HomeMy WebLinkAbout2016 09-29 PCPPLANNING COMMISSION AGENDA
CITY OF BROOKLYN CENTER
September 29, 2016
1. Call to Order: 7:00 PM
2. Roll Call
3. Approval of Agenda
• Motion to Approve Planning Commission Meeting Agenda for September 29, 2016
4. Approval of Minutes
• Motion to Approve the September 15, 2016 special meeting minutes
5. Chairperson's Explanation
The Planning Commission is an advisory body. One of the Commission's functions is to
hold public hearings. In the matters concerned in these hearings, the Commission makes
recommendations to the City Council. The City Council makes all final decisions in these
matters.
6. PLANNING ITEMS
a) Gatlin Development Company Planning App. No. 2016-009
Property Addresses: 2510 County Road 10 (etal)
PUBLIC HEARING – Consideration of Amendment No. 8 to the Shingle Creek
Crossing Planned Unit Development, to allow the re-adjustment and re-
subdivision of certain properties in and around the former Kohl’s property; the re-
subdivision of properties situated between Walmart and Shingle Creek waterway;
the re-adjustment and relocation of Building X; the addition of new Building W;
and to repurpose the old Kohl’s building into a self-storage, interior-only
warehouse facility with reduced parking
• Direct Staff to present Planning Report;
• Motion to open Public Hearing; take public input;
• Motion to close Public Hearing;
• Commission discuss requested item:
• Motion to adopt Planning Commission Resolution No. 2016-11
7. Discussion of Future Planning Items
8. Adjournment
PC Minutes
09-15-16 -1- DRAFT
MINUTES OF THE PROCEEDINGS OF THE PLANNING COMMISSION
OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF
HENNEPIN AND THE STATE OF MINNESOTA
SEPTEMBER 15, 2016
1. CALL TO ORDER
The Planning Commission meeting was called to order by Chair Christensen at 7:08 p.m.
2. ROLL CALL
Chair Randy Christensen, Commissioners Jack MacMillan, Stephen Schonning, Susan Tade
were present. Commissioner Rochelle Sweeney and Alexander Koenig were absent and excused.
Commissioner Carlos Morgan was absent. Also present were Secretary to the Planning
Commission Tim Benetti, Director of Business & Development Gary Eitel, and Michaela
Kujawa-Daniels, TimeSaver Off Site Secretarial, Inc.
3. APPROVAL OF AGENDA – SEPTEMBER 15, 2016
There was a motion by Commissioner MacMillan, seconded by Commissioner Tade, to approve
Planning Commission Meeting Agenda.
The motion passed unanimously.
4. APPROVAL OF MINUTES – SEPTEMBER 1, 2016
Commissioner Tade requested the following change to Page 3, third paragraph from the top.
Voting in favor: Chair Christensen, Commissioners Koenig, MacMillan, Schonning,
Sweeney, Tade and Morgan.
There was a motion by Commissioner Macmillan, seconded by Commissioner Schonning, to
approve the minutes of the, September 1, 2016 meeting as amended above.
The motion passed unanimously.
5. CHAIR’S EXPLANATION
Chair Christensen explained the Planning Commission’s role as an advisory body. One of the
Commission’s functions is to hold public hearings. In the matters concerned in these hearings,
the Commission makes recommendations to the City Council. The City Council makes all final
decisions in these matters.
PC Minutes
09-15-16 -2- DRAFT
6. PLANNING APPLICATION ITEMS
6a) Consideration of a Land Division Request by the City of Brooklyn Center of
City-Owned Land (EDA), located at 6250 Earle Brown Drive
Mr. Benetti introduced and gave background on this item. The request will facilitate the land
division of the EDA owned lot known as the “Embassy Suites - Phase II” parcel. The City will
retain ownership of the easterly 165-feet of the lot; with the remaining portion to be deeded to
the developers of the new Fairfield Inn and Suites hotel. He noted this action was given
preliminary approval under the Embassy Suites PUD Amendment of 2013, in which said
amendment authorizes the city to complete a land division of this lot by means of a metes and
bounds description. The division provides an ideal method for the City to retain the rights to the
pond area located east of the new hotel site.
Mr. Benetti stated the ultimate objective of this land split/division is to transfer or attach the
City/EDA owned portion of land with the Earle Brown Heritage Center properties to the east.
Commissioner MacMillan asked if the City plans to add water fountains and walkways at some
point again. Mr. Eitel stated they do plan to add a fountain as well as pathways that tie back into
the trails and possibly a covered walkway. He stated the idea is to complement the Earle Brown
Center in any way possible.
OPEN TO PUBLIC COMMENTS – RESOLUTION NO. 2016-10
Chair Christensen recognized residents in the audience who wished to speak on this matter.
There was a motion by Commissioner Schonning, seconded by Commissioner Macmillan, to
open the public hearing on the Consideration of the Simple Lot Division (Metes and Bounds) of
the EDA Owned Parcel (Embassy Suites PUD – Phase II Hotel Lot – Fairfield Inn and Suites
Hotel site), at 7:19 p.m.
Chair Christensen called for comments from the public.
There were no individuals in attendance and no comments received at that time.
MOTION TO CLOSE PUBLIC COMMENTS (HEARING)
There was a motion by Commissioner Tade, seconded by Commissioner Schonning, to close the
public hearing on the Consideration of the Simple Lot Division (Metes and Bounds) of the EDA
Owned Parcel (Embassy Suites PUD – Phase II Hotel Lot- Fairfield Inn and Suites Hotel site), at
7:21 p.m.
The motion passed unanimously.
PC Minutes
09-15-16 -3- DRAFT
ACTION TO RECOMMEND APPROVAL OF PLANNING COMMISSION RESOLUTION
NO. 2016-10 REGARDING THE SIMPLE LOT DIVISON (METES AND BOUNDS) OF THE
EDA OWNED PARCEL (EMBASSY SUITES PUD – PHASE II HOTEL LOT – FAIRFIELD
INN AND SUITES HOTEL SITE.
There was a motion by Commissioner MacMillan, seconded by Commissioner Tade, to
recommend approval of The Simple Lot Division (Metes and Bounds) of the EDA Owned Parcel
(Embassy Suites PUD – Phase II Hotel Lot – Fairfield Inn and Suites Hotel Site.
Voting in favor: Chair Christensen, Commissioners Tade, MacMillan, Schonning and
Sweeney.
And the following voted against the same: None
The motion passed unanimously.
ADJOURNMENT
There was a motion by Commissioner Tade, seconded by Commissioner MacMillan, to adjourn
the Planning Commission meeting. The motion passed unanimously. The meeting adjourned at
7:25 p.m.
STATE OF MINNESOTA )
COUNTY OF HENNEPIN ) ss. Certification of Minutes
CITY OF BROOKLYN CENTER )
The undersigned, being the duly qualified and assigned Secretary to the Planning Commission of
the City of Brooklyn Center, Minnesota, certifies:
1. That attached hereto is a full, true, and complete transcript of the minutes of a Regular
Session of the Planning Commission of the City of Brooklyn Center held on September
15, 2016.
2. That said meeting was held pursuant to due call and notice thereof and was duly held at
Brooklyn Center City Hall.
3. That the Planning Commission approved said minutes at its September 29, 2016 meeting.
_______________________________ _______________________________
Tim Benetti, Secretary Randall Christensen, Chair
________________
App. No. 2016-009
PC 09/29/16
Page 1
Planning Commission Report
Meeting Date: September 29, 2016
Application No. 2016-009
Applicant: Gatlin Development Company
Location: Shingle Creek Crossing PUD Project Site
Request: Planned Unit Development – Amendment No. 8
INTRODUCTION
Gatlin Development Company is requesting its eighth planned unit development amendment to
the previously approved Shingle Creek Crossing PUD redevelopment plans. This updated PUD
plan provides for the re-subdivision of certain properties in and around the former Kohl’s
property and certain properties situated between the Walmart and Shingle Creek waterway; the
re-adjustment (larger size) and relocation of planned Building X; the addition of a new Building
W with a reduced setback standard; and an allowance to repurpose the old Kohl’s building into
an interior only, self-storage/warehouse facility with reduced parking.
There is no Site and Building Plans submitted with this PUD Amendment application at this
time. Some of the new and existing buildings will require separate site and building plan
approvals (or amendment) when time comes for the Developer to construct said units.
This matter is being presented as a public hearing item; and notices have been mailed to all
surrounding property owners within 350-feet of the affected site.
BACKGROUND
The original Shingle Creek Crossing PUD was approved on May 23, 2011 (which is considered
the 1st Amendment to the original Brookdale Mall Planned Unit Development of 1999) and
provided for the overall redevelopment of the Brookdale Mall properties. This mall originally
consisted of over 1.1 million square feet of retail space, which was reduced by the demolition of
approximately 760,000 sf. of old mall space, followed by the planned renovation of
approximately 123,242 sf. of the Food Court mall located next to the Sears store; the
development of approximately 402,489 sf. of new retail commercial and restaurant uses; and
approval of the Single Creek day lighting features.
PUD Amendment No. 2 was approved a short time later on September 12, 2011, which provided
for the physical separation of the food court building from the Sears store; the
renovation/conversion of the Food Court’s “common area” into additional retail space, whereby
the net leasable retail area was increased from 123,242 sq. ft. to 150,591 sq. ft.; the removal of
planned Building N between Sears and Wal-Mart; and the addition of a new 6,000 sf.
commercial pad site located at the southeast corner of Xerxes Avenue/56th Avenue entrance.
PUD Amendment No. 3, adopted September 24, 2012, provided for the replatting of certain lots
and revisions to new certain building pad sites (Building D, Building Q, and Building O
• Application Filed: 09/13/16
• Application Deemed Complete: 09/16/16
• Review Period (60-day) Deadline: 11/12/16
• Extended Review Period Deadline: N/A
________________
App. No. 2016-009
PC 09/29/16
Page 2
restaurant pad site).
PUD Amendment No. 4, adopted October 14, 2013, approved the removal and replacement of
the former Brookdale Mall Food Court and replacement plan with ten (10) new retail/service
buildings.
PUD Amendment No. 5 was related to various sign allowances granted throughout the Shingle
Creek Crossing PUD.
PUD Amendment No. 6 was approved on June 9, 2014, and included the following changes: a)
revised layout and sizes of Bldgs. 9 and 10 (former Brookdale Food Court replacement plans; b)
new Buildings R - a 5,400 sq. ft. restaurant pad site; c) new Building T - a 5,500 sq. ft. restaurant
pad site; d) revised size and layout of Bldg. B from 8,500 sq. ft. to 6,673 sq. ft.; and e) approval
of preliminary/final plat of Shingle Creek Crossing 5th Addition.
The previous PUD Amendment No. 7 was approved November 9, 2015, which authorized the
subdivision of the former Kohl’s store property into two separate lots, and the planned
development of a new 9,400 sf. commercial building with reduced setbacks in one of these lots.
The image below is highlighted to illustrate the area of this previous amendment request.
PUD AMENDMENT ANALYSIS
Records show the 75,000 sf. Kohl’s building was constructed in 1987. Since the inception and
approval of this Shingle Creek Crossing PUD (SCC-PUD), the Developer intended to keep and
maintain the existing Kohl’s department store as originally designed. Although part of the
originally created SCC-PUD of 2011, this area and building have remained untouched (except
for exterior wall panel repairs) or unaffected until this application. Since the closure of Kohl’s in
2013, the Developer has actively sought new users or tenants to fill this 75,000 sq. ft. retail
commercial space; but unfortunately there have been only a handful interested parties seeking to
lease or purchase this space, none of which reached fruition. Mr. Gatlin also undertook
expensive repair work on the exterior façade due to water damage, but still no buyers or users.
________________
App. No. 2016-009
PC 09/29/16
Page 3
Platting Considerations
As noted previously, Amendment No. 7 provided an approval to split the original Kohl’s parcel
into two new lots. The first lot would have consisted of 1.48 acres in size and reserved for a new
9,400 sf. Bldg. X, while the remaining 5.35 acre lot would be left t for the old Kohl’s. The
original PUD Plan amendment called for the location of the smaller Building X to be situated as
close to the access road to the west, and provide a shared parking area between both Bldg. X and
old Kohl’s store (refer to layout image below):
After the amendment request was approved, the Developers also received approval of the first
version of re-subdividing this Kohl’s parcel into two new lots, which was to be titled “Shingle
Creek Crossing 6th Addition”.
After the Developer received preliminary plat approval of SCC 6th Addition, the developer
________________
App. No. 2016-009
PC 09/29/16
Page 4
elected not to file a final plat of this area, which in effect rendered the first plat application void.
The new PUD Amendment No. 8 now calls for the creation of three lots in this general area,
which provides a pad site for new planned Building W; the adjusted and relocated Bldg. X; and
the existing Kohl’s building, now identified as Bldg. Y.
The PUD also calls for the slight readjustment and replatting of the 5 lots (Bldgs. L, M, N/S; O,
and Q) located between the Walmart and the Shingle Creek waterway (noted red-outline layer):
The city has received an application for the new (updated) Preliminary Plat of Shingle Creek
Crossing 6th Addition, which is related to this PUD Amendment, but is not being officially
considered under this PUD Amendment request at this time. This plat, both preliminary and
________________
App. No. 2016-009
PC 09/29/16
Page 5
final plat, is scheduled to be presented for consideration at the next Planning Commission
meeting in October.
Parking Considerations
The PUD Site Data Table (noted below), which accompanies this and all previous PUD Map
submittals, has been highlighted to note the lots affected under this PUD Amendment request.
The original Kohl’s site contains 447 parking spaces, which is 34 spaces more than needed under
the current Zoning Ordinance standards for commercial/retail developments of this size. Since
the Kohl’s site is now part of the Shingle Creek Crossing PUD, the PUD Agreement allows a
reduced parking ratio for all retail/commercial uses of 4.5 spaces per 1,000 sf. of GFA. In this
case, the required parking for the 75,000 sf. building can be reduced to 338 spaces, which
reflects 109 additional spaces.
Under the previous No. 7 Amendment, the Developer intended to keep the 75,000 sf. building on
a 5.38 acre lot, with 342 parking spaces, thus maintaining a 4.56 ratio. The original planned
9,400 sf. Bldg. X meanwhile, would sit on a new 1.48 acre lot, with 51 spaces or 5.43 ratio.
Under this requested No. 8 amendment, the original Kohl’s parcel is essentially being split into
three new lots. Lot 1, Block 2 is a 1.1 acre parcel to be reserved for Bldg. W, a 6,300 sf.
retail/service building, with 50 spaces allocated and a 7.94 parking ratio. Lot 3, Block 2 is
created for the readjusted and relocated Bldg. X, which has been increased from 9,400 sf. to
19,800 sf in size, 125 parking spaces, and a 6.31 ratio. The former Kohl’s, now identified as
Bldg. Y, remains with a 75,000 sf. building area, but the new lot is reduced from 5.3 acres down
to 2.83 acres; with only 16 parking spaces, or a 0.21 ratio.
This parking allocation for Bldg. Y is a considerable reduction, due to the proposed use of this
old Kohl’s store building site by the developer, which will be addressed under the next section of
this report (“Use and Building Considerations”).
The Site Data table above also highlights existing Bldg. F lot (the City/EDA owned parcel),
which is shown with 14,000 sf. building, 63 spaces, and a 4.5 ratio. This table row line is
________________
App. No. 2016-009
PC 09/29/16
Page 6
footnoted with a remark “Includes Parking on Lot 2, Block 2 SCC 6th Addn.”, which indicates the
Developer is seeking to include parking for Bldg. F is shared with Bldg. W. The PUD Plan
shows Bldg. F site with 35 marked spaces, while Bldg. W site has 78 marked spaces, for a total
of 113 spaces between both lots. Bldg. F requires a minimum of 63 spaces (14 x 4.5 = 63), while
Bldg. W would require only 29 spaces (6.3 x 4.5 = 28.35, or 29). The shared amount of parking
between both lots should be adequate to accommodate both commercial pad sites if needed.
Use & Building Considerations
Bldg. Y (old Kohl’s) is shown with a reduced lot and parking area due to the Owner/Developer is
requesting from the City an allowance to repurpose and reuse this former retail store into a fully
secured, interior only, self-storage facility. The developer of the BC Storage development of
2015 (approved under Planning App. Nos. 2015-009 & 2015-010) - located south of the Regal
Theatre at 6330 Camden Avenue North, is now seeking to provide a similar self-storage facility
at this Bldg. Y location, which is similar to separate building rehab project they performed in a
different metro city.
Under the current PUD Agreement between Gatlin and the City, this self-storage/warehouse use
is not specifically called out as a permitted or prohibited use, and is not permitted or allowed
under the PUD/C-2 zone created for this overall commercial/retail center development.
However, under the wide-ranging powers granted under PUD approvals, the Developer (and the
City) is allowed some latitude and flexibility in allowing certain uses, or even relaxing or
strengthening certain standards, such as setbacks, parking, signage, etc., provided they are agreed
upon by both parties. The PUD is allowed to be amended at times in order to allow for changing
patterns or economic trends, which in some cases ensures the continuation and sustained
development within an approved PUD site, such as this one.
The developer of the original BC Storage project originally presented a very nice and ideal
designed self-storage facility on a similar PUD/C-2 zoned parcel within the City, and although
that project was not completed, the developer feels the rehab and remodeling (reuse) of this old
retail department store is another reasonable and more feasible site to complete his goal of
providing self-storage needs for the community and metro area.
Staff is pleased to note that the developer accepts and will comply with the no outside storage or
parking of vehicles on this site, which was similar to the approvals made under the Camden
Avenue site. The limited number of parking is shown due to the very limited nature or low
volume of vehicle traffic that is expected on this Bldg. Y site. Gatlin has effectively adjusted the
parking spaces over on to the new Bldg. W and Bldg. X sites. Bldg. X is also been relocated to
provide an effective “screen” of sorts for the Bldg. Y, and also make the building face or redirect
its frontage back towards the main Shingle Creek Crossing mall areas.
Setback Considerations:
The PUD Plan Maps (09/14/16) submitted by Gatlin do not indicate or specify any identifiable
building setbacks from lot lines or roadway lines. By using the map scale, city staff has
estimated the setback for Bldg. W along Co. Road 10 is approximately 20 feet.
Development standards in the C2 (Commerce) District provides the following setbacks: Front
________________
App. No. 2016-009
PC 09/29/16
Page 7
Yard = 35-ft.; Rear Yard =40-ft.; Side Yard = 10-ft.; and Corner Side Yard = 25-ft.
One of the paramount benefits of developing under a PUD is to allow or provide Developers
some flexibility in uses, design standards and layouts, which in some cases includes building
setbacks. This entire PUD, both existing and planned developed sites, reveal obvious allowances
and flexibility in these setback standards. For all intents and purposes, when the City accepts or
approves a master development plan or amendments, the planned design and layouts, along with
assumed setbacks, are essentially approved under the PUD Amendment process, and can be
extended to any new buildings that are comprehended lager under separate Site and Building
Plan applications.
Under the original SCC-PUD Agreement of 2011, a select number of building pad sites were
approved with reduced setbacks, due in part to the dedication of Twin Lake Regional Trail along
Bass Lake Rd./Co. Road 10; and one building affected by the proposed Shingle Creek
daylighting improvements. These setbacks are noted as follows:
A. The setbacks from public right of ways to buildings are reduced from 35 feet to 20 feet for
Lots 7, 8, 9, 12, & 13, Block 1 and 18 feet for Lot 11, Block 1 to offset the dedication of
additional right of way for the Twin Lake Regional Trail.
B. The setbacks from property lines for a side and rear yard setback are reduced from 10 feet to
6 feet for the east and south lot line of Lot 16, Block 1 and from 10 feet to 0 feet for the
south lot line of Lot 3, Block 1.
Because this Bldg. W is being presented with a reduced setback similar to those approved under
the original PUD Agreement, the City must acknowledge and approve the reduced setbacks
specifically for this new building site. City staff does not see any objections or reasons not to
allow this reduced setback for Bldg. W at this location. This will be consistent with the
allowances made for the seven other lots originally platted in 2011.
To ensure that the city recognizes and acknowledges these reduced setbacks on this proposed
building pad site, planning staff is requesting the Planning Commission discuss and provide a
recommendation to allowing these reduced setbacks from this County Road 10 right-of-way.
FINDINGS & RECOMMENDATION
Similar to those findings Staff indicated and provided under previous considerations of Shingle
Creek Crossing PUD Amendments, the requested replatting, new building pad site, new building
adjustment, and the consideration of the self-storage use with reduced parking allocation, can be
supported based on the following findings:
a) The replatting of the former Kohl’s property into three separate lots for an existing
building site and two new retail commercial pad sites; along with the replatting of Bldg.
Pad Sites L, M, O, Q, and N/S, will promote and enhance the general public welfare of
this PUD, as it maintains and keeps the redevelopment activity of this site intact and
ongoing;
b) The replatting of the Bldg. Pad Sites L, M, O, Q, and N/S is found to be a reasonable
request and provides an ideal opportunity for the City to explore or finalize potential
________________
App. No. 2016-009
PC 09/29/16
Page 8
options of expanding the daylighting features of the Shingle Creek waterway in this
development area; which in turn will provide increased aesthetic elements for future
development sites within the PUD, and may help to increase water quality;
c) The reduced setback allowance for Bldg. W at 20-feet along County Road 10 is consistent
with those reduce setback allowances granted under the original 2011 Shingle Creek
Crossing PUD Agreement;
d) The additional Bldg. W pad site and relocated/expanded Bldg. X pad site reflects a
growing demand and need for this area, which benefits and sustains the ongoing efforts
to improve, market and complete the overall Shingle Creek Crossing PUD Plan by the
Developer;
e) The additional lot and future building site, along with the acknowledgement by the City
that all new Buildings and Pad Sites will meet the required parking standards established
by the Shingle Creek Crossing PUD Agreement, should not be detrimental or pose any
threat or danger to the general public.
f) The additional lot and future building site will not be injurious to the use and enjoyment
of other uses in this Shingle Creek Crossing PUD;
g) The allowance of a self-storage facility with interior warehousing and storage only, with
no outside storage or parking of vehicles or personal items, should not be injurious to the
use and enjoyment of other uses in this Shingle Creek Crossing PUD;
h) The additional lot and future building site, the reduced setback allowance for Bldg. W,
and the allowance for the self-storage use will not impede the normal orderly
development and proposed improvements of this Shingle Creek Crossing PUD; and
i) With the addition of Bldg. W, the relocation and enlargement of Bldg. X, and the reduced
parking numbers and ratio allocated to Bldg. Y, the overall Shingle Creek Crossing PUD
site will have adequate measures in place to maintain and provide suitable access and
shared parking within the site.
j) The proposed layout of all new development lots and all new buildings, including
reduced setbacks and any other related flexibility or reductions identified on said Shingle
Creek Crossing PUD Plans (dated 09/14/2016) are hereby acceptable and approved.
Staff recommends the Planning Commission adopt the attached Resolution No. 2016-11, which
comprehends the approval of Planning Application No. 2016-009, the Planned Unit
Development (PUD) Amendment No. 8, which would allow certain changes to the original 2011
Shingle Creek Crossing Planned Unit Development (and all subsequent amendments), subject to
the following conditions and allowances:
1. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned Unit
Development by replatting the former Kohl’s site, located at 2501 County Road 10, into
________________
App. No. 2016-009
PC 09/29/16
Page 9
the three new lots, along with replatting the five lots generally located between the
existing Walmart and the Shingle Creek waterway, addressed as 1150, 1050, 1020, 1000,
and 1100 Shingle Creek Crossing, into the “Shingle Creek Crossing 6th Addition”.
2. Developer is allowed to reuse or repurpose (develop) the existing 75,000 sq. ft. building
space located on Bldg. Y site into an interior only, self-storage facility. This commercial
self-storage site shall not allow outdoor storage of personal or commercial vehicles,
including rental trucks or trailers, boats and/or trailers, recreational vehicles (of all
forms), miscellaneous equipment and other personal property items, on this site, nor any
other parking areas inside the Shingle Creek Crossing development.
3. A separate Site and Building Plan application will be required for new Bldg. W; the
relocation and enlargement of Bldg. X; and the new improvements for Bldg. Y.
4. Developer is granted a reduction to the amount of parking normally required on this
Bldg. Y site due to the acceptable limited nature of a proposed self-storage use, and the
lower levels of expected (estimated) vehicle traffic and trip generations attributed to such
use.
5. Developer must obtain a building permit and adhere to all requirements prior to
beginning any removals, demolition, land disturbance work, or new construction of
parking, utilities or buildings.
6. Developer shall comply with all conditions or request of additional information as noted
in the City Engineer Review Memorandum, dated Sept. 21, 2016.
7. Unless amended otherwise or under separate agreement, all existing provisions, standards
and variations provided under the 2011 Shingle Creek Crossing PUD and subsequent
amendments, shall remain in effect for the entire Shingle Creek Crossing Planned Unit
Development.
8. Any future PUD amendments or application requests will require the submittal and
adoption (acceptance) of an updated master plan, which plan shall govern the planned
and future redevelopment areas of this site.
9. No other allowances as illustrated or indicated on the submitted “Shingle Creek Crossing
PUD Amendment No. 8 Plans (dated 09/14/2016) shall be comprehended or permitted
under this specific approval.
10. The Developer shall enter into and execute an updated PUD Agreement (or similar
document) as prepared by the City Attorney.
Attachments
• Planning Commission Res. No. 2016-11
• City Engineers Review Memo (09/21/16)
• Shingle Creek Crossing PUD Amendment Plans No. 8
M E M O R A N D U M
DATE: September 21, 2016
TO: Tim Benetti, Planning and Zoning Specialist
FROM: Andrew Hogg, Assistant City Engineer
SUBJECT: Public Works - PUD Amendment No. 8, Review Memo – Shingle Creek Crossing
Public Works staff has reviewed the 12 sheet set of plans entitled Shingle Creek Crossing PUD
Amendment No. 8, which were prepared by Kimley-Horn and Associates, Inc.; dated August 8,
2016. PUD Amendment No. 8 applies to Building F, L, M, N, O, Q, S, X, W and Y sites.
The following comments are offered relative to the above-referenced submittals. They are
contingent upon preliminary and final plat approval, final site plans and land alteration/building
permit submittals and approval.
PUD Items - Shingle Creek Crossing PUD Amendment No. 8:
1. Drive-thru details for Building F have not been reviewed and will be examined in closer
detail during future stages when detailed drive-thru design elements are provided.
2. Re-platting will be requested for the sole purpose of revising the property lines as depicted
in the attached drawing. Under this premise, the proposed property line revisions appear to
pose no negative impacts to the development and are consistent with City requirements.
The only known impacts of the revisions pertain to the shifting of parking designation
ratios, which minimums do not appear to be met (e.g. site Q and Y).
3. Rededicating and terminating certain easements are required as part of the required
replatting. Formal vacation documents are required and must contain easement vacation
descriptions and depiction exhibits signed by a professional surveyor. A separate
application is required for the easement vacation actions.
4. No portion of building or appurtenant structures may encroach on the City drainage and
utility easement.
5. Any further development of Sites S, N and Q must include a well designed area between
the ring road including concrete curb and gutter along the north side of the ring road.
6. The landscape plan appears to be incomplete for sites F, S, N, Q and W.
7. The PUD has been reviewed by Hennepin County. The right-in access along CSAH 10
(Bass Lake Road) at the former Kohl’s site must be removed.
8. The applicant is responsible for coordinating site development plans with Xcel Energy,
CenterPoint Energy, Qwest Communications and other private utility companies. Any
further easements necessary to provide utility service to the proposed site development
shall be dedicated to the public for public use with the final plat.
9. The existing 16” watermain that crosses Lot 4, Block 2 will need to be re-routed per layout
depicted in PUD No. 8. Public utilities work must meet and conform to all City standards
and specifications, to be further coordinated and approved by City Engineer.
10. Plans must provide 1” abstraction from all impervious surfaces for the entire site to meet
Shingle Creek Watershed Commission rule changes since the approval of the stormwater
plan with the original development. Update plans and stormwater narrative as necessary.
Provide design calculations.
11. Existing stormwater facility must be able to be accessible and maintained. Suggested
PUD Amendment No. 8 Plan Review –Shingle Creek Page 2
September 21, 2016
consideration should be given to replacing the existing facility located on Lot 4, Block 2
(Site X).
12. All newly proposed loading dock and truck turning/backing areas must be fully separated
from public customer parking areas, must not direct or invite public parking ingress/egress
routes through loading dock and turning/backing areas and must not encroach on main
drive aisles. It appears site N is non-compliant with this condition.
13. Circulation exhibit must be updated to include site N, Q, W and S (e.g. delivery and garage
truck turning movements.
14. Provide an update of the original and amended traffic impact study to reflect the current
site and building revisions for PUD Amendment No. 8 and prior outstanding revisions.
15. Revise site plan to provide better pedestrian connectivity for Buildings W, X and Y with
the internal PUD sidewalk system.
16. Parking area to the south of site S must be revised so the parking stalls and backing areas
are separate from the drive aisle/intersection area to the main site roadway between
Walmart and site S.
17. The area immediately to the northeast of site X must be better defined as parking area or
delivery drop area to ensure adequately designed.
18. Upon project completion the applicant must submit an as-built survey of the property,
improvements and utility service lines and structures; and provide certified record
drawings of all project plan sheets depicting any associated private and/or public
improvements, revisions and adjustments prior to issuance of the certificate of occupancy.
The as-built survey must also verify that all property corners have been established and are
in place at the completion of the project as determined and directed by the City Engineer.
19. Inspection for the private site improvements must be performed by the developer’s
design/project engineer. Inspection for the watermain relocation must be performed by a
City hired Engineer to be reimbursed by the developer. Upon project completion the
design/project engineer must formally certify through a letter that the project was built in
conformance with the approved plans and under the design/project engineer’s immediate
and direct supervision. The designer/project engineer must be certified in the State of
Minnesota and must certify all required as-built drawings (which are separate from the as-
built survey).
20. An updated certified abstract of title or registered property report must be provided to the
City Engineer and City Attorney for review at the time of the preliminary plat application
(within 30 days of preliminary plat application). Additionally, this will need to stay current
and be updated through the approval process as required to maintain and be current within
30 days of release of the final plat.
21. All recommendations and requirements approved as part of previous actions pertaining to
all prior PUD/PUD amendment approvals, Preliminary Plan approvals and Final Plat
approvals relative to this development and/or portions thereof are withstanding and must
be incorporated into the final plans.
22. A utility facilities easement agreement is required that will provide the City perpetual
accessibility to all private utilities and storm drainage areas to inspect and enforce proper
utility service and maintenance for the entire site. This easement agreement also includes
private inspection, maintenance and reporting responsibilities and must be executed prior
to issuance of building and land alteration permits.
23. A drainage and utility easement encompassing all storm water treatment facilities and the
rerouted watermain must be dedicated on the plat.
PUD Amendment No. 8 Plan Review –Shingle Creek Page 3
September 21, 2016
24. All work performed and materials used for construction of utilities must conform to the
City of Brooklyn Center’s standard specifications and details. The City’s standard details
must be included in the plans.
25. The final plans must be certified by a licensed engineer in the State of Minnesota and
forwarded to the City Engineer for approval.
All aforementioned items, comments and recommendations are provided based on the information
submitted by the applicant at the time of this review. The PUD amendment and site plan must be
developed and maintained in substantial conformance with the referenced plans, unless modified
by the staff recommended conditions above. Subsequent approval of the final plan may require
additional modifications based on engineering requirements associated with final design of the
water supply, storm drainage, sanitary sewer, final grading, geometric design and other design
elements as established by the City Engineer and other public officials having jurisdiction over
approval of the final site plans.
Commissioner introduced the following resolution and moved its adoption:
PLANNING COMMISSION RESOLUTION NO. 2016-11
RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2016-090 SUBMITTED BY
GATLIN DEVELOPMENT COMPANY FOR A PLANNED UNIT
DEVELOPMENT AMENDMENT NO. 8 TO THE 2011 SHINGLE CREEK
CROSSING PLANNED UNIT DEVELOPMENT (LOCATED AT 1150, 1050,
1020, 1000, AND 1100 SHINGLE CREEK CROSSING AND 2501 COUNTY
ROAD 10)
WHEREAS, the City Council of Brooklyn Center adopted Resolution No. 2011-85,
dated June 13, 2011, which is considered the first amendment to the previously approved 1999
Brookdale Mall Planned Unit Development, whereby this amendment approved the establishment
of the new Shingle Creek Crossing Planned Unit Development, and which included an approved
Development/Master Plan and certain allowances and development standards that would govern
over the PUD; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2011-127,
dated September 12, 2011, which approved the first amendment to the original Shingle Creek
Crossing Planned Unit Development, and which included an updated Development/Master Plan
and provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2012-106,
dated August 13, 2012, which approved the second amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2012-129,
dated September 24, 2012, which approved the third amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2013-124,
dated October 14, 2013, which approved the fourth amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2013-72,
dated July 8, 2013, which approved the fifth amendment to the Shingle Creek Crossing Planned
Unit Development, and which included an updated Development/Master Plan and provided
additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2014-75,
dated June 9, 2014, which approved the sixth amendment to the Shingle Creek Crossing Planned
PC RESOLUTION NO. 2016-11
Unit Development, and which included an updated Development/Master Plan and provided
additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2016-170,
dated November 9, 2015, which approved the seventh amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, Gatlin Development Company submitted Planning Application No.
2016-009, which is considered the eighth amendment to the Shingle Creek Crossing Planned Unit
Development, by allowing certain changes to the approved 2011 Shingle Creek Crossing Planned
Unit Development; and
WHEREAS, the proposal comprehends additional adjustments not approved under
the 2011 Shingle Creek Crossing Planned Unit Development and the related 2011 PUD
Agreement, specifically the proposed amendments to be comprehended under this application
include the following:
a) authorize the replatting the former Kohl’s property, located at 2510
County Road 10 into three separate lots, along with the replatting of the
five lots generally situated between Walmart and Shingle Creek daylight
waterway, and addressed as 1150, 1050, 1020, 1000, and 1100 Shingle
Creek Crossing, into a new subdivision to be titled “Shingle Creek
Crossing 6th Addition”;
b) allow a new proposed Bldg. W, a 6,300 sf. multi-tenant commercial
building, with an approved reduced setback of 20-feet from the adjacent
County Road 10 right-of-way;
c) allow the relocation and enlargement of previously approved Building X,
from 9,400 sf. to 19,800 sf. ; and
d) allow the reuse and repurpose of the old Kohl’s building (new Bldg. Y)
into an self-storage, interior only warehouse facility with reduced
parking.; and
WHEREAS, the Planning Commission held a duly called public hearing on
September 29, 2016, whereby a staff report and public testimony regarding the Planned Unit
Development Amendment were received and considered by the Planning Commission; and the
Planning Commission gave proper consideration of this Planned Unit Development Amendment
request by utilizing the guidelines for evaluating such amendments as contained in Section 35-
355 of the City's Zoning Ordinance and the City's Comprehensive Plan; and
PC RESOLUTION NO. 2016-11
WHEREAS; in light of all testimony received, the Planning Advisory
Commission of the City of Brooklyn Center did determine that Planning Application No. 2016-
009, submitted by Gatlin Development Company, may be approved based upon the following
findings and considerations:
A. The replatting of the former Kohl’s property into three separate lots for an
existing building site and two new retail commercial pad sites; along with
the replatting of Bldg. Pad Sites L, M, O, Q, and N/S, will promote and
enhance the general public welfare of this PUD, as it maintains and keeps
the redevelopment activity of this site intact and ongoing;
B. The replatting of the Bldg. Pad Sites L, M, O, Q, and N/S is found to be a
reasonable request and provides an ideal opportunity for the City to
explore or finalize potential options of expanding the daylighting features
of the Shingle Creek waterway in this development area; which in turn
will provide increased aesthetic elements for future development sites
within the PUD, and may help to increase water quality;
C. The reduced setback allowance for Bldg. W at 20-feet along County Road
10 is consistent with those reduce setback allowances granted under the
original 2011 Shingle Creek Crossing PUD Agreement;
D. The additional Bldg. W pad site and relocated/expanded Bldg. X pad site
reflects a growing demand and need for this area, which benefits and
sustains the ongoing efforts to market and complete the overall Shingle
Creek Crossing PUD Plan by the Developer;
E. The additional lot and future building site, along with the
acknowledgement by the City that all new Buildings and Pad Sites will
meet the required parking standards established by the Shingle Creek
Crossing PUD Agreement, should not be detrimental or pose any threat or
danger to the general public.
F. The additional lot and future building site will not be injurious to the use
and enjoyment of other uses in this Shingle Creek Crossing PUD;
G. The allowance of a self-storage facility with interior warehousing and
storage only, with no outside storage or parking of vehicles or personal
items, should not be injurious to the use and enjoyment of other uses in
PC RESOLUTION NO. 2016-11
this Shingle Creek Crossing PUD;
H. The additional lot and future building site, the reduced setback allowance
for Bldg. W, and the allowance for the self-storage use will not impede the
normal orderly development and proposed improvements of this Shingle
Creek Crossing PUD; and
I. With the addition of Bldg. W, the relocation and enlargement of Bldg. X,
and the reduced parking numbers and ratio allocated to Bldg. Y, the
overall Shingle Creek Crossing PUD site will have adequate measures in
place to maintain and provide suitable access and shared parking within
the site.
J. The proposed layout of all new development lots and all new buildings,
including reduced setbacks and any other related flexibility or reductions
identified on said Shingle Creek Crossing PUD Plans (dated 09/14/2016)
are hereby acceptable and approved.
AND WHEREAS, the Planning Advisory Commission of the City of Brooklyn
Center did determine that the guidelines for evaluating Planned Unit Development Amendment, as
contained in Section 35-355 of the City’s Zoning Ordinance, have been met, and the proposal is
therefore, in the best interest of the community.
NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission
for the City of Brooklyn Center, Minnesota, that Planning Application No. 2016-009 submitted
by Gatlin Development Company, requesting approval of the eighth amendment to the Shingle
Creek Crossing Planned Unit Development, may be approved subject to the following conditions:
1. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned
Unit Development by replatting the former Kohl’s site, located at 2501
County Road 10, into the three new lots, along with replatting the five lots
generally located between the existing Walmart and the Shingle Creek
waterway, addressed as 1150, 1050, 1020, 1000, and 1100 Shingle Creek
Crossing, into the “Shingle Creek Crossing 6th Addition”.
2. Developer is allowed to reuse or repurpose (develop) the existing 75,000
sq. ft. building space located on Bldg. Y site into an interior only, self-
storage facility. This commercial self-storage site shall not allow outdoor
storage of personal or commercial vehicles, including rental trucks or
trailers, boats and/or trailers, recreational vehicles (of all forms),
miscellaneous equipment and other personal property items, on this site,
nor any other parking areas inside the Shingle Creek Crossing
PC RESOLUTION NO. 2016-11
development.
3. A separate Site and Building Plan application will be required for new
Bldg. W; the relocation and enlargement of Bldg. X; and the new
improvements for Bldg. Y.
4. Developer is granted a reduction to the amount of parking normally
required on this Bldg. Y site due to the acceptable limited nature of a
proposed self-storage use, and the lower levels of expected (estimated)
vehicle traffic and trip generations attributed to such use.
5. Developer must obtain a building permit and adhere to all requirements
prior to beginning any removals, demolition, land disturbance work, or
new construction of parking, utilities or buildings.
6. Developer shall comply with all conditions or request of additional
information as noted in the City Engineer Review Memorandum, dated
Sept. 21, 2016.
7. Unless amended otherwise or under separate agreement, all existing
provisions, standards and variations provided under the 2011 Shingle
Creek Crossing PUD and subsequent amendments, shall remain in effect
for the entire Shingle Creek Crossing Planned Unit Development.
8. Any future PUD amendments or application requests will require the
submittal and adoption (acceptance) of an updated master plan, which plan
shall govern the planned and future redevelopment areas of this site.
9. No other allowances as illustrated or indicated on the submitted “Shingle
Creek Crossing PUD Amendment No. 8 Plans (dated 09/14/2016) shall be
comprehended or permitted under this specific approval.
10. The Developer shall enter into and execute an updated PUD Agreement
(or similar document) as prepared by the City Attorney.
September 29, 2016
Date Chair
PC RESOLUTION NO. 2016-11
ATTEST:
Secretary
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
Chair , Commissioners , , , , , and ;
and the following voted against the same: None;
whereupon said resolution was declared duly passed and adopted.
CC
CC
CC
CC
CC
CC
CC
CC
LOT 1,
BLOCK 1
LOT 10,
BLOCK 1
LOT 1,
BLOCK 1
LOT 1,
BLOCK 1
LOT 2,
BLOCK 1 LOT 3,
BLOCK 2
LOT 1,
BLOCK 1
LOT 2,
BLOCK 1
LOT 5,
BLOCK 1
LOT 4,
BLOCK 1
LOT 3,
BLOCK 1
LOT 2,
BLOCK 1
LOT 1,
BLOCK 1
LOT 2,
BLOCK 1LOT 3,
BLOCK 1
LOT 4,
BLOCK 1
LOT 5,
BLOCK 1
LOT 6,
BLOCK 1 LOT 5,
BLOCK 1
LOT 4,
BLOCK 1
LOT 3,
BLOCK 1
PROPERTY
LINE
METRO TRANSIT STATION
EXISTING FULL
ACCESS TRAFFIC
SIGNAL
EXISTING
PRIVATE
1 0 'D R A I N A G E &
U T I L I T Y E A S E M E N T40'B U I L D I N G S E T B A C K
SHINGLE CREEK
DAYLIGHTING
(EXISTING)
20' D & U
EASEMENT
57' DRAINAGE
& UTILITY
EASEMENT
30' D & U
EASEMENT
30' D & U
EASEMENT
20' BUILDING
SETBACK
10' D & U EASEMENT
TRAIL EASEMENT
(WIDTH VARIES)
T R A I L E A S E M E N T
(W I D T H V A R I E S )
45' NSP
EASEMENT
EXISTING FULL
ACCESS
TRAFFIC SIGNAL
EXISTING
TRAFFIC
SIGNAL
OUTLOT A
EXISTING SIDEWALK EXISTING SIDEWALK EXISTING SIDEWALK
EXISTINGSIDEWALK
EXISTING
FULL
ACCESS
20' D & U EASEMENT
P R O P E R T Y L I N E (T Y P .)
35' BUILDING
SETBACK
10' D & U
EASEMENT
S T A T E H I G H W A Y N O .1 0 0
X
E
R
X
E
S
A
V
E
N
O
R
T
H
COUNTY RD NO 10 / BASS LAKE RD
20' BUILDING SETBACK
1 0 'D &U E A S E M E N T
DRIVE-THRU
PHARAMCY
DRIVE-THRU
DRAINAGE &
UTILITY EASEMENT
(WIDTH VARIES)
PUD
BOUNDARY
(TYP.)
15' BUILDING
SETBACK 3
4'
D
&
U
E
A
S
E
M
E
N
T
M MMM
M
M
P
P P
FP
FP
N E W S E A R S
E N T R A N C E
10' D & U
EASEMENT
BOX
CULVERTS
EXISTING
FULL
ACCESS
EXISTING
35' D & U
EASEMENT
PHASE I
IMPROVEMENTS
(TYP.)
DRIVE-THRU
EXISTING
APPLEBEES
M
BUILDING
5
BUILDING
4
BUILDING
3
BUILDING
2
BUILDING
1
BUILDING
6
BUILDING
9
BUILDING
10
BUILDING
7
BUILDING
8
LOT 4,
BLOCK 2
RELOCATED 20'
D&U EASEMENT
LOT 1,
BLOCK 2
LOT 2,
BLOCK 2
K
EXISTINGSTORMWATER
S T O R M W A T E R
H F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200sf
SMALLRETAIL
SMALLRETAIL
EXISTINGAPPLEBEE'S
6,000sf
Q
EXISTINGSIGNAL
EXISTING
SIGNAL EXISTINGSIGNAL
A
E
4,800sfG
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
B U I L D I N G 1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
B U I L D I N G 4
B U I L D I N G 5
B
U
I
L
D
I
N
G
1
0
R
B U I L D I N G 2
B U I L D I N G 3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
PUD
BOUNDARY
(TYP.)
BUILDING DESIGNATION SCC ADDITION NO.LOT AREA BUILDING PARKING PROVIDEDRATIO
EXISTING WALMART 1 LOT 1, BLOCK 1 18.05 ACRES 181,943 SQ. FT.889 SPACES 4.89
EXISTING APPLEBEES 1 LOT 4, BLOCK 1 0.87 ACRES 4,869 SQ. FT.53 SPACES 10.89
1,2,3,4,5 5 LOT 1, BLOCK 1 7.63 ACRES 79,508 SQ. FT.381 SPACES 4.79
10 5 LOT 2, BLOCK 1 0.93 ACRES 6,000 SQ. FT.33 SPACES 5.50
9 5 LOT 5, BLOCK 1 1.42 ACRES 13,332 SQ. FT.61 SPACES 4.58
6,7,8 5 LOT 6, BLOCK 1 2.07 ACRES 12,141 SQ. FT.60 SPACES 4.94
A 4 LOT 1, BLOCK 1 0.70 ACRES 7,322 SQ. FT.36 SPACES 4.92
B 4 LOT 2, BLOCK 1 1.45 ACRES 6,673 SQ. FT.32 SPACES 4.80
C 3 LOT 4, BLOCK 1 0.85 ACRES 2,488 SQ. FT.27 SPACES 10.85
D 2 LOT 1, BLOCK 1 0.98 ACRES 11,200 SQ. FT.50 SPACES 4.46
E 2 LOT 2, BLOCK 1 0.92 ACRES 4,800 SQ. FT.48 SPACES 10.00
F 6 LOT 1, BLOCK 2 1.19 ACRES 14,000 SQ. FT.63 SPACES 4.50
G 1 LOT 11, BLOCK 1 1.44 ACRES 8,420 SQ. FT.56 SPACES 6.65
H 3 LOT 5, BLOCK 1 1.25 ACRES 11,200 SQ. FT.55 SPACES 4.91
J 3 LOT 3, BLOCK 1 3.09 ACRES 38,000 SQ. FT.187 SPACES 4.92
K 1 LOT 10, BLOCK 1 1.19 ACRES 9,500 SQ. FT.45 SPACES 4.74
L 6 LOT 1, BLOCK 1 1.29 ACRES 11,200 SQ. FT.60 SPACES 5.36
M 6 LOT 2, BLOCK 1 1.05 ACRES 7,500 SQ. FT.67 SPACES 8.93
N 6 LOT 5, BLOCK 1 2.93 ACRES 12,541 SQ. FT.104 SPACES 8.29
O 6 LOT 3, BLOCK 1 0.81 ACRES 7,500 SQ. FT.38 SPACES 5.07
Q 6 LOT 4, BLOCK 1 1.83 ACRES 6,000 SQ. FT.58 SPACES 9.67
R 5 LOT 4, BLOCK 1 1.03 ACRES 5,400 SQ. FT.56 SPACES 10.37
S 6 LOT 5, BLOCK 1 -6,600 SQ. FT.34 SPACES 5.15
T 5 LOT 3, BLOCK 1 1.54 ACRES 5,500 SQ. FT.55 SPACES 10.00
W 6 LOT 2, BLOCK 2 1.10 ACRES 6,300 SQ. FT.50 SPACES 7.94
X 6 LOT 4, BLOCK 2 2.87 ACRES 19,800 SQ. FT.125 SPACES 6.31
Y 6 LOT 3, BLOCK 2 2.83 ACRES 75,000 SQ. FT.16 SPACES 0.21
TOTAL 61.31 ACRES 574,737 SQ. FT.2,739 SPACES 6.43
OVERALL SITE DATA TABLE
*
* INCLUDES PARKING ON LOT 2, BLOCK 2 SCC 6TH ADDITION
SIGN LEGEND:
NORTH
SCALE FEET
0 100 200
PUD
AMENDMENT
8
CONCEPTUAL
PLANS
SITE
PLAN
EXHIBIT
SH
EET
1
OF
11
SHINGLE
CR
EEK
CROSSING
BROOKLYN
CENTER,
MN
01
SYMBOL LEGEND:
FPPM
PUD
B
O
U
N
D
A
R
Y
EXIS
T
I
N
G
S
E
A
R
S
EXIS
T
I
N
G
WALM
A
R
T
EXISTING
APPLEBEES
PUD BOUNDARY
COUNTY RD NO 10 BASS LAKE ROAD
C
R
K
P
K
W
Y
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
O
R
T
H
NO
R
T
H
W
A
Y
COUNTY RD NO 10 BASS LAKE ROAD
XE
R
X
E
S
A
V
E
N
O
R
T
H
COUNTY RD
N
O
1
0
B
A
S
S
L
A
K
E
R
O
A
D
K
EXISTING
STORMWATER
STO
R
M
W
A
T
E
R
H
F
14,000sf
K
H
M
O
L
Q
EXISTING
SIGNAL
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
G
J
C 11,200sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
SEARS PROPERTY:
NOT A PART OF THIS
PROJECT
PHASING HATCH LEGEND:
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
P
U
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
PH
A
S
I
N
G
E
X
H
I
B
I
T
SH
E
E
T
2
O
F
1
1
02
K
EXISTING
STORMWATER
STO
R
M
W
A
T
E
R
H
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
7,400sf
L
11,200
SMALL
RETAIL
SMALL
RETAIL
EXISTING
APPLEBEE'S
6,000sf
Q
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
FFE: 850.75
FFE: 853.00
FFE: 853.00
FFE: 853.00
FFE: 853.00
FFE: 852.67
FFE: 852.60
FFE: 851.00
FFE: 853.00
FFE: 853.00
FFE: 853.00
FFE: 853.00
FFE: 855.50
FFE: 849.90
FFE: 850.50
FFE: 846.75
FFE: 847.75
FFE: 847.50FFE: 850.25
FFE: 853.00
FFE: 851.00
FFE: 853.00
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
PR
O
P
O
S
E
D
G
R
A
D
I
N
G
E
X
H
I
B
I
T
SH
E
E
T
4
O
F
1
1
03
LEGEND
K
EXISTING
STORMWATER
STO
R
M
W
A
T
E
R
H
F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
7,400sf
L
11,200
SMALL
RETAIL
SMALL
RETAIL
EXISTING
APPLEBEE'S
6,000sf
Q
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
FFE: 850.50
FFE: 846.75
FFE: 847.75
FFE: 847.50FFE: 850.25
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
PR
O
P
O
S
E
D
G
R
A
D
I
N
G
E
X
H
I
B
I
T
SH
E
E
T
4
O
F
1
1
04
LEGEND
K
EXISTING
STORMWATER
STO
R
M
W
A
T
E
R
H
F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALL
RETAIL
SMALL
RETAIL
EXISTING
APPLEBEE'S
6,000sf
Q
EXISTING
SIGNAL
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
15"
TRACT AREA
MAJOR ANCHOR 1 16.36 ACRE 152,036 SQ. FT.
TRACT 1 (GROSS LEASABLE)12.19 ACRE 123,242 SQ. FT.
TRACT 2 0.89 ACRE 3,530 SQ. FT.
TRACT 3 1.48 ACRE 15,353 SQ. FT.
TRACT 4 4.33 ACRE 45,021 SQ. FT.
TRACT 5 1.17 ACRE 13,770 SQ. FT.
TRACT 6 1.56 ACRE 7,700 SQ. FT.
TRACT 7 (STORMWATER)0.60 ACRE
TRACT 8 (STORMWATER)0.31 ACRE
TRACT 9 1.27 ACRE 5,813 SQ. FT.
TRACT 10 1.42 ACRE 7,555 SQ. FT.
TRACT 11 (STORMWATER)1.26 ACRE
TRACT 12 1.32 ACRE 8,533 SQ. FT.
TRACT 13 1.11 ACRE 9,018 SQ. FT.
TRACT 14 0.69 ACRE 7,605 SQ. FT.
TRACT 15 6.10 ACRE 57,671 SQ. FT.
TRACT 16 5.45 ACRE 36,532 SQ. FT.
TRACT 17 (HWY EASEMENT)1.13 ACRE
APPLEBEE'S 1.47 ACRE 4,869 SQ. FT.
KOHLS 6.99 ACRE 75,000 SQ. FT.
*CITY OWNED (BUILDING E)1.06 ACRE 5,933 SQ. FT.
TRACT 18 (STORMWATER)0.49 ACRE
TOTAL 68.65 ACRE 579,181 SQ. FT.
*THE CITY OWNED PARCEL IS TO BE REPLATTED AS INDICATED ON GRAPHIC ABOVE.
PROPOSED SITE ACREAGE WILL BE 1.26 ACRES.
SITE DATA TABLE
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
U
E
NO
R
T
H
56T
H
A
V
E
.
N
COUNTY ROAD NO. 10
15"
15"
E36"
E12"
E24"
E24"
E12"
E10"
12"
E12"
E24"
E24"
E12"
E24"
PR
I
V
A
T
E
D
U
A
L
EX
I
S
T
I
N
G
E21"
E42"E51"E42"
E24"
E12"
EXISTING
SEDIMENT
TRAP
DAY-LIGHTED
SHINGLE CREEK
TO
E
X
I
S
T
I
N
G
REG
I
O
N
A
L
P
O
N
D
S
E18"
E42"
E24"
E15"
E15"E2
4
"
E
2
4
"
E24"
15"
E23"x
3
6
"
E15"E24"
E24"
E48"
E48"
E48"
E23"X36"E30"
E
1
2
"
2x
1
5
"
E15"
E15"E48"
E12"
E18"
E48"
E15"
E15"E36"
E36"
CULVERT
E15"
E15"
E18"
E15"
E18"
E18"
2'x4' BOX
CULVERT
EXISTING
STORMCEPTOR
EXISTING
STORMCEPTOR
EXISTING
STORMCEPTOR
EXISTING
STORMCEPTOR
18"
E15"
E48"
E18"
E24"
E18"
12
'
x
1
2
'
BO
X
C
U
L
V
E
R
T
E15"
E36"
E24"
E15"
E48"
E48
"
E48"
E15
"
E24"
E42"
E15"
E36"
E48"
E15"
E24"
15"
E36
"
E42"
E15"
E15"
E18"
E30"
E15"
E42"
E42"
E42"E18"
E42"
24"
E18"
E18"
E15"
E18"
E18"
E18"
E10"
E10"
E10"
E10"
E18"
E18"
E18"
E8"
E15X24"
E12"
E15"
E15"E15"
E18"
E15"
E12"
12"
12"
E12"
E12"
E12"
E12"
12"
UNDERGROUND
STORMWATER
MANAGEMENT
12"
12"
EXISTING PRIVATE STORM SEWER
PROPOSED PRIVATE STORM SEWER
EXISTING X-INCH STORM SEWER
PROPOSED X-INCH STORM SEWER
PROPERTY LINE
WATER FEATURE/STORMWATER
TREATMENT AREA
X"
EX"
PU
D
A
M
E
N
D
E
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
ST
O
R
M
S
E
W
E
R
E
X
H
I
B
I
T
SH
E
E
T
5
O
F
1
1
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
05
LEGEND
*ON-SITE STORM SEWER IS PRIVATE UNLESS NOTED OTHERWISE
16"
16"
6"
EFH
6"
K
H
F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALL
RETAIL
SMALL
RETAIL
6,000sf
Q
EXISTING
SIGNAL
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
TRACT AREA BUILDING
MAJOR ANCHOR 1 16.36 ACRE 152,036 SQ. FT.
TRACT 1 (GROSS LEASABLE)12.19 ACRE 123,242 SQ. FT.
TRACT 2 0.89 ACRE 3,530 SQ. FT.
TRACT 3 1.48 ACRE 15,353 SQ. FT.
TRACT 4 4.33 ACRE 45,021 SQ. FT.
TRACT 5 1.17 ACRE 13,770 SQ. FT.
TRACT 6 1.56 ACRE 7,700 SQ. FT.
TRACT 7 (STORMWATER)0.60 ACRE
TRACT 8 (STORMWATER)0.31 ACRE
TRACT 9 1.27 ACRE 5,813 SQ. FT.
TRACT 10 1.42 ACRE 7,555 SQ. FT.
TRACT 11 (STORMWATER)1.26 ACRE
TRACT 12 1.32 ACRE 8,533 SQ. FT.
TRACT 13 1.11 ACRE 9,018 SQ. FT.
TRACT 14 0.69 ACRE 7,605 SQ. FT.
TRACT 15 6.10 ACRE 57,671 SQ. FT.
TRACT 16 5.45 ACRE 36,532 SQ. FT.
TRACT 17 (HWY EASEMENT)1.13 ACRE
APPLEBEE'S 1.47 ACRE 4,869 SQ. FT.
KOHLS 6.99 ACRE 75,000 SQ. FT.
*CITY OWNED (BUILDING E)1.06 ACRE 5,933 SQ. FT.
TRACT 18 (STORMWATER)0.49 ACRE
TOTAL 68.65 ACRE 579,181 SQ. FT.
COUNTY ROAD NO. 10 / BASS LAKE ROAD
*THE CITY OWNED PARCEL IS TO BE REPLATTED AS INDICATED ON GRAPHIC ABOVE.
PROPOSED SITE ACREAGE WILL BE 1.26 ACRES.
SITE DATA TABLE
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
U
E
NO
R
T
H
56T
H
A
V
E
.
N
E3" DOMESTIC
E8" FIRE
E1
0
"
E12"
E10"
EXISTING
16" PUBLIC
WATERMAIN
E10"
E10"
6"
8"E6"
E10"
E10"
E10"
E10"
E12"
E6"
E8"
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
EFH
EFH
EFH
EFH
EFH
EFH
EFH
EFH
EFH
EFH
EFH
EFHE6"
E10"
E10"
E10"
E10"
E6"E8"
E
8
"
EFH
EFH
E6"
E6"E6"
E6"
E6"
E6"
E6"
E6"
PUD BOUNDARY
E6"
6"
EXISTING PUBLIC WATERMAIN
E6"
PUD BOUNDARY
EXIS
T
I
N
G
S
E
A
R
S
EXISTING
APPLEBEES
6"
E8"
E8"
FH
E6"
EFH
E6"
E6"E8"
EFH
E6"
E10"
E10"
E10"
E6"
E6"
E8"
EFH
E6"
E8"
E8"
E8"
E6"
6"
LEGEND
EX"
X"
EFH
FH
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
06
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
WA
T
E
R
U
T
I
L
I
T
Y
E
X
H
I
B
I
T
SH
E
E
T
6
O
F
1
1
*ALL WATER LINE AND STRUCTURES ARE PRIVATE UNLESS NOTED OTHERWISE
E8"
E8"
4" P
R
I
V
A
T
E
FOR
C
E
M
A
I
N
K
H
F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALL
RETAIL
SMALL
RETAIL
6,000sf
Q
EXISTING
SIGNAL
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
TRACT AREA
MAJOR ANCHOR 1 16.36 ACRE 152,036 SQ. FT.
TRACT 1 (GROSS LEASABLE)12.19 ACRE 123,242 SQ. FT.
TRACT 2 0.89 ACRE
TRACT 3 1.48 ACRE
TRACT 4 4.33 ACRE
TRACT 5 1.17 ACRE
TRACT 6 1.56 ACRE
TRACT 7 (STORMWATER)0.60 ACRE
TRACT 8 (STORMWATER)0.31 ACRE
TRACT 9 1.27 ACRE
TRACT 10 1.42 ACRE
TRACT 11 (STORMWATER)1.26 ACRE
TRACT 12 1.32 ACRE
TRACT 13 1.11 ACRE
TRACT 14 0.69 ACRE
TRACT 15 6.10 ACRE
TRACT 16 5.45 ACRE
TRACT 17 (HWY EASEMENT)1.13 ACRE
APPLEBEE'S 1.47 ACRE
KOHLS 6.99 ACRE
*CITY OWNED (BUILDING E)1.06 ACRE
TRACT 18 (STORMWATER)0.49 ACRE
TOTAL 68.65 ACRE 579,181 SQ. FT.
COUNTY ROAD NO. 10
*THE CITY OWNED PARCEL IS TO BE REPLATTED AS INDICATED ON GRAPHIC ABOVE.
PROPOSED SITE ACREAGE WILL BE 1.26 ACRES.
SITE DATA TABLE
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
U
E
NO
R
T
H
56T
H
A
V
E
.
N
PUD BOUNDARY
EXIS
T
I
N
G
S
E
A
R
S
EXISTING
APPLEBEES
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
E12"
E18"
EXISTING LIFT
STATION
E27"
E27"
E24"
E
2
7
"
E27
"
E8"
E
8
"
E18"
E6"
E8"
E6"
6"
30' D & U
EASEMENT
20' D & U
EASEMENT
E6"
PRIVATE
LIFT STATION
PUBLIC SEWER PUB
L
I
C
S
E
W
E
R
P
U
B
L
I
C
S
E
W
E
R
PU
B
L
I
C
S
E
W
E
R
E8
"
E8"
E8
"E6"E6"
E8"
4" FORCEMAIN
35' D & U
EASEMENT
E8"
E8"
E8"
PUBLIC
P
U
B
L
I
C
PUBLIC
PUBLIC
E6"
6"
6"6"
6"
E6"
E6"E6"
E8"
E8"
6"
E8
"
E8"
LEGEND
EX"
X"
NORTH
SCALE FEET
0 100 200
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
07
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
SA
N
I
T
A
R
Y
S
E
W
E
R
E
X
H
I
B
I
T
SH
E
E
T
7
O
F
1
1
*ALL SANITARY SEWER AND STRUCTURES ARE PRIVATE UNLESS NOTED OTHERWISE
COUNTY RD NO 10 BASS LAKE ROAD
SH
I
N
G
L
E
C
R
K
P
K
W
Y
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
O
R
T
H
NO
R
T
H
W
A
Y
COUNTY RD NO 10 BASS LAKE ROAD
XE
R
X
E
S
A
V
E
N
O
R
T
H
COUNTY RD
N
O
1
0
B
A
S
S
L
A
K
E
R
O
A
D
K
H
F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALL
RETAIL
SMALL
RETAIL
6,000sf
Q
EXISTING
SIGNAL
EXISTING
SIGNAL EXISTING
SIGNAL
A
E
4,800sf
G
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
KV
PUD BOUNDARY
1 FC
3 FC
5 FC (FOOT CANDLES)
LIGHT POLE &
FIXTURES
Luminaire Schedule
Symbol Arrangement Description LLF Lumens/Lamp Arr. Lum. Lumens Arr. Watts
D180 GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 173304 2160
ROTATED 2 IN 90 GFR-540-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 94478 2160
SINGLE GFR-2-1000-PSMV-F-3HSS 39' POLE 3' BASE 0.750 120000 45676 1080
3 @ 90 DEGREES GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 259956 3240
SINGLE GB-5-100-CMH-F 16' POLE 0.790 9000 5766 129
SINGLE GFR-540-1000-PSMV-F 39' POLE 3' BASE 0.750 120000 86652 1080
EXISTING LIGHT
TO REMAIN
EXISTING LIGHT
EXISTING LIGHT
EXISTING LIGHT
EXISTING LIGHT
NORTH
SCALE FEET
0 100 200
PHOTOMETRIC NOTES:
A.CAST IN PLACE CONCRETE BASES WILL BE USED FOR
LIGHT POLE BASE FOUNDATIONS.
POLE BASE DESIGNS SHALL BE PROVIDED AT
ENGINEERING PERMITTING STAGE.
B.REFER TO ARCH. PLANS FOR SITE LIGHTING
ELECTRICAL PLAN.
C.LIGHT FIXTURES SHALL BE METAL HALIDE.
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
LI
G
H
T
I
N
G
E
X
H
I
B
I
T
SH
E
E
T
8
O
F
1
1
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
08
NOTE:
EXISTING LIGHTS REFLECT CONSTRUCTED IMPROVEMENTS AT THE END
OF PHASE I. ALL PHASE II LIGHTS ARE SHOWN PROPOSED.
KV
COUNTY RD NO 10 BASS LAKE ROAD
STA
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
X
E
R
X
E
S
A
V
E
N
O
R
T
H
COUNTY RD NO 10 BASS LAKE ROAD
XE
R
X
E
S
A
V
E
N
O
R
T
H
CC
CC
CC
CC
CC
CC
CC
CC
COUNTY RD
N
O
1
0
B
A
S
S
L
A
K
E
R
O
A
D
K
EXISTING
STORMWATER
STO
R
M
W
A
T
E
R
H
F
14,000sf
K
H
M
O
S
L
Q
A
E
G
J
C
A
BUILD
I
N
G
1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
BUILD
I
N
G
4
BUILD
I
N
G
5
B
U
I
L
D
I
N
G
1
0
R
BUILD
I
N
G
2
BUILD
I
N
G
3
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
PUD BOUNDARY (TYP.)
PUD BOUNDARY (TYP.)
QTY
PRELIMINARY PLANT SCHEDULE
COMMON NAME
-
SIZE
2" CAL.
ROOT
B & B
QUAKING ASPEN
-
-
-
#20 CONT.
6' HT
SWAMP WHITE OAK
BLACK HILLS SPRUCE
SYMBOL
VIBURNUM
COMMON HACKBERRY
BIRCH (SINGLE STEM & CLUMP)
RED PINE
DWARF BUSH HONEYSUCKLE
OVERSTORY
DECIDUOUS
EVERGREEN
SHRUB/ PERENNIAL
MASSING
B & B
DOGWOOD
#3 CONT.
#1 CONT.
BLACK-EYED SUSAN
ORNAMENTAL
DECIDUOUS
NEW HORIZON ELM
KARL FOERSTER
DAYLILY
AUTUMN BLAZE MAPLE
IVORY SILK LILAC
CRABAPPLE
LILAC
SPIREA
KOBOLD LIATRIS
2.5" CAL.B & B
2.5" CAL.B & B
2.5" CAL.B & B
#20 CONT.
#20 CONT.
#20 CONT.
6' HT B & B
#3 CONT.
#3 CONT.
#3 CONT.
#3 CONT.
#1 CONT.
#1 CONT.
#1 CONT.
JUNIPER 6' HT B & B
NO MOW MIX
LEGEND
EXISTING TREES (TO REMAIN)
EXISTING RAIN GARDEN/
STORMWATER AREA
SKYLINE HONEYLOCUST 2.5" CAL.B & B
OVERSTORY TREES
BOTANICAL NAMECOMMON NAMEQTY.SYM.
SWAMP WHITE OAKSWO5
COMMON HACKBERRYCHB2
AUSTRIAN PINE PINUS NIGRAAUP7
BLACK HILLS SPRUCEBHS12
SKYLINE HONEYLOCUST GLEDITSIA TRIACANTHOS VAR. INERMIS 'SKYCOLE'SHL 23
AUTUMN BLAZE MAPLE ACER X FREEMANII 'AUTUMN BLAZE'ABM 7
EVERGREEN
ORNAMENTAL/SMALL TREES
PICEA GLAUCA DENSATA
CELTIS OCCIDENTALIS
QUERCUS BICOLOR
ACCOLADE ELM ULMUS JAPONICA X WILSONIANA 'MORTON'ACC 20
RBC 6
RIVER BIRCHRVB3 BETULA NIGRA
RIVER BIRCH (CLUMP)BETULA NIGRA
PFC 18 PRAIRIE FIRE CRAB MALUS 'PRAIRIE FIRE'
SDC -SNOWDRIFT CRAB MALUS 'SNOWDRIFT'
SSC 4 SPRING SNOW CRABAPPLE MALUS 'SPRING SNOW'
SHRUBS/PERENNIALS
HRD 320
KARL FOERSTER GRASSKFG132 CALAMAGROSTIS 'KARL FOERSTER'
HAPPY RETURNS DAYLILY HEMEROCALIS 'HAPPY RETURNS'
ISH 54 INVINCIBLE SPIRIT HYDRANGEA HYDRANGEA ABORESCENS 'NCHA1'
FPR 36 FOXI PAVEMENT ROSE ROSA 'PAVEMENT FOXI'
RSD 485 RUBY STELLA DAYLILY HEMEROCALIS 'RUBY STELLA'
EVERGREEN
QTY
PRELIMINARY PLANT SCHEDULE
COMMON NAME
21
SIZE
2" CAL.
ROOT
B & B
QUAKING ASPEN
3
3
2,510
SF
#20 CONT.
6' HT
SWAMP WHITE OAK
BLACK HILLS SPRUCE
SYMBOL
VIBURNUM
COMMON HACKBERRY
BIRCH (SINGLE STEM & CLUMP)
RED PINE
DWARF BUSH HONEYSUCKLE
OVERSTORY
DECIDUOUS
EVERGREEN
SHRUB/ PERENNIAL
MASSING
B & B
DOGWOOD
#3 CONT.
#1 CONT.
BLACK-EYED SUSAN
ORNAMENTAL
DECIDUOUS
NEW HORIZON ELM
KARL FOERSTER
DAYLILY
IVORY SILK LILAC
CRABAPPLE
LILAC
SPIREA
2.5" CAL.B & B
2.5" CAL.B & B
2.5" CAL.B & B
#20 CONT.
#20 CONT.
#20 CONT.
6' HT B & B
#3 CONT.
#3 CONT.
#3 CONT.
#3 CONT.
#1 CONT.
#1 CONT.
JUNIPER 6' HT B & B
LEGEND
EXISTING TREES (TO REMAIN)
SKYLINE HONEYLOCUST
KV
QTY
PRELIMINARY PLANT SCHEDULE
COMMON NAME
-
SIZE
2" CAL.
ROOT
B & B
QUAKING ASPEN
-
-
-
#20 CONT.
6' HT
SWAMP WHITE OAK
BLACK HILLS SPRUCE
SYMBOL
VIBURNUM
COMMON HACKBERRY
BIRCH (SINGLE STEM & CLUMP)
RED PINE
DWARF BUSH HONEYSUCKLE
OVERSTORY
DECIDUOUS
EVERGREEN
SHRUB/ PERENNIAL
MASSING
B & B
DOGWOOD
#3 CONT.
#1 CONT.
BLACK-EYED SUSAN
ORNAMENTAL
DECIDUOUS
NEW HORIZON ELM
KARL FOERSTER
DAYLILY
AUTUMN BLAZE MAPLE
IVORY SILK LILAC
CRABAPPLE
LILAC
SPIREA
KOBOLD LIATRIS
2.5" CAL.B & B
2.5" CAL.B & B
2.5" CAL.B & B
#20 CONT.
#20 CONT.
#20 CONT.
6' HT B & B
#3 CONT.
#3 CONT.
#3 CONT.
#3 CONT.
#1 CONT.
#1 CONT.
#1 CONT.
JUNIPER 6' HT B & B
SKYLINE HONEYLOCUST 2.5" CAL.B & B
EVERGREEN
QTY
PRELIMINARY PLANT SCHEDULE
COMMON NAME
21
SIZE
2" CAL.
ROOT
B & B
QUAKING ASPEN
3
3
2,510
SF
#20 CONT.
6' HT
SWAMP WHITE OAK
BLACK HILLS SPRUCE
SYMBOL
VIBURNUM
COMMON HACKBERRY
BIRCH (SINGLE STEM & CLUMP)
RED PINE
DWARF BUSH HONEYSUCKLE
OVERSTORY
DECIDUOUS
EVERGREEN
SHRUB/ PERENNIAL
MASSING
B & B
DOGWOOD
#3 CONT.
#1 CONT.
BLACK-EYED SUSAN
ORNAMENTAL
DECIDUOUS
NEW HORIZON ELM
KARL FOERSTER
DAYLILY
IVORY SILK LILAC
CRABAPPLE
LILAC
SPIREA
2.5" CAL.B & B
2.5" CAL.B & B
2.5" CAL.B & B
#20 CONT.
#20 CONT.
#20 CONT.
6' HT B & B
#3 CONT.
#3 CONT.
#3 CONT.
#3 CONT.
#1 CONT.
#1 CONT.
JUNIPER 6' HT B & B
SKYLINE HONEYLOCUST
LEGEND
EXISTING TREES (TO REMAIN)
EXISTING RAIN GARDEN/
STORMWATER AREA
NORTH
SCALE FEET
0 100 200
PU
D
A
M
E
N
D
M
E
N
T
8
CO
N
C
E
P
T
U
A
L
P
L
A
N
S
LA
N
D
S
C
A
P
E
E
X
H
I
B
I
T
SH
E
E
T
9
O
F
1
1
09
NOTE:
EXISTING TREES REFLECT CONSTRUCTED IMPROVEMENTS AT THE END
OF PHASE I. ALL PHASE II TREES ARE SHOWN PROPOSED.
SH
I
N
G
L
E
C
R
E
E
K
C
R
O
S
S
I
N
G
BR
O
O
K
L
Y
N
C
E
N
T
E
R
,
M
N
K
H F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALLRETAIL
SMALLRETAIL
EXISTING
APPLEBEE'S
6,000sf
Q
EXISTINGSIGNAL
EXISTINGSIGNAL EXISTINGSIGNAL
A
E
4,800sfG
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
B
U
I
L
D
I
N
G
9
D
B
T
B
U
I
L
D
I
N
G
1
0
R
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
CC
CC
CC
CC
CC
CC
CC
CC
S
H
I
N
G
L
E
C
R
E
E
K
T
R
A
I
L
HATCH LEGEND:
NORTH
SCALE FEET
0 100 200
SHINGLE
CR
EEK
CROSSING
BROOKLYN
CENTER,
MN
10
PUD
AMENDMENT
8
CONCEPTUAL
PLANS
CIRCULATION
EXHIBIT
SHEET
10
OF
11
CC
CC
CC
CC
CC
CC
CC
CC
S T A T E H I G H W A Y N O .1 0 0
X
E
R
X
E
S
A
V
E
N
O
R
T
H
COUNTY RD NO 10 / BASS LAKE RD
K
EXISTINGSTORMWATER
S T O R M W A T E R
H F
14,000sf
9,500sf
K
H
11,200sf
7,500sf
M
7,500sf
O
L
11,200
SMALLRETAIL
SMALLRETAIL
6,000sf
Q
A
E
4,800sfG
8,434sf
38,000sf
J
C 11,200sf
7,322sf
A
B U I L D I N G 1
BUILDING 6
BUILDING 7
BUILDING 8
B
U
I
L
D
I
N
G
9
D
B
T
B U I L D I N G 4
B U I L D I N G 5
B
U
I
L
D
I
N
G
1
0
R
B U I L D I N G 2
B U I L D I N G 3
6,673sf
19,800sf
X
75,000sf
Y
W
6,300sf
6,600sf
S
N
12,541sf
ENLARGED
BUILDING X.
RELOCATED
D&U EASEMENT
SUBDIVIDE
LOT. MODIFIED
SITE LAYOUT.
RE-PLAT
PARCELS
ADDED
BUILDING W.
SMALLER
BUILDINGS N & S.
MODIFIED SITE
LAYOUT.
BUILDING DESIGNATION SCC ADDITION NO.LOT AREA BUILDING PARKING PROVIDEDRATIO
EXISTING WALMART 1 LOT 1, BLOCK 1 18.05 ACRES 181,943 SQ. FT.889 SPACES 4.89
EXISTING APPLEBEES 1 LOT 4, BLOCK 1 0.87 ACRES 4,869 SQ. FT.53 SPACES 10.89
1,2,3,4,5 5 LOT 1, BLOCK 1 7.63 ACRES 79,508 SQ. FT.381 SPACES 4.79
10 5 LOT 2, BLOCK 1 0.93 ACRES 6,000 SQ. FT.33 SPACES 5.50
9 5 LOT 5, BLOCK 1 1.42 ACRES 13,332 SQ. FT.61 SPACES 4.58
6,7,8 5 LOT 6, BLOCK 1 2.07 ACRES 12,141 SQ. FT.60 SPACES 4.94
A 4 LOT 1, BLOCK 1 0.70 ACRES 7,322 SQ. FT.36 SPACES 4.92
B 4 LOT 2, BLOCK 1 1.45 ACRES 6,673 SQ. FT.32 SPACES 4.80
C 3 LOT 4, BLOCK 1 0.85 ACRES 2,488 SQ. FT.27 SPACES 10.85
D 2 LOT 1, BLOCK 1 0.98 ACRES 11,200 SQ. FT.50 SPACES 4.46
E 2 LOT 2, BLOCK 1 0.92 ACRES 4,800 SQ. FT.48 SPACES 10.00
F 6 LOT 1, BLOCK 2 1.19 ACRES 14,000 SQ. FT.63 SPACES 4.50
G 1 LOT 11, BLOCK 1 1.44 ACRES 8,420 SQ. FT.56 SPACES 6.65
H 3 LOT 5, BLOCK 1 1.25 ACRES 11,200 SQ. FT.55 SPACES 4.91
J 3 LOT 3, BLOCK 1 3.09 ACRES 38,000 SQ. FT.187 SPACES 4.92
K 1 LOT 10, BLOCK 1 1.19 ACRES 9,500 SQ. FT.45 SPACES 4.74
L 6 LOT 1, BLOCK 1 1.29 ACRES 11,200 SQ. FT.60 SPACES 5.36
M 6 LOT 2, BLOCK 1 1.05 ACRES 7,500 SQ. FT.67 SPACES 8.93
N 6 LOT 5, BLOCK 1 2.93 ACRES 12,541 SQ. FT.104 SPACES 8.29
O 6 LOT 3, BLOCK 1 0.81 ACRES 7,500 SQ. FT.38 SPACES 5.07
Q 6 LOT 4, BLOCK 1 1.83 ACRES 6,000 SQ. FT.58 SPACES 9.67
R 5 LOT 4, BLOCK 1 1.03 ACRES 5,400 SQ. FT.56 SPACES 10.37
S 6 LOT 5, BLOCK 1 -6,600 SQ. FT.34 SPACES 5.15
T 5 LOT 3, BLOCK 1 1.54 ACRES 5,500 SQ. FT.55 SPACES 10.00
W 6 LOT 2, BLOCK 2 1.10 ACRES 6,300 SQ. FT.50 SPACES 7.94
X 6 LOT 4, BLOCK 2 2.87 ACRES 19,800 SQ. FT.125 SPACES 6.31
Y 6 LOT 3, BLOCK 2 2.83 ACRES 75,000 SQ. FT.16 SPACES 0.21
TOTAL 61.31 ACRES 574,737 SQ. FT.2,739 SPACES 6.43
OVERALL SITE DATA TABLE
*
* INCLUDES PARKING ON LOT 2, BLOCK 2 SCC 6TH ADDITION
SIGN LEGEND:
NORTH
SCALE FEET
0 100 200
PUD
AMENDMENT
8
CONCEPTUAL
PLANS
REVISIONS
TO
PREVIOUS
PUD
SHEET
11
OF
11
SHINGLE
CR
EEK
CROSSING
BROOKLYN
CENTER,
MN
11
SYMBOL LEGEND:
CO
U
N
T
Y
R
D
N
O
1
0
B
A
S
S
L
A
K
E
R
O
A
D
SHINGLE
CRK PKWY
S
T
A
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
XERXES AVE NORTH
NORTHWAY
DRIVE
CO
U
N
T
Y
R
D
N
O
1
0
B
A
S
S
L
A
K
E
R
O
A
D
XERXES AVE NORTH COUNTY RD NO 10 BASS LAKE ROAD
KV
EX
I
S
T
I
N
G
F
U
L
L
AC
C
E
S
S
T
R
A
F
F
I
C
SI
G
N
A
L
EX
I
S
T
I
N
G
F
U
L
L
AC
C
E
S
S
TR
A
F
F
I
C
S
I
G
N
A
L
EXISTINGTRAFFICSIGNAL
S
T
A
T
E
H
I
G
H
W
A
Y
N
O
.
1
0
0
XERXES AVE NORTH
CO
U
N
T
Y
R
D
N
O
1
0
/
B
A
S
S
L
A
K
E
R
D
EXISTINGAPPLEBEES
PR
O
P
O
S
E
D
TR
A
I
L
PU
D
BO
U
N
D
A
R
Y
(T
Y
P
.
)
PU
D
BO
U
N
D
A
R
Y
(T
Y
P
.
)
EXISTINGFULLACCESS
EX
I
S
T
I
N
G
WA
L
M
A
R
T
EXISTINGSEARS
NO
R
T
H
SC
A
L
E
FE
E
T
0
10
0
20
0
MA
J
O
R
V
E
H
I
C
U
L
A
R
A
C
C
E
S
S
R
O
U
T
E
S
SHINGLE CREEK CROSSING
BROOKLYN CENTER, MN12
MAJOR ACCESS
ROUTES - PUD
SHEET 12 OF 12
SY
M
B
O
L
L
E
G
E
N
D
RE
G
I
O
N
A
L
T
R
A
I
L
PE
D
E
S
T
R
I
A
N
C
O
N
N
E
C
T
I
O
N
S