HomeMy WebLinkAbout2017-016 PCRCommissioner introduced the following resolution and moved its adoption
PLANNING COMMISSION RESOLUTION NO. 2017-016
RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2017-012 SUBMITTED BY
TRENT MAYBERRY/TOLD DEVELOPMENT COMPANY APPROVING NEW
SITE AND BUILDING PLAN FOR THE DEVELOPMENT OF A BANK OF
AMERICA ON BUILDING SITE F IN THE SHINGLE CREEK CROSSING 6 T1
ADDITION (LOCATED AT 2545 COUNTY ROAD 10)
WHEREAS, Planning Commission Application No. 2017-012, submitted by Trent
Mayberry/Told Development Company (the "Applicant"), requests approval of a new Site and
Building Plan for the development of a 3,984 -square foot, single -story Bank of America branch
location with drive-thru at 2545 County Road 10; and
WHEREAS, the Subject Property is located within the Shingle Creek Crossing
Planned Unit Development, is zoned PUD/C2 (Planned Unit Development/Commerce) District; and
WHEREAS, on November 13, 2017, City Council approved an amendment to the
Shingle Creek Crossing Planned Unit Development plans and documents to allow the option of
providing alternative design concepts for the Subject Property, also known as Building Site F,
including its development as a bank with drive-thru; and
WHEREAS, the Planning Commission held a public meeting on November 30,
2017, to fully consider Planning Commission Application No. 2017-012, and reviewed and received
a planning report on the proposed new Site and Building Plan for the proposed Bank of America
branch location, and other related improvements in conjunction with the Shingle Creek Crossing
Planned Unit Development; and
WHEREAS, the Planning Commission finds that the Site and Building plans are
consistent with the General Development Plans of the overall Shingle Creek Crossing Planned Unit
Development.
NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission
of the City of Brooklyn Center to recommend to City Council that the Site and Building Plan of the
proposed Bank of America branch location (also known as "Building Site F" within the Shingle
Creek Crossing Planned Unit Development), and as comprehended under Planning Application No.
2017-012, be approved based upon the following considerations:
1. The Site and Building Plan is compatible with the standards, purposes, and intent
of the City's Zoning Ordinance;
2. The Site and Building Plan, in relation to the Planned Unit Development
PC RESOLUTION NO. 2017-016
Page 2 of 5
proposed on the Subject Property, will facilitate the redevelopment and
improvement of the site, will allow for the utilization of the land in question in a
manner which is compatible with, complementary to, and of comparable
intensity to adjacent land uses, as well as those permitted on surrounding land;
3. The improvements and utilization of the Subject Property as proposed under the
planned redevelopment of the Subject Property is considered a reasonable use of
the property and will conform to ordinance standards;
4. The Site and Building Plan proposal is considered consistent with the
recommendations of the City's Comprehensive Plan for this area of the City;
5. The Site and Building Plan proposal appears to be a good long range use of the
existing land and the proposed development can be considered an asset to the
community; and
6. Based upon the above considerations, it is believed that the guidelines for
evaluating and approving a Site and Building Plan, as contained in Section 35-
230 (Plan Approval) of the City's Zoning Ordinance have been met, and the site
proposal is, therefore, in the best interest of the community.
BE IT FURTHER RESOLVED by the Planning Advisory Commission of the City
of Brooklyn Center to recommend to City Council that Planning Application No. 2017-012 be
approved subject to the following conditions and considerations:
1. Building and Site Plan Review: The building plans are subject to review and approval by
the Building Official with respect to applicable codes prior to the issuance of permits; and
the final location or placement of any fire hydrants or other fire -related building code
items shall be reviewed and approved by the Fire Chief.
a. Any major changes or modifications made to this Site and Building Plan can only
be made by an amendment to the approved Site and Building Plan as approved by
the City Council.
b. Fire hydrants were not identified in the submitted set of civil plans for the Subject
Property; therefore, the Applicant shall work with the City/Fire Department to
address installation of fire hydrants where necessary so as to meet code
requirements.
c. The Applicant shall verify that the proposed building and site has met the Shingle
Creek Crossing PUD Architectural Design Guidelines and City requirements.
Revisions include, but are not limited to:
i. Revisions to the exterior building elevations to meet the building material
PC RESOLUTION NO. 2017-016
Page 3 of 5
requirements (e.g., at least 50 -percent of all four sides of the building will
be constructed of Class I materials, no large expanses of blank and
featureless walls).
ii. Revisions to the submitted civil plans as necessary to reflect placement of
any outdoor mechanical equipment and outdoor trash enclosures.
iii. Revisions to the submitted landscape plan to address planting deficiency
per the City's Landscape Point System policy.
2. Agreements:
a. No construction on the Subject Property (Building F in the Shingle Creek Crossing
PUD) shall be allowed until the final plat of the Shingle Creek Crossing 6t
Addition has been filed and recorded with the Hennepin County Recorder.
b. The owner of the Subject Property shall enter into an easement agreement for
maintenance and inspection of utility and storm drainage systems as approved by
the City Engineer prior to the issuance of building permits.
c. The Property Owner/Developer shall execute a separate Performance Agreement
with supporting financial guarantee approved by the City, which ensures the
Subject Property will be constructed, developed, and maintained in conformance
with the plans, specifications, and standards comprehended under this Site and
Building Plan. Refer to the City Assistant Engineer's memorandum dated
November 21, 2017, for more information (Exhibit C).
d. Any amplified voice systems utilized in conjunction with the proposed drive-thru
ATM lane shall meet the noise standards of the Minnesota Pollution Control
Agency (MPGA) and City Code requirements.
e. The Developer shall submit an as -built survey of the Subject Property, as well as
any improvements and utility service lines, prior to release of the performance
guarantee.
3. Engineering Review: The Applicant agrees to comply with all conditions or provisions
noted in the City Engineer's Review memorandum, dated November 21, 2017 (Exhibit C):
a. Final grading, drainage, utility and erosion control plans, and any other site
engineering related issues are subject to review and approval by the City Engineer
prior to the issuance of permits.
4. Construction Standards:
a. Appropriate erosion and sediment control devices shall be provided on site during
construction as approved by the City's Engineering Department.
K The Applicant shall obtain an NPDES construction site erosion permit from the
Minnesota Pollution Control Agency (MPCA) prior to disturbing the site.
c. All work performed and materials used for construction of utilities shall conform
to the City of Brooklyn Center Standard Specifications and Details.
PC RESOLUTION NO. 2017-016
Page 4 of 5
5. Facilities and Equipment:
a. Any outside trash disposal facilities and rooftop or ground mechanical equipment
shall be appropriately screened from view per the City Zoning Code and Shingle
Creek Crossing PUD Architectural Design Guidelines requirements.
b. Any outdoor enclosures shall be constructed with materials that are
complementary to the principal building (Bank of America).
c. The Applicant will provide assurance that the maximum level of 10 -foot candles or
less will be maintained at the property line for lighting in accordance with Section
35-712 (Lighting) of the City Zoning Code.
d. Lighting shall meet the requirements of the Shingle Creek Crossing PUD
Architectural Design Guidelines, including use of dark -sky friendly or cutoff style
fixtures, and poles, fixtures, and bases of a consistent, dark color.
6. Landscaping:
a. All landscaped areas, including street boulevards, shall include approved irrigation
systems to facilitate site maintenance. Per Sheet LIA (Landscape Plan Notes &
Details), the "entire site shall be fully irrigated. The contractor shall submit
irrigation shop drawings for review and approval by the landscape architect prior
to installation."
b. The Applicant shall revise the landscape plan as necessary to meet the City's
minimum Landscape Point System policy requirements.
7. Signage: The Applicant shall submit a Building Permit application for any proposed
signage as part of the development proposal. Signage is subject to the Shingle Creek
Crossing Sign Program requirements. Signage not addressed as part of the Program is
subject to Chapter 34 of the City Sign Ordinance.
PC RESOLUTION NO. 2017-016
Page 5 of 5
November 30, 2017
Date
ATTEST: �- aA d `-6 ef
Ginny McIntosh, ecretary
Randall Christensen, Chair
The motion for the adoption of the foregoing resolution was duly seconded by Commissioner
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.