RESOLUTION NO.
2018-93
introduced the following resolution
RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2018-004, SUBMITTED BY
STEPHANIE ALSTEAD OF BWBR, REQUESTING APPROVAL OF A SITE
AND BUILDING PLAN FOR A DRY ROOM ADDITION (6800 SHINGLE
CREEK PKWY)
WHEREAS, Planning Commission Application No. 2018-004 was submitted by
Stephanie Alstead of BWBR on behalf of Medtronic, Inc. requesting consideration of Site and
Building Plan approval for a proposed approximately 13,427 -square foot dry room addition to
the Medtronic north building, located at 6800 Shingle Creek Parkway; and
WHEREAS, on April 12, 2018, the Planning Commission received and reviewed a
planning report and Assistant City Engineer's memorandum on the proposed Site and Building
Plan for the proposed approximately 13,427 -square foot dry room addition, to be constructed
within the interior courtyard of the Medtronic north building; and
WHEREAS, in utilizing the guidelines and standards for evaluating Site and
Building Plans, as contained in Section 35-230 (Plan Approval) of the City's Zoning Ordinance,
along with consideration of the goals and objectives of the City's Comprehensive Plan, the
Planning Commission considers this Site and Building Plan an appropriate and reasonable addition
to the subject property; and
WHEREAS, the Planning Commission of the City of Brooklyn Center, Minnesota,
hereby recommends to the City Council that the Site and Building Plan for the proposed
approximately 13,427 -square foot dry room addition, to be located at 6800 Shingle Creek
Parkway, and as comprehended under Planning Commission Application No. 2018-004, be
approved based upon the following considerations:
A. The Site and Building Plan is compatible with the standards, purposes and
intent of the City's Zoning Ordinance;
B. The improvements and utilization of the property as proposed under the
planned addition on this site is considered a reasonable use of the property
and will conform with ordinance standards;
C. The Site and Building Plan proposal is considered consistent with the
recommendations of the City's Comprehensive Plan for this area of the city
as it is designated for an industrial use;
D. The Site and Building Plan proposal appears to be a good long range use of
the existing site and the proposed addition can be considered an asset to the
RESOLUTION NO. 2018-93
community; and
E. Based upon the above considerations, it is believed that the guidelines for
evaluating and approving a Site and Building Plan as contained in Section
35-230 (Plan Approval) of the City's Zoning Ordinance are met and the
building and site plan proposal is, therefore, in the best interest of the
community.
WHEREAS, the Planning Commission of the City of Brooklyn Center, Minnesota,
hereby further recommends the City Council approve Planning Commission Application No.
2018-004, subject to the following conditions:
1. Building and Site Plan Review: The building plans are subject to review and
approval by the Building Official with respect to applicable codes prior to the
issuance of permits; and the final location or placement of any fire hydrants or
other fire -related building code items shall be reviewed and approved by the Fire
Inspector.
a. Any major changes or modifications made to this Site and Building Plan
can only be made by an amendment to the approved Site and Building
Plan as approved by the City Council.
b. The Applicant shall work with the City/Fire Department to ensure
adequate access is provided for emergency vehicles on the interior
courtyard of the north building.
C. The Applicant shall verify that the proposed building and site has met City
Code requirements.
d. A pre -construction conference shall be held with City staff and other
entities designated by the City prior to issuance of a Building Permit.
2. Agreements:
a. The Property Owner/Applicant shall execute a separate Performance
Agreement with supporting financial guarantee approved by the City,
which ensures the Subject Property will be constructed, developed, and
maintained in conformance with the plans, specifications, and standards
comprehended under this Site and Building Plan.
b. The Applicant shall submit an as -built survey of the Subject Property, as
well as any improvements and utility service lines, prior to release of the
performance guarantee.
3. Engineering Review: The Applicant agrees to comply with all conditions or
provisions noted in the City Engineer's Review memorandum, dated April 4,
2018 (Exhibit B):
a. Final grading, drainage, utility, irrigation, erosion control, and as -built
plans, and any other site engineering related issues are subject to review
RESOLUTION NO. 2018-93
and approval by the City Engineer prior to the issuance of permits.
4. Construction Standards:
a. Appropriate erosion and sediment control devices shall be provided on site
during construction as approved by the City's Engineering Department.
b. All work performed and materials used for construction of utilities shall
conform to the City of Brooklyn Center Standard Specifications and
Details.
5. Facilities and Equipment:
a. Any outside trash disposal facilities and rooftop or ground mechanical
equipment shall be appropriately screened from view per City Code
requirements.
b. Any outdoor enclosures shall be constructed with materials that are
complementary to the principal building.
C. The Applicant shall comply with the special requirements for I1 -zoned
properties as identified under Section 35-413 of the Zoning Ordinance.
d. The proposed wall -pack lighting on the addition shall be installed belotiv
the rooftop of the existing north building. The lighting shall meet the
provisions of Section 35-712 (Lighting) with regard to maximum foot-
candles for both the surrounding non-residential, as well as residential
properties.
6. Landscaping:
a. An updated landscaping inventory shall be provided to the City as part of
the building permit process for verification of conformance with the City's
Landscape Point System Policy.
i. Any identified missing trees or shrubs from the last updated
landscaping inventory (dated February 6, 2001, and attached as
Exhibit C) will require replacement as a condition of approval.
b. A replacement tree shall be planted in proximity to the location of the tree
identified for removal.
7. Signage: The Applicant shall submit a Building Permit application for any
proposed signage as part of the plan proposal. Signage is subject to the provisions
of Chapter 34 (Sign Ordinance).
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center, Minnesota, that Planning Commission Application No. 2018-004, as submitted
by Stephanie Alstead of BWBR, requesting approval of a Site and Building Plan for an
approximately 13,427 -square foot dry room addition to the Medtronic north building, and located
at 6800 Shingle Creek Parkway, is hereby approved subject to the conditions memorialized
herein.
RESOLUTION NO. 2019-93
123, 2018 ,Pi`rt LC/
Date Mayor
1/1 I �
ATTEST: GAG r w- "Io/�
" u
Cit lerk
The motion for the adoption of the foregoing resolution was duly seconded by member
4xii aa\'es
and upon vote being taken thereon, the following voted in favor thereof:
Tim WAISM, 4=1 aaves, Kris , D 1 Ryan
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.