Loading...
HomeMy WebLinkAbout2012-14 PCR PC RESOLUTION NO. 2012-14 planned redevelopment of this site is considered a reasonable use of the property and will conform with ordinance standards; 4. The Site and Building Plan proposal is considered consistent with the recommendations of the City's Comprehensive Plan for this area of the city; 5. The Site and Building Plan proposal appears to be a good long range use of the existing land and this proposed development can be considered an asset to the community; and 6. Based upon the above considerations, it is believed that the guidelines for evaluating and approving a Site and Building Plan as contained in Section 35-230 (Plan Approval) of the City's Zoning Ordinance are met and the site proposal is,therefore, in the best interest of the community. BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City of Brooklyn Center to recommend to the City Council that Planning Application No. 2012-014 be approved subject to the following conditions and considerations: 1. Developer/Applicant agrees to comply with all conditions or provisions noted in the City Engineer's Review memo, dated June 20, 2012. 2. The building plans are subject to review and approval by the Building Official with respect to applicable codes prior to the issuance of permits. 3. The building and tenant spaces are to be equipped with an automatic fire extinguishing systems to meet NFPA standards and connected to a central monitoring device in accordance with Chapter 5 of the city ordinances. 4. The location or placement of any fire hydrants and other fire related building code items shall be reviewed and approved by the Fire Chief. 5. Final grading, drainage, utility and erosion control plans and any other site engineering elated issues are subject to review and approval by the City Engineer prior to the issuance of permits. 6. Any outside trash disposal facilities and roof top or on ground mechanical equipment shall be appropriately screened from view. The new trash enclosure with same building materials as those used to construct the principal building. 7. An underground irrigation system shall be installed in all landscaped areas to facilitate site maintenance. 2 of 4 PC RESOLUTION NO. 2012-14 8. Site Plan approval is exclusive of all final signs on this site, including new wall (building) signs, which shall remain subject to Chapter 34 of the city ordinances, and subject to the approved Signage Plan of the Shingle Creek Crossing PUD Agreements. 9. B6-12 curb and gutter shall be provided around all parking and driving areas. 10. The Developer shall submit an as built survey of the property, improvements and utility service lines prior to release of the performance guarantee. 11. All work performed and materials used for construction of utilities shall conform to the City of Brooklyn Center current Standard Specifications and Details. 12. Appropriate erosion and sediment control devices shall be provided on site during construction as approved by the City's Engineering Department and applicant shall obtain an NPDES construction site erosion permit from the Minnesota Pollution Control Agency prior to disturbing the site. 13. Any major changes or modifications made to this PUD Development/Site and Building Plan can only be made by an amendment to this PUD, which shall include an updated Development/Site Plan if necessary. 14. All other provisions, standards and variations provided under the 2011 Shingle Creek Crossing PUD shall remain in effect. June 28,2012 4 Date Chair ATTEST: Secretary The motion for the adoption of the foregoing resolution was duly seconded by member Kuykendall and upon vote being taken thereon,the following voted in favor thereof- 3 of 4 PC RESOLUTION NO. 2012-14 Chair Rahn, Commissioners Burfeind,Kuykendall and Schonning and the following voted against the same:None whereupon said resolution was declared duly passed and adopted. 4 of 4