HomeMy WebLinkAbout2000-192 CCRMember Kay Lasman
moved its adoption:
introduced the following resolution and
RESOLUTION NO. 2000-192
RESOLUTION ESTABLISHING 2001 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, Resolution No. 85-34 established residential street and storm drainage
special assessment rates for street reconstruction projects; and
WHEREAS, the residential assessment rates are annually reviewed and approved by
the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the proposed street assesment rate for 2001 is equivalent to 38 percent
of an average project cost; and
WHEREAS, the R-4, R-5, R-6 and R-7 zoned districts should be assessed based on
an evaluation of project cost and project benefit.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL of the City
of Brooklyn Center, Minnesota, that:
1. The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in R-1, R-2 or R-3 zoned districts. These
rates shall also be applied to parcels of property in other land use zones when such
parcels (a) are being used as one-family or two-family residential sites at the time
the assessment roll is levied; and (b) could not be subdivided under the then-existing
Subdivision Ordinance.
2. The residential assessment rates for street reconstruction effective January 1, 2001
shall be as follows:
Land Use
R-1 zoned, used as one-family
site that cannot be subdivided
2001 Assessment Rates,
$2,290 per lot (street)
$ 750 per lot (storm drainage)
Resolution No. 2000-192
Land Use
R-2 zoned, or used as a two-family
site that cannot be subdivided
R-3 zoned
2001Assessment Rates
$30.53 per front foot with a
$2,290 per lot minimum (street)
$10.00 per front foot with a
$750 per lot minimum (storm)
Assessable frontage x $30.53 (street)
Number of residential units
Assessable frontaLye x $10.00 (storm)
Number of residential units
3. The residential assessment rates for street reconstruction shall not apply to R-4, R-
5, R-6, or R-7 zoned districts. The assessment rates for street reconstruction for R-
4, R-5, R-6, or R-7 zoned property shall be based on an evaluation of the project
cost and the project benefit for each project.
November 27, 2000
Date
ayor 0
ATTEST: IAA _ 1. G
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member,
Ed Nelson and upon vote being taken thereon, the following voted in favor
thereof:
Myrna Kragness, Debra Hilstrom, Kay Lasman, Ed Nelson, and Robert Peppe;
and the following voted against the same: none;
whereupon said resolution was declared duly passed and adopted.