Loading...
HomeMy WebLinkAbout1981-06 06-08 CCO CITY OF BROOKLYN CENTER ORDII A13CE NO. ai-6 AN ORDINANCE AMENDING CHAPTER 3 OF THE CITY ORDINANCES ADOPTING THE 1980 MINNESOTA STATE BUILDING CODE BY REFERENCE AND DELETING PERMIT FEES THE CITY COUNCIL OF THE CITY OF BROOKLYN CENTER DOES ORDAIN AS FOLLG�jS: Section 1. Chapter 3 of the City Ordinances of the City of Brooklyn Center is hereby amended as follows: Section 3 -101. ADOPTION OF THE MINNESOTA STATE BUILDING CODE. The City of Brooklyn Center hereby adopts by reference those State Regulations [S.B.C. 101 through S.B.C. 8901] 242AR 1.10101 through 2MCAR 1.18901 collectively known as the Minnesota State Building Code, filed with the Secretary of State and the Coriviissioner of Administration [on January 6, 1972, and subsequent amendments to those regulations duly adopted and filed by the State Department of Administra tion three copies of which Code shall be on file and available for inspection in the Office of the City Clerk. Those regulations, combined with the provisions of this Chapter of the City Ordinances shall hereinafter be known as the "Building Code on September 9, 1980. The following codes are adopted by reference as part of the 1980 Minnesota State Buildinq_Code: .(A� 1979 Edition of the Uniform Building Code, identified as the "UBC." B` 1978 National Electric Code,_ identified as "NEC._" (C) 1978 American National Standard Safety Code for elevators, dumb waiters, escalators, and moving walks, identified as "ANSI A17. 1-1978, and su_pp L ements ANSI A17.12- 1979. (D) 1979 Minnesota Plumbing Code, identified as "FED 120 through MEID 135." (E) Flood Proofini� Regul.ations (ITPR) Office of the Chief Engineers, U.S. Army. oe (F) 1975 Edition of the One and T u family Dwelling Code. (G) 1976 Edition of the Heatincr, Ventilatinq, Air Conditioning and Refrigeration Code, identified as SBC 7101 throuqh SBC 8505. (H) The following mandatory appendices, annexes, and suppleluental material listed in this code: (1) Minnesota State Building Code, Appendix "A identified as "Technical Requirements for Fallout Shelters (applying only to State owned building). (2) Minnesota State Building _Code, Appendix "B", identified as "Variation in Snow Loads." (3) 1979 UBC Appendix," as "Sound Trans- mission Control." Minnesota Plumbing Code, Appendix "B identified as as Mumbinq Illustrations." Section 3-101 continued Three copies of the 1980 Minnesota State Building Code shall be on file and available for inspection in the Office of the Citv Clerk. Those :i7qqulations combined with the of this Chapter of the City Ordinances -shall --here-n inafter as the known "Building Code." Section 3-103 (G) Permit Fees. (1) Building Permit Fees. The fee for any building permit shall be determined [according to the provisions of Section 303 of the edition of the Uniform Building Code, Volume 1, currently refer- enced by the Minnesota Building Code.] by the fee schedule adopted by City Council Resolution based on the valuation of each building. idle building valuation referred to therein shall be computed using the up-to-date average construction cost per square foot established from time to time by the State Building Inspector. (2) Plumbing Permit Fees. Fees for plumbing permits shall be [computed on the basis of the number of plumbing fixtures and devices and of the type of system or plumbing work as set forth below.] as set forth by City Council resolution for each type of plumbing fixture, plumbing system or service work. For the purpose of this ordinance a plumbing fixture is defined as a device intended to be connected to the plumbing system, such as any sink, laundry tub, bathtub, wash basin fountain, floor drain,water closet, water heater or any other such devices. [There shall be a minimum permit fee of $10.00.] [Plumbing fixtures instal-led 5.00] [Plumbing fixture opening for future installation 4.00] [Catch basin installed 10.00] [Water heater installed 5.00] [Ground run to building 10.00] [Rainwater leader 5.00] [Installation of water treating or filter device 7.00] [Potable water well drilling 15.00] [Irrigation connection 15.00] [Repair or alteration of existing plumbing or 30 of estimated water distribution system cost] [Fire Suppression Systems] [Standpipes, 1-3 floors 15.00] [Each additional floor 1.50] [Automatic Sprinklers, 1st floor 30.00] 4 0 [Each additional floor 10.00] Section 3 -103 (G) (2) continued [The fee on any new single family dwelling plumbing system including fixtures, devices, openings, and water piping shall be $30.00.] [A plumbing permit shall be required for gas piping; the permit fees are set forth below. Fees for gas fitting of applicances and heating systems are set forth under Mechanical System Permit Fees (Section 3 -103 (G) (4).] [Up to 2 -inch diameter pipe] [1 -3 openings 3.501 [Each additional opening 1.501 [2 -inch and over diameter pipe] [1 -3 openings 10.001 [Each additional opening 2.00] (3) Electrical System Permit Fees. Fees shall be calculated and paid according to the [following] schedule set forth by City Council resolution. [There shall be a minimum permit fee of $10.00.1 [(a) Services, changes of services, temporary services, additions, alterations or repairs on either primary or secondary services shall be computed separately. In the case of services in excess of 230 volts, the following fee amounts shall be doubled.] [0 to and including 60 amp capacity 5.001 [61 to and including 100 amp capacity 6.001 [101 to and including 200 amp capacity 7.501 [For each additional 100 amp capacity or fraction thereof 3.001 [(b) The fee for circuits installation of, additions to, alterations of or repairs of each circuit or sub feeder shall be computed separately, including circuits fed from sub feeders and including the equipment served, except as provided for in items (c) through (h). In the case of services in excess of 230 volts, the following fee amounts shall be doubled.] [0 to and including 30 amp capacity (maximum number of 0 to 30 amp circuits to be paid on is 30 in any one cabinet) 1.501 [31 to and including 100 amp capacity 3.001 [For each additional 100 amp capacity or fraction thereof 1.001 [(c) The fee on any new single family dwelling electrical system, including service, feeders, circuits, fixtures and equipment shall be $30.00.] Section 3 -103 (G) (3) continued [('d) The fee on a new multiple family dwelling building shall be $14 per dwelling unit for the first 20 units and $10 per dwelling unit for the balance of the units.] [(e) In addition to other fees, all transformers and generators for light, heat, and power shall be computed separately at $4 per unit plus $.25 per IOTA up to and including 100 KVA and $.25 per KVA for 101 KVA and over. The maximum fee for any transformer or generator in this category shall be $40.] [(f) In addition to other fees all transformers for signs and outline lighting shall be computed at $6 for the first 500 VA or fraction thereof per unit, plus $.20 for each 100 VA or fraction thereof in excess of 500 VA per unit.] [(g) In addition to other fees, (except dwellings) remote control, signal circuits, and circuits of less than 50 volts shall be computed at $5 per each ten openings or devices of each system plus 50� for each additional ten or fraction thereof.] [(h) For special inspections or services, or for reinspections of improper work, the Building Official may impose such additional charges as are reasonably related to the cost of providing the service (4) Mechanical System Permit Fees. Fees shall be paid according to the [following] schedule[:] set forth by City Council resolution. ;(a) Installation, alteration, reconstruction, or repair of any heating, ventilating, comfort cooling, or refrigeration equignent, shall be computed on the basis of the estimated cost of the proposed work, except as herein provided.] [Up to and including $500 5.001 [Over $500 but not over $50,000 2% of valuation] [Over $50,000 1% of valuation] [(b) A mechanical permit shall be required for gas pipe fitting for connection to any gas burning device, except as herein provided; the fees are set forth below. Fees for gas piping are addi=- tional and are set forth under Plumbing System Permit Fees (Section 3 -103 (G) (2) The appropriate fee for gas water heaters shall be applied to the plumbing permit rather than a mechanical permit. The permit fee for installing each gas stove, range, water heater, process burner, or similar gas burning device not used in connection with a heating system shall be:] [Input (B.T.0 _Is [Not exceeding 99,999 7.001 [100,000 199,000 12.001 [200,000 399,000 24.001 [400,000 599,000 35.001 [600,000 999,000 48.001 [Over 999 000 use gas burner/heating system fee schedule f)elow.] Section 3 -103 (G) (4) (b) continued [The permit fee for installing gas burners and fittings for use in connection with a heating system shall be;] [Input (B.T.U.'s)] [Up to 999,000 use gas appliance /nonheating schedule, above.] [1,000,000 2,449,000 $80.001 [2,500,000 9,999,000 96.001 [10,000,000 49,999,000 140.001 [50,000,000 74,999,000 180.001 [75,000,000 and over 240.001 [(c) A mechanical permit shall be required for the installation, for the removal, and for the replacement of any in- ground or above ground tanks or vessels and related piping used for the storage of gaseous or liquid fuels or chemicals. Permit fees shall be:] [Above ground new installation $25.001 [In- ground new installation 35.001 [Above ground removal 15.00 [In- -ground removal 25.001 [Replace like tank to existing system 25.001 [(d) It is not intended that permits shall be required for portable heating, ventilating, comfort cooling, or refrigeration equip- ment, nor for the replacement of any component part or assembly of an appliance which does not alter its original approval and which complies with other applicable requirements of the Building Code Section 2. This ordinance shall become effective after adoption and upon thirty (30) days following its legal publication. Adopted this 8th day of June 1981 Mayor' ATTEST: 'Clerk Date of Publication 5 -28 -81 Effective Date 6 -27 -81 (Brackets indicate matter to be deleted, underline indicates new matter.)