HomeMy WebLinkAbout1980 09-17 CCP Special Session CITY.COUNCIL AGENDA
CITY OF BROOKLYN CENTER
SEPTEMBER 17, 1980
7 :00 P.M.
SPECIAL BUDGET SESSION
Call to Order
2 Roll Call
3. Invocation
4. Reconvene Public Hearing on.1981 City Budget (7:00 p.m.)
S. Resolutions
a a. Authorizing Execution of Agreement with Orr- Schelen- Mayeron and ZZZ
Associates, Inc. for Review of Preliminary Design for 67th Aven e =-
North Storm Sewer Extension ✓.
-The preliminary design for this project was prepared and submitted
by a developers engineering consultant. Analysis -of this system
is complex because it involves a pressure pipe system, review of
flood plane requirements, and a review of the adequacy of the
upstream system which is in..place. Because it is proposed to
levy ,special assessments against all property served by the storm
sewer ,system, it is recommended that an.independent firm be hired
to- review the preliminary design. The cost -of this review will
be charged to this project.
b. Authorizing Execution of a- Negotiated Contract With Shafer Contracting
Company, Inc. for Installation of a Water Main Casing Pipe Crossing
Under I -94 at Westerly Edge of Central Park '
-The City's consulting engineers, Black & Veatch, have completed
their preliminary review of the City's water supply system. One
major - element 'of their recommendations is to install a 16 water
main across I -94 near the westerly edge of Central Park.
It would obviously have been better to do this work ahead of the
I -94 construction. However, the 1972 study of the water distri-
bution system did not include this recommendation and the staff
was unaware of the need for this until now.
Because I -94 is under construction, the City is not able to
interfere with that construction by placing this work under a
separate contract without the consent of the I -94 contractor, and
that- contractor has advised the City that he will not allow any
contractor other than his own subcontractor to work within his
construction limits.
Accordingly, we have negotiated a proposed contract with that
subcontractor, Shafer Contracting Company, Inc. to install this
crossing. The Director of Public Works has reviewed the proposal
from Shafer and determined that the price is fair. The Director
CITY COUNCIL AGENDA -2 9 -17 -80
of Public Works also advises that if this work is not done now,
the cost for installing it at some future date would be considerably
higher. This is because it is now still possible to place a
"jacking,pit" in the center median, jacking both ways for that pit
under the in -place pavements and open trenching under areas where
the pavement has not yet been constructed. In the future, it would
be necessary to jack more than 220 ft. from one direction
Accordingly, it is estimated that the cost savings will be in
excess of $10,000.
5. Discussion Item
a. Request from CEAP regarding payment for new CEAP building.
7. Adjournment
Member introduced the following resolution
and moved its adoption:
RESOLUTION N0.
RESOLUTION AUTHORIZING E=UTION OF AGREEMF U t= ORR -SCE T MAYERON
AND ASSOCIATES, INC. FOR REVIEW OF PRELDUNARY DESIGN FOR 67TH AVENUE.
NORTH STO.R4 SEWER EXTENSION
BE IT RESOLVED BY THE COUNCIL CP THE CITY OF BROOKLYN CENTER that
the Mayor and City Manager are hereby authorized to execute an agreement with
the fine of Orr- Schelen- Mayeron and Associates, Inc. for review of the pre-
liminary design of the proposed 67th Avenue North stow sewer extension,
Project 1980 -24. The estimated cost for these professional services is
$2,000.00. Said costs shall be charged to the project.
Date Mayor
ATTEST:
Clerk
The motion for the adoption of the foregoing resolution was duly seconded by
member , and upon vote being taken thereon, the following
voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
I� Y �
r
L
e '
Member introduced the following resolution and
moved its adoption:
RESOLUTION NO.
t
RESOLUTION AUTHORIzIM EXECUTION CF A NEGOTIATED CONTRACT WITH
SHAFER CONTRACTING CO., INC. FOR INSTALTATION OF WATER MADT CASING
PIPE UNDER I -94
WERFAS, the City's water system consultant, Black and Veatch, has recently
determined that a 16 inch water main crossing I94 near the west line of Central Park
is necessary to the satisfactory operation of the City's water system; and
W OUAS, the City Engineer has reviewed alternatives to the above proposed
crossing with representatives of Black and Veatch and has subsequently concurred in
i
the necessity for a 16 inch water main crossing of 194 at the proposed location; and
`
WHEREAS, MN/ DOT's contractor, Lunda Construction Co., and Lunda's under-
ground utilities subcontractor, Shafer Contracting Co., Inc., now have possession
of land where the proposed watermain crossing is located and will not allow others
to work in the area during the I94 construction period; and
VMZEAS, the City Engineer has thus negotiated a price for installation
of a 30 inch casing pipe at the aforementioned location with Shafer Contracting Co.,
Inc. in the amount of $30,397.00; and
ME RFAS, the City Engineer has determined to the satisfaction of the City
Council that said negotiated price represents a substantial savings in installation
of the casing pipe due to the work presently being performed on I94.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn
Center, Minnesota, that the proposed 16 inch water main crossing of I94 at the west
line of Central Park be installed in accordance with the plans drawn by the City
Engineer and that said work be performed by Shafer Contracting Co., Inc. at the
quoted price of $30,397.00, said price to include the furnishing of all labor,
materials, tools, and equipment in connection with this project.
BE IT FURTHER RESOLVED that the Mayor and City Manager are hereby authorized
to execute a Contract with said contractor in the above amount.
BE IT FURTHER RESOLVED that the City Treasurer is hereby directed to appro-
priate the amount of $30,397.00 from Public Utilities Fund No. 72.
Date Mayor
ATTEST:
Clerk
The motion for the adoption of the foregoing resolution was duly seconded by
member , and upon vote being taken thereon, the
following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.