Loading...
HomeMy WebLinkAbout2005 06-16 PCP PLANNING COMMISSION AGENDA CITY OF BROOKLYN CENTER JUNE 16, 2005 REGULAR SESSION 1. Call to Order: 7:30 p.m. 2. Roll Call 3. Approval of Minutes - May 12, 2005 4. Chairperson's Explanation The Planning Commission is an advisory body. One of the Commission's functions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. 5. LHB 2005 -010 • Request for Rezoning from CIA to PUD /C1A and Development Plan approval through the Planned Unit Development (PUD) process for a 250 room hotel and water park on a 6.2 acre site to be addressed as 6300 Earle Brown Drive. 6. Other Business 7. Adjournment planning \plancom \agenda. frm agenda.dat Application Filed on 5 -19 -05 i City Council Action Should Be Taken By 7 -18 -05 (60 Days)` Planning Commission Information Sheet Application No. 2005 -010 Applicant: L H B Location: 6300 Earle Brown Drive Request: Rezoning/Development Plan Approval- PUD /C1A The applicant, Scott Anderson on behalf of L H B Architects, is seeking rezoning from CIA (Service - Office, no height limit) to PUD /C1A (Planned Unit Development/Service- Office, no height limit) of a vacant 6.2 acre site located on the east side of the west leg of Earle Brown Drive adjacent to the Earle Brown Heritage Center. (Property will be addressed as 6300 Earle Brown Drive.) This application also involves development plan approval through the Planned Unit Development (PUD) process of a 250 room hotel containing a 100 seat restaurant and an enclosed attached water park facility. The property in question is currently zoned CIA and is bounded on the west and north by Earle Brown Drive with a six story office building and I -94 right of way on the opposite sides of that street; on the east by the Earle Brown Heritage Center; and on the south by another high rise office building (City County Federal building). The City Council has long been concerned about the potential development of this property and its effect on adjacent and adjoining properties. Eventually the City's Economic Development • Authority (EDA) acquired the site for the purpose of controlling potential future development. The City Council/EDA has aggressively pursued the development of a hotel on the property since the time of the Calthorpe Smart Growth study of a number of years ago, which recommended such a use in this area. Discussions with potential developers have led to the EDA entering into a development agreement with Oliver Companies for a combination hotel/water park on this site. Earlier this year the City Council, after recommendation by the Planning Commission, approved an ordinance amendment allowing transient lodging and associated uses as permitted uses in the C1A zoning district. This action makes the hotel use consistent with the zoning ordinance and the Comprehensive Plan for this area which recommends office /service business uses for this area. The applicant's plan as part of this Planned Unit Development is to build a four and six story, 250 room hotel containing a 100 seat restaurant attached to a four story high water park facility. The hotel would be attached to the east of and south of the enclosed 32,000 sq. ft. water park feature. An enclosed walkway connection between this complex and the Earle Brown Heritage Center would also be made tying the two facilities together for their joint benefit. The applicant is seeking the PUD /CIA rezoning to accommodate the above hotel/water park facility. The CIA underlying zoning designation is proposed because it acknowledges the 6 -16-05 Page 1 r proposed use as a permitted use in the zoning district. The applicant is seeking modifications to the CIA requirements to allow no 15 ft. green strip along the Earle Brown Drive street right of way. This modification is proposed to make a more efficient use of the site which is slightly smaller than necessary to accommodate parking and landscaping requirements. The applicant has not proposed site considerations to off set or mitigate the negative aspects of the plan. Plan considerations will be offered to off set this that are consistent with previous approvals or encroachments into the 15 ft. green strip requirement. The land in question is acknowledged in the Comprehensive Plan as being appropriate for office /service business (CIA) uses. Transient lodging and associated uses are permitted in the CIA district, therefore, the proposal is considered consistent with the Comprehensive Plan. As the Commission is aware, a Planned Unit Development proposal involves the rezoning of land to the PUD designation followed by an alpha numeric designation of the underlying zoning district. This underlying zoning district provides the regulations governing uses and structures within the Planned Unit Development. The rules and regulations governing that district (in this case CIA) would apply to the development proposal. One of the purposes of the PUD district is to give the City Council the needed flexibility in addressing development and redevelopment issues. Regulations governing uses and structures may be modified by conditions ultimately imposed by the City Council on the development plans. As mentioned in this case, the applicant is seeking modifications to allow no 15 ft. green strip along the Earle Brown Drive street right of way. The City Council has previously allowed encroachments into the 15 ft. green strip requirement • along street right of way when an approximate 3 %2 to 4 ft. high decorative fence has been provided to off set the lack of buffer area between the street and adjacent parking lots. Such was the case at the 69 and Brooklyn Boulevard redevelopment where a combination pier and wrought iron fence was provided in areas where the green strip was less than 15 ft. The Super America Planned Unit Development on 57 Avenue and Logan provided a similar feature. We have discussed with the applicant the possibility of providing some type of fencing in this area and have suggested that used in the 69 b and Brooklyn Boulevard and SA developments as an example or the possibility of extending the wood rail fence associated with the Earle Brown Heritage Center all along the abutting Earle Brown Drive right of way. Their landscape plan, as will be shown later, proposes landscaping in the Boulevard portion of the street right of way. This landscaping and fencing should provide an appropriate buffer to off set the lack of 15 ft. of green strip in this area. The Planning Commission's attention is directed to Section 35 -355 of the City's Zoning Ordinance, which addresses Planned Unit Developments (attached). REZONING The PUD process involves a rezoning of land and, therefore, is subject to the rezoning procedures outlined in Section 35 -210 of the zoning ordinance as well as being consistent with the City's Rezoning Evaluation Policy and Review Guidelines contained in Section 35 -208. The Policy and Review Guidelines are attached for the Commission's review. The applicant has 6 -16 -05 Page 2 submitted written comments relating to the Rezoning Evaluation Policy and Review Guidelines • (attached). As with all rezoning requests, the Planning Commission must review the proposal based on the Rezoning Evaluation Policy and Review Guidelines contained in the zoning ordinance. The policy states that zoning classifications must be consistent with the City's Comprehensive Plan and must no constitute "spot zoning" which is defined as a zoning decision which discriminates in favor of a particular land owner and does not relate to the Comprehensive Plan or accepted planning principals. Each rezoning proposal must be considered on its merits and measured against the city's policy and against the various guidelines which have been established for rezoning review. The following is a review of the rezoning guidelines contained in the zoning ordinance as we believe they relate to the applicant's comments and their proposal. A. Is there a clear public need or benefit? The applicant comments that the addition of a full service hotel is viewed as a major asset to the Earle Brown Heritage Conference Center. He notes that their proposal will give the Earle Brown Heritage Center the ability to attract a new level of client to the facility, which can improve its position in the conference, meeting and convention market. It is the staff s opinion that this redevelopment proposal can be seen as meeting a clear and public need or benefit if it is consistent with the redevelopment criteria • established by the City and also is consistent with the City's Comprehensive Plan. The proposal should balance the business needs of the adjoining Earle Brown Heritage Center and the adjoining properties in this area. As mentioned previously, the Calthorpe study recommended a hotel for this site and the recent Opportunity Site study considers this a positive for the development and redevelopment of this area. This hotel/water park proposal should be a positive factor in providing benefits to the Earle Brown Heritage Center as the Earle Brown Heritage Center will provide positive reinforcement for the hotel/water park. The City Council/EDA has actively pursued such a use of this property and the proposal is seen as providing a public need or benefit. B. Is the proposed zoning consistent and compatible with the surrounding land use classifications? The applicant comments that the project is a permitted use within the C1 zoning classification and will provide substantial support functions for the surrounding land uses. The staff would concur with these comments. As mentioned previously, the zoning ordinance was recently amended to allow transient lodging and associated uses as a permitted use in the CIA zoning district. The CIA zoning district allows 6 -16 -05 Page 3 service/office uses in buildings without a height limit such as in he C 1 zoning district. • In the C1 zoning district buildings are limited in height to three stories. The office buildings on the west side of Earle Brown Drive and south of the site in question are ` all over six stories in height. The hotel portion of the proposed facility would be four stories and six stories in height while the water park feature connecting the two portions of the hotel would be four stories high. Building wise, this facility is consistent and compatible with the surrounding land uses. A physical connection is proposed between the new facility and the Earle Brown Heritage Center for the joint benefit of the two uses. C. Can all proposed uses in the proposed zoning district be contemplated for development of the subject property? The applicant answers simply yes. We would concur noting that consideration of the proposed uses was undertaken at the time the City Council amended the zoning ordinance to allow transient lodging and associated uses as a permitted use in the C1A zoning district. D. Have there been substantial physical or zoning classification changes in this area since the subject property was zoned? The applicant notes that they are not aware of substantial physical or zoning • classification changes in the area, but comments relative to the recent change in the CIA zoning classification. The staff would comment that the CC Central Commerce Overlay District has been expanded to include this area, however, there has been no other recent zoning classification changes in the immediate area. This area was rezoned to C 1 A in the mid to late 1980's to acknowledge high rise service/office commercial uses in this area. Prior to that time the property had been zoned I -1 (Industrial Park) and commercial development was handled through the granting of a special use permit. The City Council at that time felt the high rise development was appropriate and the buildings in this are reflect that. E. In the case of city initiated zoning proposals, is there a broad public purpose evident? The applicant comments that this is not a city initiated rezoning proposal. Although this is not a city initiated proposal, the city has pursued the development of a facility such as this for this site over a number of years. 6 -16 -05 • Page 4 � __ r F. Will the subject property bear fully the ordinance development restrictions for • the proposed zoning district? The applicant simply comments yes to this guideline. The staff believes that the subject property will, for the most part, bear fully the development restrictions for this Planned Unit Development with some deviations from the standard ordinance requirements. We have previously noted the request from the applicant for no 15 ft. green strip along the Earle Brown Drive right of way. A condition of approving the plans for this development should provide for some type of fencing/screening in this area such as that approved in the 69'' and Brooklyn Boulevard redevelopment or as has been suggested an extension of the wood rail fence similar to that surrounding the Earle Brown Heritage Center. The use itself seems compatible with the Earle Brown Heritage Center and, in fact, complimentary to as well. The Heritage Center is also considered compatible with and complimentary to the hotel/water park facility. G. Is the subject property generally unsuited for uses permitted in the present zoning district with respect to size, configuration, topography or location? The applicant notes that the site is generally suited to the use proposed except with respect to size. The project site is slightly smaller than necessary to meet the parking and landscape buffer requirements. The subject property is not unsuited for uses allowed in the present zoning district with respect to size, configuration, topography or location. Service /office uses would be appropriate in this area and a building of the height and bulk of the proposed hotel facility certainly fits into this site. The site is impacted by a curved roadway which makes it slightly more difficult for development. Topography and location do not cause problems with respect to the development of the property. It is a site suited for the uses allowed in the C1A zoning district of which the proposed hotel/water park are permitted uses. H. Will the rezoning result in an expansion of the zoning district warranted by 1. Comprehensive Planning; 2. Lack of developable Land in the proposed zoning district, or; 3. the best interest of the community? The applicant notes that the rezoning will not result in the expansion of a zoning district. The staff would note that the proposal appears to have merit beyond just the particular interests of the developer and should lead to a development that can be considered consistent and compatible with surrounding land uses as well as the City's Comprehensive Plan. It is also believed to be in the best interest of the community • 6 -16 -05 Page 5 with respect to the compatibility of the City's Earle Brown Heritage Center and this • facility. Both should prove beneficial to the other. I. Does the proposal demonstrate merit beyond the interests of an owner or owners of an individual parcel? The applicant responds that the addition of a full service hotel gives the Earle Brown Heritage Conference Center the ability to attract a new level of clientele to the facility which can improve its position in the conference, meeting and convention market. They note that successful conference centers help a community become more attractive and prosperous and create opportunities to introduce growth and investment that will stimulate economic growth as visitors are potential investors and consumers. We would concur with the applicant's comments with respect to this guideline. We do believe that the proposal has merit beyond just the particular interests of the developer and will lead to a development that can be considered consistent and compatible with surrounding land uses and should be beneficial to the Earle Brown Heritage Center and be in the general interests of the community. SITE AND BUILDING PLAN PROPOSAL 40 As mentioned previously, the proposal is for a four and six story 250 room hotel with a 100 seat restaurant attached to a four story high, 32,000 sq. ft. water park facility. An enclosed walkway would connect the new facility to the Earle Brown Heritage Center. The water park feature will not be open to the public generally. It is designed for the use of patrons and patrons of the Heritage Center. The restaurant will, however, be open to the general public. No conference rooms or meeting rooms will be offered in the hotel. The Earle Brown Heritage Center/ meeting rooms will serve the needs of the hotel. The water park will be located in a 32,000 sq. ft. enclosed space that is four stories high. The building meets setback requirements and takes advantage of a provision in the zoning ordinance that allows a commercial building to be as close to an interior property line as three feet rather than ten feet, provided that the exterior wall of the building conforms in all respects with the requirements of the State Building Code. This wall is located along a portion of the east property line adjacent to a Heritage Center Building. The applicant and the City's Building Official have met to discuss this matter. The Building Official believes it may be necessary to have a clear area between the hotel and the existing Heritage Center building. After determining what the distance might be, it may be necessary to provide a deed restriction on the Heritage Center property preventing buildings from being constructed in this area. This will need to be reviewed further and recommendations from the Building Official will be based on code compliance and building construction considerations. 6 -16 -05 • Page 6 . ACCESS/PARKING Access to the site will be at four locations along Earle Brown Drive. Two of the access points are shared accesses, one with the City Council Federal building to the south and the other to the Earle Brown Heritage Center to the east. The two non - shared accesses line up with the access drives across Earle Brown Drive serving the office buildings on the opposite side of the street. A total of 350 parking spaces are provided based on hotel, restaurant and employee parking requirements. The zoning ordinance requires one parking space for ever hotel room and one parking space for every hotel employee at the maximum shift. The restaurant parking formula is one space for every two restaurant seats and one space for every restaurant employee. The employee count for the hotel and restaurant at the maximum shift is 50 employees. A total of 350 parking spaces are, therefore, required and provided. The plans indicate a parking width of 8 ft. rather than the required 8 ft. 8 in. Adjustments must be made to meet the minimum requirements which in turn may effect meeting the parking requirements. Parking spaces are provided around the north, west and south portions of the building. Driving lanes are aligned as best as possible with adjoining parking lots at the Earle Brown Heritage Center and the City County Federal building. Concrete parking delineators are provided to form the drive lanes accessing the building. A canopy for a drop off area is provided to the hotel by the main entrance on the north side of that building. A service area is to be provided along the east side of the hotel. The connection to the Earle Brown Heritage Center is along the south wall • of the hotel connecting to the water park as well. Parking and driving areas will be bound by B- 618 curb and gutter as indicated on the plan. GRADING/DRAINAGE/UTILITIES The applicant has provided preliminary grading, drainage, utility and erosion control plans which are being reviewed by the Director of Public Work/City Engineer. Attached is a copy of his written comments with respect to this proposal. The site is approximately 6.2 acres and, it is my understanding, that it will be required to have a formal Watershed Management Commission review. Storm sewer will be provided throughout the site to collect storm water to be conveyed into an existing pond that serves the City County Federal building and the Earle Brown Heritage Center. Calculations need to be submitted to show that this pond is sufficient to handle drainage from this site. It was originally designed to meet the Watershed standards in the mid 1980's when the Earle Brown Heritage Center was redeveloped and the office building to the south was developed. These matters will need to be verified prior to the issuance of building permits for the property. Sanitary sewer and water are available within the Earle Brown right of way and sewer and water connections are made to the building at three different locations as shown on the utility plan. The Director of Public Works notes that the existing 8 in. sanitary sewer is not adequate to serve the proposed hotel/water park development. Earle Brown Drive is proposed for reconstruction in 2006 and the existing sanitary sewer could be replaced with 12 in. sewer if authorized by the City Council. 6 -16 -05 Page 7 A Traffic Impact Study for the proposed hotel/water park was completed by Bensboof and . Associates, Inc. and it attached with the memo indicating that existing facilities will be able to adequately accommodate the traffic generated by this proposed development. The Commission's attention is directed to the Director of Public Works' memo relating to the proposed development. LANDSCAPING The applicant has submitted a landscape plan in response to the landscape point system utilized by the Planning Commission to evaluate such plans. The site is 6.2 acres and requires 412 landscape points. The landscape plan provided shows a total of 375 points and indicates a point requirement of only 374 points. The landscape plan should be revised to provide an additional 37 landscape points to meet the minimum 412 required. The landscape plan relies more heavily on shrubs than is recommended by the landscape point system. Only 25 percent of the landscape points required should be in shrubs, a maximum of 103 points. Their plan provides 136 %2 landscape points for shrubs. A better distribution of landscape should be provided in the revised landscape plan. The existing plan calls for only six shade trees, three to the east and three to the west of what might be considered the main entrance to the site. These are Redmond Linden. Eighty seven decorative trees are provided such as Japanese Tree Lilac, Columnar Crab Apple, and Clump River Birch. These are provided in the green strip which is within the boulevard right of way area around the perimeter of the site and up close to the water park portion of the building as well as in front of the main hotel entrance on the north side of the building. Decorative trees • are also provided on the island areas at the access points to the site and in a "pocket plaza" located between the south portion of the hotel and the indoor water park. Eight coniferous trees are provided, six of which are in the boulevard right of way area and two on the divider areas between the parking facilities. Two hundred seventy three shrubs such as Compact American Vibernum, Rose Pavement Foxy, Russian Cypress, Green Mound Alpine Currant and Mount Airy Fothergilla are located around the site at different locations. It is recommended that the landscape plan be revised to meet the point distribution system and the total number of points required for a 6.2 acre site. Additional shade trees would be in order and perhaps some additional coniferous trees also. It is also recommended as noted previously that a decorative fence at least 3 % to 4 ft in height be provided where there is no minimum green strip provided. This would be along the north and west sides of the site. A wood rail fence such as at the Earle Brown Heritage Center might be in order. BUILDING The applicant has submitted building elevations of the proposed building. The hotel portion of the building would have an exterior treatment of brick with metal decorative panels and aluminum windows. The water park portion of the building would be precast concrete with 6 -16 -05 Page 8 • metal panels and aluminum windows. Skylights are to be located both on the hotel and the water park portions of the building. The walkway connecting the hotel/water park with the Earle Brown Heritage Center appears to be metal panels and aluminum windows. A canopy extends out from the north side of the building where there is a pick up drop off area. LIGHTING/TRASH The applicant has submitted a lighting plan indicating the proposed foot candles for lighting on the site. Section 35 -712 of the city ordinances requires that all exterior lighting be provided with lenses, reflectors or shades so as to concentrate illumination on the property. Illumination is not permitted at a intensity level greater than 10 foot candles measured at property lines abutting street right of way or non residentially zoned property. No glare is allowed to emanate from or be visible beyond the boundaries of the illuminated premises. A review of the foot candles proposed indicates that the standard is not exceeded. Freestanding light poles are proposed at 13 different locations on the site plan. Eight of these are single headed lights, while five are double headed lights. The lights are located primarily in the island areas around the west and north side of the building with lights also serving the parking and service areas on the east side of the building and the parking lot on the south side of the building. No trash enclosure location is shown on the plans. It is assumed that the trash will be collected in the service area and no outside trash facilities will be located on the site. If this is incorrect, the plan should be modified to show the location of an appropriate trash container. • PROCEDURE This PUD /C1A proposal, as previously mentioned, is a rezoning with a specific development plan in hand. As such, it must follow the normal rezoning process. Generally the Planning Commission seeks Neighborhood Advisory Group input with respect to Rezonings and Planned Unit Developments. In this case, the Planning Commission is the Advisory Group for the commercial/industrial park area. A public hearing has been scheduled and notices have appeared in the Brooklyn Center Sun/Post and have been sent to surrounding property owners. The Planning Commission, following public hearing should consider a draft resolution, which has been prepared in anticipation of a favorable reaction to this proposal. The draft resolution outlines various possible findings with respect to the Planned Unit Development Rezoning and various conditions related to the development plan. • 6 -16 -05 Page 9 City of Brooklyn Center A Millennium Community MEMORANDUM DATE: June 13, 2005 TO: Ron Warren, Planning and Zoning Specialist FROM: Todd Blomstrom, Director of Public Works �R$ SUBJECT: Oliver Companies Hotels & Water Park Preliminary Site Plan Review Planning Commission Applications 2005 -10 Public Works Department staff reviewed the following preliminary documents submitted for review under Planning Commission Application 2005 -010 for the vacant parcel located west of the Earle Brown Heritage Center. • Layout and Surfacing Plan, dated May 19, 2005 • Grading Plan, dated May 19, 2005 • Utility Plan, dated May 19, 2005 • Detail Sheets, dated May 19, 2005 • Site Survey, dated May 19, 2005 • Site Removal and Erosion Control Plan, dated May 19, 2005 The following comments and recommendations regarding the preliminary site plans are provided for your consideration. Site Lavout The applicant is proposing to develop Lot 1, Block 1, Brooklyn Farm Addition for the establishment of two hotel buildings and an indoor water park facility. The following general comments are provided based on a review of the site layout. 1. Parking spaces are dimensioned to be 8 -feet in width on the Layout and Surfacing Plan. City Ordinance Section 35 -702 describes minimum dimensions for surface parking spaces. The Ordinance indicates a minimum parking space width of 8'8" for general surface parking. 2. The Layout Plan indicates that the west and north edge of the parking lot would have • essentially zero setback from the property /right -of -way line. 6301 Shingle Creek Parkway Recreation and Community Center Phone & TDD Number Brooklyn Center, MN 55430 -2199 (763) 569 -3400 City Hall & TDD Number (763) 569 -3300 FAX (763) 569 -3434 FAX (763) 569 -3494 www.cityofbrooklyncenter.org 3. The Developer shall relocate the existing light standards and bases as shown on the site removal plan at the Developer's expense. 4. Additional drainage and utility easement may be necessary within the site if the storm water detention pond must be expanded to accommodate the proposed site development. 5. The applicant shall coordinate site development plans with Xcel Energy, CenterPoint Energy, Quest Communications and all other private utility companies. Water Supnly and Sanitary Sewer Service The proposed development site is currently served by public water and sanitary sewer within Earle Brown Drive. Water service to the water park building and southern hotel building is currently available from a 10 -inch diameter water main within Earle Brown Drive. Water service to the northern hotel building is available from a 12 -inch diameter water main along the northern portion of Earle Brown Drive. The following conditions and modifications shall be incorporated into the site design. 1. The existing 8 -inch diameter sanitary sewer within Earle Brown Drive adjacent to the proposed development does not have adequate capacity to serve the proposed land use within the development. The City's Capital Improvement Program includes a project to reconstruct Earle Brown Drive along the western and northern boundary of the property in 2006. This street project could be revised to replace the existing sanitary sewer with larger 12 -inch diameter sanitary sewer (maximum) to increase the conveyance capacity of the sewer system near the property. Increased sanitary sewer capacity for the proposed development is therefore contingent upon the City Council authorizing the replacement of sanitary sewer along Earle Brown Drive. 2. The total maximum discharge rate to the public sanitary sewer system from the site (including both hotels and water park) shall not exceed 450 gallons per minute under any circumstances. This capacity limitation assumes that the sanitary sewer within Earle Brown Drive is replaced with larger diameter pipe. 3. Sanitary sewer manholes shall be placed near the right -of -way or at the connection point to the public sanitary sewer for all sewer services serving restaurants or other central kitchen facilities. 4. A backwash recycling basin shall be incorporated into the design of the water park to limit the outflow to a maximum peak discharge rate of 50 gallons per minute to the public sanitary sewer system. Total site discharge shall not exceed 450 gallons per minute. • . 5. Sanitary sewer service to the water park building shall be reduced to an 8 -inch diameter pipe to reflect the requirements of Item 4 above, unless the applicant submits supporting information showing the necessity for a sewer service pipe grade less than 0.4 percent. 6. The Utility Plan indicates a proposed 18 -inch diameter water service extending from the right -of -way to the water park building. An 18 -inch diameter water service would significantly exceed the capacity of the water main within the street. The water service to the water park building shall be reduced to a maximum diameter of 8- inches unless the applicant provides technical data such as engineering calculations or fire code requirements justifying a larger water service diameter. 7. The existing gate valves on the water service stubs shall be inspected and tested by the developer's contractor prior to extending service lines into the site. The developer shall replace or repair the existing gate valves at the developers expense if the Supervisor of Public Utilities determines that repairs or replacement of the valves is necessary. line and domestic service line branching 8. The Utility lan shows a separate fire (sprinkler) g Y P from each water service prior to entering the buildings. Gate valves or PIVs shall be placed on each service branch prior to entering the buildings to allow isolation of individual water lines. 9. The applicant shall pay City and Metropolitan Council sanitary sewer connection charges and City water connection charges for each of the three buildings. 10. All utility extensions shall meet City of Brooklyn Center design standards. The location and method of connection to the existing sanitary sewer and water mains shall be subject to approval by the Supervisor of Public Utilities. Storm Water Management The proposed site improvements would covert a substantial portion of the site to impervious surface. NPDES regulations require that land development projects incorporate construction and post - construction storm water best management practices to control the rate and quality of storm water discharges. The applicant has previously indicated that they wish to utilize the existing storm water basin adjacent to the site for storm water management. 1. The preliminary site plan documents did not include storm water design calculations or other supporting drainage information. The applicant shall provide a site storm water management plan, including drainage calculations and detailed design drawings for proposed storm water management facilities, to the Engineering Division for review prior • to submitting revised site plans for a building permit. 2. Post - construction storm water best management practices shall be incorporated into the site plan to adequately address all storm water management requirements as established I by g g the Shingle Creek Watershed Management Commission. These standards can be • found at: httn:// www. shinalecreek.org/avnendixb.t)da. 3. Storm water management facilities shall be incorporated into the site development plans to sufficiently control the total discharge rate from the site to avoid overloading the existing outlet from the pond and the storm sewer system within Summit Drive and Shingle Creek Parkway. 4. The Utility Plan shall be revised to include storm sewer piping to convey runoff from all parking areas to the storm water management pond. 5. Erosion control measures shall be installed prior to starting site grading operations. The owner /developer shall be responsible for the prompt removal of all dirt and mud tracked onto public streets from the site during construction. 6. An NPDES construction site erosion control permit must be obtained from the Minnesota Pollution Control Agency prior to disturbing the site. A Storm Water Management Plan must be approved by the Shingle Creek Watershed Management Commission prior to initiating site construction. Traffic Analvsis • A Traffic Impact Study was conducted for the proposed hotel and water park development by the transportation consultant that is currently assisting the City with the Opportunity Site Study. A copy of the Traffic Impact Study report is attached to this memorandum. The above comments are provided based on the information submitted by the applicant at the time of this review. Subsequent approval of the final site plans may require additional modifications or easement dedications based on engineering requirements associated with final design of the water supply, storm drainage, sanitary sewer, gas and electric service, final grading and geometric design as established by the City Engineer and other public officials having jurisdiction over approval of the final site plans. • BENSHOOF & ASSOCIATES, INC. • TRANSPORTATION ENGINEERS AND PLANNERS w 10417 EXCELSIOR BOULEVARD, SUITE TWO/ HOPKINS, MN 55343/ (952) 238-1667/ FAX (952) 238 - 1671.. April 6, 2005 Refer to File: 05 -24 MEMORANDUM TO: Todd Blomstrom,�City of Brooklyn C er FROM: Edward F. Terhaa and David C. May RE: Results of Traffic Impact Study for the Proposed Hotel Near the Earle Brown Center PURPOSE The purpose of this memorandum is to present results of our traffic impact study for a • proposed hotel and restaurant near the Earle Brown Center in Brooklyn Center, Minnesota. Our work to date has involved an estimation of the number of trips generated by this development and the determination of impacts on the surrounding roadway network. BACKGROUND INFORMATION Location Characteristics The site for the proposed hotel and restaurant is located on the east side of Earle Brown Drive, north of Summit Drive and east of Shingle Creek Parkway, as shown in Figure 1. The Earle Brown Center is located farther to the northeast on Earle Brown Drive east of the development site. Office buildings are located on the west side of Earle Brown Drive opposite the development site. Access to a shopping center (featuring a Target) is located south of Summit Drive, opposite Earle Brown Drive. • • 4E , .,. . �1 Dpi ,. LA. ..wi#E1DBiN LA. ! AV '�.1� S +c < a ....�WhY E.A. �-- --•.. �A yf; '� � .. H Palmer Lake ?t s+ A A. lest AVW 1 t ti. 2 rd �-- Tp hh AVE. � _ LA. y ; S,I A A' 7H"aep y L4 PI.. T q E h lA. 4i dY£ pARyEytAY 6Tth VE. r yi i e � M, " 6• CSR. t ry h r pRpKyIAY N• "' 6 �` *h 66th AYE, iY4 - K i 65fi AVM . II, 65th ~ 6A +ti d AVE: AVE. ♦ r Ja u� < � • t?'NENRY At) �� , t 53rd n{ AVE. N > mummF PLASH RO *'t _ PR CT p `P• �I+y 11tN "`R, '#' CA� � �Rg _ {iy H :711 I nc on AVE. ON 4 Cr 4 �� i 2nd L 6 TI , 9 ,� � . • � � � �+ SUruMtT `• I 4 - tht uj so 4 21 NE. AVE, Tk� yR. ss 100 R. � 5�- �_����a ». N y t A a° c 96 1tt A' -c ggtr AV£ <i AVL O N.- - k < • 4tft AV E. APPROXIMATE SCALE G w I v low CITY OF BROOKLYN CENTER TRAFFIC STUDY FOR FIGURE 1 • PROPOSED PROJECT LOCATION W BENSHWF & AS=IATES, INC. HOTEL SITE TRANSPORTATIONEN(IINEERGANDPLANNERB I I I Mr. Todd Blomstrom -3- April 6, 2005 • M Development Characteristics The proposed development consists of a 225 room hotel and a 150 seat restaurant within the hotel. An indoor water park is also planned for the property, however, the use of the water park is projected to be exclusive to hotel guests (no additional vehicle trips are generated). Access` to the development will be provided via two exclusive driveways from Earle Brown Drive, with tie -ins provided to two existing driveways from Earle Brown Drive. Figure 2 shows the proposed development site plan.. Existing Roadwav Characteristics Summit Drive, Earle Brown Drive, and the Target shopping center access intersect at a four -way intersection approximately 500 feet east of Shingle Creek Parkway. The intersection is currently controlled by stop signs for southbound traffic on Earle Brown Drive and for northbound traffic exiting the Target shopping center. The eastbound approach of Summit Drive has a dedicated right turn lane, a through lane, and a shared through/left -turn lane. The westbound approach of Summit Drive has a shared through/left -turn lane and a shared through/right -turn lane. The southbound approach of Earle Brown Drive and the northbound approach of the shopping center access each have a dedicated right -turn lane and a shared through/left-turn lane. Summit Drive has a posted speed limit of 35 mph. Existing Traffic Volumes • In order to determine the baseline traffic volumes, turning movement counts were conducted on Thursday, March 10, 2005 from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM. The resulting existing volumes recorded through these counts are presented later in this report. TRAFFIC FORECASTS Traffic forecasts were established for existing conditions, the year 2007 with only background growth ("no- build" condition), and the year 2007 with development trips ( "build" condition). The traffic forecasts consist of existing traffic volumes, background growth, and new development trips. Trip generation rates for all uses in the area were established based on data presented in the seventh edition of Trio Generation (2003), published by the Institute of Transportation Engineers. • • t ' M j �~ � t� '� � i I - - ' • �.� ^t'7,.6 i", "• i ! � , 1 i i � i•, i i � T - M i f� '•`� �, iI � l�i� I R S _. — st 82AOOSQ.A7: • 7 G w - -- • � i , � w. 6NC'IOEN9LMMN 4.f't I f IL sFV N I APPRO SCALE M- , II!IIIII 0 CITY OF BROOKLYN CENTER TRAFFIC STUDY FOR FIGURE 2 • PROPOSED HOTEL SITE SITE PLAN BENSH00F & ASSOCIATES, INC. TRANSPORTATIONENOINEER &ANDPLANNERS I II I I Mr. Todd Blomstrom -5- April 6, 2005 • w Development Trio Generation Table 1 presents the resultant trips generated by the development during the weekday AM peak hour, and Table 2 presents the resultant trips generated by the development during the weekday, PM peak hour. Table 1 Weekday AM Peak Hour Trip Generation Adjusted Gross Trips Gross Trips New Trips Pass -By Trips Use Size In Out In Out In Out In Out Hotel & Meeting Rooms 225 Rooms 77 49 77 49 77 49 0 0 Quality Restaurant 150 Seats 2 2 2 2 2 2 0 0 TOTAL 79 51 79 51 79 51 0 0 Table 2 Weekday PM Peak Hour Trip Generation Adjusted Gross Trips Gross Trips New Trips Pass -By Trips Use Size In Out In Out In Out In Out • Hotel & Meeting Rooms 225 Rooms 70 63 70 63 70 63 0 0 Quality Restaurant 150 Seats 26 13 19 10 15 8 4 2 TOTAL 96 76 89 73 85 71 4 2 It is expected that a percentage of the gross vehicle trips generated by the restaurant will occur internal to the site (i.e., from the hotel to the restaurant and vice- versa). A reduction of 25% was applied to the gross vehicle trips for the restaurant during the PM peak hour. The adjusted gross trips generated by the development site can be classified into one of the following trip types: • New Trips — Trips solely to and from the subject development • Pass -By Trips — Existing through trips on Summit Drive that will include a stop at the development site For PM peak hour trips generated by the restaurant, 80% of the trips generated were determined to be new trips, and 20% were determined to be pass -by trips from Summit Drive. For AM peak hour restaurant trips and all hotel trips, all trips were determined to be new trips. • Mr. Todd Blomstrom .-6- April 6, 2005 N Directional Distribution of Trins In general, new trips generated by the development will be distributed as follows: • 75% to /from west on Summit Drive towards Shingle Creek Parkway • 15% to /from east on Summit Drive towards TH 100 • 5% to /from the Target shopping center • 5% to /from Earle Brown Drive towards the Earle Brown Center Pass -by trips generated by the development are expected to be distributed as follows: • 65% from WB Summit Drive • 35% from EB Summit Drive Background Growth in Traffic Volumes Traffic volumes on Summit Drive are expected to increase regardless of the proposed development due to continuing growth in the area. Based on the most recent available daily traffic volume counts in the area, through volumes on Summit Drive were increased by 2% per year in order to account for such growth in traffic volumes by the year 2007. • Total Proiected Traffic Volumes After accounting for existing volumes, background volume growth, and volumes due to the proposed development, we have prepared the total volume forecasts shown in Figure 3. This figure shows the projected weekday AM and PM peak hour traffic volumes for each of the following scenarios: • Existing Conditions • 2007 No -Build (background traffic growth) • 2007 Build (background traffic growth plus development trips) • A.M. PEAK HOUR N • N NOT TO SCALE sa3 .� ,� �► �---� 13/13/13 146/146 suMMrr DID. � T� 128/1 33/133 V a 36/36/36 T r r 20115 MISTING 2D07 NQ -BUILD VyV�/�yy�� 2W? BUILD J nMn = P.M. PEAK HOUR N • NOT TO 80" o 5 327/ 340=9 41/41/41 66/6W134 t SUMMIT DR. 16W164/161 —3 T ''� 2t�5 EXISIINQ F BUILD )o(w )(K r CITY OF FIGURE 3 BROOKLYN CENTER TRAFFIC STUDY FOR WEEKDAY PROPOSED A.M. AND P.M. � BENSNtK?F & ASS{}gATES, INC. HOTEL SITE PEAK HOUR TRANBPOATAT IONENQINEER8ANDPLANNER8 TRAFFIC VOLUMES 1 11 1 1 1 1 11 1 11111 1 1 1 1 1 .III II II I Mr. Todd Blomstrom -8- April 6, 2005 N TRAFFIC ANALYSIS The intersection of Summit Drive'and Earle Brown Drive was analyzed to determine the impacts of traffic generated by the proposed hotel and restaurant development. Capacity analyses were performed using Highway Capacity Software (HCS). The results are presented in terms of level of service (LOS), which range from A to F. LOS A represents the best intersection operation, with very little delay for each vehicle using the intersection. LOS F represents the worst intersection operation with excessive delay. The LOS results are shown in Figure 4. During the weekday AM peak hour, both approaches of Summit Drive operate at LOS A under all three scenarios. Right turns from both the southbound Earle Brown Drive approach and the northbound shopping center approach operate at LOS A under all three scenarios, while northbound and southbound left turns and through movements operate at LOS C under all three scenarios. During the AM peak hour, all movements operate at acceptable levels of service under all three scenarios. During the weekday PM peak hour, both approaches of Summit Drive operate at LOS A under all three scenarios. Right turns from the southbound Earle Brown Drive approach operate at LOS B under all three scenarios. Through movements and left turns from the southbound Earle Brown Drive approach operate at LOS C under existing conditions and the 2007 no -build scenario, and LOS D under the 2007 build scenario. Right turns from the northbound shopping center approach operate at LOS A under all three scenarios. Left turns and through movements from the northbound shopping center approach operate at LOS C under existing conditions, LOS D under the 2007 no -build scenario, and LOS E under the 2007 build scenario. Durin g Y the weekday PM peak hour, the northbound and southbound left turn and through movements experience increased delays due to the background growth and trips generated by the proposed development. While the increased delays will make these movements less desirable, it is our opinion that motorists will not find these movements overly difficult or unsafe. Rather, motorists will need to wait slightly longer before finding an acceptable gap in traffic to enter onto Summit Drive. In addition, traffic exiting the Target site does have other access alternatives available. • A.M. PEAK HOUR yII N • 'S' M NOTTO ter, AIWA L. A AJ A( A A XNA +1 1 I SUMMIT DFL A 20X5 EMOTING IT 20X7 NO -BUILD 2007 BUILD XXJX m P.M. PEAK HOUR N • r+OrTOSr� l c3v ag '�- VA/A 4-- ��1A * JJ4 AIAIA w t I SUMMIT DFL NAIA --3 c3 < r AlA /A � � � I 2007 NO -BUILD 2007 BUILD XX/XX1X)C CITY OF ELE RE 4 BROOKLYN CENTER TRAFFIC STUDY FOR KDAY PROPOSED AND P.M. • HOTEL SITE K HOUR I W TRANSPORTATIONEN(IINEERSANDPLANNER8 BENSHOOF & ASSOCIATES, INC. LS OF SERVICE 11 1 Hill Hill III I I I I Mr. Todd Blomstrom -10- April 6, 2005 M CONCLUSIONS AND RECOMMENDATIONS Based on the analysis presented in this report, we have concluded the following: • The proposed hotel and restaurant development are estimated to generate 130 trips during the weekday AM peak hour and 162 trips during the weekday PM peak hour. • During the weekday AM peak hour, all turning movements from both directions of Summit Drive at the western intersection with Earle Brown Drive operate at LOS A under existing conditions, the no -build scenario, and under post - development buildout. Left turns and through movements from Earle Brown Drive and from the Target shopping center operate at LOS C under all three scenarios; right turns operate at LOS A. • During the weekday PM peak hour, all turning movements from both directions of Summit Drive at the western intersection with Earle Brown Drive operate at LOS A under existing conditions, the no -build scenario, and under post - development buildout. Left turns and through movements approaching Summit Drive from Earle Brown Drive operate at LOS C under existing conditions and the no -build scenario; the movements operate at LOS D under post - development build conditions. Left turns and through movements approaching Summit Drive from the Target shopping • center operate at LOS C under existing conditions, LOS D under the no -build scenario, and LOS E under post - development build conditions. • We are confident the subject intersection will be able to adequately accommodate the traffic generated by the proposed development. The existing two -way stop control at the intersection will function adequately under the post - development build condition. i / 3 ' min • • �AN = ■ /t\ ME MEN U.a NEWS WE loin ■ /• /&lj��` Ilia RZAAR NOR as MIN IN ME r ' Y ti F] W � i Im ILA wl iN F7 � 1 C ENTR A L ? • -� N UVE - c IN ME ME WE wu No rid No ��t� ♦ ♦ ♦ �� =,:� / 111lIIEu�����IBii lii� �ME z= r � H ..M.�- .gym i Y tiw d 7 G � t J� � f c t f V ^y y � 111 ! k t c i! r i� V E TEL fill FM garmill UNWAPOLIS DULUTH OLIVER Z14'J8W N, COMPANIES 5713 MM AVBM SWE 6 % MUM. MN 559DT % I Hill am v* on Pill wwml mal OLIVER CO. HOTELS Q4 & WATERPARK r ot NtMYN CENTEK MN SITE Z--.- --will ff -* , r SLRVEY 5�06 M-1 fill CIA s � • PON E2S0�T:f*d A� mes NEMDW EXISUNG TV CURB AND PLACE TEMPORARY sm mxm GUIER WN B401 To sanx4m 351.07 T'S MEET prallECRON jjr : &UNNEAPOLIS CKPLUTH SLT FENCE RAW us= low . PLACE bratoy . .... . .... - PROTECT Elmorm VAULT RONNIE DIM A REMD* EWW MERCK calic DIM - wa STANDARD AND BASE REAW PA D ZAD A FINAM TRIM WMAENTS (Typ A u Dim \ REMONE EIRM 1 =CD RAL TO= .8,f4j8'W OLIVER A. i. COMPANIES 5713GRANDAM3M&MB DULUTH, MN SW CDNC7E NEW01i EXWW LIGHT CONSTRUCION AND STANDARD AND BASE REMUNE DISING 7W j-" M NOWUL .0 RAW 101PIN I HEAW CERIFY Not raw . . ........ slumons IRAL Aq T FENCE J, F PROTECT Tom OLIVER CO. s>R HOTELS 3: , REMM .�h mum Dam - = Su mw EMU.. & WATERPARK cm "In BROOKLYN CBgK MN ...... ... . SITE REMOVAL AND I Mfr EROSION CONTROL � PLAN T FENCE t . . ....... W— W. z� m i � � C2.00 M T*d A� 71 P R I ­ 7V FM 62nX4M 1 7 — k4WRAPOUS • CK&UTH AfJ -FITFIT law Mw r I 6" OLIVER PROPOSED WATER PARK PROPOSED HOTEL COMPANIES 5713 GRAND AVBM UM B WLUTH, MN 55807 Mw law\ I Mw coffy Md ft pl^ vfcm� ----– --------------- r --- ---- -- ----- - --- -- ti ----------- ------------- __j PROPOSED HOTEL if wosrtwe "a OLIVER CO. L M m me ww CM4 HOTELS amm Arig a mmi AN 10 FACE w on & WATERPARK CT 5 M am - no svus r.w M 2 MNAWW SUN -'A SUM BRMYN M R MN a „ va Mw M 13MA” DAM So SUDS mawmsma &Ulm "a 71 i ; LAYOUT AND & , 1 I mEwMasT lam low= mmoon MGM wIW Mw me= " SUWACWG PM ..g P ME W-ft w . . . . . . . . . . . . . m0ft .......... w saw C3.00 71 T ---R. I V E TEL Itn394M FAR 6213364M MOOMAPOLM • DULUTH vo .. ............ . . ...... . . . . . . . . H ! n ....... . . . . . . . . . . . . . . . . . . . . . . . . ;ln % . ..... j f % % % OLIVER A: PROPOSED WATER PARK COMPANIES PROPOSED HOTEL 5113GRANDAVBMWFEB DUUffKMN5W po TIMM "m WASP ..... ....... . . . ...... ...... I mm cotwy 9* mb pk.4 *new- 1 . 7 $Now& JJ .xd_mmaat PROPOSED HOTEL gramme OLIVER CO. ..... .. ....... HOTELS I L UK� MP�POBW EVAS h-W & WATERPARK • v BROMYNCUMMN OrIAM SIM GRADING PLAN A, • W_ ft m C4.00 250 tWd lk « 71 w mot FM *Q/3X4W — .,' . ,' , >• °. ,,,.. _ ,m, ,. - ...gam...... l •; • rr aYR1EAPOLIB • OVLVTH ' < M _ 1 ;, IS OLIVER _:.. , � `� •` .... 9 ,' �: . ' i i:�� is ••.. � : I � ; __.. __ .._..� ... ` s .�. uuw+sxkw ................. f ' _ , 'f ,I. ..Ii. -. } r f % COMPANIES 919GRANDAVFlAIE,SIMIE8 M UTH,MN55007 r; f(: I ..... 7 !! ' ; i : +• .. I pw soon _........... _ -._ .... I IEB®Y GRM rr Mb PIM �.._.......- .._._...- ...... _._._.._ _ ... _.. - .._.._,� .__......_....._ _......__.. I ._ . _ ............. _. Bar a ,r s Y�dr sw. r Biw1.1, rldr Br 't a Tp a rE Yr1RY1a, M @ QYW it ,.; •' {•tee B ' , aa,Mw i 4 !' ' OLIVER CO I _ n o I I 1b6111ff , 1 - ': ' HOTELS � I UTILITY &WATERPARK i ' .:. [ ll2 .......... jj pryyy� CO�p r j =; t Z -m PLM li mulls a n Is SHE MPS N M DMM r0! IBM NO FIWTM MWM TO AR 230 TW AVnIt STORM WATER POLLUTION mm MAKE wx •KIGUm L maA Tur PREVENT ITT YR =M IF EM IF EM® EATnn AREAL ftm PREVENTION P LAN (SWPPP) S"4" uo PA M O n C1µ VA M FUIF FKVEMr IIF M WF ALTS M M ONM ff PMLVTA $1111 ITS $1111 AS nMS, � 10 I rF IN S,m S 5 NOTES. UW"M, KU M, MY Wm Whitt r! Wit TOM WIER IMK MrZK PAI scan IMI It MTAM ff MEAS 0 W K NSRKO W RL IR MU MU N AMdJm VON NR W OLAAw'A I. M C87IMM1Nt M KANNa: FBI mRTtM will K EONML BANK, M AEtt MTsc[ ff mMMLTM LUIS LK tt Nola N K OIL FA= mnwimm � YT►1lw9US2w9aw am L "Elt a AFAMSAo ff emw KF m M a JEW ARMS IFF -SITE ow Ww aw mm Fm ARE mom m VKI W 3'0• O NMK. E No v mN'.RMTM INfL a mOCTLA AI NNAIIS M HKKinf M N scmAL WRRS t "m wo 4216E ff UK MR, Tit mLLOM L rim n MM FtW M!N( MINNEAPOLIS A DULUTH REIE ATT V AF wx (LL f TIAM N R III N wilt] /HAS j NSARw N mMrroKTA716E, rIAL n AKiAiMm S mi KM m6tNtlSl ApL IE/L puma m -IIIE SMI Ww AIOT NSONOE Pon ME YMAw d TE MEmIMM wL womiE "m NE N PACE W No TICS mvmm63 mm A0 NUR RAtt 0 Ai NOS FEINT IS HMAEI TO mill TERI a MEt10N ff RK stooTMt E K A:VSMM rN C NUTK K ISO. n AmDATIIr ff K DR m AM K a P 9m4M NE NI PAMix u (0601[1. K CMWER R A mMEF7K WITH OT, W IS C32, 1AW t SLEEK RMA' IMEOrE sc¢TS MI ACC EMU PNNi KKNEm r mom" K w" III OmK TNPIUPIL WM 9E low AA [NHImM S K NYKSMA Am. w wN LvmK AS 1111" 0lr µ•' Im 111 kAl LOO KILMmi OM AMP W CAA WM PEAIf AT Lim. m NmMME Stull MNA1Mt' en TAVM t FM1YL' 8951. 1 111114 mm M SOY mYER' wit At= NW COMMJCIMI ACIMr/ TIM PEINi ESTAElST6 C30TMM D VAw BALM VWX NP NI TWA WMax &wA® !O OSOYALf flffA Ww m WR ff iM K WIL M mMtAL MMSAEU MOCK b MTMTLT 1111,1 0111113 K O PRE AM O LTA. LM MCA CMAn K MY4! 1 mAA91117 • IA2 Cl/M fQl ATl NO AT 551- 231 -1 s O 1011 VCWR AT .npn.slak..udwkrhlumaMhlrwaM Abt W OCM A M IS K KM O IWATW MIT AN ARYATBYi rmM W" RNR3ME rNNIt 061 - SrMM AN S MK FIRM N OFSIR TIMOR PwL C Ao TAATd AA II r Td AN MMM roar INSTRUCTION ENTRANCE L K wolf O M RCA M ITT I SM K /IllLMiML M E • FIR M LOT - STMMH M YITLK FOR A KWIT nm ff M PMK /HA t-? NiMAM3 Ii! AT M4 buc saALti . MI 7 BU fff, IY MNIRK NM m FE AFFIL IM I ] l A M M w COI MM IT IN SITE U Mw Fn I` µIL 7 BUS Mw AE PmWAT3 NR ff AE Aol! -= _ Mnrltm w ll[ . 752 O SADAO 00101111111 NT SPOVMM stwas M ENS Ylw m M � OE 691 MRaIMMwT 9NMT�p, ill IfCt ENSTIM *SlK SMMMw AN IM IMATW. R L THE 1PO 11111 611E A LC MNAt LLITEP m AmWE Mm mVEA L MIT � SINMw ICY MK "A"m vmm IUN �� P ' m K on M AAC SIOMIAw mN MltMLL TOVI Ww VMUG 2LLIM ff y !/ s ="in mO VMLK w"u 11 Pm[w, /,m3 ff w &cw AVa10AAH 111) WLC11M16 eAWNL AIM IAYA® IS ATW ONSTMCIM M ONALR M ATE IYO EWALNFL TNAL NPr 18 E M R RICK VMK U3 ANT 01,015 ITT, INS VOIK KM UM TOM IM", RwT "Aft" sot A=M m l? a A KMAWEMiS. AANT'1911L O 1mANtiMP IM K NTA mT Td Small? ma AA. SKYJNNL [VOOU MFK NMt L. WrA01 REUTERS ff ITE KM M ACEELATMM REAM M ME CgKCI CET. DW"TMM ISM COMB WW M WAWA SMMMIM ML-M ES, C AM L RAN Mr FlOTTM AS M SINN VATIR IMINIOi ULLLUTW Mw YM WAS L YO11Q MIDI A ATM EASIMRNIS ff LAW AN ffM/S RAIN REYEATmN RAN TSVPPP7 EM KI R FIE MEL ASNK Kg=R I FEB DTF1N m IE>t J ANEW 84 A MKIAG IN TUB'% K TKKKL AN rTN WDEAIN6 AM K n N MIIML m PmIm1 KLIMiCY INCAS INA iWE9Vt mPm1Ml M. � AW noo OLIVER AgINtK TIE SINN. M M YIMLATNA BMW M MM09E[ ff M sm fla wwaK KW a AE AM SET S a TATM TMAarAIm m = [ HT SKKKe im mm A No mew= on umn F8W11MI M KMEM m6WL K" wmmm OACIICES *ft COMPANIES mMmm IF NNmif RC ET ME Dµ'scR MILK C. FAW"I R CINER AO VK=S VEEIAOVE GM R ESFMM N MM mtrA . NN mo omw 15TJW N CRTRIXIM ALL FAN. nAKTUtM mIM MYNO w AE 1 ,n EROSION PROTECTION FENCE 6713MMAVBM WH B AT Dwo mm m K mmm EMT AFFECT K nw wwarm NNIMNLI, PON NET FTSMtM AT ILL S= WM KITS Wn OIIIVE Bu.IlII.INOW r lE STVfI ff A1PA C9Mnmw TMI M MPITAtM IMF RII Pm7MTAEe TO AL "F IRA IMHM I" U. ETAL 3 SIM MR FBI NET FMWO EAST I PATS AN M1T I t1MAA1CIM NM tt9AEe M@OEYLTT FEN "B"N" � VIM TIE PENT AANOFAti M K WMU rO 1tIN1 REWRAP K KmKI D K PWH. RAAAALDM LRULlLOA9M1'ALAN Arua.YmPSnucAlonwrAUr 3 KIM 11A0NILE ro IKAscE NP AFLDMATgb - 1..Mwr rrrsA rwwMAMmhteAe9xn N E AsamNC IN IDmazrMl A i1vnT MYElD6r a On1Kt AT K CrwTaxxtlq As KMMOTt P TIE WEAK mr.l mt POKT. N AMD m EAM.. XMI ELUVEIE N K RA M WELL vEOETAT792ARS1 AELSICAML KE P.DLK, NM ME m1, UM 15 ti. A e•M ti AAwAM L PERU W WALL K R73ME FIR UK TON ODMTM t "SENSE ff mmm k im mm � ` DUTCHMAN!! HOUR - - w" I "wm Y MK ND" KNLVEM SINN TATTER YAK" EISRN FWW 31 tMDR S FU Mm@i 06 MM TO M RICE CLAMPS AT Kimbw D OVSM _,� -,� SKET TYEIPNI `� FLTMSNAT Now Q'REFY 11At tlAl t OWItA mm FIT EML A. SKET @AI mOwr A PAM w S MINK ff GIMIAEIM emit laUMM I MI WAE �. PV9NMII110 1MLI9IM IKYFmM AOA1TOIf KAN.KS' w d M 3 K FROM MOTS OF A SMILE PAIX ff 06HUIDI rM IM KEGS M M - MAN! 110!! ATIAOES Ww PAW mFAK WRIAAMWT RM A. VLNCMM AN FE13MM R �� WELL VEGMTm, GRAM MTlA PUMP � A MVtONtS AN IRF AKIN mraLN NPYYTFLT INS TILT ff TS M AKA AM7AL L PlOml 0®1 RCVOIrMI M YMAI 111MK $Sf 111NJMMi K AKA M ONMIILY WATLI AHtt PMCrmS Wt tt IO1114 DIAOHAITOl/IOA! CIAIPM 1,x 8 Mw WGINEtRIL IML I WDS AID V/L ma NPANMWT l9 TES. U PRO m IAN KSNUM KTML IDPOMM MS FM wr.a a1, AO T11' .01. fflYdiS MA VAL TRIAL NIMAJMWT MN A011 < PLTt3A EAT s L TOWN. RN 11" M YLmM SMOM FINN SI& �p aw Ijo�o NIILVIOETAIID.ONASN -- ;z ��� ��' TIC Nil 9M A WEER ff3WT ff + K SEEM Am PILLMMT E31STK NET AN AURA 1M KCTM NmmM RITIRTIOH VlNA MAKE � �m T� OLIVER CO. N A X K ITT [it UK IF K KILLFMF EUE IT AT WSU K PmBw U N F RUKN m V PL mamC;IOt - �� HOTELS USE A IItDE'7 ff K SmMMw MI All YVEAICI m M A!•9R tom N ET Rarttrml 1,O Ev ttiti FAArAAPYnNkmY3omvm ..vm tmlmeAemTnA.L S.a.ALAdtANNIR doeti ������� A'�M IM ff WGRM V,= FIEVMIM A1, SENEM mllm M t EST" VMKLAIM M" TV OM 01100 FO AREAS BMW If AbAN•rNTw -- $ WATERPARK mo mMmvm Knm AM a m ill SIT! K FULM NO FtEA1CATMM AAwANAx, mw wnwkAwAL ..rAk�Pm�M•AgewlP.PwwmlAr I I \ , I I 2611 AN. 0%% v 9EETS AN vm scrim I= slant tm%wK AN UmM nAKK "'n" "'n" r�� 1�Aer16r�Aw.�v �m� AP.ebPtlJIrLT1 �// �� BROOIQYN CENTER A ll.' 31 MEET AO TAIWAN MAPS UK aK=U Ilwi..xMAAyAm. . o. MN w�maTAiivoiiv . fw.wY7wm,dLcA.7eamnAM.wbe mole AYxI Pa..V.,iaal,.o + rbwewnb . rrte . ivte s... B mGIM M TiPE IF 940W(M 0DK11 PKV011111 NM Kmfllf nNiAM NPS U MO m mNNEIM MILLED, IamibOowpMOAlwP.,40 A N.n+xNml r wVMbMIAxY.Nia RLOyMI��AMIIO�gppCpp AM mums paNwdgmpwb M ®T1L� rrrvrsir.�Arrl�eswr a7lTrrf WARM PmA10Tr VIM VMAUW OEVMI m TIM BEAM h m+. a. Iw, � ,t+y..prvwr.+mwArt,.l.a.s.r,.er M���� A�t� Et. [FA. 0 AA IAMYME u BETTIS. ' mwu A:IIYIIT Is M K Fm a AEUt un r� mm � Jmslrrpigsx+.ep dAdbPM. a INFORMATION A IMDVE AO mm ff =mum smw To STEM 'Aim Nm M1 swill rmwHe nwml9wLwAAArcwsrumc t ROiAERiomm ' LNe/. w. PTietmAeAbalbmwWw m;rm�awAmutn &DETAILS wwfmm, PNdnvi b. Puq xAlra dtmlAY Menigsdvmerd WMff AM OMM FBI MIMM ff OPIUM IPi iiwAay AW OL AvPVeAAWY. NwrypoebmbAxbMA, PAmPb04wALAUa fnTmaAAYy mIM 11t11MMM 1AM M P.w Am b mrmawd MY ill fO RAINM IMR OIER KM All/9ilT. ® REWATERING FILTER BAG INLET PROTECTION ' A°TNL " a P w NmmAN r IMA.Mt "a C 6000 i r 2501 Third AMR4 71 �j T / "IOU S'rRB 4501 eONw w 4 - - TEL $211011410111 v >tew r1L T � B esr - A.OPE R �WT�T 7 ER 70 W7p1 a' R FAX BQ/.171QOM www ` ��� TIP b SRNh+BL&aBDo 1.9Vr11 M .AePIP M + + + i D nw� -Natlsf FM r� + y •' IAINNEAF'OLIBi • DULUTH a . R wr.rr. 3� .. . LF1• .1. •.•w er a + f I , ...V• N U AS1Y r: P• DOIPACIED BIDDING + .° 4 : E � r e . " • V.wN r.•w BI•Proa I5M r ORI) • ...c^I 'pBx) iu m EARW ! 1 ASIM .. R D n2 NOTES: ` SIAPE �• OnI _ .�.� 45011 � Tpy 1. REF. SPEC. SECTION 02317, 'TRENCHING k BACKFRIING. I�1• I 8' —� �• D 02) 2. USE 2 THICIWESSES COMBINED TO MAKE 4 ALTERNATE II tt - C— r.Mi• S.I. STAGGERED JOINTS TO MOOM FROST PENEMTgN ENTRY txr va (22 1n k POINT _ 10e. AS1M Dsa NOTES: 0 e 1 ti w `B" °• mil) PIPE INSULATION 1. PROVIDE OF REVERSE FAONT CIWB TO CURB) FOR ARCING OM . 702s (am o 124% PA M COMM F SIDG OR HA C HA N NEL 5 N !DIRECTION OF PAVEMENT CO 00 NOT CWWNEI. STORM HATER aN•rI. •R.. RuNDFF IN GurIER a wv REFIM TO 2. REFERENCE HNOOT STANDARD PIATE 7102. SCHEDULE wr•r R, DETAIL 2/C13.00 CAS INFO , amn Q' M.w an rn I.•Iaaa wm w Qsw. r wIA 1•Br.•. M CONCRETE _/.1 86113 CURB & GUTTER SECTION .0.m N wy rvw •1M .Aw wr co mF17M.Ay er• .. mF1,.•n a . Q � wri r •w : ui PRECl1 TSYKEI 4W � sR ECAS � i OLIVER M %M a h.WL LL13 r ti YAR1AINd COMPANIES MONOLITHIC PRECAST SEWER MANHOLE _ I 913G'RMIDAVEM)E UMB DULUTH, M 55807 NDTES . - PRECAST CONCRETE BASE J MIN 2 DYEMINVG i A. n•i...MB... E /..w �.wwlsel•r°. 51aVw wwl ar.P w11, b b 1. PRECAST RISR SECTIONS OF VARIABLE HEIGHTS WT BE USED AS NECESWtY rI (NOT VMCICATEO). 5-" AD IDIOM 2. PROVIDE STEPS (NOT INDICATED). IAc IKm o ___ + +_ 3. PROVIDE 27' OFFSET OPENING OVER OUTLET PPE. I IEIEBT f2A7BY BW tlA1 IM IPICilI10' 5, R Ay°I .O R14R I 4. G RCIIT PPE CONNL'Cr10N5 TO smUcTUIE. RT M BgBAID. ILIA 51+888 0111 y AN I a• fI a z I SE WER STRUCTURE I II sm%m -- - -f'1 -- nasrBm r•c lld ML• Bm AC MINI TANM DEM —I B- IWWd °11.1• B.IB•. sMrr rMes° SECTION R-R 5• r VALK r SHOULDER IMi.I. B.•. BMw mnww• a rw DETAIL 1=W Ir IS, NWW A OLIVER CO. HOTELS OR N IRIS. cu r TE & WATERPARK m..r.1 r•WI°17 V ASGREGTE BIVIE f911R5E 0") I iTn wR 1 Wr IN TUmUR WEAR CW SE BRDDKLYNCENTM IN mC CURB S, 1 1/E' INTIMBGUS BASE COURSE IBrO BBE OUTTE B• CL S AGGREGATE UK DETAILS xoTES: C,NW 1. EXTEND AGGREGATE BASE COURSE V (MIN) WYpO aINe AND WALK EDGES AS WDICATED. 2. REF. GRACING PLANS FOR PROPOSED GRADES. INTEGRALLY IAIT POSITIVE a IMLK SEPARATES FROM CURB FOR THE ORNE ADJACENT TO 12TH STREET. REF. SHEET C5.00. SLEEVE SEAL MECHANICAL SEAL MECHANICAL SEWER JOINTS ICAI RQAQ SECnON 11e °°Row W4M R E6 O ® ®R BR ARD C7.00 M TW As4M 71 "No sw1 450 TXYCAL PLACE1ENt AKm[ aumR aRAOE FNOTEe TEL must 2 w 53101 TIE LAU CALVAMZED 7RA4N GIIMD 1. CURB wT YCLED I 54/3Ua00 _- - -- FASTENER PE I MA TERIAL . FA%00/ ( wxuFACRRER s II � „E 2 FRONOE WHEEL STOP WITH wIA�...,,Ie�K4- FMCE(5) FOR SfOHI SATER MINNEAPOLIS • DULUTH PER JOINT . 7 IIp_IUP RUDFF ro FLDR IINOETt 111EE1 �� r' sw. ••••••...... ••• LS1[Y SECTION A - A ,;: n r r LENTIN 1 o CIO" 0' RP -RIP 1 3 4 r , ADA STALL PARNN6 SIGN tnehn CV. r ds. n ' : 1 n 1 INSTALLED N MKING LOT CEOTEXERE WHEEL STOP I 1 11 • AIR STALL LOCATIONS (1 -SOFO) 1S 5.2 FABPoC pq q•r I �6' If 17' SIEEL "VAN ACCE5561E SON 21 7.3 SECTION R -R 2' 24 E.5 sTm. A•FE. RWND, SET N 27 0.7 aErtR To sn< nAx 48' wNnaTC 30 114 EW surcAx TRUTNDrt. 7 ' -0 ' i i 42 18..9 SPECKED wTERMLS ARE FOR _ 11 26• 46 72.5 NMIO P1ACE 1 MqQ 54 26.5 RIP-W TO 3' 880 30.2 72 40.5 21 1 76 47.2 A A 4' - 0' S0' 1 cisNa w sera I 1 1 l_J -1r OLIVER S COMPANIES PLAN VF W s :r z :.- nm slay' sxN 5713 GR11ND AVEMIF SUITE B a F Ir x z4• s1E¢ srEZO uND zs NrR- Pn1 DULUTH, MN 5WI NOTE.- SEE SPECK U P A SECTION 02317, TRENCHING F AND S/& Q 1r x 1s• Ta PIApNa• sxN Vn1I rACx Itmu ox A xHx REnELTAT erua•auxo. ID1Jll/Fr OR RP RAID GEOTE%iRE FASWC FITER. Lourz ' rmN rrE•ENr EocE aDneleo rmN wN putt Nt alz. FLARED END SECTION Norz: 1. Rn X A s1m alum NM slaty urour, ww z. umExcc sNC. ozns raR AmL •cw 1 LaGrz C1Nrt• v ml. saa 1' iw• PAV1ENr coal CENIFRED NDN HALL LN-e mosom MY ME R1Om I /WY OD % 0W SI1 INK, WKW= a SGN DETAIL (TYPICAL) � 6N41 mvw. w .° UeK1•N ProNWlne Eaylrr Doer 6w � • M SbIY d IISN1e1L Kortle rrs m RR19.NE Y 0 1A1E Im m- t w.swwa rr4s�a ASmf AAG OLIVER CO. HOTELS & WATERPARK BR=YN m1.N IRE DETAILS Ift 0400.m .K. ft. .6 Demnr -ik` "'" C8R00 • 0 � � `✓ - -- � mil♦ /�lio�nar �! , . , . , i/ % air ✓� � � a ►�1 ✓►�1 �^ �g�c i r�>*se� ` - - -- - - - -, � d n"r^ L `..'a _ i'Y E �`•, S 6 C, il� '� 3-'./ S" 4 i �'� ate. 9 az g€ .f ya 'i^ � � •``` �, �,nX P u / B m MEN 1� 'c � a e�� c �� w � �` "° �� � Q �.�y�• � �'�� ���� � � .: i � &WiJ ■ ■!fltli ■rllltox.01M. rl R n. ; In fill �`��.:V«„ -*Jx wing 11 M Md Avft* am 490 Mko opdl6 0 854M PAR fd/MM b % .11"OAPOLM s DULUTH % b w k 1. Y b 1�<tNo XAC l b 11 41 sun Umb 05 wa,%,sl OLIVER b COMPANIES Y k 1. INDOOR WATER PARK b 5MMQAVBM&me 32,000 S0. FT, MLLqKIMMW ` LINK TO CARL M.* the $Dow mowmmwc, Y 6 w u b b dco J, 0 OLIVER CO. • HOTELS % & WATERPARK oeo -lq 4 0 Pow ww b 1. 1. 1, 1, U. escmm Y I u t. PLM i ff I E 11 PwTolu 2 m M D �ft " E1.01 IL • - 3 € i , 4' = a 5 � d cq Nis 03 is lot p ciIac faasa l , . od's pi ll, tpt •< < � iffa � rl��,Fis���fa.�dt �� 83 # R %Q S� rm ' i �sf =1i f,a t d �g eE�f ikil�t i} t l °1d put All �� e s t.:: sJ 'silii ii it It 1� l r D Metal Panels ,. . C> 4 Brick • r7 1 ?'- Aluminum Window A e a eeaeak,'� e� e e eeoa ®, ,n A South Elevation Style 1133 -1• • B East Elevation sk s; sale 1,33"- 1• Metal Panels Aluminum Window Precast Concrete ' ti e ❑' m Sky ligh ts C West Elevation Scnk 1,33 - -1• Metal Panels Brick ti. . OLIVER CO. HOTELS & WATER PARK D North Elevation BROOKLYN CENTER, MN RU.B.SUBMITTALO XIALi Scale 1/33' -I l r DRAFT i its adoption: Member introduced the following resolution and moved PLANNING COMMISSION RESOLUTION NO. 2005 -02 RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2005 -010 SUBMITTED BY LHB ARCHITECTURE WHEREAS, Planning Commission Application No. 2005 -010 submitted by LHB Architecture proposes rezoning from CIA (Service - Office, no height limit) to PUD /C1A (Planned Unit Development/Service- Office, no height limit) of a 6.2 acre site located on the east side of the west leg of Earle Brown Drive (to be addressed as 6300 Earle Brown Drive); and WHEREAS, the proposal comprehends the rezoning of the above mentioned property and development plan approval for a 250 room hotel containing a 100 seat restaurant and a 32,000 sq. ft. water park facility on the above mentioned site; and WHEREAS, the Planning Commission held a duly called public hearing on June 16, 2005 when a staff report and public testimony regarding the rezoning and development plan were received; and WHEREAS, the Planning Commission considered the Planned Unit Development • request in light of all testimony received, the Guidelines for Evaluating Rezonings contained in Section 35 -208 of the City' s Zoning Ordinance, the provisions of the Planned Unit Development ordinance contained in Section 35 -355 of the City' s Zoning Ordinance and the City' s Compre- hensive Plan. NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2005 -010 submitted by LHB Architecture be approved in light of the following considerations: 1. The Planned Unit Development is compatible with the standards, purposes and intent of the Planned Unit Development section of the City' s Zoning Ordinance. 2. The Planned Unit Development proposal will allow for the utilization of the land in question in a manner which is compatible with, complimentary to and of comparable intensity to adjacent land uses as well as those permitted on surrounding land. 3. The utilization of the property as proposed under the Planned Unit Development Rezoning is considered a reasonable use of the property and will conform with ordinance standards except for allowing a green strip along the Earl Brown Drive right of way that is less than 15 ft. This modification from the CIA ordinance • standard is justified on the basis of the development plan being an appropriate plan DRAFT • for this area and that it is off set or mitigated by various factors contained in the approved site plan. 4. The Planned Unit Development proposal is considered consistent with the recommendations of the City' s Comprehensive Plan for this area of the city. 5. The Planned Unit Development proposal appears to be a good long range use of the existing land and this development can be considered an asset to the community. 6. In light of the above considerations, it is believed that the Guidelines for Evaluating Rezonings as contained in Section 35 -208 of the City' s Zoning Ordinance are met and the proposal is, therefore, in the best interest of the community.. BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Application No. 2005 -010 be approved subject to the following conditions and considerations. 1. The building plans are subject to review and approval by the Building Official • with respect to applicable codes prior to the issuance of permits. 2. Grading, drainage, utility and erosion control plans are subject to review and approval by the City Engineer prior to the issuance of permits. 3. A site performance agreement and supporting financial guarantee in an amount to be determined based on cost estimates shall be submitted prior to the issuance of building permits to assure completion of all required site improvements. 4. A minimum B -612 curb and gutter shall be provided around all parking and driving areas. 5. Any outside trash disposal facilities and rooftop or on ground mechanical equipment shall be appropriately screened from view. 6. The building shall be equipped with an automatic fire extinguishing system to meet NFPA standards and shall be connected to a central monitoring device in accordance with Chapter 5 of the City Ordinances. 7. Underground irrigation shall be installed in all landscaped areas to facilitate site maintenance. • 8. Plan approval is exclusive of all signery which is subject to Chapter 34 of the City Ordinances. DRAFT • 9. The applicant shall submit an as built survey of the property, improvements and y. utility service lines prior to the release of the performance guarantee. 10. All work performed and materials used for construction of utilities shall conform to the City of Brooklyn Center Standard Specifications and Details. 11. The applicant shall provide appropriate erosion control during construction as approved by the City Engineering Department and obtain an NPDES construction site erosion control permit from the Minnesota Pollution Control Agency prior to disturbing the site. 12. The applicant' s storm water management plan shall be approved by the Shingle Creek Watershed Management Commission prior to the issuance of building permits for this project. 13. The applicant shall enter into a PUD agreement with the City of Brooklyn Center to be reviewed and approved by the City Attorney prior to the issuance of building permits. Said agreement shall be filed with the title to the property and shall acknowledge the specific modifications to the C1A underlying zoning district as well as other conditions of approval. The agreement shall further assure compliance with the development plans submitted with this application. • 14. The development plans shall be modified in the following manner. a. To provide a 3 1 /zto 4 ft. high decorative fence along the edge of the property line abutting the Earle Brown Drive right of way to off set or mitigate the negative aspects of a reduced green strip. b. A modified landscape plan to be consistent with the landscape point system requiring 412 landscape points and a proper distribution of plantings on the site. c. Modification to the parking plan to provide a minimum parking space width of 8 ft. 8 in. Date Chair DRAFT . ATTEST: Secretary The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. • •