Loading...
HomeMy WebLinkAbout1987 11-12 PCP Planning Commission Information Sheet Application No. 87026 Applicant: Thompson Lumber Company Location: 4810 N. Lilac Drive Request: Site and Building Plan Location/Use The applicant requests site and building plan approval to relocate a metal, Butler building from its Minneapolis location to the lumber yard at 4810 North Lilac Drive. The property in question is zoned I-2 and is bounded on the north by the Soo Line tracks, on the east by Ansari Abrasives, on the south by Bergman Machine Works, Omni Tool, and Cook Paint, and on the west by North Lilac Drive and Highway 100. The building is to be used for storage which is a permitted use in the I-2 zoning district. Building The enclosed portion of the building is 60' x 150' . The roof extends an additional 25' to each side making a total covered area of 110' x 150' . The applicant proposes to cover the entire width of the west elevation of the building with vertical board on board rough cedar siding. Also, the east elevation of the enclosed building would be covered with rough cedar siding. The north and south sides of the building, however, will only have metal siding. Open storage is proposed under the roof extensions. The building is to be located on the easterly portion of the site, just east of a waterline easement which serves a hydrant on the site. Also proposed is a 28' x 28' maintenance building which would be similar to a large frame garage. The City of Brooklyn Center has not approved a metal sided building for probably 30 years or more. The only other metal buildings in the city are those at Howe Fertilizer at Xerxes Avenue North and Brooklyn Boulevard which were built in the 1940's and '50's. Because this is not a very visible building and the sides would be shielded by stored items, staff feel that the north and south sides of the building can be metal sided without violating City standards. The Planning Commission should review this question. Parking The parking requirement for the existing buildings on the site is 147 stalls. The proposed building adds 11 stalls to this requirement. There are 72 stalls along the west side of the site and in an adjacent off-site lot in Highway 100 right-of-way. When Federal Lumber rebuilt after the fire in 1980 it showed a proof-of-parking area in the northeast corner of the site. The proposed storage building would be located over a portion of this proof-of-parking area. Accordingly, the applicant has shown a new proof-of-parking plan for 86 stalls along the easterly end of the site. The applicant should be required to enter into a proof-of-parking agreement with the City in the form of a covenant on the land. Grading, Drainage and Utilities No grading, drainage and utility plan has been submitted by the applicant. No changes in grade are proposed. The site generally retains its own runoff except near the utility easement which runs north and south through the middle of the property and extending south adjacent to the Cook Paint property to 48th Avenue North. There are two hydrants on the property, one in the middle of the site and one on the west edge. They are both at the ends of dead-end water lines. In order for there to be enough water pressure to serve both the central hydrant and the fire 11-12-87 -1- Application No. 87026 continued suppression system for the proposed storage building, it will be necessary to connect the two hydrants with a water line through the west half of the property to form a "loop" and thereby greater water pressure. The City should hold a guarantee to assure that the water line is completed. Landscaping No landscape improvements are proposed. The area outside the lumber yard along the tin a ed. Although the point value of existing west edge of the site is well landsc P p g does notequal the total recommended in the landscape point system Ptins (150-5) q lan g (approximately 250) , it is recommended that the point system be waived in this case, inasmuchas landscaping in the lumber yard ittelf would be pointless. Altogether, the plan meets minimal requirements and approval is recommended, subject to at least the following conditions: 1. Building plans are subject to review and approval by the Building Official with respect to applicable codes prior to the issuance of permits. 2. Utility plans are subject to review and approval by the City Engineer prior to the issuance of permits. 3. A site performance agreement and supporting financial guarantee (in an amount to be determined by the City Manager) shall be submitted prior to the issuance of permits. 4. The storage building is to be equipped with an automatic fire extinguishing system to meet NFPA standards and shall be connected to a central monitoring device in accordance with Chapter 5 of the City Ordinances. 5. The applicant shall enter into a restrictive covenant agreement to provide up to 86 additional parking stalls on the site upon a determination by the City that the stalls are needed for the proper functioning of the site. Said agreement to be executed and filed with the title to the property prior to the issuance of permits. 6. The property owner shall enter into an Easement and Agreement for Maintenance and Inspection of Utility and Storm Drainage Systems prior to the issuance of permits. 7. The applicant shall submit a topographic survey of the entire property prior to consideration by the City Council. 11-12-87 -2-