HomeMy WebLinkAbout2017 05-25 PCPXC' o! BROOKLYN CENTER PLANNING COMMISSION AGENDA CITY OF BROOKLYN CENTER MAY 25, 2017 1. Call to Order: 7:00 PM 2. Roll Call 3. APPROVAL OF AGENDA • Motion to Approve Planning Commission Meeting Agenda for May 25, 2017 4. APPROVAL OF MINUTES • Motion to Approve the April 27, 2017 meeting minutes 5. Chairperson's Explanation The Planning Commission is an advisory body. One of the Commission's fimctions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. 6. PLANNING ITEMS a) Consideration of minor revisions to the General Development Plan for the Shingle Creek Crossing PUD Amendment No. 8 (reduction of BLDG. X form 48,000 sf, to 38,000 sf. and BLDG. F from 14,000 sf. to 12,000 sf.) Requested Planning Commission Action: • Direct Staff to present Planning Report; • Commission discuss requested item with City Staff and Applicant; • Motion to approve the revisions to the General Development Plan 7. Discussion Items: • Review schedule for the processing of the Top Golf USA Brooklyn Center, LLC application for the redevelopment of the Regal Theater Site. • Survey/questionnaire used in preparing the 2030 Comp Plan. 8. Other Business 9. Adjournment MINUTES OF THE PROCEEDINGS OF THE PLANNING COMMISSION OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF HENNEPIN AND THE STATE OF MINNESOTA APRIL 27, 2017 i 1 1 1 ■ The Planning Commission meeting was called to order by Chair Christensen at 7:00 p.m. Chair Randall Christensen, Commissioners Alexander Koenig, Jack MacMillan, Stephen Schonning, Rochelle Sweeney, Susan Tade, and Abraham Rizvi were present. Also present were Director of Business & Development Gary Eitel, Interim Communications Coordinator/Planning Specialist Angel Smith and Michaela Kujawa-Daniels, TimeSaver Off Site Secretarial, Inc. There was a motion by Commissioner Rizvi, seconded by Commissioner Koenig, to approve the Planning Commission Meeting Agenda The motion passed unanimously. There was a motion by Commissioner Schonning, seconded by Commissioner MacMillan, to approve the minutes of the March 30, 2017 meeting as submitted. The motion passed unanimously. Chair Christensen explained the Planning Commission's role as an advisory body. One of the Commission's functions is to hold public hearings. In the matters concerned in these hearings, the Commission makes recommendations to the City Council. The City Council makes all final decisions in these matters. None at this time. 1; 1 Page 1 4-27-17 ..) CITY COUNCIL STRATEGI REDEVELOPMENT ,,Food Site Sa2. 57 th and Loan Site :. )ppo,- GOALS0' F F FOR FOCUSED Director of Business and Development Gary Eitel Mr. Eitel introduced this item and provided background and status on all 3 redevelopment sites. He stated the challenge is pursuing market rate housing opportunities within a developed community is that you need to find a developer and investment group willing to pursue a project without current market data to build their pro forma from and a good understanding of how the market will respond their project. Similar challenges relate to commercial projects and their financial challenges. Commissioner Tade asked what the status is with the Devon George Group. Mr. Eitel stated that the exclusive negotiating period ended in February. Mr. George has retained another architectural firm and his development team has been working on a redesign of a potential project that they believe will be feasible and market receptive. Assuming a positive response to the feasibility of completing the necessary infrastructure improvements (streets, utilities, storm water treatment) the redesign will be presented to the EDA to determine if the proposal is consistent with their vision of the redevelopment of the Opportunity Site. He stated that at this time, the City is open to consideration of other plans and developer interest for a market rate housing project for the site. Commissioner Rizvi asked if the properties in this plan take into account the Ocean Buffet property. Mr. Eitel stated that property is owned by the EDA and so that is part of the plan. He referenced the current lease with Ocean Buffett run through 2021 and that increases in the last years of the lease are schedule to increase the lease rate to market value. The previous plans identified the general location of the restaurant in the area planned for a future performing arts center/community building. The assumption has been that this restaurant would be relocated within the City. Commissioner Koenig asked Mr. Eitel to give an overview of the market share. He asked if the issue is that we don't have enough population to fill vacant apartments and the cost of those wanting to develop will be too expensive for residents. Mr. Eitel stated the risk factor is high because of the absence of a demonstrated market willing to support higher rents. He stated there is a lot of market interest here but the market data does not appear to support the projects he sees being built in Plymouth, Golden Valley, St. Louis Park and Minnetonka. 8b) UPDATES ON CURRENT DEVELOPMENT ACTIVITIES AND PENDING PLANNING APPLICATIONS: 8b1. 6720 sf. Commercial building under construction at Boulevard Market Center 8b2. H M Furniture — Shingle Creek Crossing PUD # W. Sanctuary at Brooklyn Center Senior Housing Page 2 4-27-17 8W. Inquiry to add 6,080 sL Addition at 6601 Parkway Circle (industrial expansion) 8b5. Regal Theater Site and 'ferry Moses Lot (PUD amendment and site plan for a commercial recreational use with restaurant and lounge. Mr. Eitel reviewed the development activities and pending planning applications. He stated the 6720 sf. Commercial building is currently under construction and being graded. He stated the HOM Furniture site is still moving forward, they are working on the sites storm drainage issue. He reviewed the status on the possible addition to 6601 Parkway Circle and noted a minor amendment to their PUD will likely be submitted for a 6,000 sf. addition to an existing 30,000 sf. tenant. He stated he is excited about the potential redevelopment of the Regal Theater Site and shared with the Commission a tentative schedule to accommodate a new commercial recreation use of the property. UPDATINGPR.. Scl. Review of the 2030 Land Use Element Mr. Eitel gave an overview of the Land Use Redevelopment and Community Image Plan. He stated he would like the Commissioners to become familiar with this plan and then they will start working through the elements of the plan. Chair Christensen asked if it's possible for the Planning Commission to get the past survey and/or questions that were on that survey. Mr. Eitel stated yes, he can get that information for the Commissioners. He also noted that comp plan indicated there were only 12 responses to this survey. Chair Christensen stated he just would like to have the questions so the Commission will know what they are talking about when they review this information. He stated outreach is something they need to be better with and he wants people to know they have a say and their input does matter. Mr. Eitel stated he agrees. He stated the plan is to go through what has been accomplished, what they hope to accomplish and what is no longer necessary to be in the plan. MAY 18"' NEIGHBORHOOD AREA MEETING — KYLAWN PARK Mr. Eitel stated this will be the first meeting of four of the neighborhood meetings scheduled for 2017. The Planning Commission is welcomed to attend. ';1. ■ 1 Page 3 4-27-17 Mr. Eitel stated this is being reviewed by the Asst. City Manager and has been identified as a future work session item for City Council consideration. He referenced his responses to questions raised by the Asst. City Manager, noting that the responses were made on behalf of previous discussions with the Planning Commission. Commissioner Tade stated she knows that Great India restaurant once had a liquor license for beer and wine but doesn't anymore as a result of prices being too high for the license. Mr. Eitel stated he would follow — up with the City Clerk and include the information to the Asst. City Manager. Mr. Eitel stated there are 35 applicants for the vacant Planning position. He stated he is in the process of reviewing and scoring the applications, which will then start of the process of interviews to replace the City Planner/Zoning Administrator position There was a motion by Commissioner MacMillan, seconded by Commissioner Koenig to adjourn the Planning Commission meeting. The motion passed unanimously. The meeting adjourned at 8:37 p.m. Chair Page 4 4-27-17 TO: Chair Randy Christensen and City Planning Commissioners FROM: Gary Eitel, Director of Business and Development Angel Smith, Interim Planning Specialist DATE: May 18, 2017 RE: May 25, 2017 Planning Commission Agenda Attached please find the Planning Commission meeting agenda for the May 25, 2017 regular meeting, along with the April 27, 2017 regular meeting minutes. 6. PLANNING ITEMS a) Consideration of minor revisions to the General Development Plan for the Shingle Creek Crossing PUD Amendment No. 8 (reduction of BLDG. X form 48,000 sf, to 38,000 sf. and BLDG. F from 14,000 sf. to 12,000 sf.) On February 13, 2017, the City Council adopted Resolution No. 2017-25, which accepted the Planning Commission's recommendation to approve PUD Amendment No. 8 for the Shingle Creek Crossing Development and site plan approval for expansion and renovation of the former Kohl's building by HOM Furniture. The City Council's resolution authorized the preparation and execution of a PUD agreement for this amendment. However, the project was delayed to address storm water management issues required with any future development within the Kohl's parking lot. When an option for the EDA to address both storm water management and additional parking required by the Shingle Creek Crossing ECR (Easements, Restrictions, & Covenants) ran into fiscal challenges and funding priorities, this option was eliminated and a new strategy/fiscal approach was necessary. Through the cooperative efforts of Gatlin Development, HOM Furniture, and the City's consultants a new economic strategy involving the creative use of TIF Pay -As -You -Go Notes from both TIF 5 and TIF7 was developed. Additionally, this strategy included the design and installation of the Storm Water Management improvements to be installed on-site by HOM as part of their initial renovation and expansion of the Kohl's building. Additionally, during this time it was determined that minor adjustment to the Master Development Plan were warranted to address a future subdivision of the EDA parcel that was referenced in the initial staff memo and the reduction of the size of the office building to meet its parking requirements on-site. The minor revisions to the PUD development plan include a reduction in Building Pad Site F from 14,000 sf. to 12,000 sf. and a reorientation and reduction of Building Pad Site X, reducing the office sf. from 48,000 sf. to 38,000 sf. The City Attorney is currently working on this PUD agreement and could include these minor revisions in the agreement for City Council acceptance at either the June 12t" or possibly the June 26t" City Council Meeting, should the Commission accept the changes. Additionally, the EDA is scheduled to consider the Tax Increment Development agreements to facilitate this new economic strategy on the June 26"' This schedule would enable Gatlin Development and HOM Furniture to complete the sales of the Kohl's site and HOM to start their renovation and expansion plans this year. I will be confirming with the City Attorney where the Commission's acceptance can be accomplished by a motion or if the previous resolution should be reworked. A recommendation on how to accept the revisions will be provided at the meeting. For your reference, the following information has been included: - City Council Resolution 2017-25 - 3 exhibits from the February PowerPoint Presentation illustrating the Building Pad Sites F&X - Planning Report on the PUD 8 application and site plan approval, (1-26-2017) - A development plan with the revised Building Pads and sizes for F and X - The revised development plan with the on-site storm water treatment area that is scheduled for the June Watershed Commission Meeting. 7. Discussion Items: • Review schedule for the processing of the Top Golf USA Brooklyn Center, LLC application for the redevelopment of the Regal Theater Site. Attached a schedule illustrating a time line for the processing of the Top Golf application to amend the Regal Road Development PUD, site plan approval, platting approval, and land conveyance / exchange with the EDA; a narrative of the proposed use; and landscape plan illustrating the redevelopment of the site. This item has been placed on the agenda for the Commission information. A public hearing is being scheduled for June 15t". • Survey/questionnaire used in preparing the 2030 Comp Plan. This information was requested at the last meeting and has been provided for informational purposed. Should Commissioners have any questions prior to next Thursday night's meeting, please call Gary at (763) 569-3305 or Angel at (763) 569- 3319. Email eitelgci.brooklyn-center.mn.us or asmithgci.brooklyn-center.mn.us Reminder: please let us know if you are unable to attend the meeting. Thank you! Member Kris Lawrence-Andersolhtroduced the following resolution and moved its adoption: RESOLUTION No. 2017-25 RESOLUTION REGARDING THE DISPOSITION OF PLANNING COMMISSION APPLICATION NO. 2017-001 SUBMITTED BY HOM FURNITURE INC. AND GATLIN DEVELOPMENT COMPANY FOR PLANNED UNIT DEVELOPMENT AMENDMENT NO. 8 TO THE 2011 SHINGLE CREEK CROSSING PLANNED UNIT DEVELOPMENT AND SITE AND BUILDING PLAN FOR HOM FURNITURE STORE- (LOCATED AT 2501 COUNTY ROAD 10) WHEREAS, the City Council of Brooklyn Center adopted Resolution No. 2011-85, dated June 13, 2011, which is considered the first amendment to the, previously approved 1999 Brookdale Mall Planned Unit Development, whereby this amendment approved the establishment of the new Shingle Creek Crossing Planned Unit Development, and which included an approved Development/Master Plan and certain allowances and development standards that would govern over the PUD; and WHEREAS, the City Council subsequently adopted City Resolution No. 2011-127, dated September 12, 2011, which approved the first amendment to the original Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2012-106, dated August 13, 2012, which approved the second amendment to the Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2012-129, dated September 24, 2012, which approved the third amendment to the Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2013-124, dated October 14, 2013, which approved the fourth amendment to the Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2013-72, dated July 8, 2013, which approved the fifth amendment to the Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2014-75, RESOLUTION NO. 2017-25 dated June 9, 2014, which approved the sixth amendment to the Shingle Creek Crossing Planned Unit Development, and -which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, the City Council subsequently adopted City Resolution No. 2016-170, dated November 9, 2015, which approved the seventh amendment to the Shingle Creek Crossing Planned Unit Development, and which included an updated Development/Master Plan and provided additional allowances and development standards; and WHEREAS, HOM Furniture Inc. and Gatlin Development Company jointly submitted Planning Application No. 2017-001, which is considered the eighth amendment to the Shingle Creek Crossing Planned Unit Development, by allowing certain changes to the approved 2011 Shingle Creek Crossing Planned Unit Development; and WHEREAS, the PUD Amendment comprehends additional adjustments and uses not approved under the 2011 Shingle Creek Crossing Planned Unit Development and the related 2011 PUD Agreement; and WHEREAS, Planning Application 2017-001 also provides for the official request for consideration and approval of the new Site and Building Plan for the new HOM Furniture Store with a retail store expansion on the subject site: and WHEREAS, on January 12, 2017, the Planning Commission held a duly called public hearing, whereby a staff report and public testimony regarding the amendment to this Planned Unit Development were initially heard and noted for the record, and said hearing was tabled to the next Planning Commission meeting; and WHEREAS, on January 26, 2017, the Site and Building Plan for HOM Furniture was officially received; an updated staff report presented; public hearing was re -opened; additional public testimony was given and noted for the record; and the Planning Commission gave full consideration of both the PUD Amendment and Site and Building Plan elements of said Planning Application No. 2017-001; and WHEREAS, in light of all testimony received, and utilizing the guidelines and standards for evaluating such amendments as contained in City Code Section 35-355 (Planned Unit Development); and utilizing the guidelines and standards for evaluating site and building plans as contained in City Code Section 35-230 (Plan Approval); along with consideration of the goals and objectives of the City's Comprehensive Plan, the Planning Commission considers this PUD Amendment No. 8 and Site and Building Plan for HOM Furniture to be an appropriate and reasonable use and redevelopment of the subject property, that standards for evaluating for evaluating such amendments and site plans have been met; and the proposal is therefore in the best interest of the community; and RESOLUTION NO. 2017-25 WHEREAS; the Planning Advisory Commission of the City of Brooklyn Center did determine that Planning Application 2017-001, Submitted by HOM Furniture Inc. and Gatlin Development Company, should be approved based upon the following findings and considerations: A. The allowance of the 2 -story, 24,000 sq. ft. addition to the former Kohl's b uilding, with approximately one-half of this space to be used for new multi - tenant retail spaces, and one-half to be used as additional floor space for the new HOM Furniture store, is a reasonable request; and helps promote and enhance the general public welfare of this PUD, as it maintains and keeps the redevelopment activity of this site intact and ongoing, and may be approved; B. The allowance of reduced amount of Class I materials along the north elevation side of the building is considered reasonable and may be approved; C, The request to grant a reduced parking ratio allowance from 4.5 spaces per 1,000 sq. ft. of building space to I space per 1,000 sq. ft. and attributed to the newly proposed ftimiture showroom and warehouse only should not be detrimental or pose any threat or danger to the general public; nor injurious to the use and enjoyment of other uses in this Shingle Creek Crossing PUD; and is hereby considered a reasonable request and acceptable; D. The request to allow future/planned Building X to be expanded from 19,000 sq. ft. to 48,000 sq. ft. is considered a positive and reasonable increase, as the larger building will provide an increased tax base in this area, and will help promote and provide a needed medical set -vices and a facility for the residents and surrounding community; E. The allowance of the reduced setbacks on the EDA lot for future development by HOM Inc. should not pose any problems in this area and is acceptable; F. The allowance of certain uses that were initially prohibited under the 2011 Shingle Creek Crossing PUD Agreement should be limited to the following: Medical Office Building - with typical tenants that may do surgeries, urgent care and treat patients in offices; ii. Medical and Dental Laboratories; RESOLUTION NO. 2017-25 iii. Educational Uses listed in Zoning Code Section 35-322. Lh.; iv. Transient lodging, provided they are limited to hotel use only, and no motels. V. Animal Hospitals, provided any outdoor kennel runs or activity areas for pets being cared for in the hospital is screen with an opaque fence and regularly cleaned and maintained. G. The allowances to omit the standard: "Drive-thru or service lanes shall be screened with ben-ning, landscaping or fencing" is not recommended and should remain intact. H. The allowance to have regular C-2 Zone sign standards as found in Chapter 34, Brooklyn Center Sign Code as opposed to the approved 2011 Shingle Creek Crossing Sign Program Plan is partially approved, with an allowance to have all new wall signs comply with the C-2 Zone sign standards established under the Sign Code; and only one (1) new freestanding sign up to 250 sq. ft. along the 1-lWY 100 frontage should be allowed, and can either be a regular static message or dynamic sign per City Code Ch. 34. 1. The proposed and general layout of all new building improvements, including reduced setbacks and any other related flexibility or reductions identified herein or the resulting resolution of approval, and on the updated Shingle Creek Crossing PUD Plans, may be acceptable and approved. AND WHEREAS, upon acceptance of all public comments and discussion of this item, the Planning Commission adopted Planning Commission Resolution No. 2017-01, which provides a favorable recommendation to the City Council, that this request submitted by HOM Furniture Inc, and Gatlin Development Company under Planning Application No. 2017-001, which is the eighth amendment to the Shingle Creek Crossing Planned Unit Development, by allowing certain changes to the approved 2011 Shingle Creek Crossing Planned Unit Development, along with the Site and Building Plan Approval of the new HOM Furniture Store development, should be approved by the City Council. NOW, THEREFORE, BE IT RESOLVED by the City Council of Brooklyn Center, Minnesota that this request submitted by HOM Furniture Inc. and Gatlin Development Company under Planning Application No. 2017-001, which is the eighth amendment to the Shingle Creek Crossing Planned Unit Development, by allowing certain changes to the approved 2011 Shingle Creek Crossing Planned Unit Development, along with the Site and Building Plan RESOLUTION NO. 2017-25 Approval of the new HOM Furniture Store development, that the findings of approval as noted herein are hereby acceptable, and this PUD Amendment and Site and Building Plan request is hereby approved subject to the following conditions: I Developer shall comply with all conditions or request of additional information as noted in the City Engineer Review Memorandum, dated January 5, 2017 2. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned Unit Development by allowing the following uses: a) Medical Office Building - with typical tenants that may do surgeries, urgent care and treat patients in offices; b) Medical and Dental Laboratories; C) Educational Uses listed in Zoning Code Section 35-322. Lh.; d) Transient lodging, provided they are limited to hotel use only, and no motels. e) Animal Hospitals, provided any outdoor kennel runs or activity areas for pets being cared for in the hospital is screen with an opaque fence and regularly cleaned and maintained. 3. Developer is allowed to construct a 2 -story, 24,622 sq. ft. addition to the former Kohl's building, with approximately one-half of this space to be used for new multi -tenant retail spaces, and one-half to be used as additional floor space for the new HOM Furniture store. 4. Developer is allowed to a reduction of Class I materials along the north elevation side of the new HOM store building, provided all other elevations receive the 50% Class I and 50% Class 11 ratio. 5. Developer is granted the reduced parking ratio allowance from 4.5 spaces per 1,000 sq. ft. of building space to I space per 1,000 sq. ft. and attributed to the new HOM Furniture store use only. All other uses must maintain the 4.5/1,000 ratio as prescribed in the 2011 Shingle Creek Crossing PUD Agreement. 6. Developer is allowed to expand proposed/ftiture Building X from 19,000 sq. ft. to 48,000 sq. ft. for a medical/inuiti-tenant office building. A separate RESOLUTION NO. 2017-25 Site and Building Plan application will be required before any approvals are granted for the new Bldg. X improvements, 7. Developer is allowed reduced setback of 20 feet on the EDA lot (Building F) for future development if needed. A separate Site and Building Plan application will be required before any approvals are granted for the new Bldg. F improvements. 8. The allowances to omit the standard: "Di-ive-thi-u oi- service lanes shall be screened vt,ith berining, landscaping or fencing" is not recommended and will remain intact. 9. Developer is allowed to have all new -wall signs for the HOM store and retail addition comply with regular C-2 Zone sign standards under Ch. 34 -Sign Code; and only one (1) new freestanding sign up to 350 sq. ft. along HWY 100 frontage, with enhanced architectural designed materials and elements that are complementary to the features of the existing Shingle Creek Crossing signs along Hwy 100. The final design and location of this new zn HWY 100 frontage sign shall be approved by the City. This freestanding sign may be 100% dynamic message board, or combination of static and dynamic. The Developer agrees to forgo any future freestanding sign allowance along County Road 10 (Bass Lake Road) frontage. 10. Developer must obtain a building permit and adhere to all requirements prior to beginning any removals, demolition, land disturbance work, or new construction of parking, utilities or buildings. 11. Unless amended otherwise or under separate agreement, all existing provisions, standards and variations provided under the 2011 Shingle Creek Crossing PUD and subsequent amendments, shall remain in effect for the entire Shingle Creek Crossing Planned Unit Development. 12. Any future PUD amendments or application requests will require the submittal and adoption (acceptance) of an updated master plan, which plan shall govern the planned and future redevelopment areas of this site. 13. No other allowances as illustrated or indicated on the submitted "Shingle Creek Crossing PUD Amendment No. 8 Plans shall be comprehended or permitted under this specific approval, 14. The Developer shall enter into and execute an updated PUD Agreement (or similar document) as prepared by the City Attorney. RESOLUTION NO. 2017-25 February 13 2017 Date ATTEST: jjwg " City Clerk Mayor The motion for the adoption of the foregoing resolution was duly seconded by member April Graves and upon vote being taken thereon, the following voted in favor thereof: Tim Willson, Marquita Butler, April Graves, Kris Lawrence -Anderson, Dan Ryan and the following voted against the same: whereupon said resolution was declared duly passed and adopted. L � � U � L to , 4-J N C V L � � N p O j cd N C 4,, MC 3 4-Jc � L N C v 4.' p o a�_o v C CL 4--J CO 1 U U N ami c o o p s CL co L N = O E N C>O C EO j 00 N C 0- O N L E L u C O _E 4., O +� C it O L s s 30 0 E I o Cid V) Ncd V Qo E.0 p O O w "- Z __J i i • • �,�� 1' III I1 ♦ ►4 • CL ,6 e f .I F CIS L- • . 1 �j ■ L � � U � L to , 4-J N C V L � � N p O j cd N C 4,, MC 3 4-Jc � L N C v 4.' p o a�_o v C CL 4--J CO 1 U U N ami c o o p s CL co L N = O E N C>O C EO j 00 N C 0- O N L E L u C O _E 4., O +� C it O L s s 30 0 E I o Cid V) Ncd V Qo E.0 p O O w "- Z __J Cd ER" A a a 0 a� 0 0 Q s a� a N a _o Q) Q v) j:) W N C, a � o N DO — V O cVi� Cd 4 �? J � y � � a a o V Wcd vj _o 4J }' N C rC) V ti Q ,f ! a� u O L a c E 4; � .� aI W C/ ` W cd s L L � I lo`" r_ ` 4.., .� 4-j L � I � C C � V) els, ZjO� •�, ` C) c Zt O o U - u i Ar � I c. lao c 4-J � N *l! it • y � f •� -0 c O � U u v� s O s; II� ,•' —Cld U O A f� L -v O • cd � 77. \ i'� wed` ► yY O E L ` u V) o oo E o am ao N — a� o� } O lao c 4-J � N •� -0 c O � U u v� O N u —Cld U O L -v O • cd � 4-J co O E L ` u V) o oo E o o ao N — a� o� O O O L O � o V) M 0 -j M co U '^0' O c O E O -v O cd W � W En co ^, C ^^ '' W N O O W co O N cd ^ ' O X ME L cd E -v 0OT w m 2: Z7O s Planning Commission Report Meeting Date: January 26, 2017 Application No. 2017-001 Applicant: HOM Furniture Inc. / Gatlin Development Location: 2501 County Road 10 Shingle Creek Crossing PUD Project Site Request: Planned Unit Development Amendment No. 8 and Site Plan Approval INTRODUCTION L1RUOKt 1 'N (Z�1,VR • Application Filed: 12/19/16 • Application Deemed Complete: 12/19/16 • Review Period (60 -day) Deadline: 02/17/17 • Extended Review Period Deadline: N/A HOM Furniture Inc., in conjunction with Gatlin Development requests consideration of the eighth amendment to the 2011 Shingle Creek Crossing PUD development plans. The PUD Amendment includes a number of changes and modifications made under the original 2011 PUD Agreement, which will assist in the redevelopment of the former Kohl's store site into a new HOM Furniture store, along with the option in developing the adjacent city -owned EDA lot. HOM also seeks approval of a Site and Building Plan application to the former Kohl's retail building, which includes a new two-story, 24,622 sq. ft. (gross sq. ft.) addition, which would provide 11,805 sq. ft. for new multi -tenant retail user space (first floor), and 12,817 sq. ft. of additional 2°a floor space for HOM's use. The PUD Amendment was given separate consideration before the Planning Commission at the January 12, 2017 meeting, with the understanding that official consideration of the new Site and Building Plans for HOM Furniture store improvements would be delayed to this January 26th meeting. It was indicated at this last meeting that Gatlin may have the necessary stormwater management plan available for review for the city engineers to complete their overall review of this application. Gatlin's engineering consultants with Kimley-Horn Assoc., who prepared the overall drainage report for the 2011 Shingle Creek Crossing development, has been in contact with Shingle Creek Watershed Commission and is preparing the necessary storm water management/drainage plan and report for this particular area, which they hope to have submitted to the watershed very soon. This Site Plan application is being presented with the understanding (and condition) that the local watershed commission approval is required before the issuance of any permits for land disturbance, demolition and/or building improvements. This public hearing item was officially tabled at the last meeting; and therefore the Commission will be asked to re -open the hearing; ask for staff presentation of the new Site Plan for HOM; discuss; close the hearing; and formulate a recommendation accordingly. App. No. 2017-001 PC 01/26/17 Page 1 BACKGROUND The Shingle Creek Crossing PUD Amendment proposal was submitted along with the proposed SCC Master Plan — December 2016 (shown on the image below). 70 4 r .:; g �� ♦dry �. B / Sears K _ i SHINGLE CREEK CROSSING ` ��� BROOKLYN CENTER, MN MASTER PLAN .10 � 10y � D CATLINDEVE10PMENTCOMPANY Kimley»Horn .,r As a reminder, HOM is seeking the following modifications or additions: a) allow the addition of a 2 -story, 24,000 sq. ft. addition to the former Kohl's building; b) allow reduced amount of Class I materials to the refurbished Kohl's building; C) allow a reduced parking ratio from 4.5 spaces per 1,000 sq. ft. of building space to 1 space per 1,000 sq. ft. for a proposed furniture showroom and warehouse; d) allow future BLDG. X to be expanded from 19,000 sq. ft. to 48,000 sq. ft.; e) allow site to have regular C-2 Zone sign standards as found in Chapter 34, Brooklyn Center Sign Code as opposed to the approved 2011 Shingle Creek Crossing Sign Program Plan; f) allow a new dynamic message sign of 350 sq. ft. on the subject site; g) allow reduced setbacks on the EDA lot for future development by HOM Inc., with further allowances to omit the standard: "Drive-thru or service lanes shall be screened with berming, landscaping or fencing"; h) allow certain prohibited uses listed under the 2011 Shingle Creek Crossing PUD Agreement. The PUD Plan calls for the improvements to the former Kohl's building, which include re- furbishing the outer shell with new materials, and the expansion of the building with new retail space and storage/display area for HOM. These improvements are generally laid out on the new Site Improvement Plans HOM Furniture — Building Y for Shingle Creek Crossing plan set attached hereto. SITE & BUILDING PLAN CONSIDERATON The Site and Building Plan represent the modifications to the outer shell of the former Kohl's App. No. 2017-001 PC 01/26/17 Page 2 building, along with a two story, approx. 25,000 total square foot addition. HOM intends to use the first story as 11,805 sq. ft. of available retail/tenant space (illustrated with five separated spaces for now), which will be controlled or leased out by HOM only. The upper (remaining) 12,817 sq. ft. of this addition will be tied into the 2nd floor space of the new HOM store, to be used for added storage or display area. Bldg. Y (old Kohl's) is shown with its original footprint, along with a new two-story, 24,000+ sf. total square foot addition on the west side of the building. HOM intends to remodel the entire interior areas of the structure, and "re -skin" or modify a majority of the exterior similar to the conceptual elevation designs shown in the images below. -.j L LEEP HOM POWs espress FLOORS son o� M was sow narwnox swF r -m• The two-story addition will be allow for the first floor to be available for 11,805 sq. ft. of new retail (multi -tenant) space, while the upper portion of 12,817 sq. ft. will be opened up to the 2nd floor of the HOM store and used for additional floor/display area. HOM intends to replace or repair any outdated or inefficient mechanicals, and replace/repair the roof as needed. The PUD Amendment also requests the City to allow a reduced amount of Class I materials to one face of the planned refurbished Kohl's building. This reduced face is located on the north side, along County Rd. 10 frontage. HOM is asking that instead of 50% of Class I materials, they be allowed to reduce to 25% of Class 1, with remaining 75% as Class II materials. Parking & Access Considerations The existing Kohl's lot consists of 6.83 acres, with an approx. 75,000 sf. retail building, and 447 App. No. 2017-001 PC 01/26/17 Page 3 parking spaces. The original Bldg. X that was approved under PUD #7 was intended to be a new 9,400 sq. ft. retail building, with 51 spaces (at 5.43 spaces/1,000 sf. — which exceeds the 4.5/1,000 sf. required under the SCC PUD). The expanded Bldg. X proposed under this PUD Amendment request is now shown as a 3 -story, 48,000 sq. ft. medical office building. Both the HOM Furniture and future Bldg. X share the same lot; and hence shared parking between uses. HOM has submitted a request under this PUD Amendment to reduce the amount of parking from 4.5 spaces per 1,000 sq. ft. of retail floor space down to 1 space per 1,000 sq. ft. This reduction only applies to the HOM Furniture store use. The retail expansion area will be parked at the current 4.5 per 1,000 standard. BUILDING Y PARKING BREAKDOWN BUILDING DESIGNATION AREA (SQFT) REQUIRED PARKING PARKING RATIO EXISTING BUILDING 72.300 73 STALLS 1 STALL/ 1000 SF HOM EXPANSION 12.817 13 STALLS 1 STALL/ 1000 SF NEW RETAIL 11.805 53 STALLS 4.5 STALL/ 1000 SF To lend support to this request, HOM submitted for consideration the table below, which indicates what other communities calculated in other HOM store uses within these cities: ------------------------------------------------------------------------------------- HOM Locations HOM is basing this request on these other city allowances, and the reasons being the larger, open store is used for more display, full -scaled room set-ups and arrangements, and warehouse space than a typical retail shopping store. Customer traffic is usually limited to a smaller than average number compared to other retail stores, and reduced parking has never been an issue with other furniture store sites they operate. Based on this requested reduction, the HOM store (and retail outlet) is indicating only 139 spaces would be allocated to HOM. The Applicant's Site Data Table (partial clip below) indicates the lot for Bldg. X and Y (Lot 2, Block 2) is identified with 361 spaces. App. No. 2017-001 PC 01/26/17 Page 4 ;Bloomington Sliding scale from 1 per 333 s.f. to 1 per 1,000 s.f. See Sec 21.301.06 ; :Coon Rapids 1 per 1,000 s.f. Rochester 1 per 600 s.f. Rogers 1 per 622 s.f. ;St Cloud 1 Per 1,000 s.f. under 100k s.f. and 1 per 1,200 s.f. over 100,000 s.f. ;Sioux Falls ------------------------------------------------------------------------------------ 1 per 600 s.f. HOM is basing this request on these other city allowances, and the reasons being the larger, open store is used for more display, full -scaled room set-ups and arrangements, and warehouse space than a typical retail shopping store. Customer traffic is usually limited to a smaller than average number compared to other retail stores, and reduced parking has never been an issue with other furniture store sites they operate. Based on this requested reduction, the HOM store (and retail outlet) is indicating only 139 spaces would be allocated to HOM. The Applicant's Site Data Table (partial clip below) indicates the lot for Bldg. X and Y (Lot 2, Block 2) is identified with 361 spaces. App. No. 2017-001 PC 01/26/17 Page 4 T 5 LOT 3, BLOCK I 1 1 54 ACRES 5.500 SO. FT 55 SPACES 10.00 X 1 LOT 2. BLOCK2 48,000 SO. FT. Y I LOT 2. BLOCK 2 6 82 ACRES 56.522 SO. FT 361 SPACES 372 TOTAL 68 I8 ACRES 702,318 SO. FT. 3368 SPACES 6.52 Pursuant to City Code 35-700 Off Street Parking Requirements, the following standards apply to medical and regular office uses: f. Medical and dental clinics: 3 spaces for each doctor/dentist, plus I space for every 2 employees or I space for each 150 square feet of gross floor area, whichever requirement is the greater. g. Office Buildings, exclusive of those specific uses otherwise listed in this section: Building Gross Floor Area (G.EA.) Required Spaces 20,000 — 220,000 sq. ft, G.F.A. .0005 G.F.A. + 190 Under the medical office use, Bldg. X calculates as follows: 48,000 / 150 sf. = 320 spaces Office Bldg. use calculates as follows: 48,000 / (.0005 * 48,000) + 190 = 224 spaces. Subtracting the 139 spaces allocated for HOM from the 361 total stalls leaves only 222 spaces for Bldg. X. It should be noted that the 222 spaces does exceed the 4.5/1,000 sf. required under the SCC -PUD Agreement for retail uses. As for access, the new HOM store will still have main access from the main drive lane coming off Co. Rd. 10, directly south from Shingle Creek Parkway intersection. There are no plans to increase this access or any other openings to the sites. The Developer is also showing the closure of the free right -turn lane off Co. Rd. 10 north of the building (see image below). The City has made it part of previous agreements with the developer that this access would be closed off once this Kohl's site was re -developed. App. No. 2017-001 PC 01/26/17 Page 5 Sianne Considerations HOM Inc. requests modifications or additional sign allowances than those originally granted under the 2011 Shingle Creek Crossing Sign Program. HOM is asking the City to allow regular C-2 Zone sign standards (as found in Ch. 34 -Sign Code) to apply, instead of the limited standards found in the 2011 Sign Plan presented by Gatlin Development and later adopted by the City under the 2011 Shingle Creek Crossing PUD Agreement. The request also includes an allowance to have a 350 sq. ft. dynamic message board sign on the HOM site; along with additional freestanding sign on the medical office site. Under the SCC Sign Plan, this HOM site would be considered a "major tenant", and its sign allowances are noted in the Shingle Creek Crossing Sign Program. The Plan states that all wall sign sizes are limited to 1.5 sq. ft. per linear foot of leased premises; with primary signs further limited to 70% of adjacent wall surface and no higher than 6 -ft. max.; while secondary sized signs limited to 70% of adjacent wall surface and 1.5 -ft. in max. height; and all wall signage is limited to 350 sq. ft. in total area per elevation/side of building. The Kohl's building has a linear wall frontage of approx. 224 feet on the large wall faces (west and east elevations); and 160 linear feet on the shorter (south and north elevation) sides. The building is approx. 52 feet in height. Under the SCC Sign Plan, up to 337.5 sq. ft. of signage is available for the west/east elevations, and 240 sq. ft. of signage to the south/north elevations. App. No. 2017-001 PC 01/26/17 Page 6 20' WATERMAIN AND SANITARY SEWER EXISTING FULL EASEMENT ACCESS TRAFFIC CLOSE FREE SIGNAL PUD RIGHT DRIVE-THRU BOUN RY x LANE (TYP / �' EXISTING SIDEWALK — P — — --- ---- - r ----- . - LOTA-- - ' ; II 51� '� II 14,000 20' D&U- EASEMENT -� LOT 1, 96=Sr / DRAINAGE & LOT 2, / UTILITY EASEMEN l ✓/ BLOCK 2 (WIDTHV ) ,ti=,.�A� Sianne Considerations HOM Inc. requests modifications or additional sign allowances than those originally granted under the 2011 Shingle Creek Crossing Sign Program. HOM is asking the City to allow regular C-2 Zone sign standards (as found in Ch. 34 -Sign Code) to apply, instead of the limited standards found in the 2011 Sign Plan presented by Gatlin Development and later adopted by the City under the 2011 Shingle Creek Crossing PUD Agreement. The request also includes an allowance to have a 350 sq. ft. dynamic message board sign on the HOM site; along with additional freestanding sign on the medical office site. Under the SCC Sign Plan, this HOM site would be considered a "major tenant", and its sign allowances are noted in the Shingle Creek Crossing Sign Program. The Plan states that all wall sign sizes are limited to 1.5 sq. ft. per linear foot of leased premises; with primary signs further limited to 70% of adjacent wall surface and no higher than 6 -ft. max.; while secondary sized signs limited to 70% of adjacent wall surface and 1.5 -ft. in max. height; and all wall signage is limited to 350 sq. ft. in total area per elevation/side of building. The Kohl's building has a linear wall frontage of approx. 224 feet on the large wall faces (west and east elevations); and 160 linear feet on the shorter (south and north elevation) sides. The building is approx. 52 feet in height. Under the SCC Sign Plan, up to 337.5 sq. ft. of signage is available for the west/east elevations, and 240 sq. ft. of signage to the south/north elevations. App. No. 2017-001 PC 01/26/17 Page 6 HOM has submitted its own sign plan with the following allowances: 923 sq. ft. of signage to the south elevation; 843 sq. ft. for the west elevation; 1,091 sq. ft. along the east elevation; and 275 sq. ft. for the north elevation. The C-2 Sign Standards found under Ch. 34 -Sign Code allows the aggregate areas of wall signs not to exceed up to 15% of the wall supporting the signs (essentially 15% of total wall area. The 224' x 52' wall face equals 11,648 sq. ft. of wall space, which would allow up to 1,747 sq. ft. of total wall signage. The smaller 160' x 52' walls equates to 8,320 sq. ft., or 1,248 sq. ft. of allowable signage. Under each wall sign illustration, the new HOM store either exceeds or greatly exceeds the App. No. 2017-001 PC 01/26/17 Page 7 allowable amount of wall signage called for under the 2011 Shingle Creek Crossing PUD Sign Plan. However, under the City's Sign Code standards for C-2 properties, all new signs would be under the allowances based on these regular signage standards. Because this old Kohl's site is somewhat detached and separated from the main elements or improvements inside the SCC PUD, city staff is not too overly concerned with granting or allowing this added signage for this HOM store building, since the C-2 standards already allow for increase signage to begin with, and the building is large enough to support the extra signage. As for the new (proposed) freestanding signs. The 2011 Shingle Creek Crossing PUD Agreement limited the number of freestanding signs throughout the PUD area based on the following approvals: Two freestanding signs, each up to 350 sq. ft in area, are allowed along HWY 100, two freestanding signs are allowed along Bass Lake Road up to 140 sq. ft.; and two freestanding signs along Xerxes Ave. up to 140 sq. ft is allowed as development identification signs as illustrated on Attachment Four and Fifteen. Four monument signs up to 140 sq. ft. are allowed along Bass Lake Road, and one monument sign up to 140 sq. ft. is allowed along Xerxes Ave. Under the C-2 sign standards in Zoning Ch. 34 -Signs, a commercial building above 24,000 sq. ft. is allowed the following freestanding sized signs [as an individual establishment]: 2. Freestanding Signs a. Individual Establishments Individual detached establishments or enterprises not clustered in a shopping center complex or in a multitenant office or industrial building may have one freestanding sign according to the following schedule. In the event such establishments abut two or more streets which are at least collector or arterial in character, and if the abutment on each street exceeds 400 feet, one freestanding sign may be erected along each such street according to the following schedule: Building Gross Floor Area Max. Sign Area Max. Sign Height Square Feet Square Feet (Above I st Flr.) Feet Above 24,000 250 32 The two 350 -sq. ft. freestanding signs inside the Shingle Creek Crossing PUD today were a hold- over from the previous Brookdale Mall planned unit development agreement of 1998, which the Developer wanted extended to the newly redeveloped PUD. These two large-scale signs are now evident along HWY 100 frontage, and are used to display the major, multiple store tenants inside the new mall area. The Developer also chose to limit individual freestanding signs on all individual parcels, by strategically placing the smaller 140 sq. ft. multiple tenant display signs throughout the development, primarily near the entry points. Since the Kohl's/HOM frontage along County Rd. 10 and HWY 100 exceeds 400 -ft. along each major (arterial) roadway, under the normal; C-2 Zone sign standards, HOM would be entitled to App. No. 2017-001 PC 01/26/17 Page 8 place two, 250 -sq. ft. sized freestanding signs along each roadway. Each sign would also be allowed to be fully dynamic or full electronic message board. The allowance that HOM is requesting under this PUD Amendment request is quite significant when compared to the approved 2011 PUD Agreement and Sign Plan between Gatlin and the City. Gatlin purposefully chose to limit the amount of individual signage inside the mall area in order to avoid over clustering of freestanding signs, and limit large, out -of -character wall signs that could detract from the newer architectural style and enhanced design of the buildings planned under this PUD. The image below illustrates a plan to install the HOM sign near the southern -most corner of the old Kohl's lot, in front of the proposed medical office building. Tenant S HOM is also showing a new freestanding sign near the main entrance (off the main access road), which appears to be for the new medical office uses. Although staff acknowledged this HOM site is somewhat detached and separated from the main part of the SCC -PUD, and essentially will function on its own accord, City staff would still like to maintain a sense of consistent and combined design criteria over the entire PUD site regarding signage, including this HOM and surrounding developments. With that being said, Staff suggests that having three, 350 -sq. ft. signs along the HWY 100 frontage may be a bit too much, and recommends HOM reduce the size of their individual sign to only 250 -sq. ft. App. No. 2017-001 PC 01/26/17 Page 9 Although entitled to an additional 250 sq. ft. sign along Co. Rd. 10, the City is accepting HOM's request to provide additional and much larger wall signs on the building, so an additional freestanding sign is not warranted along this frontage. Furthermore, any additional freestanding signs for the proposed "Medical Office" and EDA lot may be allowed, but should be limited to the C-2 Sign Code standards as well. RECOMMENDATION Staff recommends the Planning Commission adopt the attached Resolution No. 2017-01, which comprehends the approval of Planning Application No. 2017-001, the Planned Unit Development (PUD) Amendment No. 8, which would allow certain changes to the original 2011 Shingle Creek Crossing Planned Unit Development (and all subsequent amendments), along with the related Site Improvement Plans HOM Furniture — Building Y for Shingle Creek Crossing, subject to the following conditions and allowances: 1. Developer shall comply with all conditions or request of additional information as noted in the City Engineer Review Memorandum, dated January 5, 2017 2. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned Unit Development by allowing the following uses: a) Medical Office Building - with typical tenants that may do surgeries, urgent care and treat patients in offices; b) Medical and Dental Laboratories; C) Educational Uses listed in Zoning Code Section 35-322.1.h.; d) Transient lodging, provided they are limited to hotel use only, and no motels. e) Animal Hospitals, provided any outdoor kennel runs or activity areas for pets being cared for in the hospital is screen with an opaque fence and regularly cleaned and maintained. 3. Developer is allowed to construct a 2 -story, 24,622 sq. ft. addition to the former Kohl's building, with approximately one-half of this space to be used for new multi -tenant retail spaces, and one-half to be used as additional floor space for the new HOM Furniture store. 4. Developer is allowed to a reduction of Class I materials along the north elevation side of the new HOM store building, provided all other elevations receive the 50% Class I and 50% Class II ratio. 5. Developer is granted the reduced parking ratio allowance from 4.5 spaces per 1,000 sq. ft. of building space to 1 space per 1,000 sq. ft. and attributed to the new HOM Furniture store use only. All other uses must maintain the 4.5/1,000 ratio as prescribed in the 2011 Shingle Creek Crossing PUD Agreement. 6. Developer is allowed to expand proposed/future Building X from 19,000 sq. ft. to 48,000 sq. ft. for a medical/multi-tenant office building. A separate Site and Building Plan application will be required before any approvals are granted for the new Bldg. X App. No. 2017-001 PC 01/26/17 Page 10 improvements. 7. Developer is allowed reduced setback of 20 feet on the EDA lot (Building F) for future development if needed. A separate Site and Building Plan application will be required before any approvals are granted for the new Bldg. F improvements. 8. The allowances to omit the standard: "Drive-thru or service lanes shall be screened with berming, landscaping or fencing" is not recommended and will remain intact. 9. Developer is allowed to have all new wall signs comply with the C-2 Zone sign standards established under the Ch. 34 -Sign Code; and only one (1) new freestanding sign up to 250 sq. ft. along the HWY 100 frontage is allowed, which can either be a regular static message or dynamic sign per City Code Ch. 34. 10. Developer must obtain a building permit and adhere to all requirements prior to beginning any removals, demolition, land disturbance work, or new construction of parking, utilities or buildings. 11. Unless amended otherwise or under separate agreement, all existing provisions, standards and variations provided under the 2011 Shingle Creek Crossing PUD and subsequent amendments, shall remain in effect for the entire Shingle Creek Crossing Planned Unit Development. 12. Any future PUD amendments or application requests will require the submittal and adoption (acceptance) of an updated master plan, which plan shall govern the planned and future redevelopment areas of this site. 13. No other allowances as illustrated or indicated on the submitted "Shingle Creek Crossing PUD Amendment No. 8 Plans shall be comprehended or permitted under this specific approval. 14. The Developer shall enter into and execute an updated PUD Agreement (or similar document) as prepared by the City Attorney. Attachments • City Engineers Review Memo (01/05/2017) • Shingle Creek Crossing PUD Amendment Plans No. 8 • Site Improvement Plans — HOM Furniture — Bldg. Y App. No. 2017-001 PC 01/26/17 Page 1 I 5�,��5 .. =- _ ,1 03 z M O 0 �aoDo u�, m 3 3 p zz 0 � � J n 03 z M O 0 n a W m 3 3 A� G zz 0 � � J mCO 03 z M O 0 m 3 m0 A� G 3 Z p c�2`rr of2q�` N. f02 � a J mCO 03 z M O 0 m0 3 Z mz J u.a.my game: N: \Twc �nev\cnnw DEVECDv�eEm\eaaaxDA�c ceNiEa\cnoD\eNASE J\E,mm�.\zon—osis NDu ��o�•o•o��„ so•m E.nmrc.a.g sam v . - n m. m�.,,m:mai PRELMMARY - NOT FOR CONSTRUCTION m o \ SHINGLE CREEK CROSSING ED a�9 Ho�Ey u�mE 9 X=u BROOKLYN CENTER HOM UNDERGROUND a5a°aw ¢aw o. EnA Mmley*Horn M HOM FURNITURE STORMWATER EXHIBIT " a. BRIAN N. x aDEMrN _d - • —� HENNEPIN COUNTY MINNESOTA �M1E° a 5J11J No. pEN510N5 DATE dy CT -1 Vj IN Nw j A - ti2�3u1W O W W O N --I A ti O W N J tNil ®� A -i OCD N W Q) co N O CJ (j7 111 N C4 O 0 �'� o z °: m � d L CJDDd (D y :s dH o O y �Ci7 n O r CD tiNf t0 � N O O rD V W W Q `1 V � d < � rNa ch 00� v '� ID r O co � O O -a n 3 nrD rD OBD A `1 S M r'r to Ln a o J C J O ib v w w w w d D. �i m t Ai In In CT CT Ul In �• O Q _ O cu CD < .y rzro N ¢ CD ILP _ n CD CP CD N V D 3 m cu D sz CL CD = .r N N w rr z f! F' O O O Al {n y .7 �D O_ O QO CU � G � (D C z 3 O cr M N C n � C C C C C n m L^ m Oo O V l i ,E.r 4�- (Ln Uii Ln sz CL rD Q V n (D 0 Fa In (D rD cz m _ n n rD :3 fD : CD N ((D y ,_ ,y N Q1 N CT (N p r V ::3 rD O �. N fD co N C m Q 7 fR1 C C (Ln N A N p1 m D n O v 2 � is (D 2 w Ln' D T O (D n C :3 c D, Q N lD rNr 0 L V oa C)D N In V Nw j A - ti2�3u1W O W W O N --I A ti O W N J tNil ®� A -i OCD N W Q) co N O CJ (j7 111 N C4 O 0 NN r. 0 CIN] L (15 t� t71 CD tiNf t0 � N O O rD V W W Q `1 V W A < � rNa ch 00� v '� rD tD N w co � O O -a n 3 N rJ p rD OBD A `1 S M r'r to Ln a o 0) CO N C J O (D V O W •' D. �i m t Ai fD PO (n (D N o ;a J O CJ (j7 111 N W O 0 NN r. 0 CIN] w N _. (15 NCO t71 CD tiNf t0 N CD O W 3 ' V CO tD tD N w co � t(ND� th O ��" O 41 (j7 111 N W O 0 NN r. 0 CIN] w N _. NCO Z 'A 'ototi-9LS£-Z£8ti •unOlo Iuld aill sdooN pun sluauzasna 5upjjopun jo Oa.ij allil puLI ;Dql da331 of sdlatl sluauiasnO asatll Euiluoipapat pun 5uRUMA •sluau13su0 3I1umopis pun polis su Ilam su Ilam su sluauzasna ,Slilrin pun a5umutp sapnloui sigl •Inld Inuit atll uo polnotpapax pun pOlnoun Oq XIio/oilgnd aul Jo zonnJ Iii sluMosnO 5ui,4iopun aill 5uilsonbaz Oau om `ssaooid Inld lno jo Itud s •aOjj Joj jloS Ald uuo suuaii3ozd tllnoX Igozd-uou `Inool IIn `jIos jo ouaui? atll pun tllnox of luauzliuuuoo sii jo pud su `pun Iunoosip gutoizd n papino.id on sxapuodsaz XouQ&Tc) 3 Inool pun sunzalan IIS' •saoo Ii alZ)gAiX 333 aaultnd Xliunutuzoo L, Oq oI sanizis jloi?dos `XIluuoilippV •@i?v joud sig;)uoq anililodwoo n antaoar saaXoldtuo Ouul-IInj pun poiaulns ooinaas golou-dol apinoid of saOXolduza M7 JOAO Tim Poguis st Onuan jIo5do L peg •aouds Iuana Iooj-oinnbs 000`£ n puL, `oonual jooa Iooj-aannbs 000`£ n `uogoliN Iooj-Oaunbs OOS`Z n apnlout liim XIilionj ail, `xIlnuoilippy 'Iunanulsaa aIqul OS n su Ilam sn suolsiAQIOT uaO.ios 1nII OLZ PUP `sl32znl plogTno I I `sXuq 5uilliu ZOI sapnloui uoium XIrIionj IOnaI-aanll `Iooj olunbs 000`S9 u jo sisisuoo loofozd pasodoid OiIZ •Ouillud olden, puu (RORILIl plogino I I tllim) oi?uuz Ruintzp n SU Ilam sn Ianal-oojgl n sapnloui Xpodoid wou £6•i,I 3qI aoi unld alis posodoid atll `ZSZ XL'mg2IH pun tb69 OlulszOlul Jo uoiloosiolut atll jo aautoo IsomgIJOu Qqj uo palnooZ •unld OIIS pun luld Fuld pun IiL'uiuulaad fuipuodsO.uoo oqj su Ilam sr IuauidolanaQ Iiun pauunld 2utlsixO un puautp oI uollnotlddn uu gutlliuigns si jlo2dod Oouai. 3dxa onbiun XIn.tl n apinojd of auiqutoo auinB anilnnouui pun `j�nls dui n ua `azatldsouliv oiuznuXp 3qj -XIIIiqu Jo IIiNs jo ssalpzn2az `IIn of �?uiluaddv pun algiss000n st IntII oum2 n uo paaaluao anuan Iuauuuulzaluo Xlilulidsoq ssnlo -ui-lsoq L, olui panlona sutl jlofdo L 'jolul siagwauz uoilliui t,•t, pun `sllnq uolIIiq S•Z `s ox uaaljid •Oouulsip pun Xonmoon uodn pasuq sluiod Oniaow pun sl35.zul olui slluq jlo.2 p3ddit43ojotw ltu s.z Ald Xgazailm auzu2 u uo szaluao jloi?do L `XIlnogloodS •Ino2uuq pool alizonnJ znoX spoor pods jo uoippodmoo OiII wc)gm O,zu sa111Iioni •S -fl S£ ln0 °punoijvo,f jloj? jo Ouin2 aul Ooilouad of Am Jonoq n sioXuld Opinord of X2olouiloai sasn Idaouoo jlofdo L OT `666I 111 puul5ug `uopuoZ Jo Opislno paluanul •pltom aql ui Xunduzoo luautuiulzoluoilo�3 jotuzaid OiII st jloi3doI ant;VI.zUIN pafo.xd DrI `aNua,3 uSMooag VSf13to2dol, O s3g? 8£ � aFt 8$flli � tF TR 2 0 A , nm -HINUMH ibi m .. .. ....... lu 1. CID 0 1 tn L-4 .. .. ....... Page 13 We Want Your Input! Brooklyn Center Comprehensive Planning Survey I. Introduction This survey was developed to involve citizens in planning for the future of their community. This is an opportunity for citizens to provide input, in addition to attending public hearings and meetings. All citizens, elected officials and stakeholders of the community are encouraged to complete the survey. Deadline for submission of surveys will be October 22 and results will be tallied later that week. An online version can be filled out and submitted through the following link: http://www.surveymonkey.com/s.asp?u=xxxx. In lieu of participating on-line a hard copy of this form can be manually filled out and returned or mailed to: Gary Eitel, Community Development Director, City Hall, 6301 Shingle Creek Parkway, Brooklyn Center, MN 55430. Thank You! Your input is greatly appreciated! II. Overview I. How would you rate Brooklyn Center as a place to live? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 2. How would you rate Brooklyn Center as a place to raise children? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 3. How would you rate Brooklyn Center as a place to work? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 4. How would you rate Brooklyn Center as a place to retire? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 5. How would you characterize the sense of community in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion III. Land Use and Redevelopment 6. How would you describe the condition of the overall housing stock? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 7. Do you feel there are enough housing type choices in Brooklyn Center? ❑ Yes ❑ No. If no, what types are missing? 8. Do you feel there are sufficient businesses or private services available? ❑ Yes ❑ No. If no, what business types are lacking? 7200 Hemlock Lane Suite 300 Minneapolis, MN 55369 763.424.5505 main 763.424.5822 fox loucksassociates.corn Page 14 9. How do you feel the City is doing in terms of environmental enhancement or protection? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion Concerning City Center, the commercial and multi -family portion of the City located on the north and west side of Highway 100 from Brooklyn Boulevard to Humboldt Avenue/694, please indicate your level of agreement with the following statements: 10. Parts of City Center are in need of redevelopment. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 11. The intensity level of land use in City Center should be increased through redevelopment. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 12. The City should encourage the economic viability of Brookdale Mall. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion Regarding Brooklyn Boulevard and existing multiple -family housing please indicate your level of agreement with the following statements: 13. Underutilized and single-family residential land along Brooklyn Boulevard is in need of redevelopment. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 14. Brooklyn Boulevard is congested with traffic and a difficult street to drive on. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 15. A significant amount of multiple -family housing in the City is in need of maintenance or redevelopment. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 16. Please indicate the order of importance (1 -highest, 2 and 3 -lowest) of the City proactively dealing with the following: _City Center _Brooklyn Boulevard —Multiple -family housing IV. Transportation 17. How would you rate the ease of car travel in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 18. How would you rate the ease of bus travel in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 19. How would you rate the ease of bicycle travel in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 20. How would you rate the ease of walking in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 21. Do you feel a dedicated rapid bus commuter lane should be proposed in Brooklyn Center? ❑ Yes ❑ No ❑ No Opinion 22. How would you rate the sidewalks and trail systems? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion 23. How would you rate the overall transportation system in Brooklyn Center? ❑ Excellent ❑ Good ❑ Fair ❑ Poor ❑ No Opinion V. Civic Center Regarding the Civic Center please indicate your level of agreement with the following statements; 24. Improvements to the indoor swimming pool should be made. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 25. The locker room should be expanded. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 26. The fitness center should be expanded. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 27. A multi-purpose room should be added to the Civic Center. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion 28. A child-care center should be added to the Civic Center. ❑ Strongly Agree ❑ Agree ❑ Disagree ❑ Strongly Disagree ❑ No Opinion Page- 15 Page 16 29. This household uses Civic Center facilities ❑ Daily ❑ Weekly ❑ Monthly ❑ A few times a year ❑ Seldom or not at all VI. Public Facilities and Services 30. How would you rate the following public facilities and services that you use? City Hall Excellent ❑ Good Fair Poor Don't Use/ No Opinion Civic Center ❑ ❑ ❑ ❑ ❑ ❑ Hennepin County Library ❑ ❑ ❑ ❑ ❑ Park Facilities ❑ ❑ ❑ ❑ ❑ Recreation Facilities ❑ El ❑ ❑ ❑ Parks Equipment ❑ ❑ ❑ ElBall Fields Elementary Schools ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ High School ❑ ❑ ❑ ❑ ❑ ❑ ❑ Police Fire ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Street Maintenance ❑ ❑ ❑ ❑ ❑ ❑ Public Utilities (Sewer, Water) 0 ❑ p ❑ ❑ Private Utilities (Elec., Phone, TV) Health Care Availability ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Child Care Availability ❑ ❑ ❑ ❑ ❑ Recreation Programs 0 0 0 ❑ ❑ Senior Programs/Opportunities ❑ ❑ El El Child Programs/Opportunities ❑ ❑ ❑ ❑ ❑ Teen Programs/Opportunities ❑ ❑ ❑ 11❑ ❑ ❑ ❑ 31. Are there any public programs ❑ No not offered that would be beneficial? ❑ Yes (please specify) VII. Open -Ended Questions (final 3 questions) 32. What are the best features of Brooklyn Center that should be preserved and enhanced? 33. What conditions could prevent Brooklyn Center from achieving its full potential? 34. What is your vision of Brooklyn Center in the year 2030? Thank you for taking the time to be a part of the comprehensive planning process by filling out the survey. Your input is appreciated. Clustered Results of Community Analysis and Visioning- June 30, 2008 2030 Comprehensive Plan- City of Brooklyn Center The City Council, Planning Commission, Parks Commission, Housing Commission, Housing Commission and City Staff participated in a meeting to kick off the updating of the 2030 comprehensive plan. Following a brief presentation on comprehensive planning, demographic trends and population and household projections by Loucks Associates 21 people engaged in a group community analysis and visioning process. People in attendance were first asked to respond individually in writing to the three questions set forth below. Participants divided about equally around four tables were then asked to develop consensus/consolidate responses to the three questions listed below (in bold -face type) and to record that consensus/consolidation on a large piece of paper. Presenters from each of the four groups then shared results of their individual/group exercise with a general session of all participants. The consensus/consolidated results of the four groups clustered into subject areas were as follows: 1. What do you consider to be the best features, characteristics, aspects of Brooklyn Center that should be preserved and enhanced? Parks, trails, Mississippi River; River is underutilized Clean accessible water spaces for all to enjoy; ensure public access preserved/improved Improve public pathways; increase "green belting" at all traffic points/paths Parks and trails, trail access to the Mississippi River Regional Trails and community playfields Parks, green space, trails Proximity to downtown Minneapolis Freeway access Location- proximity to downtown Location, access, mass transit Mass transit Sense of neighborhood (needs to be maintained) Neighborhoods, single family homes Neighborhood schools, basic to neighborhood strength Owner -occupied housing builds strength in diversity Housing and improvements to all types; creation of upscale housing opportunities Affordable, well-built housing- maintain Preserve balance of quality housing and commercial property with emphasis on better utilization/maximizing commercially zoned property (perhaps expanding somewhat) Brookdale shopping/commercial opportunities- maintain and enhance Employment opportunities E.B.H.C. City Management's effectiveness Improve traffic flow and access to City Center and neighborhoods Diversity can be positive Earle Brown Conference Center- preserve and enhance Library Center 2. Of the issues identified in the 2020 Comprehensive Plan (refer to handout), which have been adequately addressed and which remain to be addressed? What issues not identified in the 2020 Comp Plan should be addressed in this Plan? Streetscape-improved Brooklyn Blvd. Brooklyn Blvd. south of 65"- development Brooklyn Blvd.- overlay BB corridor report recommendations needed Revisit Opportunity Site vision Promoting the Opportunity Site Center City issues, Northbrook and linking center to community under way Revisit Brookdale vision Brookdale economic viability and traffic patterns Some Brookdale efforts under way 57th use as amenity 57`h and Logan Humboldt Square as declined Redevelopment of underutilized sites, Joslyn site in SW neighborhood successfully addressed Redevelop stressed and aging rental property Multi -family- needs continuous work on maintenance Foreclosed housing issues Owner -occupied senior housing Civic Center improvement/expansion Preserving elementary school sites Consolidate school districts in Brooklyn Center 3. What is your vision of the ideal for Brooklyn Center in the year 2030? Affordable, safe, comfortable Family friendly Crime level reduced below metro area Cohesive community with shared values and respect Great parks and trails Parks and trails Town Center redevelopment Opportunity site 100% Brookdale- viable or redeveloped Bustling Brookdale! Daylight Shingle Creek through Brookdale Shingle Creek "daylighted" Increase owner -occupied housing Senior housing- accessible New housing opportunities for owners and renters Maximize on our great location Maximize on a diverse tax base Appreciating property values High-tech service and manufacturing jobs Slow speed limits on Brooklyn Blvd. Clean, attractive Highway 100 Consolidate school district Great personalized schools Increase population to 30,000 to 35,000 Following the group process it was pointed out that three neighborhood meetings are being scheduled for July and August for which individual notices will be mailed to each household and to community institutions, including religious. Participant were asked to each provide a list of ten names/addresses of people that should specifically be invited to the neighborhood meetings.