Member April Graves introduced the following resolution and moved its
RESOLUTION NO. 2018-160
RESOLUTION REGARDING RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2018-014 SUBMITTED BY
DAN WALSH OF COMMUNITY HOUSING DEVELOPMENT
CORPORATION, REQUESTING APPROVAL OF THE PRELIMINARY AND
FINAL PLAT FOR UNITY PLACE (LOCATED AT 7256 UNITY AVENUE
NORTH)
WHEREAS, Planning Commission Application No. 2018-014 was submitted by
Dan Walsh of Community Housing Development Corporation, requesting approval of a
Preliminary and Final Plat for UNITY PLACE, which would allow for an overall cleanup to the
interior lot lines and the creation of an outlot for the floodway portion of the Subject Property, and
WHEREAS, on August 30, 2018, the Planning Commission held a duly called
public hearing, whereby this item was given due consideration, a staff report was presented, and a
public hearing was opened to allow for public testimony regarding the Preliminary and Final Plat
of UNITY PLACE, which were received and noted for the record; and
WHEREAS, the Planning Commission has determined during its review of the
Preliminary and Final Plat materials submitted with Planning Commission Application No. 2018-
014, that said plat is in general conformance with City of Brooklyn Center's City Code Chapter
15 — Platting; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Brooklyn Center, Minnesota, does hereby recommend that Application No. 2018-014, as
submitted by Dan Walsh of Community Housing Development Corporation, and requesting
Preliminary and Final Plat consideration of UNITY PLACE, may be approved based upon the
following conditions:
1. The proposed subdivision is as follows:
Lot 1 — approximately 10. 17 acres
Outlot A— approximately 0.78 acres
2. All recommendations and conditions as noted in the Assistant City
Engineer's review memorandum (dated August 24, 2018), and any
comments provided by Hennepin County shall be complied with or
completed as part of final plat approval.
3. Approval of this plat will be subject to approval of the site and building
plan for the as proposed community/service building, maintenance garage,
and site improvements, also filed under Planning Commission Application
No. 2018-014.
RESOLUTION NO. 2018-160
C. The Site and Building Plan proposal is considered consistent with the
recommendations of the City's Comprehensive Plan for this area of the City
as it is designated for high density, multi -family use, and was originally
constructed in 1978;
D. The Site and Building Plan proposal appears to be a good and continued
long range use of the existing site and the proposed improvements to the
Subject Property, including the construction of a community/service
building, which would offer a fitness room, party room, and patio, and the
installation of additional walking paths and playground equipment can be
considered an asset to the residents residing at Unity Place; and
E. Based upon the above considerations, it is believed that the guidelines for
evaluating and approving a Site and Building Plan, as contained in Section
35-230 (Plan Approval) of the City's Zoning Ordinance, are met and the
Site and Building Plan proposal is, therefore, in the best interest of the
community.
BE IT FURTHER RESOLVED that the City Council of the City of Brooklyn
Center, Minnesota, does hereby recommend that Planning Application No. 2018-014, for the
property located at 7256 Unity Avenue North, be approved subject to the following conditions and
considerations:
1. Building and Site Plan and Review: The building plans are subject to review
and approval by the Building Official with respect to applicable codes prior to the
issuance of permits; and the final location or placement of any fire hydrants and
other fire related building code items shall be reviewed and approved by the Fire
Inspector.
a. Any major changes or modifications made to this Site and Building
Plan can only be made by an amendment to the approved Site and
Building Plan as approved by the City Council.
b. The Applicant shall work with City staff to identify additional
opportunities to minimize the parking deficiency by adding off-
street parking on the Subject Property. Should additional parking
be identified, the site plans shall be revised as necessary as part of
any building permit submittal.
C. The community/service building will require installation of a fire
sprinkler system, per City Code.
d. A pre -construction conference shall be held with City staff and
other entities designated by the City prior to issuance of a Building
Permit.
RESOLUTION NO. 2018-160
2. Agreements:
a. The Property Owner shall enter into a utility, facilities, and
easement agreement for maintenance and inspection of utility and
storm drainage systems as approved by the City Engineer prior to
the issuance of building permits.
i. The preliminary/final plat, which is also considered under
Planning Commission Application No. 2018-014, should be
updated to reflect all existing easements. If easements are
found to be unrecorded, the easements shall be recorded at
Hennepin County.
b. The Developer shall execute a separate Performance Agreement
with supporting financial guarantee approved by the City, which
ensures the Subject Property will be constructed, developed, and
maintained in conformance with the plans, specifications, and
standards comprehended under this Site and Building Plan.
C. The Developer shall submit an as -built survey of, the property,
improvements and utility service lines prior to release of the
Performance Agreement financial guarantee.
3. Engineering Review: The Applicant agrees to comply with all conditions or
provisions noted in the City Engineer's Review memorandum, dated August 24,
2018.
a. A land disturbance (alteration) permit and building permit is
required.
b. Final grading, drainage, utility and erosion control plans and any
other site engineering related issues are subject to review and
approval by the City Engineer prior to the issuance of permits.
4. Construction Standards:
a. Appropriate erosion and sediment control devices shall be provided
on site during construction as approved by the City's Engineering
Department.
b. The Applicant shall complete a Construction Management Plan and
Agreement and submit the associated deposit as part of a non-
compliance provision.
C. All work performed and materials used for construction of utilities
shall conform to the City of Brooklyn Center Standard
Specifications and Details.
5. Facilities and Equipment:
a. Any outside trash disposal facilities and roof top or on ground
mechanical equipment shall be appropriately screened from view.
RESOLUTION NO. 2018-160
b. The Applicant shall work with City staff to determine whether
adequate trash enclosures are provided on the Subject Property and
ensure that all trash and debris is removed from the Subject
Property in a timely manner. The Applicant should identify a plan
to ensure trash is not dumped near the adjacent waterways along
the rear portions of the townhouse units, and a plan for removal
when dumping does occur.
6. Landscaping: All landscaped areas shall include approved irrigation systems to
facilitate site maintenance.
a. The Applicant shall work with City staff to revise the Landscape
Plan to meet the minimum Landscape Points required per City
policy.
b. Per City requirements, an irrigation system is required.
C. The contractor shall submit irrigation shop drawings for review
and approval prior to installation.
7. Signage: The Applicant shall submit a Building Permit application for any
proposed signage as part of the development proposal. Signage is subject to the
Chapter 34 (Sign Ordinance).
September 10 2018
Date Mayor
ATTEST:
City Cleric
The motion for the adoption of the foregoing resolution was duly seconded by member
Marquita Butler
and upon vote being taken thereon, the following voted in favor thereof:
Tim Willson, Marquita Butler, April Graves, Kris Lawrence -Anderson, Dan Ryan
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.