HomeMy WebLinkAbout120710_6840 Shingle Creek Pkwy FLOW TEST REPORT WATER UTILITY
LOCATION (p'640 15hjhwCreeK P&gy DATE -?— %ant
TEST MADE BY jam► dpCha,Qr TIME 2:00 eM
REPRESENTATIVE OF Su�na���C trwt �r-a'teGllor�
WITNESS CjN4 of
STATE PURPOSE dF TEST -JpAA.iT FIA. y?&roLh r Are ki'T+~eWAA So ie S
IF PUMPS AFFECT TEST, INDICATE PUMPS OPERATING
FLOW HYDRANTS A, Az A3
Size Norrie
Pitot Reading 4 Total GPM
GPM 2U3 t 2l0 31
CONSUMPTION
� RATE
STATIC B +!D psi RESIDUAL B WO psi DURING TEST
PROJECTED RESULTS: @20psi Residual opm;OR psi Residual gpm
REMARKS:
LOCATION MAP: -Show line sizes and distance to next cross-connected line.-Show valves and hydrant branch
size.•Indicate North.•Show flowing hydrants-Label A,,&&-Show location of Static and Residual-Label B.
I. ❑ Hydrant ❑ Sprinkler Ot ier(identd ) `
---
5 I gae C rce P1Cwy'
POW
ZkD 31