Loading...
HomeMy WebLinkAbout2015-128 CCR Member Dan Ryan introduced the following resolution and moved its adoption: RESOLUTION NO. 2015-128 RESOLUTION AMENDING THE SCHEDULE FOR PLANNING AND INSPECTION FEES FOR CERTAIN BUILDING, ELECTRICAL AND FIRE PROTECTION PERMITS WHEREAS, Chapters 3, 12, 15, 34, and 35 of the City Code of Ordinances requires the payment of fees for building permits, plumbing permits, mechanical system permits, sewer and water permits, fire protection permits, sign permits, building maintenance and occupancy reinspections, Planning Commission applications, flood plain use permits and administrative land use permits; and WHEREAS, Chapters 3, 12, 15, 34, and 35 of the City Code of Ordinances further authorizes the setting of various fees by City Council resolution; and WHEREAS, City Council Resolution No. 86-123 (adopted 8/11/86), 89-224 (adopted 11/27/89), 90-33 (adopted 2/26/90), 95-174 (adopted 8/14/95), 98-228 (adopted 12/14/98), 99-172 (adopted 11/8/99), 2005-65 (adopted 4/11/05), 2006-48 (adopted 4/10/06) and 2008-11 (adopted 1/14/08)together comprise a schedule of fees collected for service by Building and Community Standards; and WHEREAS, the City Council finds it appropriate to modify the fees contained in said resolutions and to amend the fee schedule related to electrical permits. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn Center that the electrical fee schedule be amended as follows for the City of Brooklyn Center: Planning and Inspection Fee Schedule Electrical Fee Minimum Fee for An Inspection $40 Per Trip Maximum for Single Family Residential $175 (For 3 Inspections) (New or Remodel) Additional @ $40 Maximum for Commercial No Limit Multi-Family Units $70/Unit Swimming Pools $80 Per Trip Plus Circuits New Service Panel or Generators 0 to 300 AMP $50 Each Additional 100 AMP $14/Each Change out service in same location $100 Change our sub panel in same location $40.00 Each Circuit or Feeder 0-30 AMP $8/Each Each Circuit or Feeder 31 to 100 AMP $10/Each Each Additional 100 AMP Add $5 per 100 AMP RESOLUTION NO. 2015-128 Street Lights $4/Each Standard Traffic Signal $7/Each Transformer 0-10 $ kilovolt-amperes 10 p 11-75 kilovolt-amperes $40 76- 99 kilovolt-amperes $60 Over 299 kilovolt-amperes $150 Fire Alarm & Energy Management Device $10 first 10 openings Lighting Retrofit $0.65 per fixture Remote Control/Signal Circuits $0.75 per device Investigation Fee (Double the Fee) $100 Minimum Cancelled Permit Handling Fee $40 Reinspection Fee $40 State Surcharge Subject to Change by State Refund issued only for Overpayment on Permits that Exceed $100 (Chapter 3-103 G 6) Building and Fire Protection Valuation $1 to $1,000 $49.50 $49.50 for the first $1,000 plus $3.25 Valuation $1,001 to $2,000 for each additional $100 or fraction thereof,to and including$2,000 Valuation $2,001 to $25,000 $82.00 for the first $2,000 plus $14.85 for each additional $1,000 or fraction thereof, to and including$50,000 Valuation $25,001 to $50,000 $423.55 for the first$25,000 plus $10.70 for each additional $1,000 or fraction thereof,to and including $50,000 Valuation $50,001 to $100,000 $691.05 for the first $50,000 plus $7.45 for each additional $1,000 or fraction thereof,to and including $100,000 Valuation $100,001 to$500,000 $1,063.55 for the first$100,000 plus $6 for each additional $1,000 or fraction thereof,to and including $500,000 Valuation $500,001 to $1,000,000 $3,463.55 for the first $1,000 plus $5.10 for each additional $1,000 or fraction thereof,to and including $1,000,000 Plan Check Fee 65% of the base permit fee RESOLUTION NO. 2015-128 BE IT FURTHER RESOLVED that the above schedule of Planning and Inspection fees shall become effective on September 1, 2015. August 24, 2015 Date Mayor ATTEST: XW City Clerk The motion for the adoption of the foregoing resolution was duly seconded by member Kris Lawrence-Anderson and upon vote being taken thereon,the following voted in favor thereof: Tim Willson, April Graves, Kris Lawrence-Anderson, and Dan Ryan; and the following voted against the same: none; whereupon said resolution was declared duly passed and adopted.