HomeMy WebLinkAbout1988 05-23 EDAP Regular Session EDA AGENDA
CITY OF BROOKLYN CENTER
MAY 23, 1988
(following adjournment of City Council meeting)
1. Call to Order
2. Roll Call
3. Approval of Minutes - May 9, 1988
4. Resolution Approving Contract with McGough Construction Co.
-Earle Brown Farm on -site construction superintendent
5. Adjournment
MINUTES OF THE PROCEEDINGS OF THE ECONOMIC
DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN
CENTER IN THE COUNTY OF HENNEPIN AND THE STATE
OF MINNESOTA
SPECIAL SESSION
MAY 9, 1988
CITY HALL
CALL TO ORDER
The Brooklyn Center Economic Development Authority met in special session and
was called to order by President Dean Nyquist at 8:21 p.m.
ROLL CALL
President Dean Nyquist, Commissioners Gene Lhotka, Celia Scott, and Bill Hawes.
Also present were EDA Director Gerald Splinter, Director of Public Works Sy
Knapp, Finance Director Paul Holmlund, Director of Planning and Inspection Ron
Warren, City Attorney Charlie LeFevere, EDA Coordinator Brad Hoffman, Personnel
Coordinator Geralyn Barone, and Administrative Aid Patti Page.
President Nyquist noted Commissioner Theis was absent from this evening's
meeting.
APPROVAL OF MINUTES - MARCH 28 1988
There was a motion by Commissioner Lhotka and seconded by Commissioner Scott to
approve the minutes of the March 28, 1988, Economic Development Authority
meeting as submitted. The motion passed unanimously.
ACQUISITION OF PROPERTY AT 65TH AVENUE NORTH AND BROOKLYN BOULEVARD
The EDA Coordinator noted the City has recently received an inquiry from a
homeowner along 65th Avenue North and Brooklyn Boulevard as to the City's
interest in acquiring properties to assist the development or redevelopment of
that block. He added the block in question includes the vacant property
proposed for development by the Church on the Move. He noted currently there
are three parcels on the market. He stated the Economic Development Authority
may wish to consider a policy of acquiring selected properties when they become
available. He went on to explain the two significant hindrances to the
development of this area, those being poor soil conditions and very poor access
to the large parcel, He noted the Director of Public Works feels that access to
and from the large parcel should be achieved on 65th Avenue North and that no
left turn be permitted along Brooklyn Boulevard.
The EDA Coordinator stated the Economic Development Authority has several
options available to it and went on to outline each option and its pros and
cons. He noted one of the options would be for the EDA to acquire the northern
two parcels which would force the developer of the large parcel to work with the
EDA. The EDA Director pointed out all options are exceptionally expensive.
Commissioner Lhotka stated he felt some thought should be given to what the EDA
would like to see developed in that area. President Nyquist inquired if the EDA
were to buy some of the parcels, would the EDA have the ability to force a
developer to purchase these parcels from us. The Director of Planning and
Inspection stated the EDA could not force a developer to obtain more property
. for a better access.
5 -9 -88 -1-
There was a motion by Commissioner Scott and seconded by Commissioner Lhotka
directing staff to investigate and suggest a desirable development for the area
which would be economically feasible and to also develop a plan for acquisition
of the necessary parcels. The
y p motion P assed unanimously.
ADJOURNMENT
There was a motion by Commissioner Hawes and seconded b y Commissioner Lhotka to
adjourn the
meeting. g. The motion passed unanimously. The Brooklyn Center
Economic Development Authority adjourned at 8:41 p.m.
President
5 -9 -88 -2-
I
Member introduced the following resolution
and moved its adoption:
EDA RESOLUTION NO.
RESOLUTION ACCEPTING AND APPROVING CONTRACT WITH
MCGOUGH CONSTRUCTION CO.
WHEREAS, the Economic Development Authority has
accepted resumes from construction firms for on -site construction
superintendent contracts; and
WHEREAS, the Economic Development Authority has
reviewed the submissions of each construction firm; and
WHEREAS, the firm of McGough Construction Co. was
determined to be the group that best suits the needs of the
Brooklyn Center Economic Development Authority for the
restoration of the Earle Brown Farm.
NOW, THEREFORE, BE IT RESOLVED by the Economic
Development Authority in and for the City of Brooklyn Center that
the negotiated contract with McGough Construction Co. is hereby
accepted and the President and Executive Director are hereby
authorized to execute an agreement for those services.
Date President
The motion for the adoption of the foregoing resolution was duly
seconded by member , and upon vote being taken
thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
MEMORANDUM
TO: Gerald G. Splinter, City Manager
FROM: Brad Hoffman, EDA Coordinator
DATE: May 20, 1988
SUBJECT: McGough Contract
The resolution and contract before the EDA completes the set of
three (3) contracts previously described to the Council for the
design, management (construction), and field supervision of the
restoration of the Farm. Under this contract, McGough
Construction provides the daily, on -site supervision and
coordination for the project.
Compensation to McGough is 3.5% of the construction cost not
including compensation for the construction management or
architect. Total design and construction management is
approximately 12.5% of the total cost of the restoration.
I will be available Monday evening to respond to questions about
this contract.
AGREEMENT BETWEEN THE ECONOMIC
DEVELOPMENT AUTHORITY OF THE
CITY OF BROOKLYN CENTER
AND
McGOUGH CONSTRUCTION CO.
AGREEMENT made as of the day of in.the year of
Nineteen Hundred and Eighty Eight;
BETWEEN the Economic Development Authority of the City of
Brooklyn Center, 6301 Shingle Creek Boulevard, Brooklyn Center,
Minnesota 55430 (Owner), and McGough Construction Co., 2737 N.
Fairview Avenue, Roseville, Minnesota 55113 (Construction
Supervisor) for the following Project:
Restoration & Redevelopment of the Earle Brown Farm in
Brooklyn Center, Minnesota, for use as a multipurpose trade
show center, banquet facility and /or business conference
center as further described in Exhibit A hereto.
The Construction Manager: Heskin Resource Group, Inc., 1295
Bandana Boulevard N., #335, St. Paul, MN 55108.
The Architect: Winsor /Faricy Architects, Inc., 28 West 5th
St. #375, St. Paul, MN 55102.
The Owner and the Construction Supervisor agree as set forth
below.
ARTICLE 1
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, the
Conditions of the Contract (General, Supplementary and other
Conditions), the Drawings, the Specifications, all addenda issued
prior to and all modifications issued after execution of this
Agreement. These form the Contract, and all are as fully a part
of the Contract as if attached to this Agreement or repeated
herein. A further enumeration of the Contract Documents appears
in Article 7.
ARTICLE 2
THE WORK
The Construction Supervisor shall act as the Construction
Manager's field representative for the Project which is described
more fully in Exhibit A attached hereto. The Construction
Supervisor shall be responsible for the field supervision of all
contractors for the Projector and shall establish, maintain and
operate such temporary field construction facilities and utili-
ties as are required. The Construction Supervisor shall provide
site security and cleaning for this Project, shall be responsible
for maintaining the overall construction schedule as determined
by the Construction Manager and Owner, and shall maintain a daily
construction diary for the Project.
ARTICLE 3
TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
The Work to be performed under this Contract shall be
2
commenced on or before September 1, 1988 and, subject to
authorized adjustments, Substantial Completion of the Work shall
be achieved not later than December 31, 1989.
ARTICLE 4
CONTRACT SUM
The Owner shall pay the Construction Supervisor in current
funds for the performance of the Work, subject to additions and
deductions by Change Order as provided in the Contract Documents,
the Contract Sum as determined below:
For construction supervisory services, compensation shall be
computed as follows:
If Construction Cost is at least $3,500,000 but less than
$4,500,000, compensation shall be 3.250 of Construction Cost. If
Construction Cost totals or exceeds $4,500,000, compensation
shall be $146,250. If construction cost is less than $3,500,000,
compensation shall be 40 of Construction Cost. For purposes of
this Article 4, Construction Cost is defined as the total of the
final Contract Sums of all the separate contracts for the
Project except the compensation paid to the Construction Manager
and the Architect. Construction Cost does not include the cost
of the land, right -of -way or other costs which are the
responsibility of the Owner.
Compensation described above does not include General
Conditions as required to complete the Project as described on
Exhibit B to this Agreement, which General Conditions are
separately reimbursable to Construction Supervisor.
3
I,
ARTICLE 5
PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Con-
struction Manager by the Construction Supervisor and Project
Certificates for Payment issued by the Architect, the Owner shall
make progress payments on account of the Contract Sum to the
Construction Supervisor as provided in the Contract Documents for
the period ending the 25th day of each month as follows:
As further provided below for each period covered by the
Application for Payment, Ninety -five percent (95 %) of the portion
of the Contract Sum properly allocable to labor, materials and
equipment incorporated in the Work and Ninety -five percent (95 %)
of the portion of the Contract Sum properly allocable to materi-
als and equipment suitably stored at the site or at some other
location agreed upon in writing, for the period covered by the
Application for Payment, less the aggregate of previous payments
made by the Owner; and upon Substantial Completion of the Work, a
sum sufficient to increase the total payments to One Hundred
percent (100 %) of the Contract Sum, less such amounts as the
Architect shall determine for all incomplete Work and unsettled
claims as provided in the Contract Documents.
Application for Payment shall be processed as follows:
1. On a selected day between the 25th day and the last day
of each month, the Construction Manager, Architect, and Construc-
tion Supervisor shall meet to review a draft of the Application
for Payment. When approved, all representatives shall initial
the draft.
4
I
2. By the third day of each month, the Construction
Supervisor shall submit to the Construction Manager and Architect
a final copy of the Application for Payment together with the
approved initialed draft.
3. The Construction Manager shall submit the request to
the Owner by the fifth day each month for disbursement by the
15th of the same month.
4. Payment shall be made by the Owner.
Payments due and unpaid under the Contract Documents shall
bear interest from the date payment is due at the rate of 9% per
annum.
ARTICLE 6
FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the
Contract Sum, shall be paid by the Owner to the Construction
Supervisor when the Work has been completed, the Contract fully
performed, and the Architect has issued a Project Certificate for
Payment which approves the final payment due the Construction
Supervisor.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Terms used in this Agreement which are defined in the
Conditions of the Contract shall have the meanings designated in
those Conditions.
7.2 The Contract Documents, which constitute the entire
agreement between the Owner and the Construction Supervisor, are
5
listed in Article 1 except as further provided in Section 7.4.2
below.
7.3 Temporary facilities and services: N /A.
7.4 Working Conditions:
7.4.1 Construction Supervisor agrees to work with the
Owner, Construction Manager, and the Architect to insure
that all contracts other than those of the Construction
Manager, Architect, and Construction Supervisor and the work
performed thereunder meet the requirements of Minnesota
Statutes, Section 471.345, the Uniform Municipal Contracting
Law.
7.4.2 All documents detailing the renovation and /or
reconstruction of the Earle Brown Farm as prepared by the
Architect, known as the working drawings, will become an
integral part of this Contract.
7.4.3 Work on the various buildings involved in the
Project will proceed concurrently and construction will be
completed within a 16 month period.
7.4.4 Services relating to the following are not
included in this Contract: Tenant improvements and parking
ramp facilities.
THIS AGREEMENT entered into as of the day and year first
written above.
6
OWNER
CONSTRUCTION SUPERVISOR
ECONOMIC DEVELOPMENT AUTHORITY McGOUGH CONSTRUCTION CO.
OF THE CITY OF BROOKLYN CENTER,
MINNESOTA
By B
Its Its
By By
Its Its
7
A -1
EXHIBIT A
The hippodrome will be developed as a multipurpose facility
for banquets, seating as many as 1,200 if possible, and a trade
show arena. The facility would accommodate approximately 100
booths. Other activities contemplated for the hippodrome would
include weddings, dances, musical entertainment, exercise class
es, and so forth. Design of the hippodrome should anticipate
dividing the room up to accommodate several smaller groups on
given occasions.
The stable, which is physically connected to the hippodrome,
would encompass kitchen facilities for banquets and possible
restaurant in the main entryway to the stable. The northern most
wing would be office space, accommodating only one tenant for the
office space in the stable. The loft areas of the stable would
function as storage space for the hippodrome.
The G and H barns located to the north end of the project
would be office space. The anticipated design would connect the
two buildings, but that would be subject to tenant needs and the
architects review and suggestions. Orientation of the G and H
buildings could be changed to accommodate design needs.
The housing complex which includes the main house, the farm
house, and the guest house will be developed as a "bed and
breakfast" facility. Special attention to this will be of
primary concern to the Brooklyn Historical Society. Consider-
ation should be given to incorporation of historical artifacts
and possibly the restoration of a room to be roped off from the
A -2
public. Note, the design of the "bed and breakfast" must take
priority.
The D barn will function as an office building dependent
upon certain budget considerations. The blacksmith's shop,
located outside of the property, would be moved onto the site and
used as a senior drop -in center, or alternate function as an
artist's loft and senior drop -in center.
The bunk house will be used in conjunction with the "bed and
breakfast" or the senior drop -in center. Along with the cooks
shed and the pump house (water tower), uses of the buildings
should be supportive of the other uses as determined in the
design phase. For example, the cook's shed could provide storage
space, etc.
0007AG02.I41
WATER BLACKSMITH
' � SHOP
BUNK
O I
FARM rl
(J_ MAIN HOUSE MOUSE GUEST
GA GE HOUSE
i I
D BARN
z
/ I
. I
' a
i
STABLE
HIPPODROME
. Cif
I
COOK'S
SHED