HomeMy WebLinkAbout2018-006 PCRCommissioner Tade introduced the following resolution and moved its adoption:
PLANNING COMMISSION RESOLUTION NO. 2018-006
RESOLUTION REGARDING THE RECOMMENDED DISPOSITION OF
PLANNING COMMISSION APPLICATION NO. 2018-005 SUBMITTED BY
NEAL THAO OF NOBLE ACADEMY REQUESTING SITE PLAN
APPROVAL FOR A PARKING LOT AND DRIVEWAY EXPANSION
(LOCATED AT 6201 NOBLE AVENUE NORTH)
WHEREAS, Planning Commission Application No. 2018-005 was submitted by
Neal Thao of Noble Academy requesting consideration of Site Plan approval for a proposed
expansion to the parking lot and driveway areas at the subject property located at 6201 Noble
Avenue North; and
WHEREAS, on April 12, 2018, the Planning Commission received and reviewed a
planning report and Assistant City Engineer's memorandum on the proposed Site Plan for the
proposed parking lot and driveway expansion; and
WHEREAS, in utilizing the guidelines and standards for evaluating site and
building plans, as contained in Section 35-230 (Plan Approval) of the City's Zoning Ordinance,
along with consideration of the goals and objectives of the City's Comprehensive Plan, the
Planning Commission considers this Site Plan an appropriate and reasonable improvement to the
subject property.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the
City of Brooklyn Center, Minnesota, hereby recommends to the City Council that the Site Plan for
the proposed parking lot and driveway expansions, to be located at 6201 Noble Avenue North, as
comprehended under Planning Commission Application No. 2018-004, may be approved based on
the following considerations:
A. The Site Plan is compatible with the standards, purposes and intent of the
City's Zoning Ordinance;
B. The improvements and utilization of the property as proposed under the
planned improvements to this site is considered a reasonable use of the
property and will conform with ordinance standards;
C. The Site Plan proposal is considered consistent with the recommendations
of the City's Comprehensive Plan for this area of the city as it is designated
for a school use;
D. The Site Plan proposal appears to be a good long range use of the existing
site and the proposed parking lot and driveway expansion improvements
can be considered an asset to the community; and
E. Based upon the above considerations, it is believed that the guidelines for
evaluating and approving a Site Plan, as contained in Section 35-230 (Plan
PC RESOLUTION NO. 2018-006
Approval) of the City's Zoning Ordinance, are met and the site plan
proposal is, therefore, in the best interest of the community.
BE IT FURTHER RESOLVED that the Planning Commission of the City of
Brooklyn Center, Minnesota, does hereby recommend to the City Council that Planning
Commission Application No. 2018-005 for the property located at 6201 Noble Avenue North be
approved subject to the following conditions and considerations:
1. Building and Site Plan and Review: The building plans are subject to review
and approval by the Building Official with respect to applicable codes prior to the
issuance of permits; and the final location or placement of any fire hydrants and
other fire related building code items shall be reviewed and approved by the Fire
Inspector.
a. Any major changes or modifications made to this Site Plan can
only be made by an amendment to the approved Site Plan as
approved by the City Council. Per a review of the submitted plans,
staff is recommending that the following changes be incorporated
as part of site plan approval and under the building permit process:
i. The proposed bus -only driveway and driveway apron shall
be relocated away from the property line and residential
property to the north.
ii. The proposed three (3) space hammerhead is to be
removed.
iii. The proposed one-way drop off along Noble Avenue North
shall be re -directed and the angled parking spaces shall be
changed accordingly. Should the three parking spaces
proposed at the hammerhead be necessary, these spaces
may be shifted to the angled parking along Noble Avenue
North.
iv. The bus -only driveway shall be re -configured and one 90 -
degree bus parking space removed in order to meet the
minimum fire apparatus access road requirements of the
City's Fire Code.
b. A pre -construction conference shall be held with City staff and
other entities designated by the City prior to issuance of a Building
Permit/Land Disturbance (Alteration) Permit.
2. Agreements:
a. The owner of the property shall enter into a utility, facilities, and
easement agreement for maintenance and inspection of utility and
storm drainage systems as approved by the City Engineer prior to
the issuance of permits.
PC RESOLUTION NO. 2018-006
b. The Developer shall execute a separate Performance Agreement
with supporting financial guarantee approved by the City, which
ensures the Subject Property will be constructed, developed, and
maintained in conformance with the plans, specifications and
standards comprehended under this Site Plan.
C. The Developer shall submit an as -built survey of the property,
improvements and utility service lines prior to release of the
performance guarantee.
3. Engineering Review: The Applicant agrees to comply with all conditions or
provisions noted in the City Engineer's Review memo, dated April 4, 2018
(Exhibit D).
a. A City land disturbance (alteration) permit is required.
b. Final grading, drainage, utility and erosion control plans and any
other site engineering related issues are subject to review and
approval by the City Engineer prior to.the issuance of permits.
4. Construction Standards:
a. Appropriate erosion and sediment control devices shall be provided
on site during construction as approved by the City's Engineering
Department.
b. The Applicant shall obtain an NPDES construction site erosion
permit from the Minnesota Pollution Control Agency prior to
disturbing the site.
C. All work performed and materials used for construction of utilities
shall conform to the City of Brooklyn Center Standard
Specifications and Details.
5. Facilities and Equipment:
a. Any outside trash disposal facilities and roof top or on ground
mechanical equipment shall be appropriately screened from view
per City requirements.
b. The proposed 20 -foot by 13 -foot trash enclosure shall be
constructed with building materials that are complementary to the
principal building (school building) and fully screen all waste and
recycling containers.
6. Landscaping: All landscaped areas, including street boulevards, shall include
approved irrigation systems to facilitate site maintenance.
a. The Applicant shall provide a revised landscape plan that will
provide screening along parking areas (i.e. front parking lot along
Noble Avenue North, main parking area, and bus driveway/parking
PC RESOLUTION NO. 2018-006
a
as part of any Building Permit/Land Disturbance (Alteration)
approval.
b. Per City requirements, an irrigation system is required.
C. The contractor shall submit irrigation shop drawings for review
and approval prior to installation.
Signage: Signage for the Subject Property
Ordinance) and the approved special use
messages sign along Noble Avenue North.
April 12, 2018
Date
ATTEST: ,,,,„*%A&- `r"
Ginny Mc ntosh, Secretary
is subject to the Chapter 34 (Sign
permit provisions for the dynamic
/ Randall Christensen, Chair
The motion for the adoption of the foregoing resolution was duly seconded by member Koenig
and upon vote being taken thereon, the following voted in favor thereof:
Christensen, Koenig, MacMillan, Rizvi, Schonning, and Tade
and the following voted against the same: None
whereupon said resolution was declared duly passed and adopted.