HomeMy WebLinkAbout2013-007 PUD Amendment y City Use Only
Clr fd Q —J 3
I3ROOKI 1"N Date Received:
CIs,,VTFR Date Application Complete:
Letter of Completeness:
Planning Application Application No. aC)/.3 -00 7
A preliminary meeting with the Planning and/or Engineering Staff is required prior to the submission of a
Planning Application. No application will be accepted prior to such meeting. City Staff shall have five (5)
business days to review applications for completeness. The 60-day statutory review period does not begin
until staff determines the application is complete.
Application Request
(Mark all that Apply)
Site&Building Plan Planned Unit Development Subdivision Approval
($750) ($1800) ($300)
Rezoning PUD Amendment Appeal
($1050) ($700) ($200)
Variance Special Use Permit Determination
($200) ($200) ($200)
Applicant Information:
Name: �'f CST B(�(.�C� C-en-� Signature �.
Address:
Office Phone: Cell:
Email: FAX:
Owner Information* (if different from Applicant):
Name: Signature
Address:
Office Phone: Cell:
Email: FAX:
* The fee title owner of the property must sign this Application to make it official
Please provide a general description of your Application Request: �� men e'0
Gi new (a e ewDD cl
Vac , n � c,, - ot/one _ by -the I-- D
Address/Location of Property: W y Fa rC 6 0r r
�BlVb , 8EDI)k
Legal Description of Property:
- /Tyu )'h V
The applicant requests processing of this application and agrees to pay to the City of Brooklyn Center,within fifteen(15)days
after mailing or delivery of the billing statement,the actual costs incurred by the City for Engineering,Planning and Legal
expenses reasonably and necessarily required by the City for the processing of the application. Such costs will be in addition to
the application fee described herein. Withdrawal of the application will not relieve the applicant of the obligation to pay costs
incurred prior to withdrawal.
Application Fee$ r" y Acct No.10100-4403 Receipt No.
City of Brooklyn Center-Business and Development — 6301 Shingle Creek Pkwy — Brooklyn Center N4N 55430 (763)569-3300
Planning Application Page 1 Rev 5-21-12
City Use Only City Use Only City Use Only
Planning Commission Recommendation
Dates of PC Consideration Legal Notice Notices Mailed Action Taken Approved
Published Resolution No.
3 L Al-i 3 anl3 - v
✓ Approved Denied this a day of L yam_ 20 ,
subject to the following conditions:
Chairman
City Council Action
Dates of Council Legal Notice Notices Mailed Action Taken Approved Performance
Consideration Published Resolution No. Bond
Received
V/ Approved Denied this day of 20 '
with the following amendment:
Clerk/Planning Commission Secretary
City of Brooklyn Center-Business and Development — 6301 Shingle Creek Pkwy — Brooklyn Center MN 55430 (763)569-3300
Planning Application Page 2 Rev 5-21-12
PROPOSED AMENDMENT
The conceptual development plans for Phase II by Minnesota Hospitality Inc. include the
following changes from the conceptual plans illustrated on the 2007 Hotel plans approved as part
of the Brooklyn Hotel Partners PUD application:
1. The orientation of the hotel has changed from a westerly entrance facing Earle
Brown Drive to a central entrance facing the main entrance drive and entrance to
the Embassy Suites Hotel,
2. The plan changes unidentified hotel with a minimum 75 room hotel with 85 parking
stalls to an 81 unit Candlewood Extended Stay Hotel with 86 parking stalls.
3. The plan continues to utilize the shared access points on Summit Drive and now
provides a connection to the sidewalk within the Earle Brown Drive boulevard and
the trail connection to the Earle Brown Heritage Center.
4. The plan provides additional green space and yard area which complements the
open space and outdoor court area of the adjacent office building.
5. The architectural development standards for this hotel are identical to the Shingle
Creek Crossing PUD,
• At least 50% of all four sides of wall surfaces of the hotel will be constructed
of Class I materials and the remainder of Class II materials.
• Class I materials include: brick or acceptable brick-type material, natural looking
stone,textured cement stucco, copper, architectural panels or masonry units with
enhanced detailing such as patterns, textures color, dimension, banding, brick
inlay or glass.
• Class II materials include: EFIS, pre-finished metal, concrete block, fiber-
reinforced cement board siding, canvas or vinyl awnings.
The City's PUD ordinances states its purpose is to promote flexibility in land development and
redevelopment, preserve aesthetically significant and environmentally sensitive site features,
conserve energy and ensure a high quality of design.
The ordinance allows the Planning Commission to consider the uniqueness of each PUD and
enables the specifications and standards for streets, utilities, public facilities, approval of land
subdivisions, and modifications to zoning standards. As part of this application, the EDA is
requesting consideration to the following modifications:
1. That the parking standards for this project are adjusted from one space for each unit
plus one space for each employee on any one shift is modified to one space for each
unit plus one space for each employee on the evening shift.
2. That as part of the site plan approval the City will consider a simple metes and bound
description to facilitate a land division and combination of the eastern portion of this
platted lot (pond and trail) to the Earle Brown Heritage Center, in lieu of a formal replat
of Lot 2, Blockl, Brooklyn Farm 2nd Addition.