Loading...
HomeMy WebLinkAbout1992 04-23 FTFAMEETING NOTICE FINANCIAL TASK FORCE THURSDAY, APRIL 23, 1992 7 P.M. CITY COUNCIL CHAMBERS - CITY HALL 1. Financial Policies Discussion 2. Response to Service Prioritization Suggestions • ENCLOSURES: Memorandum from Sy Knapp High Technology Award from Hewlett-Packard Corp. SPECIAL NOTE: Please bring the draft of the Financial Policies which was included in the April 9, 1992, agenda packet to the meeting. 0 i CITY OF ROOK LY N CENTER FAX: 569-3494 EMERGENCY - POLICE - FIRE 911 • MEMORANDUM March 9, 1992 TO: G. G. Splinter FROM: Sy Knapp )K- SUBJ: Service Prioritization Suggestions Forwarded By Financial Task Force I have reviewed the several suggestions made by a resident and forwarded by a member of the Financial Task Force, and have also asked my supervisors and staff for their comments. The comments are summarized below. SNOW REMOVAL Use wings to reduce plowing passes per residential street from two/side to one/side All agree that if the snowfall is not too heavy, this would save plowing time. However, the down side is that capital outlay costs for properly equipped trucks would more than double. We now spend about $40,000 per truck with accessories. Other cities which use wings advise that the trucks must be heavier duty than our existing trucks. They estimate that a heavy duty truck so equipped would cost $70-90,000. Delay clearing of park parking lots to normal hours rather than overtime Supervisors indicate that park parking lots are cleared the same time as the rinks are cleared, and that overtime is rarely used. Review priority of sidewalk plowing routes. Do non priority routes during normal hours • It is true that some sidewalks probably don't need to be done right away. But, most of our sidewalks are considered high priority by the public. They are located on routes to school, near bus routes, in commercial areas, and near parks. r!!!~NCURN 6301 SHINGLE CREEK PARKWAY BROOKLYN CENTER, MINNESOTA 55430 TELEPHONE: 569-3300 • Page 2 Waiting to plow some sidewalks would have several disadvantages. Sidewalks that are walked on anyway become compacted, and the hardened snow and ice becomes more difficult to remove. Public safety could be affected as pedestrians walk in the streets to avoid an unplowed sidewalk; many sidewalks are located on busy streets. Finally, total time spent on sidewalk plowing would actually increase, as travel time to and from sidewalks is factored in. Has sanding of streets (low volume residential) effectively reduced the number of accidents - Also involves additional street sweeping in the spring We have not investigated the number of accidents on low volume residential streets. It is very difficult to assign accurate causes to many accidents. For most "fenderbender" type accidents, no police report is filed, and all that is recorded is the location of the accident, its type, and some other basic data. Therefore, it is impossible to say one way or another if sanding or lack of has made a difference in the number of accidents. Eliminating or reducing the sanding on low-volume streets would save time and materials. The street supervisor estimates it costs $400 per storm to sand residential streets. However, reducing or eliminating sanding would reduce the drivability of the streets, and may cause rutting, roughness, and poor drainage. Many intersections of residential streets are uncontrolled, and reduced sanding would make those intersections more dangerous. Clear or plow per policy - sometimes streets are plowed when less than 2" of snow has fallen The policy is adhered to regarding plowing, but sometimes it is necessary to scape two inches or less because wet snow will compact and turn to ice. If streets are not scraped under these conditions, the end result is more use of sand and salt, leading to more sweeping and jetting of sand from catch basins. Staff are evaluating the possibility of increasing the 2" limit to 3- 4", when the type of snow, weather, time, and other factors would make this feasible. STREET MAINTENANCE Sealcoat - CIP indicates an 8 year cycle - on low volume residential streets - may be too often - I've seen some streets go IS to 20 years without needing a new Sealcoat All agree that sealcoating done at the proper time is essential in preserving pavement life. In 1992 Brooklyn Center will be implementing a computerized Pavement Management Program (PMP), which will systematically evaluate the quality of pavement, and predict repair and Sealcoat need. Currently, streets are sealcoated cyclically, without "fine tuning" to reflect individual need. Obviously, some streets may not need sealcoating when their number comes up, while others have already deteriorated. The PMP will "fine tune" our pavement repair and sealcoating programs so that to the extent possible, only segments which are in need are repaired. and sealcoated, while others which can wait are not. Even under this program, it may still be determined to be most cost effective to group streets in one area of the City for sealcoating at the same time. However, the decision may be to go with several smaller areas of the City each year, rather than one large area. • Page 3 PARK MAINTENANCE Evaluate areas where grass could be left natural We believe that done correctly, this idea could work. However, we do have to be careful in selecting potential sites, and in establishing the right kind of turf and plantings. There may also be some labor involved in weed control and litter pickup. We will continue to evaluate this suggestion in more detail during the coming months. Reduce fertilizer - mow less If parks were fertilized once a year rather than twice, we could save about $1,000. Reducing fertilizer in parks has been forwarded to the City Manager, Financial Task Force, and City Council for their consideration. A reduction of fertilizer may not result in a proportionate reduction in mowing. Mowing needs are related to the amount and timing of rainfall received as well as to the amount of fertilizer. STREET RECONSTRUCTION Public Works Director is proposing a total reconstruction program. Curb and gutter looks nice - but is not as important as some engineers contend is The proposal for an ongoing program of Neighborhood Street Replacement, which would include the installation of curb and gutter, is based on a number of interrelated concerns. O First, many residential streets are 35-40 years old and are approaching the end of their useful life. A number of streets are even older, or are in poor condition. These streets will require reconstruction. O Second, we are currently developing our statutorily-required Local Water Management Plan. We expect that among the findings will be a need to improve our storm drainage system. Improvement will include installing or upgrading storm sewers where there are now none or where they are under capacity. Improvement will also include upgrading street drainage. Because Brooklyn Center is so flat, it may be necessary to install curb and gutter for no other reason than to get proper drainage. o Third, we do have a considerable maintenance problem resulting from a lack of curb and gutter. Street edges crumble and break from snowplow and weather damage and require repair. Boulevards are damaged from vehicles parking and driving on them, and from snowplows. Curb and gutter would eliminate this maintenance, which can be costly. O Finally, we believe that the fact that curb and gutter looks nice should be considered in the decision to install it. The Maxfield housing study conducted in 1990 indicated that the streets in Brooklyn Center without curb and gutter had an "unkempt appearance," which detracted from the marketability of homes located on them. . Page 4 As a developed, first ring suburb, we are all concerned that housing in Brooklyn Center is attractive and that our neighborhoods remain stable. The Neighborhood Street Replacement program would not only install curb and gutter where appropriate, it wold also upgrade public utilities where necessary and sidewalks where appropriate, and potentially add ornamental lighting, landscaping, and other amenities which would increase the attractiveness of our neighborhoods. We were very pleased that our 1990 alley paving projects in the southeast neighborhood spurred residents to fix fences, paint garages, plant gardens, and otherwise spruce up their alley and back yard areas. We believe that all these needs: pavement replacement, drainage upgrades, reduction in maintenance, and neighborhood improvement, would best be addressed with a Neighborhood Street Replacement program which would address all needs systematically and comprehensively, and which would include installation of curb and gutter. However, staff fully intends to provide opportunities for citizen participation in developing a street improvement program - through the Earle Brown Neighborhood Advisory Committee, through the Financial Task Force, and through a series of neighborhood meetings. An overlay is a reasonably priced maintenance technique which extends pavement life at least 10 years - perhaps more Agreed, so long as the base/sub-base of the street are adequate. If these elements are not adequate, it may be more cost effective to totally reconstruct the street. These are options and factors which will be included in the development of the Pavement Management Program. 0 0 • • Analysis of Service Costs 252 Unit Apartment Project Tax Capacity for pay1991 City Property Tax Paid (18.66% of Tax Capacity) Total HACA collected $1,082,408 Additional Tax to replace HACA (4.45% of Tax Cap.) Total LGA collected $1,679,415 Additional Tax to replace LGA (6.91% of Tax Cap.) Total--Tax on 252 unit Apartment Shopping Center-- 180,354 square feet Tax Capacity for pay1991 City Property Tax Paid (18.66% of Tax Capacity) Total HACA collected $1,082,408 Additional Tax to replace HACA (4.45% of Tax Cap.) Total LGA collected $1,679,415 Additional Tax to replace LGA (6.91 % of Tax Cap.) Total--Tax on 180,354 sf Shopping Center Office Building-- 111,907 square feet Tax Capacity for pay1991 City Property Tax Paid (18.66% of Tax Capacity) Total HACA collected $1,082,408 Additional Tax to replace HACA (4.45% of Tax Cap.) Total LGA collected $1,679,415 Additional Tax to replace LGA (6.91 % of Tax Cap.) Total--Tax on 111,907 sf Office Building pz4FJ' fl6 / 9z $5,857,900 $210,884 Per Unit Monthly Cost Monthly/Unit $39,350.95 $156.15 $3,279.25 $13.01 $9,384.34 $14.572.08 $63,307.38 $251.22 $5,275.61 $20.93 $12,322,400 $608,209 Per SF Monthly Cost Monthly/Unit $113,491.80 $0.63 $9,457.65 $0.05 $27,065.30 $42.027.24 $182,584.34 $1.01 $15,215.36 $0.08 $9,472,900 $468,909 Per SF Monthly Cost Monthly/Unit $87,498.42 $0.78 $7,291.53 $0.07 $20,866.45 $32.401.61 $140,766.48 $1.26 $11,730.54 $0.10 0 . (CCCTII) 1991 CITY TAXES PAID ON THE AVERAGE $74,000 ASSESSED VALUE HOME IN BROOKLYN CENTER Paid Directly by the Homeowner When Paying the Property Tax.... $ 149.28 Paid by Shared State Income and Sales Taxes: Agricultural Credit Adjustment (HACA) 35.60 Local Government Aid (LGA) 55.26 Total Taxes Paid (Direct and Shared) $ 240.14 TOTAL TAXES PAID PER MONTH $ 20.00 CITY SERVICES PROVIDED FOR $20.00 PER MONTH PUBLIC SAFETY $ 7.49 _ Police Protection Fire Protection Animal Control Emergency Preparedness - Planning and Inspection PUBLIC WORKS...... 4.50 Street and Sidewalk Snow Removal - Street Sealcoating Street Sweeping - Engineering Services - Street Lights Traffic Signals RECREATION.. Parks Maintenance - Children'sRecreation Programs 3.08 Teen's Recreation Programs - Adult Recreation Programs General Recreation Programs - Community Center HEALTH AND SOCIAL SERVICES.. . 0.23 Inspection Services and Environmental Health Programs GENERAL GOVERNMENT....................................... . . 3.20 Elections - Administration - Assessing - Finance - Legal Data Processing - Commissions - Building Maintenance PAYMENT ON DEBT..... . . Annual Payment for Principal and Interest for Past Years 1.50 Borrowing for Park Improvements and Equipment . TOTAL _COST _FOR_SERVICES _PER MONTH FROM TAXES $20_00 • (CCCTI2) 1991 CITY TAXES PAID ON THE AVERAGE $74,000 ASSESSED VALUE HOME IN BROOKLYN CENTER (WORK SHEET) TOTAL 1991 PAYABLE TAXES LEVIED IN 1990 TOTAL HACA COLLECTED IN 1991 TOTAL LGA COLLECTED IN 1991 TOTAL 1991 GENERAL FUND AND DEBT RETIREMENT EXPENDITURES OTHER REVENUE (EXPENDITURES LESS TAXES) CITY PROPERTY TAX PAID IN 1991 ON THE AVERAGE ($74,000) HOME IN BROOKLYN CENTER BY THE TAXPAYER TOTAL TAXES PAID THROUGH PROPERTY, SALES, AND INCOME TAXES ($149.28 DIVIDED BY 41.22%) PROPERTY TAX PAID BY TAXPAYER PROPERTY TAX SUBSIDISED BY HACA ($362.15 TIMES 9.83%) PROPERTY TAX SUBSIDISED BY LGA ($362.15 TIMES 15.26%) COST OF SERVICES Percent % of $20 $ 4,536,726 41.22% 1,082,408 9.83% 1,679,415 15.26% $ 7,298,549 66.32% 11,005,802 100.00% $ 3,707,253 33.680%, $ 149.23 $ 362.15 $ 149.28 35.60 55.26 $ 240.14 PUBLIC SAFETY 37.45% 7.49 PUBLIC WORKS 22.52% 4.50 RECREATION 15.39% 3.08 HEALTH AND SOCIAL SERVICES 1.16% 0.23 GENERAL 15.98% 3.20 DEBT RETIREMENT 7.50% 1.50 TOTAL 100.00% 20.00 0CTI3) CITY SERVICES PROVIDED FOR $20.00 PER MONTH (NET COST OF SERVICES WORK SHEET) - 1991 % of To 1991 % of 1991 1991 % of Approp- Approp- Allocate Adjusted Adj Estimated Net Net riations riations Unallocated Appropr Appropr Revenue Cost Cost GENERAL GOVERNMENT Council 76,276 0.74% 4,432 80,708 0.69% 80,708 0.90% Charter Commission 1,500 0.01% 87 1,587 0.01% 1,587 0.02% City Manager's Off 404,243 3.94% 23,486 427,729 3.66% 427,729 4.79% Elections 27,965 0.27% 1,625 29,590 0.25% 29,590 0.33% Assessing 198,007 1.93% 11,504 209,511 1.79% 209,511 2.35% Finance 387,897 3.78% 22,536 410,433 3.51% 410,433 4.60% Independent Audit 15,000 0.15% 871 15,871 0.14% 15,871 0.18% Legal Counsel 192,600 1.88% 11,190 203,790 1.74% 203,790 2.28% Government Bldgs 493,046 4.81% 28,645 521,691 4.46% 521,691 5.84% Data Processing 227,136 2.22% 13,196 240,332 2.05% 240,332 2.69% Total 2,023,670 19.75% 117,573 2,141,243 18.31% 714,400 1,426,843 15.98% PUBLIC SAFETY Police Protection 2,953,336 28.82% 171,585 3,124,921 26.72% 632,700 2,492,221 27.91% Fire Protection 652,646 6.37% 37,918 690,564 5.90% 85,000 605,564 6.78% finning & Inspect 304,809 2.97% 17,709 322,518 2.76% 167,800 154,718 1.73% rgency Prepared 73,560 0.72% 4,274 77,834 0.67% 5,000 72,834 0.82% Animal Control 23,501 0.23% 1,365 24,866 0.21% 5,600 19,266 0.22% Total 4,007,852 - - 39.11% 232,852 4,240,704 36.26% 896,100 3,344,604 37.45% PUBLIC WORKS - Engineering 457,990 4.47% 26,609 484,599 4.14% 104,500 380,099 4.26% Street Maintenance 1,034,330 10.09% 60,093 1,094,423 9.36% 109,600 984,823 11.031 Vehicle Maint 430,187 4.20% 24,993 455,180 3.89% 455,180 5.10% Traffic Signs/Sig 37,000 0.36% 2,150 39,150 0.33% 39,150 0.44% Street Lighting 143,000 1.40% 8,308 151,308 1.29% 151,308 1.69% Weed Control 3,000 0.03% 174 3,174 0.03% 2,500 674 0.01% Total 2,105,507 20.54% 122,328 2,227,835 19.05% 216,600 2,011,235 22.52% HEALTH AND SOCIAL - SERVICES - Health 91,900 0.90% 5,339 97,239 0.83% 22,000 75,239 0.84% Social Services 26,532 0.26% 1,541 28,073 0.24% - 28,073 0.31% Total 118,432 1.16% 6,881 125,313 - 1.07% 22,000 103,313 1.16% RECREATION Admin, Prks & Rec 309,878 3.02% 18,004 327,882 2.80% 327,882 3.67% ult Programs 304,015 2.97% 17,663 321,678 2.75% 314,152 7,526 0.08% en Programs 13,975 0.14% 812 14,787 0.13% 9,400 5,387 0.06% Children's Program 76,386 0.75% 4,438 80,824 0.69% 57,448 23,376 0.26% General Programs 87,253 0.85% 5,069 92,322 0.79% 28,425 63,897 0.72% Community Center 456,872 4.46% 26,544 483,416 4.13% 325,120 158,296 1.77% Parks Maintenance 744,674 7.27% 43,265 787,939 6.74% 787,939 8.82% Total 1,993,053 19.45% 115,794 2,108,847 18.03% 734,545 1,374,302 15.39% - SUB TOTAL 10,248,514 100.00% 595,427 10,843,941 92.71% 2,583,645 - 8,260,296 - 92.50% ECONOMIC DEVELOP 183,000 0.00% 0 183,000 1.56% 183,000 0 0.00% 'ALLOCATED 595,427 0.00% (595,427) 0 0.00% 0 0 0.00% EBT RETIREMENT 669,363 0.00% - 0 669,363 .5.72% - 0 669,363 7.50% TOTAL 11,696,304 100.00% 0 11,696,304 100.00% 2,766,645 8,929,659 100.00% =saaa xxxaaaaaaax aaaaaaaa aaxxaoaaa aa=aaa=xaa oxaaaaa a=aaaaxaa _axxaacaas aaa=aas