HomeMy WebLinkAbout2006-112 CCRMember 4y. La man introduced the following resolution
and moved its adoption:
RESOLUTION NO. 2006-112
RESOLUTION ESTABLISHING 2007 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, the residential assessment rates for street and storm drainage
improvements are annually reviewed and approved by the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the 2007 street and storm drainage assessment rates for R-1, R-2 and R-
3 zoned districts are based on a specific proportion of 40 percent of the average cost for street and
storm drainage improvements; and
WHEREAS, the R-4, R-5, R-6 and R-7 zoned districts will continue to be assessed
based on an evaluation of project cost and project benefit; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that:
The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in R-1, R-2 or R-3 zoned districts. These
rates shall also be applied to parcels of property in other land use zones when such
parcels (a) are being used as one-family or two-family residential sites at the time the
assessment roll is levied; and (b) could not be subdivided under the then-existing
Subdivision Ordinance.
2. The residential assessment rates for street and storm drainage reconstruction effective
January 1, 2007 shall be as follows:
Land Use
R-1 zoned, used as one-family
site that cannot be subdivided
Land Use
2007 Assessment Rates
$3,200 per lot (street)
$960 per lot (storm drainage)
2007 Assessment Rates
RESOLUTION NO. 2006-112
R-2 zoned, or used as a two-family
site that cannot be subdivided
R-3 zoned (per unit)
$42.67 per front foot with a
$3,200 per lot minimum (street)
$12.80 per front foot with a
$960 per lot minimum (storm drainage)
Assessable frontage x $40.51 (street)
Number of residential units
Assessable frontage x $12.53 (storm)
Number of residential units
3. The residential assessment rates for street and storm drainage reconstruction shall not
apply to R-4, R-5, R-6 or R-7 zoned districts. The assessment rates for street
reconstruction for R-4, R-5, R-6 or R-7 zoned property shall be based on an
evaluation of the project cost and the project benefit for each project.
October 9. 2006 Date Mayor 4
ATTEST: 1" 111PC
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
Kathleen Carmody
and upon vote being taken thereon, the following voted in favor thereof:
Myrna Kragness, Kathleen Carmody, Kay Lasman, and Diane Niesen;
and the following voted against the same: Mary 0' Con or;
whereupon said resolution was declared duly passed and adopted.
1