HomeMy WebLinkAbout1993 03-08 EDAP Regular Session EDA AGENDA
CITY OF BROOKLYN CENTER
MARCH 8, 1993
(following adjournment of City Council meeting)
7 p.m.
1. Call to Order
2. Roll Call
3. Approval of Minutes:
a. EDA Minutes - February 22, 1993 - Special Session
4. Resolutions:
a. Approving One (1) Brooklyn Center Economic Development Authority Grant
(File No. H -110 [8036])
b. Rescinding Economic Development Authority Resolution No. 91 -07
C. Awarding Catering Management Contract to D'Amico Partnership and
Authorizing the President and Secretary to Execute a Contract
5. Adjournment
CITY OF BROOKLYN CENTER council Meeting Date Msrcb s . 1993
Agenda Item Number � Qi
REQUEST FOR COUNCIL CONSIDERATION
ITEM DESCRIPTION:
EDA MINUTES - FEBRUARY 22, 1993 - SPECIAL SESSION
DEPT. APPROVAL:
Brad BloffmahiAector of Community Develop
At ss* *ssss * *sssssssss *ss * * ** sssss *sss* *ssss * *s * * *sssssss* * *s *r� s sss *ss
MANAGER'S REVIEW/RECOnAIENDATION:
No comments to supplement this report Comments below /attached
SU MLARY EXPLANATION: (supplemental sheets attached )
�I RECOMMENDED CITY COUNCIL ACTION
3 a.
MINUTES OF THE PROCEEDINGS OF THE ECONOMIC DEVELOPMENT
AUTHORITY OF THE CITY OF BROOKLYN
CENTER IN THE COUNTY OF HENNEPIN AND THE 5'1'ATE
OF MINNESOTA
REGULAR SESSION
FEBRUARY 22, 1993
CITY HALL
CALL TO ORDER
The Brooklyn Center Economic Development Authority met in special session and was
called to order by President Todd Paulson at 10,35 p .m.
ROLL C ALF
President Todd Paulson, Commissioners Celia Scott, Dave Rosene, Barb Kalligher, and
Kristen Mann. Also present were City Manager Gerald Splinter, Community Development
Specialist Tom Bublitz, City Attorney Charlie LeFevere, and Council Secretary Nancy Berg.
APPROVAL OF MINUTES
FEBRUARY 8. 1.99 - SPECIAL SES ON
T here was a motion by Commissioner Scott and seconded by C onimiys ion e r Rosenc to
approve the minutes of the February 8, 1.993, EDA meeting as printed. The motion passed
unanimously.
DISCUSSION ITEM
BIZ OKLYN CENTER COMMUNITY DEVELOPMENT CITIZENS PARTICIPATION
CQ MIT TEE FO COMMUNTTY DEVELOPMENT BL�K GRANT CDBG)
PROMAM
The City Manager presented the Brooklyn Center Community Development Citizens
Participation Committee for Community Development Block Grant (CDBU) Program for
discussion.
The Community Development Specialist explained over the past years the committee
participation had declined substantially, and he recommended the City Q)uiicil use its
required public hearing as the source of citizen input on the CDBG program rather than the
CDBG committee. He pointed out last year only the Chair of the committee attended the
meeting.
Commissioner Scott reviewed the history of the Committee for the Commissioners stating
the Committee was originally developed to handle how to use CDBG funds. She continued
once these procedures were set, other committees were formed to handle specific areas.
Commissioner Scott agreed with the suggestion to go with public hearings.
2/22/93 - 1 -
President Paulson asked if the Council could use the Housing Commission to handle the
CDBG funds. The Community Development Specialist answered yes, but any use of CDBG
funds rewired a public hearing. Commissioner Rosene suggested the Planning Commission�
would also be a proper venue for the CDBG program.
There was a motion by Commissioner Rosene and seconded by Commissioner Scott to
abolish the Brooklyn Center Community Development Citizens Participation Committee mid
to utilize public hearing format at City Council meetings and other public hearings as
decided by appropriate citizen commissions, The motion passed unanimously,
Commissioner Rosene asked staff to prepare a letter of thanks to the committee members.
RESOL
The City Manager presented a Resolution Approving the Purchase of Real Property at 6715
and 6719 Humboldt Avenue North and Authorizing Execution of Purchase Agreement. He
explained this resolution would provide for the acquisition of the two remaining buildings
on the Humboldt Avenue site.
RESOLUTION NO, 93 -02
Cuminissimier Scott introduced the following resolution and moved its adoption:
RESOLUTION APPROVING THE PURCHASE OF REAL PROPERTY AT 6715 AND
6719 HUMBOLDT AVENUE NORTH AND AUTHORI EXECUTION OF
PURCHASE AGREEMENT
The motion for the adoption of the foregoing resolution was duly seconded by
Commissioner Mann, and the motion passed unanimously.
Commissioner Rosene suggested the City should celebrate the removal of the buildings by
planning the removal on a weekend; and maybe allowing citizens a swing of a sledgehammer
for a quarter. He suggested the proceeds Gould be used to purchase seed or sod to cover
the properties, Staff agreed to contact the Commissioners regarding a celebration,
The City Manager asked if the Commissioners supported Representative Orfield's legislation
labelled The Metropolitan Community Stability Act. The Commissioners all agrccd.
President Paulson stated he would like to be involved in any meetings on this legislation.
ADJOURNME T
There was a motion by Commissioner Kalligher and seconded by Commissioner Scott to
adjourn the meeting. The motion passed unanimously. The Brooklyn Center Economic
Development Authority adjourned at 10 :50 p.m.
Todd Paulson, President
Recorded and transcribed by:
Nancy Borg
TimeSaver Off Site Secretarial
2/22/93 -2-
CITY OF BROOKLYN CENTER Cmacil Meeting Date Much 8, 1993
Agenda Item Number
REQUEST FOR COUNCIL CONSIDERATION
i .......**....**..*...*.*> r.*............*.******....*.*.. .. * * *.... * *. *.. *... * *.. * *....<*
ITEM DESCRIPTION:
RESOLUTION APPROVING ONE (1) BROOKLYN CENTER ECONOMIC DEVELOPMENT
AUTHORITY GRANT (FILE NO. H -110 [8036])
DEPT. APPROVAL:
Tom - ublitz, Community Development Specialist
MANAGER'S REVIEW/RECOMMENDATION: '
No comments to supplement this report Comments below /attached
SUIVE ,RY EXPLANATION: (supplemental sheets attached Yes
I have received one (1) application for a rehabilitation grant (File No. H -110 [8036]). Attached
is the application and recommendations for work to be performed on the home. I recommend
approval by the EDA.
This information is private and not available to the general public.
Our records indicate the applicant has Qt received a previous grant under the program.
RECOMMENDATIONS
Motion to adopt Resolution Approving One (1) Brooklyn Center Economic Development Authority
• Grant (File No. H -110 [8036] ).
Q i
Commissioner introduced the
following resolution and moved its adoption:
EDA RESOLUTION NO.
RESOLUTION APPROVING ONE (1) BROOKLYN CENTER ECONOMIC
DEVELOPMENT AUTHORITY GRANT (FILE NO. H -110 (80361)
WHEREAS, the Brooklyn Center Economic Development
Authority established a Home Rehabilitation Grant Program to
assist low and moderate income individuals in the maintenance and
repair of their homes; and
WHEREAS, the Brooklyn Center Economic Development
Authority has received one (1) application (File No. H -110 [8036])
from eligible individuals to receive grant assistance; and
WHEREAS, an inspection by the City of Brooklyn Center
has determined that the work is necessary and appropriate under
the Brooklyn Center Economic Development Authority Grant Program;
and
WHEREAS, the estimated cost of the proposed grant
application is estimated at $10,000.
NOW, THEREFORE, BE IT RESOLVED by the Brooklyn Center
Economic Development Authority that:
1. The Brooklyn Center Economic Development Authority
does approve the one (1) housing rehabilitation
grant application (File No. H -110 [80361) as
recommended by the staff.
2. That the work be performed as recommended in the
request for council consideration form dated March
8, 1993, and that the applicants be directed to
obtain the necessary bids for staff review and
approval.
3. The project shall not exceed the grant limit of
$10,000 per house.
Date Todd Paulson, President
The motion for the adoption of the foregoing resolution was duly
seconded by Commissioner and upon vote being
taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
A R- 5G ., r-1 E T R 0 H R 2916131 P 0 2'
11 4-93 THII
UHC/888 URBAN HENNEPIN COUNTY
HOUSING VEEABILITATION DEFERRED LOAN FROOR114
HOMEOWNER APPLICATION FOR CP-ANT
OLD jj;F0 M,& �10N -- Please Print First Name
Name Q i � 19 Z)0- K a of S
Address V6 1V'V • Home Phone
City Zip Code ) 5 0 �'Y- 312 Work Phone
Ci o f re If other than mailing address
Marital status (check one) Married, _ single, divorced, separated,
widowed
Race (check one) X White, _Black, American Indian/Native Alaskan,
Hispanic, Asian or Pacific Islander
The information concerning Minority Group Categories is requested for statistical purposed
t
3 are utilized by
only so th at Hennepin County may determine the degree to which its program
Minority households.
INCO Tilrom TION
'Income" means any income received from any source by a Resident.
List all the people in occupying your house for at least nine months of the year ('including
you r s elf). include ages and incomes. include any income derived from rent.
Total nu.T---ber of residents in the hou5ehold—L- How M renters?-() QYFICE USE ONLY
income of # in household
names of ages of residents
re- d residiqnts per month source of income verifia L ine omes Z3 S
r.
A t-A R rtO Ciro_ C-C-
Per mon th $
Total Income p per year income per month
RETURN APPLICATION TOi
ftECX1VE:C) Mr. aim Dupre (291-6573)
Metro HRA income per year
OCT 0 9 1992 Mears Park Centre
230 East Fifth Street
St. Paul, MN 55101
1 - 16
1 ETRO W.R.A.
h;FiF'- 4 -' = TH' -J = _ = h1ETRC� HF'H '! 1 r• 1 1 F• • 0 ,
ASSF.T INF`20 -ATIO
List the cash value of assets held by all residents of your household.
If money is owed on any item, the value listed should equal the market
value of the item minus the amount that is owed, OFFICE USE ONLY
veri ied asseets
$ Zp'
1. CASH can hand........• ...... •
......... . ........ .
...$ t�e
0 � S 2. CASH in Checking accounts..'.. .... ...... I ....... , • . at $ 3
3. CASH in saving accounts (including those held, , ..
in trust)
4. Gash value of Securities or U.S. Savings bonds ...... $ -` $
5, Redemption value of life insurance policies . ........ $
6, Current Market Value of real estate, NOT INCLUDING
the property to be improved and up to 2 surrounding
acres. Include 100% of the outstanding balance t
owed to you on property sold on Contract for Deed...$ _ $
7. Othar personal property (excluding household
furnishings, clothing and one personal vehicle).....$ —' $
TOTAL ASS= TS .............. ..............................$ ,
R -' INFORMATION
Provide the following information about the property to be improved with this deferred
loan.
1. is your property; --4 a single family house; a duplex
2. How many years have you lived in the house?
4'r
3. 'what is the approximate age of the house?
4, Do you have any outstanding mortgage(s) on the house? Yes No
If yes, with whom?
(use additional sheet
if necessary) _ _ Amount $
5, Do you have any outstanding Contract(s) for Deed on the house? Yes No
If yes, with whom?
(use additional sheet _
if necessar y ) Amount $
6. Have you received a Housing Rehabilitation Grant or Loan
before? Yes X_ No
If yes, from whom? Amount $
Amount $
2
t•1 i1 F'— 4 —'+= THU .5' METRO HRH . ' 916131 P. 04
i
PLEASE READ CAREFULLY
I
Urban Hennepin C.o{un -ty or an authorized representative shall have the right to inspect
the property t be Imp roved at any time from the date of the Deferred Loan upon given
due notice to the occupant(s).
Any person who makes a false statement or misrepresentation in connection with the
application for or use of Urban Hennepin County Deferred Loan funds shall be subject
to a fine or imprisonment, or bath, under the provisions of the Minnesota Criminal
Code, and/or may be required to return all or part of the Deferred Loan Funds to Urban
Hennepin Count)+.
I, the undersigned, certify subject to penalty under law that the above information is
true and correct to the best of ray knowledge and belief, acid that the provisions stated
are accept--d and agreed to.
applicant signature date of application
Note: All names and financial information provided on this application are considered
private dtat3 on individuals and are subject to privacy of information provisions,
pursuant to State Statute.
I ,
3
MEMORANDUM
TO: Tom Bublitz, Community Development Specialist
FROM: Dave Fisher, Building Inspector J
DATE: February 22, 1993
SUBJECT: Rehabilitation Grant for 5901 Dupont Avenue North
Homeowner: Amanda Hulke
H -110 (8036)
Subject property is a two bedroom 1' /a story expansion, approximately 45 years old. The major
deficiencies noted: Substandard electrical, plumbing and miscellaneous.
The following list of rehabilitation items would improve this home greatly:
Electrical
1. Install new UL certified 100 amp service panel and circuit breakers.
2. Provide a separate 20 amp circuit for washer and dryer.
3. Provide a 15 amp circuit to furnace.
4. Add wall receptacle in right bedroom.
5. Add wall receptacle in bathroom with GFI.
6. Provide ground to all three prong receptacles.
Plumbing
1. Install new 40 gallon energy miser water heater.
2. Install new approved gas valve on dryer.
3. Repair or cap well - work to be done by state licensed well driller.
4. Vent water closet to outside air with 3 inch vent.
5. Replace trap on bathtub with 2 inch waste and trap.
Memorandum, Page Two
2 -22 -93
Hulke
Miscellaneous
1. Provide handrail to code on basement stairs.
2. Provide handrail to code to upper level.
3. Repair wall by stairs where plumbing access is for bathtub.
4. Replace rear exterior door.
5. Replace rear storm door.
6. Replace windows in kitchen, dining room, living room, bathroom, right bedroom,
left bedroom and upper level. All windows must have positive locking devices.
7. Insulate attic to R -38.
8. Insulate foundation to R -I1.
9. Insulate accessible area rim joist to R -19.
10. Provide attic ventilation per Uniform Building Code.
11. Provide kitchen exhaust fan.
12. Repair existing gutters.
13. Tear off and replace roof to code.
hulke.mem
URBAN HENNEPIN COUNTY
HOUSING REHABILITATION GRANT PROGRAM
PROPERTY INSPECTION REQUEST
TO COUNCIL: March 8, 1993
H -110 (8036)
APPLICANT INSPECTION
Name: Amanda Hulke Staff: Tom Bublitz
Address: 5901 Dupont Avenue North Date: 2 -18 -93
Brooklyn Center, MN 55430
Time: 10:00 A.M.
Phone: 561 -5839
Inspector: David Fisher
Building Age: 45 years
Z'
Garage: None
TABLE OF CONTENTS
ART
PAG
1 ❑ HANDRAIL - GUARDRAIL $ 1
Where required, Height of, Baluster Spacing and
Installation, Specification for
2 ❑ INTERIOR - EXTERIOR STAIRS $ 1
Repair or Replacement of, Rise and Run and Installation,
Specification for
3 ❑ FOUNDATION $ 2
Repair of —Tuck Pointing
Insulation Installation and Specification for 14
4 ❑ CRAWL SPACE: $ 2
Insulation of and Vapor Barrier, Installation for
5 ❑ BASEMENT FLOOR $ 2
Repair of
6 ❑ POST AND BEAM: $ 3
Repair of, Replace
7 ❑ ACCESSIBILITY IMPROVEMENT $ 3
For Barrier Free and Handicapped Persons
8 ❑ ELECTRICAL $ 3
Upgrade Service, Unprotected Conductor,Washer, Dryer,
Hanging Receptacle, Furnace and Kitchen Circuits
Wall Receptacle, Ground Fault 4
9 ❑ ELECTRICAL MAST: $ 4
Relocation of
10 ❑ MECHANICAL $ 4
Enclosed Space Ventilation, Replace Furnace
Thermostat, Chimney, Registers, Ductwork
11 EXj PLUMBING: $ 5
Water Heater Replacement, Cold Water Shut -off, Gas Valve
T.P.R. Valve, Vent Connector, Dryer Gas Valve, Dryer 6
.Ventilation, Open Gas Device,Well Abandonment, Plugged
Sewer., Water Softener, Kitchen Sink Vent, Trap, Water
Supply, Lavatory Vent, Trap, Water Supply, Water Closet
and Sealing Gasket, Bathtub Vent, Trap, Wall Enclosure,
Laundry Tub Vent, Trap, Floor Drain
Plumbing Fixture Material and Performance Specifications 7
for, Drain Tile, Main Water Line
Septic System, City Sewer 8
-1-
TABLE OF CONTENTS
PART
�PA
12 ❑ CEILINGS $
Repair of
73 ❑ WALLS: $ .
Repair of
13 Ceiling and Wall Performance and Material Specifications for 9-
14 ❑ FINISH FLOORS: $ 10-
Replacement of, Performance and Material Specifications for
15 EXTERIOR DOORS: $
Repair - Refi nish of, Weather Sealing, and Replacement of,
Performance Specification for
16 [ EXTERIOR STORM DOORS: $
Repair - Replacement of, Material Specification for
17 ❑ INTERIOR DOORS $
Repair - Replacement of, Performance and Material
Specifications for
18 ❑ EXTERIOR STORM AND SCREEN WINDOWS $
Repair - Replacement of, Material Specification for
19 ❑X HOUSE WINDOWS: $(3_�
Repair - Refinish of, Weather Sealing of, Replacement of,
Material and Performance Specification for
20 ❑ INSULATION: $ 14 -'
Attic, Wall, Foundation, Rim Joist Installation, Material
and Performance Specification for, Code Requirement
21 [ VENTILATION: $
Provision of Attic, Kitchen, Bathroom, Repair of, Material
and Performance Specification for
22 ❑ EXTERIOR SIDING: $ 1
Installation, Repair or Replacement of, Soffit and Facia,
Window, Door and Cornice Trim, Material and Performance
Specification for
23 ❑ EXTERIOR PAINTING: $ 1
ateria an Performance Specification for
24 ❑ GUTTERS AND DOWNSPOUTS: $
Provision for and replacement of, Material and Performance
Specification for
25 ® ROOFING: $ 1
Repair - Replacement - Removal of, Material and Performance
Specification for
-2-
TABLE OF CONTENTS
PART
26 CHIMNEY PAGE
Repair - Reline - Replacement of $ 5 -19
27 KITCHEN & BATHROOM CABINETS $ 19
28 SMOKE DETECTORS:
Installation of $ 20
29 GRADING
Material and Placement Specification for, Seeding and $ 20
Sodding of
30 EXTERIOR CONCRETE WORK
Replacement - Repair of, Sidewalks, Garage Apron, Etc. $ 20
31 MISCELLANEOUS: $ 20
TOTAL $
Contractor Nave:
Address: City State_
Phone: Home Work
Homeowner Name: Amanda Hulke
Address: 5901 Dupont Avenue North
Phone: 561 -5839
H# 110 (8036)
Contractor Signature g ture
Date
-3-
1. INSTALL HANDRAIL:
® Basement Stair ❑ Front Stair ❑ Rear Stair
® Upper Level Stair
One handrail shall be installed on stairways 44" or less in width, except that
stairways open on one or both sides shall have handrails provided on the open
side or sides. Handrails shall not be less than 30 nor more than 34" in height
above stair tread. Unenclosed floor, open landings and ramps at a height of
over 30 from floor or grade shall have a guardrail. Guardrail shall not be
less than 36" in height and shall have intermediate rails or an ornamental
pattern such that a sphere 6 1' in diameter cannot pass through. Materials and
finish shall be specified in the Scope of Improvements and installation shall be
in compliance with the State Building Codes.
❑ Addition:
2. INTERIOR - EXTERIOR STAIRS
❑ Repair ❑ Basement ❑ Second Storey [] Front
❑ Rear Entrance Stairs
❑ Replace ❑ Basement [] Second Storey ❑ Front
❑ Rear Entrance Stairs
Stair riser to be a minimum of 4 to a maximum of 7 " high. Stair tread to be a
minimum of 11" wide. Wood stair stringer shall be of 2 x 10 nominal stock.
Exterior stairs can be of treated stock or concrete having footings 42" minimum
below grade.
❑ Addition:
-1-
3. REPAIR FOUNDATION:
❑ All joints shall be completely filled with mortar.
❑ Tuck pointing shall be done only after the joints have been raked out to a
minimum depth of 1/2" and wetted.
❑ Addition:
4. CRAWL SPACE:
❑ Either insulate perimeter foundation wall to R -11 or floor to a minimum of
R -19. A 6 mil. polyethylene plastic vapor barrier shall be installed over
dirt area and be weighted by sand, rocks or other non -wood materials.
❑ Addition:
5. BASE14EIlT FLOOR:
❑ Patch holes and large cracks.
❑ Addition:
-2-
6. POST AND BEAM
❑ Repair or replace as marked.
❑ Addition:
7. ACCESSIBILITY IMPROVEMENTS
❑ Refer to Minnesota State Building ode Chapter for g P 55 accessibility
architecture specifications. The type and scope of accessibility
improvements shall be at the discretion of the Grant Administrator.
❑ Addition:
8. ELECTRICAL:
® Install new U.L. certified 100 amp service panel and circuit breakers.
❑ Relocate unprotected plastic coated conductors to center of wood joist or
in metal protective tubing located in
❑ Provide grounded receptacle for: [g-J Washer & Dryer on a separate 20
amp circuit. ❑ Water Softner. ❑ Other
Replace hanging
light or
❑ P g g E receptacle with porcelain fixture mounted on an
approved box, and properly grounded.
❑Provide separate 15 amp circuit to furnace.
❑ Provide separate 20 amp circuit to kitchen countertop work area
receptacles.
-3-
ELECTRICAL COtITINUED
❑ Add wall receptacle in: O kitchen; ❑ in dining room;
Right bedroom F7 bedroom
❑ bedroom ❑ bedroom
❑ living room ® GFI bathroom
® with ❑ without ground fault. ❑ laundry room
® Addition: Ground all outlets throughout the house.
9. ELECTRICAL MAST;
❑ Relocate
❑ Other
❑ Addition:
ALL ELECTRICAL WORK SHALL BE IN COMPLIANCE TO THE NATIONAL ELECTRICAL CODE.
10. MECHANICAL:
❑ Provide ventilation of enclosed furnace space.
❑ Provide heat loss calculation of dwelling and install new heating
manufacturer's instructions capable to meet the heat loss. The minimum
AFUE shall be listed at 800 and shall include damper efficiency. New
appliance shall be AGA or UL listed and orsat tested.
-4-
❑ Replace gas valve with approved lever handle gas valve or ball valve
❑ Replace vent connector from furnace to chimney with 26 auge aiv.
g � g
sheet metal vent materials.
❑ Provide combustion air
❑ Provide set back thermostat.
❑ Reline existing Class B Chimney to expel water heater or other gas
appliance combustion gases if new heating appliance is vented through the
side wall.
❑ Remove ❑ Reline existing Class B Asbestos Chimney.
❑ Add warm air register in
❑ Add return air register in
❑ Add Duct work
❑ Addition:
ALL MECHANICAL WORK SHALL BE IN COMPLIANCE WITH STATE MECHANICAL CODES.
11. PLUMBING
® Install new 40 gallon energy miser water heater having AGA or UL
listing complete with necessary gas piping tested for leaks, new lever handle
gas valve or ball valve, new vent connector sealed and secured at all joints, new
temperature pressure relief valve with 3/4 overflow tube extending to 6" above
fini --hed floor. Water heater shall be warranted for five years.
❑ Install cold water shut off valve on existing water heater.
❑ Install approved gas valve on existing water heater.
-5-
PLUMBING continued
❑ Install temp., pressure, relief valve on existing water heater.
❑ Install new vent connector on existing water heater.
Install new approved gas valve on gas dryer.
❑ Vent gas dryer to outside air.
❑ Plug or cap open gas valve or fitting located at or near
Repair or Disconnect existing well water and reconnect water service to City water
cap with meter and reconnect electrical ground to City side of water meter.
Well to be properly abandoned, inspected and approved by the State Health
Department or City Sanitarian.
❑ Rout out main house sewer and clear stoppage.
❑ Repair or replace inoperable water softener.
❑ Install new kitchen sink vented to outside air.
❑ Install new kitchen sink water supply tubes and valves.
❑ Install new kitchen sink trap.
❑ Install new lavatory sink vented to outside air.
❑ Install new bathroom lavatory water supply tubes and valves.
❑ Install new bathroom lavatory trap.
❑ Install new bathroom water closet complete with seat and shut off
valve.
❑ Install new water closet setting seal gasket.
❑ Install new bathtub vented to outside air.
❑ Install new bathtub waste trap.
❑ Install new bathtub wall enclosure and shower curtain rod.
❑ Install new laundry tub vented to outside air.
❑ Install new laundry tub waste trap.
❑ Floor Drain ❑ Inoperable ❑ Install
Other 1. Vent water closet to outside air with 3"
2. Replace trap on bathtub with 2" wet vent.
-6-
PLUMBIPJG continued '
Q New kitchen sink shall be 33 x 22" self - rimming, unless otherwise specified in the
Scope of Improvements. Sink shall be stainless steel or cast iron and faucets shall
be either single lever or two handle.
a. Garbage disposal is only an acceptable work item in these two
circumstances.
❑ 1. reinstallation of existing disposal when installing a new sink.
❑ 2. removing and disposal.
Q New bathtub shall be cast iron, fiberglas or steel. Faucets shall either be single
lever or two handle. Color selection shall be limited white unless specified to
match existing color. Installation of a fiberglas tub insert is at the discretion
of the Grant Administrator.
Q New lavatory shall be wall -hung or with vanity. Trap shall be .17 gauge. Color
selection shall be limited to white unless specified to match existing color.
Refer to Carpentry section for dabinet specification.
Q New water closet shall be viterous china with close coupled tank, include seat and
anti - siphon ballcock. Color selection shall be limited to white unless specified
to match existing color.
Q New laundry tub shall be fiberglas and securely attached to wall or free standing.
Faucet shall be stainless steel or brass type and nonthreaded or with a vacuum
breaker.
Q Provide basement interior perimeter wall drain tile system and floor sump pump.
Sump pump shall discharge to an exterior french drain or City storm sewer.
French drain shall be located a minimum of ft. from foundation wall
and be filled with a minimum of cubic feet of 3/4" stone. Stone
shall be topped with sod or reseeded to match existing landscape.
Q Addition:
Q Provide Municipal Water - House connection to municipal water line shall entail
a bid specifying municipal tap -in fee, total length and cost per foot, location
and permit. Connect to house supply lines, patch any unnecessary holes
incurred where water line enters house, repair any necessary street damage,
back fill and mound to allow settlement to previous ground level. Seeding or
sodding the ground to match existing or blend in with the adjoining and
surrounding work shall be at the discretion of the Grant Administrator.
Q Addition:
-7-
PLUMBING continued
❑ Provide Septic Sewage System -System shall be specified in the bid and include
drawing. Installation shall include testing and permit costs. Connect t Is
house drainage lines, provide reasonable protection to lawn, driveways, etc. JqW
back fill and mound to allow settlement to previous ground level. Seeding or
sodding the ground to match existing or blend in with the adjoining and
surrounding work shall be at the discretion of the Grant Administrator.
❑ Addition:
❑ Provide Municipal Sewer - House connection to municipal sewer line shall entail
a bid specifying municipal tap -in fee, total length of line and cost per foot,
location and permit. Connect to house drainage lines, patch any unnecessary
holes incurred where line enters house, repair any necessary street damage,
fill existing septic tank(s) with dirt and back fill and mound to allow
settlement to previous ground level. Seeding or sodding the ground to match
existing or blend in with the adjoining and surroundin g work.
I
❑ Addition:
ALL PLUMBING WORK SHALL BE IN COITLIANCE WITH THE STATE PLUMING CODE
12. CEILINGS (See General Specification)
❑ Repair Ceiling in ❑ Kitchen ❑ Dining room
❑ Livingroom ❑ Bathroom ❑ Bedroom
❑ Bedroom 7 Bedroom
❑ Bedroom ❑ Basement
❑ Basement ❑ Closet h
13. WALLS (See General Specification)
p on)
Repair Wall in ❑ Kitchen Dinin room Livin roo
❑ g ❑ Living room
❑ Bathroom ❑ Bedroom ❑ Bedroom
❑ Bedroom ❑ Bedroom ❑ Basement
❑ Closet of Other: Repair wall by stairs to basement;
h ub.
WALLS continued
�X Wall and Ceiling Repair General Specification:
1. Wherever existing wails or ceilings are to be repaired, the damaged and
locse material shall be completely removed and new material shall be sized
and installed to match and blend in with the adjoining and surrounding
work. All repairs shall be properly prepared to receive the finish
application.
2. Plastering - New plastering work shall be installed in compliance with the
State Building Codes.
3. 47all Board - shall be installed in compliance with the State Buildi
codes.
4. Perforated Tape Vix - shall comply with the recommendations of the
manufacturer. A minimum temperature of 55 degrees Fahrenheit shall be
maintained in the room where work is done until the cement is completely
dry.
5. Perforated Tape Application - Follow manufacturer's directions.
a. Over Joints the tape shall be embedded in cement and covered
with a thin layer of cement. A second and third coat shall be
applied. Each coat shall be dry before applying the next
coat. Each coat shall be featheredged and extended beyond
the previous coat (approximately 2 The finish coat shall
be sanded lightly and any imperfections filled in prior to
any painting and decorating.
b. Check to see that all nails have been driven so that their
heads are below the surface of the board leaving a dimple in
the surface without breaking the paper. Cover the nails
dimple with three applications of cement allowing time to dry
between each coat. The final coat shall be sanded lightly
before application of paint or other decoration.
c. Inside corners shall be reinforced with tape embedded in
cement finished as specified "Over Joints ".
d. Out Outside corners shall be protected by wood moulding,
metal moulding or metal corner reinforcement. Metal corner
reinforcement shall be finished with two coats of cement as
specified.
6. Waterproof gypsum board shall be used in areas specified in the State
Building Code.
Install water resistant wall board base in the bath and shower enclosure,
and apply wall board with long edge horizontally over the tub, allowing
1/4 space between the board and tub.
7. Adhesive i.;an acceptable bonding material. Adhesive shall be specified
according to usage and location and applied in strict compliance with the
manufacturer's specifications.
_Q_
WALLS continued
8. Panelinz installation shall be 3/16" prefinished paneling of a medium
quality installed as per manufacturer's recommendations. Owner shall
have choice of paneling color and style.
9. Furrier strips - New ceiling shall be installed over 1" x 3" furring
strips, 12" on center. When ceiling butts to wood or paneled walls, 3/4
to 1 1/2" cove moulding shall be installed along edge. New walls shall be
installed over 1" x 2 furring strips, 16" on center. Any existing
baseboard, window or door trim shall be removed and reinstalled or
replaced with new trim over new wall material, unless otherwise specified
in the Scope of Improvements. New work shall be level and plumb with
adjoining and surrounding work.
Addition: Door or access panel is required to remain
14. FINISH FLOORING
Replace Floor Covering in Kitchen Diningroom Livingroom
Bathroom Bedroom Bedroom
Bedroom Bedroom Basement
Closet of
1. Existing wood flooring shall be repaired to match existing or blend in
with the adjoining and surrounding work.
2. Resilient flooring shall be sheet vinyl or vinyl asbestos tile minimum
thickness 1/16 ". Tile shall be medium quality and laid in exact accordance
with the manufacturer's specifications. Owner to select color and pattern
from readily available selection.
3. Carpet shall be a color and pattern from readily available selection of
medium quality and priced carpet.
4. A finished wood, vinyl or metal moulding along edge of flooring shall be
installed as part of the finish flooring installation.
-10-
FLOORING continued
5• Plywood used as subfloor shall be a minimum of 1/2" thick, nailed to joist
spaced 16 on center along intermediate members, installed with outer plies
at right angles to the joists and staggered so the end joists in adjacent
panels bear on different joists.
6. Underlayment shall be 1/4 structural grade plywood, particle board or
untempered hard board placed with smooth side up.
❑ Addition:
15• EXTERIOR DOORS
❑ Repair and Refinish: ❑ Front Door ❑ Rear Door ❑ Side Door
❑ Garage Door
❑ Weather Seal: ❑ Front Door ❑ Rear Door ❑ Front Storm Door
❑ Rear Storm Door
U Replace: ❑ Front Door ® Rear Door ❑ Garage Door
All exterior doors shall be solid core wood or insulated steel and complete with
hardware, strike plat and lock set. Installed doors shall be prehung or sized to
fit frame complete with stops, weatherstripping and jambs. After trimming and
fitting of door, all edges shall be finished to match existing or blend in with the
adjoining and surrounding work. A door bumper and threshold are included on all
exterior doors.
16. EXTERIOR STORM DOOR
❑ Repair: ❑ Front Storm Door ❑ Side Storm Door
fX] Replace: ❑ Front Storm Door Side Storm Door
Storm doors shall be solid core aluminum or wood with storm and screen inserts and
complete with hardware and strike plate. Installed doors shall be sized to fit
frame. All edges of wood storm shall be finished to match existing or blend in with
the adjoining and surrounding work.
-11-
17. INTERIOR BOORS
❑ Repair Door to:
❑ Basement F7 Bathroom ❑ Bedroom
❑ Bedroom ❑ Bedroom
❑ Bedroom
❑ Closet in
Replace Door To:
❑ Basement ❑ Bathroom
❑ Bedroom ❑ Bedroom
❑ Bedroom ❑ Bedroom
❑ Closet in
Interior doors shall be hollow core or panel and complete with hardware and strike
plate. Installed doors shall be prehung or sized to fit frame complete with stops
and jambs. After trimming and fitting of door, all edges shall be finished to match
existing or blend in with the adjoining and surrounding work. A door bumper is
included on all interior doors. Bathroom door shall be provided with "privacy"
lock set.
❑ Addition:
-12-
18. EXTERIOR STORM AND SCREEN WINDOWS
❑ Repair ❑ Replace ❑J Basement ❑ Kitchen 71 Diningroom
❑ Livingroom ❑ Bathroom ❑ Bedroom
❑ Bedroom [] _Bedroom ❑,, Bedroom
Storm windows shall be aluminum combinations of medium quality, unless otherwise
specified in the Scope of Improvements.
19. HOUSE WINDOWS
❑ Repair and Refinish Windows in: ❑ Basement ❑ Kitchen ❑ Diningroom
❑ Livingroom ❑ Bathroom ❑ Bedroom
❑ Bedroom [] Bedroom
❑ Bedroom
Repair of windows
or replacements of frames, sills, sash, trim and hardware shall
match existing work in wood, design, dimensions and finish, unless otherwise
specified in the Scope of Improvements.
Where sash counter balances are to be removed, the area must be insulated properly.
Friction guides are acceptable as substitutes. Cotton cord replacement is
acceptable.
A positive locking device shall be installed on all windows.
All broken glass shall be replaced with new glass, matching existing in size and
design and properly reglazed. All excess material shall be removed and all glass
left clean.
Weather Seal Windows in: ❑ Kitchen ❑ Diningroom ❑ Livingroom
❑ Bathroom ❑ Bedroom ❑ Bedroom
❑ Bedroom ❑ Bedroom ❑ Basement
Caulk and weatherstrip around all primary door and window frames, window panes or
other locations that lead to an unheated space or which calls for a seal and
watertight job.
Materials shall be of standard brando and application shall 11 be in exact accordance
with the manufacturer's specifications.
-13-
1 2 4 1
Reolace Window in: X� Kitchen XR Diningroom Livingroom Bathroom
I Left 2 Bedroom [ Right 2 Bedroom 1 0
2 ❑
❑X Upper level Bedroom
❑ Basement
Openings of new window units shall be framed to provide a rigid enclosure for the
installation of windows. Frames shall be set plumb, level and square within
clearance limits. New windows shall match the adjacent windows in design, glass,
material and finish, unless otherwise specified in the Scope of Improvements.
Installed windows shall be weatherstripped, left clean, tight and weatherproof.
A positive locking device shall be installed on all windows.
❑ Installed below grade bedroom window used as an excape exit shall have a
opening size of not less than 5.7 sq. ft. with a minimum of 24" depth and 20"
width. The interior sill height shall not be more than 48" from floor.
Exterior of window shall be cleared for exit and when an areawell is installed
it shall be of treated wood or galvanized metal.
❑ When a bedroom window unit is replaced, the new unit shall be sized to meet the
requirements of the State Building Codes.
❑ Addition:
20. INSULATION
[9� Insulate attics ace to meet a minimum R- 8 rating p m m 3 and have a
g vapor barrier,
where accessible. Air chutes shall be installed where there is soffit venting.
Provide protection around all recessed lights, junction boxes and chimney. Access
opening shall be sized a minimum of 22" x 30 ", framed and insulated.
❑ Insulate exterior walls to a minimum of R -11. Drill holes and blow in
insulation between wall studs approximately every 16 on center and below each fire
stop. Holes shall be patched to match existing or blend with adjoining and
surrounding work.
Insulate exterior foundation with rigid insulation of R -11 to above grade
and extend insulation 2' below grade and cover insulation with a non - combustible
material. Foundation insulation shall be at the discretion of the Grant
Administrator. 0
-14-
I
INSULATION continued
Insulate accessible area rim joist to a minimum of R -19 with vapor
barrier facing warm side.
Addition:
21. VENTILATION
U Provide attic ventilation per Uniform Building Code as follows:
Ventilation - where determined necessary by the building official due to
atmospheric or climatic conditions, enclosed attics and enclosed rafter spaces
formed where ceilings are
a underside f f afters
g applied direct to the derside o r r shall have
cross ventilation for each separate space by ventilating openings protected against
the entrance of rain and snow. The net free ventilating area shall be not less than
1/150 of the area of the space ventilated, except that the area may be 1/300,
provided at least 50% of the required ventilating area is provided by ventilators
located in the upper portion of the space to be ventilated at least three feet above
eave or cornice vents with the balance of the required ventilation provided by eave
or cornice vents. The openings shall be covered with corrosion- resistant metal
mesh with mesh openings of 1 /4" in dimension.
[ji . Provide kitchen ventilation - Exhaust Fan - kitchen without means of
natural or below minimum requirements of ventilation shall be equipped with a
mechanical exhaust fan. Installation shall include mounting fan on ceiling,
venting through the roof or exterior wall with cap, insulating vent in unheated
space and wiring on a separate wall switch.
F � Repair kitchen ventilation.
[� Provide bathroom ventilation - Exhaust Fan - Bathroom without means of
natural or below minimum requirements of ventilation shall be equipped with a
mechanical exhaust fan. Installation shall include mouting fan on ceiling,
venting through the roof or exterior wall with cap, insulating vent in unheated
space and wiring on a separate wall switch.
[� Repair bathroom ventilation.
❑ Addition:
-15-
22. EXTERIOR SIDING
❑ Repair or replace all rotten boards and nail down all loose boards or
shingles prior to receiving new siding. Side walls shall be furred out if necessary
to make walls level, plumb and free from waves, buckles and sags. Installation
shall be in strict compliance with the manufacturer's specifications. .
❑ Existing brick work shall be repaired to match existing or blend in with the
adjoining and surrounding work.
❑ Reside exterior with .024 gauge, nominal thickness, insulated type
aluminum of medium quality or equal. Color selection by owner. Installation
shall include window J channel, door channel, inside and outside corners, starter
strip, finish mould and caulking. Backing shall be installed under siding and be of
proper thickness. All nails and rivets shall be properly secured. Staples shall
not be used for installation.
❑ Cover all window, door trim and sills with baked enamel aluminum, minimum
.019 gauge. Color selection by owner.
Lap - Siding shall be minimum 7/16" thick x 16 long, smooth, pre - primed
masonite panels. Siding shall be installed with corrosion resistant nails and all
ends shall be attached together with H- moulding and sealed with exterior caulking.
Lap siding shall extend to 6 above finish grade.
Novelty - Cover indicated sections of structure with new wood novelt
siding, or other specified material. All joints shall be tight and adjacent en�
joints shall be staggered. Siding shall be installed over vapor barrier, blend and
conform with existing structure. All horizontally applied siding shall be
staggered with minimum of two stud spaces.
❑ Cover soffit and fascia with .019 gauge baked enamel aluminum using solid or
perforated soffit material. Color selection by owner. Soffit panels shall be
secured in channels to eliminate looseness and rattling. Materials shall be lapped
for proper drainage and applied in full sections. Caulk joints. Staples shall not
be used for installation.
[] Addition:
-16-
23. PAINTING
Repaint exterior siding, cornice window and door trim includin
❑ P �> g
doors and windows as follows:
Wood surfaces to be painted shall be cleaned by best means possible
to remove loose and scaley paint and rough spots any any obvious
oil and /or grease that may be covering existing wood or paint.
Where previous coats have chipped and peeled, the edge shall be
feathered to the maximum extent feasible and spot primed with a
high quality oil base paint before finish coats are applied.
No paint shall be applied until all nail holes have been filled and
sanded and all defects in wood work have been eliminated.
Paint shall be medium grade and applied according to the
manufacturer's specifications and applied to secure full
coverage. Use primer where required. Owner to select color from
readily available selection.
Spray application is not acceptable, unless authorized by the
Grant Administrator.
24. GUTTERS AND DOWN SPOUTS
❑ Provide gutters and down spouts as follows:
a) New gutters shall be minimum 5" wide .032 gauge aluminum
with hangers placed under roofing.
b) New downspouts shall be minimum 2" x 3" rectangular .020
gauge aluminum.
C) Finish of gutters and downspouts shall be a baked on
enamel finish. Owner to select color from readily
available selection.
d) Gutters shall be installed with slight pitch to the
downspout. Gutters shall be securely mounted to the
roof, 36 " or less on center. Downspouts to be installed
at one end of gutters and extend 2' at the bottom with
extension. Extension or splash block shall be installed
when the gutter and downspout system does not directly
connect into a drainage system.
® Addition: Repair gutters.
-17_
25. ROOFING
® Provide new roof per City of Brooklyn Center Handout and as follows: 0
New roofing shall be in compliance with the State Building Codes and
Manufacturer's installation instructions. Flashing, plumbing jacks and
roof vents shall be checked and replaced with new when damaged, rusted or
missing. Drip edge shall be installed along eave edge. All damaged or
rotted sheathing boards shall be replaced with new. End joints shall be
made over a rafter and all sagging portions of roof shall be corrected.
Materials - New roofing shall carry the Class C label of wind resistance
from the Underwriter's Laboratories and be applied according to the
manufacturer's specifications. The type and weight of the materials used
for the roofing shall be in compliance with the State Building Codes.
Application - Surfaces to which roofing is to be applied shall be even,
sound, thoroughly clean, dry and free from all defects that might affect the
quality of application.
a) Asphalt Shingles - No more than one overlay of asphalt
shingles shall be applied over an existing asphalt
shingle roof. Shingles shall be fastened with not less
than four nails or staples per shingle. Installed
shingles shall be 235# - 240# 3 -tab self sealing. Roll
roofing shall be installed when the slope is 4 or less.
Owner to select color of shingles from readily available
selection.
b) Built -up - Existing roofing material shall be removed
down to bare wood. New roofing shall be 4 -ply built -up
tar and slag or gravel roof, including all new flashing of
either metal or asphalt mineral roll material. Roof
shall be installed in such a way that there is no ponding
water.
c) Wood Shingles and Shakes - Repair of existing roof shall
match existing or blend in with the adjoining and
surrounding work and include a contractor warranty for
the repair work.
d) Fiberglas - is an acceptable roofing material.
Tear off existing roof and remove from site.
Addition:
-ln-
26. CHIMNEY
❑ Repair or replace missin g brick.
❑ Tuck pointing shall be done only after the joints have been raked out to a
minimum depth of 112" and wetted.
❑ Provide masonry chimney cap.
❑ Addition:
27. KITCHEN AND BATHROOM CABINETS
❑ Repair damaged kitchen cabinets.
❑ Repair damaged bathroom lavatory cabinet.
❑ Replace or add kitchen cabinets: New cabinets shall be described in
complete detail, including design, dimension, installation and location of
top or base units, detail of drawers, doors and shelves, type of material
and finish in the Scope of Improvements. The contractor shall submit a
drawing of the proposed cabinets.
❑ Replace bathroom lavatory cabinet: Vanity - lavatory base cabinet shall
be medium quality. Top shall be approximately 22" wide with 3" back splash
and covered with formica preformed or self edge top. Imitation moulded
marble tops can be used as a substitute.
❑ Replace kitchen cabinet top: Kitchen Counter Top - shall be self edge or
self forming formica with 4" backsplash. Separate backsplash material
shall match formica counter top material.
❑ Replace bathroom lavatory vanity: Vanity -lavatory base cabinet shall be
medium quality. Top shall be approximately 22" wide with 3 back splash
and covered with formica preformed or self edge top. Imitation moulded
marble tops can be used as a substitute.
❑ Provide bathroom medicine cabinet: Cabinet - shall be standard size,
recessed, or surface mounted, with a minimum of three shelves and mirror.
When light fixture is included, fixture shall be wired on separate wall
switch.
-19-
28. STOKE DETECTORS
Install UL listed battery- operated smoke detector per manufacturer's e
instructions without escape light complete with working batteries.
29. GRADING
❑ Provide grade fill as follows:
❑ Grade - Fill material shall be free of debris or other detrimental material.
All fill shall be compacted to a density that will avoid damaging settlement
to lot improvement. Top soil shall be a minimum of 4" compacted depth and
free from stones, debris and other materials detrimental to plants. Slope
away fr " '�
y m building, � -6 over a distance of 3 '- 4 1 out from wall.
Foundation w "
walls shall extend at least 6 above the finished rade adjacent
g d� cent
to the wall at all points.
❑ Seeding and Sodding as required.
30. EXTERIOR CONCRETE WORK
❑ Replace crumbled or broken sidewalks.
Replace
crumbled Ton.
❑ p mbled or broken garage entrance a
i g g P
31. AaSCELLANEOUS
Include permit costs.
CITY OF BROOKLYN CENTER council Meeting Date 3 8 93
Agenda item Number
REQUEST FOR COUNCIL CONSIDERATION
ITEM DESCRIPTION: The EDA will be asked to Rescind EDA Resolution No. 91 -07. Resolution
No. 91 -07 amended the original catering contract but was never executed.
********************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
DEPT. APPROVAL:
Brad Hoffman, Director of Comnidfilt Development
*********************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * * * * * * * * * * **
MANAGER'S REVIEW /RECOMMENDATION:
No comments to supplement this report Comments below /attached
********************************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
SUMMARY EXPLANATION: (supplemental sheets attached )
The management contract with D'Amico will begin April 1, 1993 unless Atrium decides to
withdraw before the end of the month. Technically the original contract expires April 1, 1993.
1 will be present Monday to discuss the two (2) resolutions before the EDA. The resolution
will be sent to you Friday and I will also review with you any changes to the contract from the
draft you received.
Recommendation
Pass resolutions.
Commissioner introduced the following resolution and
moved its adoption:
EDA RESOLUTION NO.
RESOLUTION REPEALING RESOLUTION NO. 91 -07
BE IT RESOLVED by the Economic Development Authority in and for the City
of Brooklyn Center that Resolution No. 91 -07 is hereby repealed.
Date Todd Paulson, President
The motion for the adoption of the foregoing resolution was duly seconded by Commissioner
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Commissioner introduced the following resolution and moved its
adoption:
EDA RESOLUTION NO.
RESOLUTION APPROVING A FOOD SERVICE MANAGEMENT
AGREEMENT FOR THE EARLE BROWN HERITAGE CENTER
WHEREAS, D'Amico + Partners Hospitality Consultants, Inc. ( "D'Amico ") has
submitted a proposed agreement for food service management at the Earle Brown Heritage
Center ( "Agreement "); and
WHEREAS the Economic Authority Development "" has determined the
P tY ( EDA)
execution of the Agreement is in the best interest of the EDA and of the public; and
NOW, THEREFORE, BE IT RESOLVED by the Economic Development
Authority in and for the City of Brooklyn Center that:
1. The Agreement is hereby approved in substantially the form on file with
the EDA on the date hereof.
2. The President is authorized and directed to execute the Agreement for and
on behalf of the EDA.
3. The Secretary is directed to notify the current caterers that the contract
between EBF Management Company and Omega Foods, Incorporated,
g Y
will not be renewed, and that it expires and is terminated on April 1,
1993, and to take such steps as are necessary to assure an efficient and
orderly transition to management of food service by D'Amico.
Date Todd Paulson, President
The motion for the adoption of the foregoing resolution was duly seconded by Commissioner
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
YP P