HomeMy WebLinkAbout2018-009 CCRMember Dan Ryan introduced the following resolution and moved its adoption:
RESOLUTION NO. 2018-09
RESOLUTION AMENDING THE SCHEDULE FOR INSPECTION FEES FOR
CERTAIN BUILDING, MECHANICAL, PLUMBING, AND ELECTRICAL
PERMITS
WHEREAS, Chapters 3, 12, 15, 34, and 35 of the City Code of Ordinances requires
the payment of fees for building permits, plumbing permits, mechanical system permits, sewer
and water permits, fire suppression permits, sign permits, building maintenance and occupancy
reinspections, Planning Commission applications, flood plain use permits and administrative
land use permits; and
WHEREAS, Chapters 3, 12, 15, 34, and 35 of the City Code of Ordinances further
authorize the setting of various fees by City Council resolution; and
WHEREAS, City Council Resolution No. 86-123 (adopted 8/11/86), 89-224 (adopted
11/27/89), 90-33 (adopted 2/26/90), 95-174 (adopted 8/14/95), 98-228 (adopted 12/14/98), 99-
172 (adopted 11/8/99), 2005-65 (adopted 4/11/05), 2006-48 (adopted 4/10/06), 2008-11 (adopted
1/14/08) and 2015-128 (adopted 8/24/15) together comprise a schedule of fees collected for
service by Building and Community Standards; and
WHEREAS, the City Council finds it appropriate to modify the fees contained in said
resolutions and to amend the fee schedule related to electrical permits
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Brooklyn
Center that the fee schedule be amended as follows for the City of Brooklyn Center:
Planning and Inspection Fee Schedule
Electrical Fee
Minimum Fee for An Inspection
Minimum Fee for An Inspection per unit with 3 or
more connected units. (Townhomes, Condos, duplex)
Maximum for Single Family Residential
(New or Remodel)
Maximum for Commercial
Multi-Family Units
Swimming Pools
$40 Per Trip
$24 per Unit Per Trip
$175 (For 3 Inspections)
Additional @ $40
No Limit
$70/Unit
$80 Per Trip Plus Circuits
New Service Panel or Generators 0 to 300 AMP
Each Additional 100 AMP
Change out service in same location
$50
$14/Each
$100