HomeMy WebLinkAbout2012-145 CCR Member Kay Layman introduced the following resolution and moved its
adoption:
RESOLUTION NO. 2012-145
RESOLUTION ESTABLISHING 2013 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, the residential assessment rates for street and storm drainage
improvements are annually reviewed and approved by the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the 2013 street and storm drainage assessment rates for Rl,R2,and R3
zoned districts are based on a specific proportion of 40 percent of the average cost for street and storm
drainage improvements; and
WHEREAS, the R4, R5, R6, and R7 zoned districts will continue to be assessed
based on an evaluation of project cost and project benefit.
NOW,THEREFORE,BE IT RESOLVED by the City Council of the City of Brooklyn
Center,Minnesota,that:
1. The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in R1, R2 or R3 zoned districts. These rates
shall also be applied to parcels of property in other land use zones when such parcels
(a) are being used as one-family or two-family residential sites at the time the
assessment roll is levied; and (b) could not be subdivided under the then-existing
Subdivision Ordinance.
2. The residential assessment rates for street and storm drainage reconstruction
effective January 1, 2013, shall be as follows:
Land Use 2013 Assessment Rates
R1 zoned, used as one-family $3731.00 per lot(street)
site that cannot be subdivided $1120.00 per lot(storm drainage)
Land Use 2013 Assessment Rates
R2 zoned, or used as a two-family $49.7467 per front foot with a
site that cannot be subdivided $3731.00 per lot minimum (street)
$14.9333 per front foot with a
$1120.00 per lot minimum (storm drainage)
RESOLUTION NO. 2012-145
R3 zoned(per unit) Assessable frontage x $49.7467 (street)
Number of residential units
Assessable frontage x $14.9333 (storm)
Number of residential units
3. The residential assessment rates for street and storm drainage reconstruction
shall not apply to R4, R5, R6 or R7 zoned districts. The assessment rates for street
reconstruction for R4,R5,R6 or R7 zoned property shall be based on an evaluation of
the project cost and the project benefit for each project.
November 13 2012
Date Mayor
ATTEST: cN r I!�r'fa a(1Sp.✓� �.ep
City Clerk
1
The motion for the adoption of the foregoing resolution was duly seconded by member
Dan Ryan
and upon vote being taken thereon,the following voted in favor thereof:
Tim Willson, Carol Kleven, Kay Lasman, Lin MyszkowsRi, and Dan Ryan;
and the following voted against the same: none;
whereupon said resolution was declared duly passed and adopted.