Loading...
HomeMy WebLinkAbout1989 09-11 EDAP Regular Session EDA AGENDA CITY OF BROOKLYN CENTER SEPTEMBER 11, 1989 1. Call to Order 2. Roll Call 3. Resolutions: a. Approving One (1) Brooklyn Center Economic Development Authority Grant (File No. H -74) b. Accepting Contract with Public Corp for Developing Implementation Strategy and Housing Programs 4. Adjournment CITY OF BROOKLYN CENTER Council Meeting Date 9/11/89 Agenda Item Number — 5 a/ REQUEST FOR COUNCIL CONSIDERATION ITEM DESCRIPTION: Resolution Approving One (1) Brooklyn Center Economic Development Authority Grant (File No. H74) DEPT. AP AOVAL: ( VEDA Coordinator Si nature - title MANAGER'S REVIEW /RECOMMENDATION: XZd No comments to supplement this report Comments below/attached- SUMMARY EXPLANATION: (supplemental sheets attached yes ) I have received one (1) application for a rehabilitation grant (file no. H74). Attached is the application and recommendations for work to be erformed on the home. I recommend P ec end a royal b the ED A. Pp Y This information is private and not available to the general public. RECOMMENDATION: Motion to adopt Resolution Approving One (1) Brooklyn Center Economic Development Authority Grant (file no. H74). Commissioner introduced the following resolution and moved its adoption: EDA RESOLUTION NO. RESOLUTION APPROVING ONE (1) BROOKLYN CENTER ECONOMIC DEVELOPMENT AUTHORITY GRANT (FILE NO H74) WHEREAS, the Brooklyn Center Economic Development Authority established a Home Rehabilitation Grant Program to assist low and moderate income individuals in the maintenance and repair of their homes; and WHEREAS, the Brooklyn Center Economic Development Authority has received one (1) application (file no. H74) from an eligible individual to receive grant assistance; and WHEREAS, an inspection by the City of Brooklyn Center has determined that the work is necessary and appropriate under the Brooklyn Center Economic Development Authority Grant Program; and WHEREAS, the estimated cost of the proposed grant application is estimated at $10,000. NOW, THEREFORE, BE IT RESOLVED by the Brooklyn Center Economic Development Authority that: 1. The Brooklyn Center Economic Development Authority does P Y approve the one (1) housing rehabilitation grant application (file no. H74) as recommended by the staff. 2. That the work be performed as recommended in the request for council consideration form dated September 11, 1989, and that the applicant be directed to obtain the necessary bids for staff review and approval. 3. The project shall not exceed the grant limit of $10,000 per house. Date President The motion for the adoption of the foregoing resolution was duly seconded by Commissioner , and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. /783 URBAN HENNEPIN COUNTY HOUSING REHABILITATION! GRANT PROGRAM',JUN - 5 1 JP'`J HOMEOWNER APPLICATION FOR GRANT H.R.A. HOUSEHOLD INFORMATION -- Please Print �'r/��v�r ,/ First Name Name ftD of Spouse Address s' 75'5 LirPI /� Home Phone .7c, City ,�Y1 Zip Code Sc/SG Work Phone City of residence if other than mailing address Marital Status (check one) , married, single, divorced, separated, widowed Race (check one) Y White, Black, American Indian /Native Alaskan, -t'— Hispanic, Asian or Pacific Islander The information concerning Minority Group Categories is requested for statistical purposes only so that Hennepin County may determine the degree to which its programs are utilized by Minority households. INCOME INFORMATION "Income" means any amount received from the following sources by a Resident. * Any public assistance * Salaries, including commissions, tips, * VA educational grants bonuses, and overtime pay Estate or trust income * Rental income * Gains from the sale of * Business profit for self - employed, * property or securities including farmers-and child care, etc. Pensions and annuities, * Payments received from property being including social security sold on contract for deed and PERA * All other income received by the * Alimony and /or child support household * Interest and dividends List all the residents of your household. Include yourself. Include their ages and their incomes, if any. "RESIDENT" means any person, other than a renter, living in the household for at least nine (9) months of the year, or a person who is claimed as a dependent for income tax purposes. Total number of residents in the household OFFICE USE ONLY income of 4 in househo d names of ages of residents residents resident per month source o inco verified incomes f- $ 7F, ocla � •. s S7r�.om d=u,u e S S 601, 7y1 /VeSf S 37 S S S S $ S Total Income S L,3 per month = S per year S 3 income per month s '%6.3Z income per year ASSET INFORMATION List the cash value of assets held by all residents of your household. If money .ies owed on any item, the value listed should equal the market value of the item minus the amount that is owed. OFFICE USE ONLY verified assets 1. CASH on hand .......... ..............................S S D a 2. CASH in checking accounts ...........................5 S 3 9 97 3. CASH in savings accounts (including those held .....S y 3l` 0-,8 S in trust) 4. Cash value of Securities or U.S. j Say,in bonds.. [ /itch' L...S f y� 5. Redemption value of life insurance policies ......... S // S 6. Current Market Value of real estate, NOT INCLUDING the property to be improved and up to 2 surrounding acres. Include 100% of the outstanding balance owed to you on property sold on Contract for Deed ... S S 7. Other personal property (excluding household _ furnishings, clothing and one personal vehicle) ..... $ S TOTAL ASSETS $ $ 13 810.911 PROPERTY INFORMATION Provide the following information about the property to be improved with this grant. 1. Is your property: K a single family house; a duplex 2. How many years have you lived in the house? ,3_ aq 3. What is the approximate age of the house? ea 'C 2 / 11&19 4. Do you have any outstanding mortgages on the house? Yes; X No If yes, with whom? Amount $ 5. Do you have any outstanding Contract for Deed on the house? Yes; N C No If yes, with whom? Amount $ i yp� 6. Have you ever receives) a Housing Rehabilitation � Yes; No a - 06' Novs %vzc v�� ra pt before? �CEU6(aPn,c.tfi' — ' — o �<! If yes, what type? 7' � ��� Amount S ,�� Urban Hennepin County or an authorized representative shall have the right to inspect the property to be improved at any time from the date of the Grant upon giving due notice to the occupant(s). Any person who makes a false statement or misrepresentation in connection with the appli- cation for or use of Urban Hennepin County Grant funds shall be subject to a fine or imprisonment, or both, under the provisions of the Minnesota Criminal Code, and /or may be required to return all or part of the Grant Funds to Urban Hennepin County. I, the undersigned, certify subject to penalty under law that the above information is true and correct to the best of my knowledge and belief, and that the provisions stated are accepted and agreed to. app tc nt signature to o app tcatton Note: All names and financial information provided on this application are considered private data on individuals and are subject to privacy of information provisions, pursuant to State Statute. URBAN HENNEPIN COUNTY HOUSING REHABILITATION GRANT PROGRAM PROPERTY INSPECTION REPORT TO CITY COUNCIL: 9/11/89 APPLICANT H74 INSPECTION Name EVELYN FRANCIS HOL Staff Address 5755 HUMBOLDT AVENUE NORTH Date BROOKLYN CENTER, MN 55430 Time Phone 561 -2077 Inspector Building Age: Garage: u NOTICE TO CONTRACTORS (1) All successful bidders awarded a contract to perform H.R.A. Grant work in the City of Brooklyn Center shall acquire permits for each specific phase of work to be completed i.e. Building, Plumbing, Heating and Electrical). These permits shall be a "No Charge" permit with the exception of the State surcharge fee. (2) Contractors are also advised to refer to the Table of Contents for easy reference of work to be accomplished with the grant. Example: Part 1 7 would indicate an item to be bid on the grant. Refer to Page 1 for complete details of Item 1. (3) Attach bid proposal to each set of work proposal forms. (4) Contractor keep one set of work proposal forms and Table of Contents for your record and return one completed set and bid proposal to: Metro HRA Attention 300 Metro Square Building St. Paul, MN 55101 Phone 291 -6596 TABLE OF CONTENTS PART PAGE 9 1 X❑ HANDRAIL - GUARDRAIL: $ 1 Where required, Height of, Baluster Spacing and Installation, Specification for (FRONT) 2 ❑ INTERIOR - EXTERIOR STAIRS $ 1 Repair or Replacement of, Rise and Run and Installation, Specification for 3 Q FOUNDATION $ 2 Repair of —Tuck Pointing Insulation Installation and Specification for 14 4 ❑ CRAWL SPACE: $ 2 Insulation of and Vapor Barrier, Installation for 5 ❑ BASEMENT FLOOR $ 2 Repair of 6 ❑ POST AND BEAM: $ 3 Repair of, Replace 7 ❑ ACCESSIBILITY IMPROVEMENT $ 3 For Barrier Free and Handicapped Persons ❑ ELECTRICAL $ 3 Upgrade Service, Unprotected Conductor Washer, Dryer, Hanging Receptacle, Furnace and Kitchen Circuits Wall Receptacle, Ground Fault 4 9 ❑ ELECTRICAL MAST: $ 4 Relocation of 10 E] MECHANICAL $ 4 . Enclosed Space Ventilation, Replace Furnace Thermostat, Chimney, Registers, Ductwork 11 ® PLUMBING: $ 5 Water Heater Replacement Cold Water Shut -off, Gas Valve T.P.R. Valve, Vent Connector, Dryer Gas Valve, Dryer 6 Ventilation Gas Device,Well Abandonment, Plugged Sewer, Water Softener, Kitchen Sink Vent, Trap, Water Supply, Lavatory Vent, Trap, Water Supply, Water Closet and Sealing Gasket, Bathtub Vent, Trap Wall Enclosure, Laundry Tub Vent, Trap, Floor Drain Plumbing Fixture Material and Performance Specifications 7 for, Drain Tile, Main Water Line Septic System, City Sewer g -1- TABLE OF CONTENTS 4 PART PAGE 12 Q CEILINGS $ *8 Repair of KITCHEN 13 ❑ WALLS: $ 8 Repair of 13 Ceiling and Wall Performance and Material Specifications for 9 -10 14 Q FINI FLOORS: KITCHEN VINYL $ 10 -11 Replacement of, Performance and Material Specifications for 15 X❑ EXTERIOR DOORS: $ 11 Repair - Refinish of, Weather Sealing, and Replacement of , Performance Specification for (3) 16 ❑ EXTERIOR STORM DOORS: $ 11 Repair - Rep acement of, Material Specification for 17 ❑ INTERIOR DOORS $ 12 Repair - Replacement of, Performance and Material Specifications for 18 ❑ EXTERIOR STORM AND SCREEN WINDOWS $ 13 Repair - Replacement of, Material Specification for 19 ❑X HOUSE WINDOWS $ 014 Repair - Refinish of, Weather Sealing of, Replacement of ,. Material and Performance Specification for 20 ❑ INSULATION: $ 14 -15 Attic, Wall, Foundation, Rim Joist Installation, Material and Performance Specification for, Code Requirement 21 ❑ VENTILATION: $ 15 Provision of Attic, Kitchen, Bathroom, Repair of, Material and Performance Specification for 22 Q EXTERIOR SIDING: $ 16 Installation, Repair or Replacement of, Soffit and Facia, Window, Door and Cornice Trim, Material and Performance Specification for STUCCO -- NEEDS REPAIR 23 ❑X EXTERIOR PAINTING: $ 17 Material and formance Specification for 24 n GUTTERS AND DOWNSPOUTS: $ 17 Provision for and Replacement of, Material and Performance Specification for 25 ❑ ROOFING: $ 18 R epa - Replacement - Removal of, Material and Performance Specification for -2- TABLE OF CONTENTS PART is PAGE 26 ❑ CHIMNEY Repair - Reline - Replacement of $ 5 -19 27 [ KITCHEN & BATHROOM CABINETS $ 19 28 ❑ SMOKE DETECTORS Installation of $ 20 29 [] GRADING Material and Placement Specification for, Seeding and $ 20 Sodding of 30 ❑ EXTERIOR CONCRETE WORK Replacement - Repair of, Sidewalks, Garage Apron, Etc. $ 20 31 ❑ MISCELLANEOUS: $ 20 TOTAL $ Contractor Name: Address: City State Phone: Home Work Homeowner Name: Address: Phone: H# Contractor Signature Date -3- 1. INSTALL HANDRAIL: EXTERIOR ❑ Basement Stair X❑ Front Stair ❑ Rear Stair ❑ Upper Level Stair One handrail shall be installed on stairways 44" or less in width, except that stairways open on one or both sides shall have handrails provided on the open side or sides. Handrails shall not be less than 30 " nor more than 34" in height above stair tread. Unenclosed floor, open landings and ramps at a height of over 30" from floor or grade shall have a guardrail. Guardrail shall not be less than 36" in height and shall have intermediate rails or an ornamental pattern such that a sphere 6 in diameter cannot pass through. Materials and finish shall be specified in the Scope of Improvements and installation shall be in compliance with the State Building Codes. ❑ Addition: 2. INTERIOR _ EXTERIOR STAIRS ❑ Repair ❑ Basement r] Second Storey ❑ Front ❑ Rear Entrance Stairs ❑ Replace ❑ Basement E] Second Storey ❑ Front ❑ Rear Entrance Stairs Stair riser to be a minimum of 4" to a maximum of 7 " high. Stair tread to be a minimum of 11" wide. Wood stair stringer shall be of 2 x 10 nominal stock. Exterior stairs can be of treated stock or concrete having footings 42 minimum below grade. ❑ Addition: -1- 3. REPAIR FOUNDATION: [] All joints shall be completely filled with mortar. Tuck pointing shall be done only after the joints have been raked out to a minimum depth of 1/2" and wetted. [� Addition: 4. CRAWL SPACE: [] Either insulate perimeter foundation wall to R -11 or floor to a minimum of R -19. A 6 mil. polyethylene plastic vapor barrier shall be installed over dirt area and be weighted by sand, rocks or other non -wood materials. Addition: 5. BASEMENT FLOOR: [I Patch holes and large cracks. Addition: -2- v 6. POST AND BEAM ❑ Repair or replace as marked. ❑ Addition: 7. ACCESSIBILITY IMPROVEMENTS ❑ Refer to Minnesota State Building ode Chapter 55 for accessibility g P Y architecture specifications. The type and scope of accessibility improvements shall be at the discretion of the Grant Administrator. ❑ Addition: 8. ELECTRICAL: ❑ Install new U.L. certified 100 amp service panel and circuit breakers. ❑ Relocate unprotected plastic coated conductors to center of wood joist or in metal protective tubing located in ❑ Provide grounded receptacle for: ❑ Washer & Dryer on a separate 20 amp circuit. ❑ Water Softner. ❑ Other ❑ Replace hanging light or receptacle with porcelain fixture mounted on an approved box and properly grounded. ❑ Provide separate 15 amp circuit to furnace. ❑ Provide separate 20 amp circuit to kitchen countertop work area receptacles. -3- I i ELECTRICAL CONTINUED ❑ Add wall receptacle in; o kitchen; ❑ in dining room; bedroom ❑ bedroom ❑ bedroom ❑ bedroom ❑ living room bathroom [:]with ❑ without ground fault. laundry room Addition: 9. ELECTRICAL MAST; ❑ Relocate ❑ Other ❑ Addition: ALL ELECTRICAL WORK SHALL BE IN COMPLIANCE TO THE NATIONAL ELECTRICAL CODE. 10. MECHANICAL: ❑ Provide ventilation of enclosed furnace space. M❑ Provide heat loss calculation of dwelling and install new heating manufacturer's instructions capable to meet the heat loss. The minimum AFUE shall be listed at 80% and shall include damper efficiency. New appliance shall be AGA or UL listed and orsat tested. -4- Q Replace gas valve with approved lever handle gas valve or ball valve Q Replace vent connector from furnace to chimney with 26 gauge galv. sheet metal vent materials. n Provide combustion air ❑ Provide set back thermostat. ❑ Reline existing Class B Chimney to expel water heater or other gas appliance combustion gases if new heating appliance is vented through the side wall. ❑ Remove ❑ Reline existing Class B Asbestos Chimney. ❑ Add warm air register in ❑ Add return air register in ❑ Add Duct work _ ❑ Addition: ALL MECHANICAL WORK SHALL BE IN COMPLIANCE WITH STATE MECHANICAL CODES. 11. PLUMBING ❑ Install new 40 gallon energy miser water heater having AGA or UL listing complete with necessary gas piping tested for leaks, new lever handle gas valve or ball valve, new vent connector sealed and secured at all joints, new temperature pressure relief valve with 3/4 overflow tube extending to 6 above finished floor. Water heater shall be warranted for five years. ❑ Install cold water shut off valve on existing water heater. ❑ Install approved gas valve on existing water heater. -5- PLUMBING continued Q Install temp., pressure, relief valve on existing water heater. Q Install new vent connector on existing water heater. Q Install new approved gas valve on gas dryer. ❑ Vent gas dryer to outside air. ❑ Plug or cap open gas valve or fitting located at or near Q Disconnect existing well water and reconnect water service to City water with meter and reconnect electrical ground to City side of water meter. Well to be properly abandoned, inspected and approved by the State Health Department or City Sanitarian. Q Rout out main house sewer and clear stoppage. ❑ Repair or replace inoperable water softener. ❑X Install new kitchen sink vented to outside air. ❑ Install new kitchen sink water supply tubes and valves. ❑X Install new kitchen sink trap. ❑ Install new lavatory sink vented to outside air. ❑ Install new bathroom lavatory water supply tubes and valves. ❑ Install new bathroom lavatory trap. ❑ Install new bathroom water closet complete with seat and shut off valve. ❑ Install new water closet setting seal gasket. ❑ Install new bathtub vented to outside air. ❑X Install new bathtub waste trap. ❑ Install new bathtub wall enclosure and shower curtain rod. [] Install new laundry tub vented to outside air. ❑ Install new laundry tub waste trap. ❑ Floor Drain ❑ Inoperable ❑ Install ® Other SOME WASTE LINES NEED REPLACEMENT KITCHEN SINK (HORIZONTAL RUN) -6- PLUMBING continued o New kitchen sink shall be 33" x 22" self - rimming, unless otherwise specified in the Scope of Improvements. Sink shall be stainless steel or cast iron and faucets shall be either single lever or two handle. a. Garbage disposal is only an acceptable work item in these two circumstances. ❑ 1. reinstallation of existing disposal when installing a new sink. ❑ 2. removing and disposal. ❑ New bathtub shall be cast iron, fiberglas or steel. Faucets shall either be single lever or two handle. Color selection shall be limited white unless specified to match existing color. Installation of a fiberglas tub insert is at the discretion of the Grant Administrator. ❑ New lavatory shall be wall -hung or with vanity. Trap shall be .17 gauge. Color selection shall be limited to white unless specified to match existing color. Refer to Carpentry section for dabinet specification. ❑ New water closet shall be viterous china with close coupled tank, include seat and anti - siphon ballcock. Color selection shall be limited to white unless specified to match existing color. ❑ New laundry tub shall be fiberglas and securely attached to wall or free standing. Faucet shall be stainless steel or brass type and nonthreaded or with a vacuum breaker. [] Provide basement interior perimeter wall drain tile system and floor sump pump. Sump pump shall discharge to an exterior french drain or City storm sewer. French drain shall be located a minimum of ft. from foundation wall and be filled with a minimum of cubic feet of 3/4 stone. Stone shall be topped with sod or reseeded to match existing landscape. ❑ Addition: ❑ Provide Municipal Water - House connection to municipal water line shall entail a bid specifying municipal tap -in fee, total length and cost per foot, location and permit. Connect to house supply lines, patch any unnecessary holes incurred where water line enters house, repair any necessary street damage, back fill and mound to allow settlement to previous ground level. Seeding or sodding the ground to match existing or blend in with the adjoining and surrounding work shall be at the discretion of the Grant Administrator. ❑ Addition: -7- PLUMBING continued ❑ Provide Septic Sewage System - System shall be specified in the bid and include drawing. Installation shall include testing and permit costs. Connect to house drainage lines, provide reasonable protection to lawn, driveways, etc., back fill and mound to allow settlement to previous ground level. Seeding or sodding the ground to match existing or blend in with the adjoining and surrounding work shall be at the discretion of the Grant Administrator. ❑ Addition: ❑ Provide Municipal Sewer - House connection to municipal sewer line shall entail a bid specifying municipal tap -in fee, total length of line and cost per foot, location and permit. Connect to house drainage lines, patch any unnecessary holes incurred where line enters house, repair any necessary street damage, fill existing septic tank(s) with dirt and back fill and mound to allow settlement to previous ground level. Seeding or sodding the ground to match existing or blend in with the adjoining and surrounding work. ❑ Addition: ALL PLUMBING WORK SHALL BE IN COMPLIANCE WITH THE STATE PLUMBING CODE 12. CEILINGS (See General Specification) �] Repair Ceiling in ❑ Kitchen ❑ Dining room ❑ Livingroom ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Basement ❑ Basement ❑ Closet o 13. WALLS (See General Specification) Repair Wall in ❑ Kitchen ❑ Dining room ❑ Livingroom ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Basement ❑ Closet of -8- WALLS continued QX Wall and Ceiling Repair General Specification: 1. Wherever existing walls or ceilings are to be repaired, the damaged and loose material shall be completely removed and new material shall be sized and installed to match and blend in with the adjoining and surrounding work. All repairs shall be properly prepared to receive the finish application. 2. Plastering - New plastering work shall be installed in compliance with the State Building Codes. 3• Wall Board - shall be installed in compliance with the State Building codes. 4. Perforated Tape Mix - shall comply with the recommendations of the manufacturer. A minimum temperature of 55 degrees Fahrenheit shall be maintained in the room where work is done until the cement is completely dry. 5. Perforated Tape Application - Follow manufacturer's directions. a. Over Joints the tape shall be embedded in cement and covered with a thin layer of cement. A second and third coat shall be applied. Each coat shall be dry before applying the next coat. Each coat shall be featheredged and extended beyond the previous coat (approximately 2 The finish coat shall be sanded lightly and any imperfections filled in prior to any painting and decorating. b. Check to see that all nails have been driven so that their heads are below the surface of the board leaving a dimple in the surface without breaking the paper. Cover the nails dimple with three applications of cement allowing time to dry between each coat. The final coat shall be sanded lightly before application of paint or other decoration. C. Inside corners shall be reinforced with tape embedded in cement finished as specified "Over Joints ". d. Outside corners shall be protected by wood moulding, metal moulding or metal corner reinforcement. Metal corner reinforcement shall be finished with two coats of cement as specified. 6. Waterproof gypsum board shall be used in areas specified in the State Building Code. Install water resistant wall board base in the bath and shower enclosure, and apply wall board with long edge horizontally over the tub, allowing 1/4 space between the board and tub. 7. Adhesive is an acceptable bonding material. Adhesive shall be specified according to usage and location and applied in strict compliance with the manufacturer's specifications. -9- WALLS continued 8. Paneling installation shall be 3/16" prefinished paneling of a medium quality installed as er manufacturer's recommendations. ommendations. Owner shall have h c oice of paneling color and style. 9. Furring strips - New ceili shall be installed over " __.� g ve 1 x 3 furring strips, 12" on center. When ceiling utts to wood or paneled wall " g 1 /4 P ,3 to 1 112" cove moulding shall be installed along edge. New walls shall be installed over 1 x 2 furring strips, 16 on center. Any existing baseboard, window or door trim shall be removed and reinstalled or replaced with new trim over new wall material, unless otherwise specified in the Scope of Improvements. ments. New work P P o shall be level and plumb with adjoining and surrounding work. Addition: INSTALL NEW SHEET ROCK CEILING IN KITCHEN OVER DAMAGED PLASTER 14. FINISH FLOORING VINYL Replace Floor Covering in Kitche Diningroom Livingroom Bathroom Bedroom Bedroom Bedroom Bedroom Basement Closet of 1. Existing wood flooring shall be repaired to match existing or blend in with the adjoining and surrounding work. 0 Resilient flooring shall be sheet vinyl or vinyl asbestos tile minimum thickness 1/16 Tile shall be medium quality and laid inexact accordance with the manufacturer's specifications. Owner to select color and pattern from readily available selection. 3. Carpet shall be a color and pattern from readily available selection of medium quality and priced carpet. 4. A finished wood, vinyl or metal moulding along edge of flooring shall be installed as part of the finish flooring installation. -10- FLOORING continued 5. Plywood used as subfloor shall be a minimum of 112" thick, nailed to joist spaced 16 on center along intermediate members, installed with outer plies at right angles to the joists and staggered so the end joists in adjacent panels bear on different joists. 6. Underlayment shall be 1/4 structural grade plywood, particle board or untempered hard board placed with smooth side up. ❑ Addition: 15. EXTERIOR DOORS El Repair and Refinish: ❑ Front Door ❑ Rear Door ❑ Side Door X❑ Garage Door (INSTALL EXISTING) ❑ Weather Seal: ❑ Front Door ❑ Rear Door ❑ Front Storm Door Fx - ❑ Rear Storm Door Replace: Q Front Door X❑ Rear Door ❑ Garage Door AND SIDE DOOR (3) All exterior doors shall be solid core wood or insulated steel and complete with hardware, strike plat and lock set. Installed doors shall be prehung or sized to fit frame complete with stops, weatherstripping and jambs. After trimming and fitting of door, all edges shall be finished to match existing or blend in with the adjoining and surrounding work. A door bumper and threshold are included on all exterior doors. 16. EXTERIOR STORM DOOR ❑X Repair: ❑ Front Storm Door X❑ Side Storm Door ❑ Replace: ❑ Front Storm Door ❑ Side Storm Door Storm doors shall be solid core aluminum or wood with storm and screen inserts and complete with hardware and strike plate. Installed doors shall be sized to fit frame. All edges of wood storm shall be finished to match existing or blend in with the adjoining and surrounding work. -11- 17. INTERIOR DOORS ❑ Repair Door to: Basement ❑ Bathroom Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Closet in Replace Door To: ❑ Basement ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Closet in Interior doors shall be hollow core or panel and complete with hardware and stri e plate. Installed doors shall be prehung or sized to fit frame complete with stops and jambs. After trimming and fitting of door, all edges shall be finished to match existing or blend in with the adjoining and surrounding work. A door bumper is included on all interior doors. Bathroom door shall be provided with "privacy" lock set. ❑ Addition: -12- 18. EXTERIOR STORM AND SCREEN WINDOWS ❑ Repair E] Replace ❑ Basement ❑ Kitchen ❑ Diningroom Livingroom ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom Storm windows shall be aluminum combinations of medium quality, unless otherwise specified in the Scope of Improvements. 19. HOUSE WINDOWS ❑ Repair and Refinish Windows in: ❑ Basement ❑ Kitchen ❑ Diningroom ❑ Livingroom ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom Repair of windows or replacements of frames, sills, sash, trim and hardware shall match existing work in wood, design, dimensions and finish, unless otherwise specified in the Scope of Improvements. Where sash counter balances are to be removed, the area must be insulated properly. Friction guides are acceptable as substitutes. Cotton cord replacement is acceptable. A positive locking device shall be installed on all windows. All broken glass shall be replaced with new glass, matching existing in size and design and properly reglazed. All excess material shall be removed and all glass left clean. Weather Seal Windows in: ❑ Kitchen [❑ Diningroom ❑ Livingroom ❑ Bathroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Basement Caulk and weatherstrip around all primary door and window frames, window panes or other locations that lead to an unheated space or which calls for a seal and watertight job. Materials shall be of standard brands and application shall be in exact accordance with the manufacturer's specifications. -13- ALL (27) Replace Window in: [:j Kitchen ❑ Diningroom ❑ Livingroom ❑ Bathroom [j Bedroom ❑ Bedroom ❑ Bedroom ❑ Bedroom ❑ Basement Openings of new window units shall be framed to provide a rigid enclosure for the installation of windows. Frames shall be set plumb, level and square within clearance limits. New windows shall match the adjacent windows in design, glass, material and finish, unless otherwise specified in the Scope of Improvements. Installed windows shall be weatherstripped, left clean, tight and weatherproof. ❑ A positive locking device shall be installed on all windows. ❑ Installed below grade bedroom window used as an excape exit shall have a opening size of not less than 5.7 sq. ft. with a minimum of 24" depth and 20" width. The interior sill height shall not be more than 48" from floor. Exterior of window shall be cleared for exit and when an areawell is installed it shall be of treated wood or galvanized metal. ❑ When a bedroom window unit is replaced, the new unit shall be sized to meet the requirements of the State Building Codes. ❑ Addition: 20. INSULATION ❑ Insulate attic space to meet a minimum R -38 rating and have a vapor barrier, where accessible. Air chutes shall be installed where there is soffit venting. Provide protection around all recessed lights, junction boxes and chimney. Access opening shall be sized a minimum of 22" x 30 ", framed and insulated. [] Insulate exterior walls to a minimum of R -11. Drill holes and blow in insulation between wall studs approximately every 16 on center and below each fire stop. Holes shall be patched to match existing or blend with adjoining and surrounding work. [] Insulate exterior foundation with rigid insulation of R -11 to above grade and extend insulation 2' below grade and cover insulation with a non - combustible material. Foundation insulation shall be at the discretion of the Grant Administrator. -14- INSULATION continued F ❑ Insulate accessible area rim joist to a minimum of R -19 with vapor barrier facing warm side. ❑ Addition: 21. VENTILATION ❑ Provide attic ventilation per Uniform Building Code as follows: Ventilation - where determined necessary by the building official due to atmospheric or climatic conditions, enclosed attics and enclosed rafter spaces formed where ceilings are applied direct to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain and snow. The net free ventilating area shall be not less than 1/150 of the area of the space ventilated, except that the area may be 1/300, provided at least 50% of the required ventilating area is provided by ventilators located in the upper portion of the space to be ventilated at least three feet above eave or cornice vents with the balance of the required ventilation provided by eave or cornice vents. The openings shall be covered with corrosion- resistant metal mesh with mesh openings of 1/4" in dimension. [:] Provide kitchen ventilation - Exhaust Fan - kitchen without means of natural or below minimum requirements of ventilation shall be equipped with a mechanical exhaust fan. Installation shall include mounting fan on ceiling, venting through the roof or exterior wall with cap, insulating vent in unheated space and wiring on a separate wall switch. ❑ Repair kitchen ventilation. Provide bathroom ventilation - Exhaust Fan - Bathroom without means of natural or below minimum requirements of ventilation shall be equipped with a mechanical exhaust fan. Installation shall include mouting fan on ceiling, venting through the roof or exterior wall with cap, insulating vent in unheated space and wiring on a separate wall switch. ❑ Repair bathroom ventilation. ❑ Addition: -15- 22. EXTERIOR SIDING [] Repair or replace all rotten boards and nail down all loose boards or shingles prior to receiving new siding. Side walls shall be furred out if necessary to make walls level, plumb and free from waves, buckles and sags. Installation shall be in strict compliance with the manufacturer's specifications. . R Existing brickwork shall be repaired to match existing or blend in with the adjoining and surrounding work. [J Reside exterior with .024 gauge, nominal thickness, insulated type aluminum of medium quality or equal. Color selection by owner. Installation shall include window J channel, door channel, inside and outside corners, starter strip, finish mould and caulking. Backing shall be installed under siding and be of proper thickness. All nails and rivets shall be properly secured. Staples shall not be used for installation. 17 Cover all window, door trim and sills with baked enamel aluminum, minimum .019 gauge. Color selection by owner. Lap - Siding shall be minimum 7/16" thick x 16 long, smooth, pre - primed masonite panels. Siding shall be installed with corrosion resistant nails and all ends shall be attached together with H- moulding and sealed with exterior caulking. Lap siding shall extend to 6 above finish grade. Novelty - Cover indicated sections of structure with new wood novelty siding, or other specified material. All joints shall be tight and adjacent end joints shall be staggered. Siding shall be installed over vapor barrier, blend and conform with existing structure. All horizontally applied siding shall be staggered with minimum of two stud spaces. 0 Cover soffit and fascia with .019 gauge baked enamel aluminum using solid or perforated soffit material. Color selection by owner. Soffit panels shall be secured in channels to eliminate looseness and rattling. Materials shall be lapped for proper drainage and applied in full sections. Caulk joints. Staples shall not be used for installation. QX Addition: REPAIR DECORATIVE MOLDING AND PAINT 4 -16- 23. PAINTING ❑ Repaint exterior siding, cornice, window and door trim including doors and windows as follows: Wood surfaces to be painted shall be cleaned by best means possible to remove loose and scaley paint and rough spots any any obvious oil and /or grease that may be covering existing wood or paint. Where previous coats have chipped and peeled, the edge shall be feathered to the maximum extent feasible and spot primed with a high quality oil base paint before finish coats are applied. No paint shall be applied until all nail holes have been filled and sanded and all defects in wood work have been eliminated. Paint shall be medium grade and applied according to the manufacturer's specifications and applied to secure full coverage. Use primer where required. Owner to select color from readily available selection. Spray application is not acceptable, unless authorized by the Grant Administrator. 24. GUTTERS AND DOWN SPOUTS Provide gutters and down spouts as follows: a) New gutters shall be minimum 5" wide .032 gauge aluminum with hangers placed under roofing. b) New downspouts shall be minimum 2 x 3 rectangular .020 gauge aluminum. C) Finish of gutters and downspouts shall be a baked on enamel finish. Owner to select color from readily available selection. d) Gutters shall be installed with slight pitch to the downspout. Gutters shall be securely mounted to the roof, 36" or less on center. Downspouts to be installed at one end of gutters and extend 2' at the bottom with extension. Extension or splash block shall be installed when the gutter and downspout system does not directly connect into a drainage system. ❑ Addition: -17- 25. ROOFING ❑ Provide new roof per City of Brooklyn Center Handout and as follows: New roofing shall be in compliance with the State Building Codes and Manufacturer's installation instructions. Flashing, plumbing jacks and roof vents shall be checked and replaced with new when damaged, rusted or missing. Drip edge shall be installed along eave edge. All damaged or rotted sheathing boards shall be replaced with new. End joints shall be made over a rafter and all sagging portions of roof shall be corrected. Materials - New roofing shall carry the Class C label of wind resistance from the Underwriter's Laboratories and be applied according to the manufacturer's specifications. The type and weight of the materials used for the roofing shall be in compliance with the State Building Codes. Application - Surfaces to which roofing is to be applied shall be even, sound, thoroughly clean, dry and free from all defects that might affect the quality of application. a) Asphalt Shingles - No more than one overlay of asphalt shingles shall be applied over an existing asphalt shingle roof. Shingles shall be fastened with not less than four nails or staples per shingle. Installed shingles shall be 235# - 240# 3 -tab self sealing. Roll roofing shall be installed when the slope is 4 or less. Owner to select color of shingles from readily available selection. b) Built -up - Existing roofing material shall be removed down to bare wood. New roofing shall be 4 -ply built -up tar and slag or gravel roof, including all new flashing of either metal or asphalt mineral roll material. Roof shall be installed in such a way that there is no ponding water. c) Wood Shingles and Shakes - Repair of existing roof shall match existing or blend in with the adjoining and surrounding work and include a contractor warranty for the repair work. d) Fiberglas - is an acceptable roofing material. ❑ Tear off existing roof and remove from site. [:] Addition: -18- 26. CHIMNEY ❑ Repair or replace missing brick. ❑ Tuck pointing shall be done only after the joints have been raked out to a minimum depth of 1/2" and wetted. ❑ Provide masonry chimney cap. Addition: 27. KITCHEN AND BATHROOM CABINETS ❑ Repair damaged kitchen cabinets. SINK BASE CABINET JJ Repair damaged bathroom lavatory cabinet. ❑ Replace or add kitchen cabinets: New cabinets shall be described in complete detail, including design, dimension, installation and location of top or base units, detail of drawers, doors and shelves, type of material and finish in the Scope of Improvements. The contractor shall submit a drawing of the proposed cabinets. ❑ Replace bathroom lavatory cabinet: Vanity - lavatory base cabinet shall be medium quality. Top shall be approximately 22" wide with 3 back splash and covered with formica preformed or self edge top. Imitation moulded marble tops can be used as a substitute. ❑X Replace kitchen cabinet top: Kitchen Counter - P nter To shall be self elf ed e or self forming formica with 4 backsplash. Separate backsplash material shall match formica counter top material. ❑ Replace bathroom lavatory vanity. Vanity - lavatory base cabinet shall be medium quality. Top shall be approximately 22" wide with 3" back splash and covered with formica preformed or self edge top. Imitation moulded marble tops can be used as a substitute. ❑ Provide bathroom medicine cabinet: Cabinet - shall be standard size, recessed, or surface mounted, with a minimum of three shelves and mirror. When light fixture is included, fixture shall be wired on separate wall switch. -19- 28. SMOKE DETECTORS ❑ Install UL listed battery- operated smoke detector per manufacturer's instructions without escape light complete with working batteries. 29. GRADING ❑ Provide grade fill as follows: ❑ Grade - Fill material shall be free of debris or other detrimental material. All fill shall be compacted to a density that will avoid damaging settlement to lot improvement. Top soil shall be a minimum of 4 compacted depth and free from stones, debris and other materials detrimental to plants. Slope away from building, 4 -6 over a distance of 3'-4' out from wall. Foundation walls shall extend at least 6 above the finished grade adjacent to the wall at all points. ❑ Seeding and Sodding as required. 30. EXTERIOR CONCRETE WORK ❑ Replace crumbled or broken sidewalks. ❑ Replace crumbled or broken garage entrance apron. 31. MISCELLANEOUS REPAIR STUCCO WHERE NEEDED -- REPAINT CITY OF BROOKLYN CENTER Council Meeting Date 9/ Agenda Item Numbe REQUEST FOR COUNCIL CONSIDERATION ITEM DESCRIPTION: RESOLUTION AUTHORIZING THE EXECUTION OF A PROFESSIONAL SERVICES CONTRACT WITH PUBLICORP, INC. AND TRANSFERRING FUNDS FROM THE GENERAL FUND TO THE 1989 PROFESSIONAL SERVICES BUDGET OF THE ECONOMIC DEVELOPMENT AUTHORITY DEPT. A Pf�QV UU oordinator ig ature -title * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * ** MANAGER'S REVIEW /RECOMMENDATION: V No comments to supplement this report Comments below /attached SUMMARY EXPLANATION: (supplemental sheets attached The EDA has recently completed a market analysis of Brooklyn Center's housing stock and housing needs. The study has been presented to the housing commission and to the planning commission. It will be formally presented to the council very soon. In order to address the problems and needs as identified in the study, the EDA needs to develop an implementation plan. The plan needs to address the identified housing problems with courses of action (programs), sources of revenue, and time frames. I am proposing that the EDA enter into a contract with Publicorp, Inc. to do this work. The EDA does not have available staff to take this project on at this time. Publicorp is a group well versed in this area and would serve the EDA well. Attached you will find additional information and work products from Publicorp. Also, Gene Ranieri from Publicorp will be available for questions. The scope of the contract requires Publicorp to identify solutions to problems as noted in the Maxfield report. They will work with the community to develop programs and prepare written programs for EDA approval. Such programs will include cost projections and time lines. Finally, Publicorp will meet with State and Federal officials to obtain support in the development and implementation of programs. The cost of the services is $20,000 with a projected completion date of January 15, 1990. The EDA may terminate the contract with fifteen (15) days written notice. The resolution before the EDA authorizes the execution of a contract for service with Publicorp and transfers 20 000 from om the EDA eneral fund t g o the EDA professional services budget. Both Gene Ranieri of Publicorp and myself will be available Monday evening to discuss this proposal in greater • detail with you. 3b Commissioner introduced the following resolution and moved its adoption: EDA RESOLUTION NO. RESOLUTION AUTHORIZING THE EXECUTION OF A PROFESSIONAL SERVICES CONTRACT WITH PUBLICORP, INC. AND TRANSFERRING FUNDS FROM THE GENERAL FUN TO THE 1989 PROFESSIONAL SERVICES BUDGET OF THE ECONOMIC DEVELOPMENT AUTHORITY WHEREAS, the Economic Development Authority (EDA) in and for the City of Brooklyn Center is responsible for the development and implementation of housing programs; and WHEREAS, the EDA has received a housing study from Maxfield Research identifying housing needs; and WHEREAS, it is the desire of the EDA to maintain and preserve Brooklyn Center's housing stock. NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority in and for the City of Brooklyn Center that: 1. The President of the Economic Development Authority be authorized to sign a contract with Publicorp, Inc. for professional services; and 2. $20,000 be transferred from the general fund of the Economic Development Authority to the 1989 professional services budget of the Economic Development Authority. Date President The motion for the adoption of the foregoing resolution was duly seconded by Commissioner , and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. PublicoRp INC. 410 PittsbURy CENTER (612 ) 337.9292 0 MiNNEAPOHS, MN 55402 I. CORPORATION BACKGROUND Publicorp, Inc., a Minnesota corporation, was originally formed in 1984 to sponsor seminars and other educational programs for units of local government which were involved in housing, development and redevelopment activities. Subsequently, several members of what was previously the technical analysis department of Holmes & Graven, Chartered, a Minneapolis law firm, joined the Company in order to offer direct consulting services. As a general matter, Publicorp was formed to help meet the demand for leadership in the design and implementation of innovative public finance tools which stimulate and control economic development, particularly in light of continued federal cutbacks and limitations. It specializes in providing a broad range of development analysis services to local government. Publicorp personnel utilize a multi - disciplinary approach in order to solve complex development problems. They recognize that these problems are impacted by financial, political and institutional issues which require not only specialized technical abilities but also experience with the sensitivity of the public arena. Publicorp serves as development consultant to local units of government regarding an overall approach to economic development; assisting in establishing and monitoring long -term development objectives; developing and establishing financial structures to accomplish the objectives; assisting in the issuance of debt that is sufficiently flexible to help meet the objectives; assisting in establishing accounting structures for management control; assisting in evaluating development proposals by analyzing balance sheets, cash flows and pro formas; assisting in negotiations with developers; assisting in achieving federal and state legislation conducive to development. Publicorp serves as part of the team and serves its clients much as a staff member with a commitment to the long -term objectives of its clients. It becomes familiar with all concerns including the existing political environment. Publicorp also services in a long -term capacity to the issuing client in bond transactions and relates each issuance in terms of its affect on overall development objectives as it participates in determining the financial feasibility of the project considering tax impact projections, probable revenues and charges, potential impact on credit rating and overall debt planning. PUBLICORP, INC. Corporate Resume II. STAFF Through the contacts and experience derived from employment with a public law practice, Publicorp principals have the capacity to assemble the brightest and most experienced group of financial development and technical professionals in the business and to provide them to the client on a project -by- project, as- needed basis. Resumes of Publicorp employees: Sidney C. Inman Mr. Inman, as Director of Development Consulting, bring a broad background of computer science, computer modeling, system development and programming, financial analysis and accounting to development transactions, particularly those that contain public and private components. He assists both local government and private development clients with creative and useful economic analysis which can be utilized in structuring and monitoring development projects. Preparatory education: University.of Northern Iowa, B.A. in Business Administration; Universities of Northern Colorado and Alaska, M.S. in Public Administration; three years of advanced doctoral studies, University of Minnesota. Employment experience: Assistant Director of Central Services, City of Fridley 1978 -1985; Technical and Computer Analyst, Homes & Graven, Chartered, 1985 - 1986. Mr. Inman has financial planning experience on a large -scale public /private.partnership projects including the Sky Harbor Center Master Plan and Implementation Program in Phoenix, Arizona. Katherine M. Holmes As a principal in Publicorp, Ms. Holmes provides a wide range of experience in the public law /real estate areas. Preparatory education: William Mitchell College of Law, J.D. 1976. Employment experience: Staff Attorney, Minneapolis Housing and Redevelopment Authority 1978 -1979; Deputy Title Examiner of Hennepin County 1978 -1979; Holmes & Graven, Chartered 1979 -1984; Publicorp, Inc. 1984 - present. Ms. Holmes has experience in real estate development, negotiation of public /private transactions and financial feasibility studies. i -2- PUBLICORP, INC. Corporate Resume Eugene J. Ranieri Mr. Ranieri, Director of Governmental Affairs has a broad public policy experience in both the public and private sector. He has served local governments as a researcher, budget officer and intergovernment coordinator. In the latter position he has been involved in the formation of legislation in such areas as public finance, development, housing policy taxation. With Publicorp, he represents public and private clients at the legislature and assists in development programs, plans and negotiations. He also represents the Minnesota chapter of the National Association of Housing and Redevelopment Officials (NAHRO) and the Minnesota Association of Local Housing Finance Agencies. Preparatory education: graduate of St. John's University, B.A. in History, graduate of the University of Minnesota's Humphrey Institute of Public Affairs, with an M.A. in Public Affairs. James S. Holmes General Counsel Mr. Holmes is a partner in the Minneapolis law firm of Holmes & Graven. He specializes in municipal finance, serving as general counsel, special counsel and bond counsel to redevelopment agencies and municipalities with respect to economic development, redevelopment and housing finance matters. His law firm is actively involved in land acquisition, relocation and disposition by governmental entities, as well as the issuance of general obligation, tax increment, housing and industrial revenue bonds. Mr. Holmes was the chief draftsman of the Minnesota Tax Increment Financing Act of 1979 which controls the use of all tax increment financing in the state and has been actively involved in other recent legislation dealing with mortgage bonds, energy rehabilitation bonds, commercial rehabilitation and interest reduction programs and housing programs. In 1985 her served on NAHRO's national federal tax policy committee and in 1986 represented the League of Minnesota Cities and Minnesota NAHRO with respect to tax increment provision of the Federal Tax Reform Act of 1986. He is an author and lecturer with respect to public finance matters. Preparatory education: graduate of Washburn University, Kansas, B.A. 1969 graduate of the University of Minnesota Law School. -3- PUBLICORP, INC. Corporate Resume Mark T.J. Ruff Mr. Ruff is a development consultant with Publicorp. His area of expertise are financial and policy analysis, computer modeling, and the impact of environmental concerns upon development. With Publicorp, Mr. Ruff has assisted in the evaluation of housing proposals in North Dakota and Minnesota. Prior to joining Publicorp, Mr. Ruff worked with the United States Environmental Protection Agency in the agency's Office of Federal Activities. He has also served as a staff person in the home office of Congressman Byron L. Dorgan. Preparatory education: 1987 summa cum laude graduate of Concordia College, Moorhead, Minnesota. M.A. in Public Affairs from the Hubert H. Humphrey Institute, University of Minneapolis, expected in 1989. -4- PUBLICORP, INC. Corporate Resume III. AREAS OF EXPERTISE A. NEGOTIATIONS OF DEVELOPMENT AND REDEVELOPMENT CONTRACTS. Publicorp has the expertise to assist in an overall approach to economic development. It has assisted in the direct negotiations of development and redevelopment agreements with prospective developers. Publicorp currently serves as economic development consultant for the cities of Brooklyn Park, Columbia Heights and Apple Valley, assisting with their market analysis cash flow considerations and negotiations. Y g B. ANALYSIS OF PRIVATE SECTOR DEVELOPMENT PROPOSALS. Publicorp has the capability to evaluate various development proposals by analyzing balance sheets, cash flows and pro formas. Its broad background of experience in evaluating development proposals includes representation of private developers in Edina, Chanhassen, Minneapolis, Maple Grove, Richfield and Fridley, as well as many public clients. Publicorp has developed computer software to assist in analyzing the economic affect of private development proposals, including the impact of the 1986 Federal Tax Reform Act. C. PROVISION OF ADVICE ON PUBLIC FINANCIAL PARTICIPATION IN DEVELOPMENT AND HOUSING PROGRAMS. Publicorp has expertise in developing and establishing financial structures to accomplish long -term development and housing objectives. In addition to Publicorp's responsibility as economic consultant to local government units, it has provided analysis and recommendations on the economic feasibility of projects in Mesa, Arizona and Sauk Rapids, Minnesota. D. ANALYSIS OF ALTERNATIVE METHODS OF FINANCING THE PUBLIC COSTS OF REDEVELOPMENT PROJECTS. Publicorp has participated in the determination of financial feasibility of many projects and has provided advice regarding tax impact projections, probably revenues and charges, potential impact on credit rating and overall debt planning. Publicorp has developed a computer model for analyzing the impact of public subsidies on real estate development. In addition, Publicorp has developed an accounting structure for management control of economic -5- PUBLICORP, INC. Corporate Resume development for the Minnesota cities of Duluth, St. Cloud and Sauk Rapids, and has assisted the staff of the Milwaukee Redevelopment Authority in doing so. E. PROVISION OF ASSISTANCE ON "WORK- OUTS" AND REORGANIZATION OF DISTRESSED DEVELOPMENT. Publicorp is capable of assisting in the long -term devel- opment objectives and is currently involved in the work -out of a major redevelopment dispute in a Minneapolis suburb. Publicorp brings both economic and legal experience to this process. F. INTERPRETATION OF THE 1986 TAX ACT. Publicorp an assist in establishing and maintaining coo P g g - P erative relationships with the local development community and with other interested units of government. Publicorp has the capacity to provide advice on all federal and state legislation that affects development efforts and can provide updates on changes in this field. Publicorp has conducted seminars for local government officials on the impact of the 1986 Tax Act on development. Its computer model on the public subsidies analysis has been updated to include the effects of the 1986 Act. G. PROVISION OF ADVICE ON MARKETING AND DEVELOPMENT. While Publicorp does not conduct market studies, it can provide advice regarding financial feasibility of various combination of mixed -use facilities. The largest project of this nature undertaken by Publicorp personnel was the Sky Harbor Center in Phoenix, Arizona. H. LEGISLATIVE REPRESENTATION. Publicorp has the capacity to represent clients before state legislatures. Firm members have experience in conducting research, drafting legislation, presenting testimony and monitoring legislation. 0 -6- PUBLICORP, INC. Corporate Resume IV. PRODUCTION CAPACITY Based on contacts and experience, Publicorp can and has demonstrated the ability to respond on short notice and within tight time lines to assignments. The corporation utilizes the latest in computer technology to respond to all client need and is set up to meet demanding deadlines and priorities. Publicorp has the capacity to assemble bright, experienced financial development and technical professionals and provide them as needed on a timely basis. Publicorp is a relatively new company with a newly - developing client base. However, it is committed to adding both professional and administrative personnel as demand requires. V. BILLING PROCEDURES Publicorp has the capacity to structure a fee arrangement that will meet the client's needs. These needs may Y var from project to project. For example, retainer arrangements assure the client that the consultant will be available when needed but do not necessarily provide compensation base y p p d on work performed. Hourly billings more accurately reflect services performed but do not represent p ent a total product which may be desired. A negotiated fixed -fee will better reflect the actual product received but may not cover unexpected events. The fee arrangement can also be a combination of these methods. In any event, Publicorp will arrange a billing structure which meets the needs of a particular project. Publicorp has a 30 -day billing cycle. All billing statements are fully detailed by name, file number, name of persons providing services, hours expended in applicable, nature of work done and expenses incurred. VI. WRITTEN ESTIMATES Written estimates of cost for individual assignments will be provided by Publicorp whenever requested by the client. -7- PUBLICORP, INC. Corporate Resume VII. PERSONNEL All personnel shall be assembled and assigned as the needs of the particular project are analyzed by the Director of Devel- opment Consulting in conjunction with the requests of the client staff. Additional staff will be added as expertise is needed to complete the tasks assigned by the client. VIII. CONFLICT OF INTEREST Publicorp will refuse to represent clients if their positions are in conflict or appear to be in conflict with existing clients. This policy will remain in effect as long as the first client relationship exists. I -8- PUBLICORP, INC. Corporate Resume IB. REFERENCES City of Apple Valley 14200 Cedar Avenue Apple Valley, Minnesota 55142 Tom Lawell, Assistant Administrator 612/432 -0750 BRW, Inc Suite 1000 2700 North Central Avenue Phoenix, Arizona 85004 John McNamara, Vice President 602/234 -1591 City of Brooklyn Park 5800 85th Avenue North Brooklyn Park, Minnesota 55443 Al Erickson, Finance Director 612/424 -8000 Business Development Services 7260 University Avenue Northeast, Suite 130 Minneapolis, Minnesota 55443 Pat Pelstring, Vice President 612/937 -1900 City of Chanhassen 690 Coulter Drive City Hall Chanhassen, MN 55317 Don Ashworth, City Manager 612/937 -1900 Chanhassen Downtown Development Association Bloomberg Company P. O. Box 100 Chanhassen, Minnesota 55317 Brad Johnson 612/934 -1500 The Christina Corporation 6125 East Lafayette Scottsdale, Arizona 85251 Peter K. Carpenter, President 602/941 -0027 Dakota County Housing & Redevelopment Authority 2496 145th Street West Rosemount, Minnesota 55068 Mark Ulfers, Executive Director 612/423 -4800 City of Duluth City Hall, Suite 102 411 West First Street Duluth, Minnesota 55802 David Sebok, 218/723 -3639 -9- PUBLICORP, INC. Corporate Resume I%. REFERENCES (continued) City of Fridley 6431 University Avenue Northeast Fridley, Minnesota 55432 Jock Robertson 612/571 -3450 Harland Bartholomew & Associates, Inc. Planning /Engineering /Landscape Arch. 2702 Union Avenue Extended Memphis, Tennessee 38112 David S. Gendey, President 901/327 -4222 Hammer /Siler /George /Associates Economic & Development Consultants 1638 Pennsylvania Denver, Colorado 80203 J. Lee Sammons, Senior Vice President 303/860 -9996 City of Maple Grove 9401 Fernbrook Lane Maple Grove,, MN 55369 Al Madsen, Economic Development Director 612/420 -4000 S Marcor Properties, Inc. 5775 Wayzata Boulevard, Suite 820 St. Louis Park, MN 55416 James Winkels, Executive V.P. 612/545 -2102 City of Mequon 11333 N. Cedarburg Road, 60W Mequon, WI 53092 Brad Lee Steinke, Dir. of Community Dev. 414/242 -3100 City of Mesa 55 North Center Street P. O. Box 1466 Mesa, Arizona 85201 -0904 Wayne Balmer 602/834 -2398 Miller & Schroeder Financial 7900 Xerxes Avenue South Bloomington, Minnesota 55431 Pat Wooldridge, Assistant Vice President 612/831 -1500 Minnesota Timberwolves 1000 IDS Center Minneapolis, Minnesota 55402 Leonard Juster 612/339 -1481 -10- PUBLICORP, INC. Corporate Resume I%. REFERENCES (continued) Mooney LeSage and Associates 400 South Executive Drive Brookfield, Wisconsin 53005 -6800 J. Michael Mooney, Chairman 414/793 -9400 The Morton County Housing Authority Box 517 301 N.W. 15th Mandan, ND 58554 H. John Loerch, Management Agent 701/663 -7494 Mortenson Company 700 Meadow Lane North Golden Valley, Minnesota 55422 Dennis Zylla 612/522 -2100 City of Phoenix City Hall, Suite D 920 East Madison Street Phoenix, Arizona George Flores 602/262 -4887 Professional Ventures, Inc. 8500 Normandale Lake Boulevard, Suite 1130 Bloomington, MN 55437 John Grossman, President 612/921 -2345 Renner Design Architects 727 North Water Street Milwaukee, Wisconsin 53202 Peter Renner 414/273 -6637 City of Sarasota P.O. Box 1058 Sarasota, Florida 33578 Dave Sollenberger 813/365 -2200 City of Sauk Rapids City Hall 104 North Benton Drive Sauk Rapids, Minnesota 56379 John Frohrip, Community Development Dir. 612/251 -1022 City of St. Petersburg P.O. Box 2842 St. Petersburg, Florida 33731 Steve Kurcan 813/892 -5367 -11- PUBLICORP, INC. Corporate Resume I%. REFERENCES (continued) Told Development Company 6442 City West Parkway, Suite 201 Eden Prairie, Minnesota 55344 Bryant J. Wangard, Executive V. P. 612/941-0970 United Properties, Inc. 3500 West 80th Street Minneapolis, Minnesota 55431 Boyd Stofer, President 612/893 -8820 Walker Methodist 3737 Bryant Avenue South Minneapolis, MN 55409 Keith Jans 612/827 -8344 Washington County Housing & Redevelopment Authority 455 Broadway Avenue St. Paul Park, Minnesota 55071 Dennis Balyeat, Executive Director 612/458 -0936 Winfield Development, Inc. 5780 Lincoln Drive Edina, Minnesota 55436 Betty Lemley 612/938 -3354 Woodbridge Properties, Inc. 10201 Wayzata Boulevard Minnetonka, Minnesota 55426 David Weir 612/541 -1000 -12- PublicoRp INC. 410 PittsbURy CENTER (612) 337.9292 MiNNEAPOHS, MN 55402 AGREEMENT FOR PROFESSIONAL SERVICES This Agreement, entered into as of this day of August, 1989 between Publicorp (herein called the "Firm ") and CITY OF BROOKLYN CENTER (herein called the "City "). WITNESSETH, that the City desires to engage the Firm to render certain professional services and both parties agree as follows: 1. Scope of Services The Firm shall provide the following professional services: Prepare in cooperation with the City a housing implementation program. The Firm as part of its task will do the following: - identify solutions to identified housing issues - work with community leaders to develop the program. - prepare a written program for presentation to the city council. The program will include costs projections, and timelines. - meet with federal and state officials to obtain their support and cooperation in developing and implementing the program. 2. Delivery of Service Mr. Eugene J. Ranieri shall assume primary responsibility for delivering the professional services required by this Agreement. He will be assisted by Mark Ruff and Sid Inman. 3. Time of Performance The services of the Firm shall begin on execution of contract and be completed by January 15, 1990. 4. Compensation: Method of Payment For the services provided for hereunder, it is agreed that Firm shall be paid $20,000. The Firm will be paid on a monthly basis. 5. Additional Services and Compensation The services Issue: Owner Occupied : Maintained Housing Several owner occupied homes located within the city are being inadequately maintained. The housing unit is in need of repair while the property can be unkept or cluttered with litter. The building and property could impart the adjacent properties and could be a hazard. Actions: 1. Hazardous Building and Property Act The city can implement the provisions of the hazardous building act (MS 463:15 et seq). Under the act the city can issue an order for the owner of the building to correct the hazardous condition of the building. A 1989 amendment permits the city to also issue an order to correct hazardous conditions found on the property. 2. Neighborhood Volunteer Proiects A deteriorating building or property could be occupied by a person who could be uncapable of completing the repairs because of his or her age, income or health. The city as part of its housing maintenance program could identify homes having such occupants and coordinate or encourage a city wide "clean up - fix up" effort. The event could be an annual event and could be part of similar metro wide efforts. 3. Deferred Loans or Grants The city with local, private or federal resources (CDBG) could establish a "fix up" fund. The fund could make available resources to correct hazardous conditions, or repair deferred maintenance items such as a roof replacement, exterior painting or property clean up. The loan could be for low interest or principal only and be repaid over time or when the house is sold. enumerated in Paragraph 1 can be expanded by mutual agreement of the Firm and the City; provided, however, Firm shall not be required to provide services as a cost in excess of that set forth in Paragraph 4 above without the agreement on the part of the City to provide additional compensation therefor. 6. Reports The Firm shall report to the City in writing, on a biweekly basis, progress regarding the study. 7. Assignability. Firm shall not, in any way, assign or transfer any of its rights or interests under this Agreement in any way whatsoever without the prior consent of the City. Further, Firm shall not assign any other person as being primarily responsible for the delivery of services hereunder, other than as provided for in Paragraph 2 above, without the prior written consent of the Foundation representatives referred to in that paragraph. 8. Termination of Services. The City may be giving written notice, specifying the effective date thereof, terminate this Agreement in whole or in part without cause. Firm may terminate this Agreement in whole or in part without cause upon giving fifteen (15) days' prior notice to City of its desire to do so. In the event of termination, all property and finished or unfinished documents and other writings prepared by Firm under this Agreement shall become the property of City, and Firm shall promptly deliver the same to the Office of City Administrator as set forth above. Firm shall be entitled to compensation for time expended by it pursuant to the termination of the Agreement. IN WITNESS WHEREOF, the City and the Firm have executed this Agreement as of the date written above. PUBLICORP, INC. By Eugene J. Ranieri CITY OF BROOKLYN CENTER By