HomeMy WebLinkAbout2018-075 CCRMember Iran Ryan introduced the following resolution and
moved its adoption:
RESOLUTION NO. 2018-75
RESOLUTION APPROVING AND AUTHORIZING EXECUTION OF A
JOINT POWERS AGREEMENT WITH THE CITY OF MINNEAPOLIS FOR
THE RECONSTRUCTION OF BROOKLYN BOULEVARD (CSAR 152)
FROM SOUTH OF 49TH AVENUE TO NORTH OF BASS LAKE ROAD
(CSAH 10), IMPROVEMENT PROJECT NO 2018-05
WHEREAS, the Brooklyn Center City Council approved the Brooklyn Boulevard
Corridor Study as a planning and development guide for the corridor under Resolution 2013-60;
and
WHEREAS, the City's Capital Improvement Program identifies the Brooklyn
Boulevard roadway and streetscape improvements from south of 49th Avenue to north of Bass
Lake Road to be constructed in 2018; and
WHEREAS, on May 9, 2016, the City Council approved a resolution establishing
the improvement project and directed staff to proceed with preliminary design, environmental
documentation, easement acquisition and final design as required to meet the Federal Aid Project
requirements for the Brooklyn Boulevard Corridor Project Phase 1 (49th Avenue to Bass Lake
Road), Project No. 2018-05; and
WHEREAS, the project is multi jurisdictional, involving the Minnesota
Department of Transportation, Hennepin County, the City of Minneapolis, Metro Transit, Three
Rivers Park, District and the City of Brooklyn Center; and
WHEREAS, a portion of the Project is located within the corporate boundaries of
Minneapolis and a portion of the Project is located within the corporate boundaries of Brooklyn
Center; and
WHEREAS, Minnesota Statutes, section 471.59 authorizes two or more
governmental units to enter into agreements to jointly or cooperatively exercise any power
common to the contracting parties or any similar power; and
WHEREAS, Brooklyn Center has prepared an Engineering Layout for the
Project; and
WHEREAS, the Minneapolis portion of the project includes curb, gutter,
sidewalk, driveway and pavement removal, grading, paving, striping, sidewalk, pedestrian ramp,
water manhole reconstruction and storm sewer construction and restoration near the intersection
of Brooklyn Boulevard and 49th Avenue as well as the replacement of the traffic signal at said
intersection within its corporate limits; and
RESOLUTION NO. 2018-75
WHEREAS, the parties determined it is in their best interests to cooperatively
exercise their common powers to undertake the construction of the project according to the terms
and conditions of the Joint Powers Agreement.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that:
The Joint Power Agreement for the Reconstruction of Brooklyn Boulevard
(CSAR 152) from south of 49th Avenue to north of Bass Lake Road
(CSAH 10) with the City of Minneapolis is hereby approved. The Mayor
and City Manager are hereby authorized to execute said agreement.
.19, 2018
Date Mayor
ATTEST: oww YT�
City Cleric
The motion for the adoption of the foregoing resolution was duly seconded by member
Nui:IA-ta Butler
and upon vote being taken thereon, the following voted in favor thereof:
Tim M lhcn, Mrquita Biller, Ori l Graves, Lin Ryan
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.