HomeMy WebLinkAbout2016-173 CCRMember Dan Ryan introduced the following resolution and
moved its adoption:
RESOLUTION NO. 2016-173
RESOLUTION ESTABLISHING 2017 STREET AND STORM DRAINAGE
SPECIAL ASSESSMENT RATES
WHEREAS, the residential assessment rates for street and storm drainage
improvements are annually reviewed and approved by the City Council; and
WHEREAS, the residential assessment rates should be adjusted annually to be
effective January 1; and
WHEREAS, the 2017 street and storm drainage assessment rates for R1, R2 and
R3 zoned districts are based on a specific proportion of approximately 40 percent of the average
cost for street and storm drainage improvements; and
WHEREAS, the R4, R5, R6 and R7 zoned districts will continue to be assessed
based on an evaluation of project cost and project benefit.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that:
1. The residential street and storm drainage special assessment rates for street
reconstruction shall apply to properties in Rl, R2 or R3 zoned districts.
These rates shall also be applied to parcels of property in other land use
zones when such parcels (a) are being used as one -family or two-family
residential sites at the time the assessment roll is levied; and (b) could not
be subdivided under the then -existing Subdivision Ordinance.
2. The residential assessment rates for street and storm drainage
reconstruction effective January 1, 2017, shall be as follows:
Land Use 2017 Assessment Rates
RI zoned, used as one -family
site that cannot be subdivided
Land Use
R2 zoned, or used as a two-family
site that cannot be subdivided
$4234.00 per lot (street)
$1270.00 per lot (storm drainage)
2017 Assessment Rates
$56.4533 per front foot with a
$4234.00 per lot minimum (street)
$16.9333 per front foot with a
$1270.00 per lot minimum (storm drainage)
RESOLUTION NO. 2016-173
R3 zoned (per unit) Assessable frontage x $56.4533 (street)
Number of residential units
Assessable frontage x $16.9333 (storm)
Number of residential units
3. The residential assessment rates for street and storm drainage
reconstruction shall not apply to R4, R5, R6 or R7 zoned districts. The
assessment rates for street reconstruction for R4, R5, R6 or R7 zoned
property shall be based on an evaluation of the project cost and the project
benefit for each project.
October 24 2016
Date Mayor
ATTEST: Jqwq�y—�
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
Lin -Myszkowski
and upon vote being taken thereon, the following voted in favor thereof:
Tim Willson, April Graves, Kris Lawrence—Anderson, Lin Myszkowski, Dan Ryan
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.