HomeMy WebLinkAbout2012-098 CCR Member Lin Myszkowski introduced the following resolution and
moved its adoption:
RESOLUTION NO. 2012-98
RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2012-015 SUBMITTED BY
LOREN VAN DER SLIK (GATLIN DEVELOPMENT COMPANY)
APPROVING NEW SITE AND BUILDING PLAN FOR PROPOSED
BUILDING L (LOCATED ON LOT 14, BLOCK 1, SHINGLE CREEK
CROSSING ADDITION- 1150 SHINGLE CREEK CROSSING)
WHEREAS Planning Commission Application No. 2012-01.5 submitted by Loren
Van Der Slik(for Gatlin Development Company) requesting approval of a new Site and Building
Plan for proposed Building L, located on Lot 14, Block 1, Shingle Creek Crossing Addition, and
addressed as 1150 Shingle Creek Crossing, which approval is in conjunction with the ongoing
improvements constructed under the Shingle Creek Crossing Planned Unit Development Project;
and
WHEREAS, the Planning Commission held a public meeting on June 28, 2012, to
fully consider Planning Commission Application No. 2012-015, and reviewed and received a
planning report on the proposed new Site and Building Plans for proposed Building L and other
related improvements in conjunction with the Shingle Creek Crossing Planned Unit Development
Project; and
WHEREAS, the Planning Commission reviewed and received an updated site plan
and building elevation plan set as part of this review, and determined the new site layout and plan
meets the 5% increase allotted under City Code Sect. 35-355, Subd. 5.d., and was found to be
acceptable; and
WHEREAS, the Planning Commission finds that the Site and Building plans are
consistent with the General Development Plans of the overall Shingle Creek Crossing Planned Unit
Development.
NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission
of the City of Brooklyn Center to recommend to the City Council that the Site and Building Plan of
proposed Building L, as comprehended under Planning Application No. 2012-015, be approved
based upon the following considerations:
1. The Site and Building Plan is compatible with the standards, purposes and
intent of the City's Zoning Ordinance;
2. The Site and Building Plan, in relation to the Planned Unit Development
proposed on the Subject Site, will facilitate the redevelopment and
impr vement of this site,will allow for the utilization of the land in question
in a manner which is compatible with, complimentary to and of comparable
i
I
I
RESOLUTION NO. 2012-98
intensity to adjacent land uses as well as those permitted on surrounding
land;
3. The improvements and utilization of the property as proposed under the
planned redevelopment of this site is considered a reasonable use of the
property and will conform with ordinance standards;
4. The Site and Building Plan proposal is considered consistent with the
recommendations of the City's Comprehensive Plan for this area of the city;
5. The Site and Building Plan proposal appears to be a good long range use of
the existing land and this proposed development can be considered an asset
to the community; and
6. Based upon the above considerations, it is believed that the guidelines for
evaluating and approving a Site and Building Plan as contained in Section
35-230 (Plan Approval) of the City's Zoning Ordinance are met and the site
proposal is,therefore, in the best interest of the community.
BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City
of Brooklyn Center to recommend to the City Council that Planning Application No. 2012-015 be
approved subject to the following conditions and considerations:
1. The Developer/Applicant agrees to reduce the building shown on this site
plan from 12,600 sq. ft. to 11,200 sq. ft. (similar to Building H).
2. Developer/Applicant agrees to comply with all conditions or provisions
noted In the City Engineer's Review memo, dated June 20, 2012.
3. The building plans are subject to review and approval by the Building
Official with respect to applicable codes prior to the issuance of permits.
4. The b ilding and tenant spaces are to be equipped with an automatic fire
extinguishing systems to meet NFPA standards and connected to a central
monitoring device in accordance with Chapter 5 of the city ordinances.
5. The location or placement of any fire hydrants and other fire related
building code items shall be reviewed and approved by the Fire Chief.
6. Final grading, drainage, utility and erosion control plans and any other site
engineering elated issues are subject to review and approval by the City
Engineer prior to the issuance of permits.
RESOLUTION NO. 2012-98
7. Any outside trash disposal facilities and roof top or on ground mechanical
equipment shall be appropriately screened from view. The new trash
enclosure with same building materials as those used to construct the
principal building.
8. An underground irrigation system shall be installed in all landscaped areas
to facilitate site maintenance.
9. Site Plan approval is exclusive of all final signs on this site, including new
wall (building) signs, which shall remain subject to Chapter 34 of the city
ordinances, and subject to the approved Signage Plan of the Shingle Creek
Crossing PUD Agreements.
10. 136-12 curb and gutter shall be provided around all parking and driving
areas.
11. The Developer shall submit an as built survey of the property,
improvements and utility service lines prior to release of the performance
guarantee.
12. All work performed and materials used for construction of utilities shall
conform to the City of Brooklyn Center current Standard Specifications
and Details.
13. Appropriate erosion and sediment control devices shall be provided on site
during construction as approved by the City's Engineering Department
and applicant shall obtain an NPDES construction site erosion permit from
the Minnesota Pollution Control Agency prior to disturbing the site.
14. Any major changes or modifications made to this PUD Development/Site
and Building Plan can only be made by an amendment to this PUD, which
shall include an updated Development/Site Plan if necessary.
15. All other provisions, standards and variations provided under the 2011
Shingle Creek Crossing PUD shall remain in effect.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that Planning Application No. 2012-015 submitted by Loren Van
Der Slik (for Gatlin Development Company)requesting approval of a new Site and Building Plan
for proposed Building L, located on Lot 14, Block 1, Shingle Creek Crossing Addition, and
addressed as 1600 Shingle Creek Crossing, is approved subject to the same conditions
RESOLUTION NO. 2012-98
memorialized herein.
r�
P
July 9, 2012
Date Mayor
ATTEST: 4" gm—ijw
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
Kay Lasman
and upon vote being taken thereon, the following voted in favor thereof
Tim Willson, Kay Lasman, Carol Kleven, and Lin Myszkowski;
and the following voted against the same: none;
whereupon said resolution was declared duly passed and adopted.