HomeMy WebLinkAbout1988 09-06 EDAP Regular Session EDA AGENDA
CITY OF BROOKLYN CENTER
SEPTEMBER 6, 1988
1. Call to Order
2. Roll Call
4. Resolutions:
a. Accepting and Approving a Contract with Robert Rippe &
Associates, Inc.
5. Adjournment
CITY OF BROOKLYN CENTER Council Meeting Date 9 -6 -8e
Agenda Item Number —
REQUEST FOR COUNCIL CONSIDERATION
ITEM DESCRIPTION:
RESOLUTION ACCEPTING AND APPROVING A CONTRACT WITH ROBERT RIPPE & ASSOCIATES,
INC.
DEPT. AP AL:
'� A Coordinator
Sig ure title
MANAGER'S REVIEW /RECOMMENDATION:
No comments to supplement this report Comments below /attached
SUMMARY EXPLANATION: (supplemental sheets attached yes
• The attached contract is for kitchen design work on the Earle Brown Farm. As you will note, Robert
Rippe & Associates, Inc. have been authorized to do the Phase I work. Completion of Phase I was
necessary to complete the programming (design) of the Farm and complete the initial cost estimates.
At this point in time, we need to complete the design work for the three (3) kitchen facilities on the
site. Robert Rippe will also complete the bid documents as they relate to the kitchen facility.
As you will recall, there are only two (2) such firms in the metro area not associated with a kitchen
equipment company. Robert Rippe & Associates, Inc. is the consultant used primarily by the firm we
are currently negotiating a lease for the banquet facilities.
recommend the execution of this contract. I will also be available Monday evening to respond to
any questions.
r
0,
Member introduced the following
resolution and moved its adoption:
EDA RESOLUTION NO.
RESOLUTION ACCEPTING AND APPROVING A CONTRACT WITH
ROBERT RIPPE & ASSOCIATES. INC
WHEREAS, the Economic Development Authority (EDA) in
and for the City of Brooklyn Center is committed to the
restoration of the Earle Brown Farm; and
WHEREAS, kitchen design and layouts are an essential
part of the programmed uses of the Farm; and
WHEREAS, the EDA has considered proposals from food
service consultants for design development, and the proposal of
Robert Rippe & Associates, Inc. in the amount of $19,600 is best
suited to the needs of the Economic Development Authority.
NOW, THEREFORE, BE IT RESOLVED by the Economic
Development Authority in and for the City of Brooklyn Center that
the Executive Director be authorized to execute an agreement for
these services.
Date President
The motion for the adoption of the foregoing resolution was duly
seconded by member , and upon vote being taken
thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
ROBERT R IPPE & ASSOCIATES INC.
F O O D S E R V I C E C O N S U L T A N T S
PROPOSAL for
FOODSERVICE FACILITIES DESIGN
EARLE BROWN FARM
Brooklyn Center, MN
February 29, 1988
SCOPE of WORK
This work includes foodservice facilities design for the phases of:
Feasibility /Schematic Design, Design Development, Contract Documents
and Review and Observation of the equipment contractor's work. The
foodservice facilities include:
1. A catering /banquet kitchen designed to serve the Earle
Brown Farm facilities and off - premise catering;
2. A 100 -seat, limited menu breakfast and lunch restaurant;
3. A 12 -room bed and breakfast kitchen.
DESCRIPTION of WORK
Phase I - Feasibility and Schematic Design
1. Design Criteria - establish design criteria, design program
and service systems in cooperation with the Owner's
designated representatives; assist Architect and Owner's
representatives with finalizing space amount, configuration
and traffic patterns; document the design criteria and
planned method of operation.
2. Equipment List - develop a preliminary equipment list for
the foodservice equipment and provide preliminary
information on mechanical and electrical load requirements.
10249 Yellow Circle Drive, Suite 200, Minneapolis, Minnesota 55343 (612) 935 -2334
3. Schematic Design - based on the approved design program and
Is on available building space as designated by the Architect
and Owner's Representatives, develop schematic plans for
the foodservice facilities; review with Owner's
representatives and revise as required until acceptable.
4. Budget - estimate at present value the Group I and Group II
foodservice equipment cost for equipment delivered,
assembled and set in place ready for final connection to
building services by others.
Phase II - Design Development
Work in this phase includes the following:
1. Prepare 1/4" scale design development drawings from the
approved schematic plan indicating the location, quantity,
size and type of foodservice equipment;
2. Prepare a foodservice equipment brochure booklet showing
accessories and utility requirements;
3. Submit plans to appropriate regulatory agencies for review
and comment;
4. Prepare mechanical and electrical drawings for the
engineers indicating the point of connection on the
foodservice equipment for all plumbing, electrical and
ventilating requirements;
5. Revise the equipment cost estimate.
Phase III - Contract Documents
Work in this section will result in a complete set of foodservice
equipment drawings and specifications coordinated with the Architect
and engineers.
1. Finalize 1/4" scale plan drawing and equipment schedule;
2. Prepare foodservice equipment elevation drawings;
3. Prepare supplemental drawings detailing the method of
construction for fabricated equipment;
4. Advise the Architect and engineers as to areas requiring
special ventilation, acoustics, lighting and construction
materials for walls and doors and special conditions for
floor and wall construction where required.
-2-
ROBERT RIPPE & ASSOCIATES, INC., Foodservice Consultants, Minneapolis, Minnesota
5. Provide information on prevailing state and local codes
applicable to the foodservice areas as they affect
equipment design and installation;
6. Provide written specifications to include Bid Proposal
Forms, Supplemental General Conditions and detailed
Equipment Item Specifications;
7. Review the architectural, mechanical and electrical
drawings to help insure proper coordination with the
foodservice equipment;
8. Provide final budget cost estimate revisions.
Phase IV - Review and Observation
This section involves review of the foodservice equipment
contractor's required submittals and observation of the contractor's
work to insure compliance with the Contract Documents.
1. Provide document clarification and /or addenda to the bid
package if required;
2. Advise on evaluation of bids, negotiation of contracts and
selection of a foodservice equipment contractor;
3. Review and approve the foodservice equipment contractor's
submittals as required by the Contract Documents including:
- fabricated equipment shop drawings
- dimensioned floor plan, special conditions plan and
rough -in and sleeve plan
- brochures of manufactured equipment
- equipment maintenance manuals and list of service
agencies
4. Prepare change orders as necessary for the foodservice
equipment; coordinate work with Architect and engineers;
5. Complete a field observation of the equipment and
installation for compliance with the Contract Documents and
submit a written report indicating acceptance of each item
or required corrective action.
FEE PROPOSAL
Our fee for the work outlined in this Proposal is scheduled below.
Reimbursement for out -of- pocket expenses is in addition to the fee.
Because of the nature of this project and the potential for studying
-3-
ROBERT RIPPE & ASSOCIATES, INC., Foodservice Consultants, Minneapolis, Minnesota
0 design and capital cost alternatives, we prefer to work on an hourly
basis with an estimated fee. The time has been prorated between
Group I (fixed) and Group II (major moveable) equipment for Phases
II, III and IV. The estimated fee and number of meetings for each
phase are as follows:
Mtgs. Fee
Phase I - Feasibility /Schem. Design 3 3,100
Gr. I Gr. II
Phase II - Design Development 4 5,600 T 1,800
Phase III - Contract Documents 3 $ 4,300 $ 2,100
Phase IV - Review & Observation 3 $ 1,800 $ 900
Totals 13 $14,800 4,800
Basis for the Fee
The above fee is based on an estimate of time required to complete
the work at the following hourly rates:
Robert Rippe $80 /hr.
Vice Pres., Design /Engineering $70 /hr.
Sr. Proj. Mgr. /Operations Consultant $60 /hr.
Project Manager /Operations Consultant $50 /hr.
Senior Draftsperson $38 /hr.
Drafting $28 /hr.
Secretarial $25 /hr.
Our fee and estimated time is also based on the - following conditions:
1. The Consultant is provided with accurate, dimensioned
drawings of the foodservice spaces;
2. Work through Contract Documents is completed before August
1, 1988;
3. Equipment for all areas will be bid in not more than one
bid package;
4. The foodservice equipment for which this Consultant is
responsible, will be purchased from a single foodservice
equipment contractor; the construction supervision will be
done by an experienced general contractor or construction
manager.
5. Equipment shop drawings and submittals will require review
and correction not more than two times;
-4-
ROBERT RIPPE & ASSOCIATES, INC., Foodservice Consultants, Minneapolis, Minnesota
6. The Group I (fixed) and Group II (major movable) equipment
value, including Owner furnished and future equipment, does
not exceed $250,000.
Changes in the Work
The Consultant will make reasonable and minor changes to the work
during the course of the project. Changes resulting from a
significant alteration in scope, space configuration, budget or
direction of the project after a major portion of the work is
completed, are causes for a fee adjustment. Any change in fee will
be billed at the stated hourly rates until the revision is completed.
Reimbursable Expenses
The Consultant will be reimbursed for direct expenses incurred while
working on this project. The primary expenses are listed below;
however, other miscellaneous expenses may be included.
Travel - The Consultant will be reimbursed for direct expenses for
travel at 22.5 cents per mile, parking and related expenses.
Mailing and delivery - The Consultant will be reimbursed at direct
cost for mailing and delivery except for normal correspondence.
Reproduction - The Consultant will be reimbursed at direct cost for
reproduction of equipment brochure booklets, specifications and
drawing prints except for internal office use.
Telephone - The Consultant will be reimbursed for long distance
calls directly connected with this work.
Work Not Included
This Proposal does not include architectural, mechanical,
electrical, plumbing, interior design or Group III equipment (pans,
utensils, tableware, etc.) work other than to coordinate the
foodservice equipment layout with these disciplines. It also does
not include field measuring existing wall conditions or field
surveying existing used equipment.
Method of Compensation
The Consultant will submit monthly billings for work performed and
expenses. Payment is due within 60 days from date invoiced.
Payments not made for more than 60 days from due date will be
assessed a 1% per month carrying charge.
-5-
ROBERT RIPPE & ASSOCIATES, INC., Foodservice Consultants, Minneapolis, Minnesota
Owner's Obligation
The Owner will furnish to the Consultant dimensioned plan drawings
for the building spaces available for foodservice functions
including all obstructions such as piping, conduit, or exhaust
ductwork that cannot be moved. The Consultant will also be provided
with sufficient sheets of the Architect's title block paper for the
foodservice Contract Documents, if required.
If the terms and conditions of the Proposal are acceptable, please
sign one copy and return to this office.
Respectfully submi d, r
Signed:
Robert D. Rippe, Pre d t
Date:
Signed: .----
Typed Name:
Title: ✓
Date: 7
P.O. Number:
RDR:ca
-6-
ROBERT RIPPE & ASSOCIATES I N C.. Foodservice Consultants, Minneapolis, Minnesota