HomeMy WebLinkAbout2017 05-25 PCPXC' o!
BROOKLYN
CENTER
PLANNING COMMISSION AGENDA
CITY OF BROOKLYN CENTER
MAY 25, 2017
1. Call to Order: 7:00 PM
2. Roll Call
3. APPROVAL OF AGENDA
• Motion to Approve Planning Commission Meeting Agenda for May 25, 2017
4. APPROVAL OF MINUTES
• Motion to Approve the April 27, 2017 meeting minutes
5. Chairperson's Explanation
The Planning Commission is an advisory body. One of the Commission's fimctions is to hold
public hearings. In the matters concerned in these hearings, the Commission makes
recommendations to the City Council. The City Council makes all final decisions in these
matters.
6. PLANNING ITEMS
a) Consideration of minor revisions to the General Development Plan for the Shingle
Creek Crossing PUD Amendment No. 8 (reduction of BLDG. X form 48,000 sf, to
38,000 sf. and BLDG. F from 14,000 sf. to 12,000 sf.)
Requested Planning Commission Action:
• Direct Staff to present Planning Report;
• Commission discuss requested item with City Staff and Applicant;
• Motion to approve the revisions to the General Development Plan
7. Discussion Items:
• Review schedule for the processing of the Top Golf USA Brooklyn Center,
LLC application for the redevelopment of the Regal Theater Site.
• Survey/questionnaire used in preparing the 2030 Comp Plan.
8. Other Business
9. Adjournment
MINUTES OF THE PROCEEDINGS OF THE PLANNING COMMISSION
OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF
HENNEPIN AND THE STATE OF MINNESOTA
APRIL 27, 2017
i 1 1 1 ■
The Planning Commission meeting was called to order by Chair Christensen at 7:00 p.m.
Chair Randall Christensen, Commissioners Alexander Koenig, Jack MacMillan, Stephen
Schonning, Rochelle Sweeney, Susan Tade, and Abraham Rizvi were present. Also present were
Director of Business & Development Gary Eitel, Interim Communications Coordinator/Planning
Specialist Angel Smith and Michaela Kujawa-Daniels, TimeSaver Off Site Secretarial, Inc.
There was a motion by Commissioner Rizvi, seconded by Commissioner Koenig, to approve the
Planning Commission Meeting Agenda
The motion passed unanimously.
There was a motion by Commissioner Schonning, seconded by Commissioner MacMillan, to
approve the minutes of the March 30, 2017 meeting as submitted.
The motion passed unanimously.
Chair Christensen explained the Planning Commission's role as an advisory body. One of the
Commission's functions is to hold public hearings. In the matters concerned in these hearings,
the Commission makes recommendations to the City Council. The City Council makes all final
decisions in these matters.
None at this time.
1; 1
Page 1
4-27-17
..) CITY
COUNCIL STRATEGI
REDEVELOPMENT
,,Food
Site
Sa2.
57 th and Loan Site
:.
)ppo,-
GOALS0' F F FOR FOCUSED
Director of Business and Development Gary Eitel Mr. Eitel introduced this item and provided
background and status on all 3 redevelopment sites. He stated the challenge is pursuing market
rate housing opportunities within a developed community is that you need to find a developer
and investment group willing to pursue a project without current market data to build their pro
forma from and a good understanding of how the market will respond their project. Similar
challenges relate to commercial projects and their financial challenges.
Commissioner Tade asked what the status is with the Devon George Group. Mr. Eitel stated that
the exclusive negotiating period ended in February. Mr. George has retained another
architectural firm and his development team has been working on a redesign of a potential
project that they believe will be feasible and market receptive. Assuming a positive response to
the feasibility of completing the necessary infrastructure improvements (streets, utilities, storm
water treatment) the redesign will be presented to the EDA to determine if the proposal is
consistent with their vision of the redevelopment of the Opportunity Site.
He stated that at this time, the City is open to consideration of other plans and developer interest
for a market rate housing project for the site.
Commissioner Rizvi asked if the properties in this plan take into account the Ocean Buffet
property. Mr. Eitel stated that property is owned by the EDA and so that is part of the plan. He
referenced the current lease with Ocean Buffett run through 2021 and that increases in the last
years of the lease are schedule to increase the lease rate to market value. The previous plans
identified the general location of the restaurant in the area planned for a future performing arts
center/community building. The assumption has been that this restaurant would be relocated
within the City.
Commissioner Koenig asked Mr. Eitel to give an overview of the market share. He asked if the
issue is that we don't have enough population to fill vacant apartments and the cost of those
wanting to develop will be too expensive for residents. Mr. Eitel stated the risk factor is high
because of the absence of a demonstrated market willing to support higher rents. He stated there
is a lot of market interest here but the market data does not appear to support the projects he sees
being built in Plymouth, Golden Valley, St. Louis Park and Minnetonka.
8b) UPDATES ON CURRENT DEVELOPMENT ACTIVITIES AND PENDING
PLANNING APPLICATIONS:
8b1. 6720 sf. Commercial building under construction at Boulevard Market
Center
8b2. H M Furniture — Shingle Creek Crossing PUD #
W. Sanctuary at Brooklyn Center Senior Housing
Page 2
4-27-17
8W. Inquiry to add 6,080 sL Addition at 6601 Parkway Circle (industrial
expansion)
8b5. Regal Theater Site and 'ferry Moses Lot (PUD amendment and site plan for
a commercial recreational use with restaurant and lounge.
Mr. Eitel reviewed the development activities and pending planning applications. He stated the
6720 sf. Commercial building is currently under construction and being graded. He stated the
HOM Furniture site is still moving forward, they are working on the sites storm drainage issue.
He reviewed the status on the possible addition to 6601 Parkway Circle and noted a minor
amendment to their PUD will likely be submitted for a 6,000 sf. addition to an existing 30,000 sf.
tenant. He stated he is excited about the potential redevelopment of the Regal Theater Site and
shared with the Commission a tentative schedule to accommodate a new commercial recreation
use of the property.
UPDATINGPR..
Scl. Review of the 2030 Land Use Element
Mr. Eitel gave an overview of the Land Use Redevelopment and Community Image Plan. He
stated he would like the Commissioners to become familiar with this plan and then they will start
working through the elements of the plan.
Chair Christensen asked if it's possible for the Planning Commission to get the past survey
and/or questions that were on that survey. Mr. Eitel stated yes, he can get that information for the
Commissioners. He also noted that comp plan indicated there were only 12 responses to this
survey.
Chair Christensen stated he just would like to have the questions so the Commission will know
what they are talking about when they review this information. He stated outreach is something
they need to be better with and he wants people to know they have a say and their input does
matter.
Mr. Eitel stated he agrees. He stated the plan is to go through what has been accomplished, what
they hope to accomplish and what is no longer necessary to be in the plan.
MAY 18"' NEIGHBORHOOD AREA MEETING — KYLAWN PARK
Mr. Eitel stated this will be the first meeting of four of the neighborhood meetings scheduled for
2017. The Planning Commission is welcomed to attend.
';1. ■ 1
Page 3
4-27-17
Mr. Eitel stated this is being reviewed by the Asst. City Manager and has been identified as a
future work session item for City Council consideration. He referenced his responses to
questions raised by the Asst. City Manager, noting that the responses were made on behalf of
previous discussions with the Planning Commission.
Commissioner Tade stated she knows that Great India restaurant once had a liquor license for
beer and wine but doesn't anymore as a result of prices being too high for the license. Mr. Eitel
stated he would follow — up with the City Clerk and include the information to the Asst. City
Manager.
Mr. Eitel stated there are 35 applicants for the vacant Planning position. He stated he is in the
process of reviewing and scoring the applications, which will then start of the process of
interviews to replace the City Planner/Zoning Administrator position
There was a motion by Commissioner MacMillan, seconded by Commissioner Koenig to
adjourn the Planning Commission meeting. The motion passed unanimously. The meeting
adjourned at 8:37 p.m.
Chair
Page 4
4-27-17
TO: Chair Randy Christensen and City Planning Commissioners
FROM: Gary Eitel, Director of Business and Development
Angel Smith, Interim Planning Specialist
DATE: May 18, 2017
RE: May 25, 2017 Planning Commission Agenda
Attached please find the Planning Commission meeting agenda for the May 25, 2017 regular
meeting, along with the April 27, 2017 regular meeting minutes.
6. PLANNING ITEMS
a) Consideration of minor revisions to the General Development Plan for
the Shingle Creek Crossing PUD Amendment No. 8 (reduction of BLDG. X
form 48,000 sf, to 38,000 sf. and BLDG. F from 14,000 sf. to 12,000 sf.)
On February 13, 2017, the City Council adopted Resolution No. 2017-25, which accepted the
Planning Commission's recommendation to approve PUD Amendment No. 8 for the Shingle
Creek Crossing Development and site plan approval for expansion and renovation of the former
Kohl's building by HOM Furniture.
The City Council's resolution authorized the preparation and execution of a PUD agreement for
this amendment.
However, the project was delayed to address storm water management issues required with any
future development within the Kohl's parking lot. When an option for the EDA to address both
storm water management and additional parking required by the Shingle Creek Crossing ECR
(Easements, Restrictions, & Covenants) ran into fiscal challenges and funding priorities, this
option was eliminated and a new strategy/fiscal approach was necessary.
Through the cooperative efforts of Gatlin Development, HOM Furniture, and the City's
consultants a new economic strategy involving the creative use of TIF Pay -As -You -Go Notes
from both TIF 5 and TIF7 was developed.
Additionally, this strategy included the design and installation of the Storm Water Management
improvements to be installed on-site by HOM as part of their initial renovation and expansion of
the Kohl's building. Additionally, during this time it was determined that minor adjustment to
the Master Development Plan were warranted to address a future subdivision of the EDA parcel
that was referenced in the initial staff memo and the reduction of the size of the office building to
meet its parking requirements on-site.
The minor revisions to the PUD development plan include a reduction in Building Pad Site F
from 14,000 sf. to 12,000 sf. and a reorientation and reduction of Building Pad Site X, reducing
the office sf. from 48,000 sf. to 38,000 sf.
The City Attorney is currently working on this PUD agreement and could include these minor
revisions in the agreement for City Council acceptance at either the June 12t" or possibly the
June 26t" City Council Meeting, should the Commission accept the changes.
Additionally, the EDA is scheduled to consider the Tax Increment Development agreements to
facilitate this new economic strategy on the June 26"'
This schedule would enable Gatlin Development and HOM Furniture to complete the sales of the
Kohl's site and HOM to start their renovation and expansion plans this year.
I will be confirming with the City Attorney where the Commission's acceptance can be
accomplished by a motion or if the previous resolution should be reworked.
A recommendation on how to accept the revisions will be provided at the meeting.
For your reference, the following information has been included:
- City Council Resolution 2017-25
- 3 exhibits from the February PowerPoint Presentation illustrating the Building Pad Sites
F&X
- Planning Report on the PUD 8 application and site plan approval, (1-26-2017)
- A development plan with the revised Building Pads and sizes for F and X
- The revised development plan with the on-site storm water treatment area that is
scheduled for the June Watershed Commission Meeting.
7. Discussion Items:
• Review schedule for the processing of the Top Golf USA Brooklyn
Center, LLC application for the redevelopment of the Regal Theater
Site.
Attached a schedule illustrating a time line for the processing of the Top Golf application to
amend the Regal Road Development PUD, site plan approval, platting approval, and land
conveyance / exchange with the EDA; a narrative of the proposed use; and landscape plan
illustrating the redevelopment of the site.
This item has been placed on the agenda for the Commission information.
A public hearing is being scheduled for June 15t".
• Survey/questionnaire used in preparing the 2030 Comp Plan.
This information was requested at the last meeting and has been provided for informational
purposed.
Should Commissioners have any questions prior to next Thursday night's meeting, please call
Gary at (763) 569-3305 or Angel at (763) 569- 3319. Email eitelgci.brooklyn-center.mn.us or
asmithgci.brooklyn-center.mn.us
Reminder: please let us know if you are unable to attend the meeting. Thank you!
Member Kris Lawrence-Andersolhtroduced the following resolution and
moved its adoption:
RESOLUTION No. 2017-25
RESOLUTION REGARDING THE DISPOSITION OF PLANNING
COMMISSION APPLICATION NO. 2017-001 SUBMITTED BY HOM
FURNITURE INC. AND GATLIN DEVELOPMENT COMPANY FOR
PLANNED UNIT DEVELOPMENT AMENDMENT NO. 8 TO THE 2011
SHINGLE CREEK CROSSING PLANNED UNIT DEVELOPMENT AND SITE
AND BUILDING PLAN FOR HOM FURNITURE STORE- (LOCATED AT
2501 COUNTY ROAD 10)
WHEREAS, the City Council of Brooklyn Center adopted Resolution No. 2011-85,
dated June 13, 2011, which is considered the first amendment to the, previously approved 1999
Brookdale Mall Planned Unit Development, whereby this amendment approved the establishment
of the new Shingle Creek Crossing Planned Unit Development, and which included an approved
Development/Master Plan and certain allowances and development standards that would govern
over the PUD; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2011-127,
dated September 12, 2011, which approved the first amendment to the original Shingle Creek
Crossing Planned Unit Development, and which included an updated Development/Master Plan
and provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2012-106,
dated August 13, 2012, which approved the second amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2012-129,
dated September 24, 2012, which approved the third amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2013-124,
dated October 14, 2013, which approved the fourth amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2013-72,
dated July 8, 2013, which approved the fifth amendment to the Shingle Creek Crossing Planned
Unit Development, and which included an updated Development/Master Plan and provided
additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2014-75,
RESOLUTION NO. 2017-25
dated June 9, 2014, which approved the sixth amendment to the Shingle Creek Crossing Planned
Unit Development, and -which included an updated Development/Master Plan and provided
additional allowances and development standards; and
WHEREAS, the City Council subsequently adopted City Resolution No. 2016-170,
dated November 9, 2015, which approved the seventh amendment to the Shingle Creek Crossing
Planned Unit Development, and which included an updated Development/Master Plan and
provided additional allowances and development standards; and
WHEREAS, HOM Furniture Inc. and Gatlin Development Company jointly
submitted Planning Application No. 2017-001, which is considered the eighth amendment to the
Shingle Creek Crossing Planned Unit Development, by allowing certain changes to the approved
2011 Shingle Creek Crossing Planned Unit Development; and
WHEREAS, the PUD Amendment comprehends additional adjustments and uses
not approved under the 2011 Shingle Creek Crossing Planned Unit Development and the related
2011 PUD Agreement; and
WHEREAS, Planning Application 2017-001 also provides for the official request
for consideration and approval of the new Site and Building Plan for the new HOM Furniture
Store with a retail store expansion on the subject site: and
WHEREAS, on January 12, 2017, the Planning Commission held a duly called
public hearing, whereby a staff report and public testimony regarding the amendment to this
Planned Unit Development were initially heard and noted for the record, and said hearing was
tabled to the next Planning Commission meeting; and
WHEREAS, on January 26, 2017, the Site and Building Plan for HOM Furniture
was officially received; an updated staff report presented; public hearing was re -opened; additional
public testimony was given and noted for the record; and the Planning Commission gave full
consideration of both the PUD Amendment and Site and Building Plan elements of said Planning
Application No. 2017-001; and
WHEREAS, in light of all testimony received, and utilizing the guidelines and
standards for evaluating such amendments as contained in City Code Section 35-355 (Planned Unit
Development); and utilizing the guidelines and standards for evaluating site and building plans as
contained in City Code Section 35-230 (Plan Approval); along with consideration of the goals and
objectives of the City's Comprehensive Plan, the Planning Commission considers this PUD
Amendment No. 8 and Site and Building Plan for HOM Furniture to be an appropriate and
reasonable use and redevelopment of the subject property, that standards for evaluating for
evaluating such amendments and site plans have been met; and the proposal is therefore in the best
interest of the community; and
RESOLUTION NO. 2017-25
WHEREAS; the Planning Advisory Commission of the City of Brooklyn Center
did determine that Planning Application 2017-001, Submitted by HOM Furniture Inc. and Gatlin
Development Company, should be approved based upon the following findings and
considerations:
A. The allowance of the 2 -story, 24,000 sq. ft. addition to the former Kohl's
b uilding, with approximately one-half of this space to be used for new multi -
tenant retail spaces, and one-half to be used as additional floor space for the
new HOM Furniture store, is a reasonable request; and helps promote and
enhance the general public welfare of this PUD, as it maintains and keeps
the redevelopment activity of this site intact and ongoing, and may be
approved;
B. The allowance of reduced amount of Class I materials along the north
elevation side of the building is considered reasonable and may be approved;
C, The request to grant a reduced parking ratio allowance from 4.5 spaces per
1,000 sq. ft. of building space to I space per 1,000 sq. ft. and attributed to the
newly proposed ftimiture showroom and warehouse only should not be
detrimental or pose any threat or danger to the general public; nor
injurious to the use and enjoyment of other uses in this Shingle Creek
Crossing PUD; and is hereby considered a reasonable request and
acceptable;
D. The request to allow future/planned Building X to be expanded from 19,000
sq. ft. to 48,000 sq. ft. is considered a positive and reasonable increase, as the
larger building will provide an increased tax base in this area, and will help
promote and provide a needed medical set -vices and a facility for the
residents and surrounding community;
E. The allowance of the reduced setbacks on the EDA lot for future
development by HOM Inc. should not pose any problems in this area and
is acceptable;
F. The allowance of certain uses that were initially prohibited under the 2011
Shingle Creek Crossing PUD Agreement should be limited to the
following:
Medical Office Building - with typical tenants that may do
surgeries, urgent care and treat patients in offices;
ii. Medical and Dental Laboratories;
RESOLUTION NO. 2017-25
iii. Educational Uses listed in Zoning Code Section 35-322. Lh.;
iv. Transient lodging, provided they are limited to hotel use only, and
no motels.
V. Animal Hospitals, provided any outdoor kennel runs or activity
areas for pets being cared for in the hospital is screen with an
opaque fence and regularly cleaned and maintained.
G. The allowances to omit the standard: "Drive-thru or service lanes shall be
screened with ben-ning, landscaping or fencing" is not recommended and
should remain intact.
H. The allowance to have regular C-2 Zone sign standards as found in Chapter
34, Brooklyn Center Sign Code as opposed to the approved 2011 Shingle
Creek Crossing Sign Program Plan is partially approved, with an allowance
to have all new wall signs comply with the C-2 Zone sign standards
established under the Sign Code; and only one (1) new freestanding sign up
to 250 sq. ft. along the 1-lWY 100 frontage should be allowed, and can either
be a regular static message or dynamic sign per City Code Ch. 34.
1. The proposed and general layout of all new building improvements,
including reduced setbacks and any other related flexibility or reductions
identified herein or the resulting resolution of approval, and on the
updated Shingle Creek Crossing PUD Plans, may be acceptable and
approved.
AND WHEREAS, upon acceptance of all public comments and discussion of this
item, the Planning Commission adopted Planning Commission Resolution No. 2017-01, which
provides a favorable recommendation to the City Council, that this request submitted by HOM
Furniture Inc, and Gatlin Development Company under Planning Application No. 2017-001,
which is the eighth amendment to the Shingle Creek Crossing Planned Unit Development, by
allowing certain changes to the approved 2011 Shingle Creek Crossing Planned Unit
Development, along with the Site and Building Plan Approval of the new HOM Furniture Store
development, should be approved by the City Council.
NOW, THEREFORE, BE IT RESOLVED by the City Council of Brooklyn
Center, Minnesota that this request submitted by HOM Furniture Inc. and Gatlin Development
Company under Planning Application No. 2017-001, which is the eighth amendment to the
Shingle Creek Crossing Planned Unit Development, by allowing certain changes to the approved
2011 Shingle Creek Crossing Planned Unit Development, along with the Site and Building Plan
RESOLUTION NO. 2017-25
Approval of the new HOM Furniture Store development, that the findings of approval as noted
herein are hereby acceptable, and this PUD Amendment and Site and Building Plan request is
hereby approved subject to the following conditions:
I Developer shall comply with all conditions or request of additional
information as noted in the City Engineer Review Memorandum, dated
January 5, 2017
2. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned
Unit Development by allowing the following uses:
a) Medical Office Building - with typical tenants that may do
surgeries, urgent care and treat patients in offices;
b) Medical and Dental Laboratories;
C) Educational Uses listed in Zoning Code Section 35-322. Lh.;
d) Transient lodging, provided they are limited to hotel use only, and
no motels.
e) Animal Hospitals, provided any outdoor kennel runs or activity
areas for pets being cared for in the hospital is screen with an
opaque fence and regularly cleaned and maintained.
3. Developer is allowed to construct a 2 -story, 24,622 sq. ft. addition to the
former Kohl's building, with approximately one-half of this space to be used
for new multi -tenant retail spaces, and one-half to be used as additional floor
space for the new HOM Furniture store.
4. Developer is allowed to a reduction of Class I materials along the north
elevation side of the new HOM store building, provided all other elevations
receive the 50% Class I and 50% Class 11 ratio.
5. Developer is granted the reduced parking ratio allowance from 4.5 spaces
per 1,000 sq. ft. of building space to I space per 1,000 sq. ft. and attributed to
the new HOM Furniture store use only. All other uses must maintain the
4.5/1,000 ratio as prescribed in the 2011 Shingle Creek Crossing PUD
Agreement.
6. Developer is allowed to expand proposed/ftiture Building X from 19,000 sq.
ft. to 48,000 sq. ft. for a medical/inuiti-tenant office building. A separate
RESOLUTION NO. 2017-25
Site and Building Plan application will be required before any approvals
are granted for the new Bldg. X improvements,
7. Developer is allowed reduced setback of 20 feet on the EDA lot (Building
F) for future development if needed. A separate Site and Building Plan
application will be required before any approvals are granted for the new
Bldg. F improvements.
8. The allowances to omit the standard: "Di-ive-thi-u oi- service lanes shall be
screened vt,ith berining, landscaping or fencing" is not recommended and
will remain intact.
9. Developer is allowed to have all new -wall signs for the HOM store and retail
addition comply with regular C-2 Zone sign standards under Ch. 34 -Sign
Code; and only one (1) new freestanding sign up to 350 sq. ft. along HWY
100 frontage, with enhanced architectural designed materials and elements
that are complementary to the features of the existing Shingle Creek
Crossing signs along Hwy 100. The final design and location of this new
zn
HWY 100 frontage sign shall be approved by the City. This freestanding
sign may be 100% dynamic message board, or combination of static and
dynamic. The Developer agrees to forgo any future freestanding sign
allowance along County Road 10 (Bass Lake Road) frontage.
10. Developer must obtain a building permit and adhere to all requirements
prior to beginning any removals, demolition, land disturbance work, or
new construction of parking, utilities or buildings.
11. Unless amended otherwise or under separate agreement, all existing
provisions, standards and variations provided under the 2011 Shingle
Creek Crossing PUD and subsequent amendments, shall remain in effect
for the entire Shingle Creek Crossing Planned Unit Development.
12. Any future PUD amendments or application requests will require the
submittal and adoption (acceptance) of an updated master plan, which plan
shall govern the planned and future redevelopment areas of this site.
13. No other allowances as illustrated or indicated on the submitted "Shingle
Creek Crossing PUD Amendment No. 8 Plans shall be comprehended or
permitted under this specific approval,
14. The Developer shall enter into and execute an updated PUD Agreement
(or similar document) as prepared by the City Attorney.
RESOLUTION NO. 2017-25
February 13 2017
Date
ATTEST: jjwg "
City Clerk
Mayor
The motion for the adoption of the foregoing resolution was duly seconded by member
April Graves
and upon vote being taken thereon, the following voted in favor thereof:
Tim Willson, Marquita Butler, April Graves, Kris Lawrence -Anderson, Dan Ryan
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
L �
� U
� L
to ,
4-J N
C V L
� � N
p O
j cd
N C 4,,
MC
3 4-Jc
� L N
C v 4.'
p o a�_o
v C
CL 4--J CO
1
U
U N ami
c
o o p
s CL
co L
N = O
E
N C>O C
EO j
00 N C
0- O N L
E L u
C O
_E 4., O +�
C
it O
L
s
s 30 0
E
I o
Cid
V) Ncd V
Qo E.0
p O O
w "- Z
__J
i
i
•
•
�,��
1' III I1 ♦
►4
•
CL
,6 e
f
.I
F
CIS
L-
•
. 1
�j
■
L �
� U
� L
to ,
4-J N
C V L
� � N
p O
j cd
N C 4,,
MC
3 4-Jc
� L N
C v 4.'
p o a�_o
v C
CL 4--J CO
1
U
U N ami
c
o o p
s CL
co L
N = O
E
N C>O C
EO j
00 N C
0- O N L
E L u
C O
_E 4., O +�
C
it O
L
s
s 30 0
E
I o
Cid
V) Ncd V
Qo E.0
p O O
w "- Z
__J
Cd
ER"
A
a
a
0
a�
0
0
Q
s
a�
a
N
a _o
Q) Q
v) j:)
W
N
C, a
� o
N
DO
— V
O cVi�
Cd 4 �?
J �
y �
� a a
o
V Wcd
vj
_o
4J }' N
C
rC)
V
ti
Q
,f !
a�
u
O
L
a
c
E
4;
�
.�
aI
W
C/
`
W
cd
s
L
L
� I
lo`" r_
`
4..,
.�
4-j
L
� I
�
C
C
�
V)
els, ZjO� •�,
` C) c
Zt
O o
U -
u
i
Ar
� I
c.
lao
c
4-J
�
N
*l!
it • y � f
•�
-0
c
O
�
U
u
v�
s
O
s;
II�
,•'
—Cld
U
O
A f�
L
-v
O
• cd
�
77.
\
i'� wed`
► yY
O
E
L
`
u
V)
o
oo
E
o
am
ao
N
—
a�
o�
}
O
lao
c
4-J
�
N
•�
-0
c
O
�
U
u
v�
O
N
u
—Cld
U
O
L
-v
O
• cd
�
4-J
co
O
E
L
`
u
V)
o
oo
E
o
o
ao
N
—
a�
o�
O
O
O
L
O
�
o
V)
M
0
-j
M
co
U
'^0'
O
c
O
E
O
-v
O
cd
W
�
W
En
co
^,
C
^^ ''
W
N
O
O
W
co
O
N
cd
^ '
O
X
ME
L
cd
E
-v
0OT
w
m
2:
Z7O
s
Planning Commission Report
Meeting Date: January 26, 2017
Application No. 2017-001
Applicant: HOM Furniture Inc. / Gatlin Development
Location: 2501 County Road 10
Shingle Creek Crossing PUD Project Site
Request: Planned Unit Development Amendment No. 8 and
Site Plan Approval
INTRODUCTION
L1RUOKt 1 'N
(Z�1,VR
• Application Filed: 12/19/16
• Application Deemed Complete: 12/19/16
• Review Period (60 -day) Deadline: 02/17/17
• Extended Review Period Deadline: N/A
HOM Furniture Inc., in conjunction with Gatlin Development requests consideration of the
eighth amendment to the 2011 Shingle Creek Crossing PUD development plans. The PUD
Amendment includes a number of changes and modifications made under the original 2011 PUD
Agreement, which will assist in the redevelopment of the former Kohl's store site into a new
HOM Furniture store, along with the option in developing the adjacent city -owned EDA lot.
HOM also seeks approval of a Site and Building Plan application to the former Kohl's retail
building, which includes a new two-story, 24,622 sq. ft. (gross sq. ft.) addition, which would
provide 11,805 sq. ft. for new multi -tenant retail user space (first floor), and 12,817 sq. ft. of
additional 2°a floor space for HOM's use.
The PUD Amendment was given separate consideration before the Planning Commission at the
January 12, 2017 meeting, with the understanding that official consideration of the new Site and
Building Plans for HOM Furniture store improvements would be delayed to this January 26th
meeting.
It was indicated at this last meeting that Gatlin may have the necessary stormwater management
plan available for review for the city engineers to complete their overall review of this
application. Gatlin's engineering consultants with Kimley-Horn Assoc., who prepared the
overall drainage report for the 2011 Shingle Creek Crossing development, has been in contact
with Shingle Creek Watershed Commission and is preparing the necessary storm water
management/drainage plan and report for this particular area, which they hope to have submitted
to the watershed very soon.
This Site Plan application is being presented with the understanding (and condition) that the local
watershed commission approval is required before the issuance of any permits for land
disturbance, demolition and/or building improvements.
This public hearing item was officially tabled at the last meeting; and therefore the Commission
will be asked to re -open the hearing; ask for staff presentation of the new Site Plan for HOM;
discuss; close the hearing; and formulate a recommendation accordingly.
App. No. 2017-001
PC 01/26/17
Page 1
BACKGROUND
The Shingle Creek Crossing PUD Amendment proposal was submitted along with the proposed
SCC Master Plan — December 2016 (shown on the image below).
70
4 r
.:; g �� ♦dry �.
B
/
Sears
K _ i
SHINGLE CREEK CROSSING
` ��� BROOKLYN CENTER, MN
MASTER PLAN
.10 �
10y
�
D
CATLINDEVE10PMENTCOMPANY Kimley»Horn
.,r
As a reminder, HOM is seeking the following modifications or additions:
a) allow the addition of a 2 -story, 24,000 sq. ft. addition to the former Kohl's building;
b) allow reduced amount of Class I materials to the refurbished Kohl's building;
C) allow a reduced parking ratio from 4.5 spaces per 1,000 sq. ft. of building space to 1 space
per 1,000 sq. ft. for a proposed furniture showroom and warehouse;
d) allow future BLDG. X to be expanded from 19,000 sq. ft. to 48,000 sq. ft.;
e) allow site to have regular C-2 Zone sign standards as found in Chapter 34, Brooklyn Center
Sign Code as opposed to the approved 2011 Shingle Creek Crossing Sign Program Plan;
f) allow a new dynamic message sign of 350 sq. ft. on the subject site;
g) allow reduced setbacks on the EDA lot for future development by HOM Inc., with further
allowances to omit the standard: "Drive-thru or service lanes shall be screened with
berming, landscaping or fencing";
h) allow certain prohibited uses listed under the 2011 Shingle Creek Crossing PUD
Agreement.
The PUD Plan calls for the improvements to the former Kohl's building, which include re-
furbishing the outer shell with new materials, and the expansion of the building with new retail
space and storage/display area for HOM. These improvements are generally laid out on the new
Site Improvement Plans HOM Furniture — Building Y for Shingle Creek Crossing plan set
attached hereto.
SITE & BUILDING PLAN CONSIDERATON
The Site and Building Plan represent the modifications to the outer shell of the former Kohl's
App. No. 2017-001
PC 01/26/17
Page 2
building, along with a two story, approx. 25,000 total square foot addition. HOM intends to use
the first story as 11,805 sq. ft. of available retail/tenant space (illustrated with five separated
spaces for now), which will be controlled or leased out by HOM only. The upper (remaining)
12,817 sq. ft. of this addition will be tied into the 2nd floor space of the new HOM store, to be
used for added storage or display area.
Bldg. Y (old Kohl's) is shown with its original footprint, along with a new two-story, 24,000+ sf.
total square foot addition on the west side of the building. HOM intends to remodel the entire
interior areas of the structure, and "re -skin" or modify a majority of the exterior similar to the
conceptual elevation designs shown in the images below.
-.j
L LEEP HOM POWs
espress FLOORS
son o�
M was
sow narwnox
swF r -m•
The two-story addition will be allow for the first floor to be available for 11,805 sq. ft. of new
retail (multi -tenant) space, while the upper portion of 12,817 sq. ft. will be opened up to the 2nd
floor of the HOM store and used for additional floor/display area. HOM intends to replace or
repair any outdated or inefficient mechanicals, and replace/repair the roof as needed.
The PUD Amendment also requests the City to allow a reduced amount of Class I materials to one
face of the planned refurbished Kohl's building. This reduced face is located on the north side,
along County Rd. 10 frontage. HOM is asking that instead of 50% of Class I materials, they be
allowed to reduce to 25% of Class 1, with remaining 75% as Class II materials.
Parking & Access Considerations
The existing Kohl's lot consists of 6.83 acres, with an approx. 75,000 sf. retail building, and 447
App. No. 2017-001
PC 01/26/17
Page 3
parking spaces. The original Bldg. X that was approved under PUD #7 was intended to be a new
9,400 sq. ft. retail building, with 51 spaces (at 5.43 spaces/1,000 sf. — which exceeds the
4.5/1,000 sf. required under the SCC PUD). The expanded Bldg. X proposed under this PUD
Amendment request is now shown as a 3 -story, 48,000 sq. ft. medical office building. Both the
HOM Furniture and future Bldg. X share the same lot; and hence shared parking between uses.
HOM has submitted a request under this PUD Amendment to reduce the amount of parking from
4.5 spaces per 1,000 sq. ft. of retail floor space down to 1 space per 1,000 sq. ft. This reduction
only applies to the HOM Furniture store use. The retail expansion area will be parked at the
current 4.5 per 1,000 standard.
BUILDING Y PARKING BREAKDOWN
BUILDING DESIGNATION
AREA (SQFT)
REQUIRED PARKING
PARKING RATIO
EXISTING BUILDING
72.300
73 STALLS
1 STALL/ 1000 SF
HOM EXPANSION
12.817
13 STALLS
1 STALL/ 1000 SF
NEW RETAIL
11.805
53 STALLS
4.5 STALL/ 1000 SF
To lend support to this request, HOM submitted for consideration the table below, which
indicates what other communities calculated in other HOM store uses within these cities:
-------------------------------------------------------------------------------------
HOM Locations
HOM is basing this request on these other city allowances, and the reasons being the larger, open
store is used for more display, full -scaled room set-ups and arrangements, and warehouse space
than a typical retail shopping store. Customer traffic is usually limited to a smaller than average
number compared to other retail stores, and reduced parking has never been an issue with other
furniture store sites they operate.
Based on this requested reduction, the HOM store (and retail outlet) is indicating only 139 spaces
would be allocated to HOM. The Applicant's Site Data Table (partial clip below) indicates the
lot for Bldg. X and Y (Lot 2, Block 2) is identified with 361 spaces.
App. No. 2017-001
PC 01/26/17
Page 4
;Bloomington
Sliding scale from 1 per 333 s.f. to 1 per 1,000 s.f. See Sec 21.301.06 ;
:Coon Rapids
1 per 1,000 s.f.
Rochester
1 per 600 s.f.
Rogers
1 per 622 s.f.
;St Cloud
1 Per 1,000 s.f. under 100k s.f. and 1 per 1,200 s.f. over 100,000 s.f.
;Sioux Falls
------------------------------------------------------------------------------------
1 per 600 s.f.
HOM is basing this request on these other city allowances, and the reasons being the larger, open
store is used for more display, full -scaled room set-ups and arrangements, and warehouse space
than a typical retail shopping store. Customer traffic is usually limited to a smaller than average
number compared to other retail stores, and reduced parking has never been an issue with other
furniture store sites they operate.
Based on this requested reduction, the HOM store (and retail outlet) is indicating only 139 spaces
would be allocated to HOM. The Applicant's Site Data Table (partial clip below) indicates the
lot for Bldg. X and Y (Lot 2, Block 2) is identified with 361 spaces.
App. No. 2017-001
PC 01/26/17
Page 4
T 5
LOT 3, BLOCK I
1 1 54 ACRES 5.500 SO. FT 55 SPACES 10.00
X 1
LOT 2. BLOCK2
48,000 SO. FT.
Y I
LOT 2. BLOCK 2
6 82 ACRES 56.522 SO. FT 361 SPACES 372
TOTAL
68 I8 ACRES 702,318 SO. FT. 3368 SPACES 6.52
Pursuant to City Code 35-700 Off Street Parking Requirements, the following standards apply to
medical and regular office uses:
f. Medical and dental clinics:
3 spaces for each doctor/dentist, plus I space for every 2 employees or I space for
each 150 square feet of gross floor area, whichever requirement is the greater.
g. Office Buildings, exclusive of those specific uses otherwise listed in this section:
Building Gross Floor Area (G.EA.)
Required Spaces
20,000 — 220,000 sq. ft,
G.F.A.
.0005 G.F.A. + 190
Under the medical office use, Bldg. X calculates as follows:
48,000 / 150 sf. = 320 spaces
Office Bldg. use calculates as follows:
48,000 / (.0005 * 48,000) + 190 = 224 spaces.
Subtracting the 139 spaces allocated for HOM from the 361 total stalls leaves only 222 spaces
for Bldg. X. It should be noted that the 222 spaces does exceed the 4.5/1,000 sf. required under
the SCC -PUD Agreement for retail uses.
As for access, the new HOM store will still have main access from the main drive lane coming
off Co. Rd. 10, directly south from Shingle Creek Parkway intersection. There are no plans to
increase this access or any other openings to the sites.
The Developer is also showing the closure of the free right -turn lane off Co. Rd. 10 north of the
building (see image below). The City has made it part of previous agreements with the
developer that this access would be closed off once this Kohl's site was re -developed.
App. No. 2017-001
PC 01/26/17
Page 5
Sianne Considerations
HOM Inc. requests modifications or additional sign allowances than those originally granted
under the 2011 Shingle Creek Crossing Sign Program. HOM is asking the City to allow regular
C-2 Zone sign standards (as found in Ch. 34 -Sign Code) to apply, instead of the limited
standards found in the 2011 Sign Plan presented by Gatlin Development and later adopted by the
City under the 2011 Shingle Creek Crossing PUD Agreement. The request also includes an
allowance to have a 350 sq. ft. dynamic message board sign on the HOM site; along with
additional freestanding sign on the medical office site.
Under the SCC Sign Plan, this HOM site would be considered a "major tenant", and its sign
allowances are noted in the Shingle Creek Crossing Sign Program.
The Plan states that all wall sign sizes are limited to 1.5 sq. ft. per linear foot of leased premises;
with primary signs further limited to 70% of adjacent wall surface and no higher than 6 -ft. max.;
while secondary sized signs limited to 70% of adjacent wall surface and 1.5 -ft. in max. height;
and all wall signage is limited to 350 sq. ft. in total area per elevation/side of building.
The Kohl's building has a linear wall frontage of approx. 224 feet on the large wall faces (west
and east elevations); and 160 linear feet on the shorter (south and north elevation) sides. The
building is approx. 52 feet in height. Under the SCC Sign Plan, up to 337.5 sq. ft. of signage is
available for the west/east elevations, and 240 sq. ft. of signage to the south/north elevations.
App. No. 2017-001
PC 01/26/17
Page 6
20' WATERMAIN
AND SANITARY
SEWER
EXISTING FULL
EASEMENT
ACCESS TRAFFIC
CLOSE FREE
SIGNAL
PUD
RIGHT
DRIVE-THRU
BOUN
RY
x
LANE
(TYP
/ �'
EXISTING SIDEWALK
— P —
— --- ----
-
r ----- . -
LOTA-- -
'
;
II
51�
'� II
14,000
20' D&U-
EASEMENT
-� LOT 1,
96=Sr
/
DRAINAGE &
LOT 2, /
UTILITY EASEMEN
l
✓/
BLOCK 2
(WIDTHV )
,ti=,.�A�
Sianne Considerations
HOM Inc. requests modifications or additional sign allowances than those originally granted
under the 2011 Shingle Creek Crossing Sign Program. HOM is asking the City to allow regular
C-2 Zone sign standards (as found in Ch. 34 -Sign Code) to apply, instead of the limited
standards found in the 2011 Sign Plan presented by Gatlin Development and later adopted by the
City under the 2011 Shingle Creek Crossing PUD Agreement. The request also includes an
allowance to have a 350 sq. ft. dynamic message board sign on the HOM site; along with
additional freestanding sign on the medical office site.
Under the SCC Sign Plan, this HOM site would be considered a "major tenant", and its sign
allowances are noted in the Shingle Creek Crossing Sign Program.
The Plan states that all wall sign sizes are limited to 1.5 sq. ft. per linear foot of leased premises;
with primary signs further limited to 70% of adjacent wall surface and no higher than 6 -ft. max.;
while secondary sized signs limited to 70% of adjacent wall surface and 1.5 -ft. in max. height;
and all wall signage is limited to 350 sq. ft. in total area per elevation/side of building.
The Kohl's building has a linear wall frontage of approx. 224 feet on the large wall faces (west
and east elevations); and 160 linear feet on the shorter (south and north elevation) sides. The
building is approx. 52 feet in height. Under the SCC Sign Plan, up to 337.5 sq. ft. of signage is
available for the west/east elevations, and 240 sq. ft. of signage to the south/north elevations.
App. No. 2017-001
PC 01/26/17
Page 6
HOM has submitted its own sign plan with the following allowances:
923 sq. ft. of signage to the south elevation;
843 sq. ft. for the west elevation;
1,091 sq. ft. along the east elevation; and
275 sq. ft. for the north elevation.
The C-2 Sign Standards found under Ch. 34 -Sign Code allows the aggregate areas of wall signs
not to exceed up to 15% of the wall supporting the signs (essentially 15% of total wall area. The
224' x 52' wall face equals 11,648 sq. ft. of wall space, which would allow up to 1,747 sq. ft. of
total wall signage. The smaller 160' x 52' walls equates to 8,320 sq. ft., or 1,248 sq. ft. of
allowable signage.
Under each wall sign illustration, the new HOM store either exceeds or greatly exceeds the
App. No. 2017-001
PC 01/26/17
Page 7
allowable amount of wall signage called for under the 2011 Shingle Creek Crossing PUD Sign
Plan. However, under the City's Sign Code standards for C-2 properties, all new signs would be
under the allowances based on these regular signage standards. Because this old Kohl's site is
somewhat detached and separated from the main elements or improvements inside the SCC
PUD, city staff is not too overly concerned with granting or allowing this added signage for this
HOM store building, since the C-2 standards already allow for increase signage to begin with,
and the building is large enough to support the extra signage.
As for the new (proposed) freestanding signs. The 2011 Shingle Creek Crossing PUD
Agreement limited the number of freestanding signs throughout the PUD area based on the
following approvals:
Two freestanding signs, each up to 350 sq. ft in area, are allowed along HWY 100, two
freestanding signs are allowed along Bass Lake Road up to 140 sq. ft.; and two
freestanding signs along Xerxes Ave. up to 140 sq. ft is allowed as development
identification signs as illustrated on Attachment Four and Fifteen. Four monument signs
up to 140 sq. ft. are allowed along Bass Lake Road, and one monument sign up to 140 sq.
ft. is allowed along Xerxes Ave.
Under the C-2 sign standards in Zoning Ch. 34 -Signs, a commercial building above 24,000 sq. ft.
is allowed the following freestanding sized signs [as an individual establishment]:
2. Freestanding Signs
a. Individual Establishments
Individual detached establishments or enterprises not clustered in a shopping center
complex or in a multitenant office or industrial building may have one freestanding sign
according to the following schedule. In the event such establishments abut two or more
streets which are at least collector or arterial in character, and if the abutment on each
street exceeds 400 feet, one freestanding sign may be erected along each such street
according to the following schedule:
Building Gross Floor Area Max. Sign Area Max. Sign Height
Square Feet Square Feet (Above I st Flr.) Feet
Above 24,000 250 32
The two 350 -sq. ft. freestanding signs inside the Shingle Creek Crossing PUD today were a hold-
over from the previous Brookdale Mall planned unit development agreement of 1998, which the
Developer wanted extended to the newly redeveloped PUD. These two large-scale signs are now
evident along HWY 100 frontage, and are used to display the major, multiple store tenants inside
the new mall area. The Developer also chose to limit individual freestanding signs on all
individual parcels, by strategically placing the smaller 140 sq. ft. multiple tenant display signs
throughout the development, primarily near the entry points.
Since the Kohl's/HOM frontage along County Rd. 10 and HWY 100 exceeds 400 -ft. along each
major (arterial) roadway, under the normal; C-2 Zone sign standards, HOM would be entitled to
App. No. 2017-001
PC 01/26/17
Page 8
place two, 250 -sq. ft. sized freestanding signs along each roadway. Each sign would also be
allowed to be fully dynamic or full electronic message board.
The allowance that HOM is requesting under this PUD Amendment request is quite significant
when compared to the approved 2011 PUD Agreement and Sign Plan between Gatlin and the
City. Gatlin purposefully chose to limit the amount of individual signage inside the mall area in
order to avoid over clustering of freestanding signs, and limit large, out -of -character wall signs
that could detract from the newer architectural style and enhanced design of the buildings
planned under this PUD.
The image below illustrates a plan to install the HOM sign near the southern -most corner of the
old Kohl's lot, in front of the proposed medical office building.
Tenant S
HOM is also showing a new freestanding sign near the main entrance (off the main access road),
which appears to be for the new medical office uses.
Although staff acknowledged this HOM site is somewhat detached and separated from the main
part of the SCC -PUD, and essentially will function on its own accord, City staff would still like
to maintain a sense of consistent and combined design criteria over the entire PUD site regarding
signage, including this HOM and surrounding developments. With that being said, Staff
suggests that having three, 350 -sq. ft. signs along the HWY 100 frontage may be a bit too much,
and recommends HOM reduce the size of their individual sign to only 250 -sq. ft.
App. No. 2017-001
PC 01/26/17
Page 9
Although entitled to an additional 250 sq. ft. sign along Co. Rd. 10, the City is accepting HOM's
request to provide additional and much larger wall signs on the building, so an additional
freestanding sign is not warranted along this frontage. Furthermore, any additional freestanding
signs for the proposed "Medical Office" and EDA lot may be allowed, but should be limited to
the C-2 Sign Code standards as well.
RECOMMENDATION
Staff recommends the Planning Commission adopt the attached Resolution No. 2017-01, which
comprehends the approval of Planning Application No. 2017-001, the Planned Unit
Development (PUD) Amendment No. 8, which would allow certain changes to the original 2011
Shingle Creek Crossing Planned Unit Development (and all subsequent amendments), along with
the related Site Improvement Plans HOM Furniture — Building Y for Shingle Creek Crossing,
subject to the following conditions and allowances:
1. Developer shall comply with all conditions or request of additional information as noted
in the City Engineer Review Memorandum, dated January 5, 2017
2. Developer is allowed to amend the 2011 Shingle Creek Crossing Planned Unit
Development by allowing the following uses:
a) Medical Office Building - with typical tenants that may do surgeries, urgent care
and treat patients in offices;
b) Medical and Dental Laboratories;
C) Educational Uses listed in Zoning Code Section 35-322.1.h.;
d) Transient lodging, provided they are limited to hotel use only, and no motels.
e) Animal Hospitals, provided any outdoor kennel runs or activity areas for pets
being cared for in the hospital is screen with an opaque fence and regularly
cleaned and maintained.
3. Developer is allowed to construct a 2 -story, 24,622 sq. ft. addition to the former Kohl's
building, with approximately one-half of this space to be used for new multi -tenant retail
spaces, and one-half to be used as additional floor space for the new HOM Furniture store.
4. Developer is allowed to a reduction of Class I materials along the north elevation side of the
new HOM store building, provided all other elevations receive the 50% Class I and 50%
Class II ratio.
5. Developer is granted the reduced parking ratio allowance from 4.5 spaces per 1,000 sq. ft. of
building space to 1 space per 1,000 sq. ft. and attributed to the new HOM Furniture store use
only. All other uses must maintain the 4.5/1,000 ratio as prescribed in the 2011 Shingle
Creek Crossing PUD Agreement.
6. Developer is allowed to expand proposed/future Building X from 19,000 sq. ft. to 48,000 sq.
ft. for a medical/multi-tenant office building. A separate Site and Building Plan
application will be required before any approvals are granted for the new Bldg. X
App. No. 2017-001
PC 01/26/17
Page 10
improvements.
7. Developer is allowed reduced setback of 20 feet on the EDA lot (Building F) for future
development if needed. A separate Site and Building Plan application will be required
before any approvals are granted for the new Bldg. F improvements.
8. The allowances to omit the standard: "Drive-thru or service lanes shall be screened with
berming, landscaping or fencing" is not recommended and will remain intact.
9. Developer is allowed to have all new wall signs comply with the C-2 Zone sign standards
established under the Ch. 34 -Sign Code; and only one (1) new freestanding sign up to 250
sq. ft. along the HWY 100 frontage is allowed, which can either be a regular static message
or dynamic sign per City Code Ch. 34.
10. Developer must obtain a building permit and adhere to all requirements prior to
beginning any removals, demolition, land disturbance work, or new construction of
parking, utilities or buildings.
11. Unless amended otherwise or under separate agreement, all existing provisions, standards
and variations provided under the 2011 Shingle Creek Crossing PUD and subsequent
amendments, shall remain in effect for the entire Shingle Creek Crossing Planned Unit
Development.
12. Any future PUD amendments or application requests will require the submittal and
adoption (acceptance) of an updated master plan, which plan shall govern the planned
and future redevelopment areas of this site.
13. No other allowances as illustrated or indicated on the submitted "Shingle Creek Crossing
PUD Amendment No. 8 Plans shall be comprehended or permitted under this specific
approval.
14. The Developer shall enter into and execute an updated PUD Agreement (or similar
document) as prepared by the City Attorney.
Attachments
• City Engineers Review Memo (01/05/2017)
• Shingle Creek Crossing PUD Amendment Plans No. 8
• Site Improvement Plans — HOM Furniture — Bldg. Y
App. No. 2017-001
PC 01/26/17
Page 1 I
5�,��5 ..
=- _ ,1
03
z
M
O
0
�aoDo u�,
m 3
3
p
zz 0
�
�
J
n
03
z
M
O
0
n a W
m 3
3
A�
G
zz 0
�
�
J
mCO
03
z
M
O
0
m
3
m0
A�
G
3
Z
p
c�2`rr
of2q�`
N.
f02
�
a
J
mCO
03
z
M
O
0
m0
3
Z
mz
J
u.a.my game: N: \Twc �nev\cnnw DEVECDv�eEm\eaaaxDA�c ceNiEa\cnoD\eNASE J\E,mm�.\zon—osis NDu ��o�•o•o��„ so•m E.nmrc.a.g sam v . - n m. m�.,,m:mai
PRELMMARY - NOT FOR CONSTRUCTION
m o \ SHINGLE CREEK CROSSING ED a�9 Ho�Ey u�mE 9
X=u BROOKLYN CENTER HOM UNDERGROUND a5a°aw ¢aw o. EnA Mmley*Horn
M
HOM FURNITURE STORMWATER EXHIBIT " a. BRIAN N. x aDEMrN _d - • —�
HENNEPIN COUNTY MINNESOTA �M1E° a 5J11J
No. pEN510N5 DATE dy
CT
-1
Vj
IN
Nw j A -
ti2�3u1W
O W W O N --I
A ti O W N
J
tNil ®� A -i
OCD N
W Q) co N
O
CJ
(j7 111 N
C4
O
0
�'� o z
°:
m
�
d
L
CJDDd
(D y
:s
dH
o O y
�Ci7
n O r
CD
tiNf t0
�
N O
O
rD
V W
W
Q
`1
V
�
d
<
� rNa ch 00�
v
'�
ID
r
O
co �
O
O
-a
n
3
nrD
rD
OBD A `1
S
M
r'r
to Ln
a
o
J
C
J
O
ib
v w
w w w
d
D.
�i m t Ai
In In
CT CT Ul
In
�•
O
Q
_ O
cu
CD
<
.y
rzro
N
¢ CD
ILP
_ n
CD
CP
CD
N
V
D
3
m cu
D
sz
CL
CD
= .r
N N
w
rr
z f!
F'
O
O
O Al
{n
y .7
�D
O_
O
QO
CU
�
G
�
(D
C
z
3
O
cr
M
N
C n
�
C
C C C
C
n
m L^
m
Oo O
V
l i ,E.r
4�- (Ln Uii
Ln
sz CL
rD
Q
V
n
(D
0
Fa
In
(D
rD
cz
m
_
n
n
rD
:3
fD
:
CD
N
((D y
,_ ,y
N
Q1
N
CT
(N
p
r
V
::3
rD O
�.
N fD
co
N
C
m
Q
7
fR1
C
C (Ln
N
A
N p1
m
D
n
O
v
2
�
is
(D
2
w
Ln'
D T
O
(D
n
C :3
c D,
Q
N
lD
rNr
0
L
V
oa
C)D
N
In
V
Nw j A -
ti2�3u1W
O W W O N --I
A ti O W N
J
tNil ®� A -i
OCD N
W Q) co N
O
CJ
(j7 111 N
C4
O
0
NN
r.
0
CIN]
L
(15
t�
t71
CD
tiNf t0
�
N O
O
rD
V W
W
Q
`1
V
W A
<
� rNa ch 00�
v
'�
rD
tD N
w
co �
O
O
-a
n
3
N rJ
p
rD
OBD A `1
S
M
r'r
to Ln
a
o
0) CO N
C
J
O
(D
V O W
•'
D.
�i m t Ai
fD
PO
(n (D N o
;a J
O
CJ
(j7 111 N
W
O
0
NN
r.
0
CIN]
w N _.
(15
NCO
t71
CD
tiNf t0
N
CD
O
W
3
'
V
CO
tD
tD N
w
co �
t(ND�
th O
��"
O 41
(j7 111 N
W
O
0
NN
r.
0
CIN]
w N _.
NCO
Z 'A 'ototi-9LS£-Z£8ti
•unOlo Iuld aill sdooN pun sluauzasna 5upjjopun jo Oa.ij allil puLI ;Dql da331 of sdlatl sluauiasnO
asatll Euiluoipapat pun 5uRUMA •sluau13su0 3I1umopis pun polis su Ilam su Ilam su sluauzasna
,Slilrin pun a5umutp sapnloui sigl •Inld Inuit atll uo polnotpapax pun pOlnoun Oq XIio/oilgnd aul
Jo zonnJ Iii sluMosnO 5ui,4iopun aill 5uilsonbaz Oau om `ssaooid Inld lno jo Itud s
•aOjj
Joj jloS Ald uuo suuaii3ozd tllnoX Igozd-uou `Inool IIn `jIos jo ouaui? atll pun tllnox of luauzliuuuoo
sii jo pud su `pun Iunoosip gutoizd n papino.id on sxapuodsaz XouQ&Tc) 3 Inool pun sunzalan IIS'
•saoo Ii alZ)gAiX 333 aaultnd Xliunutuzoo L, Oq oI sanizis jloi?dos `XIluuoilippV •@i?v joud sig;)uoq
anililodwoo n antaoar saaXoldtuo Ouul-IInj pun poiaulns ooinaas golou-dol apinoid of saOXolduza
M7 JOAO Tim Poguis st Onuan jIo5do L peg •aouds Iuana Iooj-oinnbs 000`£ n puL, `oonual jooa
Iooj-aannbs 000`£ n `uogoliN Iooj-Oaunbs OOS`Z n apnlout liim XIilionj ail, `xIlnuoilippy 'Iunanulsaa
aIqul OS n su Ilam sn suolsiAQIOT uaO.ios 1nII OLZ PUP `sl32znl plogTno I I `sXuq 5uilliu ZOI
sapnloui uoium XIrIionj IOnaI-aanll `Iooj olunbs 000`S9 u jo sisisuoo loofozd pasodoid OiIZ
•Ouillud olden,
puu (RORILIl plogino I I tllim) oi?uuz Ruintzp n SU Ilam sn Ianal-oojgl n sapnloui Xpodoid wou
£6•i,I 3qI aoi unld alis posodoid atll `ZSZ XL'mg2IH pun tb69 OlulszOlul Jo uoiloosiolut atll jo aautoo
IsomgIJOu Qqj uo palnooZ •unld OIIS pun luld Fuld pun IiL'uiuulaad fuipuodsO.uoo oqj su Ilam
sr IuauidolanaQ Iiun pauunld 2utlsixO un puautp oI uollnotlddn uu gutlliuigns si jlo2dod
Oouai. 3dxa onbiun XIn.tl n apinojd of auiqutoo
auinB anilnnouui pun `j�nls dui n ua `azatldsouliv oiuznuXp 3qj -XIIIiqu Jo IIiNs jo ssalpzn2az
`IIn of �?uiluaddv pun algiss000n st IntII oum2 n uo paaaluao anuan Iuauuuulzaluo Xlilulidsoq ssnlo
-ui-lsoq L, olui panlona sutl jlofdo L 'jolul siagwauz uoilliui t,•t, pun `sllnq uolIIiq S•Z `s ox uaaljid
•Oouulsip pun Xonmoon uodn pasuq sluiod Oniaow pun sl35.zul olui slluq jlo.2 p3ddit43ojotw
ltu s.z Ald Xgazailm auzu2 u uo szaluao jloi?do L `XIlnogloodS •Ino2uuq pool alizonnJ znoX spoor
pods jo uoippodmoo OiII wc)gm O,zu sa111Iioni •S -fl S£ ln0 °punoijvo,f jloj? jo Ouin2 aul Ooilouad of
Am Jonoq n sioXuld Opinord of X2olouiloai sasn Idaouoo jlofdo L OT `666I 111 puul5ug `uopuoZ
Jo Opislno paluanul •pltom aql ui Xunduzoo luautuiulzoluoilo�3 jotuzaid OiII st jloi3doI
ant;VI.zUIN pafo.xd
DrI `aNua,3 uSMooag VSf13to2dol,
O s3g? 8£ � aFt 8$flli �
tF
TR
2 0
A , nm -HINUMH
ibi
m
.. .. .......
lu
1.
CID
0 1
tn
L-4
.. .. .......
Page
13
We Want Your Input!
Brooklyn Center Comprehensive Planning Survey
I. Introduction
This survey was developed to involve citizens in planning for the future of their community. This is an opportunity for
citizens to provide input, in addition to attending public hearings and meetings. All citizens, elected officials and
stakeholders of the community are encouraged to complete the survey. Deadline for submission of surveys will be
October 22 and results will be tallied later that week. An online version can be filled out and submitted through the
following link: http://www.surveymonkey.com/s.asp?u=xxxx. In lieu of participating on-line a hard copy of this form
can be manually filled out and returned or mailed to: Gary Eitel, Community Development Director, City Hall,
6301 Shingle Creek Parkway, Brooklyn Center, MN 55430. Thank You! Your input is greatly appreciated!
II. Overview
I. How would you rate Brooklyn Center as a place to live?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
2. How would you rate Brooklyn Center as a place to raise children?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
3. How would you rate Brooklyn Center as a place to work?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
4. How would you rate Brooklyn Center as a place to retire?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
5. How would you characterize the sense of community in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
III. Land Use and Redevelopment
6. How would you describe the condition of the overall housing stock?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
7. Do you feel there are enough housing type choices in Brooklyn Center?
❑ Yes
❑ No. If no, what types are missing?
8. Do you feel there are sufficient businesses or private services available?
❑ Yes
❑ No. If no, what business types are lacking?
7200 Hemlock Lane
Suite 300
Minneapolis, MN 55369
763.424.5505 main
763.424.5822 fox
loucksassociates.corn
Page 14
9. How do you feel the City is doing in terms of environmental enhancement or protection?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
Concerning City Center, the commercial and multi -family portion of the City located on the north and west
side of Highway 100 from Brooklyn Boulevard to Humboldt Avenue/694, please indicate your level of
agreement with the following statements:
10. Parts of City Center are in need of redevelopment.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
11. The intensity level of land use in City Center should be increased through redevelopment.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
12. The City should encourage the economic viability of Brookdale Mall.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
Regarding Brooklyn Boulevard and existing multiple -family housing please indicate your level of agreement
with the following statements:
13. Underutilized and single-family residential land along Brooklyn Boulevard is in need of redevelopment.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
14. Brooklyn Boulevard is congested with traffic and a difficult street to drive on.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
15. A significant amount of multiple -family housing in the City is in need of maintenance or redevelopment.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
16. Please indicate the order of importance (1 -highest, 2 and 3 -lowest) of the City proactively dealing with
the following:
_City Center _Brooklyn Boulevard —Multiple -family housing
IV. Transportation
17. How would you rate the ease of car travel in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
18. How would you rate the ease of bus travel in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
19. How would you rate the ease of bicycle travel in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
20. How would you rate the ease of walking in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
21. Do you feel a dedicated rapid bus commuter lane should be proposed in Brooklyn Center?
❑ Yes
❑ No
❑ No Opinion
22. How would you rate the sidewalks and trail systems?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
23. How would you rate the overall transportation system in Brooklyn Center?
❑ Excellent
❑ Good
❑ Fair
❑ Poor
❑ No Opinion
V. Civic Center
Regarding the Civic Center please indicate your level of agreement with the following statements;
24. Improvements to the indoor swimming pool should be made.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
25. The locker room should be expanded.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
26. The fitness center should be expanded.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
27. A multi-purpose room should be added to the Civic Center.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
28. A child-care center should be added to the Civic Center.
❑ Strongly Agree
❑ Agree
❑ Disagree
❑ Strongly Disagree
❑ No Opinion
Page- 15
Page 16
29. This household uses Civic Center facilities
❑ Daily
❑ Weekly
❑ Monthly
❑ A few times a year
❑ Seldom or not at all
VI. Public Facilities and Services
30. How would you rate the following public facilities and services that
you use?
City Hall
Excellent
❑
Good
Fair
Poor
Don't Use/
No Opinion
Civic Center
❑
❑
❑
❑
❑
❑
Hennepin County Library
❑
❑
❑
❑
❑
Park Facilities
❑
❑
❑
❑
❑
Recreation Facilities
❑
El
❑
❑
❑
Parks Equipment
❑
❑
❑
ElBall
Fields
Elementary Schools
❑
❑
❑
❑
❑
❑
❑
❑
High School
❑
❑
❑
❑
❑
❑
❑
Police
Fire
❑
❑
❑
❑
❑
❑
❑
❑
Street Maintenance
❑
❑
❑
❑
❑
❑
Public Utilities (Sewer, Water)
0
❑
p
❑
❑
Private Utilities (Elec., Phone, TV)
Health Care Availability
❑
❑
❑
❑
❑
❑
❑
❑
Child Care Availability
❑
❑
❑
❑
❑
Recreation Programs
0
0
0
❑
❑
Senior Programs/Opportunities
❑
❑
El
El
Child Programs/Opportunities
❑
❑
❑
❑
❑
Teen Programs/Opportunities
❑
❑
❑
11❑
❑
❑
❑
31. Are there any public programs
❑ No
not offered that would be beneficial?
❑ Yes (please specify)
VII. Open -Ended Questions (final 3 questions)
32. What are the best features of Brooklyn Center that should be preserved and enhanced?
33. What conditions could prevent Brooklyn Center from achieving its full potential?
34. What is your vision of Brooklyn Center in the year 2030?
Thank you for taking the time to be a part of the comprehensive planning process by filling out the survey.
Your input is appreciated.
Clustered Results of Community Analysis and Visioning- June 30, 2008
2030 Comprehensive Plan- City of Brooklyn Center
The City Council, Planning Commission, Parks Commission, Housing Commission, Housing
Commission and City Staff participated in a meeting to kick off the updating of the 2030 comprehensive
plan. Following a brief presentation on comprehensive planning, demographic trends and population and
household projections by Loucks Associates 21 people engaged in a group community analysis and
visioning process. People in attendance were first asked to respond individually in writing to the three
questions set forth below. Participants divided about equally around four tables were then asked to
develop consensus/consolidate responses to the three questions listed below (in bold -face type) and to
record that consensus/consolidation on a large piece of paper. Presenters from each of the four groups
then shared results of their individual/group exercise with a general session of all participants. The
consensus/consolidated results of the four groups clustered into subject areas were as follows:
1. What do you consider to be the best features, characteristics, aspects of Brooklyn Center that
should be preserved and enhanced?
Parks, trails, Mississippi River; River is underutilized
Clean accessible water spaces for all to enjoy; ensure public access preserved/improved
Improve public pathways; increase "green belting" at all traffic points/paths
Parks and trails, trail access to the Mississippi River Regional Trails and community playfields
Parks, green space, trails
Proximity to downtown Minneapolis
Freeway access
Location- proximity to downtown
Location, access, mass transit
Mass transit
Sense of neighborhood (needs to be maintained)
Neighborhoods, single family homes
Neighborhood schools, basic to neighborhood strength
Owner -occupied housing builds strength in diversity
Housing and improvements to all types; creation of upscale housing opportunities
Affordable, well-built housing- maintain
Preserve balance of quality housing and commercial property with emphasis on better
utilization/maximizing commercially zoned property (perhaps expanding somewhat)
Brookdale shopping/commercial opportunities- maintain and enhance
Employment opportunities
E.B.H.C.
City Management's effectiveness
Improve traffic flow and access to City Center and neighborhoods
Diversity can be positive
Earle Brown Conference Center- preserve and enhance
Library Center
2. Of the issues identified in the 2020 Comprehensive Plan (refer to handout), which have been
adequately addressed and which remain to be addressed? What issues not identified in the 2020
Comp Plan should be addressed in this Plan?
Streetscape-improved Brooklyn Blvd.
Brooklyn Blvd. south of 65"- development
Brooklyn Blvd.- overlay
BB corridor report recommendations needed
Revisit Opportunity Site vision
Promoting the Opportunity Site
Center City issues, Northbrook and linking center to community under way
Revisit Brookdale vision
Brookdale economic viability and traffic patterns
Some Brookdale efforts under way
57th use as amenity
57`h and Logan
Humboldt Square as declined
Redevelopment of underutilized sites, Joslyn site in SW neighborhood successfully addressed
Redevelop stressed and aging rental property
Multi -family- needs continuous work on maintenance
Foreclosed housing issues
Owner -occupied senior housing
Civic Center improvement/expansion
Preserving elementary school sites
Consolidate school districts in Brooklyn Center
3. What is your vision of the ideal for Brooklyn Center in the year 2030?
Affordable, safe, comfortable
Family friendly
Crime level reduced below metro area
Cohesive community with shared values and respect
Great parks and trails
Parks and trails
Town Center redevelopment
Opportunity site 100%
Brookdale- viable or redeveloped
Bustling Brookdale!
Daylight Shingle Creek through Brookdale
Shingle Creek "daylighted"
Increase owner -occupied housing
Senior housing- accessible
New housing opportunities for owners and renters
Maximize on our great location
Maximize on a diverse tax base
Appreciating property values
High-tech service and manufacturing jobs
Slow speed limits on Brooklyn Blvd.
Clean, attractive Highway 100
Consolidate school district
Great personalized schools
Increase population to 30,000 to 35,000
Following the group process it was pointed out that three neighborhood meetings are being scheduled for
July and August for which individual notices will be mailed to each household and to community
institutions, including religious. Participant were asked to each provide a list of ten names/addresses of
people that should specifically be invited to the neighborhood meetings.