Loading...
HomeMy WebLinkAbout2001 09-13 PCP PLANNING COMMISSION AGENDA CITY OF BROOKLYN CENTER SEPTEMBER 13, 2001 REGULAR SESSION 1. Call to Order: 7:30 p.m. 2. Roll Call 3. Approval of Minutes - August 16, 2001 4. Chairperson's Explanation The Planning Commission is an advisory body. One of the Commission's functions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. 5. Sandness Construction 2001 -019 • Request for Site and Building Plan approval for an approximate 7,000 sq. ft. addition to the Spiritual Life Church, 6865 Shingle Creek Parkway. 6. Other Business 7. Adjournment i • • Application Filed on 8 -16 -01 City Council Action Should Be Taken By 10 -15 -01 (60 Days) Planning Commission Information Sheet Application No. 2001 -019 Applicant: Sandness Construction Location: Spiritual Life Church Request: Site and Building Plan Approval The applicant David Sandness of Sandness Construction is seeking site and building plan approval for an approximate 7,000 sq. ft. addition to the Spiritual Life Church, 6865 Shingle Creek Parkway. The property in question is zoned C -1 (Service /Office) and is bounded on the north by Shingle Creek Parkway with I -1 zoned property containing the Palmer Lake Plaza office /industrial building on the opposite side of the street; on the east by Xerxes Avenue and a two story office building with I -1 zoned property containing an office /industrial building on the opposite side of Xerxes Avenue; and on the south and west by Freeway Boulevard with R -3 zoned property containing the Earle Brown Farm Estates townhomes on the opposite side of that street. Places for religious assemblies such as chapels, churches, temple, mosques and synagogues, are permitted uses in the C -1 zoning district. Spiritual Life Church was granted site and building plan approval by the City Council for a 900 seat church on June 9, 1997, under Planning Commission Application No. 97006. They are now seeking site and building plan approval for an approximate 7,000 sq. ft. addition including a fellowship hall and meeting room. The fellowship hall addition will be located at the northwest corner of the existing building, is 5,088 sq. ft. and is labeled on the site plan as Addition A. The meeting room will be located on the south side of the building, is 1,692 sq. ft. and is labeled Addition B on the site plan. A 24 ft. by 26 ft. garage is also shown to be located in the south parking lot. The applicant is not proposing to make any site changes other than the building expansion. The church was planned with a possible expansion in mind and this expansion will not affect existing improvements. The City is still holding a financial guarantee to assure the completion of site improvements associated with the 1997 application. We may be close to recommending elimination of this guarantee upon verification of the completeness of the site improvements. AC F. ,S PARKING Access to the site is unchanged and is gained from Xerxes Avenue and two access points from Freeway Boulevard. The parking requirement for the church is based on seating capacity. Nine hundred seats were indicated on the original plan which required 300 parking spaces. Three • 9 -13 -01 Page 1 • hundred and four parking spaces were constructed. Five parking spaces will be eliminated with the construction of the garage leaving a balance of 299 parking spaces on the site. The seating capacity of the church is now 600 seats. The additions to the church do not require additional parking. We believe the parking space provided will be sufficient to meet the church's needs even with a seating capacity expansion over the present number. If need be, an additional one or two parking spaces could be provided on the site. CTR ADING/ I JR AINACTF,/I TTTT ,TTTF.ILR No site revisions are proposed with respect to grading, drainage or utilities for this expansion. It should be noted that the church had received Shingle Creek Watershed Commission approval in 1997 for a water retention plan that included two ponds, one on the north side of the site, the other on the south side. The church has recently been advised that the north pond was not constructed to the proper depth and that the outlet was not constructed according to the plan. A correction notice has been sent to the church and these matters are to be addressed by September 18, per that notice. T.ANDSC',APTNC'T The applicant's landscape plan that has been submitted with this application is a verification of the landscape plan proposed in 1997. They note that the landscape point system required 392 points which they have slightly exceeded with their plantings which include 17 Fallgold Ash, 21 • Plum Leaved Crabapple, 14 White Spruce, 7 Colorado Spruce, 15 Techney Arborvitae, 48 Hillieri, 49 Purpleleaf Sand Cherry and 22 Red Barked Dogwood. Final verification of the landscaping and pond modifications could allow the financial guarantee currently being held to assure completion of the 1997 site improvements to be released. We do not believe it is necessary to include a condition for a performance guarantee with the proposed expansion. BI M .DINCT The building exterior for the proposed additions will be a rock faced concrete masonry unit colored to match the existing building. Prefinished metal fascia will also be provided to match the existing. The floor plan shows a fellowship hall addition, which will be L shaped. A portion of the expansion in this area is labeled preschool. The preschool is considered a permitted accessory use with the church. Elementary and secondary schools (K -12) are not an allowable use in the C -1 zoning district. The preschool use should be acknowledged as a condition of this approval provided it is properly licensed by the Minnesota Department of Human Services and that a copy of the license is kept on file with the City. • 9 -13 -01 Page 2 T .TCTHTINCT The lighting plan shows the location of lighting standards that were installed. These light poles coincide with the original lighting plan submitted and no modifications are planned. RF.COMMF.NDATT(�N The plans appear to be in order and approval is recommended subject to the following conditions: 1. The building plans are subject to review and approval by the Building Official with respect to applicable codes prior to the issuance of permits. 2. Any altered grading, drainage or utility plans are subject to review and approval by the City Engineer prior to the issuance of permits. 3. The building additions are to be equipped with an automatic fire extinguishing system to meet NFPA standards and shall be connected to a central monitoring device in accordance with Chapter 5 of the City Ordinances. 4. The applicant shall provide appropriate erosion and sediment control devices on the site during construction as approved by the City Engineering Department. 5. Plan approval acknowledges a preschool use on the property. The applicant shall receive appropriate licensing from the Minnesota Department of Human Services and a copy of said license shall be kept on file with the City. I • 9 -13 -01 Page 3 „ � �� i s �� �� ■5���� ■ ■�■ �m �� �� �� �=Z■ M MM MM �. MM _ lot WIN m .� 'r � � i1 IS -- IM IM IM MI �I 1 I � JW ■� /� :• �I� �1� �_ I M F /■ ■a■ ■ ■ ■����� / //// MIAMI "fi Flo gar ®r ����■ �a�s■�i � - I■■ � glass► IN mm MM Mrs mm mm mm �� [� Timm IMIM .� �� SPIRITUAL LIFE CHURCH ADDITION SHINGLE CREEK PARKWAY ofaLE CFAW IaA"AY BROOKLYN CENTER, MINNESOTA _ AI SITE PL A2 FLOOR PLAN AJ CEILING PLAN, SCHEDULES uwm AS ELEV A T S 6 �\ �+ LI EXISTING LANDSCAPE PLAN '\ sN arf R � l u a 4 Ai k x J ,A \� f - --- — — � — - - -. —.— �" wi w 1 • sr wsw �\ R i IY i 1 11 O° '" 0 �o" O w K If ♦ 1101/ mum .L MO M nR • mg IG; r *loom i i 1 IFN AL 1. 7e10n OA�O o-1 < �\ � • raa.� wr a I w 1aa u i y w ow \ u \ 1 a n11e11r srew goo wn 4 s wn aiuq ww x 1\ aD ®IWI r ' \ N \AI- — — — — - -� "EEWAY OLVOL IF 5 y 6f1EPI.AN H M H K r! ft f! K H I! !! t t l t r l t t 4tl.t•Ifll7• MttR r 4 R. , trr twwwl QCtw.R1w m{i tMmw M Nwwi .. ... i rw.yrsw tlltr. •rw60 f A• W#IKr01 N Ntwww. a IOI rttw .L tp .tla 4 tl•IIOt•IIL wleltea N .tawGa caw m wnute w mlltNtw. r a OAP/ LMOMr r{li ,'�•. tV8 1w. ttrt , u • R1tIMlr! wW toRMI 1{ mn Nm- wk O n mm. m e • � � . . .ua t . ,. as wta ow � . . F aI � i�� �r wire nlw r w � w ® I I / "� r. rwNl. calla an w w. tf•. tnww .•u�nert Ica ta.s � II Paul" IItL I I • /CC 0 A - q H H H H • II = y .w ri ,K / ' twNwwt Y / ' M 2 / R w uttrt r! /' / two tlwli w! w-f < ICI GTE ` vm Iron t•O•� tom K Ntt a K s �011lgl 9 • . n 111.06 ® tew.ola �� R,QpA RAN � S � w �L.• r! K N K. M M itltfltt M ROOM FINISH SCHEDULE 9 1 >< t/ u r ■•r[ r t e t i [ A l l 1 1■ ■ert[ a NI Ww un 01R t6 IIMI {R K Ir 1 rR�or0. •m■1m 1■1R u w111 01l. O Y/r ! Wm 1 r-r• 1 x t = IN of m wlw u wm or, M36 PAN c u r 1 erm•t Nlo ; 1. oltlw reorr ■rN w wrl trwro 01st w w■o L OWN NOW W Nrq IO Wrlli ON W NO a t■lee■[ w le{ IW. IIAQONRY N.Y, CIITM/il 07EA Alp(E DOOR RgMETYM DOOR SCHEDULE 6 rr�I twnn >11 e ■ e r to 101 t 14 I r4 I -W • 1 1. t IN 1 re I 1 • 1 IN It 1 { lm i r-w r-, I { IN It r-r I_ { IN i r4 r-e • { M i r-w IN t r•r 77 1 • t IN 1 11 — 7-7 -- 1 A i 1 I 111 1 1 { A 111 f r4 Yom' I { I I [■ItTI ■e 1y I Ta.1 Doo I w. t1N NR errw ere I 1/r clef O ADDFI= A [iIt TIMt [t [Tlr[ Kji•tRI [ile the • CBl10 FLAN i ADDITION e d X� ►.IA __ Now N mm ma W WlLla IEnw� • O TO s 4W VAM I 10 To 1 O . A wm rrwn aM1100rw rt M10M0 GIOLLWAffN tOMYt1 N 091" VM ft .II LItM 3" r Ywl • r- w w I�LtlLpltll omwm t %MN am" TN Nw TafIM t SIM an 1100 Nwm Y mm r 1N we •w10N 01M t10a r O.rl SYIw 7WfMtY Nwt•/IwC ��MFW Y wlttN I0iN11 r0au 111M1 T10 r r i ""roe �1 I.nea Tla onw r- - � e way TI" 01 10ll Lrr .N11aINa mm am l l a ill _W" tmr sl T/Na rer raN T I - WOO role tOMM 1101 T1rr NNaNI T.MI Tor 7 M t 1 W" am 1001 T rN !u Ms1 ��NIIO Olaf Mat i1n00�+ aol All aI T1 T7 I -m rra Tnra 10M1 �-� 14M0a N0101 TIa r sm NOaY 1Y1 Tor aNllalt7 ap I � HWON I IIaMa t t t Tray 101M r- a ore aMllalil 'IN19 dl wY �� 7 T I Will r.o0a 131N1 TwN 101010 1.M OX rfRa �� 1010 10101 y i N71n 11010! L anm rran A SNOUO ° (� ra+{n rran� r.l -.r+ � r.►.w � rtan .r.+ -an r.� r•� TWM M T1VM HIdON TIrM HIiION JiD� TIVM NIAOQ'18Df7 TwM r wm im �80f� �1VM �81FJ 78x3 'b1r{ 1 @MON rrs coos L Valr I N am .* r ao lam > �.,a Ir 1 s w ,e. 1 i Saw d Y{t i0Y '+ am m 1 71l � MOQMA � � - niao 3D®{IOOF! /l ' w 1x111 n.r M rY ■ i • t I � �Tm ar rs sli �I i • • � II o0o0sooc x I fill '000000* 0 0 OW _MI i� cl �/- IL i� s x ■ ►�� • MEMORANDUM DATE: August 23, 2001 TO: Ron Warren, Planning and Zoning Specialist i FROM: Todd Howard, City Engineer SUBJECT: SPIRITUAL LIFE CHURCH ADDITION The Engineering Department has reviewed the subject site plan dated August 15, 2001 and has no comments. It is worth noting that the Shingle Creek Watershed Commission approved a plan that required a pond be constructed. The north pond at Spiritual Life Church was not constructed to the proper depth and the outlet was not constructed according to plans. A copy of field report from Shingle Creek Water Management Organization and a compliance letter from the City are attached. City of Brooklyn Center A Millennium Community CITY OF BROOKLYN CENTER PUBLIC WORKS DEPARTMENT (763) 569 -3340 FAX (763) 569 -3494 STORM WATER POND AND UTILITIES MAINTENANCE AGREEMENT COMPLIANCE ORDER DATE:7/18/01 COMPLIANCE DATE: 9/18/01 TO: SPIRITUAL LIFE MINISTRIES PO BOX 29546 BROOKLYN CENTER, MN 55429 LOCATION: 6865 SHINGLE CREEK PARKWAY 1 ST NOTICE COMPLIANCE OFFICIAL: Michael Krech The following violations of the AGREEMENT FOR MAINTENANCE AND INSPECTION OF UTILITY AND STORM DRAINAGE SYSTEMS were cited during an inspection of the • storm drainage ponds located on the property at 6865 Shingle Creek Parkway. You are hereby informed that these violations must be corrected on or before the compliance date indicated. Failure to correct these violations will result in the City contracting to have the violations abated and charging the cost to the property owner or assessing it to the property. A re- inspection of this property will occur on the compliance date. Please notify our department when the corrections have been completed. If you have any questions or comments, please contact me at 569 -3331, Monday through Friday, 8:00 a.m. to 4:30 p.m. DESCRIPTION OF VIOLATIONS The pond must be constructed as shown in the plans attached as Exhibit B to the AGREEMENT FOR MAINTENANCE AND INSPECTION OF UTILITY AND STORM DRAINAGE SYSTEMS. • 6301 Shingle Creek Parkway Recreation and Community Center Phone & TDD Number Brooklyn Center, MN 55430 -2199 " (763) 569 -3400 City Hall & TDD Number (763) 569 -3300 FAX (763) 569 -3434 FAX (763) 569 -3494 1 f Project Review SC 97 -07: Spiritual Life Church • Location: Southwest quadrant of Shingle Creek Parkway and Xerxes Avenue, Brooklyn Center Inlet: All outfalls are stabilized with nprap and clear of debris. Outlet: Outlet is clear of debris. Slimming is not provided. Outlet is not constructed according to plan. Basin: Pond does not have a permanent pool. All side slopes are vegetated. Basin does not appear to be graded to bottom elevation show in plans. Inspection Date: September 11, 2000 Comments: Pond should be graded/excavated to bottom elevation shown m plans. Pond outlet should be constructed according to plans. • ;s , Y Pond Outlet Pond - West I • J. 7 -2-