Loading...
HomeMy WebLinkAbout2014 12-01 CCP Budget Hearing and MeetingCOUNCIL ITEM MEMORANDUM DATE: November 26, 2014 TO: City Council FROM: Curt Boganey, City Manag SUBJECT: Budget Meeting Overview Recommendation: It is recommended that the City Council conduct a public hearing, receive comments and consider adoption of recommended budgets for fiscal year 2015. Background: By State Law and City Charter, each year the City Council is required to adopt an annual budget. The budget is perhaps the Cities most critical planning document. It sets forth the Council priorities for the upcoming year and allocates resources in accordance with those priorities. Monday December 1St 2014 is the culmination of a consensus building, priority setting process that began with the development of a multi-year strategic plan. The strategic plan clarifies our values, establishes goals and strategic priorities in pursuit of our Mission. Ensuring an attractive, clean, safe, inclusive community that enhances the qualify of life far all people cincl preserves the public trust Following the strategic plan and adopted financial policies as a guide, staff has worked with the City Council and Financial Commission over several months to craft budgets designed to meet the agreed upon service needs and achieve the desired community outcomes. On Monday you will be asked to consider the following: • Receive the budget report and hold the statutorily required public hearing • Hold an HRA Meeting to consider adoption of an HRA levy and budget • Hold an EDA Meeting to consider adoption of EDA an budget • Hold a City Council Meeting to • Receive the City Managers proposed budget • Adopt the Final Tax Capacity Levies • Adopt the Annual City Budget for all other funds • Approve the 2015-2019 CIP and the 2015 Capital Program Strategic Priorities • Financial Stability JiiS1OIZ Ensuring an alli ,iuUre clean,a/?, Inc/us/PC coinnniniti that enhances the quniTh of l/J' ni all people and preserves the public 111151 CITY COUNCIL MEETING PUBLIC MEETING ON BUDGET AND PROPERTY TAXES City of Brooklyn Center December 1, 2014 AGENDA 1.Call to Order - 7 p.m. —The City Council requests that attendees turn off cell phones and pagers during the meeting. A copy of the full City Council packet is available to the public. The packet ring binder is located at the front of the Council Chambers by the Secretary. 2.Roll Call 3.Presentation on Budget Process and Proposed 2015 Budgets 4.Presentation on Proposed Property Taxes Payable in 2015 5.Opportunity for Public Comment and Questions 6.Review Remaining Actions for Adoption 7. Adjourn 11/25/2014 City of Broo lldyrtCer 2015 Recommended Budget and Property Tax Levy Monday, December 1, 2014 7:00 P.M. ______•iuTrir1ir Agenda Budget Process c Strategic Priorities Proposed Levy o Revenue/Expenditure Overview o Property Taxation o Public Hearing Council Consideration of Proposed Levy, Budget and Capital Improvement Plan 1 11/25/2014 Purpose of this Hearing • Discuss the 2015 Proposed Budget • Discuss the 2015 Proposed Tax Levy o To hear input from the public on the proposed property tax levy for City services in 2015 o Following the hearing City Council will be asked to consider the adoption of the 2015 Proposed Budget and Property Tax Levy The Budget Process o Chapter 7 of the City Charter requires that the City Manager submit an annual operating budget to the City Council. o Budget Study Sessions held with the Financial Commission: July 7 Capital Improvement Plan and Capital Funds July 21 General Fund Revenues, Expenses and Property Tax Levy August 27 General Fund Revenues, Expenses and Property Tax Levy October 3 Special Revenue, Debt Service, Internal Service Funds October 20 Utility Funds, Cash Flows and Rates for 2015 Enterprise Funds (BC Liquor, Centerbrook Golf, EBHC) o Regular City Council Meetings September 8 Adoption of preliminary Levy December 8 Adoption of 2015 Utility Rates 11/25/2014 Strategic Priorities O Community Engagement In order to clearly understand and effectively respond to community needs, the City will consistently seek the input from a brood range of stakeholders from the general public,norvprotit and for profit sectors. Efforts to engage the community will be transparent and responsive. Our engagement efforts will be deliberately inclusive and culturally sensitive. O Focused Redevelopment Redevelopment and renewal of commercial, industrial and residential property is essential to the health and vitality of the city. The City will lead efforts to maintain and increase the value of private properties and willmake the necessary supporting infrastructure investments. We will encourage entrepreneurial investmentand make strategic public investments to create lobs and grow the City's tax base. O Community Image Our ability to attract and retain citizens and businesses is directly influenced by the perception of the City. We will take specific actions to assure that Brooklyn Center is recognized as a high quality, attractive and safe community. We will accomplish this by providing exceptional customer experience, vibrant neighborhoods and a sense of community thereby attracting private investment. O Financial Stability We will maintain a positive financial position with a long term perspective by diversifying revenue sources,aligning fees to adequately reflect service costs, stabilizing property taxes while reducing the City's relianceon State Shared Revenues, and ensuring that revenues are adequate to fund services and infrastructure needs, o Vibrant Neighborhoods Neighborhoods will be attractive, safe, inclusive of a diverse housing stock with owner occupied and quality - rental properties. Citizens will feel connected to each other and the natural environment will be protected and preserved for the enjoyment of future generations. Pay 2015 Proposed City Levies Description ioUiit General Fund Operations $14,332,534 Public Improvement Bond - Debt Service 396,496 Abatement for Economic Development 49.000 Total 2015 Proposed City Levy $14,778,030 Increase from 2014 (Dollars) $417,060 Increase from 2014 (Percentage) 2.90% Housing and Redevelopment Authority $280,460 Decrease from 2014 (Dollars) ($1,650) 3 11/25/2014 2015 General Fund -Revenues I City of Brooklyn Center General Fund -Revenues by Source Actual Budget Budget Budget Pt I Revenues 2012 2013 2014 2015 Change 4 Property Tax (net)$ 13,208,164 $ 13,590,682 $ 13,632,326 $ 14,381,533 5.50% Excess Tax Increment 175,827 -400,000 490,000 22.50% Lodging Tax 882,621 825,000 860,000 880,000 2.33% Licensen&Pdmits 858,593 641,208 743,668 728,115 (2.09%) Intergovernmental Revenue 966,480 1,057,250 1,253,800 1,362,941 8.70% Cheirges for Services 1,046,625 913,574 883,081 855,000 (3.18%) Fines 8L Forfeits 336,740 365,000 349,500 316,500 (9.44%) Other Revenues 546,924 136,275 343,875 388,512 12.98% $ 18,021,974 $ 17,528,989 $ 18,466,250 I $ 19,402,601 5.07% - 2015 General Fund - Revenues o Total revenue increase of $936,351 (5.07%) General Tax Levy Tax Increment Revenue State Pension Aid - Police/Fire Local Government Aid (LGA) Police Private Security Contracts Court Fines I $749,207 90,000 110,762 (25,231) (34,000) (35,000) ri 11/25/2014 2015 General Fund - Sources of Revenues Other taxes 7Property taxes Licenses & permits Intergovernmental Charges for services Fines & forfeitures 2015 General Fund - Expenses I city of Ruo&tyn Center General Fund - Expenditwsby hon Actual Budget Bwget Wdget Ptit ExpencIlitures 2012 2013 2014 2015 Chance General Government 2,267,033 2,329,887 2,432,271 2,591,201 653% Buildings & Grounds 783,978 764,248 809,667 857,958 5.96% Police 6,860,807 7,322,795 7,695,130 7,887,235 250% Fire 1,039,229 1,059,879 1,135,007 1,266,048 11.55% Public Works 3,041,430 3,318,843 3,524,016 3,620,234 2.73% Community Ddoixnert 1,222,347 1,399,362 1,537,284 1,484,110 (3.46%) Community/Recreation Services Other Services IiscdI&ieous Total 1,3112,571 560,891 (92,373) $ 17,065,913 1,488,496 537,407 (671,928) $ 17,528,989 1,463,029 569,500 (699,660) $ 18,466,250 I 1,539,497 983,253 (826,935)1 $ 19,402,601 5.23% 72.65% 18.19% 5.07% 11/25/2014 2015 General Fund -Expenses 0 Personnel o 2 percent base wage increases for employees budgeted o Health insurance increase r v Deputy Fire Chief Culture and Diversity Initiatives Contingency Sales Tax Savings Contracted Assessing Savings • $116,500 50,000 150,000 (50,000) (138,000) 205 General Fur -id - Expenses by Function Community Public works services 18% 6%CARS Fire 8% 6% Non-departmental V General gout 18% Police 39% I 11/25/2014 Capital Improvemei it Projects o 15-year Capital Improvement Plan (CIP) o Projects includes public utilities, street improvements, park improvements, and capital maintenance building improvements o 2015 Capital Improvements totaling $12.98 million • Freeway Area Neighborhood Reconstruction Project ($7.1 million) • 63°f Avenue North Reconstruction ($3.9 million) o Amphitheater o Proposed $5.2 million debt issue (Funded through sanitary sewer fees, special assessments and property taxes. Property Taxes Introduction c Why is my property tax bill changing? Change in value of your property Change in the relative proportion of your property to the total property value in BC Increase in property taxes requested for operations of City General Fund activities and programs Four different school districts in Brooklyn Center with different levies and property tax implications 7 11/25/2014 How are your taxes distributed? (Residential property in School District #279) Metro Taxing Other TaxingDistricts Districts City of Brooklyn2% 3% Center School Districts\ /36% I Hennepin County 25% IL Market Values Pay 2015 Compared Class Commercial $286,244,600 to 2014 $284,830,700 -0.5% Farm 179,400 179,400 0.0% Industrial 119,731,900 116,400,900 -2.8% Residential 737,357,328 883,850,645 19.9% Apartment 166,979,400 186,954,600 12.0% Other 456,000 456,000 0.0% Totals $1,310,948,628 $1,472,672,245 12.3% Payable 2014 Tax Capacity % 4fIP•J11 Apartment Commercial 32.4% - - Commercial Rntidential - 29.6% 46.5% \d101r Payable 2015 Tax Capacity % Other Apartment 11/25/2014 Taxable Capacity Pay 2014 Compared to 2015 Median Residential Value Homestead Residential Property Pay 2014 Median Estimated Residential Value Estimated Market Value: $114,200 Estimated Taxable Value: $87,238 Pay 2015 Median Estimated Residential Value Estimated Market Value: $131,400 Estimated Taxable Value: $105,986 o Change in Median Value Increase in Estimated Market Value: 15.1% Increase in Estimated Taxable Value: 21.5% FeE 11/25/2014 10 11/25/2014 Remaining Steps • Open the Public Hearing • City Council Consideration of Resolutions Adoption of the Final Property Tax Levy Adoption of the 2015 City of Brooklyn Center Budget Adoption of the Capital Improvement Plan • December 8, 2014 - Continuation of Budget Discussion (if needed) I Cüty of ookHyi Centel 6301 Shingle Creek Parkway Brooklyn Center, MN 55430 763-569-3300 • Curt Boganey, City Manager • Nate Reinhardt, Finance Director 11 HRA MEETING City of Brooklyn Center December 1, 2014 AGENDA Call to Order —The HRA requests that attendees turn off cell phones and pagers during the meeting. A copy of the full City Council packet, including HRA (Housing and Redevelopment Authority), is available to the public. The packet ring binder is located at the front of the Council Chambers by the Secretary. 2.Roll Call Pledge of Allegiance 3.Approval of Agenda and Consent Agenda —The following items are considered to be routine by the Housing and Redevelopment Authority (HRA) and will be enacted by one motion. There will be no separate discussion of these items unless a Commissioner so requests, in which event the item will be removed from the consent agenda and considered at the end of Commission Consideration Items. a. Approval of Minutes —Commissioners not present at meetings will be recorded as abstaining from the vote on the minutes. 1. December 9,2013—Regular Session 4. Commission Consideration Items a. Final Market Value Levy and Budget Resolutions Resolution Establishing a Final Property Levy for the Purpose of Defraying the Cost of Operation, Providing Informational Services and Relocation Assistance Pursuant to the Provisions of Minnesota Statutes Chapter 469.033 for the City of Brooklyn Center Housing and Redevelopment Authority for Fiscal Year 2015 Requested Commission Action: —Motion to adopt resolution. 2. Resolution Approving the Final Budget for the City of Brooklyn Center Housing and Redevelopment Authority Pursuant to Minnesota Statutes Chapter 469 Requested Commission Action: —Motion to adopt resolution. 5. Adjournment MINUTES OF THE PROCEEDINGS OF THE HOUSING AND REDEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPIN AND THE STATE OF MINNESOTA REGULAR SESSION DECEMBER 9, 2013 CITY HALL - COUNCIL CHAMBERS 1.CALL TO ORDER The Brooklyn Center Housing and Redevelopment Authority (HRA) met in Regular Session called to order by Chair Tim Willson at 7:00 p.m. 2.ROLL CALL Chair Tim Willson and Commissioners Carol Kieven, Kris Lawrence-Anderson, Lin Myszkowski, and Dan Ryan. Also present were City Manager Curt Boganey, Finance Director Nate Reinhardt, Public Works Director/City Engineer Steve Lillehaug, Business and Development Director Gary Eitel, Director of Community Activities, Recreation and Services Jim Glasoe, Assistant City Manager/Director of Building and Community Standards Vickie Schleuning, and Mary Mullen, TimeSaver Off Site Secretarial, Inc. 3.APPROVAL OF AGENDA AND CONSENT AGENDA Commissioner Myszkowski moved and Commissioner Lawrence-Anderson seconded approval of the Agenda and Consent Agenda, and the following item was approved: 3a. APPROVAL OF MINUTES 1. December 10, 2012 - Regular Session Motion passed unanimously. 4.COMMISSION CONSIDERATION ITEMS 4a. FINAL MARKET VALUE LEVY AND BUDGET RESOLUTIONS City Manager Curt Boganey presented an overview of the proposed resolutions, which relate to 2014 taxes. He noted, under state statute, an HRA may establish a tax on a city's taxable properties at a rate of 0.0185%. This would result in a levy of $282,110, and staff recommends authorization of this levy as well as adoption of this amount as the ERA budget, to be transferred to and used for the operations of the Economic Development Authority of the City of Brooklyn Center. 12/09/12 -1- DRAFT 1.RESOLUTION NO. 2013-01 ESTABLISHING A PROPERTY LEVY FOR THE PURPOSE OF DEFRAYING THE COST OF OPERATION, PROVIDING INFORMATIONAL SERVICES AND RELOCATION ASSISTANCE PURSUANT TO THE PROVISIONS OF MINNESOTA STATUTES CHAPTER 469.033 FOR THE CITY OF BROOKLYN CENTER HOUSING AND REDEVELOPMENT AUTHORITY FOR FISCAL YEAR 2014 Commissioner Ryan moved and Commissioner Myszkowski seconded adoption of HRA RESOLUTION NO. 2013-01 Establishing a Property Levy for the Purpose of Defraying the Cost of Operation, Providing Informational Services and Relocation Assistance Pursuant to the Provisions of Minnesota Statutes Chapter 469.033 for the City of Brooklyn Center Housing and Redevelopment Authority for Fiscal Year 2014. Motion passed unanimously. 2.RESOLUTION NO. 2013-02 APPROVING THE FINAL BUDGET FOR THE CITY OF BROOKLYN CENTER HOUSING AND REDEVELOPMENT AUTHORITY PURSUANT TO MINNESOTA STATUTES CHAPTER 469 Commissioner Myszkowski moved and Commissioner Kieven seconded adoption of HRA RESOLUTION NO. 2013-02 Approving the Final Budget for the City of Brooklyn Center Housing and Redevelopment Authority Pursuant to Minnesota Statutes Chapter 469. Motion passed unanimously. 5. ADJOURNMENT Commissioner Ryan moved and Commissioner Myszkowski seconded adjournment of the Housing and Redevelopment Authority meeting at 7:04 p.m. Motion passed unanimously. 12/09/12 -2- DRAFT Commissioner introduced the following resolution and moved its adoption: HRA RESOLUTION NO. RESOLUTION ESTABLISHING A PROPERTY TAX LEVY FOR THE PURPOSE OF DEFRAYING THE COST OF OPERATION, PROVIDING INFORMATIONAL SERVICES AND RELOCATION ASSISTANCE PURSUANT TO THE PROVISIONS OF MINNESOTA STATUTES CHAPTER 469.033 FOR THE CITY OF BROOKLYN CENTER HOUSING AND REDEVELOPMENT AUTHORITY FOR FISCAL YEAR 2015 WHEREAS, Minnesota Statutes require that the final property tax levy be provided to the Hennepin County Auditor no later than December 30, 2014 for taxes payable in calendar year 2015; and WHEREAS, the Housing and Redevelopment Authority of the City of Brooklyn Center, pursuant to the provisions of Minnesota Statutes 469.033, Subdivision 6, must certify a final property tax levy resolution to the City Council of the City of Brooklyn Center. NOW, THEREFORE, BE IT RESOLVED by the Housing and Redevelopment Authority of the City of City of Brooklyn Center, Minnesota that a special tax is hereby levied on all taxable real and personal property within the City of Brooklyn Center at the rate of 0.0 185% of the total market value of real and personal property situated within the corporate limits of the City of Brooklyn Center that is not exempted by law. BE IT FURTHER RESOLVED that the property tax levied under this resolution be used for the operations and activities of the Housing and Redevelopment Authority of the City of Brooklyn Center pursuant to Minnesota Statutes Chapter 469.001 to 469.047. December 1, 2014 Date Chair The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. Commissioner introduced the following resolution and moved its adoption: HRA RESOLUTION NO RESOLUTION APPROVING THE FINAL BUDGET FOR THE CITY OF BROOKLYN CENTER HOUSING AND REDEVELOPMENT AUTHORITY PURSUANT TO MINNESOTA STATUTES CHAPTER 469 WHEREAS, the Housing and Redevelopment Authority of City of Brooklyn Center has considered the final budget for Fiscal Year 2015. NOW, THEREFORE, BE IT RESOLVED by the Housing and Development Authority of the City of Brooklyn Center, Minnesota that revenues and appropriations for the Housing and Redevelopment Authority are hereby adopted as follows: Housing and Redevelopment Authority Revenues Property Taxes $ 280,460 Total Housing and Redevelopment Authority $ 280,460 Appropriations Transfer to EDA Fund $ 280,460 Total Housing and Redevelopment Authority $ 280,460 December 1, 2014 Date Chair The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. EDA MEETING City of Brooklyn Center December 1,2014 AGENDA 1.Call to Order —The EDA requests that attendees turn off cell phones and pagers during the meeting. A copy of the full City Council packet, including EDA (Economic Development Authority), is available to the public. The packet ring binder is located at the front of the Council Chambers by the Secretary. 2.Roll Call 3. Approval of Agenda and Consent Agenda —The following items are considered to be routine by the Economic Development Authority (EDA) and will be enacted by one motion. There will be no separate discussion of these items unless a Commissioner so requests, in which event the item will be removed from the consent agenda and considered at the end of Commission Consideration Items. a. Approval of Minutes 1.October 27, 2014— Regular Session 2.October 27, 2014 - Executive Session 4. Commission Consideration Items a. Resolution Approving the Final Budget for the City of Brooklyn Center Economic Development Authority for Fiscal Year 2015 Requested Council Action: —Motion to adopt resolution. 5. Adjournment MINUTES OF THE PROCEEDINGS OF THE ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPIN AND THE STATE OF MINNESOTA REGULAR SESSION OCTOBER 27, 2014 CITY HALL - COUNCIL CHAMBERS 1.CALL TO ORDER The Brooklyn Center Economic Development Authority (EDA) met in Regular Session called to order by President Tim Willson at 7:52 p.m. 2.ROLL CALL President Tim Willson and Commissioners Carol Kleven, Kris Lawrence-Anderson, Lin Myszkowski, and Dan Ryan. Also present were Executive Director Curt Boganey, Director of Business and Development Gary Eitel, Assistant City Manager/Director of Building and Community Standards Vickie Schleuning, City Attorney Charlie LeFevere, and Mary Mullen, TimeSaver Off Site Secretarial, Inc. 3. APPROVAL OF AGENDA AND CONSENT AGENDA Commissioner Myszkowski moved and Commissioner Lawrence-Anderson seconded approval of the Agenda and Consent Agenda, and the following items were approved: 3a. APPROVAL OF MINUTES 1.October 13, 2014— Regular Session 2.October 13, 2014— Executive Session 3. October 14, 2014 - Emergency Special Meeting Motion passed unanimously. 4. COMMISSION CONSIDERATION ITEMS 4a. FINAL NEGOTIATIONS OF A PURCHASE AGREEMENT TO PURCHASE REAL PROPERTY LOCATED AT 5939 JOHN MARTIN DRIVE, TRACT A, REGISTERED LAND SURVEY NO. 1529, HENNEPIN COUNTY, MINNESOTA (REDEVELOPMENT WITHIN THE OPPORTUNITY SITE) Commissioner Ryan moved and Commissioner Lawrence-Anderson seconded to adjourn to Closed Executive Session under the attorney-client privilege at 7:54 p.m. 10/27/14 -1- DRAFT Motion passed unanimously. The EDA returned from closed Executive Session at 8:14 p.m. Commissioner Ryan asked, with regard to acquisitions of land, whether new residential developments were being considered. Mr. Eitel stated there has not been any land available to develop in the City of Brooklyn Center for over 30 years. He added the City can work with the development community when a market is foreseen. President Willson asked whether an upscale apartment complex might be anticipated. Mr. Eitel stated market rate apartments are being considered, as the project would not be subsidized. President Willson expressed concern that there can be unintended consequences in pursuing up- scale residential developments. Mr. Boganey stated the City has sufficient affordable rental housing, and the current goal is to provide apartments with amenities that customers want, which do not exist currently in the Brooklyn Center rental market. Commissioner Myszkowski stated there is a need to attract economically diverse families, while alleviating the critical mass of families with children that are living below the poverty line. Commissioner Lawrence-Anderson thanked City staff for their hard work on this issue. She added she and her husband chose their first home in Brooklyn Center in 1987 due to its easy access to downtown, as well as parks and schools. She added she supports the idea of attracting professionals who want mobility. President. Willson thanked Mr. Eitel for his hard work on the acquisition of this property as well as other developments throughout the community. 1. RESOLUTION NO. 2014-29 AUTHORIZING THE ACQUISITION OF TRACT A, REGISTERED LAND SURVEY NO. 1529, HENNEPIN COUNTY, MINNESOTA, TO FACILITATE REDEVELOPMENT OPPORTUNITIES WITHIN THE OPPORTUNITY SITE Commissioner Ryan moved and Commissioner Myszkowski seconded to adopt RESOLUTION NO. 2014-29 Authorizing the Acquisition of Tract A, Registered Land Survey No. 1529, Hennepin County, Minnesota, to Facilitate Redevelopment Opportunities Within the Opportunity Site. Motion passed unanimously. 5. ADJOURNMENT Commissioner Lawrence-Anderson moved and Commissioner Ryan seconded adjournment of the Economic Development Authority meeting at 8:34 p.m. Motion passed unanimously. 10/27/14 -2- DRAFT MINUTES OF THE PROCEEDINGS OF THE ECONOMIC DEVELOPMENT AUTHORITY OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPfN AND THE STATE OF MINNESOTA CLOSED EXECUTIVE SESSION OCTOBER 27, 2014 CITY HALL - SHINGLE CREEK CONFERENCE ROOM 1.CALL TO ORDER The Brooklyn Center Economic Development Authority (EDA) met in Closed Executive Session called to order by President Tim Willson at 7:53 p.m. It was noted that under the exceptions to the Open Meeting law, the Economic Development Authority may elect to adjourn to Closed Executive Session regarding the purchase of real property located at 5939 John Martin Drive, Tract A, RLS 1529 (1.59 acre lot/former Golden Value Foods/Audio King) [Minn. Stat. § 13D.05, subd. 3 (c)]. 2.ROLL CALL President Tim Willson and Commissioners Carol Kieven, Kris Lawrence-Anderson, Lin Myszkowski, and Dan Ryan. Also present were Executive Director Curt Boganey, Director of Business and Development Gary Eitel, Assistant City Manager/Director of Building and Community Standards Vickie Schleuning, City Attorney Charlie LeFevere, and Mary Mullen, TimeSaver Off Site Secretarial, Inc. 3.FINAL NEGOTIATIONS OF A PURCHASE AGREEMENT TO PURCHASE REAL PROPERTY LOCATED AT 5939 JOHN MARTIN DRIVE, TRACT A, REGISTERED LAND SURVEY NO. 1529, HENNEPIN COUNTY, MINNESOTA (REDEVELOPMENT WITHIN THE OPPORTUNITY SITE) Following presentation by Director of Business and Development Gary Eitel, the EDA discussed the final negotiations of a purchase agreement to purchase real property located at 5939 John Martin Drive, The EDA reached a consensus with regard to the purchase agreement for 5939 John Martin Drive. 4.ADJOURNMENT President Willson adjourned the Economic Development Authority Closed Executive Session at 8:13 p.m. Motion passed unanimously. 11/12/13 -1- DRAFT Commissioner introduced the following resolution and moved its adoption: EDA RESOLUTION NO. RESOLUTION APPROVING THE FINAL BUDGET FOR THE CITY OF BROOKLYN CENTER ECONOMIC DEVELOPMENT AUTHORITY FOR FISCAL YEAR 2015 WHEREAS, the Economic Development Authority of City of Brooklyn Center has considered the final budget for Fiscal Year 2015. NOW, THEREFORE, BE IT RESOLVED by the Economic Development Authority of the City of Brooklyn Center, Minnesota that revenues and appropriations for the Economic Development Authority for the 2015 fiscal year are hereby adopted as follows: Economic Development Authority p Other Financing Sources Total Economic Development Authority Appropriations EDA Operations Total Economic Development Authority $ 431,182 $431,182 $ 436,983 $ 436,983 December 1, 2014 Date President The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. CITY COUNCIL SPECIAL MEETING City of Brooklyn Center December 1, 2014 AGENDA 1. Call to Order Regular Business Meeting –The City Council requests that attendees turn off cell phones and pagers during the meeting. A copy of the full City Council packet is available to the public. The packet ring binder is located at the front of the Council Chambers by the Secretary. 2. Roll Call 3. Consideration of 2015 Budget a. City Manager’s Budget Transmittal Letter for 2015 Fiscal Year Requested Council Action: –Motion to accept letter. b. Resolution Approving Final Tax Capacity Levies for the General Fund and Housing & Redevelopment Authority and Market Value Tax Levy for the Debt Service Fund for Property Taxes Payable in 2015 Requested Council Action: –Motion to adopt resolution. c. Resolution Adopting the 2015 Annual City Budget Requested Council Action: –Motion to adopt resolution. d. Resolution Approving the 2015-2029 Capital Improvement Plan and Adopting the 2015 Capital Program Requested Council Action: –Motion to adopt resolution. 4. Adjournment I CI ! OF -. A GREAT PLACE TO START, A GREAT PLACE TO STAY www.cityofbrooklyncenter.org To: Mayo!' Willson and Councilmembers Kieven, Lawrence-Anderson, Myszkowski and Ryan From: Cornelius L. Boganey, City Mana Date: December 1, 2014 RE: 2015 Final Budget Adoption It is my pleasure to transmit the 2015 budget for the City of Brooklyn Center. While the City Manager is tasked with the responsibility of preparing a budget, it cannot be accomplished without the cleat' policy direction provided by the City Council with input from the Financial Commission. It would be impossible to produce this budget without the cooperation and collaboration of the Leadership Team: Department Heads, Division Heads and other Staff Members. Special recognition should be given to the Fiscal Services Department and the Finance Director Nathan Reinhardt for his particular role in planning and coordinating the budget development process. It is our collective hope and expectations that this budget will succeed in its purpose to wisely manage our resources and implement policy for the benefit of an even greater community. Budget Overview The proposed 2015 budget, in financial terms, sets forth the action plan of the City. The priorities for staff, infrastructure improvement and service response are reflected in the allocation of resources in the plan developed in City Council Joint Work Sessions with the Financial Commission during the months of June through November 2014. The expenditure levels are focused on maintaining current services and on the achievement of the strategic goals and priority outcomes adopted by the City Council. The overall General Fund budget increase is 5.07% and the overall tax levy increase is 2.90%. The Median Value Residential Property in the City is $131,400 compared to the prior year value of $114,200, which is an increase in market value of more than 15%. Despite the significant increase in residential property market values, property values have not yet fully recovered to previous levels of residential property values. The Median Value Residential Property will pay approximately $752 in City property taxes in 2015 compared to $661 in 2014, which is an increase of $91. The 2015 Budget incorporates the following significant items: Issuance of $5.2 million of debt to finance the street and sanitary portions of infrastructure improvement projects for 63rd Avenue North Reconstruction, Freeway Boulevard Improvements (west of Xerxes), and Freeway Area Improvements. This provides the needed funding for the continuation of our street and utilities neighborhood reconstruction program. City Hall Community Center Police & Fire Departments 6301 Shingle Creek Parkway 6301 Shingle Creek Parkway 6645 Humboldt Avenue North Brooklyn Center, MN 55430-2199 Brooklyn Center, MN 55430-2199 Brooklyn Center, MN 55430-1853 763.5693300 Fax: 763.569.3494 763.569.3400. Fax: 763.569,3434 763.569.3333 . Fax: 763.561.0717 Expenses General Government $ 2,792,301 Police 7,887,235 Fire and Emergency Preparedness 1,266,048 Community Development 1,283,010 Other Services 983,253 Building and Grounds 857,958 Public Works 3,620,234 Community Activities Recreation Services 1,539,497 Miscellaneous (826,935) Total General Fund Expenditures $ 19,402,601 Strategic Focus For the past several years the City Council has remained focused on the achievement of strategic goals and each year the budget has been crafted as a policy implementation tool focused on the achievement of these strategic goals. This 2015 business plan focuses on the Council adopted Strategic Priorities of Civic Engagement, Focused Redevelopment, Community Image, Financial Stability and Vibrant Neighborhoods. During this year's budgeting process department heads identified key initiatives and value propositions for their divisions focused on the achievement of strategic priorities, which are included in their respective narratives. The definitions of the Strategic Priorities and examples of some of those key initiatives for 2015 are as follows: Civic Engagement In order to clearly understand and effectively respond to community needs, the City will consistently seek the input from a broad range of stakeholders from the general public, non-profit and for profit sectors. Efforts to engage the community will be transparent and responsive. Our engagement efforts will be deliberately inclusive and culturally sensitive. o Initiated by the City Council, the City will implement the Brooklyn Center Citizens Leadership Academy also known as BCU. The primary goal of the academy is to provide an in depth introduction of Brooklyn Center local government to 20 citizen volunteers reflective of our diverse community. These individuals will participate in eight successive weekly "classes" with City department leaders, and elected officials. They will have an opportunity tour City facilities, learn the history and future plans for their local government. Through this effort we will foster an informed constituency and encourage greater participation in civic and community life. Inclusive and culturally sensitive engagement. We will continue our Inclusion and Diversity efforts with the long term goal of establishing an organizational culture that promotes participation, engagement and creativity for • The City recently contracted with Hennepin County for property assessment services, which resulted in the reduction of three full-time equivalents in City assessing staff. The estimated savings from the move to a contracted service is $138,000 annually, which has been incorporated in this budget. • A new position of Deputy Fire Chief was added to assist with emergency preparedness and additional operational needs of the Fire Department. • Personnel costs include a two percent general wage adjustment, a $57 increase in the monthly contribution to the cafeteria plan of full-time employees, and an expected vacancy savings of $150,000. • An appropriated contingency of $150,000, in the General Fund, available for unanticipated expenditures. The Proposed 2015 Levies On September 8, 2014, the City Council adopted the 2015 preliminary budget and maximum tax levies. There are three funds that require a tax levy; the General Fund, the Debt Service Fund and the Housing and Redevelopment Authority Fund. The proposed final levy is as follows: General Fund - Operations Levy $ 14,332,534 General Fund - Abatement for Economic Development 49,000 Debt Service - Public Improvement Bond 396,496 Total Levy $ 14,778,030 Housing and Redevelopment Authority $ 280,460 The General Fund is the primary operating fund for government business of the City. The proposed General Fund Budget is as follows: The Proposed 2015 General Fund Budget Revenues Property Tax (net)$ 14,381,533 Excess Tax Increment 490,000 Lodging Tax 880,000 Licenses and Permits 728,115 Intergovernmental Revenue 1,362,941 Charges for Service 855,000 Fines and Forfeits 316,500 Other Revenue 388,512 Total General Fund Revenue $ 19,402,601 2 employees while developing an intimate understanding and appreciation of our customers/citizens. Our Diversity and Inclusion Council will begin working with our contracted support service to prioritize, organize and implement the recommendation of the client audit conducted by Inclusion Inc. Program Needs Assessment We will conduct an internal needs assessment of our recreation amenities, programs and services. The results will ensure our facilities and offerings are meeting the needs and expectations of the citizens of Brooklyn Center. The assessment will also provide a strategy and prioritization for the continued development of park and recreation facilities and programs moving forward. Focused Redevelopment Redevelopment and renewal of commercial, industrial and residential property is essential to the health and vitality of the city. The City will lead efforts to maintain and increase the value of private properties and will make the necessary supporting infrastructure investments. We will encourage entrepreneurial investment and make strategic public investments to create jobs and grow the City's tax base. e Continued development of Shingle Creek Crossing. Work with the developer in their completion of the 116,861 sq.ft. of commercial buildings currently under construction. The completion of these buildings will achieve 77.8% of the TIF construction goal of 239,000 sq.ft. within the first 5 years of commencing the redevelopment of the former Brookdale Mall. Work with the developer in their development plans for the construction of a minimum of 53,135 sq.ft. of commercial buildings. Commence redevelopment of the South Opportunity Site Area We will complete the demolition of the foundations and floor stabs of the former Brookdale Ford dealership and the vacant tenant spaces within the Brookdale Square commercial site. We will also continue to work with interested developers with the goal of entering into a development agreement for the first phase of the approved PUD. Redevelopment of the 57th and Logan Ave. Area We will obtain MPCA approval to develop a detention pond that will remove contaminated soils and provide the necessary storm water design capacity for the planned commercial development of the southern 7.5 acres. A Letter of Intent for the planned commercial development of this site will be advanced into a Development Agreement 4 Community Image Our ability to attract and retain citizens and businesses is directly influenced by the perception of the City. We will take specific actions to assure that Brooklyn Center is recognized as a high quality, attractive and safe community. We will accomplish this by providing exceptional customer experience, vibrant neighborhoods and a sense of community thereby attracting private investment. Perception of safety and youth We will work to engage youth who have entered the criminal legal system at the first sign of trouble and direct them to resources that focus on improving their contribution to the community. We will work to identify youth who have been exposed to domestic violence in their home to resources within Cornerstone domestic abuse services. 25 th Anniversary In 2015, the Earle Brown Heritage Center will celebrate 25 years of operation as one of the regions premier conference and events facilities, and as a centerpiece of the Brooklyn Center community. Through our 2015 marketing efforts, we will continually highlight this milestone anniversary and Brooklyn Center. Financial Stability We will maintain a positive financial position with a long term perspective by diversifying revenue sources, aligning fees to adequately reflect service costs, stabilizing property taxes while reducing the City's reliance on State Shared Revenues, and ensuring that revenues are adequate to fund services and infrastructure needs. Value continuous improvement and innovation We will implement DocuSphere software, which will provide an automated workflow process for accounts payable. The software will allow finance staff to locate invoices/documents at all steps of the process, increase timeliness of invoice processing, eliminate duplicated processes and reduce manual data entry. Implement capital improvement financial strategy A financial strategy that uses a combination of General Obligation Improvement Bonds, Utility Revenue Bonds, a Minnesota Public Facilities Authority (PFA) loan and Utility Fund rate adjustments will be used to provide necessary Capital Improvement funding. We will continue to implement long-term forecasting. This includes updating our assumptions based on current information and review of potential financing options including new debt issuances. 5 Vibrant Neighborhoods Neighborhoods will be attractive, safe, inclusive of a diverse housing stock with owner occupied and quality rental properties. Citizens will feel connected to each other and the natural environment will be protected and preserved for the enjoyment of future generations. o Attractiveness We will implement the 22nd year of the street and utility construction program by providing the needed capital improvements, which increase value to the public infrastructure and provide a catalyst towards other aesthetical improvements and value throughout neighborhoods Citywide. o Stabilize and improve residential neighborhood We will coordinate and inspect residential rental properties in accordance with City code requirements and further develop and implement a recognition program for rental properties. o Provide accurate and timely information regarding property ownership and special assessments We will also continue to update processes, systems and public information to provide efficient and clear processing of homestead applications and ownership documents. This includes the implementation of a new database for property ownership and homestead status. General Fund Revenue Summary Licenses & Inter- Charges for Fines & nermits \ governmental services forfeitures Other taxe 7% Property ta 74% )ther revenue 2% The 2015 General fund budgeted revenues total $19,402,601, which is an increase of $936,351 (5.07%) from 2014. Property tax revenue represents 74 percent of the General fund budget. The majority of the revenue increase is a result of increases in the general tax levy of $749,207 and property tax increment revenue of $90,000. 6 Last year the State passed a law that provided supplemental pension aid to police and fire departments state-wide to assist with increasing pension costs, the City will receive a supplemental police aid of $74,500 and a supplemental fire aid of $36,172. The fire relief supplemental aid will be received by the City but passed through to the Volunteer fire Relief Association. The City recently adopted a policy that would receipt half of the local government aid received for operations and half for capital improvements. This policy is intended to reduce the operationally reliance on local government aid and as a result the City has budgeted a General Fund reduction of $25,231. General Fund Expense Summary Community services Fire 6% Community Public works Activities, 18% Recreation & Services 8% Non-men departmental —5% Police 39% General government 18% The 2015 General Fund budgeted expenditures total $19,402,601, which is an increase of $936,351 (5.07%) from 2014. The 2015 Budget shows 39 percent of the Brooklyn Center's General Fund expenditures are for Police ($7,887,235). The remaining significant amounts include 18 percent for Public Works ($3,620,234), 18 percent for General Government ($3,650,259) and 8 percent for Community Activities, Recreation and Services ($1,539,497). The 2015 General Fund Budget Incorporates the following significant items: Personnel. It should be noted that salaries and benefits represent approximately 66 percent of the General fund expenditure budget. Significant changes to personnel include: • A two percent increase in employee base wages • A $57 increase in monthly cafeteria contributions for full-time employees • Creation of a Deputy Fire Chief position. The estimated cost of this position including salary and benefits amount to $116,500. The new position will assist with emergency preparedness and additional operational needs of the Fire Department. 7 • Reduction of three property assessment personnel. The City has contracted with Hennepin County to provide these services in 2015. The annual net savings from the agreement is approximately $138,000. • Increase in the estimated vacancy/turnover savings by $25,000 to a total estimated savings of $150,000. • Beginning on or after January 1, 2014 the City became exempt from the State sales tax on most City purchases. As a result, the budget allocates $50,000 in anticipated General Fund sales tax savings to departments. • Additional $50,000 budgeted to support the City's Inclusion and Diversity efforts to implement recommendations of the client audit conducted by Inclusion Inc. • Implementation of new software that includes an automated accounts payable workflow software, automated utility work order software and capital building maintenance software to manage City building and system replacement and maintenance requirements. The total cost of purchase, license fees and implementation for these three programs is budgeted at $125,888. • Office remodeling costs of $15,000 to remodel the entrance and front entry area of the West Fire Station and $50,000 to remodel the office and front counters of the Building & Community Standards office area. These improvements will help create a better work flow and improve the customer experience. • The General Fund budget includes a $150,000 contingency for unanticipated expenditures that may arise during the year. Taxable Market Value Commercial able 2014 $286,244,600 Payable 2015 $284,830,700 Change -0.5 Farm 179,400 179,400 0.0 Industrial 119,731,900 116,400,900 -2.8 Residential 737,357,328 883,850,645 19.9% Apartment 166,979,400 186,954,600 12.0% Other 456,000 456,000 0.0% Totals $1,310,948,628 $1,472,672,245 12.3% The City's taxable market value is estimated at $1,472,672,245, which is an increase of $161,723,617 or 12.3 percent from last year. The taxable market value increase is driven by large increases in residential (19.9%) and apartment (12.0%). Commercial and industrial taxable market value had a relatively small decrease in taxable market value. 8 Internal Service Funds Revenues and Other Sources Central Garage Fund $ 1,953,782 Total Internal Service Funds $ 1.953,782 Appropriations and Other Uses Central Garage Fund (w/o Depreciation) $ 1,808,754 Total Internal Service Funds $ 1,808354 December 1, 2014 Date Mayor ATTEST: City Clerk The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. Tax Capacity Payable 2014 Tax Capacity % Payable 2015 Tax Capacity% Industrial 13.6% Other - - Other Apartment 0.0% Apartment r00 11.5% 11.8% Commercial Residential 29.5% Commercial 46.6% 32.4%-- -I usItrial # The City levies a flat dollar for taxes which is spread amongst all taxable properties in proportion to their percentage of the total tax capacity of the City. As shown in the above chart, the increase in residential market value has resulted in a shift in total tax capacity from industrial and commerical to residential. Residential now represents 46.6% of the City's tax capacity. The total tax capacity of the City is estimated at $20,720,321 compared to $19,665,833 in 2014, which is an increase of $1,054,488 (5.4%). The increase in tax capacity results in a corresponding decrease in the City property tax rate. The decrease in the City property tax rate is the first since 2008. Property Tax Implications Median Residential Market Value $190,000 $950_. _______________ $180,000 $900- $170,000 $850- $160,000 $800 $150,000 -$750 $140,000 -$700 $130,000 -$650 $120,000 $600- $110,000 -I $550 $100,00 0 --a---$500-=-=-----2009 -T 2010 2011T2012 2013 2014 2015 [Annual City Taxes $886 $805 $818 $715 $674 $661 $752 [I Estimated Market Value $180,400 $153,600 $137,400 $133,800 $119,800 $114,200 $131,400 9 Metro Taxing Other Taxing Districts Districts City of Brooklyn -Center 36% epin County 25% School Districts 34% The median value home last year had an estimated market value of $114,200 and a taxable market value of $87,238. The price of that median value home went from $114,200 to $131,400 with a taxable market value of $105,986. As a result of the market value increase, the City property tax will increase by an estimated $91 from $661 to $752. The chart shown on the previous page provides information on the median value home and City property taxes paid since 2009. The red bar and amounts on the left axis represent the median value home. In 2009, that value was $180,400 which subsequently decreased each year to its lowest value in 2014 of $114,200. For 2015, we are seeing a reversal of that trend. The grey shaded area and the amounts on the right axis is the property tax amount paid on that median value home. In 2009 the median value home paid $886 in City property tax, similar to the market value, we have seen a steady decline in City property taxes leading up to the latest valuation. Despite seeing residential property values recover significantly for the year, the values and corresponding property taxes still remain below the amounts from 2009 to 2011. Breakdown of Property Taxes *B ase d on a Residential Property in School District 9279 City taxes accounts for 36 percent of property taxes paid by homeowners living in Brooklyn Center (based on the preliminary 2015 property tax levies). The remainder is comprised of taxes for the School District of 34 percent and County of 25 percent. The property tax paid by an individual property owner could be impacted because of several different reasons including; a change in value of the property, a change in the relative proportion of the property value to the total property value (shift in distribution of taxable market value to a different property type), an increase in property taxes requested for operations of the City General Fund activities and programs, and changes in the property tax needs of the County or School District. Brooklyn Center has four different school districts all with different levies and property tax implications. 10 Ser Fire & Emergency Preparednes $49 Police, $306 2015 Cost of General Fund - Median Value home Public Works, Community Community $140, Recreation, Technology Improvements, Golf Course, $2 _Other, $32 General Government $100 The chart above provides a cost breakdown of the property taxes paid by the median value home. This chart provides an approximate tax dollar cost of the services provided by the City, but it should be noted that it does not take in consideration any costs outside the General Fund or reduce the cost for non-property tax funded expenses such as permit fees and charges for services of the various departments. In 2015, the typical homeowner will pay approximately $306 for police, $140 for public works, $100 for general government, $60 for community recreation, $58 for community services and $49 for fire and emergency preparedness. 2015 Capital Projects & Equipment Replacement The Capital Improvement Plan (CIP) is a planning document that presents a fifteen-year overview of scheduled capital projects to address the City's goals for maintaining public infrastructure. The CIP includes a long-term financing plan that allows the City to allocate funds for these projects based on assigned priorities. The City has a total of $12.98 million of improvements budgeted for 2015, including 63rd Avenue North Reconstruction, Freeway Park Area Neighborhood Reconstruction Project and construction of an Amphitheater. Funding for these projects come from a variety of different sources. The complete CIP can be found in the Capital Improvement Program section towards the back of this budget book. The City compiles a rolling equipment replacement schedule for all City vehicles and equipment. The Central Garage, reported as an internal service fund, administers the funding, replacement schedule and disposal of equipment in the fleet. In 2015, the City is scheduled to replace $620,570 in vehicles and equipment. The detailed listing of equipment scheduled for replacement in 2015 and 2016 is included in the Internal Service Fund section of this budget book. Enterprise Funds Enterprise Funds are those programs provided by the City which generate their own revenues for operation and capital maintenance. The City operates the following three Enterprise Funds: 11 Brooklyn Center Liquor The City operates two municipal retail liquor stores to provide for the controlled sale and distribution of alcoholic beverages in the community. Profits from the operations are used to fund projects benefitting the community and avoiding the necessity of larger property tax levies for such projects. In 2015, the Liquor Fund will transfer $250,000 to the Capital Improvements Fund for future projects. Centerbrook Golf Course The mission of Centerbrook Golf Course is to be a premier value Minnesota golf course offering a challenging, well-conditioned course and exceptional customer service. Centerbrook Golf Course is a nine (9) hole, par three (3) golf course owned and operated by the City of Brooklyn Center. Even with the challenges of declining golf rounds, we are optimistic that many of the initiatives and course improvements will begin to reap dividends going forward; yet it is assumed that an annual subsidy for this recreational activity will be required for the foreseeable future. Our objective is to minimize the required subsidy each year by growing demand and improving efficiency. Earle Brown Heritage Center The Earle Brown Heritage Center (EBHC) is comprised of the Convention Center with Administrative Services, Catering Services and Commercial Office Rentals. These Divisions provide for the provision of maintenance, conference services, custodial functions, development, preparing, equipment servicing, and serving of food and beverage for events at Earle Brown Heritage Center. Maintenance of buildings and grounds of the commercial office spaces located at EBHC for two tenants. Additionally, the EBHC has a management agreement with Flik International for the food and beverage. Public Utility Funds The Public Utility Funds track revenues and expenditures for fee based public utility services provided by the City. These funds operate on their own ability to generate revenues and receive no property tax support. Each year the City Council reviews the operations of these funds and sets rates based on the needs for operations, capital spending and debt service payments. The City operates the following five Public Utility Funds: Water Fund The City has approximately 121 miles of water main, over 1,300 water valves and 1,000 fire hydrants providing service to over 7,000 single-family residential connections and approximately 1,600 apartment/commercial/industrial customers. The budget includes a rate increase for the Water Utility for both base and consumption charges. The City currently has a quarterly base charge of $8.20 per residential and commercial irrigation meter. In addition to this base charge, the City charges a consumption charge of $1.36 per 1,000 gallons (up to 30,000 gallons per quarter). The 2015 rates will 12 Mite Eear 13k BrDktyTh Fridley shriAew Center thfiI TylaplElvond Cryu!efle New Kte $iL'DcO $to,co s w.co $ 1D.O v&v increase to $10.00 per residential meter and $1.66 per 1,000 gallons, which is an increase of $1.80 per quarter in base charges and $0.30 in the consumption charge per 1,000 gallons. Multi-family, commercial and industrial properties currently pay a quarterly base charge depending on the size of the meter and a consumption rate of $1.70 per 1,000 gallons. The 2015 consumption rate will be adjusted to $2.07 per 1,000 gallons, which is an increase of $0.37. The amount by which the water bills at any particular property will be affected by rate increases depends on the size of the meter coimection and the amount of water consumed. The change in the quarterly utility bill for a household using 18,000 gallons of water (considered the typical residential user) is estimated to be $7.20 per quarter. Water rate increases are driven by the City's construction of a water treatment plant, which will reduce the level of manganese from our water supply. The water treatment plant is currently under construction and is expected to be up and running by the end of 2015. The (estimated) total cost for the water treatment plant is $19.98 million. Immediate financing will be achieved through a low interest loan under the Drinking Water Revolving Fund through the Minnesota Public Facility Authority (PFA) loan program. The loan will be repaid over twenty years at an interest rate of approximately one percent, which calculates to annual repayments of approximately $1.1 million. Water rates will be adjusted over the next three years to provide sufficient revenue for these annual loan repayments. The City annual compares its utility rates to nine other cities that are considered to be similar to Brooklyn Center. The results of that comparison show that even with an increase in water rates budgeted for 2015, Brooklyn Center will continue to have the second lowest rates among comparison cities as shown below: 13 Sanitary Sewer Fund The City provides for the collection and conveyance of wastewater through a systems of mains and lift stations. Sewage is treated by the Metropolitan Council Environmental Services, whose contracted services account for approximately 75 percent of the funds operating expenditures. The City currently charges a quarterly base charge of $74.70, which will increase to $78.45 in 2015. The $3.75 quarterly increase is predominantly driven by the replacement cost of sanitary sewer infrastructure related to the neighborhood reconstruction projects over the upcoming years. Storm Sewer Fund The City provides for the collection and management of storm water throughout the City in compliance with State and Federal regulatory requirements. The Storm Drainage Utility operates and maintains approximately 84 miles of storm sewers and nearly 100 storm water management ponds or treatment devices. There will be no changes to the current Storm Sewer fees. The current fees are sufficient to cover costs and meet fund balance targets for the near term future. Street Lighting Fund The City provides electrical service, maintenance, repair and replacement of lights owned by the City. The City owns approximately 71 ornamental lights, primarily in the Earle Brown commercial area, 85 ornamental lights on Brooklyn Boulevard, 40 ornamental lights along Xerxes Avenue, 72 ornamental lights along Bass Lake Rd and 57th Avenue and leases approximately 915 lights from Xcel Energy. Another 97 lights owned by the City are located on traffic signal systems. There will be no changes to the current Street Lighting fees. The current fees are sufficient to cover costs and meet fund balance targets for the near term future. Recycling Fund The Hennepin Recycling Group (HRG) is a joint powers organization consisting of the cities of Brooklyn Center, Crystal and New Hope. The HRG is responsible for managing a comprehensive recycling and waste education system for the residents of these cities. 14 Residents pay a Recycling Service fee on their utility bill for curbside recycling, the use of a yard waste and tree branch drop off site, and proper waste management and special material education and services. The City currently charges a quarterly base charge of $8.94, which will increase to $9.21 in 2015. The $0.27 quarterly increase is predominantly driven by operational needs of the utility. The Recycling Fund is currently below their targeted minimum cash balance and the additional revenue would bring the utility closer to that targeted cash balance. Housing and Redevelopment Authority The Housing and Redevelopment Authority (HRA) levy for 2015 is $280,460, which is a decrease of $1,650 from 2014. State law establishing a HRA provides for an operating levy of up to 0.0185% of the taxable market value within the jurisdiction to carry out the purposes of the authority. In Brooklyn Center after forming an HRA, the City established an Economic Development Authority (EDA) that assumed and expanded the HRA responsibilities into the areas of economic development. The HRA levy is required to provide the funding for the EDA activities. City of Brooklyn Center 2015 Budget Full Time Employees - By Fund, Function & Division (By Funding Source) Proposed 2008 2009 2010 2011 2012 2013 2014 2015 2016 General Fund General Government Administration Elections City Clerk Finance Assessing Human Resources Information Technology General Government Buildings & Facilities Central Supplies & Support Public Safety Police Administration Police Investigation Police Patrol Police Support Services Police Facility Maintenance Fire Emergency Preparedness Community Services Planning & Zoning Inspections Code Enforcement Ownership Services Public Works Public Works Administration/Engineering Street Maintenance Traffic Control Park Maintenance Forestry Community Activities & Recreation Services CARS Administration CARS Recreation Administration CARS Community Center Subtotal 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 3.0 3.0 3.0 3.0 3.0 3.5 3.5 0.0 0.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 37.0 40.0 40.0 40.0 40.5 40.5 40.0 40.0 40.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 2.0 1.5 1.5 1.5 1.5 1.5 1.5 4.0 4.0 4.0 4.0 4.0 4.0 5.0 5.5 5.5 2.0 5.0 5.0 5.0 4.0 5.0 5.0 4.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.5 6.0 6.0 6.0 6.0 6.0 7.0 7.0 7.0 7.0 8.0 8.0 8.0 8.0 7.0 7.0 7.0 7.0 7.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 3.0 3.0 3.0 3.0 0.0 0.0 0.0 0.0 0.0 120.0 126.0 126.0 125.5 120.0 122.5 123.0 120.5 120.5 Special Revenue Funds Economic Development Authority 2.0 2.0 2.0 2.5 2.5 2.5 2.5 2.5 2.5 Grant Funds: COPS Grant 2.0 0.0 1.0 1.0 0.5 0.5 0.0 0.0 0.0 Grant Funds: Auto Theft Grant 1.0 0.0 1.0 1.0 1.0 1.0 1.0 0.5 0.0 Subtotal 5.0 2.0 4.0 4.5 4.0 4.0 3.5 3.0 2.5 Enterprise Funds Off Sale Liquor Stores Centerbrook Golf Course Earle Brown Heritage Center Administration Convention Center Subtotal Public Utilities & Internal Service Funds Water Utility Sanitary Sewer Utility Storm Drainage Utility Central Garage Subtotal Total Full Time Employees 4.0 4.0 5.0 4.0 4.0 5.0 5.0 5.0 5.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 8.0 8.0 8.0 8.0 8.0 8.0 9.0 9.0 9.0 16.0 16.0 17.0 16.0 16.0 17.0 18.0 18.0 18.0 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 5.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 1.4 1.4 1.4 1.4 2.4 2.4 2.4 2.4 2.4 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 14.0 14.0 14.0 14.0 15.0 15.0 15.0 15.0 15.0 155.0 158.0 161.0 160.0 155.0 158.5 159.5 156.5 156.0 staffsummary201 5 25 I City of Brooklyn Center 2015 Budget Summary of Full Time Employee Positions by Function Proposed 2008 2009 2010 2011 2012 2013 2014 2015 2016 General Government Public Safety Community Services Public Works Community Recreation Enterprise Operations Public Utilities 22.0 22.0 22.0 22.0 21.0 21.5 21.5 18.0 18.0 61.0 61.0 63.0 63.0 63.0 63.0 62.0 62.5 62.0 10.0 13.0 13.0 13.0 12.0 13.0 14.0 14.0 14.0 28.0 28.0 28.0 28.0 27.0 28.0 28.0 28.0 28.0 9.0 9.0 9.0 9.0 6.0 6.0 6.0 6.0 6.0 16.0 16.0 17.0 16.0 16.0 17.0 18.0 18.0 18.0 9.0 9.0 9.0 9.0 10.0 10.0 10.0 10.0 10.0 Total 155.0 158.0 161.0 160.0 155.0 158.5 159.5 156.5 156.0 26 Member introduced the following resolution and moved its adoption: RESOLUTION NO. RESOLUTION APPROVING FINAL TAX CAPACITY LEVIES FOR THE GENERAL FUND AND HOUSING & REDEVELOPMENT AUTHORITY AND MARKET VALUE TAX LEVY FOR THE DEBT SERVICE FUND FOR PROPERTY TAXES PAYABLE IN 2015 WHEREAS, the City Council of the City of Brooklyn Center is the governing body of the City of Brooklyn Center; and WHEREAS, Minnesota Statutes require that the final property tax levy be provided to the Hennepin County Auditor no later than December 30, 2014. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center, Minnesota that a tax is hereby levied on all taxable real and personal property within the City of Brooklyn Center for the purpose and sums as follows: General Fund -Tax Capacity Based General Operations Levy Tax Abatement Levy Subtotal Tax Capacity Levies Debt Service - Tax Capacity Based Public Improvement Bond Levy Total City Levy Housing and Redevelopment Authority - Market Value Based HRA Tax Levy December 1, 2014 Date ATTEST: City Clerk $14,332,534 49.000 $14,381,534 $ 396,496 UA 7,78,080 S 280,460 Mayor The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. Member introduced the following resolution and moved its adoption: RESOLUTION NO._________ RESOLUTION ADOPTING THE 2015 ANNUAL CITY BUDGET WHEREAS, the City Council of the City of Brooklyn Center is required by City Charter and State Statute to annually adopt a budget; and WHEREAS, the City Council has reviewed the proposed governmental and enterprise fund budgets and has determined the budget is adequate to fund all City operations in 2015. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center that revenues and appropriations authorized for 2015 shall be: General Fund Revenues and Other Sources Property Taxes $ 14,381,533 Excess Tax Increment 490,000 Sales Tax-Lodging Receipts 880,000 Licenses and Permits 728,115 Intergovernmental Revenue 1,362,941 Charges for Services 855,000 Fines and Forfeits 316,500 Miscellaneous Revenue 388,512 Total General Fund Revenues $1 9.402.601 Appropriations and Other Uses General Government $ 2,591,201 General Government Buildings 857,958 Police 7,887,235 Fire & Emergency Preparedness 1,266,048 Public Works 3,620,234 CARS 1,539,497 Business & Development 405,043 Building & Community Standards 1,079,067 Convention and Tourism 418,000 Joint Powers Payments 161,000 Risk Management 232,753 Central Services and Supplies 171,500 Reimbursement from Other Funds (1,014,324) Transfer Out-Miscellaneous 187,389 Total General Fund Appropriations 19,402.601 Special Revenue Funds Revenues and Other Sources Economic Development Authority $ 280,460 Housing and Redevelopment Authority 431,182 Community Development Block Grant 150,000 Police Forfeitures 32,267 TIF District #2 10,551 TIF District #3 2,986,886 TIF District #4 466,907 TIF District #5 436,253 City Initiatives Grant Fund 170,789 Total Special Revenue Funds &4,9 62 Appropriations and Other Uses Economic Development Authority $ 280,460 Housing and Redevelopment Authority 436,983 Community Development Block Grant 150,000 Police Forfeitures 67,600 TIF District 92 - TIF District #3 21505,331 TIF District #4 464,683 TIF District #5 435,437 City Initiatives Grant Fund 342,947 Total Special Revenue Funds $4,683,442 Debt Service Funds Revenues and Other Sources 2004C GO Improvement Bonds $104,621 2004D GO TIF Bonds 1,821,050 2006A GO Improvement Bonds 162,981 2008A GO TIF Bonds 149,344 2008B GO Improvement Bonds 311,635 2013A GO TIF Bonds 427,938 2013B GO Improvement Bonds 671,189 Total Debt Service $3,648,758 Appropriations and other Uses 2004C GO Improvement Bonds $93,143 2004D GO TIF Bonds 1,821,050 2006A GO Improvement Bonds 146,408 2008A GO TIF Bonds 149,344 2008B GO Improvement Bonds 281,645 2013A GO Improvement Bonds 427,938 2013B GO Improvement Bonds 942,025 Total Debt Service Capital Project Funds Revenues and Other Sources Capital Improvements Fund $ 1,460,190 Infrastructure Construction Fund 2,137,129 Municipal State Aid (MSA) Fund 891,562 Capital Reserve Emergency 6,948 Street Reconstruction Fund 663,493 Earle Brown Heritage Center Capital Fund 203,193 Technology Fund 140,053 Total Capital Project Funds $5,502568 Appropriations and Other Uses Capital Improvements Fund $ 656,000 Infrastructure Construction Fund 1,371,595 Municipal State Aid (MSA) Fund 2,670,000 Street Reconstruction Fund 2,150,000 Earle Brown Heritage Center Capital Fund 344,000 Technology Fund 127,675 Total Capital Project Funds Enterprise Funds Revenues and Other Sources Brooklyn Center Liquor $ 5,816,002 Centerbrook Golf Course 269,750 Earle Brown Heritage Center 4,669,131 Total Enterprise Funds $10,754 Appropriations and Other Uses Brooklyn Center Liquor (w/o Depreciation) $ 5,881,041 Centerbrook Golf Course (w/o Depreciation) 258,317 Earle Brown Heritage Center (w/o Depreciation.) 4,868,354 Total Enterprise Funds $11,007,712 Public Utility Funds Revenues and Other Sources Water Fund $ 2,983,874 Sewer Fund 5,719,046 Storm Sewer Fund 1,657,390 Street Lighting Fund 451,584 Recycling Fund 325,866 Total Public Utility Funds $ 11,137,760 Appropriations and Other Uses Water Fund (w/o Depreciation) $ 3,985,866 Sewer Fund (w/o Depreciation) 4,605,104 Storm Sewer Fund (w/o Depreciation) 2,491,011 Street Lighting Fund (w/o Depreciation) 441,815 Recycling Fund (w/o Depreciation) 301,181 Total Public Utility Funds S 1L824,977 Member introduced the following resolution and moved its adoption: RESOLUTION NO. RESOLUTION ADOPTING THE 2015-2029 CAPITAL IMPROVEMENT PLAN AND ADOPTING THE 2015 PROGRAM WHEREAS, the City Council of the City of Brooklyn Center determined it is fiscally responsible and necessary to develop an infrastructure plan that coordinates the long- range municipal needs; and WHEREAS, the City Council reviewed and discussed the proposed 2015-2029 Capital Improvement Plan together with the Financial Commission on July 7, 2014; and WHEREAS, the City Council of the City of Brooklyn Center annually adopts a Capital Improvements Program following review and discussion by the City Council; and WHEREAS, attached hereto and incorporated herein by reference as Exhibit A is the documentation for the above referenced 2015-2029 Capital Improvement Plan: and WHERAS, the City Council of the City of Brooklyn Center authorizes the 2015 Program be included in the 2015 Annual City Budget. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center that the 2015-2029 Capital Improvement Plan as set forth in Exhibit A to this Resolution be and hereby is adopted. December 1, 2014 Date Mayor ATTEST: City Clerk The motion for the adoption of the foregoing resolution was duly seconded by member and upon vote being taken thereon, the following voted in favor thereof: and the following voted against the same: whereupon said resolution was declared duly passed and adopted. F,015 CA : siei I The 2015-29 Capital Improvement Plan (CIP) is a planning document that presents a fifteen-year overview of scheduled capital projects to address the City's goals for maintaining public infrastructure. The CIP includes a long-term financing plan that allows the City to allocate funds for these projects based on assigned priorities. The fifteen-year horizon of the CIP provides the City with an opportunity to evaluate project priorities annually and to adjust the timing, scope and cost of projects as new information becomes available. The information contained in this plan represents an estimate of improvement costs based on present knowledge and expected conditions. Changes in community priorities, infrastructure condition and inflation rates require that adjustments be made on a routine basis. A capital improvement is defined as a major non-recurring expenditure related to the City's physical facilities and grounds. The 2015-2029 CIP makes a concerted effort to distinguish between major maintenance projects contained in the City's operating budgets and capital improvement projects financed through the City's capital funds and proprietary funds. Typical expenditures include the cost to construct roads, utilities, parks, or municipal structures. The CIP is predicated on the goals and policies established by the City Council, including the general development, redevelopment, and maintenance policies that are part of the City's Comprehensive Plan. A primary objective of the CIP is to identify projects that further these goals and policies in a manner consistent with funding opportunities and in coordination with other improvement projects. CIP Project Types The Capital Improvement Plan proposes capital expenditures totaling approximately $144 million over the next 15 years for improvements to the City's streets, parks, public utilities, and municipal buildings. A brief description of the four functional areas is provided below. Public Utilities The City operates four utility systems, all of which have projects included in the CIP —water, sanitary sewer, storm drainage, and street lighting. A vast majority of the public utility improvements are constructed in conjunction with street reconstruction projects. The remaining portion of public utilities projects include improvements to water supply wells, water towers, lift stations, force mains and storm water treatment system. Street Improvements Street improvements include reconstruction or resurfacing of neighborhood (local), collector and arterial streets. Proposed improvements include the installation or reconstruction of curb and gutter along public roadways. As noted earlier, street improvements are often accompanied by replacement of public utilities. Park Improvements Park improvements include the construction of trails, shelters, playground equipment, athletic field lighting and other facilities that enhance general park appearance and increase park usage by providing recreational facilities that meet community needs. 2015-2029 Capital Improvement Program P a g e I 1 Capital Maintenance Building Improvements Capital maintenance building improvements include short and long term building and facility improvements identified in the 18-year Capital Maintenance Building Program approved in 2007. CIP Funding Sources Capital expenditures by funding source for the fifteen-year period are shown in Table 1 and Figure 1. Major funding sources are described below. Public Utility Funds Customers are billed for services provided by the City's water, sanitary sewer, storm sewer, and street lighting public utilities. Fees charged to customers are based on operating requirements and capital needs to ensure that equipment and facilities are replaced to maintain basic utility services. Annually the City Council evaluates the needs of each public utility system and establishes rates for each system to meet those needs. Special Assessments Properties benefiting from street and storm sewer improvements are assessed a portion of the project costs in accordance with the City's Special Assessment Policy. Every year the City Council establishes special assessment rates for projects occulTing the following year. Rates are typically adjusted annually to maintain the relative proportion of special assessments to other funding sources. Street Reconstruction Fund The Street Reconstruction Fund provides for the cost of local street improvements along roadways that are not designated as municipal state aid routes. The revenue for this fund is generated from franchise fees charged for the use of public right-of-way by natural gas and electric utility companies. The City's ability to provide adequate revenue for the Street Reconstruction Fund is currently one of the main limiting factors in determining the rate at which future street and utility improvements can be accomplished. Municipal State Aid (MSA) Fund State-shared gas taxes provide funding for street improvements and related costs for those roadways identified as MSA streets. The City has 21 miles of roadway identified as MSA streets and is therefore eligible to receive funding based on this designation. The annual amount available in 2015 is $870,741 and provides for maintenance and construction activities within the City's MSA street system. It is expected that revenues from the State will incrementally increase from 2015 through 2021 due to a phased-in statewide reformulation in allotment computations for cities. Capital Projects Funds The City Council adopted a Capital Project Funding Policy in January 2014, to provide reoccurring sources of funding for the City's Capital Projects Funds. The Policy specifically identifies three main funding sources including: audited year-end General Fund unassigned fund balance above 52% of the next year's General Fund operating budget; audited year-end Liquor Fund unrestricted cash balance that exceeds three and a half months of the next year's operating budget and one year of budgeted capital equipment needs; and Local Governmental Aid (LGA) received in the amount of $650,000 or half of the amount received by the City (whichever is greater). Other funding sources in this category include grants, park district funding, watershed funding, federal and state funding, and county funding as determined on a project by project basis. Typically the City Council has directed these funds towards municipal facilities such as parks, trails, public buildings and other general purpose needs. 2015-2029 Capital Improvement Program P a g e 12 TABLE 1. 2015-2029 Capital Improvement Plan - Summary by Funding Source Total FundingNeed 15-yr Average Annual Funding Need Percent of Total Need Water Utility $21,519,000 $1,434,600 15% Sanitary Sewer Utility $17,189,000 $1,145,933 12% Storm Drainage Utility $12,812,000 $854,133 9% Street Lighting Utility $2,645,000 $176,333 2% Municipal State Aid $10,954,000 $730,267 8% Street Reconstruction Fund $26,608,000 $1,773,867 18% Capital Projects Funds $30,372,000 $2,024,800 21% Special Assessment Collections $22,380,000 $1,492,000 15% TOTAL $144,479,000 1 $9,631,933 100% FIGURE 1. 2015-2029 Capital Improvement Plan - Overview of Project and Funding Sources. Capita rnprovernent Pu by Funding Source tilit- ' I Sanitary Sewer, 12% Capital Projects, Storm Street Reconstruction, MSA, 8% Street Light, 2% 2015-2029 Capital Improvement Program P a g e 13 CP PROJECT AREAS 2015-2022 r.illo;^KLYNTER Mill and Overlay Projects • Freeway Blvd (east of Xerxes( - 2016 57th Avenue (Humboldt to 1-94) -2016 60th Avenue (Shingle Creek Pkwy to Dupont) -2017 France Ave (north of 69th) -2017 o 0 •BellvueArea-2018 o 0 • Southeast Area -2010 Northwest Area -2022 Completed Construction (81.7 Miles -77% since 1093) October 2014 In 0 EI N oz 0.E 'U 0'U0 0a, 00 LL (0 0 C)('4C)04 04(0C o ED (0C'1 2 C/) E" <• 0Z LL aE CU 0 C C ti E00. uIUIua IIIiEEIElili I'll" 111111iiigi II jIiiiI 0a) LL a0 0 Ellil Elilil IlIllIul' 'S ••..• •S,' 0)0)00) LU 0 00) oZ aE 0 0.Lu C-) <•0 LL 0C U-a). 0a) PROJECT DESCRIPTIONS 2015 - 2029 Capital Improvement Program City of Brooklyn Center Street and Utility Improvement Projects 63'd Avenue Reconstruction Freeway Boulevard Improvements (West of Xerxes Avenue) Freeway Park Area Improvements Freeway Boulevard Mill and Overlay (East of Xerxes Avenue)57 th Avenue Mill and Overlay (Humboldt Avenue to 1-94) Palmer Lake West Area Improvements 1 " Avenue Improvements (at Brooklyn Boulevard) 69th Avenue Mill and Overlay (Shingle Creek Pkwy to Dupont Avenue) France Avenue Mill and Overlay (North of 69thi Ave) Evergreen Park Area Improvements Humboldt Ave N (CR 57) Reconstruction (53rd to 57t) Bellvue Area Mill and Overlay Firehouse Park Area Improvements Southeast Area Mill and Overlay Interstate Area Improvements Logan, Lilac and 59th Avenues Reconstruction Grandview Park Area Improvements Ryan Lake Industrial Park Area Improvements Northwest Area Mill and Overlay Knox, James and 54th Avenue Area Improvements 51st Avenue Improvements (West of France Avenue) 50th Avenue Improvements (France Avenue to Drew Avenue) 53rd Avenue North Improvements Lyndale Avenue Improvements Woodbine Area Improvements Humboldt Avenue North Improvements Orchard Lane East Improvements Orchard Lane West Improvements Meadowlark Gardens Area Improvements 53rd and Xerxes Avenue Improvements St. Alphonsus Area Mill and Overlay 67 01 and James Avenue Mill and Overlay John Martin Drive Mill and Overlay 68th and Lee Avenue Mill and Overlay 73rd Avenue Mill and Overlay (Humboldt Avenue to Camden Avenue) 66th and Camden Avenue Mill and Overlay Earle Brown Drive Area Improvements Garden City Central Area Improvements Miscellaneous Water Main and Sanitary Sewer Improvements Lift Station I Wet Well Improvements/Rehabilitation Sanitary Sewer Lining along Mississippi River Water Tower No. 3 Painting Water Tower No. 2 Painting Lift Station No. 2 Rehabilitation Project Summaries P a g e 19 2015-2029 Capital Improvement Program Well Motor Speed Controls (VFD) Wells 4, 5, 7, 9 and 10 Water Tower No. 1 Painting Lift Station No. 9 Forcemain Replacement Lift Station No. 1 Rehabilitation Lift Station Nos. 8 and 9 Rehabilitation Street Light and Traffic Signal Improvements Intersection Improvements/Traffic Signal System Replacement at Avenue and TH 252 - 2016 Traffic Signal System Rehabilitation (69th and France Avenues) - 2017 Earl Brown and Opportunity Area Street Light Replacement - Ornamental Lighting at Nodes - 2017 Capital Maintenance Building Plan Yearly Capital Maintenance Building Plan Projects Storm Water Improvements Storm Water Management Basins Storm Water Pond 60-001 Storm Water Pond 50-001 Park and Trail Improvements Centennial Park Tennis Court Resurfacing - 2015 Centennial Park Softball Field Dike Freeway Park Trail Replacement Brooklyn Boulevard City Entrance Signs 69 th Avenue Greenway & Cahlander Park Fence Rehabilitation Northport Park Lighting Replacement Project Northport Park Shelter West River Road Trail Improvements Evergreen Park Trail Improvements Centennial Park East Trail Improvements Play Ground Equipment Replacement (programmed for 3 separate years) Palmer Lake Trail Reconstruction Miscellaneous Tennis Court Resurfacing Hockey Rink Rehabilitation and Replacements Irrigation Systems Rehabilitation and Replacements Centennial Park Softball Field Regrading Improvements Softball/Baseball Fence Replacement 69thi Avenue Trail Reconstruction Evergreen Park Score Board Improvements 69t1 Avenue Landscaping Rehabilitation Park Trail and Lot Lighting Replacement Centennial Ball Field Score Board Replacement Miscellaneous Projects and Improvements Azelia Avenue and Northport Drive Retaining Wall Replacements Drive Retaining Wall Replacements (Miscellaneous Locations) Brooklyn Boulevard Corridor ReconstructionlComplete Street Improvements Project Summaries P a g e 10 2015-2029 Capital Improvement Program 63rd Avenue North Reconstruction 2015 The 63rd Avenue project area extends from the west City Limits to Brooklyn Boulevard. The project area contains a total of 5,709 linear feet of local streets. The neighborhood consists of approximately 55 residential properties (RI to R4) and 1 commercial zoned property (C2). Streets This segment of roadway is designated as a Municipal State Aid Route. 63 Avenue was originally constructed in 1965. The existing street is 43 feet wide with concrete curb and gutter. Proposed street improvements consist of the replacement of curb and gutter to improve drainage, full depth replacement of bituminous street pavement and complete sidewalk replacement. Water main The existing water main in the 63 td Avenue project area consists of 6-inch and 10-inch diameter cast iron pipe (CIP) installed between 1956 and 1958. A condition survey must be conducted for the existing water system in the project area to determine the extent of corrosion. Water records indicate three main breaks have occurred within the project corridor, and one property has experienced a frozen water service in past winters. The water main is in fair condition based on current maintenance records. The current project cost estimate includes replacement of approximately 50 percent water main and miscellaneous hydrants as necessary in the project area. Sanitary Sewer The existing sanitary sewer consists of 8-inch diameter vitrified clay pipe lateral sewers. These sewers were originally installed between 1956 and 1960. Approximately 35 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as fair. The current project cost estimate includes complete replacement of the sanitary sewer. Storm Sewer 63 Avenue contains two storm drainage systems. The first drainage system consists of 12-inch and 15-inch diameter reinforced concrete pipe. This system flows to Orchard Avenue and then to the storm drainage pond in Cahlander Park. The second storm system ranges from 18-inch to 36-inch reinforced concrete pipe. This system drains to Brooklyn Boulevard and then to Shingle Creek. The current project cost estimate includes replacing a majority of catch basin structures, castings and various pipe laterals. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 14 wood poles with 14 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 11 2015-2029 Capital Improvement Program Freeway Blvd Improvements (West of Xerxes Avenue) 2015 The Freeway Blvd project area extends from Shingle Creek Pkwy on the north and Xerxes Avenue on the east. The project area contains a total of 1,073 linear feet of local streets. The neighborhood consists of three multi-family residential properties (R3) and two commercial zoned properties (Cl). Streets This section of Freeway Blvd was originally constructed in 1981. The existing street is 32 feet wide with concrete curb and gutter. The street pavement exhibits a moderate rate of deterioration. The current cost estimate assumes street improvements that consist of approximately 30 percent curb replacement, 10 percent sidewalk replacement, and full depth pavement replacement. Water main There is no water main in the Freeway Blvd project area. Sanitary Sewer There is no sanitary sewer in the freeway Blvd project area. / / I - I1 2li 1 / \\ JJ / Storm Sewer The storm sewer on Freeway Blvd consists of 12-inch to 24-inch diameter reinforced concrete pipe that drains to Shingle Creek. This storm sewer was installed in 1981. The current project cost estimate includes replacing structure castings and isolated pipe laterals as necessary within the project area. Street Lighting The current cost estimate includes replacing the two wood poles with two fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 112 2015-2029 Capital Improvement Program Freeway Park Area limp rovements 2015 The Freeway Park project area extends from Grimes Ave to Xerxes Ave and from 69t11 Ave to Interstate 94. The project area includes a total of approximately 13,859 feet of local streets. The neighborhood consists of approximately 207 residential properties and one multi-family property. Streets The majority of the streets in the project area were originally constructed between 1967 and 1968 with the exception of the 69t1, Avenue SM AM M All B 1rt Service Road. Existing streets are generally 30 feet wide with no curb and gutter. Poor surface drainage and low stability subgrade material has resulted in deteriorated pavement throughout the neighborhood. The 69th Avenue service road was reconstructed in 1993. The road is 30 feet wide with concrete curb and gutter. In all areas with pavement older than 1993, proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. On the 69 01 Avenue Service Road, proposed street improvements include approximately 20 percent curb replacement and full depth pavement replacement. Water main Existing water main in the Freeway Park area consists of 6-inch and 16-inch diameter cast iron pipe installed between 1956 and 1960, and 16-inch diameter ductile iron pipe (DIP) installed in 1993. Existing water main along France Avenue consists of 16-inch cast iron pipe installed in 1956. This water main is trunk feeder from Water Tower No. 1 on the corner of 69' Avenue and France Avenue. Higher corrosion rates have been noted within a majority of the project area. Water records indicate 17 main breaks have occurred within the area. The current cost estimate assumes complete water main replacement in the project area except within the 690i Avenue Service Road. Sanitary Sewer Existing sanitary sewer within the neighborhood consists of 8-inch diameter vitrified clay pipe originally installed between 1956 and 1961. A sanitary sewer trunk line consisting of 21-inch diameter corrugated metal pipe runs along Ewing Avenue, 68th Avenue and Drew Avenue. A cured-in-place liner was installed along the 21 -inch diameter trunk sanitary sewer as part of project 1995-11. This portion of the sanitary sewer collection system is not proposed to be replaced with the project. Approximately 50 percent of the remaining sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. At least 50 percent of the sewer system is in poor condition. The current cost estimate assumes replacement of the 8-inch diameter sanitary sewer pipes and access structures and cured-in-place lining of the sanitary sewer on the 69th Avenue Service Road. Storm Sewer The Freeway Park improvement area consists of small diameter storm sewer lines draining to 69thj Avenue and Interstate 94. The existing storm sewer ranges in size from 12-inch to 21-inch diameter reinforced concrete pipe. The current cost estimate assumes replacement of the storm sewer in the improvement area to increase conveyance capacity and minimize local flooding during larger storm events. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 18 wood poles with 18 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 113 2015-2029 Capital Improvement Program Freeway Boulevard Mill and Overlay (East of Xerxes Avenue) 2016 The Freeway Boulevard project area extends from Xerxes Avenue to the Shingle Creek bridge. The project area contains a total of 2,826 linear feet of local streets. The neighborhood consists of approximately 9 commercial/industrial properties. Streets / / N LJ This segment of roadway is designated as a Municipal State Aid Route Freeway Blvd was originally II constructed in 1974 The existing street is generally flcvJT!--L / 45 feet wide with concrete curb and gutter. The street ------------------------------------------ pavement exhibits a moderate rate of deterioration due to higher volumes of traffic. The current cost estimate assumes street improvements that consist of approximately 20 percent curb replacement, 20 percent sidewalk replacement, 25 percent concrete apron replacement and a 3-inch mill and overlay of the bituminous pavement. Water main The existing water main in the Freeway Boulevard project area consists of 12-inch diameter cast iron pipe installed in 1974. The water main is in good condition based on current maintenance records. The current project cost estimate includes casting replacement only. Sanitary Sewer The existing sanitary sewer along the west half of the project area consists of 15-inch diameter reinforced concrete pipe installed in 1996. The existing sanitary sewer on the east half of the project area consists of 8-inch diameter vitrified clay pipe installed in 1974. The condition of the sanitary sewer system within the neighborhood is rated as good. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer on Freeway Boulevard consists of 12-inch to 30-inch diameter reinforced concrete pipe that drains to Shingle Creek. This storm sewer was installed in 1974. The current project cost estimate includes replacing structure castings as necessary within the project area. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the six wood poles with six fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 114 2015-2029 Capital Improvement Program 57th Avenue Mill and Overlay (Humboldt Avenue to ]I94) 2016 The 57th Avenue project area includes 57th Avenue from Humboldt Avenue to Interstate 94. The project area contains a total of 2,894 linear feet of local streets. The neighborhood consists of 42 residential properties. Streets570' Avenue is designated as a HHhLJi_LrlLiHHflHLtiLiL/i/T 1 H '/7/ H ci I' LiHr11_, tA-i-----'r---$i I ; II !I --1 -i 3f—L çLIII25TH I J- H I - I I 1 iH L , \i- HIVIIIIHLIpOI 3LaLC J-tlU I\OLlle. This project area was reconstructed in 1996. The road is 38 feet wide with concrete curb and gutter. The roadway surface has prematurely failed and excessive potholes have occurred in connection with the issues with the roadway chip sealcoat application. The current cost estimate assumes street improvements that consist of minor concrete repairs and a 2-inch mill and overlay. Water main The existing water main in the project area consists of 6-inch diameter ductile iron pipe (DIP) installed in 1996. The current project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter and 10-inch diameter poly-vinyl chloride (PVC) installed in 1998 and 1999. The current project cost estimate includes casting replacement only. Storm Sewer The existing storm sewer in the project area consists of a trunk storm line that flows east to the Mississippi River. It contains 21-inch to 36-inch diameter reinforced concrete pipe (RCP) installed in 1996. The current project cost estimate includes casting replacement only. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 115 2015-2029 Capital Improvement Program Palmer Lake West Area Improvements 2016 The Palmer Lake West project area extends from the north City limits to 69t1 Avenue and from France Avenue to West Palmer Lake Dr. The total project length is 11,621 feet. The neighborhood consists of approximately 198 residential properties. Streets The majority of the streets in the project area were originally constructed in 1956 and 1957. Existing streets are generally 30 feet wide with no curb and gutter. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement condition rating is fair to poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. Water main The existing water main is 6-inch diameter cast iron pipe installed in 1956 and 1957. A majority of the existing water main is believed to have a cement based internal liner. The corrosion rate within the project area has not been thoroughly documented at this time. However, the project area has a history of water main breaks along West Palmer Lake Dr., Ewing Avenue and Woodbine Lane. Water records indicate nine main breaks have occurred within the area, and five properties have experienced frozen water service in past winters. The current project estimate includes complete water main replacement. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1956 and 1957. Lift Station No. 3 is located in the project area on West Palmer Lake Drive. The lift station was reconstructed in 1982, the force main was replaced in 1992, and the control cabinet was replaced in 2003. Approximately 75 percent of the sanitary sewer in the project area is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as poor. Complete replacement of all sanitary sewer pipes and access structures are proposed as part of the project. Storm Sewer An expansion of the storm drainage system within the project area is necessary to reduce local flooding and preserve street pavement. A majority of the storm water runoff from the project area is collected in the existing storm sewer system and conveyed to a regional storm water management pond adjacent to Palmer Lake. A trunk storm sewer line extends along back property lines north of Urban Avenue. This line consists of 54-inch diameter reinforced concrete pipe installed in 1956. Expansion of the existing storm sewer system and higher capacity will be needed to minimize local flooding. The current project cost estimate assumes reconstruction of the existing storm sewer system within the street right-of-way, but does not include the replacement of the 54- inch diameter trunk storm sewer within the rear yards. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 18 wood poles with 18 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 116 2015-2029 Capital Improvement Program 51 " Avenue Improvements (at Brooklyn Boulevard) 2016 The project area extends from the north property line of the Malmborg's Garden Center south and east to Xerxes Avenue. The total project length is 680 feet. The neighborhood consists of three residential properties (RI), two multi-family properties (RI) and one commercial property. Streets 51st Avenue east of Brooklyn Blvd is a designated Municipal State Aid Route. The streets in the project area were originally constructed in 1964. 51st Avenue east of Brooklyn Boulevard is 30 feet wide with no curb and gutter. The service road along Brooklyn Boulevard is currently 25 feet wide with curb and gutter on the west side of the road. The street pavement is deteriorated throughout most of the project area. The 2WLi A VE N L..U 0 L - -- UI :sr AVE N z ½ ½ ½U overall pavement condition rating is fair to poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. Water main The existing water main in the project area is 3-inch diameter cast iron pipe (CIP) installed in 1964. The current project estimate assumes complete replacement of the water main within the project area. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1964. Complete replacement of all sanitary sewer pipes and access structures are proposed as part of the project. Storm Sewer The project area consists of two storm structures that convey water to the east into Miimeapolis. The current cost estimate includes minor storm sewer repairs. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 117 2015-2029 Capital Improvement Program 69th Avenue Mill and Overlay (Shingle Creek Pkwy to Dupont Avenue) 2017 L1-'iLr r jLJLJ-j--- - - jll[_ Li Li1 LJ I liii— - - I L I H Jui /LH N t L_\\ It \ __ -- L '\\ aE The 69t1i Avenue North mill and overlay project area extends from Shingle Creek Pkwy to Dupont Avenue North. The project area contains a total of 6,902 linear feet of local streets. The neighborhood consists of approximately 30 residential properties (RI), 1 R3 property, 5 R5 properties, 6 industrial (Ii) and 5 commercial (C2) properties. Streets This segment of roadway is designated as a Municipal State Aid Route. This section of 69t 1 Avenue was reconstructed in 1996. The existing street ranges from 30 to 50 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of complete bituminous trail replacement, approximately 20 percent curb replacement, 20 percent sidewalk replacement, 25 percent apron replacement and a 2-inch mill and overlay. Water main The existing water main in the 69 't' Avenue North project area consists of 16-inch diameter cast iron pipe (CIP) installed in 1960 and 24-inch diameter ductile iron pipe (DIP) installed in 1996. Based on current maintenance records, there have been three water main breaks in this area. The current project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer on 69 th Avenue consists of 4-inch vitrified clay pipe (VCP) installed in 1962, 8-inch diameter VCP installed between 1961 and 1969 and 12-inch diameter VCP installed in 1969. The current project cost estimate includes casting replacement only. Storm Sewer The existing storm sewer on the west half of the 69' Avenue project consists of 15-inch to 18-inch diameter reinforced concrete pipe (RCP) that drains to Shingle Creek. The east half of the 69thi Avenue project consists of 12-inch to 30-inch diameter reinforced concrete pipe (RCP) that drains to the Mississippi River. All of the storm sewer on 69th Avenue was installed in 1996 when the road was reconstructed with the exception of 250 feet of 30-inch RCP installed in 1969. The current project cost estimate includes casting replacement as needed. Street Lighting The current cost estimate includes replacing the eight wood poles with eight fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 118 2015-2029 Capital Improvement Program France Avenue Mill and Overlay (North of 69th Avenue) 2017 The France Avenue North project area extends from 73 Avenue to 691h Avenue. The project area contains a total of 2,635 linear feet of local streets. The neighborhood consists of approximately 59 residential properties (RI). Streets This segment of roadway is designated as a Municipal State Aid Route. This section of France Avenue was reconstructed in 1997. The existing street is generally 32 feet wide with concrete curb and gutter. The roadway surface has prematurely failed and excessive potholes have occurred in connection with the issues with the roadway chip sealcoat application. The current cost estimate assumes street improvements that consist of approximately 20 percent curb replacement, 20 percent sidewalk replacement, 25 percent apron replacement and a 2 inch mill and overlay. Water main 73RP AVE 24 cnY OF e000KOR -- 72RO AVE I -- 1ISI AVE N -- 114 AVE Il - - The existing water main on France Avenue North consists of 14- inch diameter ductile iron pipe (DIP) installed in 1997. The current project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer on France Avenue consists of 8-inch vitrified clay pipe (VCP) with a cured-in-place pipe liner installed in 1997 and an 8-inch diameter poly-vinyl chloride (PVC) installed in 1997. The current project cost estimate includes casting replacement only. Storm Sewer The existing storm sewer on France Avenue consists of 12-inch to 18-inch and 48-inch diameter reinforced concrete pipe (RCP) that drains to Palmer Lake. The storm sewer in the project area was installed in 1997 when the road was reconstructed with the exception of the 48-inch RCP installed in 1968. The current project cost estimate includes casting replacement only. Street Lighting The current cost estimate includes replacing the two wood poles with two fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 119 2015-2029 Capital Improvement Program Evergreen Park Area Improvements 2017 The Evergreen Park project area extends from Humboldt Avenue to State Highway 252 and from 69 th Avenue to 73'd Avenue. Dupont Avenue is not included in the project area. The total project length is 16,996 feet. The neighborhood consists of approximately 214 residential properties (RI to R5). Streets 70th Avenue is designated as a Municipal State Aid Route. Most of the streets in the project area were originally constructed between 1963 and 1966. Existing streets are generally 30 feet wide with no 7(\t11 fr(,ni fliir,nnt Avenue to Hwy 252 hascurb IIU ULL1. / 'J v concrete curb and gutter and ranges in size from 30 to 65 feet wide. 70th Avenue was constructed in 1982. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement condition rating is fair to poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. Water main The Evergreen Park project area contains a complex water main system. This area contains five municipal wells and one water tower. The existing water main ranges in size from 6-inch diameter cast iron pipe to 30-inch steel pipe. The main line water main in the residential areas generally consists of 6-inch cast iron pipe installed between 1961 and 1965. A majority of the existing water main is believed to have a cement based internal liner. There is a history of water main breaks along 72 id Avenue, Woodbine Lane and Camden Avenue. Water records indicate 23 main breaks have occurred within the neighborhood, and 10 properties have experienced frozen water service in past winters. The project design process must include a detailed hydraulics study using the City's water distribution computer model to determine any warranted modifications to water main sizes and configuration. The current project estimate assumes replacement of the older 6-inch to 10-inch cast iron water main. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1961 and 15-inch reinforced concrete pipe installed in 1960. The south portion of the project area contains 8-inch diameter VCP installed in the 1958 and 1960. Approximately 25 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as fair. The current cost estimate includes complete replacement of the sanitary sewer. Storm Sewer A majority of the storm water runoff from the project area is conveyed to the Mississippi River. Emerson Avenue, Bryant Avenue and Camden Avenue have storm drainage systems that flow to 701 Avenue. and then to the Mississippi River. The trunk line on 70th Avenue consists of pipe ranging in size from 42-inch to 66-inch reinforced concrete pipe installed in 1960. The current project cost estimate assumes complete reconstruction of the existing storm systern in the project area. The condition of the trunk storm sewer pipe along 70 t11 Avenue must be evaluated to determine the remaining service life. The project estimate includes complete storm sewer replacement and construction of a storm water pond located to the north of 70t1, Avenue and east of Camden Avenue to treat regional storm water runoff prior to discharging to the Mississippi River. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 20 wood poles with 20 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 120 2015-2029 Capital Improvement Program Humboldt Avenue North (CR 57) Reconstruction (53 to 57t1) 2,018 The Humboldt Avenue project area extends from 53rd Avenue to 57thi Avenue. The total project length is approximately 2,660 linear feet. The neighborhood consists of approximately 56 residential properties. Streets This segment of roadway is a Hennepin County Roadway. Humboldt Avenue was originally constructed between 1966 and 1969. Existing streets are generally 36 feet wide with no curb and gutter. The street pavement is deteriorated due to the age of the pavement and inadequate drainage. This project is included in the City's CIP due to a potential cost sharing agreement for the street and drainage improvements and funding for water main and sanitary sewer improvements as described below. Water main The existing water main in the Humboldt Avenue project area consists of 6-inch diameter cast iron pipe (CIP) installed in 1966. A condition survey must be conducted for the existing water systern in the project area to determine the extent of corrosion. The water main is in fair condition based on current maintenance records. The current project cost estimate assumes replacing approximately 75 percent of the water main. Sanitary Sewer The existing sanitary sewer consists of 8-inch diameter vitrified clay pipe lateral sewers. These sewers were originally installed in 1952. Sanitary sewer between 53 and 55thi Avenues is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The current project cost estimate includes replacement of approximately 100 percent of the sanitary sewer. Storm Sewer The storm sewer on Humboldt Avenue consists of 18-inch diameter corrugated metal pipe that drains to a trunk line along 55t1i Avenue. This storm sewer was installed in 1952. The current project cost estimate includes replacing 100 percent of the storm sewer. The cost estimate assumes that Brooklyn Center may contribute to a portion of the storm drainage cost for the project. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the three wood poles with three fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 121 2015-2029 Capital Improvement Program Beilvue Area Mill and Overlay 201 The Beilvue project area extends from Dupont Avenue to 4111 Street and 53rd Avenue to 55th Avenue. The project area also includes 55 th Avenue from James Avenue to 0 1 Street. The area contains a total of 10,858 linear feet of local streets. The project area consists of approximately 165 residential properties, three multi- family properties, two business properties and one church property. Streets Dupont Avenue is designated as a Municipal State Aid Route. The Belivue area was last reconstructed in 1998. The streets are generally 30 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 10 percent concrete replacement and a 2-inch mill and overlay. Water main Approximately 15 percent of the water main in the Belivue area was replaced with ductile iron pipe (DIP) in 1998 when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch to 10- inch diameter CIP and 16-inch steel water main installed between 1964 and 1982. Water records indicate seven main breaks have occurred within the neighborhood, and seven properties have experienced a frozen water service in past winters. The current project cost estimate includes casting replacement only. Sanitary Sewer All sanitary sewer in the project area was replaced with 8-inch and 10-inch poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1998. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer in the Bellvue project area flows to two trunk lines on 55th Avenue and then east to the Mississippi River. Approximately 75 percent of the storm sewer in this area was installed in 1998, including one of the trunk lines on 55111 Avenue. This storm sewer consist of 12-inch to 54-inch diameter pipe. The remaining storm sewer is a second trunk line that runs along 551 Avenue. This trunk line consists of 30-inch to 42-inch reinforced concrete pipe (RCP) that was installed in 1952. The current project cost estimate includes casting replacement only. Street Lighting The existing street light system is overhead power, with a combination of wood poles with cobra head light fixtures and fiberglass poles with rectilinear fixtures. The current cost estimate includes no street light replacement. Project Summaries P a g e 122 2015-2029 Capital Improvement Program Firehouse Park Area Improvements 2018 The Firehouse Park project area extends from 69t1, Avenue to Interstate 94 and from Humboldt Avenue to Highway 252. Dupont Avenue and 65thi Avenue are not included in the project area. The total project length is 21,456 feet. The neighborhood consists of approximately 305 single family residential properties (RI) and 14 multi-family properties (R4 and R5). Streets 67di Avenue is designated as a Municipal State Aid Route. The majority of the streets in the project area were originally constructed between 1964 and 1967. Existing streets are generally 30 feet wide with no curb and gutter. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement condition rating is poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. - - - ---vk it-it -; 'I -L i - II-- - -- ----- - Water main The existing water main in the project area is 6-inch and 8-inch diameter cast iron pipe installed between 1961 and 1969. In 1974, a 16-inch diameter ductile iron water main was installed along 64th Avenue. A majority of the existing water main is believed to have a cement based internal liner. The corrosion rate within the project area has not been thoroughly documented at this time. Water records indicate 13 main breaks have occurred within the neighborhood. The current project estimate includes replacement of approximately 60 percent of the water main within the project area. The estimated water main costs will need to be refined by conducting further field inspections. Sanitary Sewer The sanitary sewer in the north portion of the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed between 1961 and 1968 and between 1971 and 1974. Approximately 25 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as fair. The current project estimate includes complete replacement of the sanitary sewer pipes and access structures and cured-in-place lining of the sanitary sewer that follows the 5 t11 Street easement between 66th Avenue and 67d1 Avenue. Storm Sewer A majority of the storm water runoff from the project area is collected in the existing storm sewer system and conveyed to the trunk storm sewer line on 65 t11 Avenue, and then to the Mississippi River. Runoff from the portion of the project area north of 68thi Avenue is conveyed to the trunk storm sewer line on 69thi Avenue. The current project cost assumes reconstruction and expansion of the residential storm sewer system, but does not include replacement of the trunk storm sewer along 65t1 and 69thi Avenues. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 21 wood poles with 21 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries a g e 123 2015-2029 Capital Improvement Program Southeast Area Mill and Overlay 2019 Tr•Li fjH r HJL - - I -HL -i - I WrIA - - - H - 6TH A N fl LHH. T LILT J;L ti, L L IHç 541!L AVE - L. --It - \ \ K LAiL LJLL - — — -- 5AH AVE N - The Southeast project area extends from Interstate 94 to Irving Ave between 57t1i Avenue and 55th Avenue, and from Dupont Avenue to Irving Avenue between 55th Avenue and 53td Avenue. The area contains a total of 20,364 linear feet of local streets. The project area consists of approximately 401 single family residential properties and 6 multi-family properties. Streets Dupont Avenue is designated as a Municipal State Aid Route. The Southeast area was last reconstructed in 1999. Diincmt Avenue is 33 feet wide and the remaining streets are generally 30 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 10 percent concrete replacement and a 2-inch mill and overlay. Water main Approximately 2 percent of the water main in the Southeast area was replaced with ductile iron pipe (DIP) in 1999 when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch and 8- inch diameter ClIP installed between 1964 and 1969. Water records indicate three main breaks have occurred within the neighborhood, and six properties have experienced frozen water services in past winters. The current project cost estimate includes casting replacement only. Sanitary Sewer All of the sanitary sewer in the project area was replaced with 8-inch and 10-inch poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1999. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer in the Southeast project area flows to two trunk lines on 55th Avenue and then east to the Mississippi River. Approximately 93 percent of the storm sewer in this area was installed in 1999 when the neighborhood was reconstructed. This storm sewer consist of 12-inch to 27-inch diameter pipe. The remaining storm sewer throughout the project area consists of 12-inch and 18-inch reinforced concrete pipe (RCP) that was installed between 1952 and 1979. The current project cost estimate includes casting replacement only. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 124 2015-2029 Capital Improvement Program Interstate Area Improvements 2019 The Interstate project area extends from Interstate 94 to 59th Avenue and from Dupont Avenue to Lyndale Avenue. The total project length is 17,343 feet. The neighborhood consists of approximately 235 residential properties (RI). Streets The majority of the streets in the project area were originally constructed in 1968 and 1969. Existing streets are generally 30 feet wide with concrete curb and gutter. The street pavement is showing signs of distress throughout most of the neighborhood. Proposed street improvements consist of the replacement of curb and gutter as necessary and placement of bituminous street pavement. Water main 1i::1-j'E1-F_E:J The existing water main in the project area consists of 6-inch and 8-inch diameter cast iron pipe installed in 1969. Colfax Avenue contains a 24-inch I steel water main installed in 1964. A majority of the existing water main is ] believed to have a cement based internal liner. There is no history of water - main breaks in the project area. Three properties have experienced frozen -t I I I-i 11ñ111TFTJ / water service in past winters. In 2019, the water main system will be in service for 50 to 55 years. Cast iron water main is highly vulnerable to leaks and breaks when disturbed by replacement of adjacent sanitary sewer. The current project estimate assumes complete replacement of the water main to facilitate the sanitary sewer replacement noted below. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1960. Approximately 90 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as poor. Complete replacement of all sanitary sewer pipes and access structures are proposed as part of the project. Storm Sewer A majority of the storm water runoff from the project area is collected in the existing storm sewer system and conveyed to the storm trunk line on 59 0' Avenue and then to the Mississippi River. The trunk storm sewer along 59 01 Avenue and an in-line water quality treatment device was installed in 2009 as part of the Aldrich Neighborhood Street and Utility Improvement project. The current project cost estimate assumes complete reconstruction of the storm drainage system within the neighborhood due to the need to increased capacity of local storm sewers and the expansion of the system to address minor local flooding issues. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 15 wood poles with 15 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 125 2015-2029 Capital Improvement Program Logan, Lilac and 59th Avenues Reconstruction 2020 This project area includes Logan Avenue from 57thi Avenue to Lilac Drive N, 5V1 Lilac Drive N to Dupont Avenue and Lilac Drive N from Logan Avenue to 59 01 Avenue. The total project length is 3,761 feet. The neighborhood consists of approximately 19 residential properties (RI to R5) and 5 commercial zoned properties (Cl and C2). Streets The entire project area is designated as a Municipal State Aid Route. The majority of the streets in the II (1 project area were originally constructed in 1966. The existing roads are 30 to 35 feet wide. Logan Avenue and Lilac Drive N have concrete curb and gutter, and 59th Avenue has no curb. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement condition rating is fair to poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. Water main The existing water main along Logan Avenue and Lilac Drive N is 10-inch diameter cast iron pipe installed in 1965 and 16-inch diameter cast iron main along 59 01 Avenue installed in 1969. A majority of the existing water main is believed to have a cement based internal liner. The corrosion rate within the project area has not been thoroughly documented at this time. Utility records indicate that there has been one water main break along Logan Avenue. However, the Public Utilities Division will need to excavate and inspect various fittings to determine the extent of water main replacement that is warranted. The current project estimate includes replacement of water main along Logan Avenue and Lilac Drive N only. Sanitary Sewer The only sanitary sewer in the project area runs along Logan Avenue. This sanitary sewer was lined with cured- in-place pipe (CIPP) in 2005. Manhole casting replacement is the only proposed sanitary sewer improvement for the project. Storm Sewer A majority of the storm water runoff from the project area is collected in the existing trunk line along 591 Avenue. This line consists of 24" to 36" corrugated metal pipe. A second storm lines runs south along Logan Avenue to 57th Avenue. This line consists of 21" to 42" RCP installed in 1988. The current project cost estimate assumes replacement of the corrugated metal pipe alone Avenue as part of the scheduled neighborhood improvements. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the three wood poles with three fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 126 2015-2029 Capital Improvement Program Grandview Park Area 1[rnprovemellts 2020 The Grandview Park project area extends Interstate 694 to 57th Avenue and from Logan Avenue to Dupont Avenue. The total project length is 20,821 feet. The neighborhood consists of approximately 345 residential properties (RI) and 4 multi-family properties (R6). Streets The majority of the streets in the project area were originally constructed between 1964 and 1969. Existing streets are generally 30 feet wide with no curb and gutter. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement condition rating is fair to poor. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement."U Water main I I The existing water main in the north portion of the project area is 6-inch and 8-inch diameter cast iron pipe installed between 1964 and 1969. A 16-inch steel water main runs along Emerson Avenue from 57 '11 Avenue to 59th Avenue. A majority of the existing water main is believed to have a cement based internal liner. Water records indicate two main breaks have occurred within the neighborhood, and two property has experienced a frozen water service in past winters. The current project estimate includes replacement of approximately 50 to 75 percent of the water main within the project area. The 16-inch steel water main along Emerson Avenue potently could be replaced with C900 plastic water main. Sanitary Sewer The sanitary sewer in the north portion of the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1960 and 1963. Approximately 50 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as fair to poor. The current project estimate includes replacement of approximately 50 to 75 percent of the sanitary sewer system within the project area. Storm Sewer A majority of the storm water runoff from the project area is collected in the existing storm sewer system and conveyed to the trunk storm sewer line on 59 "' and then to the Mississippi River. A portion of the existing storm sewer system within the project area could be salvaged, although it is anticipated that expansion of the system and additional conveyance capacity will be needed to minimize local flooding. The current project cost estimate includes replacement of 75 percent of the local drainage system within the neighborhood. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 25 wood poles with 25 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 127 2015-2029 Capital Improvement Program Ryan Lake Industrial Park Area Improvements 2021 The Ryan Lake project area includes Lilac Drive N from 48l Avenue to the dead end, 48thj Avenue and Dusharme Drive from Drew Avenue to the dead end and 47' Avenue from Drew Avenue to the dead end. The total project length is 1,932 feet. The neighborhood consists of approximately 12 industrial properties and 3 multi-family properties (R5). - 48111 AIL M Streets The majority of the streets in the project area were originally 1 i nco .,,-1 1 nn T1 ,tin tnrtinii of 47th Avenueconstructed 111 158 aiiu 17JV. and Drew Avenue were reconstructed in 2002. The western portion of 48 " Avenue was reconstructed in 2005. The remaining street sections are 25 to 40 feet wide with no curb and gutter. The street pavement is deteriorated and in poor condition. Proposed street improvements consist of the reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of bituminous street pavement. Water main The existing water main on Lilac Drive N, 48 th Avenue and Dusharme Drive consists of 10-inch diameter cast iron pipe (C1P) installed in 1958. The water main on 47th Avenue consists of 6-inch cast iron pipe installed in 1960. Water records indicate one main break has occurred within the neighborhood. The current project estimate assumes complete replacement of the water main in the project area. The cost estimate also includes the cost of jacking new water main under the railroad tracks from Dusharme Drive to 49thi Avenue. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1960. The sanitary sewer along 47th Avenue and 48 61 Avenue is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated as fair to poor. Complete replacement of all sanitary sewer pipes and access structures are proposed as part of the project. Storm Sewer A majority of the storm water runoff from the project area is collected in the existing storm sewer system and conveyed to Ryan Lake. Runoff from Lilac Drive N is conveyed to storm drainage ditches along Highway 100. The current project cost estimate assumes reconstruction of all of the existing storm sewer system. The cost estimate also includes installation of a small storm water management pond at the intersection of 48C' Avenue and Dusharme Drive within City owned property adjacent to Ryan Lake. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the two wood poles with two fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 128 2015-2029 Capital Improvement Program Northwest Area Mill and Overlay 2022 The Northwest project area extends from Toledo Avenue east to Perry Avenue and from 71St Avenue south to 69th Avenue. The total project length is 6,819 feet. The neighborhood consists of 124 residential properties (RI) and two school owned properties. Streets The streets in the project area were reconstructed in 1994. The streets are 30 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of minor concrete repairs and a 2 inch mill and overlay. Water main When the neighborhood was reconstructed in 1994, approximately 65 percent of the water main was replaced with 6-inch diameter ductile iron pipe. The remaining water main consists of 6-inch diameter cast iron pipe (CIP) installed in 1955. Water records indicate two main breaks have occurred on the CIP water main, and one property has experienced a frozen water service in past winters. The current project cost estimate includes lining the existing CIP pipe. Sanitary Sewer When the area was reconstructed in 1994, approximately 72 percent of the sanitary sewer was replaced with 8- inch and 10-inch diameter poly vinyl chloride (PVC). The remaining sanitary sewer consists of 8-inch vitrified clay pipe (VCP) installed in 1956. The project cost estimate includes cured-in-place lining of the VCP sanitary sewer main. Storm Sewer The storm water runoff from the project area is collected in a storm water pond in the northwest corner of the project area. The storm sewer consists of 15-inch to 42-inch diameter reinforced concrete pipe (RCP) installed in 1994. The current project estimate includes minor storm sewer repairs. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the nine wood poles with nine fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries ' a g e 129 2015-2029 Capital Improvement Program Knox, James and 54th Avenues Area Improvements 2023 The Knox, James and 54 0 ' Avenue project area includes James Avenue and Knox Avenue between 55th Avenue and 53'd Avenue, and 54th Avenue between Logan Avenue and Irving Avenue. The project area includes a total of 3,487 feet of local streets. The neighborhood consists of approximately 78 residential one multi- family property. Streets The existing streets in the project area are 30 wide with concrete curb and gutter constructed in 1994. Proposed street improvements consist of new street pavement and replacement of isolated sections of concrete curb and gutter as necessary. AVE - ,, I I I L ±'i'i4! E!ITtrFHL -HH-- -5JI AE N—I — Water Main IN, ;.-.,, ,.,+,., ;n the a r ea consists of 6-inch,.I 11 ex ng vv aLN u.'-' -' diameter ductile iron pipe (DIP) installed in 1994. The current project estimate includes casting replacement only. Sanitary Sewer The sanitary sewer in the project area consists of 10-inch diameter poly vinyl chloride (PVC) installed in 1994. The condition of the sanitary sewer system within the neighborhood is rated as good. The current project cost estimate includes the replacement on sanitary sewer castings only. Storm Sewer The majority of the storm sewer runoff in the project area drains to the trunk storm sewer line on 55111 Avenue and is conveyed to the Mississippi River. The storm sewer consists of 12-inch diameter to 18-inch diameter reinforced concrete pipe installed in 1994. The current project cost estimate includes replacement of storm sewer castings. Street Lighting The existing street light system is overhead power, with a combination of wood poles with cobra head light fixtures and fiberglass poles with rectilinear fixtures. The current cost estimate includes no street light replacement. :JiL h HIL — C,t NT ONL)N Ciflt I — Tin POLlS r Project Summaries P a g e 130 2015-2029 Capital Improvement Program 51st Avenue North Improvements (West of France Avenue) 2023 CIA L'Lui JIM-FTRil iL Ll 4liWllL • I_-: GTR AVE M -Juili J; Water Main I - i I The existing water main in the 51st Avenue project area consists of 8-inch diameter ductile iron pipe installed in 1990. The water main is in good condition based on current maintenance records. The project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer in the 51 " Avenue project area consists of 8-inch diameter poly vinyl chloride (PVC) pipe installed in 1990. The condition of the sanitary sewer system within the neighborhood is rated as good. The current project estimate includes the replacement of sanitary sewer castings only. Storm Sewer The storm sewer runoff from the 51st Avenue project area is collected in the existing storm sewer system and conveyed to the storm water pond west of 5 1 " Avenue. The existing storm sewer in the project area consists of 15-inch to 21-inch diameter reinforced concrete pipe installed in 1990. The current project cost estimate includes replacing the storm sewer structure castings and isolated portions of lateral storm sewer as necessary. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 3 wood poles with 3 fiberglass poles with a decorative rectilinear fixture and underground power. The 51st Avenue project area extends from 185 feet south of Oak Street on Twin Lake Blvd B to France Avenue. The total project length is 1,171 feet. The neighborhood consists of approximately 25 residential properties. Streets The 51 " Avenue project area was originally constructed in 1990. The existing street is 30 feet wide with concrete curb and gutter. After the year 2023 the pavement will have exceeded the expected service cycle. Proposed street improvements consist of reconstruction of the bituminous street pavement and replacement of the concrete curb and gutter as necessary. Project Summaries P a g e 131 2015-2029 Capital Improvement Program 50th Avenue North Improvements (France Avenue to Drew Avenue) 2023 The 50th Avenue project area extends on 50 "' from France Avenue to Drew Avenue. The total project length is 665 feet. The neighborhood consists of approximately 4 residential properties (R4), 5 industrial properties (12) and 1 commercial property (Cl). Streets This section of 50th Avenue was reconstructed in 1988. The existing street is 36 feet wide with concrete curb and gutter. After the year 2023 the pavement will have exceeded the expected service cycle. Proposed street improvements consist of reconstruction of the bituminous street pavement and replacement of the concrete curb and gutter as necessary. GAK Si U UorH AVE ii 91U AVE ii Water Main The existing water main in the 50th Avenue project area consists of 8-inch and 10-inch diameter cast lion pipe installed in 1958 and 1966. The corrosion rate within the project area has not been thoroughly documented at this time. Water records indicate that one main break has occurred within the project area, and one property has experienced a frozen water service in past winters. The current cost estimate includes complete replacement of the water main. Sanitary Sewer The sanitary sewer in the 50 t" project area is owned and maintained by the Metropolitan Council and consists of 30-inch diameter reinforced concrete pipe (RCP) installed in 1955. The current project estimate includes the replacement of sanitary sewer castings only. Storm Sewer The storm sewer runoff from the 50th Avenue project area is collected in the existing storm sewer system and is conveyed to storm drainage ditches along Highway 100. The existing storm sewer in the project area consists of 15-inch to 24-inch diameter reinforced concrete pipe installed in 1988. The current project cost estimate includes replacing the storm sewer structure castings and isolated portions of lateral storm sewer as necessary. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 132 2015-2029 Capital Improvement Program 53rd Avenue North Improvements 2023 jIi71±ETf1,[iTPJ1JELJt1 j I HL[ \I 'I lIlT — iir r _ R;' IlL The 53rd Avenue project area extends on 53rd Avenue from Penn Avenue to 4 " Street N. The project area includes a total of 5,979 feet of local streets. The neighborhood consists of approximately 27 residential properties, one multi-family property and two business properties. Streets 53rd Avenue is designated as a Municipal State Aid Route. 53 Avenue is also the border between Brooklyn Center and Minneapolis. The north portion of 53 Avenue is maintained by Brooklyn Center and the south portion is maintained by Minneapolis. The existing streets in the project area are 36 feet wide with concrete curb and gutter, constructed in 1985. Proposed street improvements consist of the reconstruction of the street subgrade, installation new of curb and gutter to improve drainage and placement of bituminous street pavement. Water Main The existing water main on 53 Avenue is 6-inch diameter cast iron pipe (ClIP) installed between 1965 and 1969. The corrosion rate within the project area has not been thoroughly documented at this time. Water records indicate there have been no main breaks within the project area. The current project estimate includes complete water main replacement on 53 rd Avenue. The project cost estimate also includes an emergency connection with Minneapolis if formal inter-communication arrangements can be established for this connection, Brooklyn Center staff will need to contact Minneapolis Water Utilities to discuss this potential emergency connection. Sanitary Sewer The sanitary sewer on 53td Avenue consists of 8-inch and 9-inch diameter vitrified clay pipe (VCP) installed between 1952 and 1959. The condition of the sanitary sewer system within the neighborhood is rated as fair. The current project cost estimate includes complete sanitary sewer replacement Storm Sewer The majority of the storm sewer runoff in the project area drains to the trunk storm sewer line on 55th Avenue and is conveyed to the Mississippi River. The storm sewer on 53 consists of 12-inch diameter to 15-inch diameter reinforce concrete pipe installed between 1952 and 1979. The current project cost estimate includes replacement of 75 percent of the storm sewer laterals and structures. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes replacing the 21 wood poles with 21 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 133 2015-2029 Capital Improvement Program Lyndale Avenue Improvements 2023 The Lyndale Avenue project area extents from 57thi Avenue to 55th Avenue and includes the 56 " Avenue and 55th Avenue cul-de-sacs. The current project length is 1,905 feet. The neighborhood consists of 11 residential properties (R2 and R4). Streets The streets in the project area were constructed in 1985. The existing streets area 30 feet wide with concrete curb and gutter. Proposed improvements include 20 percent curb replacement and installation of new street pavement. Water Main The existing water main in the project area consists of 6-inch diameter ductile iron pipe (DIP) installed in 1978 and 1985. The water main is in good condition based on current maintenance records. The current project cost estimate includes replacement of miscellaneous valves and hydrants as necessary. 5ZTE AVE U - AVE, ri Ea a5Th AVE N - -- -.i -w - - Sanitary Sewer The existing sanitary sewer consists of 24-inch diameter reinforced concrete pipe installed in 1959. This sanitary sewer line is the main trunk line that carries the sanitary flow from the eastern third of Brooklyn Center to a lift station on Lyndale Avenue south of 55t1, Avenue. The condition of the sanitary sewer in the neighborhood is rated fair. The current project cost estimate includes replacement of sanitary services and replacement of sanitary sewer castings. Cured-in-place lining of the trunk sanitary sewer may be necessary based on future televising inspections. Storm Sewer A substantial portion of the southeast section of the city drains through the trunk storm sewer located along 55' Avenue. The existing trunk storm sewer line consists of 36-inch diameter reinforced concrete pipe installed in 1952. The remainder of the project area consists of 12-inch diameter to 18-inch diameter reinforced pipe installed in 1955 and 1985. The current project cost estimate includes replacing the storm sewer structure castings and isolated portions of lateral storm sewer as necessary. Street Lighting The current cost estimate includes replacing the three wood poles with three fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 134 2015-2029 Capital Improvement Program Woodbine Area Improvements 2024 The Woodbine project area extends from Brooklyn Blvd to France Avenue and from the north City limits to 71 " Avenue. The project area contains a total of 15,525 linear feet of local streets. The neighborhood consists of approximately 248 residential properties. Streets Noble Avenue from Brooklyn Blvd to the north City limits is a designated Municipal State Aid Route. The Woodbine w- - --- - i- - I I I iH ___I iitl,I -IjI 1 - I I 7XV3 WIC 14. 10 1 -i1 T :' jl i±E ijT 1 LTfl I ThL-i ii - - Neighborhood was reconstructed in 1995. Noble Avenue is 40 feet wide with concrete curb and gutter. The remaining streets are generally 30 feet wide with concrete curb and gutter. The project design process will include evaluating geometric options at the intersection of Noble Avenue and Woodbine Lane to address possible pedestrian safety issues. The current cost estimate assumes street improvements that consist of approximately 50 percent curb replacement, 10 percent sidewalk replacement, and full depth pavement replacement. Water main The existing water main in the Woodbine area consists of 6-inch and 8-inch diameter cast iron pipe (CIP) installed between 1957 and 1959. Records indicate there have been 11 water main breaks in the neighborhood between 1975 and 2013, and five properties have experienced frozen water service in past winters. The current project cost estimate includes complete water main replacement. Sanitary Sewer Approximately 25 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1995. The remaining sanitary sewer consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1958 and 1959. The current project cost estimate includes replacement of the existing VCP sanitary sewer within the roadway and cured-in-place lining of the sanitary sewer along the June Avenue easement between 71St Avenue and 70 01 Avenue. Storm Sewer The storm sewer on Noble Avenue consists of 12-inch and 15-inch diameter reinforced concrete pipe (RCP) that drains to Shingle Creek. This storm sewer was installed in 1970. The remainder of the project area consists of 15-inch to 33-inch diameter RCP installed when the neighborhood was reconstructed in 1995. This storm sewer generally drains to Palmer Lake. The condition of the storm sewer within the neighborhood is rated as good. The current project cost estimate includes replacing storm structure castings and isolated portions of lateral storm sewer as necessary. Street Lighting The current cost estimate includes replacing the 20 wood poles with 20 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 2015-2029 Capital Improvement Program Humboldt Avenue North Improvements 2024 The Humboldt Avenue North project area extends from 691h Avenue to the north City limits. The project area contains a total of 2,618 linear feet of local streets. The neighborhood consists of approximately 38 residential properties (RI), 3 R5 properties, and 2 commercial (C2) properties. Streets This segment of roadway is designated as a Municipal State Aid Route. This section of Humboldt Avenue was reconstructed in 1995. The existing street is generally 30 feet wide with concrete curb and gutter. The street pavement exhibits a moderate rate of deterioration due to higher volumes of traffic. The current cost estimate assumes street improvements that consist of approximately 25 percent curb replacement, 10 percent sidewalk replacement, and full depth pavement replacement. Water main The existing water main in the Humboldt Avenue North project area consists of 8-inch diameter cast iron pipe installed in 1965 and 1967. Based on current maintenance records, there is no history of water main breaks in this area. The current project cost estimate includes replacement of 25 percent of the water main and replacement of all hydrants and valves. Sanitary Sewer When the Humboldt Avenue project area was reconstructed in 1995, 25 percent of the sanitary sewer was replaced with 10-inch diameter poly-vinyl chloride (PVC). The remaining sanitary sewer in the area consists of 8-inch diameter vitrified clay pipe (VCP) installed between 1965 and 1967. The current project cost estimate includes replacement of the existing VCP sanitary sewer. Storm Sewer The existing storm sewer in the Humboldt Avenue project area consist of 15-inch to 36-inch diameter reinforced concrete pipe (RCP) that drains to the Mississippi River. The storm sewer was installed between 1955 and 1961 and in 1995. When the project area was reconstructed in 1995, the existing storm sewer was left in place and additional storm sewer was added to the existing system. The current project cost estimate includes replacing structure castings and isolated pipe laterals as necessary within the project area. Street Lighting The current cost estimate includes replacing the five wood poles with five fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 136 2015-2029 Capital Improvement Program Orchard Lane East Improvements 2025 The Orchard Lane East project area extends from Perry Avenue to Brooklyn Blvd and Interstate 94 to 63' Avenue. The project area contains a total of 21,560 linear feet of local streets. The neighborhood consists of approximately 358 residential properties, two multi-family properties and one commercial property. Streets The Orchard Lane East area was reconstructed in 1996. The streets are generally 30 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 50 percent curb replacement, 10 percent sidewalk replacement, and full depth pavement replacement. i-i —t--- II--- (nm] HfTTT L 1 H\ (_-'!, Jim I I iffl wiL__LLJmwlH'AVTc,WI _./ \ i TH m I- tHHHHiti H Water main Approximately 25 percent of the water main in the Orchard Lane East area was replaced with ductile iron pipe (DIP) in 1996 when the neighborhood was reconstructed. The remaining water main in the area consists of 6- inch, 8-inch and 12-inch diameter cast iron pipe (CIP) installed between 1955 and 1973. Records indicate there have been nine water main breaks in the neighborhood, and one property has experienced a frozen water service in past winters. The current project cost estimate includes replacement of existing CIP water main. Sanitary Sewer Approximately 50 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1996. The remaining sanitary sewer consists of 8-inch diameter and 12-inch diameter vitrified clay pipe (VCP) installed between 1956 and 1966. The current project cost estimate includes replacement of the existing VCP sanitary sewer. Storm Sewer The storm sewer on the north and west streets of the Orchard Lane East area drain to the storm water ponds at Orchard Park and Cahlander Park. The storm sewer consists of 12-inch to 42-inch diameter pipe. The south and east streets in the project area drains to Shingle Creek. This storm sewer consists of 12-inch to 60-inch diameter pipe. The trunk storm sewer on 65th Avenue and Orchard Avenue was installed in 1956. The remainder of the storm sewer was installed when the neighborhood was reconstructed in 1996. The current project cost estimate includes replacing storm structure castings and isolated portions of lateral storin sewer as necessary. Street Lighting The current cost estimate includes replacing the 24 wood poles with 24 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 137 2015-2029 Capital Improvement Program Orchard Lane West Improvements 2026 The Orchard Lane West project area extends from Unity Avenue to Perry Avenue and Interstate 94 to 61st Avenue. The project area contains a total of 25,702 linear feet of local streets. The neighborhood consists of approximately 509 residential properties, one church property and one school property. Streets The Orchard Lane West area was reconstructed in 1997. The streets are generally 30 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 50 percent curb replacement, 20 percent sidewalk replacement, 50 percent driveway apron replacement and full depth pavement replacement. Water main Approximately 99 percent of the water main in the Orchard Lane West area was replaced with ductile iron pipe (DIP) in 1997 when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch DIP installed in 1987. Records indicate there have been no water main breaks in the neighborhood since the area was reconstructed, and one. property in the area has experienced a frozen water service in past winters. The current project cost estimate includes replacement of miscellaneous valves and hydrants as necessary. Sanitary Sewer Approximately 5 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1997. The remaining sanitary sewer consists of 8-inch diameter and 10-inch diameter vitrified clay pipe (VCP) installed between 1955 and 1958. The current project cost estimate includes replacement of the existing VCP sanitary sewer. Storm Sewer The storm sewer north of 63' Avenue in the Orchard Lane West area drains to the storm water ponds at Orchard Park and Cahlander Park. This storm sewer consists of 12-inch to 36-inch diameter pipe. The streets south of 63td Avenue drain to the storm water pond at 63rd Avenue and Perry Avenue. This storm sewer consists of 12- inch to 36-inch diameter pipe. A 27-inch reinforced concrete pipe (RCP) storm line installed in 1958 remains on Woodbine Lane, and a 15-inch RCP storm line installed in 1965 remains on Scott Avenue. The current project cost estimate includes replacement of the storm sewer installed in 1958 and 1965 and replacement of storm laterals as needed for storm sewer replacement. Street Lighting The current cost estimate includes replacing the 29 wood poles with 29 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 138 2015-2029 Capital Improvement Program Meadowlark Gardens Area Improvements 2026 The Meadowlark Gardens project area extends on Logan Avenue from 53 d Avenue to 57th Avenue, on Knox and James Avenues from 55th Avenue to 57th Avenue, and on CI Avenue and 56 " Avenue from Morgan Avenue to living Avenue. The project area also includes 571 Avenue from Humboldt Avenue to the Interstate 94 bridge. The project area contains a total of 10,150 linear feet of local streets. The neighborhood consists of approximately 162 residential properties, two multi-family properties and two commercial properties. Streets Logan Avenue and 57 t11 Avenue are designated as Municipal State Aid Routes. The Meadowlark Gardens project area was last reconstructed in 1996. 57 "' is 30 feet wide, Logan Avenue is 32 feet wide and the remaining streets are 30 feet wide. All streets in the project have concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent curb replacement, 20 percent sidewalk replacement, 25 percent driveway apron replacement and full depth pavement replacement. III--II--I —•_-I II I.=II=I AWt* ui::i.iiI-I I --l•.i II IU .•IU'IJ -UN uwi WI IiIIIIHUIáraIa_i_1_T1j-1II.•i—iv1•uii• !!!IW IL_IIII -I--I—_I_I.I=I=l I-i-I- :.!i=ii - — - - -- - - - - Water main Approximately 80 percent of the water main in the Meadowlark Garden area was replaced with ductile iron pipe (DIP) in 1996 when the neighborhood was reconstructed. The remaining water main in the area consists of 10- inch cast iron pipe (CIP) installed in 1969 and 16-inch steel pipe installed in 1964. Water records indicate one main break has occurred on the CIP water main. The current project cost estimate includes replacement of the CIP and steel water mains. Sanitary Sewer Approximately 94 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1996. The remaining sanitary sewer consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1959. The current project cost estimate includes replacement of the existing VCP sanitary sewer. Storm Sewer Approximately 92 percent of the storm sewer in the project area was replaced in 1996 when the neighborhood was reconstructed. The remaining pipe consists of 24-inch to 42-inch pipe on 55thi Avenue installed in 1952. The storm sewer on James Avenue and to the west drains to the trunk line on 55thi Avenue and then to the Mississippi River. This storm sewer consists of 15-inch to 44-inch diameter pipe. The storm sewer on 57 Avenue drains to the trunk line on 59t1 Avenue and then to the Mississippi River. This storm sewer consists of 15-inch to 42-inch diameter pipe. The current cost estimate includes replacing the existing pipe installed in 1952 and replacement of storm laterals as needed for water main and sanitary sewer replacement. Street Lighting The current cost estimate includes replacing the 17 wood poles with 17 fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries 1 a g e 139 2015-2029 Capital Improvement Program 53rd and Xerxes Avenue Improvements 2026 53rd Avenue extends from Xerxes Avenue to Upton Avenue and Xerxes Avenue extends from Sl Avenue to 53rd Avenue. The project area contains a total of 2,028 linear feet of local streets. The neighborhood consists of 22 residential properties and one multi-family (115) property. Streets This project area was most recently reconstructed in 1996 by the City of Minneapolis. 53rd Avenue and Xerxes Avenue are the border between Brooklyn Center and Minneapolis. The north portion of 531 Avenue and the west portion of Xerxes Avenue are maintained by LILAC OR N - - 53RD CITY OF BROOKLYN CENTERr'--1 CITY OF MINNEAPOLIS 52ID AVE N'III 51ST AVE II -1 Brooklyn Center. Existing streets are generally iU teet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent curb replacement, 25 percent driveway apron replacement, and full depth pavement replacement. Water main The existing water main on 53 Avenue consists of 6-inch diameter cast iron pipe (CIP) installed in 1973. Records indicate that there have been no water main breaks in the area. The water main is in good condition based on current maintenance records. The water main on Xerxes Avenue is owned and maintained by the City of Minneapolis. The current project cost estimate includes no water main replacement. Sanitary Sewer There is no sanitary sewer on 53rd Avenue. The existing sanitary sewer on Xerxes Avenue is owned and maintained by the City of Minneapolis. The current project cost estimate includes no sanitary sewer replacement. Storm Sewer The storm sewer in the project area consists of 10-inch poly-vinyl chloride (PVC) pipe that flows to storm water ponds located south of 53 rd Avenue and east of Upton Avenue. This storm sewer was installed in 1996 when the area was last reconstructed. The current project cost estimate includes casting replacement only. Street Lighting The current cost estimate includes replacing the eight wood poles with eight fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 140 2015-2029 Capital Improvement Program St. Aiphonsus Area Mill and Overlay 2027 The St. Alphonsus project area extends from Brooklyn Boulevard to Grimes Avenue and 69thi Avenue to 71 s' Avenue. The area contains a total of 4,580 linear feet of local streets. The project area consists of approximately 31 residential properties, three - commercial properties, one church property and one multi-family property. Streets The St. Alphonsus area was last reconstructed in 1998. Halifax HF Avenue is 30 to 35 feet wide, 70t1, Avenue is 35 to 42 feet wide I and the remaining streets are 30 feet wide. All streets in the area - have concrete curb and gutter. The current cost estimate assumes street approximately 20 percent concrete replacement and a 2-inch mill and overlay. flu . I ILQi q . 'r'1' '' improvements that consist of Water main The existing water main in the project area consists of 6-inch cast iron pipe (CIP) installed between 1959 and 1961 and 6-inch ductile iron pipe (DIP) installed in 1978. Based on current maintenance records, there has been one water main break in this area, and four properties have experienced frozen water service in past winters. The current project estimate includes casting replacement only. Sanitary Sewer Approximately 83 percent of the sanitary sewer in the project area was replaced with 8-inch poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 1998. The remaining pipe consists of 8" diameter vitrified clay pipe (VCP) installed in 1958 and 1959. The current project estimate includes casting replacement only. Storm Sewer The storm sewer in the project area flows east to Palmer Lake. Approximately 25 percent of the storm sewer in this area was installed in 1998 or later. This storm sewer consists of 15-inch diameter high-density polyethylene plastic pipe (HDPE) and 18-inch to 42-inch diameter reinforced concrete pipe (RCP). The remaining storm sewer consists of 15-inch to 42-inch diameter RCP installed in 1957 and 1984. The current project estimate includes casting replacement only. Street Lighting The current cost estimate includes replacing the seven wood poles with seven fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 141 2015-2029 Capital Improvement Program 67th and James Avenue Mill and Overlay 2027 I tuan k Jail 11Z, AVE I r—\ \diL_ HiLH —\ \ r\ \_j FREEWAY BL The project area includes 67d1 Avenue from Shingle Creek Parkway to the east cul-de-sac and James Avenue from Freeway Blvd to 67th Avenue. The project area contains a total of 2,063 linear feet of local streets. The project area consists of 11 industrial properties. Streets The 67 01 Avenue and James Avenue area was reconstructed in 1998. The streets are generally 44 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent concrete replacement and a 2-inch mill and overlay. Water main The existing water main in the project area consists of 8-inch diameter cast iron pipe (CIP) installed in 1970. Records indicate that there have been no water main breaks in the area. The current project estimate includes casting replacement only. Sanitary Sewer The existing sanitary sewer in the project area consists of 8-inch poly-vinyl chloride (PVC) installed in 1970. The current project estimate includes casting replacement only. Storm Sewer The storm sewer in the project area drains to the trunk line on 65t1, Avenue and then east to the Mississippi River. This storm sewer consists of 15-inch to 36-inch diameter reinforced concrete pipe (RCP) installed in 1970 and 1974. The current project estimate includes casting replacement only. Street Lighting The current cost estimate includes replacing the two wood poles with two fiberglass poles with a decorative rectilinear fixture and underground power. Project Summaries P a g e 142 2015-2029 Capital Improvement Program John Martin Drive Mill and Overlay 2027 The John Martin Drive project area extends from Shingle Creek Parkway to 450 feet south of Earle Brown Drive. The project I I 11 area contains a total of 1,381 linear feet of local streets. The neighborhood consists of approximately nine commercial properties. I •s'_ ' Streets 4 John Martin Drive is designated as a Municipal State Aid Route. The project area was reconstructed in 1998. The streets - IIare generally 50 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist I of approximately 20 percent concrete replacement and a 2-inch I mill and overlay. Water main The existing water main in the project area consists of 8-inch diameter cast iron pipe (CIP) installed in 1969. Records indicate that there have been no water main breaks in the area. The current project estimate includes casting replacement only. Sanitary Sewer The existing sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1969. The current project estimate includes casting replacement only. Storm Sewer The storm sewer on John Martin Drive drains to Shingle Creek. This storm sewer consists of 12-inch to 48-inch diameter reinforced concrete pipe (RCP) installed in 1969. The current project estimate includes casting replacement only. Street Lighting The existing street light system is underground power, with aluminum and a decorative light fixture. The current cost estimate includes no street light replacement, Project Summaries P a g e 143 2015-2029 Capital Improvement Program 6t1 and Lee Avenue Mill and Overlay 2027 The project area includes 68 "' from Lee Avenue to Brooklyn Boulevard and Lee Avenue from 68 "' to 69 t11 Avenue. The project area contains a total of 1,668 linear feet of local streets. The project area consists of nine commercial properties. Streets The 67thi and James area was reconstructed in 1998. The streets are generally 45 feet wide with concrete curb and gutter. The current LE:H cost estimate assumes street improvements that consist of approximately 20 percent concrete replacement and a 2-inch mill and overlay. - Water main The existing water main in the project area consists of 8-inch diameter cast iron pipe (CIF) installed in 1966 and 1968. Records indicate that there have been no water main breaks in the area. The current project estimate includes casting replacement only. Sanitary Sewer The existing sanitary sewer in the project area consists of 8-inch poly-vinyl chloride (PVC) installed in 1970. Approximately 25 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The current project estimate includes casting replacement only. Storm Sewer The storm sewer in the project area drains south to the storm water pond at Orchard Park. This storm sewer consists of 12-inch to 24-inch diameter reinforced concrete pipe (RCP) installed in 1966 and 1968. The current project estimate includes casting replacement only. Street Lighting The current cost estimate includes replacing the three wood poles with three fiberglass poles with a decorative rectilinear fixture and underground power. [' F-7 '-?1 1 14 Project Summaries P a g e 144 2015-2029 Capital Improvement Program 73rd Avenue Mill and Overlay (Humboldt Avenue to Camden Avenue) 2028 ilkC1TY OF BROOKLYN PARK -73RD AVE N CITY OF BROOKLYN CENTER I I iIi'J I -WDBOON LtNE, 12521 0i W I I I The 73' Avenue project extends from Humboldt Avenue to approximately 275 feet east of Camden Avenue. It contains a total of 2,994 linear feet of local streets. The project area consists of 25 single family properties and one church property. Streets 73rd Avenue is designated as a Municipal State Aid Route. 73'd Avenue is also the border between Brooklyn Center and Brooklyn Park. The south portion of 73 rd Avenue is maintained by Brooklyn Center and the north portion is maintained by Brooklyn Park. This project area was reconstructed in 2000. The road is generally 33 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent concrete replacement and a 2-inch mill and overlay. Water main All of the water main in the project area was replaced with ductile iron pipe (DIP) in 2000 when the neighborhood was reconstructed. The current project cost estimate includes casting replacement only. Sanitary Sewer Approximately 4 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) in 2000 when the area was reconstructed. The remaining sanitary sewer in the area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1961 and 1969. There is no history of root intrusion in this area. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer in the project area drains south to a trunk line on 70 "' then east to the Mississippi River. This storm sewer consists of 12-inch to 21-inch diameter reinforced concrete pipe (RCP) installed in 1969 and 2000. The current project estimate includes casting replacement only. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 145 2015-2029 Capital Improvement Program 66th and Camden Avenue Mill and Overlay 202 The 661 and Camden Avenue project includes Camden Avenue from 66thi Avenue to the south cul- de-sac and 661 Avenue froin 360 feet east of Bryant Avenue to Highway 252. It contains a total of 1,960 linear feet of local streets. The project area consists of four multi-family properties and seven commercial properties. Streets 66 1h Avenue is designated as a Municipal State Aid Route. This project area was reconstructed in 1999. The roads in the project area range from 40 feet wide to 70 feet with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent concrete replacement, a 2 inch mill and overlay, and a new traffic signal at 66 "' Camden Avenue. \ ASTH AVE ,4 VE N Ely -6 414 1:1 H I \ ii-Water main ,-.cme waier inaHi iii u1 p1uJwL aia diameter cast iron pipe (CIP) installed in 1968. Water records indicate four main breaks have occurred within the area. The current project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter poly-vinyl chloride (PVC) and vitrified clay pipe (VCP) installed in 1968. There is no history of root intrusion in this area. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer in the project area drains to the trunk line on 65th Avenue and then east to the Mississippi River. This storm sewer consists of 12-inch to 72-inch diameter reinforced concrete pipe (RCP) installed in 1968 and 1999. The current project estimate includes casting replacement only. Street Lighting The existing street light system is overhead power, with wood poles and a cobra head light fixture. The current cost estimate includes no street light replacement. Project Summaries P a g e 146 2015-2029 Capital Improvement Program Earle Brown Drive Area Improvements 202 T/7 / 7 1// I / -----------.- \t / -iF \\ \-\\\ / - II / 1L The Earle Brown Drive project extends from John Martin Drive in the southwest to the northeast corner of the Earle Brown Heritage Center. It contains a total of 3,075 linear feet of local streets. The project area consists of 11 commercial properties. Streets Earle Brown Drive is designated as a Municipal State Aid Route between John Martin Drive and Summit Drive. This project area was reconstructed in 1999. The road is generally 50 feet wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent curb replacement, 30 percent sidewalk replacement, 25 percent driveway apron replacement and full depth pavement replacement. Water main The water main in the project area consists of 8- -'- -'.---- __ cast fC'TT\men and i-incn uiameier east iioii pipe installed in 1971 and 1974. Water records indicate one main break has occurred within the area. The current project cost estimate includes casting replacement only. Sanitary Sewer The sanitary sewer in the project area consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1971 and 1974. There is no history of root intrusion in this area. The current project cost estimate includes casting replacement only. Storm Sewer The storm sewer in the project area drains north and west to local storm water ponds. This storm sewer consists of 12-inch to 30-inch diameter reinforced concrete pipe (RCP) installed in 1971 and 1974. Additional 15-inch diameter high-density polyethylene plastic pipe (HDPE) was added to the project area when the road was reconstructed in 1999. The current project estimate includes casting replacement only. Street Lighting The existing street light system contains underground power with aluminum poles and decorative light fixtures. The current cost estimate includes no street light replacement. Project Summaries a g e 147 2015-2029 Capita' Improvement Program Garden City Central Area Improvements 2029 The south portion of the Garden City Central project area extends from Brooklyn Boulevard to Brooklyn Drive from 61 " Avenue to 63d Avenue, and the north portion extends from Xerxes Avenue to Brooklyn Drive from 63M Avenue to 66 0' Avenue. The project area contains a total of 19,230 linear feet of local streets. The neighborhood consists of approximately 361 residential properties, 1 church property, 3 multi- family properties (R4 and R5) and 3 commercial properties. Streets 63rd Avenue from Brooklyn Boulevard to Xerxes Ave is designated as a Municipal State Aid Route. The Garden City Central project area was last,-,nnn rnrd A ) potFo I&MO or PAV Ct: / 4 i Vr- reconstructed in uuu. oi j-veiiue ranges 38 to 48 feet wide and the remaining streets are 30 feet wide. All streets in the project have concrete curb and gutter. The current cost estimate assumes street improvements that consist of approximately 20 percent concrete replacement and a 2-inch mill and overlay. Water main Approximately 81 percent of the water main in the Garden City Central area was replaced with ductile iron pipe (DIP) in 2000 when the neighborhood was reconstructed. The remaining water main in the area consists of 6- inch and 16-inch DIP installed in 1980, 1981, 1983 and 1993. Records indicate there has been one water main break in the neighborhood, and four properties in the area have experienced frozen water services in past winters. The current project estimate includes casting replacement only. Sanitary Sewer Approximately 72 percent of the sanitary sewer in the project area was replaced with poly-vinyl chloride (PVC) when the neighborhood was reconstructed in 2000. The remaining sanitary sewer consists of 8-inch diameter vitrified clay pipe (VCP) installed in 1958, 8-inch diameter PVC installed in 1980, 15-inch diameter reinforced concrete pipe (RCP) installed in 1956 and 24-inch diameter pipe corrugated metal pipe (CMP) lined with cured- in-place pipe in 1995. The current project estimate includes cured-in-place lining of the RCP and VCP sanitary sewer mains installed in the 1950s and casting replacement. Storm Sewer Approximately 83 percent of the storm sewer in the project area was installed in 2000 when the neighborhood was reconstructed. The remaining pipe consists of 15-inch, 36-inch and 72-inch pipe installed in the backyards between 64thi Avenue and 65 d' in 1956. The storm sewer in this neighborhood drains Shingle Creek. The current cost estimate includes replacing storm structure castings and isolated portions of lateral storm sewer as necessary. Street Lighting The existing street light system contains underground power with fiberglass poles and standard light fixtures, which were installed in 2000. The current cost estimate includes replacement of 2 street lights that have not been replaced and upgrade all to LED luminaires. Project Summaries P a g e 148 2015-2029 Capital Improvement Program Miscellaneous Water Main and Sanitary Sewer Improvements Lift Station 1 Wet Well Improvements/Rehabilitation - 2016 The existing lift station was installed in 1996. The current wet well design is a basic rectangle with an elevated wing wall. The flat bottom allows for solids to build and the wing wall traps grease thereby creating an ongoing maintenance issue where staff is required to enter the space multiple times per year for maintenance. To properly clean this wet well, workers must follow confined space entry procedures and enter the 28' deep structure. Even when all necessary precautions are followed, there is a significant level of danger involved when entering the structure. The goal is to "reshape" the wet well by mimicking the existing wet well at lift station 2 and eliminate the elevated wing wall. The wet well at lift 2 consists of a sloped configuration that nearly eliminates the buildup of any solids (rarely is it necessary to enter that wet well). Proposed rehabilitation includes pump replacement, miscellaneous appurtenance replacement, and wet well reconfiguration to aid in self-cleaning. Sanitary Sewer Lining along Mississippi River - 2016 This project extends from the manhole north of Interstate 694 on Willow Lane to the first manhole south of 57th Avenue on Lyndale Avenue, approximately 4,752 feet. The existing line is 21-inch to 24-inch reinforced concrete pipe (RCP) and contains root infiltrations throughout. Roots were last removed in 2011. Directly under the interstate is a 70 foot section of pipe where it appears through televising that the pipe was cut in half and put inside a 70 foot section of steel casing to form an invert. Water Tower No. 3 Painting - 2016 Tower No. 3, a 1.5 million gallon elevated storage tank located within the Centerbrook Golf Course was constructed in 1973. The complete exterior coating system was replaced in 1986. In 1998 the exterior was spot repaired, power washed and a urethane top coat was applied to the exterior of the tower. In 2005, the bottom shell course of the fluted exterior was coated and the entire exterior was power washed. This tank was last inspected in 2010. Although the steel substrate is still protected, a number of coating failures were noted on the interior (wet area and dry area) and are attributed to deficiencies in the coating system itself. The 2010 recommendation is to reevaluate in 5 years with an anticipated plan of complete coating replacement in 6 to 8 years. Based on the 2010 evaluation, Tower No. 3 is recommended for complete interior wet, interior dry and exterior coating rehabilitation in 2016. Water Tower No. 2 Painting - 2017 Water Tower No. 2, a one-million gallon elevated storage tank located at 69th Avenue and Dupont Avenue was constructed in 1960. In 1984, the interior (wet area) and exterior coating systems were completely replaced. In 1997, the interior coating system (wet area) was spot repaired and the exterior coating was spot repaired, power washed and a urethane top coat was applied to the existing system. The estimated service life for 1997 paint coating is 15 to 20 years as noted in a 1999 warranty inspection report. This tank was last inspected in 2005. Both the interior and exterior coatings required no repairs at that time. The 2005 recommendation is to re- inspect every 5 years. Tower No. 2 is scheduled to be inspected in 2011. Based on a 2009 review of the 2005 recommendation, Tower No. 2 is recommended for complete interior and exterior coating rehabilitation in 2017. Lift Station No. 2 Rehabilitation - 2017 This includes replacement of the emergency generator for Lift Station No. 2. The existing generator is a 1981 model with a typical lifespan of 35 years. Both generator and switch gear are proposed to be replaced. New pumps, guide rails and piping as well as electrical main breakers, starters/contactors, overloads, programmable logic controller, HOA's and UPS are also included in the rehab. Well Motor Speed Controls (WD) Wells 4, 5, 7, 9 and 10 - 2017 The existing well motor speed controls were installed in 1997 as part of an energy conservation project, and Wells 5 and 7 VFDs were replaced due to failure in 2013 and 2014, respectively. Due to well's 4, 9 and 10 ages Project Summaries P a g e 149 2015-2029 Capital Improvement Program and parts availability, they are due for VFD replacement. All five wells would be equipped with bypass switch gears that allow the operation of the well pump if the controls fault and need repair. Water Tower No. 1 Painting - 2018 Water Tower No 1, a 500,000 gallon elevated storage tank located at 6911, Avenue and France Avenue was constructed in 1958. In 1988, spot repairs of the existing interior were completed (wet area repaired with coal tar/epoxy coating) and the exterior • coating system was completely replaced. In 1999, the interior wet coating system was completely replaced and the exterior coating was spot repaired, power washed and a urethane top coat was applied to the existing system. The estimated service life for the 1999 paint coating is 15 to 20 years. This tank was last inspected in 2009. Both the interior and exterior coatings required no repairs at that time. The 2009 recommendation is to re-inspect every 5 years. Based on the 2009 inspection, Tower No. I is recommended for complete interior and exterior coating rehabilitation in 2018. Lift Station No. 9 Forcemain Replacement - 2019 The existing forcemain located south of lift station No. 9 was installed in 1969 and consists of 12-inch ductile iron pipe, which was verified in 2010 through an exploratory open excavation. Approximately 1300-feet is proposed to be replaced. Lift Station No. 1 Rehabilitation - 2021 Scheduled for 2021, new pumps, guide rails and piping as well as electrical main breakers, starters/contactors, overloads, programmable logic controller, HOA's and UPS are included in the rehab. The closed transition generator transfer switch is to be replaced in 2021 as well. The existing generator is a 1996 model with a typical lifespan of 35 years. The generator is scheduled for replacement in 2031. Lift Station Nos. 8 and 9 Rehabilitation - 2025 This project includes the rehabilitation of lift station Nos. 8 and 9 with a full evaluation of pumps, control equipment and appurtenances. Street Light and Traffic Signal Improvements Intersection Improvements/Traffic Signal System Replacement at 66' Avenue and TB 252 - 2016 The existing traffic signal system at the intersection of 66th Avenue and TH 252 is owned and operated by the State. The Minnesota Department of Transportation (Mn/DOT) has programmed this system to be replaced and the City will be required to pay 50 percent as the City's portion for two of the four legs of the intersection. The intersection is currently included and being evaluated as part of the TH 252 Corridor Study. This project will be adjusted, dependent on the outcome and recommendations of this study. Traffic Signal System Rehabilitation (69th and France Avenues) - 2017 Proposed improvements to include a new controller and cabinet, painting of the poles and mast arms, installation of APS pushbuttons, EVP system, new wiring and a video loop detection system. Earl Brown and Opportunity Area Street Light Replacement - Ornamental Lighting at Nodes - 2017 The 35 ornamental lights located within the Earl Brown area at the nodes (intersections) along a portion of Shingle Creek Parkway, Summit Drive, Earl Brown Drive and John Martin Drive were installed in 1986. The typical life expectance of this lighting system is approximately 30 years. The City has no remaining replacement poles or luminaires that match the existing system, and matching luminaires are no longer available from suppliers. The existing system is generally rated in fair to poor shape with increasing maintenance costs. The project includes replacement of the existing decorative lighting system at the intersections/nodes with a new, advanced system using current technology. Project Summaries P a g e 150 2015-2029 Capital Improvement Program Capital Maintenance Building Plan Yearly Capital Maintenance Building Plan Projects In 2007, the City approved an 18-year Capital Building Maintenance Plan that includes short- and long-term building and facility improvements. The following buildings and facilities are covered under this plan: city hall, community center, public works facility, public works cold storage building, public works salt/sand storage building, police station, west fire station, east fire station, Centerbrook Golf Course club house, Centerbrook Golf Course maintenance building, Centerbrook Golf Course storage garage, sanitary lift station Nos. I and 2, municipal well Nos. 2-10, Evergreen Park building, Garden City Park building, Central Park west building, Central Park plaza, and Central Park gazebo. Storm Water Improvements Storm Water Management Basins In 2005, the City of Brooklyn Center hired the consulting firm of Bonestroo Rosene Anderlik & Associates to conduct a condition assessment of 30 storm water management ponds located throughout the City. The assessment process resulted in a list of improvements to address problems with shoreline erosion, sediment accumulation, inlet and outlet blockages and other miscellaneous maintenance issues. The City is currently updating the pond maintenance plan as part of the local water management plan update. Below are descriptions of two projects that were not considered routine annual maintenance work normally addressed as part of the annual operating budget for the Storm Drainage Utility. Descriptions of all needed pond projects are expected to be updated as part of the 2015C1P and budget process. Storm Water Pond 60-001 - 2015 Pond 60-001 is located west of Xerxes Avenue and south of Brooklyn Drive within Central Park. The pond receives runoff from approximately 85 acres of upstream residential development. This pond was constructed in 2003. By 2013, preliminary estimates indicate that approximately 30 to 40 percent of the wet volume will be lost due to sediment accumulation. The proposed work consists of removal of sediment and installation of a skimmer structure to enhance the water quality treatment performance of the pond. Storm Water Pond 50-001 - 2015 Pond 50-001 is located within Cahiander Park. The pond receives runoff from approximately 230 acres of upstream residential development. Due to the large watershed to pond area ratio, this pond is subject to higher rates of sediment accumulation and potential erosion issues. Traces of hydrocarbon pollutants were noted in the sediment during the most recent site inspection. The proposed project consists of dredging and properly disposing of sediment from the pond and repairs to various shoreline erosion issues. Park and Trail Improvements Centennial Park Tennis Court Resurfacing - 2015 Proposed construction includes the removal of two existing tennis courts and resurfacing of the two remaining two tennis courts within Central Park. The Parks and Recreation Commission recommended replacing the two removed tennis courts with a basketball court as part of their 2015 ClIP plan review. Centennial Park Softball Field Dike - 2015 Due to continual flooding of the ball fields over several of the past years from 2009 through 2014, construction of a dike and enhanced pumping system is proposed within the floodplain as a short term mitigation strategy. Project Summaries Page 151 2015-2029 Capital Improvement Program Freeway Park Trail Replacement 2015 Proposed construction includes replacement of the trail system within Freeway Park. An eight foot wide trail section is proposed. Brooklyn Boulevard City Entrance Signs 2016 Proposed improvements include painting the existing City entrance signs with miscellaneous structural repairs and cedar fences surrounding the signs located along Brooklyn Boulevard at the Minneapolis and Brooklyn Park borders. 69 1h Avenue Greenway & Cahlander Park Fence Rehabilitation - 2016 Proposed construction includes replacing the wood fence along the north side of the 69t1i Avenue greenway between Brooklyn Boulevard and Palmer Lake Drive and the privacy fence on the west side of Cahlander Park. Northport Park Lighting Replacement Project - 2016 Proposed replacing trail and parking lot lights with energy efficient lighting (LED) fixtures, fiberglass poles, new wire in conduit within Northport Park. Northport Park Shelter - 2016 The existing park building in Northport Park was removed in 2012 due to structural issues. The Parks and Recreation Commission recommended eliminating the proposed plan to replace the building and only replace the existing shelter as part of their 2015 CIP plan review. The new structure is proposed to include an enhanced picnic shelter and facilities. A water fountain and electrical service will also be provided. West River Road Trail Improvements - 2017 Proposed construction includes replacement of the bituminous trail along West River Road from 73 r AvenueAvenue to 66th Avenue. A ten foot wide trail section is proposed. Evergreen Park Trail Improvements - 2017 Proposed construction includes replacement of the bituminous trail within Evergreen Park. Replacement of the trail along 70th Avenue is not part of the project. An eight foot wide trail section is proposed. Centennial Park East Trail Improvements - 2018 Proposed construction includes replacement of the bituminous trail system within the eastern portion of Central Park. The trail segment proposed for replacement is between Interstate 94 and the south City Hall parking lot, east of Shingle Creek, that are adjacent to the main trail corridor which is owned and operated by the Three Rivers Park District. All adjacent bituminous trails east of the regional trail are proposed to be reconstructed to eight foot wide. The plaza areas are also proposed to be replaced. Play Ground Equipment Replacement - 2019 through 2021 Proposed replacement includes replacing park playground equipment over a three year period. A total of 20 parks located within Brooklyn Center contain 21 separate playground equipment areas, 18 that are maintained by the City and three that are maintained by the adjacent schools. Six playgrounds are scheduled for replacement each year over the three year period. An assessment of the playground equipment will need to be completed to determine replacement priority. Palmer Lake Trail Reconstruction - 2022 Proposed construction includes resurfacing of the existing trail system extending around Palmer Lake. This trail was last reconstructed in 2005 with an expected maximum service life of 15 to 20 years due to the soil stability issues within the park area. Miscellaneous Tennis Court Resurfacing - 2024 Proposed construction includes the removal of the existing tennis courts and resurfacing of the remaining tennis courts at Evergreen Park, West Palmer Lake Park, Northport Park, Grandview Park and Centennial Park. Project Summaries P a g e 152 2015-2029 Capital Improvement Program Hockey Rink Rehabilitation and Replacements - 2026 Proposed rehabilitation includes resurfacing of five existing rinks with other miscellaneous rink repairs. An assessment of the rink appurtenances will need to be completed to determine replacement priority. The rink located at Northport Park will be further evaluated with the Northport Park improvements and master planning being conducted in connection with the Northport School rehabilitation. Irrigation Systems Rehabilitation and Replacements 2026 The City's Irrigation systems are located as follows: Evergreen Park, Centennial Park, Northport Park, Grandview Park, 69th Avenue, Public Works Garage Facility, West Fire Station, Shingle Creek Parkway, 53 Avenue (Bellvue area), Xerxes Avenue, Bass Lake Road and County Road 57. The proposed rehabilitation estimate includes rehabilitation of the Evergreen Park and the 69th Avenue systems, which were installed in 1986 and 1989, respectively. Centennial Park Softball Field Regrading Improvements - 2026 The Centennial Park softball fields experience settlement due to the underlying organic soils. Over the years, settlement has occurred approximately one foot. This is evident in the fact that the light base foundations within the ball field areas have generally held their original elevations and are higher than the surrounding ground. Due to the proximity to Shingle Creek and the low lying areas, this settlement causes increased flooding and drainage issues. The proposed plan includes raising the ball fields one to two feet and replacement of any necessary appurtenances including irrigation systems, draintile, fences and bituminous/concrete trails and other paved areas. Softball/Baseball Fence Replacement - 2027 Proposed construction includes replacement of the line and outfield fences at West Palmer Lake Park. 691I Avenue Trail Reconstruction - 2027 Proposed construction includes replacement of the trail system along 69th Avenue from Brooklyn Boulevard to West Palmer Lake Drive. A nine foot wide trail section is proposed. Evergreen Park Score Board Improvements - 2027 Proposed construction includes installing new score boards at the two softball fields and one baseball field at Evergreen Park, and replacement of the scoreboard at the soccer/football field. 69th Avenue Landscape Rehabilitation - 2027 Proposed construction would include irrigation updates and replacing the landscaping plantings and sod along 691h Avenue from Brooklyn Boulevard to West Palmer Lake Dr. Park Trail and Lot Lighting Replacement - 2028 Replacement of trail and parking lot lights with energy efficient lighting (LED) fixtures, fiberglass poles, new wire in conduit in the following parks: Evergreen, Bellvue, Lions, Centennial East, and Centennial West. Work shall include replacing the electrical cabinets in Beilvue and Lions parks. Centennial Ball Field Score Board Replacement - 2027 Proposed construction includes replacement of the two score boards at the two softball fields at Centennial Park (east). Project Summaries Page 153 2015-2029 Capital Improvement Program Miscellaneous Projects and Improvements Azelia Avenue and Northport Drive Retaining Wall Replacements - 2016 Replacement of the retaining walls at 4001 Lakebreeze (Dead End of Azelia Ave.), and 5736 Northport Dr. Drive Retaining Wall Replacements (Miscellaneous Locations) - 2029 Replacement of miscellaneous retaining walls at numerous locations within the City's right-of-way (Brooklyn Boulevard, Dupont Avenue, 57 th Avenue and 69th Avenue). A full evaluation will be performed subsequently. Brooklyn Boulevard Corridor Reconstruction/Complete Street Improvements Brooklyn Boulevard from 1-94 to the southerly City limits (49th Avenue) is a Hennepin County roadway (County Road 152) under their jurisdiction. The City completed the Brooklyn Boulevard Corridor Study in 2013 to guide the reconstruction and redevelopment of this corridor. This study will be used to create a vision, identify an implementation strategy, identify costs for the improvements, and develop funding strategies for the improvements. The funding partnership and proportions are to be determined in the future but are anticipated to include federal funding, Hennepin county funding, Three Rivers Park District Funding and City funding. Project Summaries P a g e 154 2015-2029 Capital Improvement Program ci oci I 'I © © 'II C WO >C 0=1= V) 2 0 > 4== := o oa rn c c 0U, DC 5Q E >®E0 >Q0 >< ><Oà===LUOO_ = Ca Drn 0'' ,i C ,, ( 0 0.' (U J =:: 0 D D (]t LL O IL ft-, U n 0 0) (.f 0-r © Ln © C)©in U CL © L 'I © © =) ==1 ri F ci Fl b ct J .- XO ©bJ 'I© (I-i Ii ED ©C• .114c00 00 00=,1 _I) ji 0 0 E HHc/) ©CD I))•'-r \=-©0 )© _r .0C ,c c © =jo:===1) v v Ct a) c© L) c — _.:L)=1 I)ct En Li ©-_E-©'(ID 4 F ct ct 1) U ct ©© i NN © _ UO - cu CO 0 0 INRw ci) ->-Co c = ci) D Oci) O.- 00 Ln 14--OCE ci4— -->4JJO 00-i-- c> co -I—. >-.-I--U)(Dci)P ci)> O^.ctc Dc4-Do D 0ci) C') ci) -'--W C- co o®coCa) --0: DQ D ci)UEED (]). 0)C= C O (D c 0 0 C C•V)ci) ci)D ci Ln Ln CCciicicici) - >0 0_C C 0®E EDa) >-o (D-0 > CC'ci) Q2D) 0o0 W0 ci) :>. ODE>><cc0) 00-i-- C0C --- Oci)>Q 2fD$2 ci>-0)O c cOWci) 0)00 Cci)Lo ---ci) aOD OC0cL Ep E-° -COci)00ci) CDD )ci) 50) (D C: C5 ci)0- :OCC .2XO —00 -10 C(D DCD®0 Cr—c')C0)0 Oo 0-aD 0 Lo C')O -I-O " C 0c oo .Q O) aci)ci) Dj.- Oci)Oci)POoO-4=) EC Doo - >_i__CE ci) ao ^o^- --ci)(I) OO D> C0 0 =- O — V)0 OO) C0-2 "'j 0D0 E E0 0.E © ci)i-i 4- - - E aci) ©2c)—a c;JJ .cc Doo C—.: >004(n > —=C> 0O CO(4 L> ci) OOCD = ci) +=:) - —C) D • ,=i 0 C ci) jC ) o -4= 00O 00-0 uci) .1 Qci)>ZL °E ,o DC 00OQD U 'ci)C•— ci)-'-E ci0 0 (,)0 0 00Eci ci)DS c•$2 o 00 ©E4-0_ o=1 0)ci)-0ci)ci) • j0-CO r =Oi=' 0E O0D--- o ciP 5Ccci)4-3ci)'- C Oci o OQ Obo OE c c OZO Cl) (1 \!c '•c'©©J_1 ©©© çr I-00N c-I 00 'CL)_E 7t V—=^ Goq U p CL)C C ?I)bbOV == —ct - _a I V_c=V V ,:0 II .E ©E -j \—J cn E (©C C ©ci)ci)ci)E v>ct V V _ C/Daci)C C L m R SR OR OR OR LM; m r-%CLr0- CD Lr iN iN iN 00 r)C ININ ©Lr©Cr1-C Ir 00 C -L--I C Lr IJ1 O,C .C ..00 ..rJ .Lr)LO 00 iN00C00r.J 'C Lr oo C tN I- 0 NC Ln V) ci): ci) ci) LL ci)Ea) NJ U)m CCN .9 '- ju - I I IN I — a. . . .INCCCDC O - LC 00 'J ro 00H NL C©CLflC00 C C Lf) N C N 00 I NJ C IN C) N m Lr o COIN m NiLf CO ko C O rn Lr N Ln C) 00 O U) IZ N C C oNoo - NJr-I0O00cCrC 00 0.m LZ CDHi CDU—C i: U L] q:L •IF * I N © ©Nc _•'- N ©.N I-' N i N c')(1) Li (ID 0 --) V V1E H V 0 ;--ct V VV00V00 0 V) fl 4t Q) Q) n di a)Cr) Lr © Ii E2 I (/) 0 LL- 0 (I)0 0c,) -oE 0E0 0 Lo CN u•) 0 0 p 0 00)0) I V CL0 U)0) 0)D 0) 0) C,,w (I)cTcDa><U-i LL * C Lt) C1 '.0 C Lr,O NLnC' Lfl Lr) ¼0 '-I C2Ih f CO 00 - 0 N r1 Lm T-fC.LrrIC .4J Lfl -4 N N tD C - a m kDIr.iC Lr CO tD N 00 ri Co tNlC - C Lr) CO CO rJ id Lt) C COI tD r.J NNCNOCEC N... L ri rr L( In •—N m L( Lr) NmCC.'.D41Nr)W'.0CCCOtLfl'.0 ' b.c1I r'4 COLI.. NCOC1CJ'.ONCOOCON0CC(COcONJNCOCOCC N-1Cw.w a NJrJ N-IC'fl-I-1 N. .r0ONOCN'-IClMr)N0NNON L. — rNicrJLr COCCO¼0C08rNCO0CNJC)Lfl .. C W <.N u ø) 'iTT cu Hr E LI) ot 2^ 2r U) EE'- 3 LIZOU.UO W LO r ©© I I ©© U l) bi) I):1 .1 -CtIllQ)Ct I)•_ci)n•'Ct I)0 bb V ct V Ct C 0 0 U U U 4 E 0 U- 0 (I) (1)Cwa><LU C: L CN C 0 a)(1) V) r p E o u U —o V r o xi V V V ©o V © © V © V E ctjV CAO VV V V V 0 0 (ID o CoCI) bJ.—$i ct c1 0 0 0 S m CIA Ecb 2a o n ci .1 E © tr\ o .1 I Cl) VE © CA 41 V © E 'I © VEV © o 'I © * U (U ) O\= © E © © UO c C/O =- © 0& © ct o © 'I ' o=I 11 \-1 CIO 4=' - () () o ©© o o=l 'C©© o '= © © ov= 'C o © 1! ti'C (L o I! © PA © © © © o?= © © 0 F \----= I) 0'Q Cf)rn 0 LV) C I 0a 0 EMS-1 C00 -o 0 4C.) (I) 0 0 0 • 1) 00 zo0 .E ( .2I- 0) N 0 LO 1,t CDN P p0 r3 1 Ct) D 0 >Ls —I 6 0 0 0 0 LQqcq all qqc 00 I (NI Or-(NO (N 000 Li)00 LI) 000 t 00rONOt'OO (N 0 0 c 0 tO (Nci)N 0 LO LI)LI)r O ci)Nd (Ncococa (N co 000 co 0003000(NOD (NNO't C>1 (0 Iq C)O t 0 .N zt 0 -O COr-I (0 LI)LI) 0 N-16 0cocoNO (N (0 o DC LI)C E U) u LL- 1- •00 - IR a•)EN0 oJ U 0.(Uu CLx Lfl'-I0N .0 m Ln I-WR00 '0O_. 41 QJ E u Em(UCL E L(0 (UU t CL '-I0Na) CU Q)Lt) CU 5) U (5 LI) T)(N p .LO>- p0 DEa0 0) (D 00 FH= : -- II © 0 II o=l 00 \=5 F F I - .. 0 0 0 •1 FA VA I == (L Q EE0 CC 0 O= c/i c/i o o 0 4 0 0ii ki cD E ff E C) 0 0 0 0 0 0 0 0 0 U) 0 U) 0 U) 0 U) 0 U) 0o. O co CO N N. 10 10 U) 14) V t/ U tf V Vr V) V)- 0 cq 0 U) N 00I_ (1)-f 0 C'O W 0 LO 0_ co 00 - - - --co Kco U) co C) trk Lr to-/ 0 oco I I I f U) 0 0 a) > .1- (S.) Q)- . 004 0 0a) 0E —0 U.I C14 m a)><0— I- ' > 0 0 [] 0c'i 0'00c-'1 0 0 0 0 0 0 0 0 0 0O00Cl0000000000000c00 0 d o 0 0 0 0 0 0 0 0'CO N.10 14)19T C)C'0 (1)-(1)-(1)-t (1)-(1)-(1)-(1)-U)-U Aw -iz: ____ a) -N-0 0 0 C)o(0 CD co,a) 00 LC)L. 0 CO L0 c c U Lo (0 CD to -— L2 0 'r C)0 '1-0 cc 0 •a)a (0t U)N-(N Q -.L CL LO c L a)0)C'Q P.N-co C U) -a)oE- OQC -0 N-o N-o iO3 (I)a)0)cc ç,j -U)(0 o Co cio(N cocoa)'.J -z:oU U-i a)co c (0o(1)o CO LO C It (0 E E C 'C)Co ciq><5O —a, 4-J - ('3 o U) CL mCD (1 -a).— o (0 C-a)00>,ok-o =E(D ('3LL Ca)2a)0— a)E E-)E ocLCO0 0 9-0 cococc (0 00 © © © © E 'I * I eq I (0a)C) a)U)U)(00.x(0I-> 00 0U) U)I a)C) 0U) 'I ll 0) :i L 1) LAO o o= NO 4 ==l pq © — 'I ^i 117i ICAI 4=1© © © © © © CIO o= 'I o VA .fl o ovC 0 C) 0 0 =1 © o C __ o'= © © oI 0 •: c) LO >n=L1L0 cDw acoIDL = := 0 0 0 0Z On 00 I (1\ = © ©cn 38 0 I CITY OF BROOKLYN CE A GREAT PLACE TO START, A GREAT PLACE TO STAY www.cityofbrooklyncenter.org To: Mayor Willson and Councilmembers Kleven, Lawrence-Anderson. Myszkowski and Ryan From: Cornelius L. Boganey, City Manager Date: December 1. 2014 RE: 2015 Final Budget Adoption It is my pleasure to transmit the 2015 budget for the City of Brooklyn Center. While the City Manager is tasked with the responsibility of preparing a budget, it cannot be accomplished without the clear policy direction provided by the City Council with input from the Financial Commission. It would be impossible to produce this budget without the cooperation and collaboration of the Leadership Team: Department Heads, Division Heads and other Staff Members. Special recognition should be given to the Fiscal Services Department and the Finance Director Nathan Reinhardt for his particular role in planning and coordinating the budget development process. It is our collective hope and expectations that this budget will succeed in its purpose to wisely manage our resources and implement policy for the benefit of an even greater community. Budget Overview The proposed 2015 budget, in financial terms, sets forth the action plan of the City. The priorities for staff, infrastructure improvement and service response are reflected in the allocation of resources in the plan developed in City Council Joint Work Sessions with the Financial Commission during the months of June through November 2014. The expenditure levels are focused on maintaining current services and on the achievement of the strategic goals and priority outcomes adopted by the City Council. The overall General Fund budget increase is 5.07% and the overall tax levy increase is 2.90%. The Median Value Residential Property in the City is $131,400 compared to the prior year value of $114,200, which is an increase in market value of more than 15 0/u. Despite the significant increase in residential property market values, property values have not yet fully recovered to previous levels of residential property values. The Median Value Residential Property will pay approximately $752 in City property taxes in 2015 compared to $661 in 2014, which is an increase of $91. The 2015 Budget incorporates the following significant items: Issuance of $5.2 million of debt to finance the street and sanitary portions of infrastructure improvement proj ects for 63'' Avenue North Reconstruction, Freeway Boulevard Improvements (west of Xerxes). and Freeway Area Improvements. This provides the needed funding for the continuation of our street and utilities neighborhood reconstruction program. City Hall Community Cqnter Police & Fire Departments6301 Shingle Creek Parkway 6301 Shingle Creek Parkway 6645 Humboldt Avenue NorthBrooklyn Center, MN 55430-2199 Brooklyn Center, MN 55430-2199 Brooklyn Center, MN 55430-1853763.569,3300 Fax: 763.569.3494 763.569.3400. Fax: 763.569.3434 763.569.3333. Fax: 763.561,0717 • The City recently contracted with Hennepin County for property assessment services, which resulted in the reduction of three full-time equivalents in City assessing staff. The estimated savings from the move to a contracted service is $138,000 annually, which has been incorporated in this budget. • A new position of Deputy Fire Chief was added to assist with emergency preparedness and additional operational needs of the Fire Department. • Personnel costs include a two percent general wage adjustment, a $57 increase in the monthly contribution to the cafeteria plan of full-time employees, and an expected vacancy savings of $150,000. • An appropriated contingency of $150,000, in the General Fund, available for unanticipated expenditures. The Proposed 2015 Levies On September 8, 2014, the City Council adopted the 2015 preliminary budget and maximum tax levies. There are three funds that require a tax levy; the General Fund, the Debt Service Fund and the Housing and Redevelopment Authority Fund. The proposed final levy is as follows: General Fund - Operations Levy $ 14,332,534 General Fund - Abatement for Economic Development 49,000 Debt Service - Public Improvement Bond 396,496 Total Levy $ 14,778,030 Housing and Redevelopment Authority $ 280,460 The General Fund is the primary operating fund for government business of the City. The proposed General Fund Budget is as follows: The Proposed 2015 General Fund Budget Revenues Property Tax (net)$ 14,381,533 Excess Tax Increment 490,000 Lodging Tax 880,000 Licenses and Permits 728,115 Intergovernmental Revenue 1,362,941 Charges for Service 855,000 Fines and Forfeits 316,500 Other Revenue 388,512 Total General Fund Revenue $ 19,402,601 Expenses General Government $ 2,792,301 Police 7,887,235 Fire and Emergency Preparedness 1,266,048 Community Development 1,283,010 Other Services 983,253 Building and Grounds 857,958 Public Works 3,620,234 Community Activities Recreation Services 1,539,497 Miscellaneous (826,935) Total General Fund Expenditures S 19,402,601 Strategic Focus For the past several years the City Council has remained focused on the achievement of strategic goals and each year the budget has been crafted as a policy implementation tool focused on the achievement of these strategic goals. This 2015 business plan focuses on the Council adopted Strategic Priorities of Civic Engagement, Focused Redevelopment, Community Image, Financial Stability and Vibrant Neighborhoods. During this year's budgeting process department heads identified key initiatives and value propositions for their divisions focused on the achievement of strategic priorities, which are included in their respective narratives. The definitions of the Strategic Priorities and examples of some of those key initiatives for 2015 are as follows: Civic Engagement In order to clearly understand and effectively respond to community needs, the City will consistently seek the input from a broad range of stakeholders from the general public, non-profit and for profit sectors. Efforts to engage the community will be transparent and responsive. Our engagement efforts will be deliberately inclusive and culturally sensitive. • Initiated by the City Council, the City will implement the Brooklyn Center Citizens Leadership Academy also known as BCU. The primary goal of the academy is to provide an in depth introduction of Brooklyn Center local government to 20 citizen volunteers reflective of our diverse community. These individuals will participate in eight successive weekly "classes" with City department leaders, and elected officials. They will have an opportunity tour City facilities, learn the history and future plans for their local government. Through this effort we will foster an informed constituency and encourage greater participation in civic and community life. • Inclusive and culturally sensitive engagement. We will continue our Inclusion and Diversity efforts with the long term goal of establishing an organizational culture that promotes participation, engagement and creativity for employees while developing an intimate understanding and appreciation of our customers/citizens. Our Diversity and Inclusion Council will begin working with our contracted support service to prioritize, organize and implement the recommendation of the client audit conducted by Inclusion Inc. Program Needs Assessment We will conduct an internal needs assessment of our recreation amenities, programs and services. The results will ensure our facilities and offerings are meeting the needs and expectations of the citizens of Brooklyn Center. The assessment will also provide a strategy and prioritization for the continued development of park and recreation facilities and programs moving forward. Focused Redevelopment Redevelopment and renewal of commercial, industrial and residential property is essential to the health and vitality of the city. The City will lead efforts to maintain and increase the value of private properties and will make the necessary supporting infrastructure investments. We will encourage entrepreneurial investment and make strategic public investments to create jobs and grow the City's tax base. • Continued development of Shingle Creek Crossing. Work with the developer in their completion of the 116,861 sq.ft. of commercial buildings currently under construction. The completion of these buildings will achieve 77.8% of the TIF construction goal of 239,000 sq.ft. within the first 5 years of commencing the redevelopment of the former Brookdale Mall. Work with the developer in their development plans for the construction of a minimum of 53,135 sq.ft. of commercial buildings. • Commence redevelopment of the South Opportunity Site Area We will complete the demolition of the foundations and floor stabs of the former Brookdale Ford dealership and the vacant tenant spaces within the Brookdale Square commercial site. We will also continue to work with interested developers with the goal of entering into a development agreement for the first phase of the approved PUD. • Redevelopment of the 57th and Logan Ave. Area We will obtain MPCA approval to develop a detention pond that will remove contaminated soils and provide the necessary storm water design capacity for the planned commercial development of the southern 7.5 acres. A Letter of Intent for the planned commercial development of this site will be advanced into a Development Agreement 4 Community Image Our ability to attract and retain citizens and businesses is directly influenced by the perception of the City. We will take specific actions to assure that Brooklyn Center is recognized as a high quality, attractive and safe community. We will accomplish this by providing exceptional customer experience, vibrant neighborhoods and a sense of community thereby attracting private investment. Perception of safety and youth We will work to engage youth who have entered the criminal legal system at the first sign of trouble and direct them to resources that focus on improving their contribution to the community. We will work to identify youth who have been exposed to domestic violence in their home to resources within Cornerstone domestic abuse services. 25th Anniversary In 2015, the Earle Brown Heritage Center will celebrate 25 years of operation as one of the regions premier conference and events facilities, and as a centerpiece of the Brooklyn Center community. Through our 2015 marketing efforts, we will continually highlight this milestone anniversary and Brooklyn Center. Financial Stability We will maintain a positive financial position with a long term perspective by diversifying revenue sources, aligning fees to adequately reflect service costs, stabilizing property taxes while reducing the City's reliance on State Shared Revenues, and ensuring that revenues are adequate to fund services and infrastructure needs. • Value continuous improvement and innovation We will implement DocuSphere software, which will provide an automated workflow process for accounts payable. The software will allow finance staff to locate invoices/documents at all steps of the process, increase timeliness of invoice processing, eliminate duplicated processes and reduce manual data entry. Implement capital improvement financial strategy A financial strategy that uses a combination of General Obligation Improvement Bonds, Utility Revenue Bonds, a Minnesota Public Facilities Authority (PFA) loan and Utility Fund rate adjustments will be used to provide necessary Capital Improvement funding. We will continue to implement long-term forecasting. This includes updating our assumptions based on current information and review of potential financing options including new debt issuances. 5 Vibrant Neighborhoods Neighborhoods will be attractive, safe, inclusive of a diverse housing stock with owner occupied and quality rental properties. Citizens will feel connected to each other and the natural environment will be protected and preserved for the enjoyment of future generations. . Attractiveness We will implement the 22nd year of the street and utility construction program by providing the needed capital improvements, which increase value to the public infrastructure and provide a catalyst towards other aesthetical improvements and value throughout neighborhoods Citywide. o Stabilize and improve residential neighborhood We will coordinate and inspect residential rental properties in accordance with City code requirements and further develop and implement a recognition program for rental properties. o Provide accurate and timely information regarding property ownership and special assessments We will also continue to update processes, systems and public information to provide efficient and clear processing of homestead applications and ownership documents. This includes the implementation of a new database for property ownership and homestead status. General Fund Revenue Summary Licenses & Inter- Charges for Fines & permits \ governmental services _forfeitures Other ta: 7% Property 74% ther revenue 2% The 2015 General fund budgeted revenues total $19,402,601, which is an increase of $936,351 (5.07%) from 2014. Property tax revenue represents 74 percent of the General fund budget. The majority of the revenue increase is a result of increases in the general tax levy of $749,207 and property tax increment revenue of $90,000. 6 Last year the State passed a law that provided supplemental pension aid to police and fire departments state-wide to assist with increasing pension costs, the City will receive a supplemental police aid of $74,500 and a supplemental fire aid of $36,172. The fire relief supplemental aid will be received by the City but passed through to the Volunteer fire Relief Association. The City recently adopted a policy that would receipt half of the local government aid received for operations and half for capital improvements. This policy is intended to reduce the operationally reliance on local government aid and as a result the City has budgeted a General Fund reduction of $25,231. General Fund Expense Summary Community Activities, Community Public works Recreation services 18%& Services6% I ntal uvei i.ti.efltPolice18%39% The 2015 General Fund budgeted expenditures total $19,402,601, which is an increase of $936,351 (5.07%) from 2014. The 2015 Budget shows 39 percent of the Brooklyn Center's General Fund expenditures are for Police ($7,887,235). The remaining significant amounts include 18 percent for Public Works ($3,620,234), 18 percent for General Government ($3,650,259) and 8 percent for Community Activities, Recreation and Services ($1,539,497). The 2015 General Fund Budget Incorporates the following significant items: Personnel. It should be noted that salaries and benefits represent approximately 66 percent of the General fund expenditure budget. Significant changes to personnel include: • A two percent increase in employee base wages • A $57 increase in monthly cafeteria contributions for full-time employees • Creation of a Deputy Fire Chief position. The estimated cost of this position including salary and benefits amount to $116,500. The new position will assist with emergency preparedness and additional operational needs of the Fire Department. Fi, 6 • Reduction of three property assessment personnel. The City has contracted with Hennepin County to provide these services in 2015. The annual net savings from the agreement is approximately $138,000. • Increase in the estimated vacancy/turnover savings by $25,000 to a total estimated savings of $150,000. • Beginning on or after January 1, 2014 the City became exempt from the State sales tax on most City purchases. As a result, the budget allocates $50,000 in anticipated General Fund sales tax savings to departments. o Additional $50,000 budgeted to support the City's Inclusion and Diversity efforts to implement recommendations of the client audit conducted by Inclusion Inc. o Implementation of new software that includes an automated accounts payable workflow software, automated utility work order software and capital building maintenance software to manage City building and system replacement and maintenance requirements. The total cost of purchase, license fees and implementation for these three programs is budgeted at $125,888. o Office remodeling costs of $15,000 to remodel the entrance and front entry area of the West Fire Station and $50,000 to remodel the office and front counters of the Building & Community Standards office area. These improvements will help create a better work flow and improve the customer experience. o The General Fund budget includes a $150,000 contingency for unanticipated expenditures that may arise during the year. Taxable Market Value ,Class TW Commercial "Payable 2014 $286,244,600 Payable 2015 $284,830,700 ________ -0.5 Farm 179,400 179,400 0.0 Industrial 119,731,900 116,400,900 -2.8 Residential 737,357,328 883,850,645 19.9% Apartment 166,979,400 186,954,600 12.0% Other 456,000 456,000 0.0% Totals $1,310,948,628 $1,472,672,245 12.3% The City's taxable market value is estimated at $1,472,672,245, which is an increase of $161,723,617 or 12.3 percent from last year. The taxable market value increase is driven by large increases in residential (19.9%) and apartment (12.0%). Commercial and industrial taxable market value had a relatively small decrease in taxable market value. 8 Tax Capacity Payable 2014 Tax Capacity % Other Apar tme nt ---0 .0 % 'Residential - 42.5% Commercial 32.4% Industrial .13.6% Payable 2015 Tax Capacity % Other Apartment 0.0% 11.8% -- 41 Commercial sidential 29.5% 46.6% kri^1'^41!1 Industrial The City levies a flat dollar for taxes which is spread amongst all taxable properties in proportion to their percentage of the total tax capacity of the City. As shown in the above chart, the increase in residential market value has resulted in a shift in total tax capacity from industrial and commerical to residential. Residential now represents 46.6% of the City's tax capacity. The total tax capacity of the City is estimated at $20,720,321 compared to $19,665,833 in 2014, which is an increase of $1,054,488 (5.4%). The increase in tax capacity results in a corresponding decrease in the City property tax rate. The decrease in the City property tax rate is the first since 2008. Property Tax Implications $190,000 $180,000 $170,000$160,000 $150,000 $140,000 $130,000 $120,000 $100,000 Median Residential Market Value $950 $900 $850 $800 $750 $700 $650 $600 $550 $500 -1--i•i-H -4 - - $110,000 ____________________ -- - k- - '-j-- •.- I_ _- --------------- - 2009 2010 2011 2012 2013 2014 2015 []Annual City Taxes $886 $805 $818 $715 $674 $661 $752 Ll Estimated Market Value $180,400 $153,600 $137,400 1 $133,800 $119,800 1 $114,200 1 $131,400 , 9 Metro Taxing Other Taxing Districts Districts School Districts 34% City of rooklyn Center 36% ?Pin County 25% The median value home last year had an estimated market value of $114,200 and a taxable market value of $87,238. The price of that median value home went from $114,200 to $131,400 with a taxable market value of $105,986. As a result of the market value increase, the City property tax will increase by an estimated $91 from $661 to $752. The chart shown on the previous page provides information on the median value home and City property taxes paid since 2009. The red bar and amounts on the left axis represent the median value home. In 2009, that value was $180,400 which subsequently decreased each year to its lowest value in 2014 of $114,200. For 2015, we are seeing a reversal of that trend. The grey shaded area and the amounts on the right axis is the property tax amount paid on that median value home. In 2009 the median value home paid $886 in City property tax, similar to the market value, we have seen a steady decline in City property taxes leading up to the latest valuation. Despite seeing residential property values recover significantly for the year, the values and corresponding property taxes still remain below the amounts from 2009 to 2011. Breakdown of Property Taxes *B a sed on a Residential Property in School District #279 City taxes accounts for 36 percent of property taxes paid by homeowners living in Brooklyn Center (based on the preliminary 2015 property tax levies). The remainder is comprised of taxes for the School District of 34 percent and County of 25 percent. The property tax paid by an individual property owner could be impacted because of several different reasons including; a change in value of the property, a change in the relative proportion of the property value to the total property value (shift in distribution of taxable market value to a different property type), an increase in property taxes requested for operations of the City General Fund activities and programs, and changes in the property tax needs of the County or School District. Brooklyn Center has four different school districts all with different levies and property tax implications. 10 2015 Cost of General Fund - Median Value Home Public Works, Community Technology Community $140 Recreation, Improvements, ServicE Fire & Emergency—/ Preparedness, $49 Golf Course, $2 Other, $32 General Government $100 Police, $306 The chart above provides a cost breakdown of the property taxes paid by the median value home. This chart provides an approximate tax dollar cost of the services provided by the City, but it should be noted that it does not take in consideration any costs outside the General Fund or reduce the cost for non-property tax funded expenses such as permit fees and charges for services of the various departments. In 2015, the typical homeowner will pay approximately $306 for police, $140 for public works, $100 for general government, $60 for community recreation, $58 for community services and $49 for fire and emergency preparedness. 2015 Capital Projects & Equipment Replacement The Capital Improvement Plan (CIP) is a planning document that presents a fifteen-year overview of scheduled capital projects to address the City's goals for maintaining public infrastructure. The CIP includes a long-term financing plan that allows the City to allocate funds for these projects based on assigned priorities. The City has a total of $12.98 million of improvements budgeted for 2015, including 63 k' Avenue North Reconstruction, Freeway Park Area Neighborhood Reconstruction Project and construction of an Amphitheater. Funding for these projects come from a variety of different sources. The complete CIP can be found in the Capital Improvement Program section towards the back of this budget book. The City compiles a rolling equipment replacement schedule for all City vehicles and equipment. The Central Garage, reported as an internal service fund, administers the funding, replacement schedule and disposal of equipment in the fleet. In 2015, the City is scheduled to replace $620,570 in vehicles and equipment. The detailed listing of equipment scheduled for replacement in 2015 and 2016 is included in the Internal Service Fund section of this budget book. Enterprise Funds Enterprise Funds are those programs provided by the City which generate their own revenues for operation and capital maintenance. The City operates the following three Enterprise Funds: 11 Brooklyn Center Liquor The City operates two municipal retail liquor stores to provide for the controlled sale and distribution of alcoholic beverages in the community. Profits from the operations are used to fund projects benefitting the community and avoiding the necessity of larger property tax levies for such projects. In 2015, the Liquor Fund will transfer $250,000 to the Capital Improvements Fund for future projects. Centerbrook Golf Course The mission of Centerbrook Golf Course is to be a premier value Minnesota golf course offering a challenging, well-conditioned course and exceptional customer service. Centerbrook Golf Course is a nine (9) hole, par three (3) golf course owned and operated by the City of Brooklyn Center. Even with the challenges of declining golf rounds, we are optimistic that many of the initiatives and course improvements will begin to reap dividends going forward; yet it is assumed that an annual subsidy for this recreational activity will be required for the foreseeable future. Our objective is to minimize the required subsidy each year by growing demand and improving efficiency. Earle Brown Heritage Center The Earle Brown Heritage Center (EBHC) is comprised of the Convention Center with Administrative Services, Catering Services and Commercial Office Rentals. These Divisions provide for the provision of maintenance, conference services, custodial functions, development, preparing, equipment servicing, and serving of food and beverage for events at Earle Brown Heritage Center. Maintenance of buildings and grounds of the commercial office spaces located at EBHC for two tenants. Additionally, the EBHC has a management agreement with Flik International for the food and beverage. Public Utility Funds The Public Utility Funds track revenues and expenditures for fee based public utility services provided by the City. These funds operate on their own ability to generate revenues and receive no property tax support. Each year the City Council reviews the operations of these funds and sets rates based on the needs for operations, capital spending and debt service payments. The City operates the following five Public Utility Funds: Water Fund The City has approximately 121 miles of water main, over 1,300 water valves and 1,000 fire hydrants providing service to over 7,000 single-family residential connections and approximately 1,600 apartment/commercial/industrial customers. The budget includes a rate increase for the Water Utility for both base and consumption charges. The City currently has a quarterly base charge of $8.20 per residential and commercial irrigation meter. In addition to this base charge, the City charges a consumption charge of $1.36 per 1,000 gallons (up to 30,000 gallons per quarter). The 2015 rates will 12 increase to $10.00 per residential meter and $1.66 per 1,000 gallons, which is an increase of $1.80 per quarter in base charges and $0.30 in the consumption charge per 1,000 gallons. Multi-family, commercial and industrial properties currently pay a quarterly base charge depending on the size of the meter and a consumption rate of $1.70 per 1,000 gallons. The 2015 consumption rate will be adjusted to $2.07 per 1,000 gallons, which is an increase of $0.37. The amount by which the water bills at any particular property will be affected by rate increases depends on the size of the meter connection and the amount of water consumed. The change in the quarterly utility bill for a household using 18,000 gallons of water (considered the typical residential user) is estimated to be $7.20 per quarter. Water rate increases are driven by the City's construction of a water treatment plant, which will reduce the level of manganese from our water supply. The water treatment plant is currently under construction and is expected to be up and running by the end of 2015. The (estimated) total cost for the water treatment plant is $19.98 million. Immediate financing will be achieved through a low interest loan under the Drinking Water Revolving Fund through the Minnesota Public Facility Authority (PFA) loan program. The loan will be repaid over twenty years at an interest rate of approximately one percent, which calculates to annual repayments of approximately $1.1 million. Water rates will be adjusted over the next three years to provide sufficient revenue for these annual loan repayments. The City annual compares its utility rates to nine other cities that are considered to be similar to Brooklyn Center. The results of that comparison show that even with an increase in water rates budgeted for 2015, Brooklyn Center will continue to have the second lowest rates among comparison cities as shown below: SSILW $00 tO cJ.cO sEo.tO $50.cO S4o.tO SkIm rO S. wKile BE1 SwIdyn Fliffley SbDreJav FOrKE11A mapilwwwd crpun Grilden R5Eille ratIw L Center Val ley [I5(i 13 Sanitary Sewer Fund The City provides for the collection and conveyance of wastewater through a systems of mains and lift stations. Sewage is treated by the Metropolitan Council Environmental Services, whose contracted services account for approximately 75 percent of the funds operating expenditures. The City currently charges a quarterly base charge of $74.70, which will increase to $78.45 in 2015. The $3.75 quarterly increase is predominantly driven by the replacement cost of sanitary sewer infrastructure related to the neighborhood reconstruction projects over the upcoming years. Storm Sewer Fund The City provides for the collection and management of storm water throughout the City in compliance with State and Federal regulatory requirements. The Storm Drainage Utility operates and maintains approximately 84 miles of storm sewers and nearly 100 storm water management ponds or treatment devices. There will be no changes to the current Storm Sewer fees. The current fees are sufficient to cover costs and meet fund balance targets for the near term future. Street Lighting Fund The City provides electrical service, maintenance, repair and replacement of lights owned by the City. The City owns approximately 71 ornamental lights, primarily in the Earle Brown commercial area, 85 ornamental lights on Brooklyn Boulevard, 40 ornamental lights along Xerxes Avenue, 72 ornamental lights along Bass Lake Rd and 57th Avenue and leases approximately 915 lights from Xcel Energy. Another 97 lights owned by the City are located on traffic signal systems. There will be no changes to the current Street Lighting fees. The current fees are sufficient to cover costs and meet fund balance targets for the near term future. Recycling Fund The Hennepin Recycling Group (HRG) is a joint powers organization consisting of the cities of Brooklyn Center, Crystal and New Hope. The HRG is responsible for managing a comprehensive recycling and waste education system for the residents of these cities. 14 Residents pay a Recycling Service fee on their utility bill for curbside recycling, the use of a yard waste and tree branch drop off site, and proper waste management and special material education and services. The City currently charges a quarterly base charge of $8.94, which will increase to $9.21 in 2015. The $0.27 quarterly increase is predominantly driven by operational needs of the utility. The Recycling Fund is currently below their targeted minimum cash balance and the additional revenue would bring the utility closer to that targeted cash balance. Housing and Redevelopment Authority The Housing and Redevelopment Authority (HRA) levy for 2015 is $280,460, which is a decrease of $1,650 from 2014. State law establishing a HRA provides for an operating levy of up to 0.0 185% of the taxable market value within the jurisdiction to carry out the purposes of the authority. In Brooklyn Center after forming an HRA, the City established an Economic Development Authority (EDA) that assumed and expanded the HRA responsibilities into the areas of economic development. The HRA levy is required to provide the funding for the EDA activities. 15 This page has been left blank intentionally. 16