HomeMy WebLinkAbout1987 04-09 PCP Planning Commission Information Sheet
Application No. 87007
Applicant: Shingle Creek Land Company
Location: Tract A, R.L.S. 1572 (Spec. 12)
Request: Special Use Permit (Off-Site Accessory Parking)
The applicant (Shingle Creek Land Company) is requesting a special use permit to
provide off-site accessory parking on Tract A, R.L.S. 1572 (Spec. 12 site) in order
to provide sufficient parking to allow a full office occupancy of the RCM Plaza
building, 6701 Parkway Circle (Tract B, R.L.S. 1564) . The applicant has negotiated
a lease with the audit division of Target Stores for the remaining space in RCM Plaza
as an office occupancy.
The properties under consideration are located in the I-1 zoning district and are a
part of the Shingle Creek Business Center. RCM Plaza is bounded on the east by the
Spec. 11 (or Shingle Creek 11) site; on the north by the Spec. 9; on the west by the
MTC site; and on the south by the Spec. 12 site and Parkway Circle (the nonpublic
roadway that serves as access to the Shingle Creek Business Center) . The Spec. 12
site is a vacant parcel between t_he MTC and RCM Plaza sites and the Ramada Hotel to
the south.
Off-site Accessory Parking
This application proposes to provide an off-site accessory parking lot containing
153 spaces for the sole use of RCM Plaza. It would also alter the most recent
allocation of parking spaces in the central parking lot (Tract C, R.L.S. 1564 and
Tract C, R.L.S. 1572) servicing various buildings in the Shingle Creek Business
Center which was approved by the City Council under Planning Commission Application
No. 86034 on September 8, 1986. The central parking lot is divided into two areas, a
north and south lot separated by a landscaped area, and has a parking capacity of 276
parking spaces. There also exists an agreement between the City and Lombard
Properties stipulating that Lombard will construct a 185 stall parking ramp over the
central parking lot upon a determination by the City that parking demand in this
complex demands it. A parking allocation totaling 332 spaces (276 in central lots
with 56 deferred as part of a future parking ramp) was allocated and distributed in
the following manner as part of Application No. 86034:
Building Spaces Required Provided On-Site Off-Site
Central Lot
Shingle Creek 11 152 50 102
(20% Office; 80% Industrial)
RCM Plaza 226 176 50
50% Office; 50% Industrial)
Parkway Place 271 156 115
(60% Office; 10% Clinic;
30% Industrial)
Ramada Hotel 493 428 65
1,142 810 332
Because the applicant proposes a total office occupancy of RCM Plaza, the parking
requirement for that building would be 329 spaces based on the ordinance parking
formula for a 74,699 sq. ft. office building. As indicated above, there are 176
4-9-87 -1-
Application No. 87007 continued
spaces on-site and a need, therefore, for 153 off-site spaces to accomplish this.
For an off-site accessory parking special use permit to be granted, it must be
consistent with the Standards for Special Use Permits and also, with the provisions
contained in Section 35-701, Subdivision 3a through 3g (copy attached) .
Subdivision 3b limits off-site accessory parking to one site for each principal use.
Therefore, the applicant proposes to have no parking allocation from the central
parking lot for RCM Plaza and to provide all of the needed off-site parking on the
vacant Spec. 12 site. They have submitted a parking plan showing an expansion of
the parking lot south of RCM Plaza on to the Spec. 12 site to provide the required
parking. B612 curb and gutter would be provided around the parking and driving
areas and additional landscaping, consistent with that at RCM Plaza, would be
provided in large parking .lot islands and the greenstrips along Parkway Circle.
New Allocation
The new central parking lot allocation would be as follows:
Shingle Creek 11 102 spaces
Parkway Place 115 spaces
Ramada Hotel 65 spaces
Unallocated 50 spaces
Total 332 spaces
The applicant has also requested consideration of a proof-of-parking agreement at
this time because they may well have other alternatives and parking allocation
proposals in the near future.
Other Considerations
This proposed change leads to other considerations which must be addressed. First
of all, the additional office occupancy RCM Plaza (100%) will lead to additional
traffic being generated particularly the p.m. peak hour. The traffic generation
based on a probable development used as the model in the Short-Elliott-Hendrickson
Traffic Analysis anticipated a 50% office occupancy being generated from the RCM
site. Of primary concern is the impact on the intersection of Shingle Creek Parkway
and Freeway Boulevard during the p.m. peak hour (5:00 to 6:00 p.m.) . Given the
probable case, a level of service of D was anticipated. This level of service can be
improved to a level of service C with turn lane improvements. The proposed change
in occupancy will not cause maximum case development and we do not anticipate any
significant impact as this intersection with the proposed change in occupancy of the
building. However, the Director of Public Works has noted that the increased
office occupancy at RCM Plaza may well cause an increase in traffic movements at the
north intersection of Parkway Circle/67th Avenue North and Shingle Creek Parkway.
He has recommended, as part of the approval of this application, that the applicant
be required to enter into a traffic signal agreement with the City whereby they would
agree to pay for half the cost of a traffic signal at that location should one become
necessary within the next 10 years. This agreement would be similar to the one
Lombard has entered into to pay the entire cost of a traffic signal at the south
intersection of Parkway Circle and Shingle Creek Parkway. Similar agreements have
been executed for the north and south entrances to the Target/Shingle Creek Center
on Summit Drive and John Martin Drive respectively and with the Brookdale Square
Shopping Center.
4-9-87 -2-
Application No. 87007 continued
The City Engineer has indicated that a drainage plan for the Spec. 12 site must be
submitted and approved by the Shingle Creek Watershed Management Commission. It is
our understanding that the applicant is preparing such a plan for submission. The
City Engineer has also expressed concern that the flowageway running from the
intersection of 67th Avenue North and Shingle Creek Parkway to Shingle Creek be
protected and left open.
Central Parking Lot Landscape Provisions
The City Council also approved a proposal by Lombard Properties on September 8, 1986
to construct a somewhat elaborate landscaped plaza with two pools and a pavilion
within the central parking lot under Planning Commission Application No. 86033•
The applicant wishes to request approval of a proposal to scale this project down to
provide only a landscaped area and a walkway through this same area. The area would
be the same size, approximately 54' wide north to south and 270' long east to-west.
It would contain a lighted concrete meandering walkway with eight sitting benches.
The area would be sodded and contain. numerous trees, shrubs and flowers (5 Imperial
Locusts, 3 Norway Maples, 16 Green Spruce, 9 Radiant Crab, 4 Snowdrift Crab, 10
Japanese Tree Lilac, many Junipers, Winged Euonymus, Narrow Leaf Hosta and over
1,000 Red Geraniums) . It should be noted that underground irrigation is required,
as under the previous application, in all landscaped areas.
Recommendation
We believe this application is in order and recommend approval subject to the
following conditions:
1. Special use permit approval acknowledges off-site accessory
parking of 153 spaces on Tract A, R.L.S. 1572 to be provided for the
sole use of Tract B, R.L.S. 1564. The applicant shall encumber
the 153 parking spaces for this specific purpose in a manner
consistent with City ordinances as approved by the City Attorney.
Said encumberance shall be filed with the title to the properties.
2. Special Use Permit approval acknowledges the proof-of-parking for
up to 153 parking spaces. The applicant shall execute an
agreement, as approved by the City Attorney, to install said
parking upon a determination by the City that they are necessary
for the proper functioning of the site. This agreement shall be
filed with the title to the property.
3• A revised declaration establishing parking rights in the central
parking lot for the Ramada Hotel, Parkway Place and Shingle Creek
11 shall be reviewed and approved by the Zoning Official and the
City Attorney prior to the filing at the County.
4. The applicant shall execute a standard utility maintenance and
inspection agreement as approved by the City Engineeer.
5• The applicant shall submit a drainage plan for approval by the
Shingle Creek Watershed Management Commission.
6. The applicant shall agree to dedicate the necessary easement area
required for storm water detention in accordance with the plan
approved by the Shingle Creek Watershed Management Commission.
7. The applicant shall be responsible for protecting the flowageway
running from the intersection of 67th Avenue North and Shingle
Creek Parkway to Shingle Creek.
4-9-87 _3_
Application No. 87007 continued
8. The applicant shall enter into a traffic signal agreement with the
City, as approved by the Director of Public Works, whereby they
shall be responsible for paying half of the cost., of.the future
installation of a traffic signal at the Parkway Circle/67th Avenue
North intersection with Shingle Creek Parkway if the necessity of
such a traffic signal is determined by the City.
9. Approval of this application acknowledges an amendment to the
landscape/plaza plan submitted under Planning Commission
Application No. 86033 subject to all of the conditions imposed on
that application on September 8, 1986.
10. Special use permit approval acknowledges the ability of RCM Plaza
to have a 100% office occupancy.
11. Special use permit approval is subject to all applicable codes,
ordinances and regulations. Any violation thereof shall be
grounds for revocation.
4-9-87 -4-