HomeMy WebLinkAbout2011-008 CCRits adoption:
Member Kay Lasman introduced the following resolution and moved
RESOLUTION NO. 2011 - 08
RESOLUTION ESTABLISHING 2011 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, the residential assessment rates for street and storm drainage
improvements are annually reviewed and approved by the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the 2011 street and storm drainage assessment rates for R1, R2, and
R3 zoned districts are based on a specific proportion of 40 percent of the average cost for street and
storm drainage improvements; and
WHEREAS, the R4, R5, R6, and R7 zoned districts will continue to be assessed
based on an evaluation of project cost and project benefit.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that:
1. The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in R1, R2 or R3 zoned districts. These rates
shall also be applied to parcels of property in other land use zones when such parcels
(a) are being used as one - family or two - family residential sites at the time the
assessment roll is levied; and (b) could not be subdivided under the then - existing
Subdivision Ordinance.
2. The residential assessment rates for street and storm drainage reconstruction
effective January 1, 2011, shall be as follows:
Land Use 2011 Assessment Rates
R1 zoned, used as one - family $3559.00 per lot (street)
site that cannot be subdivided $1068.00 per lot (storm drainage)
RESOLUTION NO. 2011 -08
ATTEST:
Land Use 2011 Assessment Rates
R2 zoned, or used as a two - family $47.4533 per front foot with a
site that cannot be subdivided $3559.00 per lot minimum (street)
$14.2400 per front foot with a
$1068.00 per lot minimum (storm
drainage)
R3 zoned (per unit) Assessable frontage x $47.4533 (street)
Number of residential units
3. The residential assessment rates for street and storm drainage reconstruction
shall not apply to R4, R5, R6 or R7 zoned districts. The assessment rates for street
reconstruction for R4, R5, R6 or R7 zoned property shall be based on an evaluation
of the project cost and the project benefit for each project.
January 10, 2011
Date
Assessable frontage x $14.2400 (storm)
Number of residential units
Mayor
The motion for the adoption of the foregoing resolution was duly seconded by member
Dan Ryan
and upon vote being taken thereon, the following voted in favor thereof:
Tim Willson, Carol Kleven, Kay Lasman, Tim Roche, and Dan Ryan;
and the following voted against the same: none;
whereupon said resolution was declared duly passed and adopted.