Loading...
HomeMy WebLinkAbout2006-009 Planned Unit Development -' City of Brooklyn Center �' . Planning Commission Application C Date Received Application No. Please Print Clearly or Tvoe 4 Z 15 (A r" /I'VE 1J ; (c 100 B RWV-LI Ytj 8L\lb Address /Street Location of Property 4101 (0e) Ot A'vt N (o �W 69,00K -1_yt4 aL -\j.D Legal Description of Property ,MF ' fJ - ? � s Owner se Phone No. x(93 Address ZI ia� A A11E - 5 ) � IF, Uk); QOL -J - Zt� VA• W1 tJ jSijI(,o FAX No. qfo; Applicant I tiE Li)Tl (kl2 M pLK Y LI M ITD t�R�2 T15t It 1 P Phone No. - 5�?3 5 3 Address al )(QS Ifs A F-- .5, ZZD; t� OW VAU-C P3�, I (, FAX No. z3 5-i3 Q Type of Request: ❑ Rezoning ($1050) ❑ Special Use Permit ($200) ❑ Subdivision Approval ($300) ❑ Site & Building Plan Approval ($750) Planned Unit Development ($1800) ❑ Appeal ($200) ❑ Variance ($200) ❑ Other: Description of Request: Application Fee $ 1 Wo Acct No. 10100 - 4403 Receipt No. The applicant requests processing of this application and agrees to pay to the City of Brooklyn Center, within fifteen (15) days after mailing or delivery of the billing statement, the actual costs incurred by the City for Engineering, Planning and Legal expenses reasonably and necessarily required by the City for the processing of the application. Such costs will be in addition to the application fee described herein. Withdrawal of the application will not relieve the applicant of the obligation to pay costs incurred prior to withdrawal. Applicant (Please Print) Applicant's S ature City Use Only PLANNING COMMISSION RECOMMENDATION. City Use Only Dates of P. C. Consideration Action Taken Approved ❑ Denied this % �i day of l�f r r s i' 20, subject to the following conditions: G'•. Chairman ---------------------------------------------------------------------- CITY COUNCIL ACTION Dates of Council Consideration _ 0 -� Action Taken Approved ❑ Denied this day of �� 20 with the following amendynent: , e n .--- i Clerk I< i CITY OF BROOKLYN CENTER 6301 Shingle Creek Parkway Brooklyn Center, MN 55430 PROCEDURES AND REQUIREMENTS FOR FILING APPLICATION FOR SITE AND BUILDING PLAN APPROVAL Prior to submission of an application for plan review and approval, prospective applicants should arrange an informational meeting with the Planning Staff to discuss preliminary plans and to become familiarized with applicable ordinance and policy provisions. Four (4) copies of the following documents and information will be submitted, at least 14 days prior to the date of the regular Commission meeting, concurrent with filing the application (required documents must be consistent with ordinance and policy provisions before an application may be accepted): 1. A certified site survey drawing by a registered engineer or land surveyor showing pertinent existing condition, accurately dimensioned. 2. *An accurately scaled and dimensioned site plan indicating: a) parking layouts and access provisions, including calculation of ordinance parking requirements; b) designations and locations of all proposed buildings and required setback lines; c) fences, walls or other screening, including heights and type of material; d) outside lighting provisions, type and location (foot candle strength at property line must be calculated); e) curbing (B612 curb and gutter is required). Indicate radius measurements; f) building information, including: gross floor area, type of construction and occupancy classification. 3. *A landscape plan showing areas to be sodded or seeded, quantity, location, size and species of trees and shrubbery. (Note: Underground irrigation is required in all landscaped areas in commercial and industrial districts. Plans must be so noted.) 4. *Building floor plans, elevations, sections and specifications, including materials proposed. 5. *Existing and proposed land elevations, drainage provisions, and utility provisions, including the diameters of utility lines. 6. Additional drawings, plans or information deemed necessary by the Secretary. *Must be prepared by a registered architect or person registered with the State Board of Registration for Architects, Engineers, Landscape Architects and Land Surveyors, and said drawings /plans will be so certified. NOTE: Upon approval of plans by the Council and prior to issuance of permits, a Performance Agreement as to approved site improvements and a supporting financial guarantee, in an amount to be determined by the City, are required. Acceptable financial instruments include cash escrow; certificate of deposit; and performance bond. Copies of the Zoning Ordinance may be obtained from the Administrative Office. Questions should be directed to the Planning and Zoning Specialist at 763 -569 -3330. Procedures &Requirements for Filing Application for Site & Bldg Plan Approval Revised 5 -05 ■ Planning Commission Application For Subdivision Approval City of Brooklyn Center Supplemental Information: Property Address PID Legal Description Proverty Owner Contact Info 4215 69`" Avenue N 34- 119 -21 -21 -0008 Chrysler Realty Addition The Luther Company Ltd Part Linda McGinty Brooklyn Center, MN 55429 Lot 1 Block 1 701 Xenia Ave S, Ste 220 763 -593 -5755 Golden Valley, MN 55416 6800 Brooklyn Blvd 34- 119 -21 -21 -0032 Bri Mar Addition (i ft KL.Y Iv 8L v o LLC' Linda McGinty Brooklyn Center, MN 55429 Lot 1 Block 1 104 X.04A ME �, 4 t' yZO 763 -593 -5755 6700 Brooklyn Blvd 34- 119 -21 -21 -0033 Bri Mar Addition Brooklyn Leasing LLC Linda McGinty Brooklyn Center, MN 55429 Lot 2 Block 1 701 Xenia Avenue S, Ste 220 763 -593 -5755 Golden Valley, MN 55416 4l0( togTH AN rr N 34• 00K APMR' -us *25 410( 901 - 11i"c K o o1<LyI cz A M q0 j ?mil Aptt s,S1E L1N JIt no CAW : y ' Z�1 C-A Da-► V 4LL- ey 1 -1I1 93 16,