to improve water quality. �'���`m I� ����r�, i 4� ..�fe,� y G� Central Open Space t Guideline Recommendations The storm water ponds will become a visual amenity I, I The Logan and 57th Site will provide connections �I for residents and visitors to access regional open space. x r tnurt ,;,,,r_. j ���en.. Quality Green Space for Residents 13 Logan and 57�h Oevelopment Guidelines Guideline Recommendations B. VII. Utilities Integration of the storm water management A solid network of water distribution and systems with site planning should include an wastewater collection infrastructure is vital to the opportunity for creative buffering and visual health, safety, welfare, and success of the Logan amenities for the development. Design creativity, and 57th Site. Understanding the location, size, use of high quality materials, and solutions to and characteristics of individual utility safety cancerns are critical objectives to be components is important. Development addressed. proposais must acknowledge awareness of the entire redevelopme�t area as well as areas The followina obiectives must also be considered beyond. Specifically, the infrastructure must in the finai desian: address the overali utility system. The project will also be served by a full complement of private A regional storm water pond. utilities including cable television, fiber optic cable, eleetric, telephone, and so on. Reduce the rate of storm water runoff from the present rate of runoff. Guideline Recommendations Dual pond system preliminary pond(s) and Remove existing sewer, water, and other primary pond. infrastructure that will not be incorporated into the I Emergency overflow of ponds. new utility systems. I Recycle water for project irrigation. Provide wastewater collection infrastructure. I Provide fountains to improve water oxygen Install water distribution system for potable levels. water consumption and for fire protection. Plant pond edges with native plantings that Bury all utilities within City right-of-way and I discourage geese from using sodded areas. make connections to a"back of house" location. w All utilities should be designed according to u Ciry standards. w Work with private utility companies to ensure timely installation of private utility infrastructure. Alth utilit� r ou h es a e icall not vi i 9 tYP Y s ble and are of no aesthetic value, they play a vital role by establishing the needed framework for development to move forward and to be Pond Edges will be planted with native grasses to sustained. minimize geese 14 ��_s ,,�a n o c F. i ��C'Y�� cv x P 4 7 x� i �t X `t% x y,a �y 4 �i� s4� a A t f r R .��'11 t k a Y �MA�V.Lb7I' �rv�..m x �y+�<- r� w.l a 'es s .W i 'k k 5,� Y K i E t -el� �'C k i n; i r x t v t n ti �`,a TM �srV i s�� 4�*� ef h s n s.: .e, G,. a� ,5 .%k h x .s �4 .0' SkA ..i ..rn. i.+e. `rs .b ��r{... a�` �r�� I "T '4. rv•�: �n.�.�b s" r, ��3.n� «...c.�„ ..u, s yo:y '<s a f ..x., s o .`�^y' ::i+ ^�"``:;�te r ti� logan and 57�h Development Guidelines C. Standards for Private Development From 20,000 feet in the air an $18 ,000 Chevrolet looks Just like a $7q000 Mercedes. C. 1. Intent of the Standards But from 5 feet, there are distinct differences in f F quality, detail and amenities. In any r �4 development, the quality of the individual The "Standards for Privafe Develo menY' are P j; components and the quality of the details are intended to provide guidance to the private "E t equaliy as important as the plan itself. developers as they begin to design the individuai pieces that comprise this T s redevelopment plan. The Standards will insure �li� that the City's overall goais for the redevelo ment area are met and that the '�1, r individuappieces are integrated create a F• i r r cohesive neighborhood within the c�ty of Broaklyn Center. These Standards for Private 1 t e x� Development deal with the site as well as the w'.. individual buildings within the site. r t ;4,. C. I. a. StYUCtuPe of the St2ndardS Site Development Standa�ds describe howbuildings� relate to the sfreet 4 s These standards are prepared in a multi- �'s"�T, layered fashion with three distinct but Like a zoning ordinance, this section will interrelated parts. The ensuing section of this prescribe allowable uses, density, building bulk, r document specifies the development standards height, floor area ratio and parking in greater detail. They are structured to plainly requirements. It will also indicate the desired communicate the developmenYs requirements relationship of buildings to streets, pedestrian I in each category below. ways and open spaces. Normally, bulk I requirements establish upper limits on the Architectural Guidelines control quality The first section entitled Projeet Overview intensity of development in a given area. Since describes the desired characteristics and a certain intensity of development will be Architectural Gufdelines define the desired qualities of the area in non-technical, layman's needed in this project to sustain the public quality and standards that are expected for all terms. expenditure in the infrastructure improvements, components within the area and est�blish the the requirements for this plan may also specify foundation of the architectural vision of the The section entitled Sife Development tower limits of bulk and intensity. eommunity. They may vary somewhat from Standards describes each area in typical one end of the site to the other but they strive language and terms normally associated with a If Land Use Standards are called the "view to establish the guiding principles for the design zoning ordinance. It is the view from 20,000 from 20,000 feet", Architectural Guidelines are of individual components of the plan so all will feet in the air. Site development standards the "view from 5 feet." After the overall goals work together as parts of the whole. The specify the relationship between buildings, their prescribed by the Land Use Standards are rinci les will not be rescri tive nor will the edges, streets and public spaces. They imply a established, this nearer view, the 5 foot p p p p y strong relationship between architecture and perspective encourage thematic architecture or the use of site, how buildings define the spaces around is needed to ensure that the design, the details, any specific architectural style. Rather they will them, and the visual and physical connections the quality and the craftsmanship of the private address individual aspects of design In hope of between the private and public realm. components of the development are reflective establishing consistent standards that can be of the overall public goats of the community. applied to any style of design. 16 Logan and 57�h Development Guidelines Architectural Guideline Princi�les will deal with: Lighting the place to get a cup of eoffee, get your hair Site Design and Landscaping cut or shop at a niche grocery store. Scale and Conte� Proportion and Massing C. 1. b. Project Overview These objectives require that the majority of Articulation Structure Organization buildings front on both private and public streets Materials and Color The project area adjacent to 57th Avenue N. and pedestrian thoroughfares that may be part Craftsmanship and Detailing provides the broadest variety and greatest of the redevelopment plan and connect and Signage intensity of development within the Logan and relate to the neighborhood core. Parking and Streetscape and Pedestrian Environment 57th Site. It will allow both a vertically and service areas should be located internal to, or Sustainability horizontally integrated mix of uses eontaining on, the sides of buildings, away from view. A office and residential over ground floor reta'sl. mix of uses within the area, including retail, y� restaurant and residential will further enhance ��r x this model and promote activity throughout both G x p C. II. Area Guidelines: the day and evening hours. Site development r guidelines include the following: t One of the main objectives of the Site Development Guidelines for the Logan and 57th Site is to create a unique opportunity to recast typical, suburban commercial development pattems and to focus on the creation of an ,�y innovative new urban development pattern that promotes design richness and variety in the built environment. C, II. a. Overview The Guidelines will promote pedestrian circulation on the public sidewalks within the Logan and 57th Site. Supporting services and 4 y retailers with their related parking facilities will be encouraged to locate in the ground floor of t*� mixed use interconnected buiidings. In addition Architectural Guidelines suggest scale the Guidelines for the Logan and 57th Site will describe the qualities and character of a desired The Architectura{ Guidelines establish separate �urban form' within the site. Compact buildings goals for each sub-area that regulate some or and high-density blocks that define this area all of the major building and site components must include continuous built edges that relate listed below. d'+recNy to streets and sidewalks. The togan and 57th site development must incorporate Ground Level Expression innovative parking strategies that support the Fagade Transparency mix of use and that provide easy access to Entries and Stoops commercial destinations. Upper Story Setbacks Roof Profile Together these elemenfs wilf create a Rooftop Screening neighborhood core that is the center of activity 17 i I I Logan and 57th Development Guidelines Characteristics: Emphasis should be given to building Parking Strategies: features located at primary intersections or The ground floor of ali mixed use buildings will where streets intersect with the central open Provide required parking spaces for daily use be limited to retail and restaurant uses only. space. These locations will be seen from that satisfy both quantity and location needs Street level development wilt be designed with several directions and terminate views. They through a mix of on-street and structured storefronts, entrances, windows and related will become future landmarks 8nd parking solutions with a minimum of small streetscapes to encourage the greatest level of orientation/way-finding icons as the Logan and surface lots; and pedestrian circulation and traffic as is possible. 57th Site develops; Ancillary uses, such as service and delivery Locate any surFace parking lots away from the spaces will be allowed but should be located major streets, either behind or to the side of away from pedestrian oriented storefronts and primary buildings. Surface parking lots along public streets. major street frontage shall be screened with a combination of decorative fencing, landscaping High-density housing and office uses are also landform. acceptable uses within the Logan and 57th site. Building Placement and Setbacks: Commercial uses should be located at the build-to lines (zero setback), but allow recessed spaces for outdoor dining, front doors, other street level pedestrian activities. 80% of building facades should address the build-to lines. Comer buildings with character I Residential uses on 57th Avenue N. or along Minimize openings between buildings. I Logan Avenue N. should orient toward the Limited driveway access and provisions for I street. Buildings should be set back 20'-30' to pedestrian connections through blocks are allow for front-yard green space. encouraged. Gaps between buildings to I accommodate surface parkinq lots, greater building setbacks or other purposes are d'+scouraged; and r Encourage recessed entrfes end windows to r� create street-level interest and variety to promote a sense of safety and to enhance pedestrian scale along street frontage. Mixed-Use buildi s with retail on first floor r �9 18 Logan and 57��� Development Guidelines C. II. b. Site Development Standards Rear Yard Setback: None. Subject to individual review. k Allowable Land Use: Floor Area Ratio: Subject to individual a Retail, office and higher density residential uses review, but multi-story buildings are encouraged are all allowed in the Logan and 57th area. throughout the Site. Free standing, single story Large grocery stores, car dealerships and big buildings are not al�owed. box retail will not be allowed. Minimum Building Height: 32 ft. Three stories. Maximum Building Height: Five floors or 75 ft. adjacent to 57"' Avenue and three stories along Logan Avenue N. Subject to individual review. Off Street Pa�king- Retall/OffiCe: Parking A variery of architectural styles adds mterest ��'�f` facilities within the Logan and 57th Site will be x subject to individual review. The overarching t strategy is to accommodate the required retail/office parking demand in surface lots. Surface parking must be screened from public I i.. i view. I Recessed or corner entries add visual interest Off Street Parking Residential: Private Minimum Lot Area: NA and secure parking for residences within the site will be fully enclosed in private faeilities. Minimum Lot Width/Depth: NA Guest parking may be accommodated on street and in surface lots. Parking demand will be Front Build-to Lines: on 57th Avenue N., market driven a�d subject to individual review. 80% of the lot frontage must be constructed out A minimum of one space per bedroom is to the built-to tine or tot line. Where buiVdings anticipated. front on common areas, pedestrian ways or other open spaces, 80% of the building facades must be built to the open spaee line. One driveway or access driveway to service areas is acceptable on 57th Avenue N. directly across from Litac Drive. Side Yard Setbacks: None. Subject to individual review. i9 ,i Logan and 57�h Development Guidelines C, II. c. Architectural Guidelines: Emphasize important intersections by placing Conceat service entries, loading facilities and distinctive architectural elements or interesting mechanical services from view along public Building Character and Expression: fa�ades at these prominent locations; and streets; and Buildings in the Logan and 57th area will play a Provide a variery of front elevations for rows Create a continuous building edge along street major role in defining the scale and character of of buildings along any given block. side, visually connecting adjacent buildings with the area. The proposed mix of uses for this complementary fagade treatments. signature destination suggests the potential for Scale, Proportion and Height: a variety of building types, demanding creativity Windows and Doors: and innovation to highlight unique architecture, Articulate front fa�ades with projections and while knitting the entire area together as a recesses; and Maximize glass openings for all ground level, coherent whole. street front fa�ades especially for retail, Encourage increased building height, higher restaurant and other commercial uses Building design is an important consideration density and larger scale buildings adjacent to recommend 50°to minimum of total ground {evel and emphasis on first floor fa�ade treatments is the 57th Avenue N. fagade, or demonstrate great design through essential to encourage street-level activity and other means; enhance the pedestrian experience. I Architecture should be '4-sided' Emphasis is to Provide real window openings for all street be on creating highly animated design solutions z` facing fagades above ground level recommend along all street frontages and pedestrian ways. 40% minimum of total fagade; fd� Architectural Guidelines include the followina: Provide recessed entries wherever possible; Provide a variety of building types and styles, Use clear or lightly tinted glass for all windows expressed both in large scale (overall building) and doors mirrored, reflective or highly tinted and small scale (design details); glazing is not acceptable; and Minimize blank walls along the public rights- Provide primary access doors facing public of-way and should consider all street frontages, streets. �I including buildings at comers, as primary Emphasize details transparency at street level elevations, Street Presence: Emphasize transparency at street level to encourage two way viewing both window Emphasize pedestrian experience with shopping and 'eyes on the street;' architectural features at street level canopies, porches, decorative light fixtures and material I Promote interesting, animated architectural detail; features without being thematic or artificial. Encoura e variet of color texture and Faux decorative elements are discouraged; 9 Y materials to complement other streetscape Avoid large, unarticulated far elements; 20 logan and 57ih Development Guidelines Materials: Landscape: H, Provide a diverse mix of materials, applied in a Provide for 12' wide sidewalk width to invite variety of proportions, exposures and detailing; pedestrian traffic on 57th Avenue N. Encourage durable, high quality materials; Install a variety of trees to frame the street and provide shade. Prohibit siding (vinyl, metal, wood) except as a complimentary use; Provide street lighting that meets all safety standards and design criteria, while creating a Encourage the use of mostly brick or �y' unique character for this area. comparable altemative; minimum requirement of 50°� of non-glazed wall area; i Explore street light spacing, height and a variety of fixture types that support proposed Metal and wood components are acceptable mix of uses and activities (note, however, that as a complimentary use; too much light is as bad as too little). Encourage overhead projections, either as a Explore a range of options for streetscape specific building component or as improvements including special pavements, permanenUtemporary canopies; f V,, concrete tinting or scoring pattems, additional 4 9� y�J plantings, ornamental fencing and other Select materials that relate to the building use, features (note, however, that simpler is better not artificially contrived or themed; and and too much clutter is a negative). ,.�a., Include small scale elements, variety of Fumishings, landscaping, lighting, paving and Install significant coniferous buffer from materials and carefut detailing to support street signage create a quality environment Highway 100 with greater emphasis given to the level activities and enhance the pedestrian naturai edge of the site. experience. The entire site should be significantly landscaped to emphasize change, a variety of texture and scale, and enhance the proposed architecture of the project. 21 I Logan and 57th Development Guidelines C. NL Review and Approvals Process: Review Meetinas Review Three: The Ci has retained a desi n consu�tant to Review One: Ty 9 This is a continuation of the design review help interpret this document and to An initial introductory meeting will be scheduled process. The City anticipates that after this constructively review the developer's proposal by the applicant to meet the key city staff and review the design direction is clear and the in order to insure the architecture and site the city's design consultant. developer can move forward with the fina{ planning follow the intent of these Development presentation material for the planning Guidelines. This meetinq will have five obieetives: commission and council meetings. The Opportunity Site Task Force mission is to Answer questions about the Guidelines; Additional Reviews work with the developer(s) early in their schematic design process in orde� to avoid Outline the schedule; Only as necessary and as requested by the wasting time and money pursuing inappropriate C designs. We do not believe constructive design Verify the deliverables for the Approval critiques can happen at 10:30 at night in a Process; Design Sign-off: public meeting, in the council chambers. It is important to note that the review process will General review of the developers initial After the final design review meeting, the design focus on exterior design and site ptanning. design thoughts. The developer should consultant will submit a simple bullet-point Technical/engineering issues will be reviewed present past work that most closely overview of the proposed design. by the city staff. represents the direction they will be The planner will include this overview along with I proposing. It is assumed that the developer's the information packages issued to the experience and design skills have been commission and the councif. The consultant will No building permits wil� be issued without scrutinized by the City in the selection also identify any inconsistencies between the complying with codes, ordinances and other process; and proposed design and the Guidelines. The qualitative and quantitative regulatory planning commission's recommendation to the requirements. It is assumed that chosen Define the communication flow between the council will include their position on the developers have thoroughly read these developer, city inconsistencies. The Council will have final say Guidelines so they appreciate and embrace the and consultants. on project related disputes. design intentions. Review Two: As soon as the developer has generated sufficient drawings for a meaningful design review the developer will schedule a review with the ciry planner and design consultant. As previously stated, this review will focus on architectural design and site planning. 22