HomeMy WebLinkAbout2018-001 PCRCommissioner Koenig introduced the following resolution and moved its adoption:
PLANNING COMMISSION RESOLUTION NO. 2018-001
RESOLUTION REGARDING RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2018-001 SUBMITTED BY
GREG HAYES OF EBERT CONSTRUCTION, REQUESTING APPROVAL OF
THE PRELIMINARY PLAT OF NORTHBROOK CENTER 3RD ADDITION
(LOCATED AT 1950 57TH AVENUE NORTH)
WHEREAS, Planning Commission Application No. 2018-001 was submitted by
Greg Hayes of Ebert Construction, requesting approval of a Preliminary Plat of a new subdivision
to be titled NORTHBROOK CENTER 3RD ADDITION, which would subdivide an existing 7.32
acre lot into two lots, and
WHEREAS, on March 15, 2018, the Planning Commission held a duly called
public hearing, whereby this item was given due consideration, a staff report was presented, and a
public hearing was opened to allow for public testimony regarding the preliminary plat of
Northbrook Center 3'd Addition, which were received and noted for the record; and
WHEREAS, the Planning Commission has determined during its review of the
preliminary plat materials submitted with Planning Application No. 2018-001, that said plat is in
general conformance with City of Brooklyn Center's City Code Chapter 15 — Platting; and
NOW, THEREFORE, BE IT RESOLVED by the Planning Advisory Commission
of the City of Brooklyn Center does hereby recommend to the City Council that Application No.
2018-001, as submitted by Greg Hayes of Ebert Construction, and requesting Preliminary Plat
consideration of a new subdivision to be titled NORTHBROOK CENTER 3RD ADDITION, may
be approved based upon the following conditions:
1. The proposed subdivision is as follows:
Lot 1, Block 1, Northbrook Center 3rd Addition
(Ebert Construction) —approximately 2.6 acres
Lot 2, Block 1, Northbrook Center 3rd Addition
(City of Brooklyn Center) —approximately 4.72 acres
2. All recommendations and conditions as noted in the Assistant City
Engineer's review memorandum (dated March 6, 2018), review by
MnDOT (dated March 14, 2018), and comments provided by Hennepin
County in their review (dated March 7, 2018), shall be complied with or
completed as part of any final plat approvals.
3. Approval of this plat will be subject to approval of the site and building
plan for an indoor commercial storage building, and establishment of a
new Planned Unit Development, also filed under Planning Application
No. 2018-001.
PC RESOLUTION NO. 2018-001
4. Any easements that need to be vacated under this platting process as
determined by the City Engineer must be considered under separate and
formal City easement vacation process, with all documentations,
descriptions, and exhibits singed by a licensed surveyor.
5. The final plat shall be subject to review and final approvals by the City
Engineer, prior to release by the City for recording purposes.
6. The final plat shall be subject to the provisions of Chapter 15 of the City
Ordinances.
7. An updated certified abstract of title or registered property report must be
provided to the City Attorney and City Engineer for review at the time of
the final plat application (within 30 days of release of the final plat).
,n
f
March 15 2018
Date Randal Christensen, Chair
ATTEST:
Ginny McIntosh, Secretary
The motion for the adoption of the foregoing resolution was duly seconded by member Susan Tade
and upon vote being taken thereon, the following voted in favor thereof:
Alexander Koenig, John MacMillan, Stephen Schonning, Rochelle Sweeney, Susan Tade, Abraham Rizvi, and
Randall Christensen
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.