Loading...
HomeMy WebLinkAbout1998 08-31 CCP Work Session AGENDA CITY COUNCIL WORK SESSION AUGUST 31, 1998 7:00 P.M. CONFERENCE ROOM B 1. Discussion of development issues 2. Discussion of Draft Capital Improvement Plan 3. Miscellaneous 4. Adjourn • a =_ A 7 DVANU rces for Development, Inc. August 27, 1998 Mr. Michael J. McCauley City Manager City of Brooklyn Center 6301 Shingle Creek Parkway Brooklyn Center, MN 55430 -2199 RE: ANALYSIS OF REVISED BROOKDALE CENTER PROPOSAL Dear Mr. McCauley: I have completed my review of the revised proposal from Talisman regarding the redevelopment of Brookdale Center. Prior to reviewing the rate of return analysis, it is important to review differences between the latest proposal and the one previously analyzed. The latest project proposed by Talisman includes a redevelopment budget of between $60 -65 million dollars plus the initial acquisition price. The redevelopment costs would result in the following improvements to the center: • Renovation by Dayton's of its existing facility • Total renovations to the existing mall areas and new mall areas totaling 184,776 SF • Construction of a 20 screen theater which will occupy 89,000 SF of the Center area. • Construction of a 20,000 SF, 450 seat West Court amphitheater area. The table on the following page depicts differences between the two budget proposals. r Development CORPORATE OFFICES P.O. Box 48269 P.O. Box 3027 and Finance Mpls., MN 55448 -0269 Mankato, MN 56002 -3027 Phone: (612) 755 -7741 Phone: (507) 387 -7117 Specialists Fax: (612) 755 -5393 Fax: (507) 387-6115 August 27, 1998 Mr. Michael J. McCauley Page Two Budget Previous New Proiect ( Variance Proposal Proposal Acquisition $25.374,407 $25.374,000 ($407) Hard Costs $87,291,670 $56.352,528 ($30,939.142) Soft Costs $9.950,000 $9,743,000 ($207,000) Contingency $50,000 $1,000,000 $950,000 TOTAL $122,666,077 $92,469,5281 ($30,196,549) As noted above, the new project proposal promotes a significant reduction in expenditures. The reduction is most heavily pronounced in the hard costs associated with the project. The total reduction in hard costs is in excess of $30 million. In addition,the developer is increasing the size of the project contingency over the previous proposal we reviewed. The contingency has been increased from $50,000 to $1 million. The reduction in project costs is impacted by a reduction in the overall size of the project. The previous proposal had a final project size of 1,288,395 SF. The new proposal states that the project will be 1,200,813 SF. This is a reduction of 87,582 SF. The initial proposal exhibited a final project cost of $95 per foot. The new proposal has a final cost of $77 per foot or a reduction of $18 per foot. SOURCES OF FUNDS The table below illustrates the anticipated Sources of Funds for the "new proposal' and compares these numbers with the previous proposal. SOURCES OF FUNDS Previous New Proiect Variance Percent Proposal Proposal Bank Loan $104,291,670 $77,969,528 ($26,322,142) - 25.24% Owner Equity $3,374,407 $7,500,000 $4,125,593 122.26% TIF $15.000,000 $7.000,000 ($8,000.000) - 53.33% TOTAL $122,666,077 $92,469,528 ($30,196,549) - 24.62% August 27, 1998 Mr. Michael J. McCauley Page Three MEASURING THE RATE OF RETURN From the Earnout Analysis, the "cash on cash return" for the project can be determined. Cash flow represents Net Operating Income (NOI) minus debt service on mortgages to which the property is subject or to which the project will be subject under the assumptions made by the developer. The Earnout Analysis projects the following cash on cash return to the developer at the end of the project assuming city participation at a level of $7 million. Projected NOI (excluding tenant rollover expenses) $8,541,118 Less: Debt Service 6.865.353 Cash Flow $1,675,765 Equity Investment $7,500,000 Cash Flow Return (Cash on Cash) 22.34% This is a reasonable cash on cash return for most real estate projects. The rate of return is substantially impacted by the proposed level of participation by the City of Brooklyn Center. Without the city's participation, the developer would be required to invest additional equity in the project assuming the project costs are held constant and the bank loan is maximized for the project. The following table illustrates various levels of city participation and the rate of return to the developer. Required Equity $14,500,0001 $14,500,000 $14,500,000 City Participation $7,000,000 $3,500,000 $0 Developer Equity Required $7,500,000 $11 ,000,000 $14,500,000 Net Cash Flow $1,675,765 $1,675,765 $1,675,765 Cash on Cash Return 22.34% 15.23% 11.56% It is important to note that in information previously supplied by the developer, the annualized cash flow from Brookdale Center as the mall is currently configured is $1,853,052. If the developer undertakes the revitalization effort, the new proposal projects that net cash flow will be $1,675,765; a decrease from its current level. Further explanation is needed by the developer to identify why a substantial investment is being made which will result in a net decrease in cash flow. May 28, 1998 Mr. Michael J McCauley Page Four The developer has had discussions with the city that have indicated a potential decrease in project costs. The remodeling of Dayton's may decrease from $12 million to a level of $8 million. This would potentially reduce the equity in the project from 14,500,000 to $10,500,000. In addition, the contingency for the project may or may not be used. This would reduce the level of equity by an additional $1 million. In the event that this happened it is important to review the developer's potential return assuming that the city's participation were held constant. The chart below illustrates rates of return if the project is impacted by these variables. Required Equity $14,500,000 $10,500,0001 $9,500,000 City Participation $7,000,000 $7,000,0001 { $7,000,000 Developer Equity Required $7,500,000 $3,5 00,0001 $2,500,000 Net Cash Flow $1,675,765 $1,675,765 $1,675,765 Cash on Cash Return 22.34% 47.88% 67.03% As you are aware, in a project of this nature there are many variables to consider. I will be happy to meet with the council to review this information. Please let me know if you have any questions. It has been a pleasure to be of service. Sincerely, Michael J. Mulrooney Financial Consultant 1998 -2002 CAPITAL IMPROVEMENTS PRO FT TABLE OF CONTENTS • Introduction ................. ............................... 1 Public Utilities WaterUtility ................. ............................... 9 Sanitary Sewer Utility ............ ............................... 12 Storm Drainage Utility ............ ............................... 14 Streets, Sidewalks, and Trails Streets ................ ............................... 16 Sidewalks and Trails ............. ............................... 19 Parks, Public Facilities, and Capital Equipment Parks ................ ............................... 20 Government Buildings ........................................... 23 Miscellaneous Equipment .......... ............................... 24 TABLES Table l: Summary By Functional Area .. ............................... 3 Table 2: Summary By Fund ......... ............................... 5 Table 3: 1998 Projects ............. ............................... 7 Table 4: Summary By Function and Fund ............................... 8 Table 5: Water Utility Projected 5 Year Balance .......................... 10 Table 6: Water Utility Facilities Future Maintenance or Replacement Needs ........ 11 Table 7: Sanitary Sewer Utility Fund Projected 5 Year Balance ................ 13 Table 8: Sanitary Sewer Utility Facilities Future Maintenance or Replacement Needs .. 13 Table 9: Storm Drainage Utility 5 Year Projected Balance .................... 15 • Table 10: Neighborhood Street and Utility Improvement Program Progress 17 Table 11: Municipal State Aid Fund 5 Year Projected Balance ................. 18 Table 12: General Fund Contributions to Street Projects 5 Year Projected Balance .... 18 Table 13: Local State Aid Fund 5 Year Projected Balance .................... 20 Table 14: Parks Facilities Future Maintenance or Replacement Needs ............ 22 Table 15: Capital Improvement Fund 5 Year Projected Balance ................ 25 FIGURES Figure 1: By Functional Area ........ ............................... 4 Figure 2: By Funding Source ........ ............................... 6 APPENDIX Table A: Water Utility ............ ............................... Al Map A: Water Facilities ..... ............................... A2 Table B: Sanitary Sewer Utility ...... ............................... A3 Map B: Sewer Facilities ..... ............................... A4 Table C: Storm Drainage Utility ..... ............................... A5 Map g C: Drainage Facilities .... ............................... A6 Table D: Sidewalk and Trail Improvements ............................. A7 Map D: Sidewalk & Trail Facilities ............................. A8 Table E: Park Improvements ........ ............................... A9 Map E: Park Facilities ...... ............................... All Table F: Public Buildings Improvements .............................. Al2 Map F: Public Buildings .... ............................... A13 • Table G: Street Improvements ....... ............................... A14 Map G: Street Improvement Projects A19 1999 -2003 CAPITAL IMPROVEMENTS PROGRAM • INTRODUCTION The Capital Improvement Program (CIP) is a planning document. It is intended to serve as a summary of the physical improvements proposed to carry out the City's strategic and comprehensive plans. The CIP presents a schedule of improvements and an evaluation of the community's financial capabilities, as well as its goals and priorities. In such a way, the community can be assured that it is adequately prepared to meet the demands on its financial resources in the coming years. No document or planning process, however, can anticipate all contingencies or opportunities. Certainly not all of the capital improvements to be undertaken during this time period are known at this time. Rather, the information contained in these tables represents a best estimate of improvements and their costs based on present knowledge and expected conditions. The CIP is a flexible planning tool that provides a means to determine which projects are of highest priority. The City can be responsive to opportunities because it has available a comprehensive listing of its needs which can be evaluated and reprioritized if necessary to take into account new or changing situations. For the purposes of this report, a capital improvement can be defined as any major non - recurring expenditure or any expenditure for physical facilities of government. Typical expenditures are the cost of land acquisition or interest in land; construction of buildings or other structures; construction of roads, utilities, or park improvements; and pursuit of community development activities. Most capital improvements are typically funded from revenue sources other than the general fund. Maintenance of these improvements p ements is primarily funded by the general fund. The CIP is directly linked to the goals and policies, land use and community facility sections of the Comprehensive Plan, since these sections indicate general policies of development, redevelopment, and the maintenance of the community. Consequently, the primary objective of the CIP is to integrate the specific goals, policies, and recommendations contained in the City's plan with its capability to pay for and maintain capital improvements. Meeting Strategic Goals The City's draft Comprehensive Plan presents the framework for programming, development and redevelopment within the community. This Comprehensive Plan identified the several general community goals. ► Carve out a unique and desirable niche in the Twin Cities are by capitalizing on physical attributes such as: location, highway and bus access; sound and diversified housing stock; vibrant mixed -use center; attractive Brooklyn Boulevard Corridor; and interconnected park and open space system. Proiects consistent with this goal are: ► Completion of park upgrades including playground equipment replacement, shelter renovations and replacement, and addition of amenities and linkages to regional parks. ► City participation in a Hennepin County street improvement project providing a major upgrade to Brooklyn Boulevard, improving safety, increasing capacity, and coordinating with redevelopment and enhancement projects. ► Gain an increased sense of unity and place by: retrofitting the public elements of the neighborhoods; focusing and linking these neighborhoods toward an intensified, mixed use retail- office- residential -civic core; making major street corridors and other public spaces highly attractive; and celebrating diversity. Projects consistent with this goal are: ► The continuation of a systematic program of neighborhood street and utility improvement projects designed to upgrade neighborhood infrastructure and improve the appearance of Brooklyn Center neighborhoods; ► Landscaping and enhancement projects on Brooklyn Boulevard and the three loops: commercial, neighborhood, and park, as well as rehabilitation of streetscaping in the Earle Brown commercial area; and ► A focus on the redevelopment of mature commercial sites by assisting in the construction of infrastructure improvements, such as regional storm water ponds. ► Develop a positive public image and strong community esteem. Projects consistent with this coal are: ► Construction of new public facilities and rehabilitation of existing facilities to provide attractive and functional places for community gatherings. Provide cooperative leadership and sound management. Projects consistent with this goal are: • Continued maintenance and repair of the City's infrastructure, such as: painting and repairing well houses and water towers; rehabilitating sanitary sewer lift stations; repairing storm sewer outfalls; repairing sidewalks and retaining walls; sealcoating streets and trails; and replacing and expanding lighting at city parks. These major projects focus on maintaining a high quality of life and neighborhood focus and on redeveloping the community. The program provides for the continuation of the high level of public services which Brooklyn Center has come to expect and to enjoy. The detailed tables of proposed improvement projects are organized by functional area -- for example:, water system improvements, park upgrades, street projects, etc. The CIP begins with a series of summary tables and graphs showing the overall level of expected need and funding requirements. A summary of the proposed capital improvements by functional area for the five year period of 1999 through 2003 is shown in Table 1. A summary by funding source is shown in Table 2. Table 3 shows the projects proposed for consideration in 1999. All costs shown are best guess of future costs based on 1998 estimated costs. It must be understood that the scheduling of various improvements, especially those that are related to development or redevelopment, can change substantially from year to year. However, the overall level of improvements shown in this CIP represents the best judgment of what is necessary to maintain infrastructure in good condition, and to provide those facilities which are necessary to support public services through the year 2003. • City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 2 TABLE 1 _Capita Improvement Program -Su0Omary by Functional Area PUBLIC UTILITY : Water Utility Capital Projects 283.824 1.210.909 423.008 25.000 25.000 25.080 Sanitary Sewer Utility Capital Projects 42.360 200.000 500.000 O O O Storm Drainage Utility Capital Projects 76.022 1.055.344 1.830.000 50.000 250.000 50.000 SUBTOTAL $402.206 | $2.460.253 | $2.753.000 | $75.000 $275.000 $75.000 � S|DEVW4LKJTRA|L|[NPROVEyNENTS: Off-Street Trails O 25.000 160.000 O 0 O 8idmme|ku 24.184 125.000 75.000 O 25.000 O SUBTOTAL $24.184| $150.00O1 $235.0001 $U $25.000 $U PARK|N1PROVENYENTS $O| $209.690 | $250.800 | $222.600 $229.000 $273.000 | | | . . . PUBLIC BUILDINGS $440.348| $5,228.772| $4,025.000 *1.950,000 *600.008 $O | | | STREET IMPROVEMENTS: Saa|coabng Signals U 18.000 25.000 O U O State Aid Street Projects 810.994 219.254 760,000 1.899.550 852.000 O Neighborhood Street Projects 3.661.449 3.004.362 2.989.200 3.809.700 2.982.240 5.065.050 Commercial Street Projects O 377.145 100.000 O O O Landscaping O O 25.000 175.000 O 250 SUBTOTAL $4.473.443| *3.618.761 | *3.899.200 | *5.884.250 *3.834.240 $5.315.050 ' ����l�|� � ���X������ �1� ��������� �1� �������y�[� ��������� ������������ �������/���� ~�^="'"^" ^��"��^- +~=,==~',"=" ^p^ ^.=" ",-'"= �' ^,"==,~~== *^=,"=^,=~~= �-�,=~°=,°-��= ^*=.~~=°.=°= City of. Brooklyn Center Capital Improvement Program, 1999 -2003 By Functional Area Water Sanitary Sewer 4% 2% Storm Drainage Other Street 7% Improvements Parks 44% 3% Public Buildings 26% State Aid Streets Trails & Sidewalks 10% 1% Total 5 Year Proposed Expenditures = $41,592,616 • • • TABLE 2 - Capital Improvement Program - Summary by Fund . ..... ...... ....... ................ .. ........ . . .... ... . . .. ....... ......... 2 .......... 27-Aug-98 .. ..... . . . ............ X . WATER UTILITY $1,384,429 $1,313,153 $803,700 $906,685 $647,945 $706,825 SANITARY SEWER UTILITY $709,867 $679,898 $1,003,270 $698,360 $533,480 $681,825 STORM DRAINAGE UTILITY $246,294 $797,835 $177,945 $752,185 $622,645 $945,604 MSA-REGULAR $494,479 $334,429 $270,650 $289,080 $232,320 $743,460 MSA - LOCAL ACCOUNT ($35,616) $81,956 $778,800 $854,250 $23,040 $100,000 SPECIAL ASSESSMENTS $1,531,615 $1,296,284 $1,243,340 $1,557,445 $1,025,415 $1,296,634 CAPITAL IMPROVEMENTS FUND $159,248 $1,532,562 $550,800 $1,947,600 $829,000 $233,000 GENERAL FUND: STREET CONSTR $517,929 $489,459 $809,495 $433,845 $549,395 $665,702 GOLF COURSE FUND $0 $0 $25,000 $0 $0 $40,000 LIQUOR STORE FUND $0 $0 $0 $0 $0 $0 TIF FUNDS $0 $500,000 $0 $442,400 $250,000 $250,000 GENERAL OBLIGATION BONDS $281,100 $3,918,900 $3,700,000 $0 $0 $0 OTHER GOVERNMENTS/FUNDS $49,836 $727,000 $1,800,000 $250,000 $250,000 $0 GRAND TOTAL $5,339,181 $11,671,476 $11,163,000 $8,131,850 $4,963,240 $5,663,050 r City of Brooklyn Center Capital Improvement Program, 1999 -2003 By Funding Source Storm Drainage Special Sanitary Sewer Utility Utility 8% Assessments y 17% 9% Water Utility 12% Other Enterprise Funds GO Bonds <1% 17% MSA Regular 5% MSA Local 4% Other Funds General Fund Capital 10% 7% Improvements Fund 11% Total 5 Year Proposed Expenditures = $41,592,696 TABLE 3 - Capital Impro4i ent Program - 1999 Projects ....... : >:::.....:: ................ . ... ... ... ...... . ... ...... ... . . .. ... .... .... ....... . . . . . ..... . . n Water Wellhouse #5 & 6 exterior rehab $160,000 160.000 Wellhouse, #7 interior rehab 13,000 13,000 Routine well maintenance 50,000 50,000 Paint tower #1 200.000 200,000 Sanitary Sewer Replace lift sin #10 &11 & 300,000 300,000 forcemain 0 Stabilize Miss River Interceptor 200,000 200.000 Storm Drainage . 0 Misc storm structure Impr 50,000 50,000 Shingle Creek Regional Pond 1,750,000 1.750,000 Palmer Lake drainage design 30,000 30,000 Sidewalks & Traits Misc park trails 60,000 60,000 53rd Avenue greenway trail 50.000 50,000 100,000 Misc sidewalk repairs 50,000 50,000 Repair retaining walls 25,000 25.000 Parks Bellvue 20.000 20,000 Central 90,000 90,000 Centerbrook 25,000 25,000 Grandview 3,800 3.800 Kylawn 3.800 3.800 Lions 30,200 30,200 Northport 22,800 22,800 E Palmer 6,500 6,500 W Palmer 3,800 3,800 Wangstad 26,400 26.400 Willow Lane $18,500 18,500 Public Buildings New police station 2,500,000 2,500,000 Additional public safety tech 125.000 125,000 Civic Center parking lots 200.000 200,000 Remodel E fire station 200.000 200,000 New W fire station 1,000,000 1,000,000 Streets Signal painting & restoration 25,000 25,000 Humboldt Avenue turn lane 0 Earle Brown Drive 189,000 139,200 (106.200) 13,000 113,000 12,000 260.000 Brooklyn Boulevard ROW 600,000 600,000 SE neighborhood 809,495 795,440 131,450 50,000 367,700 490,270 85.945 258,900 2.989,200 Paint 69th parkway fence 25,000 25,000 GRAND TOTAL $809.495 1 $1,825,000 I $984,440 1 $4,250,800 $270,650 1 $778,800T $803,700 1 $1,003,270 1 $177,945 1 $258.900 1 $11,163,000 TABLE 4-Capital Improve Program - SQmmary By Function and Fu 2/_Au8'np PUBLIC UT IMPROVEMENTS: Water Uti 283.824 1.210.909 423.000 25.000 26.000 25.000 Sanitary Sewer Utility 42.380 200.000 600.000 U O 0 Storm Dra Utility 28.186 40.344 80.000 50.000 250.000 50.000 TlF/Ot erQovonnments/Capda||mpnovementoF 49.836 1.015.000 1.750.000 0 U U SUBTOTAL *402.206 *2.488.263 $2.753.000 *76.000 $275.000 $75.000 S|OEVVALK/TRA|L|K8PFlOVEK4ENTS: TRAILS Local State Aid O 26.000 160.000 O O O SIDEWALKS Local State Aid 24.184 135.000 75.000 O 25.000 D SUBTOTAL *24.184 $150.000 $236.000 $U $25.000 $U � ^PARK|N)PROVEK8ENTS Capital Projects Fund O 209.690 225.800 222.688 229.000 233.000 Golf Course Fund O O 26.800 O 0 40 � SUBTOTAL $O $209.690 $250.800 *222.800 *229.000 $273.800 PUBLIC BUILDINGS Capital Improvements Fund 169.248 1.307.873 325.000 1.725.000 800.000 U Water Utility O O O 112.500 O D Sanitary Sewer Utility O O D 112.500 O U Liquor Fund U O O O O U GO Bonds 281.100 3.918.800 3.700.000 U O D SUBTOTAL $440.348 $5.226.772 $4.025.000 $1.950.000 $600,000 *O STREET IMPROVEMENTS K8SA'Regular 494.470 334.429 270.650 389.080 232.320 743.460 K8SA-Local (59.800) (68.044) 583.800 854.250 (i.QGO) 100.000 � Wa Utility 1.100.605 339.344 380.700 769.185 822.945 681.826 Sanitary Sewer Utility 867.507 479.898 503.270 585.860 533.480 681.825 Storm Drainage Utility 220.108 767.491 07.045 702.186 372.845 895.604 Special Assessments 1.531.615 1.296.384 1.243.340 1.557.445 1.025.415 1.298.634 � � Spec Assessment ConstrFund 517.929 489.459 808.495 433.846 549.395 665.702 T|FRevenua O O O 4424O� 25OOOO 250,000 . . � Other Governments O O O 250.000 250.000 O SUBTOTAL *4.472.443 $3.618.781 $3.899.200 $6.884.260 $3.834.340 $6.315.050 ������Y�����Y �����1��1 �11�����1���� �11 ������[� ���������M �������u1n ���f������M � | ~~^~^^^^~ ^~~^^^~ | `'~`~~~^^~' | �' ''~^ '` ^^- | �^ '`^~^^'~~~ | ~'~`^~'`~~~ | ^r^'~~~'^-'~ | `' '~~~'~~~ |� / / � 1. PUBLIC UTILITIES • a. Water Utility The City's water utility provides service to 8,820 customers in Brooklyn Center. The City also has cooperative agreements with the adjacent cities of Brooklyn Park and Robbinsdale to provide service to about 100 border customers in those cities where Brooklyn Center has mains but those cities do not. About 12 homes in Brooklyn Center receive their water from the City of Minneapolis. The water utility finances all costs for water supply, distribution, operations and maintenance, and capital improvements. Revenues are generated through water use charges, connection charges, and special assessments. Charges are adjusted annually based on a rate study analysis which reviews operation, maintenance, and construction costs and projected water demand. Substantial cash expenditures have been made from the water utility in the past few years, and additional substantial expenditures are expected in the next few years. These expenditures are primarily cyclical in nature, such as painting and repairs to the three water towers and replacement of the SCADA system. Once this cycle of larger scale improvements is complete, it will be several years before items such as tower repainting come up again. Annual expenditures during the "off cycle" years would primarily be associated with neighborhood street projects. In most cases, these represent repairs to the system, rather than substantial replacements. However, in 1997, the utility replaced over 5 miles of water main in the Orchard West neighborhood, which historically has had water quality problems and maintenance issues. There are a few other neighborhoods which are know to have "hot" or corrosive soils where substantial replacements are likely to be required. • As a result of these large capital expenditures, the balance in the fund has fallen considerably. This is acceptable, as the balance was considered too high. The target balance in this fund is $1.5 million. 5 Year Improvements Short term activities relate primarily to routine maintenance, and improvements associated with Neighborhood Street and Utility Improvement Program. 1. Continue the routine well inspection and maintenance program to assure the continued functioning of the existing wells. 2. Repair the interior and exterior coatings and provide for structural repair of the water towers. Tower #2 was completed in 1997 and Tower #3 in 1998, with Tower #1 scheduled in 1999. 3. Rehabilitate the exterior of the older well houses, especially those located in residential neighborhoods, and make necessary repairs such as replacement of doors, roofs, etc. 4. Make various water distribution system improvements to assure the system's ability to deliver needed capacities to all portions of the City during peak demand periods and for fire protection, and replace existing mains as necessary with the Neighborhood Street and Utility Improvement Program. City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 9 Table 5 WATER UTILITY FUND PROJECTED 5 YEAR BALANCE Starting $3,287,865 $2,537,620 $2,267,027 $1,890,372 $1,763,902 $1,584,120 Balance Revenu Investment interest 180,833 139,569 124,686 103,970 97,015 87,127 User fees 1,049,475 1,080,959 1,113,388 1,146,790 1,181,194 1,216,629 NSP 227,000 Other 124,786 128,529 132,385 136,357 140,447 144,661 &Denditures Capital outlays $1,540,153 $803,700 $906,685 $647,945 $706,825 $620,180 SCADA replacement 270,000 Wellhouse rehabilitation 37,675 173,000 Routine well maintenance 12,240 50,000 25,000 25,000 25,000 25,000 Tower painting/repair 540,160 200,000 Street improvements 329,244 380,700 769,185 622,945 681,825 595,180 Previous years' projects Other (bldg projects) 350,834 112,500 Transfers 0 0 0 0 0 0 Debt service 0 0 0 0 0 0 Operating costs 792,185 815,951 840,429 865,642 891,612 918,360 Ending $2,537,620 $2,267,027 $1,890,372 $1,763,902 $1,584,120 $1,493,997 Balance Lone-term Improvements Long-term improvements require detailed evaluation of capacity following the extensive distribution system improvements constructed in the past several years, and future water quality regulations. 1 In 1998, the periodic Water System Analysis study last conducted in 1989 ("The Black and Veatch study") was updated. The study concludes that Brooklyn Center's water supply system is adequate, and that no new wells or elevated storage need to be constructed. The emergency water interconnect with Brooklyn Park which was constructed in 1997 is capable of supplying all the City's average day demand should that need arise. An emergency generator capable of starting up a well was purchased in 1998, and electric control modifications were made to several of the wells at the time the adjustable speed drives ere installed to accommodate the generator. Water modeling confirms that under most emergency scenarios, as long as the integrity of the distribution system is not breached, water adequate for serving average water needs and providing fireflow would be available. The study also updated the estimated cost of an iron and manganese removal water treatment plant, should the City desire to construct such a facility. At this time there is no regulatory reason to do so, and alternative methods such as chemical treatment have kept complaints about these naturally-occurring minerals to a minimum. Iron and manganese are not aesthetically pleasing in the water, but no health hazards have been City of Brooklyn Center Capital Improvement Program 1999-2003 Page 10 identified as a result of their presence. It is estimated that a plant to remove iron and manganese, including an additional 1 MGAL ground storage, would cost about $8 million. A suitable site in the City's well field is available, and is reserved for such a • future use, and the water distribution system has been designed to accommodate a future plant with few adjustments. 2. In 1997 -98, adjustable speed drives were installed on the pumps at several of the City's primary wells. A revised operations plan to manage energy use and maximize production was implemented. n p p nted. A final component of the revised operations plan is to amend the City's periodic well maintenance program to provide major maintenance based on running time rather than every 6 years. This component is still being developed, and is expected to be implemented in 2000. 3. The following is a listing of major water utility facilities and future major maintenance or replacement needs: Table 6 WATER UTILITY FACILITIES FUTURE MAINTENANCE OR REPLACEMENT NEEDS FACILITY YEAR BUII.T S YEAR I LONG TERM Well #2 (B Blvd) 1959 2001: routine maintenance Routine maintenance every 6 years Well #3 (at Tower #2) 1961 2001: routine maintenance Routine maintenance every 6 years Well #4 (Evergreen W) 1961 1999: routine maintenance Routine maintenance every 6 years 2002: exterior rehab Well #5 (70th/Camden) 1966 2002: routine maintenance Routine maintenance every 6 years Well #6 (69th/Emerson) 1965 1999: exterior rehab Routine maintenance every 6 years 2000: routine maintenance Well #7 (Evergreen E) 1970 1999: exterior rehab Routine maintenance every 6 years Well #8 (Camden/Woodb) 1977 2000: routine maintenance Routine maintenance every 6 years 1999: exterior rehab Well #9 (Camden N) 1984 1999: routine maintenance Routine maintenance every 6 years Well #10 (Camden S) 1 1990 2003: routine maintenance Routine maintenance every 6 years Tower #1 (France) 1958 1999: repair coatings Inspect coatings in 2004; rehab in 15 -20 years Tower #2 (Dupont) 1 1960 Inspect coatings in 2004; rehab in 15 -20 years Tower #3 (Centerbrook) 1973 Inspect coatings in 2004 rehab in 15 -20 years SCADA 1 1998 Periodically upgrade, replace when technologically obsolete City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 11 b. Sanitary Sewer Utility The City's sanitary sewer utility provides service to 8,800 customers in Brooklyn Center. The City • also has cooperative agreements with the adjacent cities of Brooklyn Park and Robbinsdale to provide service to about 100 border customers in those cities where Brooklyn Center has mains but those cities do not. The sanitary sewer utility finances all costs for operations and maintenance and capital improvements through sewer use charges, connection charges and special assessments. Charges are adjusted annually based on a rate study analysis which reviews operation, maintenance, and construction costs, as well as sewage treatment charges from the Metropolitan Council Environmental Services (formerly Metropolitan Waste Control Commission), which P rovides wastewater treatment for the entire Twin City metro area. MCES charges account for about 3/4 the annual operating expenditure of the utility. Substantial cash expenditures have been made from the sanitary sewer utility in the past few years; capital expenditures in the next several years are expected to be less costly, confined mostly to replacement of mains as necessary through the Neighborhood Street and Utility program. In the past several years the utility has replaced the two primary lift stations, number 1 in Garden City Park and number 2 on Lyndale Avenue, and relined or replaced where possible a substantial amount of corrugated metal pipe which was used for some major interceptors in the late 1950s. As a result of these large capital expenditures, the balance in the fund has fallen considerably. This is acceptable, as the balance was considered too high. The target minimum balance in this fund is $1.0 million. While current projections show the fund periodically falling below that minimum, project costs are reviewed annually, and adjustments may or may not need to be made in future years based on more current information. i 5 Year Improvements Short term activities relate primarily to routine maintenance, and improvements associated with the Neighborhood Street and Utility Improvement Program. 1. Continue routine sewer televising and lift station inspection and maintenance program. 2. Replace any segments of sewer which have been identified as needing replacement by the television inspection program, and as necessary with the Neighborhood Street and Utility Improvement Program. It has been determined that almost one -half of the sanitary sewer pipe in the City is of the ungasketed, clay tile variety. This type of material is highly susceptible to root and groundwater infiltration. On average about half the sewer pipe in the Neighborhood projects have had to be replaced because of extensive root infiltration. Many individual services have also been replaced for the same reason. The projects identified in this 5 year plan are all in areas with known instances of root infiltration, so it is expected that replacements will be substantial. 3. Replace two smaller lift stations which are reaching the end of their useful life, and consider relining two associated segments of force main. 4. Stabilize the river bank around the section of the Mississippi River interceptor that is immediately adjacent to the river. • City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 12 Table 7 SANITARY SEWER UTILITY FUND PROJECTED 5 YEAR BALANCE .. ... .. .. ... ... ........... ... .. Starting $1,167,966 $1,026,087 $611,338 $521,808 $645,003 $705,369 Balance Revenu Investment interest 64,238 56,435 33,624 28,699 35,475 38,795 User fees 2,343,460 2,442,636 2,527,548 2,623,050 2,745,490 2,827,855 Other 6,445 1,000 1,000 1,000 1,000 1,000 Expenditures Capital Outlays $679,898 $1.003,270 $698,360 $533,480 $681,825 $745,180 INTRAC replacement 200,000 Replace lifts #10 & 11 300,000 150,000 River line 200,000 Street improvements 479,898 503,270 585,860 533,480 681,825 595,180 Previous years' projects Other 112,500 Operating costs 345,679 356,050 366,731 377,733 389,065 400,737 MCES charge 1,525,000 1,555,500 1,586,610 1,618,342 1,650,709 1,650,709 Ending $1,026,087 $611,338 $521,808 $645,003 $705,369 $776,392 Balance Lone-Term Improvements Long term improvements relate specifically to replacement of major facilities. The following is a list of those facilities and their maintenance or replacement needs. Table 8 SANITARY SEWER UTILITY FACILITIES FUTURE MAINTENANCE OR REPLACEMENT NEEDS FACILrrY YEAR BUILT 5 YEAR LONG TERM Lift Station #1 (Garden City) 1997 Monitor, maintain & rehab as necessary Lift Station #2 (Lyndale) 1993 Monitor, maintain & rehab as necessary Lift Station #3 (Palmer Lake) 1982 Monitor, maintain & rehab as necessary Lift Station #4 (Queen & 55th) 1990 Monitor, maintain & rehab as necessary Lift Station #5 (Indiana & 56th) 1990 Monitor, maintain & rehab as necessary Lift Station #6 (France & LakeB) 1988 Monitor, maintain & rehab as necessary Lift Station #7 (Willow Lane) 1990 Monitor, maintain & rehab as necessary Lift Station #10 (58th & June) 1967 1999: replace Monitor, maintain & rehab as necessary Lift Station #11 (SCP) 1969 1999: replace Monitor, maintain & rehab as necessary Lift Station #12 (Freeway) 1985 Maintain & rehab as necessary. Review condition in 2015 INTRAC 1998 Periodically upgrade, replace when technologically obsolete i City of Brooklyn Center Capital Improvement Program 1999-2003 Page 13 C. Storm Drainage Utility I • The e C ty ' s storm drainage system consists of storm sewer piping and a series of storm water detention ponds. The Local Water Management Plan has established a goal of constructing new and/or replacing old storm sewers plus adding additional storm water ponds to provide adequate drainage for a five year storm. The Plan also requires private developments to provide on -site drainage system and storage necessary to treat storm water and retain all drainage on -site for up to six hours after a five year storm. Substantial capital improvements have been undertaken in the years since the storm drainage utility fund was established in 1991. Through revenue bonds the fund financed the acquisition of property and the construction of Bob Cahlander Park, which includes a 4 acre storm water detention and water quality pond. These revenue bonds will be retired in 2005. The neighborhood projects which have been undertaken in the past several years have had very substantial storm drainage components. As a result, the fund has expended all its reserves. A less aggressive level of improvement will be pursued until reserves can be rebuilt and a minimum balance of $500,000 can be maintained. In addition, the special assessment component of street improvements will increase so that property owners are paying a larger share of the cost of installation of new storm sewers. The storm drainage utility finances all costs for storm drainage system operations_ and maintenance and capital improvements. Capital improvement bonds and special assessments supplement the SDU. Charges are adjusted annually based on a rate study analysis which reviews all costs relating to the storm drainage system. • 5 Year Improvements Short term activities include both major drainage improvements and improvements associated with the Neighborhood Street and Utility improvement Program. 1. Complete storm drainage improvements as necessary with the Neighborhood Street and Utility Improvement Program. Major trunk improvements have been made by several previous projects, including 65th Avenue through the Orchard East and West projects; 57th Avenue from Humboldt to the east; and 55th Avenue through several projects, including the Logan/James/Knox and Bellvue projects. Trunk storm sewer work in this 5 year plan is expected on 63rd Avenue from Brooklyn Boulevard to Brooklyn Drive. Some additional ponding is being explored in several areas of Garden City Park. This pending would pretreat stormwater before it is discharged into Shingle Creek. 2. Refine concepts for increasing stormwater storage in the Palmer Lake basin, and construct the first phase of these improvements. 3. Coordinate with the city of Minneapolis the completion of the Shingle Creek Regional Pond. As Brookdale Shopping Center redevelops, its utility and drainage plans will have to be coordinated with the Regional Pond design. • City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 14 Table 9 STORM DRAINAGE UTILITY 5 YEAR PROJECTED BALANCE • 00( 3:: :> 2 :::>::: z:::::: �:<::::>::>:06i:::: <::: >::I::: >:::: >:..2fl0 5"I<f)R14I;AIAllYAt�E;tiTlliY _ . - .--- ._......__. _._...._..._ Starting $151,169 $386,376 $297,430 $196,003 $431,330 $154,198 Balance Revenues Special assessments 10,159 9,704 9,249 8,794 8,339 8,339 User fees 856,920 936,000 988,000 1,040,000 1,040,000 1,040,000 Bond sales /prepays 206,132 258,900 297,770 253,625 309,170 255,895 Interest 2,890 18,428 30,746 45,738 45,738 Other 1,500,000 1,250,000 Eroenditures Capital outlays $2,003,967 2,186,845 1,049,955 676,270 1,254,773 831,175 Structure improvements 25,344 50,000 50,000 50,000 50,000 50,000 Misc studies 15,000 30,000 Previous years' projects Street improvements 757,491 97,945 702,185 372,645 895,604 525,280 Shingle Creek Reg Pond 1,000,000 1,750,000 Assessed portion of proj 206,132 258,900 297,770 253,625 309,170 255,895 Palmer Lake Impr 200,000 Debt service 244,185 241,595 243,520 244,700 245,200 245,000 Operating costs 168,932 170,000 173,400 176,868 180,405 184,013 Ending $386,376 $297,430 Sl%,003 $431,330 $154,198 $243,982 balance • Long -term Improvements The Phase II study which expanded upon the Local Water Management Plan has identified numerous deficiencies and opportunities for improvement. As more funds become available when the revenue bonds used to construct Cahlander Park and Pond are retired, a program of water quality improvements will be developed. Of particular concern are strategies to improve water quality in Upper and Middle Twin Lakes, and to complete what is expected to be a series of improvements in the Palmer Lake basin. 2. STREETS, SIDEWALKS, AND TRAILS Improvements to streets, sidewalks, and trails are funded from a variety of sources. The largest of these are the Special Assessment Construction Fund, special assessments, the various public utilities, Municipal State Aid, and the Local State Aid Fund. The sources of funds for the Special Assessment Construction Fund are: the General Fund; special assessment revenue bonds; special assessments; and excess funds transferred from bond repayment funds being closed out. The Municipal State Aid Fund is supported by gas tax revenues which are apportioned to the state, counties, and cities to provide for the construction, maintenance, and reconstruction of a network of roadways known as the State Aid System. About 21 miles of City streets are designated MSA streets, and the City receives about $800,000 annually for these improvements. Finally, the Local State Aid Fund consists primarily of excess funds available when special assessments on a state aid project and MSA reimbursement exceed the cost of the project. The LSA Fund is used primarily to finance sidewalk and trail improvements, • and that part of improvements on an MSA project which is not eligible for MSA financing. City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 15 a. Streets The City is responsible for maintaining just over 100 miles of streets; about 80 miles are classified as • neighborhood streets, and just over 21 miles as Municipal State Aid streets. Capital improvements generally include mill and overlay improvements and total reconstruction. The Pavement Management Program conducted by Braun Intertec in 1992 has been used to help identify the City's street reconstruction needs. From the results of this analysis and an ongoing review of utility needs, a plan to reconstruct or rehabilitate as necessary the City's streets has been developed. This plan has been designated the Neighborhood Street and Utility Improvement Program. When this program began in 1994, it was anticipated that reconstructing or rehabilitating the City's streets could take about 20 years, at a rate of 4 -6 miles of streets per year. On further analysis, it is likely that financial considerations will not allow that pace to be sustained continuously. Accordingly, it is expected that annually between 4 and 4.5 miles can be reconstructed until 2005. In 2005, 2006, and 2007, debt on previous street improvement bonds will be retired, and the property tax levy dedicated to servicing that debt can be redirected to the "pay as you go" projects. Realistically, after this second five year program is complete, it will likely take about 15 years to complete the remainder of the City. The policies guiding the designation of streets to be improved are as follows: 1. Improvements proceed on a neighborhood basis, rather than piecemeal and strictly on "need. " This approach has the benefits of a) minimizing construction cost by confining improvements to one area rather than multiple sites throughout the city; b) approaching drainage needs on an area wide basis; and c) allowing for more efficient construction • administration and inspection. 2. Brooklyn Center has historically had two methods of identifying "neighborhoods ": planning neighborhoods, and park service districts. These are fairly large areas, which often do not make a suitable base for assessing infrastructure needs. To retain its rims emphasis as one of infrastructure p ry p rehabilitation, for the purposes of the Neighborhood Program, storm drainage areas are the basis of identifying neighborhoods. However, in many cases "natural" neighborhoods do not conform precisely to drainage areas, so the boundaries of an improvement area might be amended slightly to define a broader area. It may also for various reasons be prudent to construct improvements to only a portion of a neighborhood at one time. 3. Priorities are established as follows: a) Areas with multiple needs; b) Improvements which could immediately reduce operating costs; C) Areas petitioned for by a majority of the property owners; d) Areas which would complete regional improvements; and e) Improvements which could benefit from being coincident with redevelopment. The following table details progress in past years and projected for the coming 5 years on meeting neighborhood infrastructure improvement needs. City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 16 Table 10 Neighborhood Street and Utility Improvement Program Progress • CIP Street Reconstruction M iles Local MSA Total % of Total 11985 -1993 1 6.50 3.40 9.901 10% 1994 1.98 - 1.98 1995 3.08 0.84 3.91 1996 5.61 2.04 7.65 1997 4.61 0.50 5.11 1998 3.49 0.50 3.99 11994 -1998 1 18.77 3.87 22.651 22% 1999 3.93 0.43 4.36 2000 3.21 0.68 3.89 2001 3.52 - 3.52 2002 4.31 1.02 5.33 2003 3.91 - 3.91 11999 -2003 1 18.88 2.13 21.021 20% (Remaining 1 38.45 11.59 50.041 48% Totals 1 82.60 21.00 103.601 5 Year Improvements 1. Complete two State Aid Street projects: mill and overlay Earle Brown Drive from John Martin Drive north to the new EBHC parking lot; and reconstruct 73rd Avenue from Humboldt to Camden. 2. Work cooperatively with Hennepin County to accomplish the widening and enhancement of Brooklyn Boulevard from 65th to 71st Avenues. 3. Complete Neighborhood improvements in the Southeast area with two projects, one called Southeast, which generally completes work south of 57th and east of Irving, and one called Tangletown, which is the streets from 53rd to Lilac Drive, west of Logan to Centerbrook Golf Course /Lions Park. These projects would complete the streets south of 57th in the Southeast Neighborhood, except for County Road 57, that is 57th from TH 100 to Humboldt, and Humboldt from 57th to 53rd. 4. Complete Neighborhood improvements in the Garden City area, that is the residential area between Brooklyn Boulevard and Shingle Creek, from CR 10 to I -694. This would be accomplished over three years. 5. Complete Neighborhood improvements in the area west of Northport Park, from France to Upper Twin Lake, from Eckberg north to Bass Lake Road. 6. Consider several landscaping and "streetscaping" projects to enhance the appearance of the City and promote neighborhood unity and sense of place. City of Brooklyn Center Capital Improvement 1 rogram 1999 -2003 Page 17 7. Paint all signal poles for which the City has service responsibility. LEDs installed in 1998 will dramatically reduced energy operating costs for the signal systems, and will greatly reduce bulb changing and other maintenance requirements. • Table 11 MUNICIPAL STATE AID FUND 5 YEAR PROJECTED BALANCE .... ....... Starting ($30,651) ($81,672) $154,705 ($105,081) $89,859 $51,272 Balance Revenues Intergovernmental 943,705 830,000 430,000 830,000 830,000 830,000 Advance 400,000 Expenditures Capital Outlays $496,138 $596,063 $289,080 $232,320 $469,800 $0 France Avenue 162,036 Previous years' projects 314,613 John Martin/Earle Brown Dr 142,000 150,000 73rd, Humboldt to Camden 232,320 Neighborhood streets 192,102 131,450 289,080 0 469,800 0 Transfers 90,000 90,000 90,000 90,000 90,000 90,000 Debt service 308,588 307,560 310,706 312,740 308,787 308,787 Ending ($81,672) $154,705 ($105,081) $89,859 $51,272 $482,485 balance • Table 12 GENERAL FUND CONTRIBUTIONS TO STREET PROJECTS 5 YEAR PROJECTED BALANCE .. ........ 99 . ........ E .4 C . ...... .... ... . . .. ....... . .............. ......... ..... ........... Starting $49,824 $184,365 ($1,130) $189,024 $263,629 $221,927 Balance Revenues Special assmnt fund interest 30,000 30,000 30,000 30,000 30,000 30,000 General fund contribution 594,000 594,000 594,000 594,000 594,000 594,000 Expenditures Capital Outlays $489,459 $809,495 $433,845 $549,395 $665,702 $856,045 Bellvue 390,493 St. Al's 98,966 Southeast 809,495 Garden City Central 351,230 Halifax/Grimes/France 82,615 Garden City North 549,35 Garden City South 501,392 Northport West 164,310 Tangletown 856,045 Ending $184,365 $($1,130) $189,024 $263,629 $221,927 ($10,118) Balance City of Brooklyn Center Capital Improvement Program 1999-2003 Page 18 Long -term Imp rovements • 1. Continue the rehabilitation and reconstruction of residential streets, under the Neighborhood Street and Utility Improvement program. 2. Continue improvements under the Municipal State Aid street program. These improvements may be coordinated with Neighborhood projects, or may be stand - alone. 3. Monitor intersections with growing traffic volumes for possible future traffic signal installation. 4. Monitor neighborhood streets for possible traffic calming opportunities. b. Sidewalks and Trails A comprehensive sidewalk system which serves all major activity areas and corridors of pedestrian traffic has been established. Only a few segments of this system remain to be completed. In addition, the City has developed a plan for development of a comprehensive trail system to provide recreational trails for pedestrians and transportation trails for bicyclists. Both on- street and off - street trails are being developed, and integrated into the regional trail system which serves the Twin City metropolitan area. Where feasible, trail construction is being coordinated with other construction projects to assure lowest cost development of this system. Funding for sidewalk and trail improvements is provided by two accounts within the Municipal State Aid Construction fund. Activities included in the CIP for future consideration include: 5 Year Improvements 1. Continued maintenance and repair of existing sidewalks and trails. The City owns and maintains about 35 miles of sidewalks, and about 12 miles of bicycle /pedestrian trails. 2. Construction of the 53rd Avenue Trail, which will link the Bellvue Lane redevelopment area and the Southeast Neighborhood with the North Mississippi Regional Park.. 3. Construction of a new trail in Bellvue Park from Bellvue Lane to the existing trail in the central portion of the park. 4. Designation of on- street and on- sidewalk trail systems. 5. Repair of sidewalk retaining walls throughout the City. 6. Repair of landscaping nodes in the Earle Brown Farm commercial district.. Most of the nodes have been repaired, either by the John Martin Drive street project, or a separate node repair project. Some remaining nodes will be repaired as a part of the Earle Brown Drive street project. The nodes on the west side of Shingle Creek Parkway at John Martin Drive (the entrance to the Hennepin County Service Center), will not be repaired because Hennepin County plans to expand the Service Center and reconstruct that driveway into the Center. • City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 19 Table 13 LOCAL STATE AID FUND 5 YEAR PROJECTED BALANCE • VW . ... .. 2 00 :M Starting $2,080,196 $2,112,650 $1,400,050 $622,800 $634,010 $568,880 Balance Revenues Investment interest 114,410 116,200 77,000 34,250 34,870 31,290 Other &Denditures Capital Outlays $81,856 $828,800 $854,250 $23,040 $100,000 $75,000 Sidewalks 125,000 75,000 25,000 25,000 Trails 25,000 160,000 Street improvements (68,044) (6,200) 250,000 (1,960) 100,000 50,000 Brooklyn Boulevard 600,000 604,250 Ending $2,112,650 $1,400,050 $622,800 $634,010 $568,880 $525,170 Balance Lon:? -term Improvements a. Completion of the 53rd Avenue trail link between the Shingle Creek/North Hennepin Trail Loop trail and Bryant Avenue.. b. Consideration of the Twin Lake Trail system and Shingle Creek trail head improvements. III. PARKS, PUBLIC FACILITIES, AND CAPITAL EQUIPMENT Improvements to parks and other public facilities such as the Civic Center, central garage, and fire stations, are made primarily through the Capital Improvements Fund. Certain types of large-scale equipment such as telephone systems are also purchased through the Capital Improvements Fund. The Capital Improvements Fund is funded from a variety of sources, with the largest being the General Fund and proceeds from General Obligation bond sales. In 1997, the Capital Improvements Fund was split into two funds: the $1 million Capital Reserve Emergency Fund, and the Capital Improvements Fund. The Capital Improvements Fund is intended for park, building, and other miscellaneous improvements, while the Capital Reserve Emergency Fund is a restricted fund intended to provide emergency financing for nonreimbursable emergency expenses or emergency cash flow. There is no established minimum balance for the Capital Improvements Fund. Since all the improvements under the following three sections are financed primarily through the Capital Improvements Fund, the table projecting its balance in 5 years follows the final section. a. Parks The Brooklyn Center park system is in the process of being systematically renovated. A thorough • review of park facilities has been completed, and a plan for improvements is under way. This plan City of Brooklyn Center Capital Improvement Program 1999-2003 Page 20 I anticipates the continued use of the operating budget to make improvements such as minor equipment (picnic tables, benches, trash receptacles, etc.) replacement; trail repair and sealcoating; minor shelter building and electrical repairs; landscaping enhancements; minor tennis court rehab; etc. Major improvements such as playground replacement; shelter replacement; replacement of field and trail • lights; parking lot improvements; etc. would be financed through the Capital Improvements Fund. This plan uses the following principles to establish priorities for improvements: 1. Complete the replacement of playground equipment by 1999. 2. If possible, improve neighborhood parks coincident with neighborhood street and utility improvements. 3. Provide geographic balance in improving parks, so that over a short period of time all neighborhoods have access to at least one fully improved park. 4. Complete improvements at one Community Park per year. 5. If possible, when improving a park complete all improvements comprehensively. For example, complete all playground, shelter, and other large improvements as well as smaller improvements such as replacing picnic tables, trash receptacles, bleachers, and drinking fountains, etc., repairing basketball courts, adding landscaping, sealcoating trails, and replacing signs. 6. Improvements should be made systematically and annually from the Capital Improvements Fund and General Fund, rather than periodically by bond issue • proceeds. Annual expenditures from the Capital Improvements Fund should not exceed $225,000. These prioritization principles result in a program of seven to eight years of capital improvements. This plan does not comprehend adding major new facilities, such as additional lighted ball fields. Addition of new facilities would increase the length of the program. After about year ten, playgrounds, tennis courts, etc. which had been improved in the past several years would start to require rehabilitation or replacement, and the cycle would begin again. This plan uses the following principles to establish the types of improvements: 1. Five parks have been designated Community Parks. These "destination parks" will have larger playgrounds; larger, heated shelter buildings; lighted rinks and ballfields; lighted ball fields; and other specialized facilities such as tennis courts, or football or soccer fields. These parks are: Central /Garden City, Grandview, Evergreen, West Palmer, and Kylawn. 2. Neighborhood parks will generally include playgrounds, basketball courts, ball diamonds, and picnic shelters and picnic areas. Some parks with traditionally strong hockey and pleasure skating programs will include lighted rinks and smaller warming houses. Parks which would continue to have warming houses would be: Orchard Lane and Northport. As specialized facilities in neighborhood parks are to be considered for • City of Brooklyn Center Capital improvement Program 1999 -2003 Page 21 major capital improvements, the neighborhood, the Park and Recreation Commission, and the Council would review the appropriateness of the facility for the neighborhood and the park before making that investment. 5 Year I v e is mnro em n . 1. Complete the replacement of playground equipment. 2. Continue the systematic improvement of park facilities, with major improvements in the next 5 ears to Central West Palmer K lawn and Grandview. Y Y 3. Revise recreation programming as improvements are made. 4. Revisit the several parks which have had playground equipment replaced in the past few years and add swingsets and containments. Because of new safety regulations, some of the existing playground containments were too small to include both playground equipment and swings. Lone Term Improvements Continue the systematic improvement of park facilities: Table 14 PARK FACILITIES FUTURE MAINTENANCE OR REPLACEMENT NEEDS • PARK S YEAR LONG TERM Bellvue 1999: construct path from Belivue Lane to ballfield, playground, and Monitor, replace as necessary picnic shelter; create new park entrance on the south with decorative lighting, landscaping, and fencing Brooklane Monitor, minor improvements through General Fund Review shelter condition Cahlander Monitor, minor improvements through General Fund Centerbrook GC 1999: rehab & expand garage area Monitor, replace as necessary 2000: replace hot water heater 2001: clubhouse improvements, replace foot bridges 2002: replace irrigation system controllers 2003: overlay parking lot Central 1999: upgrade trails & bailfields, add concession and storage bldgs Monitor, replace as necessary 2000: expand playground, repair tennis courts, replace lights Evergreen Monitor, minor improvements through General Fund Monitor, replace as necessary Firehouse 2000: replace shelter, lighting, bleachers Monitor, replace as necessary Freeway 2001: replace lighting, minor improvements through General Fund Review shelter, playground condition Garden City 2000: review parking needs, enlarge lot if necessary, add swings Monitor, replace as necessary Grandview 2003: replace shelter, ballfield / hockey lights, repair tennis courts, Monitor, replace as necessary pave hockey rink • City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 22 PARK 5 YEAR LONGTERIM Hagel Arboretum Monitor, minor improvements through General Fund Happy Hollow 1998: replace playground Monitor, replace as necessary 2000: replace shelter, lights Kylawn 2002: replace shelter, repair tennis courts, pave hockey rink Monitor, replace as necessary Lakeside No improvements Lions 1999: replace shelter, lights, add swings, pave Little League area, Monitor, replace as necessary Marlin Monitor, minor improvements through. General Fund Monitor, replace as necessary North Mississippi Hennepin Parks improvements Orchard Lane 2001: replace shelter, lights Monitor, replace as necessary Palmer Lake East 1999: replace outfield fence Monitor, replace as necessary 2000: replace shelter, lights Palmer Lake West 2001: replace shelter, add storage bldg, repair tennis courts, rehab Monitor, replace as necessary parking lot, replace lights I Palmer Lake Cooperative trailhead improvements with Hennepin Parks, such as Monitor, replace as necessary add picnic shelter I Riverdale Monitor, minor improvements through General Fund Monitor, replace as necessary, review shelter condition Twin Lake Establish purpose of park, identify needs Implement recommendations for improvement Wangstad 1999: Replace playground 1 Monitor, replace as necessary Willow Lane 1999: replace lights Monitor, replace as necessary 2002: replace shelter, tot lot b. Government Buildings The City owns and operates several major facilities: City Hall and the Community Center (together, the Civic Center); the Central Garage; and two fire stations. In addition, the City owns two of the three municipal liquor store buildings. The City also owns and operates the Earle Brown Heritage Center, a convention center and Inn complex developed from several buildings formerly housing the historic Earle Brown estate and horse farm. The Central Garage was recently remodeled and expanded and underground storage tanks removed and replaced with a new fuel system. Similar improvements to the City Hall and Community Center are under consideration. Proposed funding for the improvements would come from the Capital Improvement Fund. The major facilities improvements in 1998-99 will be the construction of a new public safety facility at Humboldt and 67th Avenues, and the demolition of the west fire station/liquor store and reconstruction of a new west fire station. The east fire station will be remodeled. A referendum authorizing the sale of $7.9 million of General Obligation bonds to finance the public safety and fire station work was approved in November, 1997. Improvements to the Earle Brown Heritage Center are considered elsewhere and are not comprehended in this study. Proposed major improvements to other facilities to be considered over the next several years include: City of Brooklyn Center Capital Improvement Program 1999-2003 Page 23 S Year Im provements • 1. Construct a new, larger police station, alleviating severe space shortages and providing upgraded facilities. 2. Remodel City Hall to provide for improved public access and customer service and improved Council Chambers, to meet ADA accessibility requirements, to correct code violations, and to upgrade the roof and mechanical systems. 3. Remodel the Community Center with the emphasis on improved accessibility and to meet code requirements. 4. Construct a new west fire station and an addition to the east fire station to correct code violations, increase training, storage, and sleeping quarters space, and increase vehicle storage space. 5. Consider an additional cold storage building at the Central Garage to accomodate additional storage needs. 6. Rehabilitate the north and south parking lots at the Civic Center. Long -term Improvements • 1. Monitor community facility needs. Between 2005 -2010, begin community discussions regarding city hall and community center long -term needs. C. Miscellaneous Equipment The City operates a Central Garage Internal Service Fund, which owns all vehicles and major equipment. The cost of owning (depreciation, license, insurance, overhead) and operating (fuel, preventative maintenance and repair) vehicles and equipment is charged back to the departments using the equipment. Replacement of existing equipment is financed from the Fund. The addition of equipment is funded from a variety of sources: the General Fund, enterprise funds, etc. The City's policy for the replacement of vehicles and equipment establishes a projected reasonable life cycle for each item. Annually, the life cycles are reviewed and updated on the basis of experience or changed circumstances. Also, new vehicles and equipment are proposed for addition to existing inventories and replacement schedules when new needs are clearly demonstrated. Vehicles and equipment purchases are generally considered during the annual budget process, and are no longer incorporated into the CIP. Routine equipment purchases, such as data processing equipment, are considered through the general fund process and the MIS Strategic Plan, and are no longer incorporated into the CIP. However, major equipment systems due to be considered for replacement which are beyond the scope of routine are included here. For example, in 1998, the telephone systems which service the Civic Center, Central Garage, Heritage Center, Fire Stations, and Liquor stores were replaced. City of Brooklyn Center Capital Improvement Program 1999 -2003 Page 24 S Year Improvements • 1. Replace the City's public safety and public works radio systems. Lone-term Improvements 1. Monitor data processing, telecommunications, and other equipment needs Table 15 CAPITAL IMPROVEMENTS FUND 5 YEAR PROJECTED BALANCE .............. ....... ..... ................... C Starting $11,063,287 $6,982,591 $3,571,745 $2,070,235 $1,580,095 $1,659,005 Balance Revenues Investment interest 304,240 384,040 196,450 113,860 86,910 91,250 Golf course loan payments 50,000 50,000 50,000 50,000 50,000 50,000 Liquor store loan payments 28,830 30,914 24,640 Transfer from General/Liquor Fund 175,000 175,000 175,000 175,000 175,000 175,000 Emenditures Capital Outlays $4,638,766 $4,050,800 $1,947,600 $829,000 $233,000 $347,400 Pool ozonization 35,407 East fire station 762,289 200,000 West fire station 1,447,892 1,000,000 Police station 1,708,719 2,625,000 Building proj contingency 1,000,000 Civic Center impr 15,000 200,000 1,500,000 Park improvements 209,690 225,800 222,600 229,000 233,000 347,400 Central Garage impr 75,000 225,000 Equipment/other 182,465 600,000 Ending $6,982,591 $3,571,745 $2,070,235 $1,580,095 $1,659,005 $1,627,855 Balance • City of Brooklyn Center Capital Improvement Program 1999-2003 Page 25 • APPENDIX • TABLE A - Capital l 1 of Capital Outlays Water Utility @Wital Improvements -- EXPENDITURES: WATER SUPPLY SYSTEM SCADARep|aoement 4.817 270.000 VVo||houou#3.4rehab 7.675 Design #5.G exterior rehab 30.000 VVeUhouae#5&G exterior rehab 160.000 VVeUhouuo#7rehab 13.000 | Previous years' projects � Routine well maintenance 24.886 12 50.000 25.000 25.000 25.000 25.008 WATER TOWERS Repair Paint on Tower #1 200.000 Repair Paint on Tower #2 209.754 0.820 Replace Paint on Tower #3 515.340 Landscape Tower #1 15.000 MISCELLANEOUS Replace Fuel Tanks 21.788 Install adjustable speed drives 22.579 201.559 � Portable 25OKWgenerator 53.275 � Relocate VV Fire main 70.000 Water system study update 26.000 � TOTAL EXPENDITURES $283.824 $1.210.909 $423.000 $26.000 $25.000 $25.000 $25.000 FUND SOURCES: Water Utility 283.824 983.909 423.000 25.000 25.000 25.000 25.000 NSP 227.000 TOTAL *283.824 $1.210.909 $423.000 *25.000 $25.000 o25.000 $35.000 ' TABLE B - Capital Improvemerogram - Detail of Capital Outlays . Sanitary Sewer Ulffillf Capital Improvements :::.:1..99 ..:::..:.::..: ::::::.19 999..::::: :::.::::flf1!#.................2 4........ ...........2842................ D............... d:.. CE<< EXPENDITURES: All San Sewer Utility LIFT STATIONS INTRAC Replacement 200,000 Previous years' projects 20,572 Replace Lifts 10 & 11 and Forcemain 300,000 150,000 SEWER REPLACEMENT: Stabilize Miss River Interceptor 200,000 MISCELLANEOUS Replace Fuel Tanks 21,788 TOTAL EXPENDITURES $42,360 1 $200,000 1 $500,000 I $0 $o $0 $150,000 FUND SOURCES: Sanitary Sewer Utility 42,360 200,000 500,000 0 0 0 150,000 TOTAL $42,360 I $200,000 1 $500,0001 $0 $0 $0 $150,000 I • TABLE C - Capital Improveme rogram - Detail of Capital Outlays • Storm Drainage LfflWy Capital Improvements 26-Aug EXPENDITURES: SYSTEM IMPROVEMENTS Miscellaneous structure improvments 25,344 50,000 50,000 50,000 50,000 50,000 All storm drainage utility Previous years' projects I 26,186 WATER TREATMENT IMPROVEMENTS Shingle Creek Regional Pond 49,836 1,000,000 1,750,000 Not yet established Twin Lake Improvements 200,000 MISCELLANEOUS Palmer Lake Drainage Study 0 0 30,000 Surface Water Study 30,000 1/2 sou, 1/2 Capital Impr Fund TOTAL EXPENDITURES $76,022 $1,055,344 $1,830,000 $50,000 $250,000 $50,000 $50,000 FUND SOURCES: Storm Drainage Utility 26,186 40,344 80,000 50,000 250,000 50,000 50,000 Capital Improvements Fund 0 15,000 TIF 500,000 Other Governments 49,836 500,000 1,750,000 TOTAL $76,022 $1,055,344 $1,830,000 $50,000 $250,000 $50,000 $50,000 TABLE D - Capital ImprovemegWrogram - Detail of Capital Outlays • • Sidewalk an ail improvements '0 .......... 26-Aug-98 00 .. MOE: EXPENDITURES: OFF-STREET TRAIL: All Local State Aid Kylawn/Preserve 25,000 50% DNR match Miscellaneous park trails 60,000 53rd Ave Greenway Trails 100,000 50% DNR match ON-STREET TRAIL: Marking and Signage General Fund SIDEWALK: :Miscellaneous Repairs • 24,184 50,000 50,000 25,000 25,000 Repair retaining walls 25,000 25.000 Repair streetscape nodes 50,000 TOTAL EXPENDITURES $24,184 $150,000 $235,000 $0 $25,000 $0 $25,000 FUND SOURCES: State Aid - Local 24,184 150,000 185,000 0 25,000 0 25,000 DNR 0 0 50,000 0 0 0 0 TOTAL $24,184 $150,000 $235,000 $0 $25,000 $0 $25,000 TABLE E - Capital U00k� Detail Capital . ^ . ° Park 11 8 IM EXPENDITURES: eUok Be0vme Shelter, playground, lights, mioc 51.500 20.800 All Cap |mprFund Bnmmk/ane except oonoted Cab/andor 10.000 Central Shelter, boUUe|d. plaza pond 90.000 Lighting 30.00 � Tennis, plaza 40.000 � Cemberbrnmk Goff Course � Garage Improvements 25.000 Golf Course Fund Replace irrigation system 40.000 Golf Course Fund Overlay parking lot 10.000 Golf Course Fund Evergreen Shelter, lighting, mion 103.190 � Firehouse Picnic shelter, lighting. niuc 39,40 Freeway Lighting, etc 19.000 � Garden City � Enlarge parking lot, miuc 45.400 Grandview � 8hobwr, ball field lights, miso 3.800 312,400 Happy Hollow Playground equipment 25.000 � 8he|ter.mioc 31.400 � Kylawm Shabar, tennis courts, misc 3,800 132,000 Lions Shaber, |ighbng.miso 30,200 Marlin Park lWovements 26-Aug-98 Northport Lighting, etc 32.800 Orchard Shelter, miuoimpr 45.000 EPalmer Playground equipment 30.000 8.500 Shelter, miuuimpr 36.400 . S Palmer Picnic shelter, miucimpr WPalmwr Shelter, tennis courts, reoonu1rparking 3.800 165.000 � lot, storage, miocimpr Riverdale Picnic shelter, lighting, mioc 35.000 Twin Lake Playground, picnic shelter 35.000 Nangstad Playground equipment 26.400 Willow Lane Shelter, miuuimpr 18.500 56.000 TOTAL EXPENDITURES $O $209.690 $250.800 $222.600 $229.000 $273.000 $357.400 FUND SOURCES: � Capital |mprFund $0 $209.690 $225.800 $222.600 $220.000 $233.000 *347.480 Golf Course O O 25U0O O O 4OOUO 10,000 . . � TOTAL *O $209.680 $250.800 $222.600 $229.000 $273.000 $357.400 TABLE K� - ����U���U |�� �f ��������M _ �����'l �~��������1 '^ ^~~^-^- ^ Capital Imp "^^~''"^ Program ~~=°=" =" Capital Out Improvements EXPENDITURES: CIVIC CENTER Construct new police station 91.281 1.708.719 2.500.000 Additional PDtechnology 125.000 Rehabilitate Civic Center 7.472 15.000 1.500.000 Replace phone systems 182.465 Replace radio system 608.000 Poo|uzonnzodion 3.093 35.407 Rehab parking lots 200.000 � CENTRAL GARAGE Replace fuel tanks 122.532 Additional Storage 450.000 Garage addition 1.151 76.800 FIRE STATIONS Remodel East Station 37.711 762.289 200.000 New West Station 152.108 1.447.892 1.000.000 Fridley training facility 25.000 building project contingency 1.000.000 � � TOTAL EXPENDITURES $44U34O $522G772 �4U25O0U �1S5UUOO �6OUUOD �8 � �O � . . . . . . . . � FUND SOURCES: Capital Improvements Fund 159.348 1.307.872 325.000 1.725.000 600.000 O D Water Utility O 0 112.500 O O O � � Sanitary Sewer Utility D O 112.500 O O O � GO Bonds ' 281.100 3.018.900 3.700.000 O O O O Liquor Fund O D 0 O O O O TOTAL $440.348 $5.226.772 $4.035.000 $1.950.000 $600,000 $O $0 � TABLE G - Capital ymp Detail of Capital Outlays Street 1 EXPENDITURES: SIGNALS Replace lamps with LCDo 18.000 Pole painting &restoration 25.000 STATE AID STREETS Proviouo years' projects 15.467 Humboldt Ave Turn Lane France Avenue. G9thtoNCdvLim 795.527 89.590 � K8SA'Regular 479.012 &1SA'Regu|nr � NYSA'Loca| (114.726) Local State Aid Water Utility 215.446 51.122 Water Utility Sanitary Sewer Utility 96.855 18.468 Sanitary Sewer Utility Storm Drainage Utility (37.410) Storm Drainage Utility Special Assessments 150.350 Special Assessments � � John Martin/Earle Brown Drive 149.664 160.000 � W18A'Regu|ar 142.327 139.200 yN8A-Rogu|a, � N1SA-Local (129.162) (114.200) Local State Aid Water Utility 3.337 8,000 Water Utility Sanitary Sewer Utility 4.000 8.000 Sanitary Sewer Utility Storm Drainage Utility O U Storm Drainage Utility � Special Assessments 129.162 119.000 Special Assessments Bmok|vn Boulevard. G4thtoNCib/Limits 600.000 1.899.550 500.000 ROW Acquisition 600,000 LSA Road Construction 599.550 Utilities, Sp Assess, YN8 Lighting, Landscaping 1.300.000 500.000 T|F. Local SA, |STEA 73vd. Humboldt hnTH252 352.000 yN3A'Regu|ar 232.320 yNSA,Regu|ar &1SA-Local (51.960) Local State Aid Water Utility 58.320 Water Utility Sanitary Sewer Utility 56.320 Sanitary Sewer Utility Storm Drainage Utility Storm Drainage Utility Special Assessments 60.000 Special Assessments TABLE G - Capital Umproveme Detail of Capital Outlays Street fWrovements 0. COMMERCIAL STREETS | James/67th 180.541 7O96 Spec mmoaaumnt K8SA-Local 22.773 Local State Aid Water Utility 2.800 Water Utility Sanitary Sewer Utility 2.000 Sanitary Sewer Utility Storm Drainage Utility 2 Storm Drainage Utility Spec Assessments 150.968 Spec Assessments Lae/68th 196.804 3096LSA K8SA,Loco| (25.875) Local State Aid | Water Utility 18.229 Water Utility Sanitary Sewer Utility 3.500 Sanitary Sewer Utility Storm Drainage Utility 3.850 Storm Drainage Utility Special Assessments 196.900 Special Assessments Earle Brown DrNof Summit, yN&O 100.000 yNSArL000| 8.000 Local State Aid Water Utility 5.000 Water Utility Sanitary Sewer Utility 5.800 Sanitary Sewer Utility Storm Drainage Utility 12.000 Storm Drainage Utility Special Assessments 70.000 Special Assessments NEIGHBORHOOD STREETS Orchard West 8p Assess ConntrFund 517.929 N1SA'Louo| 54.926 465 Water Utility 885.159 77.100 Sanitary Sewer Utility 570.052 53.823 Storm Drainage Utility 257.518 30.108 Street Assessments 1.037.402 � Storm Drainage Assessments 337.863 � 8mUvuaNeinhbnrhood Sp Assess ConutrFund 390.493 � � KASA'Ragu|ar 192.102 /NSA'L000l 45.755 Water Utility 146.348 Sanitary Sewer Utility 299.411 � Storm Drainage U0ty 750.993 � Street Assessments 428.732 Storm Drainage Assessments 141.518 " TABLE G - Capital lmprove0Oe Detail of Capital Outlays Street MWrovements 0 St. Al's Neiqhborhond Sp Assess CunskFund 98.966 yNSA'Regu|ar W1SA'Loms| Water Utility 30.308 Sanitary Sewer Utility 98.696 Storm Drainage Uti|ty (29.460) Street Assessments 186.390 Storm Drainage Assessments 64.614 SENeiohborhoud Sp Assess CunutrFund 809.495 YNSA,Regu|or 131.450 | yNGA'Loco| 50.000 Water Utility 367.700 Sanitary Sewer Utility 490.370 Storm Drainage Uti|ty 85.945 Street Assessments 795.440 Storm Drainage Assessments 258.900 Garden CdvCentral 8p Assess ConotrFund 351.238 NYSA-Ragu|o, 289.080 yNSA'Loco| 75.000 Water Utility 630.520 Sanitary Sewer Utility 474.180 Storm Drainage Ub|ty 520.160 Street Assessments 831.195 Storm Drainage Assessments 272.210 Halifax/Grimes/France Sp Assess ConotrFund 82.618 KXSA-Regular KUSA'Loce| Water Utility 69.585 Sanitary Sewer Utility 58.580 Storm Drainage UU|ty 51.325 Street Assessments 78.480 Storm Drainage Assessments 25.560 TABLE G - Capital |00prove0Me Detail of Capital Out Street IlWovements 26-Au8-98 ��;����#����������� 9��x�� Garden CitvNorth Gp Assess ConstrFund 549.395 K8GA'Ragu|ar U M8A-Loca| 50,000 Water Utility 566.625 Sanitary Sewer Utility 477.180 Storm Drainage Ud|ty 372.645 Street Assessments 712.790 Storm Drainage Assessments 353.625 Garden CitvSouth Sp Assess ConutrFund 501.392 7NGA-Regular 489.800 | [NSA'L000/ 1UOOUO � . � Water Utility 442.325 � Sanitary Sewer Utility 442.325 Storm Drainage Ub|ty 761.284 . Street Assessments 634.835 Storm Drainage Assessments 216.170 � � Northport Wes Sp Assess ConotrFund 164.310 yN8A,Rogu|or 273.680 K88A'Loco| Water Utility 239.500 Sanitary Sewer Utility 239.500 � Storm Drainage UUhy 134.320 � Street Assessments 352.640 Storm Drainage Assessments 93.080 Tonn|mtmmn � � Sp Assess ConsbFund 858.045 � K88A-Regular � K8GA'Looa| 50.000 Water Utility 595.180 Sanitary Sewer Utility 595.180 Storm Drainage UtiKy 525.280 � Street Assessments 842.300 Storm Drainage Assessments 255.895 � � TABLE �� - �������X ��7 �����'A ��������| Out ^^ `^~^-�- ~~ ^~ x �^°~^ ^ r '^=~~^^^^~^ ~~=°=^" =" ^�=�°^°=^ Sueet/Wwxewe//tp ENHANCEMENTS Paint 6Uth Avenue parkway fence 25.000 Southeast Neighborhood Loop 75.000 Local State Aid Xerxes Avenue Stmeetucopa 100.000 Local State Aid BC|PSteatocape 258.000 T|F TOTAL EXPENDITURES *4.472.443 $3.618.761 $3.899.200 $5.884.250 $3.834.240 $5.315.050 | $3.718.880 | | FUND SOURCES: � MSA'Regular 494.479 334.429 270 289,080 232.320 743.460 D yNSA'Local (D].BOO) (68.044) 593.800 854.250 (1.960) 100.000 50.000 Water Utility 1.100.605 329.244 380.700 769.185 622.945 681.825 595.180 Sanitary Sewer Utility 667.507 479.888 503.270 585.860 533.480 681.825 595.180 Storm Drainage Utility 220.108 757.481 97.945 702.185 372.845 895.604 525.380 Special Assessments: Streets 1.193.752 1.090.152 984.440 1.259.675 771.790 987.465 842.300 Special Assessments: Storm Or 337.863 206.133 258.900 297.770 253.625 309.170 255.895 Sp Assess ConutrFund 517.928 489.458 809.495 433.845 549.395 665.702 856.046 T|F O D O 442.400 250.000 250.000 O Other Governments 350.000 250.000 TOTAL $4.472.443 s3.618.781 $3.899.200 $5.884.258 $3.834.240 $5.315.050 $3.719.880 City Of Brooklyn Center Parepapital Improvement Plan L 0 c: I M a� y < . O C O' G: yyyy 1 x'a y d C U p. - _ . � C > :a'' O F Park Capital Projects 1998 �- $0 Bellvue $20,000 $25,000 $11,500 $56,500 East Palmer Lake $30,000 $30,000 Happy Hollow $25,000 $25,000 Evergreen $70,000 $5,000 $15,000 $6,400 $6,825 $103,225 $214,7 J Park Capital Projects 1999 ' . ` Northport $15,000 $6,400 $1,400 $22,800 Bellvue $20,000 $20,000 Lions $10,000 $15,000 $3,800 $1,400 $30,200 Wangstad $25,000 $1,400 $26,400 Willow Lane $18,500 $18,500 East Palmer Lake $6,500 $6,500 Kylawn, W Palmer, Grandvw $11,400 $11,400 Central 1 $40,000 $30,000 $20,000 $90,000 $225,800 Park Capital Projects 2000 Central $20,000 $30,000 $20,000 $70,000 Happy Hollow $20,000 $10,000 $1,400 $31,400 East Palmer Lake $20,000 $15,000 $1,400 $36,400 Firehouse Park $30,000 $8,000 $1,400 $39,400 Garden City $4,000 $1,400 $40,000 $45,400 $222,600 [Park Capital Projects 2001 Freeway $15,000 $4,000 $19,000 Orchard Lane $35,000 $10,000 $45,000 West Palmer Lake $75,000 $10,000 $15,000 $42,000 $6,500 $6,500 $10,000 $165,000 $229,000 _ [Park Capital Projects 2002 Willow Lane $35,000 $15,000 $10,000 $60,000 Riverdale $25,000 $10,000 $35,000 Kylawn Park/Arboretum $75,000 $25,000 $25,000 $7,000 $132,000 Cahlander $10,000 $10,000 $237,000, Park Capital Projects 2003 Twin Lake $25,000 0,000 $35,000 Grandview $75,000 $16,000 $ $6,400 1 $ $30,000 $312,400 $347,400 F:Eng \CIP \Parks Capital Improvements Fund Council Work Session August 31, 1998 Division: Capital Improvements Fund Bud Code: 630 PROFILE The Capital Improvements Fund is monies available from General Fund surpluses, plus other sources as designated by the City Council. It is used to finance government building and park improvements, and to purchase land for public uses such as parks or other public facilities. Park Improvements. A multi -year plan has been developed to systematically address large park capital improvement needs. Improvements contemplated for 1999 include the replacement of the playground at Wangsted Park; the replacement of a warming house shelter at Lions Park with a picnic shelter; the construction of a permanent concession stand/storage building at Central Park; the replacement of park/trail lights at Northport, Lions, and Willow Lane Parks; ballfield and drainage improvements at Central; and construction of new swingset containments at Lions, Kylawn, West Palmer, and Grandview Parks. A small amount has been set aside for as yet undefined improvements at the south end of Bellvue Park, adjacent to the Bellvue Lane redevelopment area. Certain other minor improvements are included in the amount allocated to each of the parks. I Building Improvements. In 1999, construction will continue on the new police and west fire stations. Improvements to the Civic Center will be designed. If the preliminary design for those improvements indicates that the Civic Center parking lots will not need to be reconfigured, then those parking lots will be resurfaced in 1999. DEPARTMENTAL GOALS • • Continue making t multi-year o e m in ark improvements in accordance with the mul plan. gP P Y P • Maintain and improve public facilities to provide for adequate function and accessibility to all. P P P q tY PERSONNEL LEVELS No personnel are budgeted in this fund. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date Bellvue Park Improvements Summer, $20,000 Improvements to south end of 1999 park as selected by new property owners on Bellvue Lane Central Park Improvements, Phase I Summer, $90,000 Regrade ballfields, add storm 1999 sewer, construct concession stand, rehab ponds & boardwalk • Item Anticipated Units Cost(s) Use /need purchase date Miscellaneous Swingsets and Spring, 1999 $11,400 Add swing sets & concrete Containments containments at Grandview, • Kylawn, and West Palmer Lions Park Improvements Spring, 1999 $30,200 Replace shelter w /picnic shelter, trail lighting, swings & concrete containment, drinking fountain. Northport Park Improvements Spring, 1999 $22,800 Replace trail lights, bleachers, drinking fountain East Palmer Fence Spring, 1999 $6,500 Replace outfield fence Wangsted Park Playground Summer, $26,400 Replace playground, drinking Replacement 1999 fountain Willow Lane Lighting Improvements Summer, $18,500 Replace hockey /skating rink 1999 lights Civic Center Parking Lots Summer, $200,000 Resurface lots 1999 • I • City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Bellvue Park Improvements Year: Tvn_ e of I mprovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park _X Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Fur it g: $20,000 Capital Improvements Fund Pronosal summary and obje ctives Describe in detail the proposal. its intended results, and pu The south end of Bellvue Park, which previously had been unimproved and inaccessible behind homes on 53rd Avenue, is now opened up due to the 53rd Avenue DALP. It is proposed to provide a small budget for improvements identified by the new property owners who will be adjacent to the park. Some examples of improvements would be a decorative fence, shrubbery, decorative lighting, a park sign, etc. Project iustification, ( Describe pros and cons of project, alternate ch oices. impact of not doing project. etc. This would provide a small budget to beautify the south end of Bellvue Park, which would improve the salability of the new homes on Bellvue Lane. Imnact on oneratine budget: Other comments: Project Title Bellvue Park Improvements • L CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other ( $20,000 I TOTAL $20,000 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $20,000 G. GO Bonds H. Special Assessments 1. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $20,000 • City of Brooklyn Center Capital Improvement Program • Capital Request Project Title: Central Park Improvements - Phase I Year: Tvne of I mprovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park _.x _ Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Furl: $90,000 Capital Improvements Fund Proposal summary and--Qj�jeclives (Des in detail the proposa its intendg- 1, results. a purpose This phase would accomplish the following: 1) Regrade the ballfields and plaza and add storm sewer to replace hard to maintain drainage swales. 2) Construct a permanent shelter /concession stand between the two softball fields. 3) Rehabilitate the plaza ponds & boardwalk. One pond would be planted with wetland plants, and the other would be bordered with Keystone. Phase II of the improvements, in 2000, would replace lighting, rehab the tennis court, and provide for a permanent amphitheater in the plaza area. Proiect iustification (Describe p ros a nd cons n i Qert_ alternate choices. impact of not doine proiect. etc.): All these items are maintenance concerns. They also create unsightly conditions in the City's " showplace " park - the P laza. Long term settlement of the ball fields has restricted drainage and caused the fields to be unusable at some times. If not corrected, settlement will continue and the fields will eventually become unusable. The ball fields at Central, East, and West Palmer Lake Parks are all built on unstable, peaty soil which settles unpredictably. Settlement problems at West and East Palmer Lake Parks have been completed in the last few years, and the fields should remain usable for at least several years. However, settlement will again occur, and those fields will need to be regraded again when settlement affects the usability of the fields. The additional storm sewer work which would be completed along with the Central Park work will help keep those fields in play longer, and will also make Central Park more usable. The area south of the Plaza pond, for example, where the showmobile is usually parked, takes an unusually long time to drain and dry after rain. lmr)act on operatin budget Many tournaments are held at the Central Park fields, the largest of which is the Dudley Classic. Improved drainage will make these ballfields easier to maintain, and easier to play on in wet conditions. Other co mments : The plaza pond and boardwalk is an increasingly popular place for wedding photography, which shows the pride Brooklyn Center residents have for this facility. The proposed improvements will rehabilitate this showplace. Project Title: Central Park Improvements, Phase I ' :;:;i:v ::•''' ::i;' ii: : :::i : i': : : : ::i::i�::::::: : ii: Y .. . C :. .....: :...... :: '.-`.::: _ :: iii::: X: 4 :;:::•:: ii::: i?:::: isii: i:::: i:::: i:: i'•?;^? j :•'::L::::::i::::::::i::i::::i: : iii:::::: iii: viiii': i:: i::::: i<:'•'::::::'::: ':::ii:L:::i::i::ii::i:i::i:':' ::::::.. ::.:: :::::::::.................::.:::::::.::::: :::::.::::.::::::::::: ::::..::. CATEGORY 1999 19 A. Construction (incl 25 % contingency) $80,000 B. Professional Services C. Staff Engineering 4,000 I D. Administration, Legal 1,000 I E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other -Landscape materials 5,000 I TOTAL $90,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility I D. Regular MSA E. Local State Aid F. Capital Improvements Fund $90,000 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other I TOTAL I $90,000 I I • • Plaza Pond t213t l W £. Figure 1 Erosion in south lobe of pond. The edges of this pond would be aquascaped with wetlands grasses and flowers Figure 2 Erosion on north lobe of pond. The edge of this pond • would be stabilized with Keystone and geotextile. City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Miscellaneous Swing Sets & Containments Tyne of Improvement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street Park X Building_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Fundin2: $11,400 Capital Improvements Fund Proposal summary and obiective,-, (De t. . and numose): (De in d etail proposal. its intended r J fb�t This item would add swing sets and containments at Grandview, Kylawn, and West Palmer Lake parks. • Proiect justification (Describe pro-, and cons of project. alternate choices. impact of not doing project. etc.): When these playgrounds were replaced, the existing playground containments were not large enough to accommodate swing sets. These parks do not now have swings, and numerous complaints have been received about this deficiency. Imnact on operating budLyet: Other comments: • • g � Project Title' ....... 'Miscellaneous 1 Swm ( Sets &Containments ,. , „, „„ ,,,,,,., „,,,,,.,,,, „,,,,,,,,, ,, ,, „„ , , ,,,,,.,,,,,,,,,,,,,,,,,., „,., CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment $ 1,800 G. Other $9,600 TOTAL $11,400 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $11,400 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $11,400 • City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Lions Park Improvements Tvpe of Improvement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street Park X Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $30,200 Capital Improvements Fund shelter $10,000 - trail lighting $15,000 - swings & enclosure $3,800 - drinking fountain $1,400 Value of Lions Club donation - $10-$12,000, depending on final design Proposal summary and obiectives (Describe in, detail the proposal. its intended results. and purnose): The Brooklyn Center Lions Club proposes to donate to the City funds to purchase a picnic-style shelter to replace the existing park shelter, which is in disrepair. The City would pay for demolishing the existing building, installing the necessary concrete pad and installing the shelter. Other improvements at the park would be upgraded trail lighting, swings and an enclosure, and a new drinking fountain. • Project justification (Describe pros and g%5 of project, alternate choices. impact of not doing T)roiect. etc.): This is part of the continuing effort to upgrade facilities in the parks. This would also add swings to the playground in a separate enclosure. Because of the new safety fall zones, the existing playground containment was not large enough to accommodate a new playground and swings. Impact on operating budget: The existing trail lights require excessive maintenance and electrical repairs. Other comments: i I J,i,, Project Title: Lions Park Improvements ... .......... ............... ........ .......... .......... . .......... ..... ... ..... . . ......... ..... .......................... iii ii . .... .... . .................... .. . .................... . . . ................ . . ........ ........................ . ....... .. .... . - - . M M .. .. . . ....... ...... ............. ......................... ... . .... .............. ........................ .. ....................... . . . .... .. .... . ....................... . ........ ... ...................... ....... . ......................... . ..... .......... ..... .... . . ............. ......... ..... .1-9 ........... ........................ .... .. . . ... ... ............... CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment $2,000 G. Other $28,200 TOTAL $30,200 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $30,200 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $30,200 City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Northport Park lmprovemen is .. .. ..,,.,.., . ,,,, .„ .,,, �, ������������,.,,, ,,�.,,.,�.�,,,,..��,,,.,.�.��.� ear: Tvne of Improvement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park X Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $22,800 Capital Improvements Fund $15,000 trail lights - $6,400 bleachers - $1,400 drinking fountain Pronosal summary a.nd objec (Describe in detail the proposal. its intended results. and numose): These items would complete the improvements to Northport Park, except for ongoing maintenance to the warming house. • Project Justification (Describe pros and cons of project, alter nate choices. impact of not doing proiect. etc,): The trail lights require continuing electrical repairs, which are time consuming and can be costly. Bleacher replacement is part of the ongoing effort to replace the wooden bleachers with safer, low maintenance aluminum. Impact on operating budget: Other comments: • Project Title; ' Northport Park Improvements ;::::;:>::> ::: >: >::<::<: >::;:: »:<::: >:: >:: >:: >: >::> ::. off >: ! ::: ..... i.......... ?�' »; > :::<:< < <> < <` >< >< < » > > CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment $ 7,800 G. Other $15,000 TOTAL $22,800 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $22,800 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $22.8 City of Brooklyn Center Capital Improvement Program Capital Request Project Title: East Palmer Fence Year: Tvne of Ininrovement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street Park X Building_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $6,500 Capital Improvements Fund Pronosal summary and pbjep.tives (Describe in detail t urpo— __ht, pT(?Dosal. its intended results. and p g s—e): The East Palmer ballfields, which had settled to the point of unusability have been raised. This item would replace the outfield fence. • Project justification (Describe prg. 5 4Ud goiqs ()f pToiec, alternate choices. imp_ act of not doing oroject. etc.): This fence would complete the improvements necessary to bring the ballfields back into play. Impact on onerating budget: Other comments: • _Project Title: East Palmer Fence .... ............ ........... ............... ................................................................. .. ... ............................................................................. . ........................................................................ .. .. ............................................................................ ................................................................. ......... ...... .............. ...................................................... ..... . ... ....... ... . ..................... ...................................................... .......................................................................... .......................................................... ... ........... .. ...... .......... .................................................................... ................... . . . . . . ...................... . . . . . . ..................... ........... ..................... CATEGORY 1999 . 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment $6,500 G. Other TOTAL $6,500 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $6,500 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $6,500 City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Wangstad Park Playground Replacement Year: Tv_ _ne of Imn_ rovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park X Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $26,400 Capital Improvements Fund Proposal summary and objectiv (Describe in detail the proposal. its intended results. and u ose ): Replace the old wooden playground equipment with modern, low maintenance equipment. The drinking fountain would also be replaced. • Proiect iustification (Describe pres and cons of prpject-, alternate choices. impact of not doinLy proiect. etc. : This equipment is older and high maintenance. This is part of the ongoing program of replacement of park equipment. Imnact on operating budeet: Other comments: • ( Project Title: Wangstad Park Playground Replacement ............ ........ ... .. .... .... ............ . .... .. ......... .... ...... . .... .................. ............. .................... ....... . . .. ......... ... ...... .... . .... . ..... ........................ ............ .............. ..... ...... ............... ...... ...... . ................ .......... ....... ....... .............. CATEGORY 1999 19 A. Construction (incl 25 %contingency) $25,000 B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment 1,400 G. Other TOTAL $26,400 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $26,400 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $26,400 • City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Willow Lane Park Lighting Improvements Year: Tvne of Imn_ rovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park X_ Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $18,500 Capital Improvements Fund PPr nosal summary and obiectives ( in detail ,tie proposal. its intended results. and puroose): This item would replace the hockey /skating rink lights. They are old and energy inefficient, and replacement parts are very difficult to find. Proiect justification (Describe pros a.n cons of project. al ternate choices. impact of not doing rp oject. et . : At some point in the near future it will no longer be possible to obtain replacement parts, and the lights will no longer be usable. Willow Lane does have a substantial hockey program. Imnact on oneratina budget: Reduced electric costs Other comments: • Project Title: Willow Lane Park Lighting Improvements ............... ..... ......... .... ..... . .................................... ............. ...... ... ....................... X. ....................... . ........ ................... ... . . ...................... ............ ........ .. .. ........ . .......... .... ........... ..................... .............. .... ........... .... .......... ..... ..... . ........... ....... ..... ..................... ..... .......... ..................... ... ....... ....... --- .......... .......... ... . . ....... ism= . .......... ...... . . . CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other -Contractual $18,500 TOTAL $18,500 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $18,500 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $18,500 City of Brooklyn Center . Capital Improvement Program Capital Request Project Title: Civic Center Parking Lots Year: Tv_ _ne of Improvement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park Building _X_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: s $200,000 Capital Improvements Fund Pronosal summary and obiectives (Desc in detail the proposal. its intended results. and pu o e ): It is proposed to mill and overlay the north and south parking lots at the Civic Center, which are in poor condition. Storm sewer would be added or relocated as necessary. The bollards would be removed, and concrete medians added. The south parking lot would be reoriented so parking is parallel to City Hall. Parking lot lighting wiring should be replaced. Proiect justification (Describe pros an cons of p roject. alternate choices. impact of not doinLy vroiect. etc. The parking lot pavement is in poor condition. Removal of the bollards would provide better snowplowing and improved drainage. This project would proceed in 1999 only if designs for Civic Center improvements indicate that the parking lots do not need major reconfiguration. Impact on oneratinLy budLyet: At this time, both parking lots would require extensive patching and crack sealing. Weeds and grass grow through many of the cracks, and must be weed whipped for appearance. Other comments: • • Project Title: Civic Center Parking Lots CATEGORY 1999 19 A. Construction (incl 25% contingency) $190,000 B. Professional Services C. Staff Engineering 8,000 D. Administration, Legal 2,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $200,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund $200,000 G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $200,000 I MSA Fund Council Work Session August 31, 1998 Division: MSA Fund Budget Code: 631 • PROFILE The Municipal State Aid Fund is comprised of three accounts: Regular State Aid, Local State Aid, and State Aid Bonds. The State Aid Bonds account is used to finance State Aid street improvements which are funded all or in part by proceeds of a State Aid bond issue. There is currently no balance. The Regular State Aid account is monies allocated to the City from the State from gas tax proceeds. These r ved improvement project on a State for the C' and released upon letting of an a o funds are held m trust o City p g pp p p J Aid street. The Local State Aid account is City- controlled monies which are available for the construction of sidewalks and trails, and for certain street improvements. Sidewalks and Trails Park Trail Improvements. This project would have three components. First, a new trail would be constructed in Bellvue Park, from Bellvue Lane to the trail in the central part of the park. This would link the redevelopment area to the ballfield, playground, and picnic shelter in the central and northern parts of the park. Second, the trail in Central Park would be relocated as necessary to accommodate the building and drainage improvements proposed in Division 630. Finally, the bituminous paving in Lions Park in the area of the Little League building would be rehabbed. 53rd Avenue- Trail. This item would construct the trail and greenway portion of the 53rd Avenue • Development and Linkage Project. The existing sidewalk along 53rd would be removed, and a new bituminous trail constructed, along with additional landscaping and signing. Sidewalk Repairs. Sidewalk repairs and replacements are periodically combined into a single improvement project. This project would repair all sidewalks as necessary south of I -694. North of 1 -694 was completed in 1998. Repair Retaining Walls. The City owns numerous sidewalk retaining walls, many on 57th Avenue, 63rd r re Avenue, and Dupont Avenue. These are deteriorating and require repair or replacement. This routine project continues the cycle begun in 1998. Paint 69th Avenue Fence. This fence is beginning to show wear, and the paint is beginning to flake. Painting the .fence will increase its useful life. Streets Signal Painting and Restoration. By cooperative agreements with Hennepin County and Mn/DOT, the City is responsible for certain types of maintenance on signal systems on County and State roads, as well as on City -owned signal systems. A number of the signal poles are rusted or peeling, and require repainting. This project would paint the signal poles in 13 locations. Earle Brown Drive Mill and Overlay. This pavement has reached the end of its useful life, and now requires significant maintenance. This project would extend from John Martin Drive to the new Heritage • Center parking lot. The segment between John Martin Drive and Summit Drive is State Aid, the segment north of Summit is not. Dupont Avenue, 55th to 57th. As a part of the proposed Southeast Neighborhood Street and Utility Improvements (see Division 632); this segment of Dupont would be reconstructed, with installation of curb and gutter and utility improvements as necessary. DEPARTMENTAL GOALS • Continue to construct bicycle /pedestrian trails and linkages in accordance with the Comprehensive Plan, either concurrent with street projects, or as stand -alone projects. • Maintain and rehabilitate sidewalks as necessary to keep them safe and functional. ► Systematically maintain and rehabilitate as necessary the system of State Aid Streets in accordance with state requirements. PERSONNEL LEVELS No personnel are budgeted in this fund. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date Park Trail Improvements Spring, 1999 $60,000 Construct new trail linkage in Bellvue, rehab Lions Park Little League area, relocate • trail segment in Central 53rd Avenue Trail Spring, 1999 $ 50,000 Construct new trail, '/z LSA, '/2 50.000 DNR $100,000 Sidewalk Repair Fall, 1999 $50,000 Repair as needed all sidewalks south of I -694 Repair Retaining Walls Summer, $25,000 Repair retaining walls on 57th, 1999 63rd Avenues, Dupont Avenue Signal Painting and Restoration Summer, $25,000 Paint signal poles as necessary 1999 Paint 69th Parkway Fence Summer, $25,000 Preventative maintenance to 1999 preserve wood and improve appearance Earle Brown Drive Mill and Overlay Summer, $260,000 -Mill and overlay deteriorated 1999 pavement $189,000 - Special assessments $139.200 - Regular MSA $(106,200) -Net increase to Local State Aid Dupont Avenue, 55th to 57th Spring ,1999 $181,445 Reconstruct deteriorated street City of Brooklyn Center Capital Improvement Program Capital Request Project Title: Park Trail Improvements Tv_ ne of Improvement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street Park — Building_ Sidewalk/Trail X Housing Redevelopment Estimated Cost and Funding: $60,000 MSA - Local Proposal summary and objectives (Describe in detail the proposal. its intended results. and numose): This item would have 3 components: 1) Construct new trail in Bellvue Park from Bellvue Lane to the existing trail north of the ball diamond. 2) Relocate trail in Central Park as necessary for drainage and building improvements. • 3) Repair bituminous pavement around the Lions Park Little League building. Proiect iustification (Describe pros alud co]R,5 of pToiect- alternate choices. imnact of not doing project. etc.): A new trail link in Bellvue Park is necessary to provide residents in the new Bellvue Lane area access to the playground and picnic shelter on the north end. Impact on oneratinLy budget: Other comments: I Project Title: Park Trail Improvements r . .:> CATEGORY 1999 19 A. Construction (incl 25 % contingency) $55,000 B. Professional Services C. Staff Engineering 4,000 D. Administration, Legal 1,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $60,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $60,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTA $60,000 I City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: 53rd Avenue Trail Year: Tv_ ne of Improvement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street Park — Building Sidewalk/Trail X Housing Redevelopment Estimated Cost and Funding: $100,000 - $50,000 MSA - Local $50,000 DNR Grant Proposal summary and ()bjectives (Describe in detail thLpro u se pro posal. its intended results. and 9 ipgj This item would construct the trail and greenway portion of the 53rd Avenue DALP. Remove existing sidewalk, construct new trail, add landscaping. Prpject ustification (Describe pros and cons of alternate choices. impact of not doing proiect, etc.): This trail will link the Bellvue neighborhood and the redevelopment area to the North Mississippi Regional Park. Impact on or)eratinLy budget: Other comments: • • ...Project Title 1 . ' 53rd Avenue Trail ,,,, ., „,,,,, ,,, ,,,, ,„ .:::::;;;:.;:.;.................................................................:.::.::::...................................................... ............................... . CATEGORY 1999 19 A. Construction (incl 25 % contingency) $80,000 B. Professional Services C. Staff Engineering 4,500 D. Administration, Legal 500 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other 15,000 TOTAL $100,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $50,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other - DNR Grant $50,000 TOTAL I $100,000 • City Brooklyn Center t3' Y . Capital Improvement Program Capital Request Project Title: Miscellaneous Sidewalk Repairs Year: TvDe of Imp_ rovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park Building Sidewalk/Trail X Housing Redevelopment Estimated Cost and Funding: $50,000 Local State Aid Proposal summary and obiectives �nescribP in, detail the proposal. its intended results. and purpose): This project would systematically repair defective sidewalk panels in the area south of I -69. Along with the 1998 sidewalk repair project, which focused on the area north of I -694, most of the high - priority work should be accomplished. • Proiect iustification (Describe pros and cons of proi ect, alternate choices. impact of not doinL nroiect. etc. It is necessary to keep City sidewalks in good repair to ensure the public safety. In addition,; many existing curb cuts were installed prior to the adoption of a modified standard curb cut, after the passage of the ADA. These curb cuts are being corrected. Impact on oDeratine budget: Other comments: • Project Title: Miscellaneous Sidewalk Repairs - 0 ................... i .... ... . . .... . .... ........................ ...................................... .................................... ...................... ......................... ..... ... ............. .. .......... . ............... . . ........................................ . .................................. . . ... .... ..... . .. . . ................ .... . ................... ............ .... ................................. .. . . ... ..... .. ..... ... . ..... ........ ................................. ... :;: ..... ............................. .. 'N .................. ........ . :..- ......... . ... ------ ....... .. ........ .. CATEGORY 1999 19 A. Construction (incl 25 %contingency) $45,000 B. Professional Services C. Staff Engineering 4,000 D. Administration, Legal 1,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $50,000 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $50,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $50,000 • City of Brooklyn Center . Capital Improvement Program Capital Request Project Title: Repair Retaining Walls Y1 Year: Tv_ oe of Improvement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park Building Sidewalk/Trail X Housing Redevelopment Estimated Cost and Funding: $25,000 Local State Aid Proposal summary and objectives (Desc ribe in detail, the proposal. its intended results. and numose): Many of the City -owned retaining walls adjacent to sidewalks are aging and require maintenance to ensure their structural integrity. Stone walls will be tuckpointed. • Proiect iustificatipn (Describe pr9s a cons of projec alternate choices. impact of not doin g_prQject. etc,): This item is a continued effort to address this concern. Without this maintenance, the retaining walls will continue to deteriorate as the mortar holding them together crumbles. IIMpact on operating budget: Reduction in time spent making emergency repairs Other comments: • • .. Project Title: 111 Repair Retaining Walls ..... . .. ..... ...........: :::::::::::::::::::::::.::::. CATEGORY 1999 19 A. Construction (incl 25% contingency) $23,000 B. Professional Services C. Staff Engineering 1,500 D. Administration, Legal 500 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $25,000 . A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $25,000 F. Capital Improvements Fund G.' GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $25,000 City of Brooklyn Center • Capital Improvement Program Capital Request L o�ect Title: Paint 69th Avenue Fence ' Year: Tv_ ne of Improvement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park X_ Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $25,000 Capital Improvements Fund Proposal summary and objectives (Describe in detail the proposal, its intended results. and purpose): The 69th Avenue fence is beginning to show wear. It is proposed to repaint the fence to protect the wood from the elements. s Project iustification (_Describe n_ ros and cons of pr!Qject. a lternate choices. impact of not doin project. etc. To protect the fence and increase its useful life, it is vital to keep it protected from the elements. It is important to complete this work before too much wood is exposed, to prevent deterioration. Impact on operating budget: Other comments: • I Project Title: Paint 69th Avenue Fence 1 ,. t..:.....:::::::::::::::::::::::::::::::::::..::...::::::: ::::: ::.:::....::::::...:...... CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other - Contractual $25,000 TOTAL $25,000 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $25,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOT I $2 5,000 • City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Signal Painting & Restoration Year: Tvo_ e of Imp_ rovement Water Sanitary Storm 1999 MSA Street Neighborhood Street Park Building Sidewalk/Trail Housing Redevelopment _ Other X Estimated Cost and Funding: $25,000 Local State Aid Proposal summary and objectives (Describe in. detail . the proposal. its intended results. and purpose): According to agreements between the City, Hennepin County, and Mn/DOT, the City is responsible for repainting most of the traffic signal uprights. Many of these have not been repainted in many years, and are showing wear and rust. This item would clean and paint signal poles at 13 locations. These are the same locations where we are installing energy - efficient LED bulbs and heads in 1998. Project justification (Descri a ros and co of project. alte rnate choices. impact of not doing proiect.. etc : One of the functions of paint on signal poles is to rust proof the metal. The longer a metal pole is left unprotected, the more rust will develop, making future maintenance more difficult and ultimately compromising structural integrity and rust. Flaking paint and rust on signal poles also detracts from the appearance of these devices in high - traffic commercial areas. Impact on operating budget: Other comments: Project Title: ( Painting 1 & 1 Restoration ,r CATEGORY 1999 19 A. Construction (incl 25 % contingency) $23,000 B. Professional Services C. Staff Engineering 1,500 D. Administration, Legal 500 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $25,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid $25,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $25,000 l i City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Earle Brown Drive Mill and Overla y " Year: Tv_ ne of Improvement Water Sanitary Storm 1999 MSA Street _X' Neighborhood Street Park Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $260,000 MSA, LSA, special assessments, water, sanitary sewer, storm drainage utilities Pronosal summary and ob 'ect? fives (Dt,5 -ibe in detail the prop 9sal. its intended results. and nu rVose) : The pavement on Earle Brown Drive has reached the end of its useful life and requires increasing maintenance. This project would provide for a mill and overlay of pavement, spot repairs to the concrete curb and gutter, and rehabilitation of the sidewalk nodes at the intersection of Earle Brown Drive and Summit Drive. • Proiect justification (Describe pros and cons of project. alternate choices. impact of not doing proiect. etc. : A mill and overlay would reduce maintenance and prolong the life of the full pavement section. On the sidewalk nodes, pavers abutting the curb and curb cut have settled, reducing accessibility and creating trip hazards. Some of the pavers on the sidewalk nodes would be replaced with poured concrete, and the curb cuts redone. Impact on oneratina budget: Other comments: • I J Pro'ect Title: Earle Brown Drive Mill and Overlay ,,,,,,,,,,, ., ., „ .,,,.,,. ., ., ., ., .,,, .„, �,, ,�,,,,...,,,,,,,,,,,,,,...,,� „� CATEGORY 1999 19 A. Construction (incl 25 % contingency) $245,000 B. Professional Services C. Staff Engineering 13,000 D. Administration, Legal 2,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $260,000 • A. Water Utility $13,000 B. Sanitary Sewer Utility 13,000 C. Storm Drainage Utility 12,000 D. Regular MSA 139,200 E. Local State Aid (106,200) F. Capital Improvements Fund G. GO Bonds H. Special Assessments 189,000 I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $260.000 • Special Assessment Construction Fund Council Work Session August 31, 1998 Division: Special Assessment Construction Fund Budget Code: 632 • PROFILE The Special Assessment Construction Fund accounts for the financing of public improvements funded all or in part by special assessments. Commercial Streets Earle Brown Drive, Summit Avenue to the Heritage Center Parking Lot. This street segment, which is proposed to be milled and overlaid at the same time as the segment between John Martin Drive and Summit Drive, is discussed in Division 631, MSA Fund. Neighborhood Streets Southeast Neighborhood Street, Storm Drainage, and Utility Improvements. This project would reconstruct Camden, Aldrich, Bryant, Colfax, and Dupont Avenues from 55th to 57th Avenues, and Emerson, Fremont, Girard, and Irving from 53rd to 57th Avenues. to a neighborhood standard of 30 feet wide with concrete curb and gutter. This project is part of the continuing improvement of infrastructure in the southeast neighborhood. The major focus of the project would be on completing storm drainage improvements, and repairing or replacing as necessary water and sanitary sewer improvements. Root sawing records, which will be confirmed by sanitary sewer televising, reveals a number of sections of sanitary sewer which have been infiltrated by roots, and which require replacement. • DEPARTMENTAL GOALS. • Reconstruct or rehabilitate streets and utilities to improve pavement conditions, improve drainage, reduce water quality concerns, and eliminate infiltration into the sanitary sewer. • Enhance the appearance of neighborhoods, and provide an opportunity to address other neighborhood concerns. PERSONNEL LEVELS No personnel are budgeted in this fund. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date Southeast Neighborhood Street and Spring, 1999 $2,989,200 Reconstruct streets, install new Utility Improvements concrete curb and gutter and driveway aprons, reforest, replace street lights City of Brooklyn Center Capital Improvement Program Capital Request Project Title: Southeast Neighborhood Street and Utility improvements ............. ... . .. . . . . . . .................. ... . .. . ........ Year: Tvne of Imp_ rovement Water Sanitary Storm 1999 MSA Street _ Neighborhood Street _X_ Park Building_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $2,989,200, General fund, MSA-regular, local state aid, water, sanitary, storm drainage utilities, special assessments Proposal summary and obiectiYes Tesuibi- in detail the proposal. its intended results. and purpose): The proposed project, which includes Camden, Aldrich, Bryant, Colfax, and Dupont Avenues from 55th to 57th Avenues, and Emerson, Fremont, Girard, and Irving from 53rd to 57th Avenues, is part of the City's Neighborhood Street and Utility Reconstruction Program. Essentially, the streets would be reconstructed to a standard 30 foot width, with concrete curb and gutter and driveway aprons added. Utilities would be repaired, replaced, or added as necessary. Trees which are removed would be replaced by a follow-up reforestation project, and the street lights would be replaced. Proiect iustification (Describe pros and cons of project. alternate cboices. impact of not doing nroiect. etc. J This project would complete improvements to the area from 1-94 to Logan Avenue, from 53rd to 57th, with the exception of Humboldt Avenue, and 57th from Humboldt to TH 100, which are county roads. This greater neighborhood improvement will have substantially upgraded storm drainage by constructing new trunk storm sewers on 55th and 57th, will have replaced a substantial amount of the older sanitary sewer main which had been root infiltrated, and repaired or replaced as necessary water main. The new pavement and concrete curb and gutter and aprons will substantially upgrade the appearance of the neighborhood, and contributed to overall neighborhood property value stabilization. Impact on operating budges: Other comments: • Project Title: Southeast Neighborhood Street and Utility Improvements ,,..... ,,,, ,,,, ,,,. , „,,,, ,,, „ . `a>DO . CATEGORY 1999 19 A. Construction (incl 25 % contingency) $2,679,200 I B. Professional Services C. Staff Engineering $205,000 D. Administration, Legal 5,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Street Lights, Reforestation $90,000 G. Other (Contractual Services) $10,000 TOTAL $2,989,200 A. Water Utility $367,700 B. Sanitary Sewer Utility 490,270 C. Storm Drainage Utility 85,950 D. Regular MSA 131,460 E. Local State Aid 50,000 F. Capital Improvements Fund G. GO Bonds H. Special Assessments: Street 795,440 1 1. Special Assessments: Storm 258,900 J. EDA Levy K. General Fund 809,500 I L. Other TOTAL I $2,98 l Water Construction Projects Council Work Session August 31, 1998 Division: Water Construction Projects Budget Code: 672 • PROFILE Water system improvements made as part of the neighborhood street reconstruction or other improvement projects. Proposed water utility capital projects for 1999 are: Street and Utility Improvements. Substantial water main improvements are generally completed in association with street improvement projects. In the Southeast neighborhood street improvement project, watermain would be replaced as necessary. This project is described in Division 632, special assessment construction fund. Repair Paint on Tower V. The structure and coatings on Tower #1 (France & 69th Avenues) are due for repairs. The tower was last coated and repaired in 1988. Its coatings are generally in fair condition but require repair, especially the exterior coating. Routine Well Maintenance. On a six year rotation, the pump and motor of every well is removed, inspected, and repaired as necessary. If there is excessive sand buildup in the well cavity, during the period the pump and shaft are removed the well cavity is bailed. Wellhouse Rehabilitation. The Public Utilities Supervisor has developed a schedule for systematic improvement of the 9 well houses. Proposed for construction in 1999 is exterior and interior wellhouse rehabilitation at well #s 5 and 6. These facilities are located in residential neighborhoods, and are intended to have the appearance of residential houses. The exteriors and roofs of both wellhouses are in fair to poor • condition, and require substantial maintenance. It is proposed to reconstruct the roofs and clad the buildings in brick veneer, as well as replace furnaces and A/C units as necessary. The garage doors at #6 also need replacement. DEPARTMENTAL GOALS • Perform, in a cost - effective manner, water system improvements as a part of neighborhood street reconstruction of other improvement projects. • Complete the projects included in the 1998 budget, on time and within budget. • Repair, rehabilitate, or reconstruct water facilities as necessary to provide for efficient and effective operations. PERSONNEL No staff are currently assigned to this program. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date • Southeast Neighborhood Street and Spring, 1999 $367,700 Replacement of water main and services Utility Project as necessary. Item Anticipated Units Cost(s) Use /need purchase date Earle Brown Drive Mill and Overlay Spring, 1999 $13,000 Minor structure modifications Repair Paint on Tower #1 Fall, 1999 $200,000 Periodic maintenance for structural and coatings integrity Routine well maintenance, Well #4 Fall, 1999 $50,000 Well pumps and motors are periodically Routine well maintenance, Well #9 removed, inspected, and repaired as necessary to ensure continued safe and dependable operation. Wellhouses #5 and 6 exterior Summer, 1999 $160,000 Exterior and roofing rehabilitation. rehabilitation City of Brooklyn Center Capital Improvement Program Capital Request Project Title: Miscellaneous Structural and Coating Repairs - Tower No. 1 .......... 1999 Tvt)eoflmt)rovement Water X Sanitary Storm MSA Street _ Neighborhood Street Park Building_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Fundine: $200,000, Water Utility Fund Proposal summary and ok1tctjvP,5 (T )escribe in detail the proposal its intended results. and pmrp9se): Elevated storage tank number 1, located at France and 69th Avenues, has a 500,000 gallon capacity, and was built in 1958. Elevated storage tanks require periodic inspections and typically require miscellaneous re-coatings and repairs throughout their service life. The tower last received maintenance work in 1988, and was reinspected in 1995. The inspection revealed the need to recoat the interior and spot repair the exterior coating; some miscellaneous structural repairs, and replacing the finish coat. It was also recommended in 1995 that these repairs be completed within the next 3-5 years. Proiect iustification (Describe pr(),5 and cons of pL9jQgL alternate choices. impact of not doing Dr!Qject. etc.): The City's three elevated storage reservoirs are critical to the operation of the City's water supply and distribution system. If not properly maintained and allowed to continue to provide adequate service, waste supply, pressures, and public health and safety would be severely compromised. In addition, elevated storage reservoirs are a very large infrastructure investment, and must be maintained properly to avoid even larger capital expenditures in future years. Impact on operating budLyet: Other comments: • Project Title: Miscellaneous Structural and Coating Repairs - Tower No.1 '::i:i::::::'':4 ::!:::i::i: .'tS.`•i }! }Ci'r`i.'•: ;y;'ri +' ri.' ti:::: c ' riil�iT`:: i:: iiii: :::jti::iiti::i:::::::i:::i:::C:i +:::ii::i:i::: {:: .: f4:•. Y. T! YR::: i:::::::::: i:::: iY isii: i::: i: yi: isYi: is : i: : : : i: : i: : : : : : : : i: : i: : i::Y , ii :::::::::::::::::::::::::::::. i:: CATEGORY 1999 19 A. Construction (incl 25% contingency) $178,000 B. Professional Services 15,000 C. Staff Engineering 5,000 D. Administration, Legal 2,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $200,000 • A. Water Utility $200,000 B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other T OTAL $200. I • City of Brooklyn Center Capital Improvement Program Capital Request Project Title: Routine Well Maintenance, Wells #4 & #9 ............ ..... ...... ........................................ ..................... . .... .. .......... .. ........ . .. ...... ....... ... Tv_ ne of Imo_ rovement Water X Sanitary _ Storm 1999 MSA Street _ Neighborhood Street Park — Building_ Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $50,000 Water Utility Fund Proposal summary and objectives (Describe in detail the pr op9sal. its intended results. and numose): Wells #4 & #9 are due for 6 year scheduled maintenance. Well #4 should be a routine pull and review, with parts replaced as necessary. Well #9 will need to be bailed. It has sluffed in approximately 26 feet. When the scheduled maintenance was last performed, it was noted that this well will need all new column pipe. In addition, much of the interior discharge piping will also need replacement because of • corrosion. The interior work will be completed by the utility department. Proiect iustification (Describe pros and cons of project. alternate choices. hnr)act of not doing Droiect. etc.): Impact on ooeratinLy budget: Other comments: • Project Title: Routine Well Maintenance, Wells #4 & #9 .... ............................... CATEGORY 1999 19 A. Construction (incl 25% contingency) $45,000 B. Professional Services C. Staff Engineering 4,000 D. Administration, Legal 1,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $50,000 A. Water Utility $50,000 B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $50,000 City of Brooklyn Center Capital Improvement Program • Capital Request Project Title: Wellhouse #5 & 6 Rehab Yea r: 1999 Tvnf Improvement Water _ — X Sanitary Storm -- e o - MSA Street Neighborhood Street Park Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $160,000, Water Utility Fund Proposal summary and obiectives (Describe in detail . the nroposal. its intended results. and numose): These two wellhouses are located in highly visible, residential areas. The exteriors are shabby and badly in need of rehab, and the roofs are in poor condition. Wellhouse #5 is located on the corner of Camden and 70th Avenues. Wellhouse #6 is located on 69th Avenue between a single family home and a townhouse development. . It is proposed to rehabilitate the exteriors of both of these highly visible wells. Both would require new roof structures. Each would be re -sided with exteriors which are in keeping with the character of its neighbors. At #6, the garage doors need replacement, as does the air conditioning and the furnace on the chlorine supply side. Project justification (Describe pros and cons of project. a lternate choices- impact of not doing proiect. etc. Welhhouses located in residential districts should be good neighbors, and should be as unobtrusive as possible. If these structures were private homes, each likely would have been cited for code violations regarding disrepair of siding, door frames, etc. Without significant work, as time goes by these structures will further deteriorate and require increasing levels of time and costly maintenance. Impact on operating budget: New roofs would be more energy efficient, resulting in slightly lower utility costs. Fewer service calls, time spent painting, patching, etc. Other comments: 11 Project Title Wellhouse #5...& 6 Reh ab ... :: »::: >:: >:: >:: >:: >:::; < : :.....::::::.....::::::::.....: <;: >::: >:: >:: >:: >.....: >::> <> >:N CATEGORY 1999 19 A. Construction (incl 25% contingency) $125,000 B. Professional Services 10,000 C. Staff Engineering 5,000 D. Administration, Legal 2,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other 18,000 TOTAL $160,000 A. Water Utility $160,000 B. Sanitary Sewer Utility C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $160,000 Well #5 4 IL i Figure 1 Wellhouse #5, Camden & 70th Avenues Figure 2 Close up of siding, showing deterioration Well #6 1Yni iftPPAf 'M'_fi wRrii (' Figure 3 Wellhouse #6, Emerson & 69th Figure 5 Close up of siding, showing deterioration Figure 4 View from residential property • Sewer Construction Projects Council Work Session August 31, 1998 Division: Sewer Construction Projects Budget Code: 677 • PROFILE Sewer system improvements made as part of the neighborhood street reconstruction or other improvement projects. Proposed sanitary sewer utility capital projects for 1999 are: Street and Utility Improvements. Substantial sanitary sewer main improvements are generally completed in association with street improvement projects. In the Southeast Neighborhood street improvement project, main would be replaced as necessary. This project is described in Division 632, special assessment construction fund. Replace Lift Stations #10 and 11, and Reline Forcemain at #10. Included in 1999 is the replacement of lift stations #10 and #11, and the relining of 220 feet of forcemain adjacent to lift station #10. These old lift stations have reached the end of their useful life, and require replacement. The forcemain at #10 is in fair condition. The lift station replacement project is the most cost - effective time to reline the pipe. Stabilize Mississippi River Interceptor. For a short part of its run north of I -694, the Mississippi River Interceptor lies very close to the river bank. - During the high water of 1997, one particular manhole structure had to be temporarily stabilized with rip rap to prevent further erosion. This project would permanently armor the river bank to prevent further erosion. • DEPARTMENTAL GOALS • Perform, in a cost - effective manner, sewer system improvements as a part of neighborhood street reconstruction or other improvement projects. • Complete the projects included in the 1998 budget on time and within budget. Repair, rehabilitate, or reconstruct sanitary sewer facilities as necessary to provide for efficient and effective operations. PERSONNEL LEVELS No staff are currently assigned to this program. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date Southeast Neighborhood Street and Spring, 1999 $490,270 Replacement of mains as Utility Project necessary. Replace Lifts #10, & #11 and Spring, 1999 $300,000 Replacement of mains as Forcemain necessary. Stabilize Mississippi River 1/99 $200,000 Stabilize Mississippi Riverbank Interceptor to prevent further erosion • around manholes Earle Brown Drive Mill and Overlay Spring, 1999 $13,000 Adjust structures as necessary City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Replace Lift Stations #10 & 11, and Reline Forcemain at #10 Yea : 1999 Tvne of Improvement Water Sanitary _X Storm MSA Street Neighborhood Street Park Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $300,000, Sanitary Sewer Utility Fund Proposal summary and obiectives (Describe in detail the proposal. its intended results. and purpose): These two lift stations were built in 1967 and 1969, and have reached the end of their useful lives. In 1990, stations #4, 5, and 7 were similarly replaced. The project includes relining the 6" forcemain at #10 (Bass Lake Road at June). This forcemain runs 220 feet, and is mostly under the concrete pavement of Bass Lake Road. Project justification (Describe pros and cons of project. alternate choices. impact of not doing nroiect. etc.). art ewer tem. The must be kept in good repair, or sewage Lift stations are a vital of the sanitary s system. y p g p e g P rY Y will back up in the collection system, and eventually in house services. The forcemain along Bass Lake Road is in fair to poor condition, and should be relined now to avoid the potential of a costly open trench excavation of Bass Lake Road in the future. The forcemain which runs from Lift #11 (Shingle Creek Parkway at about 59th) south along Shingle Creek Parkway, under CR 10, across Shingle Creek in the weir structure in the Brookdale parking lot, then to the Brookdale interceptor, is in fair to good shape. It is not proposed to be relined at this time. It should, however, be addressed in about 5 years. Impact on operating budget: Other comments: Project Title: Replace Lift Stations #10 & #11, and Reline Forcemain at #10 ...... „ ' ..... • �i C:; i:::: i f : �i �:: ii:: i:: i:: iiii} ii:: isv:: :::i:::i::i:: ::::: isi:'i :: :i::i:ti:iii:• ": A^l NF. i:: is2:::<:: iii:::::::i::: i::::i:: i:: ii:: isi:::i:: i::ii:iii::i::'i:: %::i ii:tii ..................... Ti' 'j ::::::: :::.....:......i::iiii i'' i? Y: ii:>':.::: i :::: i::i::i::::i::i::i:::ii::i: CATEGORY 1999 19 A. Construction (incl 25 % contingency) $283,000 B. Professional Services C. Staff Engineering 15,000 D. Administration, Legal 2,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $300,000 A. Water Utility B. Sanitary Sewer Utility $300,000 C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $300,000 I City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Stabilize Mississippi River Interceptor ear: Type of Improvement Water Sanitary X Storm 1999 MSA Street Neighborhood Street Park Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $200,0000 Sanitary Sewer Utility Proposal summary and obiectives (Describe in detail„ the pronosal. its intended results. and pumose): For a short part of its run north of I -694, the Mississippi River Interceptor lies very close to the river bank. During the high water of 1997, one particular manhole structure had to be temporarily stabilized with rip rap to prevent further erosion. This project would permanently armor the river bank to prevent further erosion. • Proiect iustification (Describe nros and cons of prnjecx alternate choices. impact of not doing moiect., The Mississippi River Interceptor at this point carries the sewage from entire northeast quadrant of the City down to Lift Station #1. Its structural integrity is essential. Emergency measures had to be taken during the high water of 1997. Any further erosion would expose a manhole structure to the force of the Mississippi River, which must be avoided. Imnact on operating budget: Other comments: • Project Title: Stabilize Mississippi River Interceptor CATEGORY 1999 19 A. Construction (incl 25% contingency) $180,000 B. Professional Services 15,000 C. Staff Engineering 4,000 D. Administration, Legal 1,000 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $200,000 . A. Water Utility B. Sanitary Sewer Utility $200,000 C. Storm Drainage Utility D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOT $ I Storm Sewer Construction Projects Council Work Session August 31, 1998 Division: Storm Sewer Construction Projects Budget Code: 681 PROFILE Storm sewer system improvements made as part of the neighborhood street reconstruction or other improvement projects. Proposed storm drainage utility capital projects for 1997 are: Street and Utility Improvements. Substantial storm sewer main improvements are generally completed in association with street improvement projects. In the Southeast Neighborhood, new storm sewer laterals will be installed to provide positive drainage to the new storm sewer trunks recently completed on 55th and 57th Avenues. Additional storm sewer would be replaced as necessary. This project is described in Division 632, special assessment construction fund. Miscellaneous structure improvements. Two miscellaneous projects would be constructed: continued repair of various Mississippi River outfalls, and continued joint sealing on the 65th Avenue trunk storm sewer. Palmer Lake Drainage Design. The primary reason for continued trail flooding problems in the Palmer Lake basin is sedimentation and excessive vegetation in the basin area, with long -term settlement of trail portions contributing to the problem. Some concepts for channelization and dredging have been identified. It is proposed to develop more detailed designs and cost estimates for what will be a series of future improvement projects aimed at restoring storage and moving storm water from the edges of the basin to the center. • DEPARTMENTAL GOALS • Perform, in a cost - effective manner, storm sewer system improvements as a part of neighborhood street reconstruction of other improvement projects. • Complete the projects included in the 1998 budget, on time and within budget. • Repair, rehabilitate, or reconstruct storm drainage facilities as necessary to provide for efficient and effective operations. PERSONNEL LEVELS No staff are currently assigned to this program. CAPITAL OUTLAY Item Anticipated Units Cost(s) Use /need purchase date Southeast Neighborhood Street and Spring, 1999 $344,850 -Storm sewer laterals Utility Project $258.900 -Storm drainage assessments $85,950 -Net cost to SDU Miscellaneous Structure 1/99 $50,000 Repair Mississippi River Improvements outfalls//seal 65th Avenue trunk line joints • Palmer Lake Design 1/99 $30,000 Design projects improve storage in Palmer Lake Earle Brown Drive Mill & Overlay Spring, 1999 $12,000 Adjust structures as necessary City of Brooklyn Center Capital Improvement Program Capital Request J Improvements Project Title: Storm Structure Irn roveme is "II Year: Tv_ ne of Im_rovement Water Sanitary Storm _ MSA Street Neighborhood Street 1999 Park Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Funding: $50,000 Storm Drainage Utility Pronosal summary and obiectives (Describe in detail the proposal. its intended results. and nurnoseJ: The storm sewer outfalls along the Mississippi River are in considerable need of repair. Each year one location has been addressed. This item also includes storm sewer joint sealing. • Proiect iustification (Describe nmsa. cons of project. alt ernate choices. impact of not doing nroiect. tc. Outfalls periodically need to be maintained to correct erosion, sedimentation, and pipe distress. This maintenance is required to ensure that the outfalls remain free flowing and in good condition, and to prevent potential loss of property and flooding due to pipe failures. Imnact on operating budget: Reduction in continuing maintenance Other comments: • Project Title: Miscellaneous Storm Structure Improvements CATEGORY 1999 19 A. Construction (incl 25 % contingency) $47,000 B. Professional Services C. Staff Engineering 2,500 D. Administration, Legal 500 E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $50,000 A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility $50,000 D. Regular MSA E. Local State Aid F. Capital Improvements Fund G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL I $50 ,000 I City of Brooklyn Center • Capital Improvement Program Capital Request Project Title: Palmer Lake ( Drainage Design YOU Tv_ ne of Improvement Water Sanitary Storm X MSA Street Neighborhood Street 1999 Park _ Building Sidewalk/Trail Housing Redevelopment Estimated Cost and Fundine: $30,000 Storm Drainage Utility Proposal summary and obiectives (Describe in, detail the proposal. its intended results. and purpose): In the second phase of the Local Water Management Plan it was determined that the primary reason for the continued trail flooding problems in the Palmer Lake area was sedimentation and excessive vegetation in the basin area, with settlement of portions of the trails contributing to the problem. There has been a reduction in the storage area of the basin, so the storm water in the basin is overflowing, flooding the trails and the parks. Very conceptual ideas have been identified which may help alleviate this problem. It is proposed to study these issues more in depth to determine which would be most effective, and to estimate the cost of potential improvements. Project Justification (Describe pr()s an cons of project. al ternate choices, impact of not doing nro iect• tc. : The trial and park flooding will continue to worsen as the basin continues to fill in with silt. A large portion of northern Brooklyn Center drains to Palmer Lake. Trail users often cannot use the trail where it has been flooded. This is a very heavily -used trail system, and is part of the North Hennepin Regional Trail Loop. Impact on operating budeet: There would also be a,reduction in maintenance time and effort to create temporary solutions to trail flooding, and to repair trails damaged by flooding. Other comments: • Project Title: Palmer Lake Drainage Design I „ 1., „, ,, >1' CATEGORY 1999 19 A. Construction (incl 25 % contingency) B. Professional Services $30,000 C. Staff Engineering D. Administration, Legal E. Property Acquisition, Relocation, Hazard Abatement, Demolition F. Equipment G. Other TOTAL $30,000 • A. Water Utility B. Sanitary Sewer Utility C. Storm Drainage Utility $30,000 D. Regular MSA E. Local State Aid F. Capital Improvements Fund ” G. GO Bonds H. Special Assessments I. CDBG J. EDA Levy K. General Fund L. Other TOTAL $30, I •