3.2020 Budget
A.Consideration of 2020 Budget and Public Hearing
- It is recommended that the City Council conduct a public hearing, receive
comments and consider adoption of recommended budgets for fiscal year
2020 and 2020-2034 Capital Improvement Plan (CIP).
B.City M anager's Budget Transmittal Letter for 2020 Fiscal Year
- Motion to accept letter of transmittal
C.Resolution Approving Final Tax Capacity L evies for the General Fund
and Debt S ervice Funds and M arket Value Tax L evy for the Housing
and Redevelopment Authority for P roperty Taxes P ayable in 2020
- Motion to approve resolution
D.Resolution Adopting the 2020 Annual City Budget
- Motion to adopt 2020 Budget and approve resolution
E .Resolution Approving the 2020-2034 Capital Improvement Plan and
Adopting the 2020 Capital P rogram
- Motion to adopt 2020-2034 Capital Improvement Plan and approve
resolution
4.Adjourn
C ouncil Special Meeng
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:C ons idera,on of 2020 Budget and P ublic H earing
B ackground:
AT TA C H M E N TS :
D escrip,on U pload D ate Type
Powerpoint 11/27/2019 P resenta,on
2020 Recommended Budget
and Property Tax Levy
Truth in Taxation Hearing 12-2-2019
Andrew Splinter Interim Finance Director
Agenda
•Budget Process
•Strategic Priorities
•Proposed Levy
•Revenue/Expenditure Overview
•Property Taxation
•Public Hearing
•Council Consideration of Proposed Levy, Budget and Capital
Improvement Plan
2
Purpose of this Hearing
•Discuss the 2020 Proposed Budget
•Discuss the 2020 Proposed Tax Levy
•To hear input from the public on the proposed property tax levy for
City services in 2020
•Following the hearing City Council will be asked to consider the
adoption of the 2020 Proposed Budget and Property Tax Levy
3
The Budget Process
•Chapter 7 of the City Charter requires that the City Manager submit
an annual operating budget to the City Council.
•Budget Study Sessions held with the Financial Commission:
•July 15 Capital Improvement Plan and Capital Funds
•July 29 2020 Budget Overview
•August 7 General Fund Department Budget Requests
•August 19 General Fund Department Budget Requests
•September 16 City Manager Recommended Property Tax Levy
4
The Budget Process
•Budget Study Sessions held with the Financial Commission:
•October 7 Special Revenue, Debt Service, Capital Project Funds
•October 21 Utility Funds, Cash Flows and Rates for 2020 Enterprise
Funds (BC Liquor, EBHC)
•Regular City Council Meetings
•September 23 Adoption of Preliminary Levy
•November 25 Adoption of 2020 Utility Rates
5
Strategic Priorities
•Resident Economic Stability
•The economic stability of residents is essential to vibrant neighborhoods and to retail, restaurant, and business growth. We will lead by supporting collaborative efforts of education, business, and government sectors to improve income opportunities for residents.
•Targeted Redevelopment
•Redeveloping properties to the highest value and best use will accomplish our goals regarding housing, job creation, and growth of the City’s tax base. We will appropriately prepare sites and provide the necessary supporting infrastructure investments to guide redevelopment of publicly-and privately-owned properties.
6
Strategic Priorities
•Enhanced Community Image
•Our ability to attract and retain residents and businesses is influenced by the perception of the City. We will take specific actions to assure that Brooklyn Center is recognized by residents, businesses, stakeholders, and visitors as a high quality, attractive, and safe community.
•Inclusive Community Engagement
•In order to provide effective and appropriate services, we must clearly understand and respond to community needs. We will consistently seek input from a broad range of stakeholders from the general public, non-profit, and for-profit sectors. Efforts to engage the community will be transparent, responsive deliberately inclusive, and culturally sensitive.
7
Strategic Priorities
•Safe, Secure, and Stable Community
•For residents and visitors to fully appreciate and enjoy a great quality of life, it is essential that all neighborhoods are safe, secure, and stable. We are committed to assuming compliance with neighborhood conditions and building safety standards, providing proactive and responsive public safety protection, wise stewardship of City resources and policies that promote safety, security, and a lasting stable environment.
•Key Transportation Investments
•Proactively maintaining an efficient and effective infrastructure will meet the high level or community expectations. We will plan for and invest in critical infrastructure improvements that enhance safety, improve life quality and support opportunities for redevelopment, while sustaining the natural environment.
8
Pay 2020 Proposed City Levies
9
Description Amount
General Fund Operations $17,957,263
Public Improvement Bond –Debt Service 1,457,047
Abatement for Economic Development 95,000
Total 2020 Proposed City Levy $19,509,310
Increase from 2019 (Dollars)$1,082,194
Increase from 2019 (Percentage)5.87%
Housing and Redevelopment Authority $405,069
Increase from 2019 (Dollars)$24,971
Comparison of Change in City
Levy to Statewide Average
10
2020 General Fund –Revenues
11
2020 General Fund -Revenues
12
Significant Changes Amount
General Fund Property Tax Levy $1,017,266
Excess Tax Increment Distribution $150,000
Building Permits $190,000
Local Government Aid $167,631
Charges for Services ($44,500)
Assessment revenue (abatements)($35,000)
CDBG funding transfer elimination ($150,000)
2020 General Fund –Sources of
Revenues
13
2020 General Fund –
Expenditures
14
2020 General Fund –
Expenditures
15
Significant Changes Amount
Personnel
3 Percent base wage increase $357,167
FT Community Engagement position (net PT)55,449
FT HR Development specialist (net PT)50,542
Associate Planner 85,995
PT Housing Inspector 35,347
Election Judges 65,490
Cafeteria contribution increase 97,773
2020 General Fund –
Expenditures
16
Significant Changes Amount
Other Services and Charges
New Software (Novus, Polco, NeoGov, Envisio, IMS)$90,500
LOGIS charges 40,000
Contingency 50,000
Central Garage Charges 78,500
2020 General Fund –Expenditures by Function
17
Capital Improvement Projects
•15-year Capital Improvement Plan (CIP)
•Projects includes public utilities, street improvements, park
improvements, and capital maintenance building improvements
•2020 Capital Improvements totaling $10.83 million
•Grandview Park Area North ($6.6 million)
•Water Tower #1 Painting ($1.0 million)
•Creek Stabilization Project ($406k)
•Additional projects including bridge rehab, retaining wall replacement, well
and pond rehab, park equipment, CMBP($2.82 million)
18
Capital Improvement Projects
•Proposed $7.08 million debt issue (Funded through water utility fees,
sanitary sewer utility fees, storm sewer fees, and property taxes.
There is also a special assessment component to the Grandview Park
Area North project, however cash available in that fund is sufficient
that bonding for that portion in 2020 is not considered necessary.
19
Property Taxes -Introduction
•Why is my property tax bill changing?
•Change in value of your property
•Change in the relative proportion of your property to the total property value
in BC
•Increase in property taxes requested for operations of City General Fund
activities and programs
•Four different school districts in Brooklyn Center with different levies and
property tax implications
20
How are your taxes distributed?
21
Sample residential
property within
School District #279
Market Values Payable 2019
Compared to 2020
22
Class Payable 2019 Payable 2020 Change (%)
Commercial $318,811,800 $359,740,500 12.8%
Industrial 140,570,900 158,740,700 12.9%
Residential 1,325,890,784 1,449,806,371 9.4%
Apartment 275,022,304 311,518,030 13.3%
Other 478,000 507,000 6.1%
Totals $2,060,773,788 $2,301,278,201 11.6%
Tax Capacity Pay 19 vs. Pay 20
23
Levy Share Pay 19 vs. Pay 20
24
Median Residential Value
•Pay 2019 Median Estimated Residential Value
•Estimated Market Value: $184,000
•Estimated Taxable Value: $163,320
•Pay 2020 Median Estimated Residential Value
•Estimated Market Value: $198,000
•Estimated Taxable Value: $178,580
•Change in Median Value
•Increase in Estimated Market Value: 7.6%
•Increase in Estimated Taxable Value: 9.3%
25
Median-Value Home Property Tax
26
Property Tax Considerations
•Tax Rates estimated to decrease, meaning if you had no change in
your assessed value, your City taxes will decrease
•If levy increase was zero, median value home would see a $10 (0.8%
property tax decrease)
•Each 1% levy increase/decrease is approximately $11 per year for the
median value home
27
State of MN Market Value
Exclusion (property tax credit)
28
Will my property taxes go up or
down?
29
28.1% of residential properties will see a decrease, 66.2% will
increase $450 or less 5.7% will increase more than $450
Remaining Steps
•Open the Public Hearing
•City Council Consideration of Resolutions
•Adoption of the HRA Levy & Budget
•Adoption of the EDA Budget
•Adoption of the 2020 City of Brooklyn Center Levy & Budget
•Adoption of the Capital Improvement Plan
30
Further Questions
•Curt Boganey, City Manager
•cboganey@ci.Brooklyn-center.mn.us
•Andy Splinter, Interim Finance Director
•asplinter@ci.Brooklyn-center.mn.us
•Phone: 763-569-3352
•Josh Whitney, Hennepin County Assessor
•Joshua.whitney@Hennepin.us
•Phone: 612-715-6181
31
C ouncil Special Meeng
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:C ity M anager's Budget Transmi-al L e-er for 2020 F is cal Year
B ackground:
By S tate L aw and C ity Charter, each y ear the C ity C ouncil is required to adopt an annual budget. T he budget
is perhaps the Ci4 es mos t cri4 cal planning document. I t s ets for th the C ouncil prior i4es for the upcoming
year and allocates res ources in accordance w ith thos e priori4es.
Monday, D ecember 2 , 2019, is the culmina4on of a consens us building, priority s e5ng pr oces s that began
w ith the development of a mul4 -year strategic plan. T he s trategic plan clarifies our v alues , es tablis hes goals
and strategic priori4es in purs uit of our M is s ion.
Ensuring an a
racve, clean, safe, inclusive community that enhances the quality of like for all people and
preserves the public trust.
Following the s trategic plan and adopted financial policies as a guide, s taff has w orked w ith the C ity Council
and F inancial C ommis s ion over several months to cra; budgets des igned to meet the agreed upon service
needs and achieve the desired community outcomes .
Tonight you w ill be as ked to consider the follow ing:
Receive the budget report and hold the s tatutorily required public hearing
H old an H R A mee4ng to consider the adop4on of an H R A levy and budget
H old an E DA mee4ng to consider the adop4on of an E DA budget
H old a City Council M ee4ng to
Receive the C ity M anager ’s proposed budget
A dopt the F inal P roperty Tax Levies
A dopt the A nnual City Budget for all funds
A pprove the 2020-2034 C I P and 2020 Capital P rogram
Revisions:
The 2020-2034 Capital I mpr ovement P lan w as pres ented and rev iewed by the City C ouncil and F inancial
Commission at the J uly 15, 2019, joint wor k s ession. There have been no s ubs equent modifica4 ons to the
P lan prior to this cons idera4on for adop4on.
S trategic Priories and Values:
Enhanced Community I mage, Resident Economic S tability, I nclusive C ommunity Engagement, Targeted
Redevelopment, S afe, S ecure, S table Community, Key Transporta4on I nvestments
AT TA C H M E N TS :
D escrip4on U pload D ate Type
L e-er of Trans mi-al 11/27/2019 Backup M aterial
1
To: Mayor Elliott and Councilmembers Butler, Graves, Lawrence-Anderson, and Ryan
From: Cornelius L. Boganey, City Manager
Date: December 2, 2019
RE: 2020 Final Budget Adoption
It is my pleasure to transmit the proposed 2020 budget for the City of Brooklyn Center. While
the City Manager is tasked with the responsibility of preparing a budget, it cannot be
accomplished without the clear policy direction provided by the City Council with input from the
Financial Commission. It would be impossible to produce this budget without the cooperation
and collaboration of the Leadership Team: Department Heads, Division Heads and other Staff
Members. Special recognition should be given to the Fiscal Services Department for the role in
planning and coordinating the budget development process. It is our hope and expectations that
this budget will succeed in its purpose to wisely manage our resources and implement policy for
the benefit of the residents, businesses and visitors to Brooklyn Center.
Budget Overview
The proposed 2020 budget, in financial terms, sets forth the action plan of the City. The
priorities for staff, infrastructure improvement and service response are reflected in the allocation
of resources in the plan developed in City Council Joint Work Sessions with the Financial
Commission during the months of June through November 2019. The expenditure levels are
focused on maintaining current services and on the achievement of the strategic priorities of
Resident Economic Stability, Targeted Redevelopment, Enhanced Community Image,
Inclusive Community Engagement, Safe Secure Stable Community and Key Transportation
Investments and key outcomes adopted by the City Council.
The overall General Fund budget increase is 6.14% and the overall tax levy increase is 5.87%.
The property tax levy increase includes a new debt service levy dedicated for the repayment of a
2019 bond issue used to finance neighborhood infrastructure reconstruction improvements. The
Median Value Residential Property in the City is $198,000 compared to the prior year value of
$184,000, which is an increase in market value of 7.6%. The Median Value Residential
Property will pay approximately $1,233 in City and Housing and Redevelopment Authority
property taxes in 2020 compared to $1,174 in 2019, which is an increase of $59.
The 2020 Budget incorporates the following significant items:
2
• Issuance of $6.44 million of debt to finance capital improvements including the street,
water, sanitary sewer and storm sewer portions of the infrastructure improvement project
for Grandview Area North Street and Utility Improvements and the rehabilitation of
Water Tower #1. This debt issue provides the needed funding for the continuation of our
street and utilities neighborhood reconstruction program.
• The addition of a full-time Associate Planner (Community Development) to assist City
Economic Development Coordinator with day-to-day tasks, zoning administration, permit
review, and special projects related to accomplishing strategic initiatives and policy
directives. This will allow additional time for City Planner and Workforce Development
Specialist to focus on core functions related to forwarding strategic priorities. This
position was initiated as a result of the increase in the pipeline of development projects.
• The addition of a part-time Housing/Code Enforcement Inspector (Community
Development) to maintain pace for the ongoing high demand for housing inspections,
which are consistently three to four weeks out for inspection scheduling. This has
routinely pulled Building Inspector off their duties to fill in, which draws away from
building plan review and permit inspections time. The position will be filled by the
longest serving inspector who has indicated their desire for part-time and would allow
them an opportunity to train their successors and pass on their vast knowledge and
experience.
• The conversion of a part-time Community Engagement Specialist (Administration) to a
full-time position. The position will design, plan and coordinate the City engagement
efforts and work of the Neighborhood Liaisons.
• The conversion of a part-time Human Resource Development Specialist (Administration)
to a full-time position. The position will develop and lead City-wide training and
development at all staff levels, coordinate the City Inclusion & Diversity efforts and
support Human Resource daily operations.
• Master development planning for targeted redevelopment areas that include: Opportunity
Site Redevelopment, Brooklyn Boulevard Corridor and Former Sears Site. The City will
be working with Alatus, LLC to move forward with the first phase of the redevelopment
of the Opportunity Site.
• Creation of a funding pool that would allocate funding to each neighborhood for
neighborhood engagement activities.
• Water Tower No. 1 rehabilitation, which will include painting the water tower with
current Brooklyn Center city logo.
• Purchase of digital signage to replace existing signage outside City Hall/Community
Center to promote current events and City notifications.
• Begin developing the Brooklyn Boulevard Corridor Phase 2 project (Bass Lake Road to
65 th Avenue) for construction in 2021.
• Work with regional partners and jurisdictions to develop an environmental study for the
TH 252 conversion to a freeway and MnPASS lanes on TH 252 and I-94. This project
was selected for Corridors of Commerce funding in 2018 ($163M) for start of
construction in 2023.
3
The Proposed 2020 Levies
On December 2, 2019, the City Council will consider the 2020 budget and property tax levies.
There are three funds that require a tax levy; the General Fund, the Debt Service Fund and the
Housing and Redevelopment Authority Fund. The proposed final levy is as follows:
General Fund - Operations Levy $ 17,957,263
General Fund - Abatement for Economic Development 95,000
Debt Service - Public Improvement Bond 1,457,047
Total Levy $ 19,509,310
Housing and Redevelopment Authority $ 405,069
The General Fund is the primary operating fund for government business of the City. The
proposed General Fund Budget is as follows:
The Proposed 2020 General Fund Budget
Revenues
Property Tax (net) $ 17,967,857
Excess Tax Increment 400,000
Lodging Tax 1,180,000
Licenses and Permits 1,075,001
Intergovernmental Revenue 2,134,417
Charges for Service 790,150
Fines and Forfeits 246,500
Other Revenue 320,700
Total General Fund Revenue $ 23,793,989
Expenses
General Government $ 3,757,881
Building and Grounds 939,939
Police 9,484,284
Fire and Emergency Preparedness 1,568,294
Community Development 1,759,523
Public Works 4,187,070
Community Activities, Recreation & Services 1,886,524
Other Services 749,900
Risk Management 260,528
Central Supplies and Services 488,200
Vacancy/Turnover Savings (350,000)
Reimbursement from Other Funds (1,148,154)
Transfers Out 210,000
Total General Fund Expenditures $ 23,793,989
4
Strategic Focus
For the past several years the City Council has remained focused on the achievement of strategic
priorities and each year the budget has been crafted as a policy implementation tool focused on
the achievement of these strategic priorities.
This 2020 business plan focuses on the Council adopted 2018-2020 Strategic Priorities of:
• Resident Economic Stability
• Targeted Redevelopment
• Enhanced Community Image
• Inclusive Community Engagement
• Safe, Secure, and Stable Community
• Key Transportation Investments
During this year’s budgeting process department heads identified key initiatives and values of
their divisions focused on the achievement of strategic priorities, which are included in their
respective narratives. The definitions of the Strategic Priorities and examples of some of these
key initiatives for 2020 are as follows:
Resident Economic Stability
The economic stability of residents is essential to vibrant neighborhoods and to retail, restaurant,
and business growth. We will lead by supporting collaborative efforts of education, business,
and government sectors to improve income opportunities for residents.
• Job Pathways
Create job pathways and training opportunities for residents. To achieve the desired
outcome we will Implement a comprehensive “pipeline” strategy to provide greater
opportunities for unemployed/underemployed BC residents to be employed by the City in
Livable Wage Jobs.
• Entrepreneur Support
Foster entrepreneurship opportunities for residents and those that desire to start or grow a
business in Brooklyn Center, with an emphasis on underserved entrepreneurs. To achieve
this outcome we will develop a program to support existing local and start-up businesses.
The City will identify service gaps for local entrepreneurs, develop solutions, and identify
resources, with the goal of reducing local government barriers to business success
• Job Retention and Expansion
The desired outcome is to increase the number of high quality jobs in the community. To
achieve this outcome we will create a Business Expansion and Retention Program to
identify existing businesses’ needs and develop relationships with the City’s businesses.
5
We will identify programs to support business expansion and attraction to the
community.
• Resident Wealth Creation and Financial Literacy
The desired outcome is to increase resident economic stability through wealth creation and
financial literacy. To achieve this outcome we will explore opportunities to promote home
ownership for existing and future residents, with an emphasis on serving those with barriers
to home ownership. We will explore partnerships with outside agencies to provide financial
literacy classes to residents. We will develop a Housing Policy Action Plan, which will
examine the City’s housing policies and ordinances with the goal of expanding tenant
protections and preserving existing affordable housing. We will also examine the City’s
policies around the creation of new, legally-binding, affordable housing units.
Targeted Redevelopment
Redeveloping properties to the highest value and best use will accomplish our goals regarding
housing, job creation, and growth of the City’s tax base. We will appropriately prepare sites and
provide the necessary supporting infrastructure investments to guide redevelopment of publicly-
and privately-owned properties.
• Opportunity Site Redevelopment
The desired outcome is an inviting, attractive, walkable and vibrant development that
provides for a mix of housing and commercial types that create a dense mixed-use
downtown.
The initiatives for 2019-2020 include:
- The creation of a Master Development Strategy which will:
o Identify a master development plan that is grounded in market realities and
economically feasible, which will allow the city to begin financial analysis to
identify potential and realistic need for public subsidy;
o Determine a desired land use plan that identifies subareas within the
Opportunity Site and their appropriate land use mix.
o Identify a regulatory framework that outlines the desired form and function of
both public and private space, as well as the relationship between buildings
and ROW;
o Layout a path to achieving entitlements that is flexible, market driven, and
ensures a high quality product that is in keeping with the City’s vision for the
area;
o Identify a multi-modal transportation framework so that the City can begin
planning for future CIP needs, as well as organize the land use concept around
foundational street networks. The transportation framework will identify street
6
hierarchies and sections, as well as consider the role of transit in the
redevelopment area.
• 57 th and Logan Redevelopment
The desired outcome is an inviting, attractive, and vibrant development that forwards the
City’s Strategic Priorities.
The initiatives include:
- Master Development Planning which will:
o Identify planning issues and considerations;
o Provide a market feasibility analysis;
o Identify development opportunities;
o Identify the role of public subsidy in relationship to development feasibility;
o Provide high level transportation analysis;
o Provide a regulatory framework that identifies land use, design standards, and
zoning to both incentivize development and ensure that it forwards the City’s
vision;
o Prepare marketing materials and a development implementation plan.
• Brooklyn Boulevard Corridor
The desired outcome is a cohesive mixed use corridor with commercial uses that serve the
community, provides a variety of housing types, and responds to the access and mobility
needs of Brooklyn Boulevard.
The initiatives include:
- Master Development Corridor Planning which will:
o Identify planning issues and considerations;
o Provide a market feasibility analysis;
o Identify appropriate locations for commercial and higher density residential
concentrations;
o Identify development opportunities;
o Identify the role of public subsidy in relationship to development feasibility;
o Utilize past planning work related to the corridor;
o Provide high level transportation analysis;
o Provide a regulatory framework that identifies land use, design standards, and
zoning to both incentivize development and ensure that it forwards the City’s
vision;
o Prepare marketing materials and a development implementation plan for
EDA-owned properties on the corridor.
• Brooklyn Boulevard Corridor
7
The desired outcome is a cohesive mixed use corridor with commercial uses that serve the
community, provides a variety of housing types, and responds to the access and mobility
needs of Brooklyn Boulevard.
The initiatives include:
- Master Development Corridor Planning which will:
o Identify planning issues and considerations;
o Provide a market feasibility analysis;
o Identify appropriate locations for commercial and higher density residential
concentrations;
o Identify development opportunities;
o Identify the role of public subsidy in relationship to development feasibility;
o Utilize past planning work related to the corridor;
o Provide high level transportation analysis;
o Provide a regulatory framework that identifies land use, design standards, and
zoning to both incentivize development and ensure that it forwards the City’s
vision;
o Prepare marketing materials and a development implementation plan for
EDA-owned properties on the corridor.
• Former Sears Site
The desired outcome is an inviting, attractive, and vibrant development that forwards the
City’s Strategic Priorities.
The initiatives include:
- Master Development Planning which will:
o Identify planning issues and considerations;
o Provide a market feasibility analysis which includes an analysis of land value
based on likely land use scenarios;
o Identify development opportunities;
o Identify the role of public subsidy in relationship to development feasibility;
o Provide high level transportation analysis;
o Provide a regulatory framework that identifies land use, design standards, and
zoning to both incentivize development and ensure that it forwards the City’s
vision;
o Prepare a development implementation plan that includes assisting the
landowner in identifying perspective developers and/or businesses to achieve
the City’s goals for the site.
Enhanced Community Image
Our ability to attract and retain residents and businesses is influenced by the perception of the
City. We will take specific actions to assure that Brooklyn Center is recognized by residents,
businesses, stakeholders, and visitors as a high quality, attractive and safe community.
8
• Police Department
Enhance the image of the community by improving the perception of safety within the
community; accomplishing that through community engagement and outreach whenever
possible.
Engage the media to include social media; highlighting stories that spotlight police efforts
with crime reduction and citizen engagement. This effort may include allowing better and
more frequent access to police personnel and activities. Issues such as suspect
identifications, crime trends (open ignition auto theft), graffiti, and other livable concerns
will be spotlighted on the Police/City Facebook pages.
• System-wide Development and Operations
Continue working with all departments and at all levels of the organization in a systematic
manner on key administrative operations including technology planning, branding,
recruitment and hiring, communication, employee evaluations, and electronic council
affairs. Through coordination of communication, training and development of efforts with
frontline staff, supervisors, and department management messages will be consistently
communicated throughout the organization. The hope is that there is share understanding
and unified action on key strategic directives throughout the entire organization.
• Customer Intimacy and Operational Excellence
Continue to develop and adopt quality performance practices to improve results and
customer satisfaction. We will strengthen the development of staff at all levels of the
organization and align performance of all staff with the strategic direction and values of the
City via internal graphic design support, bi-lingual translation and interpretation services,
digitizing of records, citywide performance evaluation, technological system and
infrastructure upgrades, strategic area transition from city hosted software to cloud-based
software and technological disaster and emergency planning. All staff will uniformly and
consistently be evaluated on the areas customer service and operational excellence via a
newly implemented electronic employee appraisal system.
• Premier Conference Facility and Centerpiece for the City of Brooklyn Center
In 2020, the Earle Brown Heritage Center will celebrate 30 years of operation as one of the
regions premier conference and events facilities, and as a centerpiece of the Brooklyn Center
community. Through our 2020 marketing efforts, we will continually highlight Earle Brown
Heritage Center and the City of Brooklyn Center.
We will strive to maintain our current level of 90% repeat corporate clients, by reviewing
feedback from event evaluations and growing our new creative team, which was initiated in
2014 to foster innovations and enhancements to our customer experience.
9
• Centerbrook Golf Course
Continue to focus on increasing the awareness of Centerbrook Golf and attempting to grow
the game locally, with concentration on youth, women, and new golfers.
• BC Liquor
Staff Development
o Continue GUEST model training with employees.
o Continue towards 100% of staff trained on Product Information Trainings (PIT’s).
Upkeep of stores
o New store #1 will be opening in spring of 2020.
o We will be adding Bottle Lox to store #2.
Respond to Customer Needs
o We will be upgrading our BC Buck rewards program to include outgoing
communication. We will begin collecting text numbers and e-mails to send out
digital coupons on customer birthdays, special occasions or if they have not
visited ours stores for awhile.
Inclusive Community Engagement
To provide effective and appropriate services, we must clearly understand and respond to
community needs. We will consistently seek input from a broad range of stakeholders from the
general public, non-profit, and for-profit sectors. Efforts to engage the community will be
transparent, responsive, deliberately inclusive, and culturally sensitive.
• Inclusive Community Engagement
Expand organizational capacity and reach into community in an effort to increase inclusive
community engagement. Over the past two years, the City has continued to build out the
City established the Division of Communication and Community Engagement, which
increased social media outreach strategies, volunteer opportunities, community dialogues,
community partnerships and media outreach endeavors. The City will enhance the use of
interpreters and translators to the diverse populace of the City.
The City also will enhance internal training and development of staff related to inclusion
and diversity in order to build greater capacity and competency with services to the diverse
populace of the City.
• Host a City Sponsored Event for the Community
Earle Brown Heritage Center will work with stakeholders, general public, and local business
to host a community experience.
• Align City Resources to Most Effectively Support Brooklyn Center Youth
We will align City resources, including financial, staff, facilities and equipment to most
equitably support Brooklyn Center youth.
10
Specific actions include:
o Co-lead, with the City of Brooklyn Park, the Brooklynk Internship Program.
o Identify and provide Brooklyn internship opportunities within Brooklyn Center
o Increase equitable access to programs and services
• Increase Opportunities for Police Officers to Engage the Community
Increase the opportunities for officers to engage the community and specifically the youth in
non-enforcement, positive, and informative ways, including but not limited to events such as:
coffee/ice cream with a cop, open gyms, local school educational talks (violence prevention,
drug awareness, and positive decision making). The police staff will continue to partner with
Junior Achievement programming for area elementary schools.
• General Community Outreach
Continue the operation of the new water treatment plant. This new community asset must
include a component of open and valuable community participation, outreach and education.
Safe, Secure, and Stable Community
For residents and visitors to fully appreciate and enjoy a great quality of life, it is essential that
all neighborhoods are safe, secure, and stable. We are committed to assuring compliance with
neighborhood conditions and building safety standards, providing proactive and responsive
public safety protection, wise stewardship of City resources and policies that promote safety,
security, and a lasting stable environment.
• Zoning Code Update
The desired outcome is to have regulations that support the vision of the community and
enhance the ability of property owners to improve and redevelop property in a way that
responds to market demands, is reasonable, and results in attractive, quality property that
enhances the community.
• Code Enforcement, Rental Licensing, and Building Inspections
Stabilize and improve residential neighborhoods. To achieve this outcome we will:
o Coordinate and inspect residential rental properties in accordance with city
code requirements;
o Monitor, inspect, and register vacant properties;
o Continue Code Enforcement activities with proactive inspections with the
focus on resolving ongoing and repeat violations;
o Review the Rental Licensing Program for improvements which will better
serve the goals of the program and enhance tenant protections;
o Implement new software to improve the management of code enforcement
cases and rental licenses to improve customer service and efficiency.
11
Ensure all buildings are designed, constructed and maintained in a safe and sound condition.
To achieve this outcome we will:
o Work with developers, architects, business owners and property owners to
ensure building plans indicate compliance with all residential and commercial
construction codes;
o Develop a system for delivering welcome and introductory information for
newly remodeled or constructed businesses that can also be used for business
retention strategies;
o Adopt the International Property Maintenance Code;
o Implement new software to improve permit processing efficiency and
customer service.
Provide effective communications and public education about neighborhood and community
initiatives. To achieve this outcome we will:
o Develop or revise educational materials for department programs and projects;
o Continue to review and improve letters and notices;
o Provide handouts and forms in multiple languages.
Provide accurate and timely information regarding property ownership and special
assessments. To achieve this outcome we will:
o Continue to update processes, systems and public information to provide
efficient and clear processing of homestead applications and ownership
documents.
• Safety
Increase the safety of the community by offering Home Safety Surveys, Hands Only CPR,
and installation of Smoke and Carbon Monoxide Detectors. Visit all elementary schools
during Fire Prevention Week and educate approximately 1250 school aged children on fire
safety. Continue Fire and Fall safety for older adults.
Recruitment of 5 additional paid on call firefighters.
• Continue to improve customer relationships and operational efficiency
In 2020 we will collaborate with Public Works and Information Technology on the
installation of gateways on City water tower’s to obtain fixed water utility meter reads. This
will provide real-time information to utility billing staff and quicker responses to customer
requests and questions.
Maintain a team of officers with a sergeant, whose primary focus is dedicated to constantly
monitor criminal activity and address it in a proactive manner. This team’s primary focus
will be the commercial districts, including Shingle Creek Crossing. New hotel licensing will
be coordinated and enforced by this team of officers. In 2020, hotel operators will be for the
first time held fully responsible for the safety and security of their properties.
Work to identify youth who have been exposed to domestic violence within their home in
addition to potential sex trafficking victims. Provide resources available to the victim such as
12
Cornerstone advocacy services. Continue to use Cornerhouse as an investigative resource for
youth victims and witnesses. Cornerhouse has enhanced services to provide for better family
self-care and healing. In 2020, initiate the Cities United model as a means to enhance
services offered to BC youth.
Review and enhance investigative resources regarding sexual assault investigations and
prosecutions. Insure we are using a best practices model and employing all resources
available both internally and externally to examine these crimes. Utilize best practices
Trauma Informed interview skills at all levels of investigations.
Continue to insure staff compliance with use of Body Worn Cameras (BWCs) alongside our
existing squad camera systems to create an enhanced environment of transparency and
increased investigative effectiveness. This will be done by audits for compliance of BWC
usage during complaint reviews and use of force incidents.
• Improve cost controls through improved analysis and reporting
We will improve and promote inclusive reviews of monthly departmental reporting and
annual budgeting with individual departments. We will implement a Central Garage Policy
to establish a sound business approach associated with the cost benefits of vehicles and
equipment and its capabilities, funding purchases through a “pay-as-you-go” methodology,
and making decisions on acquisition and replacement considering the level of usage and
demonstrated needs.
• Best practice reviews to identify better methods of efficiency improvement
We will continue to improve and implement equipment replacement tracking methodology.
A scoring methodology will be developed to assist fleet replacement decision making. This
methodology will be incorporated into the Central Garage Policy.
Key Transportation Investments
Proactively maintaining an efficient and effective infrastructure will meet the high level of
community expectations. We will plan for and invest in critical infrastructure improvements that
enhance safety, improve life quality, and support opportunities for redevelopment, while
sustaining the natural environment.
• Brooklyn Boulevard Corridor and TH 252
We will begin developing the Brooklyn Boulevard Corridor Phase 2 project (Bass Lake
Road to 65 th Avenue) for construction in 2021. We will also work with regional partners
and jurisdictions to develop an environmental study for the TH 252 conversion to a freeway
and MnPASS lanes on TH 252 and I-94. This project was selected for Corridors of
Commerce funding in 2018 ($163M) for start of construction in 2023.
• Critical Infrastructure Improvements
13
We will implement the 27 th year of the street and utility construction program by providing
the needed capital improvements, which increase value to the public infrastructure and
provide a catalyst towards other infrastructure improvements and value throughout
neighborhoods Citywide.
• Capital Improvement Funding Strategy
Implement a financial strategy that uses a combination of General Obligation Improvement
Bonds, Utility Revenue Bonds, and Utility Fund rate adjustments will be used to fund short
fallings in Capital Improvement funding.
General Fund Revenue Summary
The 2020 General Fund budgeted revenues total $23,793,989, which is an increase of $1,377,420
(6.14%) from 2019. Property tax revenue represents 75 percent of the General Fund budget.
The majority of the revenue increase is a result of increases in the general tax levy of $1,017,266,
building permit revenues of $225,000, local government aide of $167,631, excess tax revenues
of $150,000. These increases were partially offset by budgeted revenue reductions in the
reimbursement from the Community Development Block Grant of $150,000, charges for
services of $44,500, and special assessment revenue of $35,000.
14
General Fund Expense Summary
The 2020 General Fund budgeted expenditures total $23,793,989, which is an increase of
$1,377,420 (6.14%) from 2019. The 2020 Budget shows 40 percent of the General Fund
expenditures are for Police ($9,484,284). The remaining significant amounts include 20 percent
for General Government ($4,697,820), 18 percent for Public Works ($4,187,070) and 8 percent
for Community Activities, Recreation and Services ($1,886,524).
The 2020 General Fund Budget incorporates the following significant items:
• Personnel . Salaries and benefits represent 70 percent of the General fund expenditure
budget. Personnel includes:
o A three percent increase in employee base wages, resulting in an annual cost of
$357,167
o A 5.25 percent increase in the health insurance contribution, increase the annual
cost by $97,773.
o Addition of a full-time Associate Planner in the Community Development
department. The estimated annual cost of the position is $85,995.
o Inclusion of election judges for the election year, including an additional primary,
resulting in an increase of $69,990
o The conversion of a part-time Community Engagement Specialist to full-time.
The estimated annual net cost of this position is $55,449.
o The conversion of a part-time Human Resource Specialist to full-time. The
estimated annual net cost of this position is $50,542.
o The addition of a part-time Housing and Code Enforcement Inspector. The
estimated annual cost of this position is $35,347.
o Budgeted vacancy/turnover savings by of $350,000. This amount reflects a
budgeted expenditure reduction for open positions throughout the year.
• Allocation of $41,000 for the implementation of permitting and licensing software.
General
government
20% Police
40%
Fire
6%
Community
development
7%
Public works
18%
CARS
8% Non-
departmental
1%
15
• A $50,000 increase in the General Fund contingency to $175,000 for unanticipated
expenditures that may arise during the year.
Taxable Market Value
The City’s taxable market value is estimated at $2,301,278,201, which is an increase of
$240,504,413 (11.6%) from last year. For the 5th consecutive year the taxable market value has
increased.
Tax Capacity
The City levies a flat dollar for taxes which is spread amongst all taxable properties in proportion
to their percentage of the total tax capacity of the City. Residential represents 51.3% of the City’s
tax capacity. The comparison of this chart to last year shows that residential properties will pay
0.6% less of the share of total City property taxes in 2020, with commercial properties paying
about 0.3% more. This reverses the trend from the past couple of years where we saw residential
pick up a higher portion of city property taxes.
The total tax capacity of the City is estimated at $28,683,786 compared to $25,937,818 in 2019,
which is an increase of $2,745,968 (10.6%).
16
Property Tax Implications
The median value home last year had an estimated market value of $184,000 and a taxable
market value of $163,320. The price of that median value home went from $184,000 to
$198,000 with a taxable market value of $178,580. As a result of the market value increase, the
City (including HRA) property tax will increase by an estimated $59 from $1,174 to $1,233.
The chart shown above provides information on the median value home and City property taxes
paid since 2012. The red bar and amounts on the left axis represent the median value home. In
2013, that value was $119,800 which subsequently decreased to its lowest value in 2014 of
$114,200. The grey shaded area and the amounts on the right axis is the property tax amount
paid on that median value home.
17
Breakdown of Property Taxes
*Based on a Residential Property in School District #279
City taxes account for 39 percent of property taxes paid by homeowners living in Brooklyn
Center (based on the preliminary 2020 property tax levies). The remainder is comprised of taxes
for the School District of 31 percent and County of 25 percent.
The property tax paid by an individual property owner could be impacted because of several
different reasons including; a change in value of the property, a change in the relative proportion
of the property value to the total property value (shift in distribution of taxable market value to a
different property type), an increase in property taxes requested for operations of the City
General Fund activities and programs, and changes in the property tax needs of the County or
School District. Brooklyn Center has four different school districts all with different levies and
property tax implications.
18
2020 Cost of General Fund – Median Value Home
The chart shown above provides a cost breakdown of the property taxes paid by the median
value home (excludes Debt Service and Housing & Redevelopment Authority property taxes).
This chart provides an approximate tax dollar cost of the services provided by the City, but it
should be noted that it does not take into consideration any costs outside the General Fund or
reduce the cost for non-property tax funded expenses such as permit fees and charges for
services of the various departments. In 2020, the typical homeowner will pay approximately
$445 for police, $197 for public works, $166 for general government, $89 for community
recreation, $83 for community development activities, and $74 for fire and emergency
preparedness.
General
Government,
$166
Police, $445
Fire &
Emergency
Preparedness,
$74
Community
Development,
$83
Public Works,
$197
Community
Recreation, $89
Technology
Improvements,
$6
Golf Course, $4 Other, $54
19
2020 Capital Projects & Equipment Replacement
2019 Projects Cost
Grandview Park Area North Improvements $6,630,000
Shingle Creek Parkway Bridge Rehabilitation (2 Bridges) 240,000
Bass Lake Road at Xerxes Avenues Traffic Signal ADA Upgrades 60,000
Miscellaneous Retaining Wall Replacements 373,000
Brooklyn Blvd. City North Entrance Sign Rehab. 88,000
Park Playground Equipment Replacement 504,000
Lift Station No. 6 Rehabilitation 633,000
Water Tower No. 1 Painting 1,020,000
Well No. 5 Rehabilitation 124,000
Storm Water Pond 40 -001 Rehab. 260,000
Connections at Shingle Creek Phase 2 (Creek Stabilization Project) 406,000
Brine Equipment Project 125,000
CMB P: City Hall – Community Development Office Expansion 230,000
CMBP: Public Works – Carpet & Paint 60,000
CMBP: City Hall, Community Center, Fire, Police – Expansion Joint Caulking 76,000
Total: $10,829,800
The Capital Improvement Plan (CIP) is a planning document that presents a fifteen-year
overview of scheduled capital projects to address the City’s goals for maintaining public
infrastructure. The CIP includes a long-term financing plan that allows the City to allocate funds
for these projects based on assigned priorities. The City has a total of $10.8 million in
improvements budgeted for 2020, including the Grandview Park Area North Improvements,
Water Tower No. 1 Painting and Lift Station No. 6 Rehabilitation. Funding for these projects
come from a variety of different sources. The complete CIP can be found in the Capital
Improvement Program section in the back of this budget book.
The City compiles a rolling equipment replacement schedule for all City vehicles and equipment.
The Central Garage, reported as an internal service fund, administers the funding, replacement
schedule and disposal of equipment in the fleet. In 2020, the City is scheduled to replace
$756,000 in vehicles and equipment including street, parks, police, water, and economic
development vehicles. The largest planned purchases include replacement of a public work’s
dump truck of $188,000. The detailed listing of equipment scheduled for replacement in 2020
and 2021 is included in the Internal Service Fund section of this budget book.
Enterprise Funds
Enterprise Funds are those programs provided by the City which generate their own revenues for
operation and capital maintenance. The City operates the following three Enterprise Funds:
Brooklyn Center Liquor
The City operates two municipal retail liquor stores to provide for the controlled sale and
distribution of alcoholic beverages in the community. Profits from the operations are used to
fund projects benefitting the community and avoiding the necessity of larger property tax
20
levies for such projects. Since 2009, the Liquor Fund has transferred $1,654,781 to the Capital
Improvements Fund for building, park and trail projects throughout the community.
Earle Brown Heritage Center
The Earle Brown Heritage Center (EBHC) is comprised of the Convention Center with
Administrative Services, Catering Services and Commercial Office Rentals. These Divisions
provide for the provision of maintenance, conference services, custodial functions,
development, preparing, equipment servicing, and serving of food and beverage for events at
Earle Brown Heritage Center.
The EBHC has a management agreement with Flik International to provide food and beverage
services for its facilities. The EBHC is also responsible for the maintenance of buildings and
grounds of the commercial office spaces for two tenants.
Public Utility Funds
The Public Utility Funds track revenues and expenditures for fee based public utility services
provided by the City. These funds operate on their own ability to generate revenues and receive
no property tax support. Each year the City Council reviews the operations of these funds and
sets rates based on the needs for operations, capital spending and debt service payments. The
City operates the following five Public Utility Funds:
Water Fund
The City has approximately 121 miles of water main, over 1,300 water valves and 1,000 fire
hydrants providing service to over 7,000 single-family residential connections and
approximately 1,600 apartment/commercial/industrial customers.
The budget includes a rate increase for the Water Utility which consists of base and
consumption charges. The City currently has a quarterly base charge of $15.52 per residential
and commercial irrigation meter. In addition to this base charge, the City charges a
consumption charge of $2.59 per 1,000 gallons (up to 30,000 gallons per quarter). The
proposed 2020 rates will increase to $16.61 per residential meter and $2.77 per 1,000 gallons,
which is an increase of $1.09 per quarter in base charges and $0.18 in the consumption
charge per 1,000 gallons.
Multi-family, commercial and industrial properties currently pay a quarterly base charge
depending on the size of the meter and a consumption rate of $3.42 per 1,000 gallons. The
amount billed at any particular property depends on the size of the meter connection and the
amount of water consumed. The water charge for the quarterly utility bill for a household
using 18,000 gallons of water (considered the typical residential user) for 2020 will be $3.66
per quarter.
Sanitary Sewer Fund
21
The City provides for the collection and conveyance of wastewater through a system of mains
and lift stations. Sewage is treated by the Metropolitan Council Environmental Services,
whose contracted services account for approximately 75 percent of the fund’s operating
expenditures.
The City currently charges a quarterly base charge of $84.89, which is proposed to increase
to $89.14 in 2020. Rates are predominantly driven by the replacement cost of sanitary sewer
infrastructure related to the neighborhood reconstruction projects and changes to the rates the
Metropolitan Council charges the City.
Storm Sewer Fund
The City provides for the collection and management of storm water throughout the City in
compliance with State and Federal regulatory requirements. The Storm Drainage Utility
operates and maintains approximately 84 miles of storm sewers and nearly 100 storm water
management ponds or treatment devices.
The City currently charges a residential customer $15.07 per quarter in 2019, which is
proposed to increase to $15.52 in 2020 (an increase of $0.45 per quarter).
Rate Comparison (Water/Sewer/Storm Sewer)
The City annually compares its utility rates to nine other cities that are considered to be
similar to Brooklyn Center. Not all of the comparison cities operate a recycling or a street
light utility, however eight of the comparison cities provide water, sewer and storm sewer
utilities (White Bear Lake does not provide a storm water utility). The rates shown in the
following table are for the comparison cities are their 2019 rates. At the time this chart was
compiled their 2020 rates were unknown. The rates were used to calculate the typical
residential quarterly bill.
The results of that comparison show Brooklyn Center remains among the lower providers .
The City’s 2020 bill for these services of $171.13 compares favorably to average of $206.42.
22
*White Bear Lake does not operate a storm water utility
Street Lighting Fund
The City provides electrical service, maintenance, repair and replacement of lights owned by
the City. The City owns approximately 71 ornamental lights, primarily in the Earle Brown
commercial area, 85 ornamental lights on Brooklyn Boulevard, 40 ornamental lights along
Xerxes Avenue, 72 ornamental lights along Bass Lake Rd and 57th Avenue and leases
approximately 915 lights from Xcel Energy. Another 97 lights owned by the City are located
on traffic signal systems.
There will be no changes to the current Street Lighting fees. The current fee for residential is
$6.55 per quarter. The current fees are sufficient to cover costs and meet fund balance targets
for the near term future.
Recycling Fund
The Hennepin Recycling Group (HRG) is a joint powers organization consisting of the cities
of Brooklyn Center, Crystal and New Hope. The HRG is responsible for managing a
comprehensive recycling and waste education system for the residents of these cities.
Residents pay a Recycling Service fee on their utility bill for curbside recycling, biennial
(Spring 2021 curbside pick-up of large and bulky items, the use of a yard waste and tree
branch drop off site, and proper waste management and special material education and
services.
The City currently charges a quarterly base charge of $11.98, which will remain unchanged
for 2020.
Housing and Redevelopment Authority
23
The proposed Housing and Redevelopment Authority (HRA) levy for 2020 is $405,069, which is
an increase of $24,971 from 2019. State law authorizes the HRA to establish an operating levy
of up to 0.01813% of the taxable market value within the jurisdiction to carry out the purposes of
the Authority. In Brooklyn Center after forming an HRA, the City established an Economic
Development Authority (EDA) that assumed and expanded the HRA responsibilities into the
areas of economic development. The HRA levy is the primary source of funding for EDA
activities.
C ouncil Special Meeng
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:Res olu,on A pproving F inal Tax Capacity Levies for the G eneral F und and D ebt S ervice
F unds and Market Value Tax Levy for the H ousing and Redevelopment A uthority for
P roperty Taxes Payable in 2020
B ackground:
AT TA C H M E N TS :
D escrip,on U pload D ate Type
Res olu,on 2020 11/27/2019 Resolu,on Le7er
Member introduced the following resolution and
moved its adoption:
RESOLUTION NO.
RESOLUTION APPROVING FINAL TAX CAPACITY LEVIES FOR
THE GENERAL FUND AND DEBT SERVICE FUNDS AND A
MARKET VALUE TAX LEVY FOR THE HOUSING AND
REDEVELOPMENT AUTHORITY FOR PROPERTY TAXES
PAYABLE IN 2020
WHEREAS, the City Council of the City of Brooklyn Center is the
governing body of the City of Brooklyn Center; and
WHEREAS, Minnesota Statutes require that the final property tax levy be
provided to the Hennepin County Auditor no later than December 30, 2019.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City
of Brooklyn Center, Minnesota that a tax is hereby levied on all taxable real and personal
property within the City of Brooklyn Center for the purpose and sums as follows:
General Fund – Tax Capacity Based
General Operations Levy $17,957,263
Tax Abatement Levy 95,000
Subtotal Tax Capacity Levies $18,052,263
Debt Service – Tax Capacity Based
Public Improvement Bond Levy $1,457,047
Total City Levy $19,509,310
Housing and Redevelopment Authority – Market Value Based
HRA Tax Levy $405,069
December 2, 2019
Date Mayor
ATTEST:
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
C ouncil Special Meeng
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:Res olu,on A dop,ng the 2020 A nnual C ity Budget
B ackground:
S trategic Priories and Values:
Enhanced Community I mage, Resident Economic S tability, I nclusive C ommunity Engagement, Targeted
Redevelopment, S afe, S ecure, S table Community, Key Transporta,on I nvestments
AT TA C H M E N TS :
D escrip,on U pload D ate Type
Res olu,on 2020 11/27/2019 Resolu,on Le4er
Member introduced the following resolution and
moved its adoption:
RESOLUTION NO.
RESOLUTION ADOPTING THE 2020 ANNUAL CITY BUDGET
WHEREAS, the City Council of the City of Brooklyn Center is required by City
Charter and State Statute to annually adopt a budget; and
WHEREAS, the City Council has reviewed the proposed governmental and
enterprise fund budgets and has determined the budget is adequate to fund all City operations in
2020.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center that revenues and appropriations authorized for 2020 shall be:
General Fund
Revenues and Other Sources
Property Taxes $17,967,857
Excess Tax Increment 40 0,000
Lodging Tax (Gross Receipts) 1,180,000
Licenses and Permits 1,075,001
Local Government Aid 1,059,416
Other Intergovernmental Revenues 754,365
Charges for Services 790,150
Fines and Forfeits 246,500
Miscellaneous Revenue 270,700
Special Assessments 50 ,000
Total General Fund Revenues $23,793,989
Appropriations and Other Uses
General Government $3,757,881
General Government Buildings 939,939
Police 9,484,284
Fire & Emergency Preparedness 1,568,294
Community Development 1,759,523
Public Works 4,187,070
Community Activities, Recreation &
Services
1,886,524
Convention and Tourism 562,900
Joint Powers 187,000
Risk Management 260,528
Central Services and Supplies 488,200
Vacancy and Turnover Savings (350,000)
Reimbursement from Other Funds (1,148,154)
Transfer Out -Miscellaneous 210,000
Total General Fund Appropriations $ 23,793,989
Special Revenue Funds
Revenues and Other Sources
Economic Development Authority $496,145
Housing and Redevelopment Authority 405,069
Community Development Block Grant 150,000
Police Forfeitures 14,057
TIF District #2 112,799
TIF District #3 6,268,031
TIF District #4 343,657
TIF District #5 477,145
TIF District #6 194,731
City Initiatives Grant Fund 231,209
Centerbrook Golf Course 326,250
Total Special Revenue Funds $ 9,019,093
Appropriations and Other Uses
Economic Development Authority $475,088
Housing and Redevelopment Authority 405,069
Community Development Block Grant 150 ,000
Police Forfeitures 13,000
TIF District #2 100,00 0
TIF District #3 3,076,727
TIF District #4 287,502
TIF District #5 625,727
TIF District # 6 199,731
City Initiatives Grant Fund 193,305
Centerbrook Golf Course 301,550
Total Special Revenue Funds $ 5,827,699
Debt Service Funds
Revenues and Other Sources
2013A GO TIF Bonds $477,063
2013B GO Improvement Bonds 567,343
2015A GO Improvement Bonds 381,593
2015B GO TIF Bonds 1,757,450
2016A GO Improvement Bonds 216,550
2016B GO TIF Bonds 48,325
2016C GO TIF Bonds 308,508
2017A GO Improvement Bonds 414,765
2018A GO Improvement Bonds 476,257
2019A GO Improvement Bonds 416,325
2019B Lease Revenue Bonds 75,924
Total Debt Service Funds $ 5,140,103
Appropriations and other Uses
2013A GO Improvement Bonds $477,063
2013B GO Improvement Bonds 589,375
2015A GO Improvement Bonds 386,846
2015B GO TIF Bonds 1,757,450
2016A GO Improvement Bonds 204,650
2016B GO TIF Bonds 48,325
2016C GO TIF Bonds 308,508
2017A GO Improvement Bonds 442,338
2018A GO Improvement Bonds 504,725
2019A GO Improvement Bonds 143,101
2019B Lease Revenue Bonds 75,924
Total Debt Service Funds $4,938,305
Capital Project Funds
Revenues and Other Sources
Capital Improvements Fund $1,276,936
Municipal State Aid (MSA) Fund 1,309,314
Capital Reserve Emergency 15,919
Special Assessments Construction Fund 764,229
Street Reconstruction Fund 2,805,058
Earle Brown Heritage Center Capital Fund 337,010
Technology Fund 130,521
Total Capital Project Funds $6,638,987
Appropriations and Other Uses
Capital Improvements Fund $1 ,331,800
Municipal State Aid (MSA) Fund 220,000
Capital Reserve Emergency -
Special Assessments Construction Fund 1,042,300
Street Reconstruction Fund 2,350,000
Earle Brown Heritage Center Capital Fund 750,000
Technology Fund 346,700
Total Capital Project Funds $6,040,800
Enterprise Funds
Revenues and Other Sources
Brooklyn Center Liquor $7,473,738
Earle Brown Heritage Center 5,762,427
Total Enterprise Funds $13,236,165
Appropriations and Other Uses
Brooklyn Center Liquor $7,475,956
Earle Brown Heritage Center 5,943,699
Total Enterprise Funds $13,419,655
Public Utility Funds
Revenues and Other Sources
Water Fund $6,419,892
Sewer Fund 5,798,118
Storm Sewer Fund 2,173,338
Street Lighting Fund 473,098
Recycling Fund 522,111
Total Public Utility Funds $ 15,386,557
Appropriations and Other Uses
Water Fund $ 8,004,413
Sewer Fund 6,706,440
Storm Sewer Fund 4,501,646
Street Lighting Fund 382,178
Recycling Fund 511,080
Total Public Utility Funds $20,105,757
Internal Service Funds
Revenues and Other Sources
Central Garage Fund $1,965,475
Total Internal Service Funds $1,965,475
Appropriations and Other Uses
Central Garage Fund (w/ Depreciation) $2,866,728
Total Internal Service Funds $2,866,728
December 2, 2019
Date Mayor
ATTEST:
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
C ouncil Special Meeng
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:Res olu,on A pproving the 2020-2034 C apital I mprovement P lan and A dop,ng the 2020
C apital P rogram
B ackground:
AT TA C H M E N TS :
D escrip,on U pload D ate Type
Res olu,on 2020 11/27/2019 Resolu,on Le5er
C I P P lan F inal 11/27/2019 Backup M aterial
Member introduced the following resolution and
moved its adoption:
RESOLUTION NO. ______________
RESOLUTION APPROVING THE 2020-2034 CAPITAL
IMPROVEMENT PLAN AND ADOPTING THE 2020 CAPITAL PROGRAM
WHEREAS, the City Council of the City of Brooklyn Center determined it is
fiscally responsible and necessary to develop an infrastructure plan that coordinates the long-
range municipal needs; and
WHEREAS, the City Council reviewed and discussed the proposed 2020-2034
Capital Improvement Plan together with the Financial Commission on July 15, 2019; and
WHEREAS, the City Council of the City of Brooklyn Center annually adopts a
Capital Improvements Program following review and discussion by the City Council; and
WHEREAS, attached hereto and incorporated herein by reference as Exhibit A is
the documentation for the above referenced 2020-2034 Capital Improvement Plan: and
WHERAS, the City Council of the City of Brooklyn Center authorizes the 2020
Program be included in the 2020 Annual City Budget.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Brooklyn Center that the 2020-2034 Capital Improvement Plan as set forth in Exhibit A to this
Resolution be and hereby is adopted.
December 2, 2019
Date Mayor
ATTEST:
City Clerk
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
2020-2034 Capital Improvement Program Page | 1
City of Brooklyn Center
2020 CAPITAL IMPROVEMENT PROGRAM
PROFILE
The 2020-34 Capital Improvement Plan (CIP) is a planning document that presents a fifteen-year overview of
scheduled capital projects to address the City’s goals for maintaining public infrastructure. The CIP includes a
long-term financing plan that allows the City to allocate funds for these projects based on assigned priorities.
The fifteen-year horizon of the CIP provides the City with an opportunity to evaluate project priorities
annually and to adjust the timing, scope and cost of projects as new information becomes available. The
information contained in this plan represents an estimate of improvement costs based on present knowledge
and expected conditions. Changes in community priorities, infrastructure condition and inflation rates require
that adjustments be made on a routine basis.
A capital improvement is defined as a major non-recurring expenditure related to the City’s physical facilities
and grounds. The 2020-2034 CIP makes a concerted effort to distinguish between major maintenance projects
contained in the City’s operating budgets and capital improvement projects financed through the City’s capital
funds and proprietary funds. Typical expenditures include the cost to construct roads, utilities, parks, or
municipal structures.
The CIP is predicated on the goals and policies established by the City Council, including the general
development, redevelopment and maintenance policies that are part of the City’s Comprehensive Plan. A
primary objective of the CIP is to identify projects that further these goals and policies in a manner consistent
with funding opportunities and in coordination with other improvement projects.
CIP Project Types
The CIP proposes capital expenditures totaling approximately $192.66 million over the next 15 years for
improvements to the City’s streets, parks, public utilities and municipal buildings. A brief description of the
four functional areas is provided below.
Public Utilities
The City operates four utility systems, all of which have projects included in the CIP - water, sanitary sewer,
storm drainage and street lighting. A vast majority of the public utility improvements are constructed in
conjunction with street reconstruction projects. The remaining portion of public utilities projects include
improvements to water supply wells, water towers, lift stations, force mains and storm water treatment system.
Street Improvements
Street improvements include reconstruction or resurfacing of neighborhood (local), collector and arterial
streets. Proposed improvements include the installation or reconstruction of curb and gutter along public
roadways. As noted earlier, street improvements are often accompanied by replacement of public utilities.
Park Improvements
Park improvements include the construction of trails, shelters, playground equipment, athletic field lighting
and other facilities that enhance general park appearance and increase park usage by providing recreational
facilities that meet community needs.
2020-2034 Capital Improvement Program Page | 2
Capital Maintenance Building Improvements
Capital maintenance building improvements include short and long term building and facility improvements
identified in the 18-year Capital Maintenance Building Program approved in 2007.
CIP Funding Sources
Capital expenditures by funding source for the fifteen-year period are shown in Table 1 and Figure 1. Major
funding sources are described below.
Public Utility Funds
Customers are billed for services provided by the City’s water, sanitary sewer, storm sewer and street lighting
public utilities. Fees charged to customers are based on operating requirements and capital needs to ensure that
equipment and facilities are replaced to maintain basic utility services. Annually the City Council evaluates the
needs of each public utility system and establishes rates for each system to meet those needs.
Special Assessments
Properties benefiting from street and storm sewer improvements are assessed a portion of the project costs in
accordance with the City’s Special Assessment Policy. Every year the City Council establishes special
assessment rates for projects occurring the following year. Rates are typically adjusted annually to maintain the
relative proportion of special assessments to other funding sources.
Street Reconstruction Fund
The Street Reconstruction Fund provides for the cost of local street improvements along roadways that are not
designated as Municipal State Aid (MSA) routes. The revenue for this fund is generated from franchise fees
charged for the use of public right-of-way by natural gas and electric utility companies. Debt was issued in
2018 to supplement this fund and is expected to again be issued in 2019 and future years to maintain the
current reconstruction plan.
MSA Fund
State-shared gas taxes provide funding for street improvements and related costs for those roadways identified
as MSA streets. The City has 21 miles of roadway identified as MSA streets and is therefore eligible to receive
funding based on this designation. The annual amount available in 2020 is estimated to be $1,357,000 and
provides for maintenance and construction activities within the City’s MSA street system.
Capital Projects Funds
The City Council adopted a Capital Project Funding Policy in January 2014 (amended July 8, 2019), to provide
reoccurring sources of funding for the City’s Capital Projects Funds. The Policy specifically identifies three
main funding sources including: audited year-end General Fund unassigned fund balance above 52 percent of
the next year’s General Fund operating budget; audited year-end Liquor Fund unrestricted cash balance that
exceeds two months of the next year’s operating budget and one year of budgeted capital equipment needs; and
Local Governmental Aid (LGA) received in the amount of $650,000 or half of the amount received by the City
(whichever is greater). Other funding sources in this category include grants, park district funding, watershed
funding, federal and state funding and county funding as determined on a project by project basis. Typically
the City Council has directed these funds towards municipal facilities such as parks, trails, public buildings and
other general purpose needs.
2020-2034 Capital Improvement Program Page | 3
TABLE 1. 2020-2034 Capital Improvement Plan - Summary by Funding Source
FIGURE 1. 2020-2034 Capital Improvement Plan – Overview of Project and Funding Sources
Water Utility,
12%
Sanitary Sewer,
10%
Storm Drainage,
10%
Street
Light, 1%
MSA, 7%
Street
Reconstruction,
16%
Capital Projects,
34%
Special
Assessments,
10%
Capital Improvement Plan by Funding Source
Total Funding
Need 15-yr
Average Annual
Funding Need
Percent of
Total Need
Water Utility $23,559,000 $1,570,600 12%
Sanitary Sewer Utility $19,806,000 $1,320,400 10%
Storm Drainage Utility $18,540,000 $1,236,000 10%
Street Lighting Utility $1,963,000 $130,867 1%
Municipal State Aid $12,750,000 $850,000 7%
Street Reconstruction Fund $30,942,000 $2,062,800 16%
Capital Projects Fund $66,376,700 $4,425,113 34%
Special Assessment Collections $18,720,000 $1,248,000 10%
TOTAL $192,656,700 $12,843,780 100%
!
!
!
!
!
! ! ! ! ! !
!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! ! !
!
!
!
!
!!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
! !
!
!
!
IN
T
E
R
S
T
A
T
E
9
4
HIGH
W
A
Y
1
0
0
69TH AVE N
DU
P
O
N
T
A
V
E
N
63RD AVE N
73RD AVE N
H
I
G
H
W
A
Y
2
5
2
INTER
S
T
A
T
E
6
9
4
55TH AVE N
J
U
N
E
A
V
E
N
R
I
V
E
R
R
D
W
B
E
A
R
D
A
V
E
N
59TH AVE N
FREEWAY BLVD
SHINGLE CREEK PKWY
65TH AVE N
H
U
M
B
O
L
D
T
A
V
E
N
B
R
O
O
K
L
Y
N
B
L
V
D
KN
O
X
A
V
E
N
61ST AVE N
IR
V
I
N
G
A
V
E
N
64TH AVE N
XE
R
X
E
S
A
V
E
N
U
N
I
T
Y
A
V
E
N
60TH AVE N
AL
L
E
Y
GI
R
A
R
D
A
V
E
N
HOWE LA
LO
G
A
N
A
V
E
N
L I L A C D R N
O
L
I
V
E
R
A
V
E
N
BR
Y
A
N
T
A
V
E
N
W I L L O W L N
GR
I
M
E
S
A
V
E
N
FR
A
N
C
E
A
V
E
N
L
Y
N
D
A
L
E
A
V
E
N
DA
L
L
A
S
R
D
NE
W
T
O
N
A
V
E
N
53RD AVE N
T W I N L A K E B L V D E
ERICON DR
CA
M
D
E
N
A
V
E
N
P
E
R
R
Y
A
V
E
N
49TH AVE N
K
Y
L
E
A
V
E
N
BRO
O
K
L
Y
N
D
R
MUMFORDRD
52ND AVE N
NASH RD
JANET LN
58TH AVE N
JOYCE LN
S U M
M I T
D R
N
C
O
L
F
A
X
A
V
E
N
72NDAVEN
NORT
H
W
A
Y
D
R
66TH AVE N
AMY LN
P A L M E R L A K E D R W
AL
D
R
I
C
H
A
V
E
N
L
E
E
A
V
E
N
4
T
H
S
T
N
N
O
B
L
E
A
V
E
N
H A L I F A X
P L
JO
H
N
M
A
R
TI
N
D
R
FR
E
M
O
N
T
A
V
E
N
67TH AV
E
N
53RD PL N
62ND AVE N
48TH AVE N
WOODBINE LN
70TH AVE N
YO
R
K
A
V
E
N
H A L I F A X A V E N
WINCHESTER LN
EW
I
N
G
A
V
E
N
B R O O K V I E W D R
QUARLESRD
OHENRY RD
VIOLET
A
V
E
N
THURBER R
D
J U D Y L N
E A R L E B ROWN DR
WOODBINELN N
A D M I R A L L N
ZE
N
I
T
H
A
V
E
N
S
C
O
T
T
A
V
E
N
R I
V E R D A L E
R D
JA
M
E
S
A
V
E
N
47TH AVE N
OAK ST N
DR
E
W
A
V
E
N
P E A R S O N
D R
ELEANOR LN
N
O
R
T
H
P
O
R
T
D
R
AB
B
O
T
T
A
V
E
N
50TH AVE N
MO
R
G
A
N
A
V
E
N
6 3 R D L N N
51 S T AVE N
POE R
D
68TH A VE N
H A L I F A X D R
S
A
I
L
O
R
L
N
QU
E
E
N
A
V
E
N
Q
U
A
I
L
A
V
E
N
IRVING LN N
O
R
C
H
A
R
D
A
V
E
N
T
O
L
E
D
O
A
V
E
N
BELLVUE LN N
5
T
H
S
T
N
FRAN CEPL
PAUL DR
A
Z
E
L
I
A
A
V
E
N
RU
S
S
E
L
L
A
V
E
N
W I N G A R D P L
VI
N
C
E
N
T
A
V
E
N
56TH AVE N B
R
O
O
K
L
Y
N
B
L
V
D
L
N
M A R LI N D R
SH
O
R
E
S
D
R
R
E
G
E
N
T
A
V
E
N
IN
D
I
A
N
A
A
V
E
N
57TH AVE N
B ASS LAK E RD
BOULDER LN
WA
S
H
B
U
R
N
A
V
E
N
E
M
E
R
S
O
N
A
V
E
N
54TH AV E N
T
W
I
N
L
A
K
E
A
V
E
ECKBERG DR
A
D
MIRAL LN N
P
E
N
N
A
VEN
BURQUEST LN
LAKE BREEZEAV
E
72N
D
C
I
R
N
LA
K
E
V
I
E
W
A
V
E
N
URBAN A V E N
C
H
O
W
E
N
A
V
E
N
LAKESIDE AVE N
LAWRE N C E R D
OHENRY RD N
71ST AVE N
COMMODORE DR
P
A
R
K
WAY CI R
F
R
E
M
O
N
T
P
L
N
M
A
J
O
R
A
V
E
N
67TH L
A
N
WOODBINE LA N
71ST CI
R
N
AL
D
R
I
C
H
D
R
N
P O N D S D R N
G
R
E
A
T
V
I
E
W
A
V
E
W I N G A R D LA
K A T H E R I N E D R
70TH CIR
N
Q
U
A
ILCIR
W
UP
T
O
N
A
V
E
N
N
O
P
R
T
H
P
O
R
T
D
R
68TH LA N
69T
H
L
A
N
58 1/2 AVE N
I
R
V
I
N
G
P
L
HOWE LN
58TH PL N
PERRY CT E
EMERSON LN N
V
E
R
A
C
R
U
Z
A
V
E
N
69THAVE N
DU
P
O
N
T
A
V
E
N
VI
N
C
E
N
T
A
V
E
N
B A S S LAK E RD
H I G H W A Y 1 0 0
H
I
G
H
W
A
Y
2
5
2
C
O
L
F
A
X
A
V
E
N
LY
N
D
A
L
E
A
V
E
N
55TH AVE N
CO
L
F
A
X
A
V
E
N
6 6 T H AVEN
C
H
O
W
E
N
A
V
E
N
XE
R
X
E
S
A
V
E
N
LILA
C
D
R
N
67TH AVE N
MA
J
O
R
A
V
E
N
54TH AVE N
WINCHESTER LN
GI
R
A
R
D
A
V
E
N
EM
E
R
S
O
N
A
V
E
N
F
R
A
N
C
E
A
V
E
N
CA
M
D
E
N
A
V
E
N
61ST AVE N
AB
B
O
T
T
A
V
E
N
FR
E
M
O
N
T
A
V
E
N
F
R
E
M
O
N
T
A
V
E
N
XE
R
X
E
S
A
V
E
N
HU
M
B
O
L
D
T
A
V
E
N
71ST AVE N
64TH AVE N
72ND AVE N
EM
E
R
S
O
N
A
V
E
N
56TH AVE N
E
W
I
N
G
A
V
E
N
P
E
R
R
Y
A
V
E
N
BRY
A
N
T
A
V
E
N
72ND AVE N
LILAC DR N
62ND AVE N
AL
L
E
Y
AL
L
E
Y
63RD AVE N
MO
R
G
A
N
A
V
E
N
P
E
R
R
Y
A
V
E
N
A
L
D
R
I
C
H
A
V
E
N
68TH AVE N
GI
R
A
R
D
A
V
E
N
70TH AVE N
QU
A
I
L
A
V
E
N
CA
M
D
E
N
A
V
E
N
56TH AVE N
AL
L
E
Y
AL
L
E
Y
FR
A
N
C
E
A
V
E
N
51ST AVE N
WOODBINE LN
50TH AVE N
65TH AVE N
NE
W
T
O
N
A
V
E
N
67TH AVE N
MA
J
O
R
A
V
E
N
T
O
L
E
D
O
A
V
E
N
M
O
R
G
A
N
A
V
E
N
62ND AVE N
64TH AVE N
LILA
C
D
R
N
AL
L
E
Y
66TH AVE N
AL
L
E
Y
Z
E
N
I
T
H
A
V
E
N
ADMIRAL LN N
IR
V
I
N
G
A
V
E
N
B
R
O
O
K
L
Y
N
B
L
V
D
HIG
H
W
A
Y
1
0
0
68TH AVE N
WOODBINE LA N
S
C
O
T
T
A
V
E
N
66TH AVE N
HA
L
I
F
A
X
A
V
E
N
X
E
R
X
E
S
A
V
E
N
57TH AVE N
B
R
Y
A
N
T
A
V
E
N
C
A
M
D
E
N
A
V
E
N
LILA
C
D
R
N
F
R
A
N
C
E
A
V
E
N
69TH AVE N
N
O
B
L
E
A
V
E
N
68TH AV
E
N
70TH AVE N
HIG
H
W
A
Y
1
0
0
AL
L
E
Y
55TH AVE N
PE
N
N
A
V
E
N
AD
M
I
R
A
L
L
N
N
LE
E
A
V
E
N
6 5 T H A V E N
H
I
G
H
W
A
Y
2
5
2
70TH AVE N
XE
R
X
E
S
A
V
E
N
B
E
A
R
D
A
V
E
N
B
E
A
R
D
A
V
E
N
LILAC DR
N
67TH AVE N
M
A
J
O
R
A
V
E
N
71ST AVE N
71ST AVE N
G
R
I
M
E
S
A
V
E
N
E
W
I
N
G
A
V
E
N
67TH AVE N
OL
I
V
E
R
A
V
E
N
59TH AVE N
AL
D
R
I
C
H
A
V
E
N
BEA
R
D
A
V
E
N
Q
U
A
I
L
A
V
E
N
LO
G
A
N
A
V
E
N
J
A
M
E
S
A
V
E
N
73RD AVE N
SH
I
N
G
L
E
C
R
E
E
K
P
K
W
Y
58TH AVE N
I
N
T
E
R
S
T
A
T
E
9
4
53RD AVE N
D
R
E
W
A
V
E
N
JA
M
E
S
A
V
E
N
61ST AVE N
70TH AVE N
72ND AVE N
LE
E
A
V
E
N
IR
V
I
N
G
A
V
E
N
WI
L
L
O
W
L
N
EW
I
N
G
A
V
E
N
51ST AVE N
GI
R
A
R
D
A
V
E
N
JU
N
E
A
V
E
N
62ND AVE N
TO
L
E
D
O
A
V
E
N
70TH AVE N
XE
R
X
E
S
A
V
E
N
67TH AVE N
65TH AVE N
NO
B
L
E
A
V
E
N
CO
L
F
A
X
A
V
E
N
C
A
M
D
E
N
A
V
E
N
B
R
Y
A
N
T
A
V
E
N
CO
L
F
A
X
A
V
E
N
AL
L
E
Y
F
R
A
N
C
E
A
V
E
N
S
C
O
T
T
A
V
E
N
K
Y
L
E
A
V
E
N
INTERSTATE 694
56TH AVE N
J
U
N
E
A
V
E
N
L
E
E
A
V
E
N
LILA
C
D
R
N
O
R
C
H
A
R
D
A
V
E
N
ZE
N
I
T
H
A
V
E
N
AL
L
E
Y
N
O
B
L
E
A
V
E
N
71ST AVE
N
66TH AVE N
OHENRY RD
RE
G
E
N
T
A
V
E
N
KN
O
X
A
V
E
N
70TH AVE N
HA
L
I
F
A
X
A
V
E
N
Q
U
A
I
L
A
V
E
N
G
I
R
A
R
D
A
V
E
N
60TH AVE N
INTERSTATE 94
56TH AVE N
X
E
R
X
E
S
A
V
E
N
R
E
G
E
N
T
A
V
E
N
AL
L
E
Y
F
R
A
N
C
E
A
V
E
N
E
W
I
N
G
A
V
E
N
61ST AVE N
53RD AVE N
KY
L
E
A
V
E
N
DR
E
W
A
V
E
N
CA
M
D
E
N
A
V
E
N
O R C H A R D A V E N
65TH AVE N
AL
L
E
Y
W
I
L
L
O
W
L
N
6 6 T H A V E N
MO
R
G
A
N
A
V
E
N
AL
L
E
Y
67TH AVE N
BR
Y
A
N
T
A
V
E
N
PE
R
R
Y
A
V
E
N
D
R
E
W
A
V
E
N
KN
O
X
A
V
E
N
EM
E
R
S
O
N
A
V
E
N
CIP PROJECT AREAS2020 - 2027
November 2019
Full Depth Pavement Replacement Projects
Lyndale Ave - 2021
Knox, James & 54th Ave - 2023
51st Ave (west of France) - 2023
Humboldt Ave - 2024
Orchard Lane West - 2025
53rd and Xerxes - 2025
Meadowlark Gardens - 2026
Earle Brown Drive - 2027Completed Construction (99.1 Miles - 93.6% since 1993)
Reconstruction Projects
Grandview Park North - 2020
Grandview Park South - 2021
Humboldt Ave (CR 57 - 53rd to 57th) - 2021
Ryan Lake Industrial Park - 2021
Brooklyn Boulevard Phase 2 - 2021
Woodbine Area - 2022
TH 252/66th Interchange - 2022
53rd Ave (Penn to Lyndale) - 2023
50th Ave (France to Drew) - 2023
Orchard Lane East - 2024
69th Ave (CSAH 130 - Unity to Brooklyn Blvd) - 2025Mill and Overlay
! ! !Northwest Area - 2021
! ! !67th and James Area - 2026
! ! !68th and Lee Area - 2026
! ! !John Martin Drive - 2026
! ! !St Alphonses Area - 2026
! ! !Humboldt Ave (65th to 69th) - 2026
! ! !65th/66th and Camden - 2027
! ! !73rd Ave (Humboldt to Camden) - 2027
!!!!
!
!
!
!
!
!
! !
!!
!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!!
!
!
!!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!!!
!
!!
!
!
!
!!
!
!
! !
!
!
!!
!
!
!
!
!
!
!!
!!!!!
!
!
!!!!
!
!
!!!
!
!
!
!
!
!
!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!!
!!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!!!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!
!
!
!
!
!
!
! ! ! ! ! !
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!!!
!
!
!
!
!!
!
!!!
!
!
!
!
!
!!!!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
IN
T
E
R
S
T
A
T
E
9
4
HIGH
W
A
Y
1
0
0
69TH AVE N
DU
P
O
N
T
A
V
E
N
63RD AVE N
73RD AVE N
H
I
G
H
W
A
Y
2
5
2
INTER
S
T
A
T
E
6
9
4
55TH AVE N
J
U
N
E
A
V
E
N
R
I
V
E
R
R
D
W
B
E
A
R
D
A
V
E
N
59TH AVE N
FREEWAY BLVD
SHINGLE CREEK PKWY
65TH AVE N
H
U
M
B
O
L
D
T
A
V
E
N
B
R
O
O
K
L
Y
N
B
L
V
D
KN
O
X
A
V
E
N
61ST AVE N
IR
V
I
N
G
A
V
E
N
64TH AVE N
XE
R
X
E
S
A
V
E
N
U
N
I
T
Y
A
V
E
N
60TH AVE N
AL
L
E
Y
GI
R
A
R
D
A
V
E
N
HOWE LA
LO
G
A
N
A
V
E
N
L I L A C D R N
O
L
I
V
E
R
A
V
E
N
BR
Y
A
N
T
A
V
E
N
W I L L O W L N
GR
I
M
E
S
A
V
E
N
FR
A
N
C
E
A
V
E
N
L
Y
N
D
A
L
E
A
V
E
N
DA
L
L
A
S
R
D
NE
W
T
O
N
A
V
E
N
53RD AVE N
T W I N L A K E B L V D E
ERICON DR
CA
M
D
E
N
A
V
E
N
P
E
R
R
Y
A
V
E
N
49TH AVE N
K
Y
L
E
A
V
E
N
BRO
O
K
L
Y
N
D
R
MUMFORDRD
52ND AVE N
NASH RD
JANET LN
58TH AVE N
JOYCE LN
S U M
M I T
D R
N
C
O
L
F
A
X
A
V
E
N
72NDAVEN
NORT
H
W
A
Y
D
R
66TH AVE N
AMY LN
P A L M E R L A K E D R W
AL
D
R
I
C
H
A
V
E
N
L
E
E
A
V
E
N
4
T
H
S
T
N
N
O
B
L
E
A
V
E
N
H A L I F A X
P L
JO
H
N
M
A
R
TI
N
D
R
FR
E
M
O
N
T
A
V
E
N
67TH AV
E
N
53RD PL N
62ND AVE N
48TH AVE N
WOODBINE LN
70TH AVE N
YO
R
K
A
V
E
N
H A L I F A X A V E N
WINCHESTER LN
EW
I
N
G
A
V
E
N
B R O O K V I E W D R
QUARLESRD
OHENRY RD
VIOLET
A
V
E
N
THURBER R
D
J U D Y L N
E A R L E B ROWN DR
WOODBINELN N
A D M I R A L L N
ZE
N
I
T
H
A
V
E
N
S
C
O
T
T
A
V
E
N
R I
V E R D A L E
R D
JA
M
E
S
A
V
E
N
47TH AVE N
OAK ST N
DR
E
W
A
V
E
N
P E A R S O N
D R
ELEANOR LN
N
O
R
T
H
P
O
R
T
D
R
AB
B
O
T
T
A
V
E
N
50TH AVE N
MO
R
G
A
N
A
V
E
N
6 3 R D L N N
51 S T AVE N
POE R
D
68TH A VE N
H A L I F A X D R
S
A
I
L
O
R
L
N
QU
E
E
N
A
V
E
N
Q
U
A
I
L
A
V
E
N
IRVING LN N
O
R
C
H
A
R
D
A
V
E
N
T
O
L
E
D
O
A
V
E
N
BELLVUE LN N
5
T
H
S
T
N
FRAN CEPL
PAUL DR
A
Z
E
L
I
A
A
V
E
N
RU
S
S
E
L
L
A
V
E
N
W I N G A R D P L
VI
N
C
E
N
T
A
V
E
N
56TH AVE N B
R
O
O
K
L
Y
N
B
L
V
D
L
N
M A R LI N D R
SH
O
R
E
S
D
R
R
E
G
E
N
T
A
V
E
N
IN
D
I
A
N
A
A
V
E
N
57TH AVE N
B ASS LAK E RD
BOULDER LN
WA
S
H
B
U
R
N
A
V
E
N
E
M
E
R
S
O
N
A
V
E
N
54TH AV E N
T
W
I
N
L
A
K
E
A
V
E
ECKBERG DR
A
D
MIRAL LN N
P
E
N
N
A
VEN
BURQUEST LN
LAKE BREEZEAV
E
72N
D
C
I
R
N
LA
K
E
V
I
E
W
A
V
E
N
URBAN A V E N
C
H
O
W
E
N
A
V
E
N
LAKESIDE AVE N
LAWRE N C E R D
OHENRY RD N
71ST AVE N
COMMODORE DR
P
A
R
K
WAY CI R
F
R
E
M
O
N
T
P
L
N
M
A
J
O
R
A
V
E
N
67TH L
A
N
WOODBINE LA N
71ST CI
R
N
AL
D
R
I
C
H
D
R
N
P O N D S D R N
G
R
E
A
T
V
I
E
W
A
V
E
W I N G A R D LA
K A T H E R I N E D R
70TH CIR
N
Q
U
A
ILCIR
W
UP
T
O
N
A
V
E
N
N
O
P
R
T
H
P
O
R
T
D
R
68TH LA N
69T
H
L
A
N
58 1/2 AVE N
I
R
V
I
N
G
P
L
HOWE LN
58TH PL N
PERRY CT E
EMERSON LN N
V
E
R
A
C
R
U
Z
A
V
E
N
69THAVE N
DU
P
O
N
T
A
V
E
N
VI
N
C
E
N
T
A
V
E
N
B A S S LAK E RD
H I G H W A Y 1 0 0
H
I
G
H
W
A
Y
2
5
2
C
O
L
F
A
X
A
V
E
N
LY
N
D
A
L
E
A
V
E
N
55TH AVE N
CO
L
F
A
X
A
V
E
N
6 6 T H AVEN
C
H
O
W
E
N
A
V
E
N
XE
R
X
E
S
A
V
E
N
LILA
C
D
R
N
67TH AVE N
MA
J
O
R
A
V
E
N
54TH AVE N
WINCHESTER LN
GI
R
A
R
D
A
V
E
N
EM
E
R
S
O
N
A
V
E
N
F
R
A
N
C
E
A
V
E
N
CA
M
D
E
N
A
V
E
N
61ST AVE N
AB
B
O
T
T
A
V
E
N
FR
E
M
O
N
T
A
V
E
N
F
R
E
M
O
N
T
A
V
E
N
XE
R
X
E
S
A
V
E
N
HU
M
B
O
L
D
T
A
V
E
N
71ST AVE N
64TH AVE N
72ND AVE N
EM
E
R
S
O
N
A
V
E
N
56TH AVE N
E
W
I
N
G
A
V
E
N
P
E
R
R
Y
A
V
E
N
BRY
A
N
T
A
V
E
N
72ND AVE N
LILAC DR N
62ND AVE N
AL
L
E
Y
AL
L
E
Y
63RD AVE N
MO
R
G
A
N
A
V
E
N
P
E
R
R
Y
A
V
E
N
A
L
D
R
I
C
H
A
V
E
N
68TH AVE N
GI
R
A
R
D
A
V
E
N
70TH AVE N
QU
A
I
L
A
V
E
N
CA
M
D
E
N
A
V
E
N
56TH AVE N
AL
L
E
Y
AL
L
E
Y
FR
A
N
C
E
A
V
E
N
51ST AVE N
WOODBINE LN
50TH AVE N
65TH AVE N
NE
W
T
O
N
A
V
E
N
67TH AVE N
MA
J
O
R
A
V
E
N
T
O
L
E
D
O
A
V
E
N
M
O
R
G
A
N
A
V
E
N
62ND AVE N
64TH AVE N
LILA
C
D
R
N
AL
L
E
Y
66TH AVE N
AL
L
E
Y
Z
E
N
I
T
H
A
V
E
N
ADMIRAL LN N
IR
V
I
N
G
A
V
E
N
B
R
O
O
K
L
Y
N
B
L
V
D
HIG
H
W
A
Y
1
0
0
68TH AVE N
WOODBINE LA N
S
C
O
T
T
A
V
E
N
66TH AVE N
HA
L
I
F
A
X
A
V
E
N
X
E
R
X
E
S
A
V
E
N
57TH AVE N
B
R
Y
A
N
T
A
V
E
N
C
A
M
D
E
N
A
V
E
N
LILA
C
D
R
N
F
R
A
N
C
E
A
V
E
N
69TH AVE N
N
O
B
L
E
A
V
E
N
68TH AV
E
N
70TH AVE N
HIG
H
W
A
Y
1
0
0
AL
L
E
Y
55TH AVE N
PE
N
N
A
V
E
N
AD
M
I
R
A
L
L
N
N
LE
E
A
V
E
N
6 5 T H A V E N
H
I
G
H
W
A
Y
2
5
2
70TH AVE N
XE
R
X
E
S
A
V
E
N
B
E
A
R
D
A
V
E
N
B
E
A
R
D
A
V
E
N
LILAC DR
N
67TH AVE N
M
A
J
O
R
A
V
E
N
71ST AVE N
71ST AVE N
G
R
I
M
E
S
A
V
E
N
E
W
I
N
G
A
V
E
N
67TH AVE N
OL
I
V
E
R
A
V
E
N
59TH AVE N
AL
D
R
I
C
H
A
V
E
N
BEA
R
D
A
V
E
N
Q
U
A
I
L
A
V
E
N
LO
G
A
N
A
V
E
N
J
A
M
E
S
A
V
E
N
73RD AVE N
SH
I
N
G
L
E
C
R
E
E
K
P
K
W
Y
58TH AVE N
I
N
T
E
R
S
T
A
T
E
9
4
53RD AVE N
D
R
E
W
A
V
E
N
JA
M
E
S
A
V
E
N
61ST AVE N
70TH AVE N
72ND AVE N
LE
E
A
V
E
N
IR
V
I
N
G
A
V
E
N
WI
L
L
O
W
L
N
EW
I
N
G
A
V
E
N
51ST AVE N
GI
R
A
R
D
A
V
E
N
JU
N
E
A
V
E
N
62ND AVE N
TO
L
E
D
O
A
V
E
N
70TH AVE N
XE
R
X
E
S
A
V
E
N
67TH AVE N
65TH AVE N
NO
B
L
E
A
V
E
N
CO
L
F
A
X
A
V
E
N
C
A
M
D
E
N
A
V
E
N
B
R
Y
A
N
T
A
V
E
N
CO
L
F
A
X
A
V
E
N
AL
L
E
Y
F
R
A
N
C
E
A
V
E
N
S
C
O
T
T
A
V
E
N
K
Y
L
E
A
V
E
N
INTERSTATE 694
56TH AVE N
J
U
N
E
A
V
E
N
L
E
E
A
V
E
N
LILA
C
D
R
N
O
R
C
H
A
R
D
A
V
E
N
ZE
N
I
T
H
A
V
E
N
AL
L
E
Y
N
O
B
L
E
A
V
E
N
71ST AVE
N
66TH AVE N
OHENRY RD
RE
G
E
N
T
A
V
E
N
KN
O
X
A
V
E
N
70TH AVE N
HA
L
I
F
A
X
A
V
E
N
Q
U
A
I
L
A
V
E
N
G
I
R
A
R
D
A
V
E
N
60TH AVE N
INTERSTATE 94
56TH AVE N
X
E
R
X
E
S
A
V
E
N
R
E
G
E
N
T
A
V
E
N
AL
L
E
Y
F
R
A
N
C
E
A
V
E
N
E
W
I
N
G
A
V
E
N
61ST AVE N
53RD AVE N
KY
L
E
A
V
E
N
DR
E
W
A
V
E
N
CA
M
D
E
N
A
V
E
N
O R C H A R D A V E N
65TH AVE N
AL
L
E
Y
W
I
L
L
O
W
L
N
6 6 T H A V E N
MO
R
G
A
N
A
V
E
N
AL
L
E
Y
67TH AVE N
BR
Y
A
N
T
A
V
E
N
PE
R
R
Y
A
V
E
N
D
R
E
W
A
V
E
N
KN
O
X
A
V
E
N
EM
E
R
S
O
N
A
V
E
N
CIP PROJECT AREAS2028 - 2034
November 2019
Completed Construction (99.1 Miles -
93.6% since 1993)
Full Depth Pavement Replacement Projects
Southeast Alleys - 2032
Mill and Overlay
! ! !Garden City Central - 2028
! ! !Shingle Creek Pkwy and Xerxes Ave - 2028
! ! !Garden City North - 2029
! ! !Garden City South - 2030
! ! !Southwest Area - 2031
! ! !Happy Hollow - 2032
! ! !Northport Area - 2033
! ! !Lions Park South - 2034
! ! !73rd Ave (Penn to Humboldt) - 2034
Table 2
Capital Improvement Program (2020 - 2034)
November 19, 2019
G:\Administration\Budget\2020\CIP\FINAL CIP\191119_FINAL_2020-2034 CIP Table 2.xlsx Page | 6
Special Street MSA Storm Drainage Sanitary Sewer Water Street Light Capital Projects Total Project
Project Assessments Reconst. Fund Fund Utility Utility Utility Utility Funds Cost
2020
Grandview Park Area North Improvements $1,040,000 $2,110,000 $1,240,000 $1,060,000 $1,120,000 $60,000 $6,630,000
Shingle Creek Parkway Bridge Rehabilitation (2 Bridges)$240,000 $240,000
Bass Lake Road at Xerxes Avenue Traffic Signal ADA Upgrades $60,000 (A)$60,000
Miscellaneous Retaining Wall Replacements $373,000 $373,000
Brooklyn Blvd City North Entrance Sign Rehab $88,000 $88,000
Park Playground Equip Replacement $504,000 $504,000
Lift Station No. 6 Rehabilitation $633,000 $633,000
Water Tower No. 1 Painting $1,020,000 $1,020,000
Well No. 5 Rehabilitation $124,000 $124,000
Storm Water Pond 40-001 Rehab $260,000 $260,000
Connections at Shingle Creek Phase 2 (Creek Stabilization Project)$406,000 (B)$406,000
Brine Equipment Project $125,000 (C)$125,000
CMBP: City Hall - Community Development Office Expansion $230,000 $230,000
CMBP - Public Works - Carpet & Paint $60,000 $60,000
CMBP - CH, CC, Fire, Police - Expansion Joint Caulking $76,800 $76,800
2020 Subtotal $1,040,000 $2,350,000 $60,000 $2,031,000 $1,693,000 $2,264,000 $60,000 $1,331,800 $10,829,800
NOTES:(A) Hennepin County funding estimated at 50% ($30k) and 50% City MSA funding ($30k)
(B) Watershed funding estimated at 75% ($305k) and 25% City funding ($101k)
(C) Watershed funding estimated at ($50k) and City Storm Drainage Utility funding ($75k)
2021
Grandview Park Area South Improvements $1,260,000 $2,790,000 $1,700,000 $1,880,000 $1,400,000 $1,990,000 $60,000 $11,080,000
Humboldt Ave (CR 57) Reconstruction (53rd to 57th)$320,000 $395,000 $110,000 $380,000 $390,000 $20,000 $825,000 (D)$2,440,000
Ryan Lake Industrial Park Area Improvements $300,000 $380,000 $200,000 $190,000 $300,000 $10,000 $1,380,000
Northwest Area Mill and Overlay $210,000 $600,000 $400,000 $200,000 $390,000 $50,000 $1,850,000
Lyndale Avenue Improvements $50,000 $240,000 $150,000 $110,000 $130,000 $20,000 $20,000 $720,000
Brooklyn Boulevard Corridor Phase 2 - Bass Lk Rd to I-94 $700,000 $240,000 $240,000 $180,000 $250,000 $13,399,000 (E)$15,009,000
Traffic Sig Sys Rehab (Shingle Creek Pkwy/Summit)$69,000 $206,000 $275,000
Traffic Sig Sys Rehab. (Shingle Creek Pkwy/John Martin)$69,000 $206,000 $275,000
Park Playground Equip Replacement $531,000 $531,000
61st & Perry Avenues Storm Sewer Improvement $175,000 $175,000
65th Avenue Trunk Storm Sewer Rehabilitation $477,000 $477,000
Lift Station No. 8 Rehabilitation $442,000 $442,000
Lift Station No. 9 Rehabilitation $571,000 $571,000
Lift Station No. 9 Force Main Replacement $314,000 $314,000
Well No. 10 and High Service Pump (HSP) Rehab (BW)$96,000 $96,000
CMBP: Civic Center - Cooling Replace (Chillers/condensers)$115,900 $115,900
2021 Subtotal $2,140,000 $4,543,000 $2,962,000 $3,592,000 $3,867,000 $3,366,000 $410,000 $14,870,900 $35,750,900
NOTES:(D) Anticipated Hennepin County funding share - Humboldt Ave is a county road (CR 57)
(E) Federal funding ($6,616,000), Hennepin County ($4,500,000), Xcel Utility Surcharge ($350,000), City Capital Improvements Fund ($1,933,000).
Table 2
Capital Improvement Program (2020 - 2034)
November 19, 2019
G:\Administration\Budget\2020\CIP\FINAL CIP\191119_FINAL_2020-2034 CIP Table 2.xlsx Page | 7
Special Street MSA Storm Drainage Sanitary Sewer Water Street Light Capital Projects Total Project
Project Assessments Reconst. Fund Fund Utility Utility Utility Utility Funds Cost
2022
Woodbine Area Improvements $1,610,000 $1,950,000 $170,000 $600,000 $1,530,000 $2,850,000 $130,000 $8,840,000
Miscellaneous Park Parking Lot Mill and Overlay $569,000 $569,000
West River Rd, Arboretum, Freeway, Palmer Lake & Northport Trail Replacements $548,000 $548,000
Park Playground Equip Replacement $559,000 $559,000
Storm Water Ponds 12-001, 12-006 & 57-003 Rehab $125,000 $125,000
Freeway and Highway Utility Crossing Replacement $194,000 $393,000 $587,000
Well No. 7 and Water Treatment Plant HSP No. 1 $99,000 $99,000
CMBP: All - Fire Alarm/Annunciator Replacement $50,000 $50,000
CMBP: Civic Center - Air Handlers #4, #5 Replace $67,300 $67,300
CMBP: East/West Fire - Roof Replacement $363,900 $363,900
CMBP: West Fire - Rooftop Unit Replacement $58,400 $58,400
CMBP: Police - Parking Lot Mill & Overlay $107,100 $107,100
CMBP: Public Works - Lighting System Upgrade $97,600 $97,600
2022 Subtotal $1,610,000 $1,950,000 $170,000 $725,000 $1,724,000 $3,342,000 $130,000 $2,420,300 $12,071,300
2023
53rd Avenue Improvements (Penn Ave to Lyndale Ave)$30,000 $1,130,000 $180,000 $120,000 $540,000 $130,000 $1,810,000 (F)$3,940,000
50th Avenue Improvements (France Ave to Drew Ave)$40,000 $110,000 $30,000 $20,000 $140,000 $340,000
51st Avenue Improvements (west of France Avenue)$160,000 $90,000 $40,000 $10,000 $10,000 $20,000 $330,000
Knox, James and 54th Ave. Area Improvements $460,000 $400,000 $110,000 $20,000 $100,000 $1,090,000
TH 252/66th Interchange and 70th Pedestrian Overpass $35,000,000 (G)$35,000,000
Earle Brown/Opportunity Area Street Light Replacement $253,000 $253,000
Evergreen Park Score Board Improvements $144,000 $144,000
Lift Station Nos. 4 and 5 Rehabilitation $519,000 $519,000
Well Nos. 4 and 9; Water Treatment Plant HSP No. 2 $185,000 $185,000
Storm Water Pond 48-001 Rehab $334,000 $334,000
CMBP: City Hall/CC Addition - Roof Replacement $404,400 $404,400
2023 Subtotal $690,000 $600,000 $1,130,000 $694,000 $689,000 $975,000 $403,000 $37,358,400 $42,539,400
NOTES:(F) Estimated cost sharing with City of Minneapolis per 1970 agreement
2024
Orchard Lane East Improvements $2,450,000 $2,850,000 $400,000 $1,580,000 $3,450,000 $160,000 $10,890,000
Humboldt Ave Improvements $330,000 $410,000 $60,000 $330,000 $200,000 $30,000 $1,360,000
Centennial Park Softball Field Improvements $579,000 $579,000
Well Nos. 6 and 8; Water Treatment Plant HSP No. 3 $190,000 $190,000
CMBP: East/West Fire - Parking Lot Mill & Overlay $117,700 $117,700
CMBP: Police - Roof Replacement $266,900 $266,900
2024 Subtotal $2,780,000 $2,850,000 $410,000 $460,000 $1,910,000 $3,840,000 $190,000 $963,600 $13,403,600
2025
Orchard Lane West Area Improvements $3,560,000 $3,160,000 $350,000 $1,810,000 $170,000 $200,000 $9,250,000
53rd and Xerxes Avenue Improvements $80,000 $450,000 $120,000 $60,000 $710,000
69th Ave (CSAH 130) Unity to Brooklyn Boulevard $40,000 $410,000 $30,000 $610,000 $880,000 $10,000 $1,920,000 (H)$3,900,000
Traffic Sig Sys Rehab.(Shingle Creek Pkwy/Brookdale Sq)$102,000 $207,000 $309,000
Park Name Sign Replacements $72,000 $72,000
Well Nos. 2 and 3; Water Treatment Plant HSP No. 4 $196,000 $196,000
Storm Water Pond 17-001 Rehab $152,000 $152,000
CMBP: Community Center - Water Slide Skylight $54,500 $54,500
CMBP: Public Works Cold - Roof Replacement $117,100 $117,100
CMBP: Public Works Salt - Roof Replacement $55,600 $55,600
2025 Subtotal $3,680,000 $4,122,000 $207,000 $652,000 $2,420,000 $1,246,000 $270,000 $2,219,200 $14,816,200
NOTES:(H) Hennepin County funding estimated at 80% for street and storm costs and 20% City funding
(G) Provisional project: funding estimated outside source ($29,500,000) and City Capital Improvements Fund ($5,500,000)
Table 2
Capital Improvement Program (2020 - 2034)
November 19, 2019
G:\Administration\Budget\2020\CIP\FINAL CIP\191119_FINAL_2020-2034 CIP Table 2.xlsx Page | 8
Special Street MSA Storm Drainage Sanitary Sewer Water Street Light Capital Projects Total Project
Project Assessments Reconst. Fund Fund Utility Utility Utility Utility Funds Cost
2026
Meadowlark Gardens Area Improvements $940,000 $700,000 $460,000 $230,000 $100,000 $330,000 $120,000 $2,880,000
67th Avenue and James Avenue Mill and Overlay $160,000 $130,000 $110,000 $10,000 $60,000 $20,000 $490,000
68th Avenue and Lee Avenue Mill and Overlay $130,000 $100,000 $100,000 $10,000 $70,000 $20,000 $430,000
John Martin Drive Mill and Overlay $100,000 $130,000 $30,000 $10,000 $50,000 $60,000 $380,000
St. Alphonses Area Mill and Overlay $390,000 $240,000 $240,000 $40,000 $170,000 $50,000 $1,130,000
Humboldt Ave (65th to 69th) Mill and Overlay $60,000 $610,000 $70,000 $20,000 $10,000 $10,000 $780,000
Hockey Rink Rehabilitation/Replacements $214,000 $214,000
Irrigation Systems Rehabilitation/Replacements $143,000 $143,000
Lift Station Nos. 3 Rehabilitation $281,000 $281,000
Well No. 5 and Water Treatment Plant HSP (BW)$111,000 $111,000
Storm Water Ponds 41-001, 41-002 & 53-001 Rehab $154,000 $154,000
CMBP: West Fire - Generator/Transfer Replacement $185,100 $185,100
CMBP: Police - Condenser Jail $64,500 $64,500
2026 Subtotal $1,780,000 $1,170,000 $1,200,000 $934,000 $471,000 $801,000 $280,000 $606,600 $7,242,600
2027
Earle Brown Drive Area Improvements $50,000 $1,330,000 $640,000 $130,000 $20,000 $20,000 $2,190,000
65th/66th Avenue and Camden Avenue Mill and Overlay $70,000 $270,000 $660,000 $150,000 $300,000 $20,000 $1,470,000
73rd Avenue Mill and Overlay (Humboldt to Camden)$50,000 $70,000 $110,000 $60,000 $20,000 $10,000 $290,000 (I)$610,000
Softball/Baseball Fence Replacement $64,000 $64,000
69th Avenue Trail Reconstruction $217,000 $217,000
69th Avenue Landscape Rehabilitation $146,000 $146,000
Well No. 10 and Water Treatment Plant HSP No. 1 $113,000 $113,000
CMBP: Police - Generator/Transfer Replacement $169,700 $169,700
CMBP: Police - Main Condenser $65,400 $65,400
2027 Subtotal $170,000 $1,670,000 $1,410,000 $340,000 $340,000 $163,000 $952,100 $5,045,100
NOTES:(I) 50% Cost sharing of street & storm with City of Brooklyn Park per 1999 agreement
2028
Garden City Central Area Mill and Overlay $730,000 $1,800,000 $290,000 $970,000 $410,000 $100,000 $4,300,000
Shingle Creek Pkwy and Xerxes Ave Mill and Overlay $120,000 $1,430,000 $250,000 $40,000 $460,000 $90,000 $2,390,000
Park Trail and Parking Lot Lighting Improvements $396,000 $396,000
Water Meter Full System Replacement $546,000 $1,637,000 $2,183,000
Well No. 7 and Water Treatment Plant HSP No. 2 $114,000 $114,000
Emergency Responder Radio Replacement (Police/Fire/PW)$600,000 $600,000
CMBP: City Hall - Ribbon Window Replacement $83,600 $83,600
CMBP: Community Center - Ribbon Window Replacement $100,200 $100,200
CMBP: Police - Carpet Replacement $67,700 $67,700
2028 Subtotal $850,000 $1,800,000 $1,720,000 $1,220,000 $996,000 $2,311,000 $90,000 $1,247,500 $10,234,500
2029
Garden City North Area Mill and Overlay $610,000 $2,400,000 $2,740,000 $640,000 $590,000 $6,980,000
Retaining Wall Replacement (miscellaneous locations)$123,000 $123,000
Lift Station Nos. 7 and 10 Rehabilitation $1,072,000 $1,072,000
Well Nos. 4 and 9 and Water Treatment Plant HSP No. 3 $211,000 $211,000
Storm Water Ponds 11-001, 59-003, 60-003, 63-001, 63-002 & 64- $108,000 $108,000
CMBP: City Hall - Main Switch Gear Replacement $264,800 $264,800
CMBP: Community Center - Carpet Replacement $68,700 $68,700
2029 Subtotal $610,000 $2,400,000 $2,848,000 $1,712,000 $801,000 $456,500 $8,827,500
Table 2
Capital Improvement Program (2020 - 2034)
November 19, 2019
G:\Administration\Budget\2020\CIP\FINAL CIP\191119_FINAL_2020-2034 CIP Table 2.xlsx Page | 9
Special Street MSA Storm Drainage Sanitary Sewer Water Street Light Capital Projects Total Project
Project Assessments Reconst. Fund Fund Utility Utility Utility Utility Funds Cost
2030
Garden City South Area Mill and Overlay $480,000 $2,340,000 $990,000 $1,320,000 $800,000 $1,720,000 $10,000 $7,660,000
Sanitary Sewer Lining (Miss. River Trunk N. of I-694 to 70th/Willow)$1,581,000 $1,581,000
Lift No. 2 Forcemain Lining (Under I-94)$260,000 $260,000
Well Nos. 6 and 8; Water Treatment Plant HSP No. 4 $214,000 $214,000
CMBP: City Hall - Brick Veneer Restoration $131,100 $131,100
CMBP: Community Center - Brick Veneer Restoration $205,300 $205,300
2030 Subtotal $480,000 $2,340,000 $990,000 $1,320,000 $2,641,000 $1,934,000 $10,000 $336,400 $10,051,400
2031
Southwest Area Mill and Overlay $570,000 $1,240,000 $1,090,000 $930,000 $550,000 $1,220,000 $60,000 $5,660,000
Park Bleacher Replacement $65,000 $65,000
Lift Station No. 1 Generator Replacement $213,000 $213,000
Well Nos. 2 and 3 and Water Treatment Plant HSP (BW)$217,000 $217,000
Storm Water Pond 57-004, 57-005 & 70-002 Rehab $75,000 $75,000
CMBP: East/West Fire - Epoxy Floor Replacement $118,400 $118,400
CMBP: Public Works - Exterior Paint $108,000 $108,000
CMBP: Public Works - Make Up Air (2) Replacement $167,200 $167,200
2031 Subtotal $570,000 $1,240,000 $1,090,000 $1,005,000 $763,000 $1,437,000 $60,000 $458,600 $6,623,600
2032
Happy Hollow Mill and Overlay $310,000 $1,090,000 $290,000 $740,000 $220,000 $370,000 $50,000 $3,070,000
Southeast Alleys Improvements $1,220,000 $10,000 $1,230,000
Park Bleacher Replacement $86,000 $86,000
Brooklyn Blvd Street Light Replacement (65th to BP Border)$921,000 $921,000
Well No. 5 and Water Treatment Plant HSP No. 1 $121,000 $121,000
Storm Water Pond12-002, 12-003, 12-004, 12-005 & 18-001 Reha $629,000 $629,000
CMBP: Public Works - Main Switch Gear Replacement $235,100 $235,100
CMBP: Public Works - Generator/Transfer Replacement $182,800 $182,800
2032 Subtotal $1,530,000 $1,090,000 $290,000 $1,369,000 $220,000 $491,000 $60,000 $1,424,900 $6,474,900
2033
Northport Area Mill and Overlay $360,000 $1,000,000 $580,000 $570,000 $120,000 $70,000 $2,700,000
Traffic Sig Sys Rehab.(65th Avenue/Dupont Ave)$354,000 $354,000
Traffic Sig Sys Rehab.(66th Ave/Camden Ave)$177,000 $177,000 $354,000
Evergreen Park Football/Soccer Field Improvements $140,000 $140,000
Well No. 10 and Water Treatment Plant HSP No. 2 $123,000 $123,000
Self Contained Breathing Apparatus (SCBA) Replacement (Fire)$612,500 $612,500
CMBP: Public Works - Make Up Air (2) Replacement $92,800 $92,800
CMBP: East/West Fire - Overhead Door Replacements $225,300 $225,300
CMBP: Community Center - Sauna Reconstruction $92,800 $92,800
2033 Subtotal $360,000 $1,177,000 $1,111,000 $570,000 $120,000 $193,000 $1,163,400 $4,694,400
2034
Lions Park South Mill and Overlay $390,000 $1,480,000 $700,000 $110,000 $70,000 $2,750,000
73rd Avenue (Penn to Humboldt) Mill and Overlay $40,000 $160,000 $80,000 $130,000 $200,000 $280,000 (J)$890,000
Well No. 7 and Water Treatment Plant HSP No. 3 $125,000 $125,000
CMBP: Community Center - RTU #1 & #2 $286,500 $286,500
2034 Subtotal $430,000 $1,640,000 $780,000 $240,000 $395,000 $566,500 $4,051,500
NOTES:(J) 50% Cost sharing of street & storm with City of Brooklyn Park per 2004 agreement
TOTALS $18,720,000 $30,942,000 $12,750,000 $18,540,000 $19,806,000 $23,559,000 $1,963,000 $66,376,700 $192,656,700
PROJECT DESCRIPTIONS
2020-2034 Capital Improvement Program
City of Brooklyn Center
Project Summaries Page | 10
2020-2034 Capital Improvement Program
Table of Contents
Street and Utility Improvements .................................................................................................................... 14
Grandview North Area Improvements - 2020 ........................................................................................... 14
Grandview South Area Improvements - 2021 ........................................................................................... 15
Ryan Lake Industrial Park Area Improvements - 2021 ............................................................................. 17
Northwest Area Mill and Overlay - 2021 .................................................................................................. 18
Lyndale Avenue Improvements - 2021 ..................................................................................................... 19
Woodbine Area Improvements - 2022 ....................................................................................................... 20
53rd Avenue Improvements (Penn Avenue to Lyndale Avenue) - 2023 .................................................... 21
50th Avenue Improvements (France Avenue to Drew Avenue) - 2023 ..................................................... 22
51st Avenue Improvements (West of France Avenue) - 2023 ................................................................... 23
Knox, James and 54th Avenues Area Improvements - 2023 ...................................................................... 24
Orchard Lane East Improvements - 2024 .................................................................................................. 25
Humboldt Avenue Improvements - 2024 .................................................................................................. 26
Orchard Lane West Area Improvements - 2025 ........................................................................................ 27
53rd Avenue and Xerxes Avenue Improvements - 2025 ............................................................................ 28
69th Avenue (CSAH 130) (Unity Ave to Brooklyn Blvd) - 2025 .............................................................. 29
Meadowlark Gardens Area Improvements - 2026 ..................................................................................... 30
67th Avenue and James Avenue Mill and Overlay - 2026 ......................................................................... 31
68th Avenue and Lee Avenue Mill and Overlay - 2026 ............................................................................. 32
John Martin Drive Mill and Overlay - 2026 .............................................................................................. 33
St. Alphonsus Area Mill and Overlay - 2026 ............................................................................................ 34
Humboldt Avenue Mill and Overlay (65th Ave to 69th Ave) - 2026 .......................................................... 35
Earle Brown Drive Area Improvements - 2027 ......................................................................................... 36
65th/66th Avenue and Camden Avenue Mill and Overlay - 2027 .............................................................. 37
73rd Avenue Mill and Overlay (Humboldt Ave to Camden Ave) - 2027 .................................................. 38
Garden City Central Area Mill and Overlay - 2028 .................................................................................. 39
Shingle Creek Parkway and Xerxes Avenue Mill and Overlay - 2028 ..................................................... 40
Garden City North Area Mill and Overlay - 2029 ..................................................................................... 41
Garden City South Area Mill and Overlay - 2030 ..................................................................................... 42
Southwest Area Mill and Overlay- 2031 ................................................................................................... 43
Happy Hollow Mill and Overlay - 2032 .................................................................................................... 44
Southeast Alleys Improvements – 2032 .................................................................................................... 45
Northport Area Mill and Overlay- 2033 .................................................................................................... 46
Lions Park South Mill and Overlay - 2034 ................................................................................................ 47
Project Summaries Page | 11
2020-2034 Capital Improvement Program
73rd Avenue Mill and Overlay (Penn Ave to Humboldt Ave) - 2034 ........................................................ 48
Water Main and Sanitary Sewer Improvements ............................................................................................ 49
Lift Station No. 6 Rehabilitation - 2020 ................................................................................................. 49
Water Tower No. 1 Painting - 2020 ....................................................................................................... 49
Well No. 5 Rehabilitation - 2020 ........................................................................................................... 49
Lift Station No. 8 Rehabilitation - 2021 ................................................................................................. 49
Lift Station No. 9 Rehabilitation - 2021 ................................................................................................. 49
Lift Station No. 9 Force Main Replacement - 2021 ............................................................................... 49
Well No. 10 and High Service Pump (HSP) Rehabilitation (BW) - 2021 ............................................. 49
Freeway and Highway Utility Crossing Replacement - 2022 ................................................................ 49
Well No. 7 and Water Treatment Plant HSP No. 1 - 2022 ..................................................................... 49
Lift Station Nos. 4 and 5 Rehabilitation - 2023 ..................................................................................... 50
Well Nos. 4 and 9; Water Treatment Plant HSP No. 2 - 2023 ............................................................... 50
Well Nos. 6 and 8; Water Treatment Plant HSP No. 3 - 2024 ............................................................... 50
Well Nos. 2 and 3; Water Treatment Plant HSP No. 4 - 2025 ............................................................... 50
Lift Station No. 3 Rehabilitation - 2026 ................................................................................................. 50
Well No. 5 and Water Treatment Plant HSP (BW) - 2026 .................................................................... 50
Well No. 10 and Water Treatment Plant HSP No. 1 - 2027 ................................................................... 50
Water Meter Full System Replacement- 2028 ....................................................................................... 50
Well No. 7 and Water Treatment Plant HSP No. 2 - 2028 ..................................................................... 50
Lift Station Nos. 7 and 10 Rehabilitation - 2029 ................................................................................... 50
Well Nos. 4 and 9; Water Treatment Plant HSP No. 3 - 2029 ............................................................... 50
Sanitary Sewer Lining (Mississippi River Trunk North of I-694 to 70th Avenue/Willow Lane) - 2030 50
Well Nos. 6 and 8; Water Treatment Plant HSP No. 4 - 2030 ............................................................... 51
Lift Station No. 1 Generator Replacement – 2031 ................................................................................. 51
Well Nos. 2 and 3; Water Treatment Plant HSP (BW) - 2031 ............................................................... 51
Well No. 5 and Water Treatment Plant HSP No. 1 - 2032 ..................................................................... 51
Well No. 10 and Water Treatment Plant HSP No. 2 - 2033 ................................................................... 51
Well No. 7 and Water Treatment Plant HSP No. 3 - 2034 ..................................................................... 51
Street Light and Traffic Signal Improvements .............................................................................................. 52
Traffic Signal System Rehabilitation (Shingle Creek Parkway/Summit Avenue) - 2021 ..................... 52
Traffic Signal System Rehabilitation (Shingle Creek Parkway/John Martin Drive) - 2021 .................. 52
Earle Brown/Opportunity Area Street Light Replacement (Ornamental at Nodes) - 2023.................... 52
Traffic Signal System Rehabilitation (Shingle Creek Parkway/Brookdale Square) - 2025 ................... 52
Brooklyn Boulevard (65th Ave to Brooklyn Park Border) Street Light Replacement - 2032 ................ 52
Project Summaries Page | 12
2020-2034 Capital Improvement Program
Traffic Signal System Rehabilitation (65th Avenue/Dupont Avenue) - 2033 ........................................ 52
Traffic Signal System Rehabilitation (66th Avenue/Camden Avenue) - 2033 ....................................... 52
Capital Maintenance Building Plan ............................................................................................................... 53
Yearly Capital Maintenance Building Plan Projects .............................................................................. 53
Storm Water Improvements ........................................................................................................................... 53
Storm Water Management Basins .......................................................................................................... 53
Storm Water Pond 40-001 - 2020........................................................................................................... 53
Storm Water Pond 12-001- 2022............................................................................................................ 53
Storm Water Pond 12-006 - 2022........................................................................................................... 53
Storm Water Pond 57-003 - 2022........................................................................................................... 53
Storm Water Pond 48-001 - 2023........................................................................................................... 53
Storm Water Pond 17-001 - 2025........................................................................................................... 54
Storm Water Pond 41-001 - 2026........................................................................................................... 54
Storm Water Pond 41-002 - 2026........................................................................................................... 54
Storm Water Pond 53-001 - 2026........................................................................................................... 54
Storm Water Pond 11-001 - 2029........................................................................................................... 54
Storm Water Pond 59-003 - 2029........................................................................................................... 54
Storm Water Pond 60-003 - 2029........................................................................................................... 54
Storm Water Pond 63-001 - 2029........................................................................................................... 54
Storm Water Pond 63-002 - 2029........................................................................................................... 54
Storm Water Pond 64-001 - 2029........................................................................................................... 55
Storm Water Pond 57-004 - 2031........................................................................................................... 55
Storm Water Pond 57-005 - 2031........................................................................................................... 55
Storm Water Pond 70-002 - 2031........................................................................................................... 55
Storm Water Pond 12-002 - 2032........................................................................................................... 55
Storm Water Pond 12-003 - 2032........................................................................................................... 55
Storm Water Pond 12-004 - 2032........................................................................................................... 55
Storm Water Pond 12-005 - 2032........................................................................................................... 55
Storm Water Pond 18-001 - 2032........................................................................................................... 55
Connections at Shingle Creek Phase 2 (Creek Stabilization Project) - 2020 ......................................... 55
61st Avenue and Perry Avenue Storm Sewer Improvement - 2021 ...................................................... 56
65th Avenue Trunk Storm Sewer Rehabilitation - 2021 ........................................................................ 56
Park and Trail Improvements ......................................................................................................................... 56
Shingle Creek Bridge Rehabilitation (2 Bridges) - 2020 ....................................................................... 56
Brooklyn Boulevard City Entrance Signs Rehabilitation - 2020 ........................................................... 56
Project Summaries Page | 13
2020-2034 Capital Improvement Program
Park Playground Equipment Replacement – 2020 through 2022 .......................................................... 56
Miscellaneous Park Parking Lot Mill and Overlay - 2022 ..................................................................... 56
West River Road, Arboretum, Freeway, Palmer Lake and Northport Trails Replacements - 2022 ...... 56
Evergreen Park Scoreboard Improvements - 2023 ................................................................................. 57
Centennial Park Softball Field Improvements - 2024 ............................................................................ 57
Park Name Sign Replacement - 2025 ..................................................................................................... 57
Hockey Rink Rehabilitation/Replacements - 2026 ................................................................................ 57
Irrigation Systems Rehabilitation/Replacements - 2026 ........................................................................ 57
Softball/Baseball Fence Replacement - 2027 ......................................................................................... 57
69th Avenue Trail Reconstruction – 2027 ............................................................................................... 57
69th Avenue Landscape Rehabilitation - 2027 ....................................................................................... 57
Park Trail and Parking Lot Lighting Improvements - 2028 ................................................................... 57
Park Bleacher Replacement - 2031 ........................................................................................................ 57
Park Bleacher Replacement - 2032 ........................................................................................................ 58
Evergreen Park Football/Soccer Field Improvements - 2033 ................................................................ 58
Miscellaneous Projects and Improvements .................................................................................................... 58
Bass Lake Road at Xerxes Avenue Traffic Signal ADA Upgrades - 2020 ............................................ 58
Brine Equipment Project - 2020 ............................................................................................................. 58
Miscellaneous Retaining Wall Replacements - 2020 ............................................................................. 58
Brooklyn Boulevard Corridor Projects 8, 9 and 10 (Bass Lake Road to Interstate 94) - 2021 .............. 58
TH 252/66th Avenue Interchange and 70th Avenue Pedestrian Overpass - 2023 ................................... 58
Emergency Responder Radio Replacement (Police/Fire/PW) - 2028 .................................................... 58
Retaining Wall Replacements (Miscellaneous Locations) - 2029 ......................................................... 59
Self Contained Breathing Apparatus (SCBA) Replacement (Fire) - 2033 ............................................. 59
Project Summaries Page | 14
2020-2034 Capital Improvement Program
Street and Utility Improvements
Grandview North Area Improvements - 2020
The Grandview North project area extends from Interstate 694 to 59th
Avenue and from Humboldt Avenue to Dupont Avenue. The total project
length is 9,356-feet. The neighborhood consists of approximately 110
residential properties (R1), one church property (R1), and 34 multi-family
properties (R3 and R6).
Streets
The majority of the streets in the project area were originally constructed
between 1964 and 1968. Existing streets are generally 30-feet wide. All
streets except Humboldt Avenue have concrete curb and gutter. The street
pavement is deteriorated throughout most of the neighborhood. The overall
pavement condition rating is fair to poor. Proposed street improvements
consist of the reconstruction of the street subgrade, installation of curb and
gutter to improve drainage and placement of bituminous street pavement.
Water main
The existing water main in the project area consists of 6-inch and 8-inch diameter CIP installed between
1964 and 1968. A majority of the existing water main is believed to have a cement based internal liner.
Water records indicate one main break has occurred within the neighborhood and one property has
experienced a frozen water service in past winters. The current project estimate includes replacement of
approximately 75 percent of the water main within the project area.
Sanitary Sewer
The sanitary sewer in the project area consists of 8-inch diameter VCP installed in 1960 and 1963.
Approximately 86 percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root
sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition
of the sanitary sewer system within the neighborhood is rated as fair to poor. The current project estimate
includes complete replacement of the sanitary sewer system within the project area.
Storm Sewer
A majority of the storm water runoff from the project area is collected in the existing storm sewer system
and conveyed to the trunk storm sewer line on 59th Avenue and then to the Mississippi River. A portion of
the existing storm sewer system within the project area could be salvaged, although it is anticipated that
expansion of the system and additional conveyance capacity will be needed to minimize local flooding. The
current project cost estimate includes complete replacement of the local drainage system within the
neighborhood.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the 10 wood poles with 10 fiberglass poles with a cut-off type LED
light fixture and underground power.
Project Summaries Page | 15
2020-2034 Capital Improvement Program
Grandview South Area Improvements - 2021
The Grandview South project area extends from 57th
Avenue to 59th Avenue and from Logan Avenue to
Dupont Avenue. The total project length is 15,557-
feet. The neighborhood consists of approximately
183 residential properties (R1), one school property
(R1), two church properties (R1), 14 multi-family
properties (R4 and R5), and three commercial
properties (C1 and C2).
Streets
Logan Avenue, Lilac Dr N and 59th Avenue are
designated as a MSA Route. The MSA Route was constructed in 1966 and is 30 to 35-feet wide. Logan
Avenue and Lilac Drive have concrete curb and gutter. The remaining streets in the project area were
originally constructed between 1964 and 1969. These streets are generally 30-feet wide with no curb and
gutter. The street pavement is deteriorated throughout most of the neighborhood. The overall pavement
condition rating is poor. Proposed street improvements consist of the reconstruction of the street subgrade,
installation of curb and gutter to improve drainage and placement of bituminous street pavement.
Water main
The existing water main in the project area consists of 6-inch, 8-inch, 10-inch and 16-inch diameter CIP
installed between 1964 and 1969. A 16-inch steel water main runs along Emerson Avenue from 57th
Avenue to 59th Avenue and on 59th Avenue from Emerson Avenue to Colfax Avenue. A majority of the
existing water main is believed to have a cement based internal liner. Water records indicate two main
breaks have occurred within the neighborhood and no properties have experienced a frozen water service in
past winters. The current project estimate includes replacement of approximately 50 to 75 percent of the
water main within the project area. The 16-inch steel water main along Emerson Avenue potently could be
replaced with C900 plastic water main.
Sanitary Sewer
The sanitary sewer in the project area consists of 8-inch and 10-inch diameter VCP installed in 1959 and
1960 and 12-inch diameter RCP installed in 1959. The sanitary sewer on Logan Avenue consists of 8-inch
VCP rehabilitated with a CIPP liner in 2005. Approximately 50 percent of the sanitary sewer is subjected to
frequent problems with root intrusion. Root sawing must be performed on an annual basis to maintain the
system conveyance capacity. The condition of the sanitary sewer system within the neighborhood is rated
as fair to poor. The current project estimate includes complete replacement of existing VCP in the roadway
and cured-in-place lining of the sanitary sewer along the easement between 57th Avenue and 58th Avenue.
Storm Sewer
A majority of the storm water runoff from the project area is collected in the existing storm sewer system
and conveyed to the trunk storm sewer line on 59th Avenue and then to the Mississippi River. A portion of
the existing storm sewer system within the project area could be salvaged, although it is anticipated that
expansion of the system and additional conveyance capacity will be needed to minimize local flooding. The
current project cost estimate includes complete replacement of the local drainage system within the
neighborhood.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the 10 wood poles with 10 fiberglass poles with a cut-off type LED
light fixture and underground power.
Project Summaries Page | 16
2020-2034 Capital Improvement Program
Humboldt Avenue (County Road 57) Reconstruction (53rd Ave to 57th Ave) - 2021
The Humboldt Avenue project area extends from 53rd Avenue to 57th Avenue.
The total project length is approximately 2,660 linear feet. The neighborhood
consists of approximately 52 residential properties.
Streets
This segment of roadway is a Hennepin County Roadway. Humboldt Avenue
was originally constructed between 1966 and 1969. Existing streets are
generally 36-feet wide with no curb and gutter. The street pavement is
deteriorated due to the age of the pavement and inadequate drainage. This
project is included in the City’s CIP due to a potential cost sharing agreement
for the street and drainage improvements and funding for water main,
sanitary sewer and street lighting improvements as described below.
Water main
The existing water main in the Humboldt Avenue project area consists of 6-
inch diameter CIP installed in 1966. A condition survey must be conducted
for the existing water system in the project area to determine the extent of
corrosion. The water main is in fair condition based on current maintenance
records. The current project cost estimate assumes replacing approximately
75 percent of the water main.
Sanitary Sewer
The existing sanitary sewer consists of 8-inch diameter VCP lateral sewers. These sewers were originally
installed in 1952. Approximately 51 percent of the sanitary sewer is subjected to frequent problems with
root intrusion. Root sawing must be performed on an annual basis to maintain the system conveyance
capacity. The current project cost estimate includes replacement of approximately 100 percent of the
sanitary sewer.
Storm Sewer
The storm sewer on Humboldt Avenue consists of 18-inch diameter corrugated metal pipe that drains to a
trunk line along 55th Avenue. This storm sewer was installed in 1952. The current project cost estimate
includes replacing 100 percent of the storm sewer. The cost estimate assumes that Brooklyn Center may
contribute to a portion of the storm drainage cost for the project.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the three wood poles with three fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 17
2020-2034 Capital Improvement Program
Ryan Lake Industrial Park Area Improvements - 2021
The Ryan Lake project area includes 48th Avenue and
Dusharme Drive from Drew Avenue to the dead end and 47th
Avenue from Drew Avenue to the dead end. The total project
length is 1,288-feet. The neighborhood consists of
approximately 10 industrial properties and three multi-family
properties (R5).
Streets
The majority of the streets in the project area were originally
constructed in 1958 and 1960. The western portion of 47th
Avenue and Drew Avenue were reconstructed in 2002. The western portion of 48th Avenue was
reconstructed in 2005. The remaining street sections are 30 to 45-feet wide with no curb and gutter. The
street pavement is deteriorated and in poor condition. Proposed street improvements consist of the
reconstruction of the street subgrade, installation of curb and gutter to improve drainage and placement of
bituminous street pavement.
Water main
The existing water main on 48th Avenue and Dusharme Drive consists of 10-inch diameter CIP installed in
1958. The water main on 47th Avenue consists of 6-inch CIP installed in 1960. Water records indicate no
main breaks have occurred within the neighborhood. The current project estimate assumes complete
replacement of the water main in the project area. The cost estimate also includes the cost of jacking new
water main under the railroad tracks from Dusharme Drive to 49th Avenue.
Sanitary Sewer
The sanitary sewer in the project area consists of 8-inch diameter VCP installed in 1960. The sanitary
sewer along 47th Avenue and Dusharme Drive is subjected to frequent problems with root intrusion. Root
sawing must be performed on an annual basis to maintain the system conveyance capacity. The condition
of the sanitary sewer system within the neighborhood is rated as fair to poor. Complete replacement of all
sanitary sewer pipes and access structures are proposed as part of the project.
Storm Sewer
All of the storm water runoff from the project area is collected in the existing storm sewer system and
conveyed to Ryan Lake. The current project cost estimate assumes reconstruction of all the existing storm
sewer system. The cost estimate also includes installation of a small storm water management pond at the
intersection of 48th Avenue and Dusharme Drive within City owned property adjacent to Ryan Lake.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the two wood poles with two fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 18
2020-2034 Capital Improvement Program
Northwest Area Mill and Overlay - 2021
The Northwest project area extends from Toledo
Avenue east to Perry Avenue and from 71st Avenue
south to 69th Avenue. The total project length is 6,819-
feet. The neighborhood consists of 132 residential
properties (R1) and two school owned properties.
Streets
The streets in the project area were reconstructed in
1994. The streets are 30-feet wide with concrete curb
and gutter. The current cost estimate assumes street
improvements that consist of minor concrete repairs
and a 2-inch mill and overlay.
Water main
When the neighborhood was reconstructed in 1994, approximately 65 percent of the water main was
replaced with 6-inch diameter DIP. The remaining water main consists of 6-inch diameter CIP installed in
1955. Water records indicate two main breaks have occurred on the CIP water main and one property has
experienced a frozen water service in past winters. The current project cost estimate includes lining the
existing CIP pipe and replacing 50 percent of the existing hydrants and gate valves.
Sanitary Sewer
When the area was reconstructed in 1994, approximately 72 percent of the sanitary sewer was replaced
with 8-inch and 10-inch diameter PVC. The remaining sanitary sewer consists of 8-inch VCP installed in
1956. The project cost estimate includes cured-in-place lining of the VCP sanitary sewer main and
replacement of all castings.
Storm Sewer
The storm water runoff from the project area is collected in a storm water pond in the northwest corner of
the project area. The storm sewer consists of 15-inch to 42-inch diameter RCP installed in 1994. The
current project estimate includes minor storm sewer repairs.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the nine wood poles with nine fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 19
2020-2034 Capital Improvement Program
Lyndale Avenue Improvements - 2021
The Lyndale Avenue project area extends from 57th Avenue
to 55th Avenue and includes the 56th Avenue and 55th
Avenue cul-de-sacs. The current project length is 1,905-feet.
The neighborhood consists of 9 residential properties (R2
and R4).
Streets
The streets in the project area were constructed in 1985. The
existing streets are 30-feet wide with concrete curb and
gutter. Proposed improvements include 30 percent curb
replacement and installation of new street pavement.
Water Main
The existing water main in the project area consists of 6-
inch diameter DIP installed in 1978 and 1985. The water
main is in good condition based on current maintenance
records. The current project cost estimate includes
replacement of miscellaneous valves and hydrants as
necessary.
Sanitary Sewer
The existing sanitary sewer consists of 24-inch diameter RCP installed in 1959. This sanitary sewer line is
the main trunk line that carries the sanitary flow from the eastern third of Brooklyn Center to a lift station
on Lyndale Avenue south of 55th Avenue. The condition of the sanitary sewer in the neighborhood is rated
fair. The current project cost estimate includes replacement of sanitary services and replacement of sanitary
sewer castings. Cured-in-place lining of the trunk sanitary sewer may be necessary based on future
televising inspections.
Storm Sewer
A substantial portion of the southeast section of the City drains through the trunk storm sewer located along
55th Avenue. The existing trunk storm sewer line consists of 36-inch diameter RCP installed in 1952. The
remainder of the project area consists of 12-inch diameter to 18-inch diameter reinforced pipe installed in
1955 and 1985. The current project cost estimate includes replacing the storm sewer structure castings and
isolated portions of lateral storm sewer as necessary.
Street Lighting
The current cost estimate includes replacing the three wood poles with three fiberglass poles with a cut-off
type LED light fixture and underground power.
Project Summaries Page | 20
2020-2034 Capital Improvement Program
Woodbine Area Improvements - 2022
The Woodbine project area extends from
Brooklyn Boulevard to France Avenue and
from the north City limits to 71st Avenue.
The project area contains a total of 15,525
linear feet of local streets. The
neighborhood consists of approximately
254 residential properties.
Streets
Noble Avenue from Brooklyn Boulevard to
the north City limits is a designated MSA
Route. The Woodbine Neighborhood was
reconstructed in 1995. Noble Avenue is 40-feet wide with concrete curb and gutter. The remaining streets
are generally 30-feet wide with concrete curb and gutter. The project design process will include evaluating
geometric options at the intersection of Noble Avenue and Woodbine Lane to address possible pedestrian
safety issues. The current cost estimate assumes street improvements that consist of approximately 50
percent curb replacement, 10 percent sidewalk replacement and full depth pavement replacement.
Water main
The existing water main in the Woodbine area consists of 6-inch and 8-inch diameter CIP installed between
1957 and 1959. Records indicate there have been 11 water main breaks in the neighborhood between 1975
and 2013 and six properties have experienced frozen water service in past winters. The current project cost
estimate includes complete water main replacement.
Sanitary Sewer
Approximately 25 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 1995. The remaining sanitary sewer consists of 8-inch diameter VCP
installed in 1958 and 1959. Approximately 57 percent of the sanitary sewer is subjected to frequent
problems with root intrusion. Root sawing must be performed on an annual basis to maintain the system
conveyance capacity. The current project cost estimate includes replacement of the existing VCP sanitary
sewer within the roadway and cured-in-place lining of the sanitary sewer along the June Avenue easement
between 71st Avenue and 70th Avenue.
Storm Sewer
The storm sewer on Noble Avenue consists of 12-inch and 15-inch diameter RCP that drains to Shingle
Creek. This storm sewer was installed in 1970. The remainder of the project area consists of 15-inch to 33-
inch diameter RCP installed when the neighborhood was reconstructed in 1995. This storm sewer generally
drains to Palmer Lake. The condition of the storm sewer within the neighborhood is rated as good. The
current project cost estimate includes replacing storm structure castings and isolated portions of lateral
storm sewer as necessary.
Street Lighting
The current cost estimate includes replacing the 20 wood poles with 20 fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 21
2020-2034 Capital Improvement Program
53rd Avenue Improvements (Penn Avenue to Lyndale Avenue) - 2023
The 53rd Avenue project area extends on 53rd Avenue from Penn Avenue to Lyndale Avenue. The project
area includes a total of 6,323-feet of local streets. The neighborhood consists of approximately 27
residential properties, one multi-family property and two business properties. We estimate that only four of
the properties will receive a special assessment because the remaining properties were previously assessed
with adjacent construction projects.
Streets
53rd Avenue is designated as a MSA Route. 53rd Avenue is also the border between Brooklyn Center and
Minneapolis. Minneapolis is responsible for maintenance of 53rd Avenue from Lyndale Avenue to
Humboldt Avenue and Brooklyn Center is responsible for maintenance from Humboldt Avenue to Penn
Avenue. The existing streets in the project area are 36-feet wide with concrete curb and gutter, constructed
in 1985. Proposed street improvements consist of the reconstruction of the street subgrade, installation new
of curb and gutter to improve drainage and placement of bituminous street pavement.
Water Main
The existing water main on 53rd Avenue is 6-inch diameter CIP installed between 1965 and 1969. The
corrosion rate within the project area has not been thoroughly documented at this time. Water records
indicate there have been no main breaks within the project area. The current project estimate includes
complete water main replacement on 53rd Avenue. The project cost estimate also includes an emergency
connection with Minneapolis if formal inter-connection arrangements can be established for this
connection. Brooklyn Center staff will need to contact Minneapolis Water Utilities to discuss this potential
emergency connection.
Sanitary Sewer
The sanitary sewer on 53rd Avenue consists of 8-inch and 9-inch diameter VCP installed between 1952 and
1959. Approximately 52 percent of the sanitary sewer is subjected to frequent problems with root intrusion.
Root sawing must be performed on an annual basis to maintain the system conveyance capacity. The
condition of the sanitary sewer system within the neighborhood is rated as fair. The current project cost
estimate includes complete sanitary sewer replacement.
Storm Sewer
The majority of the storm sewer runoff in the project area drains to the trunk storm sewer line on 55th
Avenue and is conveyed to the Mississippi River. The storm sewer on 53rd Avenue consists of 12-inch
diameter to 15-inch diameter RCP installed between 1952 and 1979. The current project cost estimate
includes replacement of 75 percent of the storm sewer laterals and structures.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the 21 wood poles with 21 fiberglass poles with a cut-off type LED
light fixture and underground power.
Project Summaries Page | 22
2020-2034 Capital Improvement Program
50th Avenue Improvements (France Avenue to Drew Avenue) - 2023
The 50th Avenue project area extends on 50th Avenue from
France Avenue to Drew Avenue. The total project length is
665-feet. The neighborhood consists of approximately seven
residential properties (R4), five industrial properties (I2) and
one commercial property (C1).
Streets
This section of 50th Avenue was reconstructed in 1988. The
existing street is 36-feet wide with concrete curb and gutter.
After the year 2023 the pavement will have exceeded the
expected service cycle. Proposed street improvements consist
of reconstruction of the bituminous street pavement and replacement of the concrete curb and gutter as
necessary.
Water Main
The existing water main in the 50th Avenue project area consists of 8-inch and 10-inch diameter CIP
installed in 1958 and 1966. The corrosion rate within the project area has not been thoroughly documented
at this time. Water records indicate that one main break has occurred within the project area and one
property has experienced a frozen water service in past winters. The current cost estimate includes
complete replacement of the water main.
Sanitary Sewer
The sanitary sewer in the 50th Avenue project area is owned and maintained by the Metropolitan Council
and consists of 30-inch diameter reinforced RCP installed in 1955. The current project estimate includes
the replacement of sanitary sewer castings and services.
Storm Sewer
The storm sewer runoff from the 50th Avenue project area is collected in the existing storm sewer system
and is conveyed to storm drainage ditches along Highway 100. The existing storm sewer in the project area
consists of 15-inch to 24-inch diameter RCP installed in 1988. The current project cost estimate includes
replacing the storm sewer structure castings and isolated portions of lateral storm sewer as necessary.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes no street light replacement.
Project Summaries Page | 23
2020-2034 Capital Improvement Program
51st Avenue Improvements (West of France Avenue) - 2023
The 51st Avenue project area extends from 185-feet south
of Oak Street on Twin Lake Boulevard to France Avenue.
The total project length is 1,171-feet. The neighborhood
consists of approximately 25 residential properties.
Streets
The 51st Avenue project area was originally constructed in
1990. The existing street is 30-feet wide with concrete
curb and gutter. After the year 2023 the pavement will
have exceeded the expected service cycle. Proposed street
improvements consist of reconstruction of the bituminous
street pavement and replacement of the concrete curb and
gutter as necessary.
Water Main
The existing water main in the 51st Avenue project area consists of 8-inch diameter DIP installed in 1990.
The water main is in good condition based on current maintenance records. The project cost estimate
includes casting replacement.
Sanitary Sewer
The sanitary sewer in the 51st Avenue project area consists of 8-inch diameter PVC pipe installed in 1990.
The condition of the sanitary sewer system within the neighborhood is rated as good. The current project
estimate includes the replacement of sanitary sewer castings only.
Storm Sewer
The storm sewer runoff from the 51st Avenue project area is collected in the existing storm sewer system
and conveyed to the storm water pond west of 51st Avenue. The existing storm sewer in the project area
consists of 15-inch to 21-inch diameter RCP installed in 1990. The current project cost estimate includes
replacing the storm sewer structure castings and isolated portions of lateral storm sewer as necessary.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes replacing the three wood poles with three fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 24
2020-2034 Capital Improvement Program
Knox, James and 54th Avenues Area Improvements - 2023
The Knox, James and 54th Avenues project area includes James
Avenue and Knox Avenue between 55th Avenue and 53rd Avenue,
and 54th Avenue between Logan Avenue and Irving Avenue. The
project area includes a total of 3,487-feet of local streets. The
neighborhood consists of approximately 68 residential and one
multi-family property.
Streets
The existing streets in the project area are 30-feet wide with
concrete curb and gutter constructed in 1994. Proposed street
improvements consist of new street pavement and replacement of
isolated sections of concrete curb and gutter as necessary.
Water Main
The existing water main in the project area consists of 6-inch
diameter DIP installed in 1994. The current project estimate includes 50% hydrant and gate valve
replacements and casting replacement.
Sanitary Sewer
The sanitary sewer in the project area consists of 10-inch diameter PVC installed in 1994. The condition of
the sanitary sewer system within the neighborhood is rated as good. The current project cost estimate
includes the replacement on sanitary sewer castings only.
Storm Sewer
The majority of the storm sewer runoff in the project area drains to the trunk storm sewer line on 55th
Avenue and is conveyed to the Mississippi River. The storm sewer consists of 12-inch diameter to 18-inch
diameter RCP installed in 1994. The current project cost estimate includes replacement of storm sewer
castings.
Street Lighting
The existing street light system is overhead power, with a combination of wood poles with cobra head light
fixtures and fiberglass poles with rectilinear fixtures. The current cost estimate includes no street light
replacement.
Project Summaries Page | 25
2020-2034 Capital Improvement Program
Orchard Lane East Improvements - 2024
The Orchard Lane East project area extends
from Perry Avenue to Brooklyn Boulevard and
Interstate 94 to 63rd Avenue. The project area
contains a total of 21,560 linear feet of local
streets. The neighborhood consists of
approximately 360 residential properties, two
multi-family properties and one commercial
property.
Streets
The Orchard Lane East area was reconstructed
in 1996. The streets are generally 30-feet wide
with concrete curb and gutter. The current cost
estimate assumes street improvements that
consist of approximately 50 percent curb
replacement, 10 percent sidewalk replacement
and full depth pavement replacement.
Water main
Approximately 25 percent of the water main in the Orchard Lane East area was replaced with DIP in 1996
when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch, 8-inch
and 12-inch diameter CIP installed between 1955 and 1973. Records indicate there have been nine water
main breaks in the neighborhood and one property has experienced a frozen water service in past winters.
The current project cost estimate includes replacement of existing CIP water main.
Sanitary Sewer
Approximately 50 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 1996. The remaining sanitary sewer consists of 8-inch and 12-inch
diameter VCP installed between 1956 and 1966. The current project cost estimate includes replacement of
the existing VCP sanitary sewer.
Storm Sewer
The storm sewer on the north and west streets of the Orchard Lane East area drain to the storm water ponds
at Orchard Park and Cahlander Park. The storm sewer consists of 12-inch to 42-inch diameter pipe. The
south and east streets in the project area drains to Shingle Creek. This storm sewer consists of 12-inch to
60-inch diameter pipe. The trunk storm sewer on 65th Avenue and Orchard Avenue was installed in 1956.
The remainder of the storm sewer was installed when the neighborhood was reconstructed in 1996. The
current project cost estimate includes replacing storm structure castings and isolated portions of lateral
storm sewer as necessary.
Street Lighting
The current cost estimate includes replacing the 24 wood poles with 24 fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 26
2020-2034 Capital Improvement Program
Humboldt Avenue Improvements - 2024
The Humboldt Avenue project area extends from 69th Avenue to the
north City limits. The project area contains a total of 2,618 linear feet of
local streets. The neighborhood consists of approximately 43 residential
properties (R1), three R5 properties and two commercial (C2)
properties.
Streets
This segment of roadway is designated as a MSA Route. This section of
Humboldt Avenue was reconstructed in 1995. The existing street is
generally 30-feet wide with concrete curb and gutter. The street
pavement exhibits a moderate rate of deterioration due to higher
volumes of traffic. The current cost estimate assumes street
improvements that consist of approximately 35 percent curb
replacement, 10 percent sidewalk replacement and full depth pavement
replacement.
Water main
The existing water main in the Humboldt Avenue project area consists
of 8-inch diameter CIP installed in 1965 and 1967. Based on current
maintenance records there is no history of water main breaks in this area. The current project cost estimate
includes replacement of 25 percent of the water main and replacement of all hydrants and valves.
Sanitary Sewer
When the Humboldt Avenue project area was reconstructed in 1995, 25 percent of the sanitary sewer was
replaced with 10-inch diameter PVC. The remaining sanitary sewer in the area consists of 8-inch diameter
VCP installed between 1965 and 1967. The current project cost estimate includes replacement of the
existing VCP sanitary sewer.
Storm Sewer
The existing storm sewer in the Humboldt Avenue project area consists of 15-inch to 36-inch diameter
RCP that drains to the Mississippi River. The storm sewer was installed between 1955 and 1961 and in
1995. When the project area was reconstructed in 1995, the existing storm sewer was left in place and
additional storm sewer was added to the existing system. The current project cost estimate includes
replacing structure castings and isolated pipe laterals as necessary within the project area.
Street Lighting
The current cost estimate includes replacing the five wood poles with five fiberglass poles with a cut-off
type LED light fixture and underground power.
Project Summaries Page | 27
2020-2034 Capital Improvement Program
Orchard Lane West Area Improvements - 2025
The Orchard Lane West Area project extends from Unity
Avenue to Perry Avenue and Interstate 94 to 61st Avenue. The
project area contains a total of 25,702 linear feet of local
streets. The neighborhood consists of approximately 508
residential properties, one church property and one school
property.
Streets
The Orchard Lane West Area was reconstructed in 1997. The
streets are generally 30-feet wide with concrete curb and gutter.
The current cost estimate assumes street improvements that
consist of approximately 50 percent curb replacement, 20
percent sidewalk replacement, 50 percent driveway apron
replacement and full depth pavement replacement.
Water main
Approximately 99 percent of the water main in the Orchard
Lane West Area was replaced with DIP in 1997 when the
neighborhood was reconstructed. The remaining water main in
the area consists of 6-inch DIP installed in 1987. Records
indicate there have been no water main breaks in the
neighborhood since the area was reconstructed and one property in the area has experienced a frozen water
service in past winters. The current project cost estimate includes replacement of miscellaneous valves and
hydrants as necessary.
Sanitary Sewer
Approximately 55 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 1997. The remaining sanitary sewer consists of 8-inch diameter and 10-
inch diameter VCP installed between 1955 and 1958. Approximately 11 percent of the sanitary sewer is
subjected to frequent problems with root intrusion. Root sawing must be performed on an annual basis to
maintain the system conveyance capacity. The current project cost estimate includes replacement of the
existing VCP sanitary sewer.
Storm Sewer
The storm sewer north of 63rd Avenue in the Orchard Lane West Area drains to the storm water ponds at
Orchard Park and Cahlander Park. This storm sewer consists of 12-inch to 36-inch diameter pipe. The
streets south of 63rd Avenue drain to the storm water pond at 63rd Avenue and Perry Avenue. This storm
sewer consists of 12-inch to 36-inch diameter pipe. A 27-inch RCP storm line installed in 1958 remains on
Woodbine Lane and a 15-inch RCP storm line installed in 1965 remains on Scott Avenue. The current
project cost estimate includes replacement of the storm sewer installed in 1958 and 1965 and replacement
of storm laterals as needed for utility replacement.
Street Lighting
The current cost estimate includes replacing the 29 wood poles with 29 fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 28
2020-2034 Capital Improvement Program
53rd Avenue and Xerxes Avenue Improvements - 2025
53rd Avenue extends from Xerxes Avenue to Upton
Avenue and Xerxes Avenue extends from 51st Avenue
to 53rd Avenue. The project area contains a total of
2,028 linear feet of local streets. The neighborhood
consists of 20 residential properties and one multi-
family (R5) property.
Streets
This project area was most recently reconstructed in
1996 by the City of Minneapolis. 53rd Avenue and
Xerxes Avenue is the border between Brooklyn Center
and Minneapolis. Agreement documents indicate that
Brooklyn Center is responsible for maintenance of
these roadways. Existing streets are generally 30-feet wide with concrete curb and gutter. The current cost
estimate assumes street improvements that consist of approximately 30 percent curb replacement, 25
percent driveway apron replacement and full depth pavement replacement.
Water main
The existing water main on 53rd Avenue consists of 6-inch diameter CIP installed in 1973. Records indicate
that there have been no water main breaks in the area. The water main is in good condition based on current
maintenance records. The water main on Xerxes Avenue is owned and maintained by the City of
Minneapolis. The current project cost estimate includes no water main replacement.
Sanitary Sewer
There is no sanitary sewer on 53rd Avenue. The existing sanitary sewer on Xerxes Avenue is owned and
maintained by the City of Minneapolis. The current project cost estimate includes no sanitary sewer
replacement.
Storm Sewer
The storm sewer in the project area consists of 10-inch PVC pipe that flows to storm water ponds located
south of 53rd Avenue and east of Upton Avenue. This storm sewer was installed in 1996 when the area was
last reconstructed. The current project cost estimate includes casting replacement only.
Street Lighting
The current cost estimate includes replacing the eight wood poles with eight fiberglass poles with a cut-off
type LED light fixture and underground power.
Project Summaries Page | 29
2020-2034 Capital Improvement Program
69th Avenue (CSAH 130) (Unity Ave to Brooklyn Blvd) - 2025
The 69th Avenue project extends
from the western City limits to
Brooklyn Boulevard. The total
project length is 3,654 linear feet.
The neighborhood consists of 30
single family properties (R1), one
church property (R1), four multi-
family properties (R2 to R4), and
five commercial properties (C2).
The cost estimate assumed only 6
properties will be assessed for the
project because the remaining properties were assessed with adjacent project.
Streets
This segment of roadway is a Hennepin County Roadway. The existing road is 38 feet wide with
bituminous curb. The street pavement is deteriorated due to age of the pavement and inadequate drainage.
The last road construction date is unknown. This project is included in the City’s CIP due to a potential
cost sharing agreement for the street and drainage improvements if the County improves that roadway in
the future and funding for the water main, sanitary sewer, storm sewer and street lighting improvements
described below.
Water main
The existing water main on 69th Avenue consists of 6-inch, 8-inch and 10-inch diameter CIP installed
between 1956 and 1963, and 8-inch, 10-inch and 12-inch DIP installed in 1974, 1977, 1994 and 2000.
Records indicate that there have been five water main breaks in the area, and two properties have
experience frozen water services in past winters. The current project cost estimate includes complete water
main replacement. .
Sanitary Sewer
The existing sanitary sewer on 69th Avenue consists of 12-inch diameter VCP installed in 1956, and 15-
inch and 21-inch diameter RCP installed in 1956. There is no history of root intrusion in the project area.
The current project cost estimate includes complete sanitary sewer replacement.
Storm Sewer
The storm sewer in the project area consists of 12-inch, 15-inch and 18-inch RCP installed by the City in
1994. The storm sewer flows north to the storm water ponds located around Unity Avenue. The current
project cost estimate includes replacing 100 percent of the storm sewer. The cost estimate assumes that
Brooklyn Center may contribute to a portion of the storm drainage cost for the project.
Street Lighting
The current cost estimate includes replacing the one wood pole with one fiberglass pole with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 30
2020-2034 Capital Improvement Program
Meadowlark Gardens Area Improvements - 2026
The Meadowlark Gardens project area extends on Logan Avenue
from 53rd Avenue to 57th Avenue, on Knox and James Avenues
from 55th Avenue to 57th Avenue and on 55th Avenue and 56th
Avenue from Morgan Avenue to Irving Avenue. The project area
also includes 57th Avenue from Humboldt Avenue to the Interstate
94 bridge. The project area contains a total of 10,150 linear feet of
local streets. The neighborhood consists of approximately 129
residential properties, two multi-family properties and two
commercial properties.
Streets
Logan Avenue and 57th Avenue are designated as MSA Routes.
The Meadowlark Gardens project area was last reconstructed in
1996. 57th Avenue is 30-feet wide, Logan Avenue is 32-feet wide
and the remaining streets are 30-feet wide. All streets in the
project have concrete curb and gutter. The current cost estimate
assumes street improvements that consist of approximately 35
percent curb replacement, 25 percent sidewalk replacement, 25
percent driveway apron replacement and full depth pavement
replacement.
Water main
Approximately 80 percent of the water main in the Meadowlark Garden area was replaced with DIP in
1996 when the neighborhood was reconstructed. The remaining water main in the area consists of 10-inch
CIP installed in 1969 and 16-inch steel pipe installed in 1964. Water records indicate one main break has
occurred on the CIP water main. The current project cost estimate includes replacement of the CIP and
steel water mains.
Sanitary Sewer
Approximately 94 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 1996. The remaining sanitary sewer consists of 8-inch diameter VCP
installed in 1959. The current project cost estimate includes replacement of the existing VCP sanitary
sewer.
Storm Sewer
Approximately 92 percent of the storm sewer in the project area was replaced in 1996 when the
neighborhood was reconstructed. The remaining pipe consists of 24-inch to 42-inch pipe on 55th Avenue
installed in 1952. The storm sewer on James Avenue and to the west drains to the trunk line on 55th Avenue
and then to the Mississippi River. This storm sewer consists of 15-inch to 44-inch diameter pipe. The storm
sewer on 57th Avenue drains to the trunk line on 59th Avenue and then to the Mississippi River. This storm
sewer consists of 15-inch to 42-inch diameter pipe. The current cost estimate includes replacing the
existing pipe installed in 1952 and replacement of storm laterals as needed for water main and sanitary
sewer replacement.
Street Lighting
The current cost estimate includes replacing the 17 wood poles with 17 fiberglass poles with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 31
2020-2034 Capital Improvement Program
67th Avenue and James Avenue Mill and Overlay - 2026
The project area includes 67th Avenue from Shingle Creek
Parkway to the east cul-de-sac and James Avenue from
Freeway Boulevard to 67th Avenue. The project area contains
a total of 2,063 linear feet of local streets. The project area
consists of 11 industrial properties.
Streets
The 67th Avenue and James Avenue area was reconstructed in
1998. The streets are generally 44-feet wide with concrete
curb and gutter. The current cost estimate assumes street
improvements that consist of approximately 30 percent
concrete replacement and a 2-inch mill and overlay.
Water main
The existing water main in the project area consists of 8-inch
diameter CIP installed in 1970. Records indicate that there
have been no water main breaks in the area. The current
project estimate includes 50 percent hydrant and gate valve
replacement and casting replacement.
Sanitary Sewer
The existing sanitary sewer in the project area consists of 8-inch PVC installed in 1970. The current project
estimate includes casting replacement only.
Storm Sewer
The storm sewer in the project area drains to the trunk line on 65th Avenue and then east to the Mississippi
River. This storm sewer consists of 15-inch to 36-inch diameter RCP installed in 1970 and 1974. The
current project estimate includes casting replacement only.
Street Lighting
The current cost estimate includes replacing the two wood poles with two fiberglass poles with a cut-off
type LED light fixture and underground power.
Project Summaries Page | 32
2020-2034 Capital Improvement Program
68th Avenue and Lee Avenue Mill and Overlay - 2026
The project area includes 68th Avenue from Lee Avenue to
Brooklyn Boulevard and Lee Avenue from 68th Avenue to 69th
Avenue. The project area contains a total of 1,668 linear feet of
local streets. The project area consists of nine commercial
properties.
Streets
The 67th Avenue and James Avenue area was reconstructed in
1998. The streets are generally 45-feet wide with concrete curb
and gutter. The current cost estimate assumes street
improvements that consist of approximately 30 percent concrete
replacement and a 2-inch mill and overlay.
Water main
The existing water main in the project area consists of 8-inch diameter CIP installed in 1966 and 1968.
Records indicate that there have been no water main breaks in the area. The current project estimate
includes 50 percent hydrant and valve replacement and casting replacement.
Sanitary Sewer
The existing sanitary sewer in the project area consists of 8-inch PVC installed in 1970. Approximately 25
percent of the sanitary sewer is subjected to frequent problems with root intrusion. Root sawing must be
performed on an annual basis to maintain the system conveyance capacity. The current project estimate
includes casting replacement only.
Storm Sewer
The storm sewer in the project area drains south to the storm water pond at Orchard Park. This storm sewer
consists of 12-inch to 24-inch diameter RCP installed in 1966 and 1968. The current project estimate
includes casting replacement only.
Street Lighting
The current cost estimate includes replacing the three wood poles with three fiberglass poles with a cut-off
type LED light fixture and underground power.
Project Summaries Page | 33
2020-2034 Capital Improvement Program
John Martin Drive Mill and Overlay - 2026
The John Martin Drive project area extends from Shingle
Creek Parkway to 450-feet south of Earle Brown Drive. The
project area contains a total of 1,381 linear feet of local
streets. The neighborhood consists of approximately nine
commercial properties.
Streets
John Martin Drive is designated as a MSA Route. The
project area was reconstructed in 1998. The streets are
generally 50-feet wide with concrete curb and gutter. The
current cost estimate assumes street improvements that
consist of approximately 30 percent concrete replacement
and a 2-inch mill and overlay.
Water main
The existing water main in the project area consists of 8-inch diameter CIP installed in 1969. Records
indicate that there have been no water main breaks in the area. The current project estimate includes 50
percent hydrant and valve replacement and casting replacement.
Sanitary Sewer
The existing sanitary sewer in the project area consists of 8-inch diameter VCP installed in 1969. There is
no history of root intrusion in the project area. The current project estimate includes casting replacement
only.
Storm Sewer
The storm sewer on John Martin Drive drains to Shingle Creek. This storm sewer consists of 12-inch to 48-
inch diameter RCP installed in 1969. The current project estimate includes casting replacement only.
Street Lighting
The existing street light system is underground power, with aluminum and a decorative light fixture. The
current cost estimate includes replacing fiberglass poles with a cut-off type LED light fixture that are not
located at intersection nodes. The replacement of intersection node lighting will be completed under a
separate project.
Project Summaries Page | 34
2020-2034 Capital Improvement Program
St. Alphonsus Area Mill and Overlay - 2026
The St. Alphonsus project area extends from Brooklyn
Boulevard to Grimes Avenue and 69th Avenue to 71st Avenue.
The area contains a total of 4,580 linear feet of local streets.
The project area consists of approximately 63 residential
properties, three commercial properties, one church property
and one multi-family property.
Streets
The St. Alphonsus area was last reconstructed in 1998. Halifax
Avenue is 30 to 35-feet wide, 70th Avenue is 35 to 42-feet
wide and the remaining streets are 30-feet wide. All streets in
the area have concrete curb and gutter. The current cost estimate assumes street improvements that consist
of approximately 25 percent sidewalk and driveway apron replacement, 35 percent curb replacement and a
2-inch mill and overlay.
Water main
The existing water main in the project area consists of 6-inch CIP installed between 1959 and 1961 and 6-
inch DIP installed in 1978. Based on current maintenance records there have been two water main breaks in
this area and four properties have experienced frozen water service in past winters. The current project
estimate includes 50 percent hydrant and valve replacement and casting replacement.
Sanitary Sewer
Approximately 83 percent of the sanitary sewer in the project area was replaced with 8-inch PVC when the
neighborhood was reconstructed in 1998. The remaining pipe consists of 8-inch diameter VCP installed in
1958 and 1959. There is no history of root intrusion in the project area. The current project estimate
includes casting replacement only.
Storm Sewer
The storm sewer in the project area flows east to Palmer Lake. Approximately 25 percent of the storm
sewer in this area was installed in 1998 or later. This storm sewer consists of 15-inch diameter high-density
polyethylene plastic pipe and 18-inch to 42-inch diameter RCP. The remaining storm sewer consists of 15-
inch to 42-inch diameter RCP installed in 1957 and 1984. The current project estimate includes casting
replacement only.
Street Lighting
The current cost estimate includes replacing the seven wood poles with seven fiberglass poles with a cut-
off type LED light fixture and underground power.
Project Summaries Page | 35
2020-2034 Capital Improvement Program
Humboldt Avenue Mill and Overlay (65th Ave to 69th Ave) - 2026
The Humboldt Avenue project area extends from 69th Avenue
to 65th Avenue. The area contains a total of 2,625 linear feet of
local streets. The project area consists of the City Police
Station, High School property (R1), 26 multi-family properties
(R5) and four commercial properties (C2).
Streets
The Humboldt Avenue area was last reconstructed in 2006.
Humboldt Avenue is 50 to 70-feet wide with concrete curb and
gutter The current cost estimate assumes street improvements
that consist of 30 percent curb replacement, a 2-inch mill and
overlay and minor sidewalk repairs.
Water main
The existing water main in the project area consists of 6-inch
DIP installed in 2006. Based on current maintenance records
there have been no water main breaks in this area and one
property has experienced a frozen water service in past winters.
The current project estimate includes casting replacements
only.
Sanitary Sewer
Approximately 77 percent of the sanitary sewer in the project area was replaced with 8-inch CIPP liner or
8-inch PVC when the neighborhood was reconstructed in 2006. The remaining pipe consists of 8-inch
diameter VCP installed in 1965. There is no history of root intrusion in the project area. The current project
estimate includes casting replacements only.
Storm Sewer
The storm sewer in the project area flows to trunk lines on 69th Avenue and 65th Avenue and then to the
Mississippi River. The storm sewer consists of 15-inch and 18-inch diameter HDPE and 21-inch to 27-inch
RCP installed in 2006. The current project estimate includes casting replacements only.
Street Lighting
The current cost estimate includes replacing the one wood pole with one fiberglass pole with a cut-off type
LED light fixture and underground power.
Project Summaries Page | 36
2020-2034 Capital Improvement Program
Earle Brown Drive Area Improvements - 2027
The Earle Brown Drive project extends from
John Martin Drive in the southwest to the
northeast corner of the Earle Brown Heritage
Center. It contains a total of 3,075 linear feet
of local streets. The project area consists of 11
commercial properties.
Streets
Earle Brown Drive is designated as a MSA
Route between John Martin Drive and Summit
Drive. This project area was reconstructed in
1999. The road is generally 50-feet wide with
concrete curb and gutter. The current cost
estimate assumes street improvements that
consist of approximately 30 percent curb
replacement, 30 percent sidewalk replacement,
25 percent driveway apron replacement and
full depth pavement replacement.
Water main
The water main in the project area consists of
8-inch and 12-inch diameter CIP installed in
1971 and 1974. Water records indicate one main break has occurred within the area. The current project
cost estimate includes casting replacement only.
Sanitary Sewer
The sanitary sewer in the project area consists of 8-inch diameter VCP installed in 1971 and 1974. There is
no history of root intrusion in this area. The current project cost estimate includes casting replacement only.
Storm Sewer
The storm sewer in the project area drains north and west to local storm water ponds. This storm sewer
consists of 12-inch to 30-inch diameter RCP installed in 1971 and 1974. Additional 15-inch diameter high-
density polyethylene plastic pipe was added to the project area when the road was reconstructed in 1999.
The current project estimate includes casting replacement only.
Street Lighting
The existing street light system contains underground power with aluminum poles and decorative light
fixtures. The current cost estimate includes no street light replacement.
Project Summaries Page | 37
2020-2034 Capital Improvement Program
65th/66th Avenue and Camden Avenue Mill and Overlay - 2027
The project includes Camden
Avenue from 66th Avenue to the
south cul-de-sac and 65th Avenue
and 66th Avenue from Humboldt
Avenue to just east of Camden
Avenue. It contains a total of
4,264 linear feet of local streets.
The project area consists of 13
single family properties (R1), a
City Park and Fire Station, a High
School property (R1), 24 multi-
family properties (R3 and R5) and
one commercial property (C2).
Streets
65th Avenue and 66th Avenue is designated as a MSA Route. Camden Avenue and a small portion of 66th
Avenue was reconstructed in 1999. In 2018 the south 300 feet and cul-de-sac on Camden Avenue were
reconstructed with the Top Golf development. A mill and overlay project was done on the remaining street
within the project area in 2007. The roads in the project area range from 40-feet wide to 66-feet with
concrete curb and gutter. The current cost estimate assumes street improvements that consist of
approximately 30 percent concrete replacement, minor sidewalk repairs and a 2-inch mill and overlay.
Water main
The water main in the project area consists of 6-inch and 8-inch diameter CIP installed in 1960 and 1968.
Water records indicate seven main breaks have occurred within the area. The current project cost estimate
includes casting replacement only.
Sanitary Sewer
The sanitary sewer in the project area consists of 8-inch and 10-inch diameter PVC and VCP installed in
1960, 1968 and 1989. Approximately 38 percent of the sanitary sewer is PVC pipe. There is no history of
root intrusion in this area. The current project estimate includes lining of the existing VCP sanitary sewer
and casting replacement in the remaining areas.
Storm Sewer
The storm sewer in the project area drains to the trunk line on 65th Avenue and then east to the Mississippi
River. This storm sewer consists of 12-inch to 66-inch diameter RCP installed in 1960, 1968 and 1999. The
current project estimate includes casting replacement only.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes no street light replacement.
Project Summaries Page | 38
2020-2034 Capital Improvement Program
73rd Avenue Mill and Overlay (Humboldt Ave to Camden Ave) - 2027
The 73rd Avenue project extends from Humboldt Avenue to approximately 275-feet east of Camden
Avenue. It contains a total of 2,994 linear feet of local streets. The project area consists of 25 single-family
properties and one church property.
Streets
73rd Avenue is designated as a MSA Route. 73rd Avenue is also the border between Brooklyn Center and
Brooklyn Park. The south portion of 73rd Avenue is maintained by Brooklyn Center and the north portion is
maintained by Brooklyn Park. This project area was reconstructed in 2000. The road is generally 33-feet
wide with concrete curb and gutter. The current cost estimate assumes street improvements that consist of
approximately 30 percent concrete replacement and a 2-inch mill and overlay.
Water main
All of the water main in the project area was replaced with DIP in 2000 when the neighborhood was
reconstructed. Water records indicate one property has experienced a frozen service in past winters. The
current project cost estimate includes casting replacement only.
Sanitary Sewer
Approximately four percent of the sanitary sewer in the project area was replaced with PVC in 2000 when
the area was reconstructed. The remaining sanitary sewer in the area consists of 8-inch diameter VCP
installed in 1961 and 1969. There is no history of root intrusion in this area. The current project cost
estimate includes casting replacement only.
Storm Sewer
The storm sewer in the project area drains south to a trunk line on 70th Avenue and then east to the
Mississippi River. This storm sewer consists of 12-inch to 21-inch diameter RCP installed in 1969 and
2000. The current project estimate includes casting replacement only.
Street Lighting
The existing street light system is overhead power, with wood poles and a cobra head light fixture. The
current cost estimate includes no street light replacement.
Project Summaries Page | 39
2020-2034 Capital Improvement Program
Garden City Central Area Mill and Overlay - 2028
The south portion of the Garden City Central project area
extends from Brooklyn Boulevard to Brooklyn Drive from 61st
Avenue to 63rd Avenue, and the north portion extends from
Xerxes Avenue to Brooklyn Drive from 63rd Avenue to 66th
Avenue. The project area contains a total of 19,230 linear feet
of local streets. The neighborhood consists of approximately
377 residential properties, one church property, three multi-
family properties (R4 and R5) and three commercial properties.
Streets
63rd Avenue from Brooklyn Boulevard to Xerxes Avenue is
designated as a MSA Route. The Garden City Central project
area was last reconstructed in 2000. 63rd Avenue ranges from 38 to 48-feet wide and the remaining streets
are 30-feet wide. All streets in the project have concrete curb and gutter. The current cost estimate assumes
street improvements that consist of approximately 30 percent concrete replacement and a 2-inch mill and
overlay.
Water main
Approximately 81 percent of the water main in the Garden City Central area was replaced with DIP in 2000
when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch and 16-
inch DIP installed in 1980, 1981, 1983 and 1993. Records indicate there has been one water main break in
the neighborhood and four properties in the area have experienced frozen water services in past winters.
The current project estimate includes casting replacement only.
Sanitary Sewer
Approximately 72 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 2000. The remaining sanitary sewer consists of 8-inch diameter VCP
installed in 1958, 8-inch diameter PVC installed in 1980, 15-inch diameter RCP installed in 1956 and 24-
inch diameter pipe corrugated metal pipe lined with CIPP in 1995. There is no history of root intrusion in
the project area. The current project estimate includes cured-in-place lining of the RCP and VCP sanitary
sewer mains installed in the 1950s and casting replacement.
Storm Sewer
Approximately 83 percent of the storm sewer in the project area was installed in 2000 when the
neighborhood was reconstructed. The remaining pipe consists of 15-inch, 36-inch and 72-inch pipe
installed in the backyards between 64th Avenue and 65th Avenue in 1956. The storm sewer in this
neighborhood drains to Shingle Creek. The current cost estimate includes replacing storm structure castings
and isolated portions of lateral storm sewer as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2000. The current cost estimate includes replacement of two street lights
that have not been replaced and upgrade all to LED luminaires.
Project Summaries Page | 40
2020-2034 Capital Improvement Program
Shingle Creek Parkway and Xerxes Avenue Mill and Overlay - 2028
The project area includes Shingle
Creek Parkway from Xerxes
Avenue to Freeway Boulevard and
Xerxes Avenue from the I-694
bridge to Shingle Creek Parkway.
The project area contains a total of
5,551 linear feet of local streets.
The project area consists of 45
multi-family properties (R3), two
commercial properties (C1), and 16
industrial properties (I1).
Streets
All streets within the project area
are designated as Minnesota State Aid Routes. Xerxes Avenue was reconstructed in 2008 and a mill and
overlay project was done on Shingle Creek Parkway in 2005. Xerxes Avenue ranges from 38-feet to 52-
feet wide with concrete curb and gutter. Shingle Creek Parkway is generally 70-feet wide but varies in
some locations. The current cost estimate assumes street improvements that consist of approximately 30
percent concrete replacement and a 2-inch mill and overlay.
Water main
The existing water main in the project area consists of 10-inch and 12-inch diameter CIP installed between
1969 and 1974. Records indicate that there have been five water main breaks in the area. The current
project estimate includes casting replacement only.
Sanitary Sewer
The existing sanitary sewer on Xerxes Avenue consists of 12-inch diameter RCP installed in 1969. The
existing sanitary sewer on Shingle Creek Parkway consists of 8-inch and 10-inch diameter PVC installed in
1970 and 1972. The current project estimate includes cured-in-place lining of the RCP sanitary sewer
mains and casting replacement.
Storm Sewer
The storm sewer in the west half of the project area drains to Shingle Creek and the east portion drains to
the trunk line on Freeway Blvd and then east to the Mississippi River. The existing storm sewer ranges in
size from 12-inch to 60-inch diameter RCP pipe installed between 1969 and 1984. The current project
estimate includes casting replacement only.
Street Lighting
Xerxes Avenue contains an existing steet light system with underground power, fiberglass poles and
standard light fixtures, which were installed in 2008. The existing light system on Shingle Creek Parkway
has underground power, wood poles and single and double cobrahead light fixtures. The current cost
estimate includes replacing 12 wood poles with 12 fiberglass poles with a cut-off type LED light fixture
and underground power.
Project Summaries Page | 41
2020-2034 Capital Improvement Program
Garden City North Area Mill and Overlay - 2029
The east portion of the Garden City Central project area
extends from Brooklyn Boulevard to Xerxes Avenue from
Interstate 94 to 63rd Avenue, and the west portion includes
Halifax Drive, Grimes Avenue and France Avenue north of
63rd Avenue. The project area contains a total of 18,390 linear
feet of local streets. The neighborhood consists of
approximately 305 residential properties, one school property,
10 multi-family properties (R5) and four commercial
properties.
Streets
The Garden City Central project area was last reconstructed in 2001. The streets within the project area
consist of 30-foot wide roads with concrete curb and gutter. The current cost estimate assumes street
improvements that consist of approximately 20 percent concrete replacement and a 2-inch mill and overlay
in areas with no proposed utility replacement (81 percent of the project area). In utility replacement areas,
the cost estimate assumes 50 percent curb replacement, 20 percent sidewalk replacement and full depth
pavement replacement.
Water main
Approximately 85 percent of the water main in the Garden City North area was replaced with DIP in 2001
when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch and 8-
inch CIP installed in 1956, 1959, 1962 and 1974. Records indicate there have been two water main breaks
in the neighborhood on the older water main and one property in the area has experienced a frozen water
service in past winters. The current project estimate includes replacing old water main in the areas west of
Brooklyn Boulevard and at 65th Avenue and Xerxes Avenue. In the remainder of the project area the cost
estimate assumes casting replacement only.
Sanitary Sewer
Approximately 68 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 2001. The remaining sanitary sewer consists of 8-inch diameter VCP
installed in 1958, 15-inch diameter RCP installed in 1956 and 24-inch corrugated metal pipe lined with
CIPP in 1995. Root sawing must be performed on all of the VCP in the area an annual basis to maintain the
system conveyance capacity. The current project estimate includes replacement of the existing VCP and
RCP sanitary sewer from the 1950s and casting replacement in the remaining areas.
Storm Sewer
Approximately 78 percent of the storm sewer in the project area was installed in 2001 when the
neighborhood was reconstructed. The remaining pipe consists of 18-inch, 66-inch and 72-inch pipe
installed in rear and side lot easements in 1956 and 1965. The storm sewer in this neighborhood drains to
Shingle Creek. The current cost estimate includes replacing the older storm sewer in the 64th Avenue rear
lot easement, structure casting replacement and isolated portions of lateral storm sewer as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2001. The current cost estimate includes upgrading all lights to LED
luminaires.
Project Summaries Page | 42
2020-2034 Capital Improvement Program
Garden City South Area Mill and Overlay - 2030
The Garden City South project area extends from Brooklyn
Boulevard to Upton Avenue from Northway Drive to 61st Avenue,
and includes Xerxes Avenue from Northway Drive to the
Interstate 94 bridge. The project area contains a total of 19,418
linear feet of local streets. The neighborhood consists of
approximately 241 residential properties, three church properties,
one multi-family property (R5) and five commercial properties.
Streets
Xerxes Avenue is designated as a MSA Route. The Garden City
South project area was last reconstructed in 2002. The local streets
within the project area consist of 30-foot wide roads with concrete
curb and gutter and Xerxes Avenue is a 70-foot wide road with a
center median. The current cost estimate assumes street
improvements that consist of approximately 30 percent curb
replacement, a 2-inch mill and overlay on local streets, a 3-inch
mill and overlay on Xerxes Avenue and 20 percent sidewalk
replacement on Xerxes Avenue.
Water main
Approximately 34 percent of the water main in the Garden City
South area was replaced with DIP in 2002 when the neighborhood
was reconstructed. The remaining water main in the area consists
of 6-inch, 8-inch and 12-inch CIP installed in 1956, 1961, 1964 and 1966. Records indicate there have been
two water main breaks in the neighborhood on the older water main and two properties in the area have
experienced frozen water services in past winters. The current project estimate includes lining the 1950s
and 1960s water main in the area and insulating the frozen water services. In the remainder of the project
area the cost estimate assumes casting replacement only.
Sanitary Sewer
Approximately 50 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed in 2002. The remaining sanitary sewer consists of 8-inch diameter VCP
installed in 1957, 1958, 1964 and 1965, and sanitary force main consisting of 16-inch CIP installed in 1966.
Root sawing must be performed on 20 percent of the VCP in the area on an annual basis to maintain the
system conveyance capacity. The current project estimate includes lining of the existing VCP sanitary
sewer from the 1950s and 1960s and casting replacement in the remaining areas.
Storm Sewer
Approximately 61 percent of the storm sewer in the project area was installed in 2002 when the
neighborhood was reconstructed. The remaining pipe consists of 15-inch to 27-inch and 72-inch RCP
installed in 1956, 1964, 1965 and 1966. The storm sewer in this neighborhood drains to Shingle Creek. The
current project estimate includes lining of the existing RCP storm sewer from the 1950s and 1960s and
structure casting replacement as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2002. The current cost estimate includes replacing the one wood pole with
one fiberglass pole with a cut-off type LED light fixture and underground power on Xerxes Avenue north
of 61st Avenue.
Project Summaries Page | 43
2020-2034 Capital Improvement Program
Southwest Area Mill and Overlay- 2031
The Southwest project area extends from France Avenue to Brooklyn
Blvd from 53rd Avenue to 55th Avenue; Twin Lake Avenue to Azelia
Avenue from Lakeside Avenue to the cul-de-sacs north of Lakebreeze
Avenue; and includes Azelia Avenue, 50th Avenue from France to
west the railroad tracks, and France Avenue from the south cul-de-sac
to 53rd Avenue. The project area contains a total of 17,208 linear feet
of local streets. The neighborhood consists of approximately 180
single family residential properties (R1 and R2), 36 multi-family
properties (R4 and R5), 12 Industrial properties, one commercial
property and one school.
Streets
The Brooklyn Boulevard service road, 53rd Avenue, France Avenue
from 53rd Avenue to 50th Avenue, 50th Avenue, and Azelia Avenue from Lakebreeze Avenue to the railroad
tracks are all designated as a MSA Routes. The Southwest project area was last reconstructed between 2002
and 2005. The local streets within the project area consist of 30-foot wide roads with concrete curb and
gutter. The Brooklyn Blvd Service Road, 53rd Avenue and France Avenue are 32-foot wide roads, and
Azelia Avenue from Lakebreeze Avenue to the railroad tracks is a 38-foot road. The current cost estimate
assumes street improvements that consist of approximately 40 percent concrete replacement and a 2-inch
mill and overlay.
Water main
Approximately 42 percent of the water main in the Southwest project area was replaced with DIP between
2002 and 2005 when the neighborhood was reconstructed. The remaining water main in the area consists of
6-inch, 8-inch, 10-inch and 12-inch CIP installed in 1956, 1958, 1960, 1961, 1961, 1964, 1968, and 1973.
Records indicate there have been two water main breaks in the neighborhood on the older water main and
three properties in the area have experienced frozen water services in past winters. The current project
estimate includes lining the 1950s, 1960s and 1970s water main in the area and insulating the frozen water
services. In the remainder of the project area the cost estimate assumes casting replacement only.
Sanitary Sewer
Approximately 60 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed between 2002 and 2005. The remaining sanitary sewer consists of 8-inch
diameter VCP installed in 1960 and 1961, 15-inch RCP installed in 1956 and 8-inch PVC installed in 1977
and 1999. Root sawing must be performed on 30 percent of the VCP in the area on an annual basis to
maintain the system conveyance capacity. The current project estimate includes lining of the existing VCP
sanitary sewer from the 1950s and 1960s and casting replacement in the remaining areas.
Storm Sewer
Approximately 82 percent of the storm sewer in the project area was installed between 2002 and 2005
when the neighborhood was reconstructed. The remaining pipe consists of 15-inch to 48-inch RCP installed
in 1938 and 1957. The storm sewer in northeast portion of the project area flows to the ponds at
Centerbrook Golf Course, and the southwest portion of the project area flow to Upper and Middle Twin
Lakes. The current cost estimate includes replacing storm structure castings and isolated portions of lateral
storm sewer as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed between 2002 and 2005. The current cost estimate includes replacing the
standard light fixtures with a cut-off type LED light fixture.
Project Summaries Page | 44
2020-2034 Capital Improvement Program
Happy Hollow Mill and Overlay - 2032
The Happy Hollow project area extends from Lilac
Drive to Brooklyn Boulevard and 49th Avenue to the
extension of 51st Avenue; France Avenue to Drew
Avenue from 47th Avenue to Lakebreeze Avenue; and
includes Lakebreeze Avenue/France Avenue from
Azelia Avenue to the southern City limits. The project
area contains a total of 10,902 linear feet of local streets.
The neighborhood consists of approximately 95 single
family residential properties (R1), four multi-family
properties (R5), 10 industrial properties, and one
commercial property.
Streets
The Happy Hollow project area was last reconstructed between 2002 and 2005. Lakebreeze Avenue and
France Avenue are designated as a MSA Routes. The local streets within the project area consist of 30-foot
wide roads with concrete curb and gutter. Lilac Drive north of 50th Avenue is a 24-foot road, 47th Avenue
is a 27-foot road, 48th Avenue is a 38-foot road, and the road width on Lakebreeze Avenue and France
Avenue varies with concrete islands separating the driving lanes. The current cost estimate assumes street
improvements that consist of approximately 40 percent concrete replacement and a 2-inch mill and overlay.
Water main
Approximately 84 percent of the water main in the Happy Hollow project area was replaced with DIP
between 2002 and 2003 when the neighborhood was reconstructed. The remaining water main in the area
consists of 6-inch, 8-inch and 10-inch CIP installed in 1958, 1960, 1964 and 1967. Records indicate there
have been no water main breaks in the neighborhood and one property in the area has experienced a frozen
water service in past winters. The current project estimate includes lining the 1950s and 1960s water main
in the area and insulating the frozen water service. In the remainder of the project area the cost estimate
assumes casting replacement only.
Sanitary Sewer
Approximately 75 percent of the sanitary sewer in the project area was replaced with PVC when the
neighborhood was reconstructed between 2002 and 2003. The remaining sanitary sewer consists of 8-inch
and 10-inch diameter VCP and CIP installed in 1960. The sanitary sewer on 50th Avenue owned and
maintained by the Metropolitan Council and consists of 30-inch and 33-inch diameter reinforced RCP
installed in 1955. Root sawing must be performed on 30 percent of the VCP in the area on an annual basis
to maintain the system conveyance capacity. The current project estimate includes lining of the existing
VCP and CIP sanitary sewer from 1960 and casting replacement in the remaining areas.
Storm Sewer
Approximately 84 percent of the storm sewer in the project area was installed between 2002 and 2005
when the neighborhood was reconstructed. The remaining pipe consists of 21-inch installed in 1953. The
storm sewer in the project area flows to Ryan Lake and Middle Twin Lake. The current project estimate
includes lining of the existing RCP storm sewer from the 1950s and structure casting replacement as
necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2002. The current cost estimate includes replacing the two wood pole with
two fiberglass poles with a cut-off type LED light fixture and replacing the standard light fixtures with a
cut-off type LED light fixture.
Project Summaries Page | 45
2020-2034 Capital Improvement Program
Southeast Alleys Improvements – 2032
The Southeast Alley project area includes all
alleys between Morgan Avenue and Dupont
Avenue from 53rd Avenue to 57th Avenue. The
project area contains a total of 7,978 linear feet.
The project area consists of approximately 234
single family residential properties (R1 and R2)
and 2 multi-family properties (R4).
Streets
Three of the alleys in the project area were 10 feet
wide, constructed with concrete in 1989. The
remaining alleys were constructed with
bituminous pavement in 1999 and 2000 and are
also 10 feet wide. The current cost estimate
assumes complete alley reconstruction with
bituminous pavement and without concrete curb
and gutter.
Water main
There is no water main within the Southeast Alley project area.
Sanitary Sewer
There is no sanitary sewer within the Southeast Alley project area.
Storm Sewer
The storm sewer in the project area drains to the trunk storm line on 55th Avenue and then east to the
Mississippi River. The existing storm sewer in the area consists of 10-inch PVC, 12-inch RCP, PVC and
CMP; and 15-inch PVC installed between 1974 and 1989. The current project estimate includes casting
replacement as necessary.
Street Lighting
The existing street light system contains overhead power with wood poles and non-standard light fixtures.
The current cost estimate assumes replacing four old light fixtures with cut-off type LED light fixtures on
the existing wood pole.
Project Summaries Page | 46
2020-2034 Capital Improvement Program
Northport Area Mill and Overlay- 2033
The Northport project area extends from County Road 10 to 53rd
Avenue and from June Avenue to France Avenue. The project area
contains a total of 11,860 linear feet of local streets. The
neighborhood consists of approximately 178. single family
residential properties (R1).
Streets
The Northport project area was last reconstructed in 2004. Halfiax
Avenue, Eckberg Drive and France Avenue south of Eckberg Drive
are designated as a MSA Routes. Indiana Avenue contains a 24-foot
wide road and the MSA Route contains 32-foot wide roads. The
remaining local streets within the project area consist of 30-foot
wide roads. All roads within the project area have concrete curb and
gutter. The current cost estimate assumes street improvements that
consist of approximately 30 percent curb replacement and a 2-inch
mill and overlay.
Water main
Approximately 99 percent of the water main in the Northport project
area was replaced with DIP in 2004 when the neighborhood was
reconstructed. The remaining water main in the area consists of 6-inch and 10-inch CIP installed between
1955 and 1967. Records indicate there have been no water main breaks in the neighborhood and no
properties have experienced a frozen water service in past winters. The current project estimate includes
assumes casting replacement.
Sanitary Sewer
All of the sanitary sewer in the project area was replaced with PVC when the neighborhood was
reconstructed in 2004. The current project estimate includes casting replacement.
Storm Sewer
Approximately 96 percent of the storm sewer in the project area was installed in 2004 when the
neighborhood was reconstructed. The remaining pipe consists of 15-inch and 18-inch pipe installed in
1960. The storm sewer in the project area flows to Upper Twin Lake and a stormwater ponds at Northport
Park. The current project estimate includes casting replacement as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2004. The current cost estimate assumes no street light replacements.
Project Summaries Page | 47
2020-2034 Capital Improvement Program
Lions Park South Mill and Overlay - 2034
The Lions Park South project area extends from
Russell Avenue to Logan Avenue and from
Ericon Drive to 53rd Avenue. The project area
contains a total of 12,741 linear feet of local
streets. The neighborhood consists of
approximately 188 single family residential
properties (R1).
Streets
The Lions Park South project area was last
reconstructed in 2005. Russell Avenue and 54th
Avenue contain32-foot wide roads. The
remaining local streets within the project area
consist of 30-foot wide roads. All roads within
the project area have concrete curb and gutter. The current cost estimate assumes street improvements that
consist of approximately 30 percent curb replacement and a 2-inch mill and overlay.
Water main
All of the 6-inch diameter water main in the Lions Park South project area was replaced with DIP in 2005
when the neighborhood was reconstructed. The remaining water main in the area consists of 16-inch steel
installed in 1965. Records indicate there have been no water main breaks in the neighborhood and no
properties have experienced a frozen water service in past winters. The current project estimate includes
assumes casting replacement only.
Sanitary Sewer
All of the sanitary sewer in the project area was replaced with PVC when the neighborhood was
reconstructed in 2005. The current project estimate includes casting replacement only.
Storm Sewer
All of the storm sewer in the project area was installed in 2005 when the neighborhood was reconstructed.
The existing pipe consists of 12-inch to 36-inch pipe. The storm sewer in the project area flows to a trunk
line on 55th Avenue and then to the Mississippi River, and to a storm water pond at Lions Park and then to
Shingle Creek. The current project estimate includes casting replacement as necessary.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2005. The existing stand-alone poles in the project area are owned and
maintained by the City. The current cost estimate assumes no street light replacements.
Project Summaries Page | 48
2020-2034 Capital Improvement Program
73rd Avenue Mill and Overlay (Penn Ave to Humboldt Ave) - 2034
The 73rd Avenue
project extends from
Penn Avenue to
Humboldt Avenue.
The project area
contains a total of
2,606 linear feet of
local streets. The
neighborhood consists
of approximately 20
single family residential properties (R1).
Streets
73rd Avenue is the border between Brooklyn Center and Brooklyn Park. The 73rd Avenue project area was
last reconstructed in 2004 by the City of Brooklyn Park. 73rd Avenue contains a 32-foot wide road with
concrete curb and gutter. The current cost estimate assumes construction will be performed by Brooklyn
Park and the cost will be shared 50 percent by each city. The estimate assumes street improvements that
consist of approximately 30 percent curb replacement and a 2-inch mill and overlay.
Water main
Approximately 65 percent of the water main in the 73rd Avenue project area was replaced with PVC in
2004 when the neighborhood was reconstructed. The remaining water main in the area consists of 6-inch
CIP installed in 1967. Records indicate there has been one water main break in the neighborhood and one
property has experienced a frozen water service in past winters. The current project estimate includes
assumes lining the 1967 water main and insulating the frozen water service. In the remainder of the project
area the cost estimate assumes casting replacement that shall be paid fully by Brooklyn Center.
Sanitary Sewer
Approximately 48 percent of the sanitary sewer main in the project area was replaced with PVC when the
neighborhood was reconstructed in 2004. All of the existing sanitary manholes were left in place. The
remaining water main in the area consists of 8-inch diameter VCP installed in 1967. The current project
estimate includes lining the 1967 sanitary sewer and complete casting replacement in the remainder of the
project area. The cost shall be paid fully by Brooklyn Center.
Storm Sewer
All of the storm sewer in the project area was installed in 2004 when the neighborhood was reconstructed.
The existing storm sewer consists of 12-inch to 18-inch diameter RCP that drains west to Palmer Lake and
drains east to the trunk line on 70th Avenue and then to the Mississippi River. The current project estimate
includes casting replacement as necessary and the cost will be shared by the two cities.
Street Lighting
The existing street light system contains underground power with fiberglass poles and standard light
fixtures, which were installed in 2004. The current cost estimate assumes no street light replacements.
Project Summaries Page | 49
2020-2034 Capital Improvement Program
Water Main and Sanitary Sewer Improvements
Lift Station No. 6 Rehabilitation - 2020
This project includes the rehabilitation of lift station No. 6 with a full evaluation of pumps, control
equipment and appurtenances.
Water Tower No. 1 Painting - 2020
Water Tower No. 1, a 500,000 gallon elevated storage tank located at 69th Avenue and France Avenue, was
constructed in 1958. In 1988 spot repairs of the existing interior were completed (wet area repaired with
coal tar/epoxy coating) and the exterior coating system was completely replaced. In 1999 the interior wet
coating system was completely replaced and the exterior coating was spot repaired, power washed and a
urethane top coat was applied to the existing system. The estimated service life for the 1999 paint coating
was 15 to 20 years. This tank was inspected in 2009. Both the interior and exterior coatings required no
repairs at that time. The 2009 recommendation was to re-inspect every five years. The tower was again
inspected in 2014 and was determined to be in satisfactory condition but needing full replacement within
five to six years. The tower is planned to be re-inspected in 2019 with rehabilitation in 2020.
Well No. 5 Rehabilitation - 2020
The rehabilitation of the well was completed in 2014. The well needs complete rehabilitation (motor,
pumps, MCC and SCADA upgrades).
Lift Station No. 8 Rehabilitation - 2021
This project includes the rehabilitation of lift station No. 8 with a full evaluation of pumps, control
equipment and appurtenances.
Lift Station No. 9 Rehabilitation - 2021
This project includes the rehabilitation of lift station No. 9 with a full evaluation of pumps, control
equipment and appurtenances.
Lift Station No. 9 Force Main Replacement - 2021
The existing force main located south of lift station No. 9 was installed in 1969 and consists of 12-inch
DIP, which was verified in 2010 through an exploratory open excavation. Approximately 1,300-feet is
proposed to be replaced.
Well No. 10 and High Service Pump (HSP) Rehabilitation (BW) - 2021
The rehabilitation of the well was completed in 2015. The well needs complete rehabilitation (motors,
pumps, MCC and SCADA upgrades). HSP (backwash) started operation in 2015 with the new Water
Treatment Plant. The HSP needs complete rehabilitation of motor, shaft and pump.
Freeway and Highway Utility Crossing Replacement - 2022
This project includes lining approximately 2,600’ of sanitary sewer pipes that were installed between 1955
and 1992 which cross under Interstate 94, Interstate 694, Highway 100, and Highway 252. This project also
includes replacement of approximately 1,500’ of water main which varies in sizes from 6-inch to 10-inch
diameter cast iron pipe (CIP) that was installed between 1961 and 1968 under Highway 252. The water
main replacements would be coordinated with the TH 252/66th Avenue Interchange and 70th Avenue
Pedestrian Overpass project.
Well No. 7 and Water Treatment Plant HSP No. 1 - 2022
The rehabilitation of the well was completed in 2016. Well needs complete rehabilitation of motor and
pump. High Service Pump No. 1 started operation in 2015 with the new Water Treatment Plant. The HSP
needs complete rehabilitation of motor and pump.
Project Summaries Page | 50
2020-2034 Capital Improvement Program
Lift Station Nos. 4 and 5 Rehabilitation - 2023
This project includes the rehabilitation of lift station No. 4 and No. 5 with a full evaluation of pumps,
control equipment and appurtenances.
Well Nos. 4 and 9; Water Treatment Plant HSP No. 2 - 2023
The rehabilitation of both wells was completed in 2017. Both wells need complete rehabilitation (motors,
pumps, MCC and SCADA upgrades). High Service Pump No. 2 started operation in 2015 with the new
Water Treatment Plant. The HSP needs complete rehabilitation of motor and pump.
Well Nos. 6 and 8; Water Treatment Plant HSP No. 3 - 2024
The rehabilitation of both wells will be completed in 2018. Both wells need complete rehabilitation
(motors, pumps, MCC and SCADA upgrades). High Service Pump No. 3 started operation in 2015 with the
new Water Treatment Plant. The HSP needs complete rehabilitation of motor and pump.
Well Nos. 2 and 3; Water Treatment Plant HSP No. 4 - 2025
The rehabilitation of both wells will be completed in 2019. The wells need complete rehabilitation of motor
and pump. High Service Pump No. 4 started operation in 2015 with the new Water Treatment Plant. The
HSP needs complete rehabilitation of motor and pump.
Lift Station No. 3 Rehabilitation - 2026
This project includes the rehabilitation of lift station No. 3 with a full evaluation of pumps, control
equipment and appurtenances.
Well No. 5 and Water Treatment Plant HSP (BW) - 2026
The rehabilitation of the well will be completed in 2020. The well needs complete rehabilitation of motor
and pump. The rehabilitation of High Service Pump (BW) was last completed in 2021. The HSP needs
complete rehabilitation of motor and pump.
Well No. 10 and Water Treatment Plant HSP No. 1 - 2027
The rehabilitation of the well will be completed in 2021. Well needs complete rehabilitation of motor and
pump. The rehabilitation of High Service Pump No. 1 was last completed in 2022. The HSP needs
complete rehabilitation of motor and pump.
Water Meter Full System Replacement- 2028
This project will include the complete replacement of the water meter reading system. This will include
new meter registers, meter body, battery, reading software and reading hardware. The decision will need to
be made to continue with the mobile drive by reading or fully move to the fixed read network.
Well No. 7 and Water Treatment Plant HSP No. 2 - 2028
The rehabilitation of the well will be completed in 2022. Well needs complete rehabilitation of motor and
pump. The rehabilitation of High Service Pump No. 2 was last completed in 2023. The HSP needs
complete rehabilitation of motor and pump.
Lift Station Nos. 7 and 10 Rehabilitation - 2029
This project includes the rehabilitation of lift station No. 7 and No. 10 with a full evaluation of pumps,
control equipment and appurtenances.
Well Nos. 4 and 9; Water Treatment Plant HSP No. 3 - 2029
The rehabilitation of both wells will be completed in 2023. Both wells need complete rehabilitation of
motor and pump. The rehabilitation of High Service Pump No. 3 was last completed in 2024. The HSP
needs complete rehabilitation of motor and pump.
Sanitary Sewer Lining (Mississippi River Trunk North of I-694 to 70th Avenue/Willow Lane) - 2030
This project extends from the manhole at 70th Avenue and Willow Lane to the Manhole at the dead end,
north of Interstate 694 on Willow Lane. The existing line is 4,178-feet of 18-inch reinforced concrete pipe
Project Summaries Page | 51
2020-2034 Capital Improvement Program
(RCP) and 1,451-feet of 21-inch RCP. This is the main trunk line that carries the sewage out of the NE
quadrant of the City to Lift Station No. 2.
Lift No. 2 Forcemain Lining (Under I-94) - 2030
The existing 406-foot section of 16-inch DIP forcemain, located under I-94 at 52nd Avenue in Minneapolis,
was installed in 1980 with the I-94 project. The projected life span of this section of pipe is 50 years.
Lining this section of pipe will require an extensive bypass as well as an open excavation on the eastside of
I-94. In 2008 a new forcemain was installed from lift station No. 2 to the I-94 crossing on the east side of
52nd Avenue.
Well Nos. 6 and 8; Water Treatment Plant HSP No. 4 - 2030
The rehabilitation of both wells will be completed in 2024. Both wells need complete rehabilitation of
motor and pump. The rehabilitation of High Service Pump No. 4 was last completed in 2025. The HSP
needs complete rehabilitation of motor and pump.
Lift Station No. 1 Generator Replacement – 2031
This project will be a replacement of the generator only. The closed transition generator transfer switch will
have been replaced in a prior year. The existing generator is a 1996 model with a typical lifespan of 35
years.
Well Nos. 2 and 3; Water Treatment Plant HSP (BW) - 2031
The rehabilitation of both wells will be completed in 2025. The wells need complete rehabilitation of motor
and pump. The rehabilitation of High Service Pump (BW) was last completed in 2026. The HSP needs
complete rehabilitation of motor and pump.
Well No. 5 and Water Treatment Plant HSP No. 1 - 2032
The rehabilitation of the well will be completed in 2026. The well needs complete rehabilitation of motor
and pump. The rehabilitation of High Service Pump No. 1 was last completed in 2027. The HSP needs
complete rehabilitation of motor and pump.
Well No. 10 and Water Treatment Plant HSP No. 2 - 2033
The rehabilitation of the well will be completed in 2027. The well needs complete rehabilitation of motor
and pump. The rehabilitation of High Service Pump No. 2 was last completed in 2028. The HSP needs
complete rehabilitation of motor and pump.
Well No. 7 and Water Treatment Plant HSP No. 3 - 2034
The rehabilitation of the well will be completed in 2028. The well needs complete rehabilitation of motor
and pump. The rehabilitation of High Service Pump No. 3 was last completed in 2029. The HSP needs
complete rehabilitation of motor and pump.
Project Summaries Page | 52
2020-2034 Capital Improvement Program
Street Light and Traffic Signal Improvements
Traffic Signal System Rehabilitation (Shingle Creek Parkway/Summit Avenue) - 2021
The traffic signal system was evaluated for needed system improvements and documented in a report dated
December 2014. Proposed improvements contain complete system rehabilitation and replacement including
video detection, EVP, countdown pedestrian heads, APS and flashing yellow left turn arrow upgrade.
Traffic Signal System Rehabilitation (Shingle Creek Parkway/John Martin Drive) - 2021
The traffic signal system was evaluated for needed system improvements and documented in a report dated
December 2014. Proposed improvements contain complete system rehabilitation and replacement including
video detection, EVP, countdown pedestrian heads, APS and flashing yellow left turn arrow upgrade.
Earle Brown/Opportunity Area Street Light Replacement (Ornamental at Nodes) - 2023
The 35 ornamental lights located within the Earle Brown area at the nodes (intersections) along a portion of
Shingle Creek Parkway, Summit Drive, Earle Brown Drive and John Martin Drive were installed in 1986.
The typical life expectance of this lighting system is approximately 30 years. The City has no remaining
replacement poles or luminaires that match the existing system and matching luminaires are no longer
available from suppliers. The existing system is generally rated in fair to poor shape with increasing
maintenance costs. The project includes replacement of the existing decorative lighting system at the
intersections/nodes with a new, advanced system using current technology.
Traffic Signal System Rehabilitation (Shingle Creek Parkway/Brookdale Square) - 2025
The traffic signal system was evaluated for needed system improvements and documented in a report dated
December 2014. Proposed improvements contain complete system rehabilitation and replacement including
video detection, EVP, countdown pedestrian heads, APS and flashing yellow left turn arrow upgrade.
Coordination with the future development of the Opportunity Site must also occur with this improvement
project.
Brooklyn Boulevard (65th Ave to Brooklyn Park Border) Street Light Replacement - 2032
The 76 street lights north of 65th Avenue to the Brooklyn Park border will have reached their proposed
lifecycle and need to be replaced. Proposed 35’ painted aluminum poles with LED shoebox style fixture.
The light pole bases and wire should not need to be replaced.
Traffic Signal System Rehabilitation (65th Avenue/Dupont Avenue) - 2033
The traffic signal system was installed in 1990 and partially rehabilitated in 2007. According to MnDOT,
the expected useful service life of a traffic signal system is approximately 30 years. The traffic signal
system will be evaluated for needed system improvements. Proposed improvements are anticipated to
contain complete system rehabilitation and replacement including video detection, EVP, countdown
pedestrian heads, APS and flashing yellow left turn arrow upgrade.
Traffic Signal System Rehabilitation (66th Avenue/Camden Avenue) - 2033
The traffic signal system was installed in 1999. According to MnDOT, the expected useful service life of a
traffic signal system is approximately 30 years. The traffic signal system will be evaluated for needed
system improvements. Proposed improvements are anticipated to contain complete system rehabilitation
and replacement including video detection, EVP, countdown pedestrian heads, APS and flashing yellow
left turn arrow upgrade.
Project Summaries Page | 53
2020-2034 Capital Improvement Program
Capital Maintenance Building Plan
Yearly Capital Maintenance Building Plan Projects
In 2007 the City approved an 18-year Capital Building Maintenance Plan that includes short and long-term
building and facility improvements. The following buildings and facilities are covered under this plan: city
hall, community center, public works facility, public works cold storage building, public works salt/sand
storage building, police station, west fire station, east fire station, Centerbrook Golf Course club house,
Centerbrook Golf Course maintenance building, Centerbrook Golf Course storage garage, sanitary lift
station Nos. 1 and 2, municipal well Nos. 2-10, Evergreen Park building, Garden City Park building,
Centennial Park west building, Centennial Park plaza, Centennial Park gazebo, Kylawn Park building and
West Palmer Park building. In 2016, the 2007 plan was replaced with the new asset management planning
program (Facility Dude). Thereafter, CIP projects have been updated starting in the 2017 budgeting process
using Facility Dude.
Storm Water Improvements
Storm Water Management Basins
In 2015, the City hired WSB and Associates to conduct a condition assessment of the City-maintained storm
sewer system and storm water management ponds located throughout the City. The assessment process resulted
in a list of improvements to address problems with erosion, sediment accumulation, inlet and outlet blockages
and other miscellaneous maintenance issues. Below are improvement projects that are part of the City’s Storm
Drainage Utility, using the City’s Storm Water Asset Management Plan (SWAMP) program developed by WSB
and Associates that uses an annual sediment loading rate to predict sediment accumulation for project
prioritization.
Storm Water Pond 40-001 - 2020
Pond 40-001 is located east of Palmer Lake Road. The pond receives runoff from approximately 176 acres of
upstream residential development. This pond was constructed in 2000. The performance of this pond is limited
due to the accumulation of sediment. The proposed work consists of the removal of sediment to restore the
water quality treatment performance of the pond.
Storm Water Pond 12-001- 2022
Pond 12-001 is located north of 53rd Avenue at the end of Upton Avenue adjacent the Centerbrook Golf Course.
The pond receives runoff from approximately 0.5 acres of park land, but is part of a chain of ponds providing
storm water treatment. This pond was constructed in 1997. The proposed work consists of the removal of
sediment and the installation of a skimmer to improve water quality treatment performance of the pond.
Storm Water Pond 12-006 - 2022
Pond 12-006 is located in Lions Park adjacent to the Centerbrook Golf Course. The pond receives runoff from
approximately 42 acres of upstream residential development. This pond was constructed in 2005. The proposed
work consists of the removal of sediment to restore the water quality treatment performance of the pond.
Storm Water Pond 57-003 - 2022
Pond 57-003 is located north of 69th Avenue just north of the City’s Public Works facility. The pond receives
runoff from approximately 3.0 acres of upstream park and trail runoff. This pond was constructed in 1996. The
performance of this pond is limited due to the accumulation of sediment and the abundance of wetland plants
and cattails. The proposed work consists of the removal of sediment and vegetation to restore the water quality
treatment performance of the pond.
Storm Water Pond 48-001 - 2023
Pond 48-001 is located south of Odyssey Academy. The pond receives runoff from approximately 54 acres of
upstream residential development. This pond was constructed in 1997. The proposed work consists of the
removal of sediment and vegetation to restore the water quality treatment performance of the pond.
Project Summaries Page | 54
2020-2034 Capital Improvement Program
Storm Water Pond 17-001 - 2025
Pond 17-001 is located north of 65th Avenue. The pond receives runoff from approximately 85 acres of
upstream residential development. The performance of this pond maybe limited due to the accumulation of
sediment. The proposed work consists of the removal of sediment to restore the water quality treatment
performance of the pond.
Storm Water Pond 41-001 - 2026
Pond 41-001 is located east of 7100 Brooklyn Boulevard. The pond receives runoff from approximately 30 acres
of residential and commercial development and has access issues. This pond was constructed in 1995. The
proposed work consists of removal of sediment, bank stabilization to control erosion and the installation of a
skimmer to enhance the water quality treatment performance of the pond.
Storm Water Pond 41-002 - 2026
Pond 41-002 is located north of Woodbine Lane and west of France Avenue. The pond receives runoff from
approximately 36 acres of upstream residential development. This pond was constructed in 1995. The
performance of this pond is limited due to the accumulation of sediment. The proposed work consists of the
removal of sediment to restore the water quality treatment performance of the pond.
Storm Water Pond 53-001 - 2026
Pond 53-001 is located between Beard Avenue and Zenith Avenue adjacent to 69th Avenue. The pond receives
runoff from approximately 35 acres of upstream residential development. This pond was constructed in 1993.
The performance of this pond is limited due to the accumulation of sediment and the abundance of wetland
plants and cattails. The proposed work consists of the removal of sediment and vegetation to restore the water
quality treatment performance of the pond.
Storm Water Pond 11-001 - 2029
Pond 11-001 is located near the parking lot at Centerbrook Golf Course. The pond receives runoff from
approximately 33 acres of upstream residential development. This pond was constructed in 2006. The
performance of this pond maybe limited due to the accumulation of sediment. The proposed work consists of the
removal of sediment to restore the water quality treatment performance of the pond.
Storm Water Pond 59-003 - 2029
Pond 59-003 is located north of the parking lot at Brooklyn Center Community Center. The pond receives runoff
from approximately 1.7 acres of upstream parking lot runoff. This pond was constructed in 2001. The
performance of this pond is limited due to the accumulation of sediment and the abundance of wetland plants
and cattails. The proposed work consists of the removal of sediment and vegetation to restore the water quality
treatment performance of the pond.
Storm Water Pond 60-003 - 2029
Pond 60-003 is located south of the parking lot at City Hall. The pond receives runoff from approximately 2.0
acres of upstream parking lot runoff. This pond was constructed in 2001. The performance of this pond is
limited due to the accumulation of sediment and the abundance of wetland plants and cattails. The proposed
work consists of the removal of sediment and vegetation to restore the water quality treatment performance of
the pond.
Storm Water Pond 63-001 - 2029
Pond 63-001 is located north of the parking lot at the Community Center. The pond receives runoff from
approximately 4.0 acres of upstream street runoff. The performance of this pond maybe limited due to the
accumulation of sediment. The proposed work consists of the removal of sediment to restore the water quality
treatment performance of the pond.
Storm Water Pond 63-002 - 2029
Pond 63-002 is located adjacent to Shingle Creek Parkway. The pond receives runoff from approximately 3.0
acres of upstream street runoff. The performance of this pond is limited due to the accumulation of sediment.
The proposed work consists of the removal of sediment and vegetation to restore the water quality treatment
performance of the pond.
Project Summaries Page | 55
2020-2034 Capital Improvement Program
Storm Water Pond 64-001 - 2029
Pond 64-001 is located adjacent to Shingle Creek Parkway. The pond receives runoff from approximately 0.5
acres of upstream runoff but the pond is mostly part of the larger pond network at the City Hall complex. The
proposed work consists of the removal of sediment to restore the water quality treatment performance of the
pond.
Storm Water Pond 57-004 - 2031
Pond 57-004 is located north of 69th Avenue with the Palmer Lake Park. The pond receives runoff from
approximately 4.0 acres of upstream street runoff. This pond was constructed in 1999. The performance of this
pond is limited due to the accumulation of sediment and the abundance of wetland plants and cattails. The
proposed work consists of the removal of sediment and vegetation to restore the water quality treatment
performance of the pond.
Storm Water Pond 57-005 - 2031
Pond 57-005 is located adjacent to the west of the Public Works facility. The pond receives runoff from
approximately 5.0 acres of upstream runoff from the Public Works yard. This pond was constructed in 1980.
The performance of this pond is limited due to the accumulation of sediment and the abundance of wetland
plants and cattails. The proposed work consists of the removal of sediment and vegetation to restore the water
quality treatment performance of the pond.
Storm Water Pond 70-002 - 2031
Pond 70-002 is located at the intersection of 65th Avenue and Willow Lane. The pond receives runoff from
approximately 3.5 acres of upstream residential runoff. This pond was constructed in 2001. The proposed work
consists of the removal of sediment to restore the water quality treatment performance of the pond
Storm Water Pond 12-002 - 2032
Pond 12-002 is located on the Centerbrook Golf Course. The pond receives runoff from approximately 356.3
acres of upstream residential, commercial and highway runoff. This pond was constructed in 1998. The
proposed work consists of the removal of sediment and vegetation to restore the water quality treatment
performance of the pond.
Storm Water Pond 12-003 - 2032
Pond 12-003 is located on the Centerbrook Golf Course. The pond receives runoff from approximately 19.7
acres of upstream commercial and golf course runoff. This pond was constructed in 1998. The proposed work
consists of the removal of sediment and vegetation to restore the water quality treatment performance of the
pond.
Storm Water Pond 12-004 - 2032
Pond 12-004 is located on the Centerbrook Golf Course. The pond receives runoff from approximately 19.7
acres of upstream commercial and golf course runoff. This pond was constructed in 1998. The proposed work
consists of the removal of sediment and vegetation to restore the water quality treatment performance of the
pond.
Storm Water Pond 12-005 - 2032
Pond 12-005 is located on the Centerbrook Golf Course. The pond receives runoff from approximately 0.80
acres of upstream golf course runoff. This pond was constructed in 1998. The proposed work consists of the
removal of sediment and vegetation to restore the water quality treatment performance of the pond.
Storm Water Pond 18-001 - 2032
Pond 18-001 is located west of France Ave at 57th Ave. The pond receives runoff from approximately 112.8
acres of upstream residential runoff. This pond was constructed in 1980. The proposed work consists of the
removal of sediment and vegetation to restore the water quality treatment performance of the pond.
Connections at Shingle Creek Phase 2 (Creek Stabilization Project) - 2020
In 2015-2016 the City partnered with the Shingle Creek Watershed Management Commission and the City of
Brooklyn Park to complete the Connections at Shingle Creek Restoration Project Phase 1 from Brooklyn
Project Summaries Page | 56
2020-2034 Capital Improvement Program
Boulevard to Noble Avenue. A Phase 2 planning project from Regent Avenue to Brooklyn Boulevard needs to
be completed to determine the extent of the stabilization required. The City will look into a possible partnership
with the Shingle Creek Watershed Management Commission to help fund this project along with working with
the City of Brooklyn Park.
61st Avenue and Perry Avenue Storm Sewer Improvement - 2021
The storm sewer at 61st Avenue and Perry Avenue has joint failures and sink holes which are leaking and
causing sediment transfer. The storm sewer will need to be evaluated and rehabilitated.
65th Avenue Trunk Storm Sewer Rehabilitation - 2021
The trunk line along 65th Avenue between Cahlander Park and Shingle Creek is deteriorating. A pipe joint
repair project was completed in the 1990’s. The storm sewer will need to be evaluated and rehabilitated.
Park and Trail Improvements
Shingle Creek Bridge Rehabilitation (2 Bridges) - 2020
Proposed bridge rehabilitation including concrete deck sealing, miscellaneous concrete repair and railing
repair/painting to the two Shingle Creek Parkway bridges spanning Shingle Creek.
Brooklyn Boulevard City Entrance Signs Rehabilitation - 2020
Proposed improvement includes replacing the entrance sign located along Brooklyn Boulevard at the
Brooklyn Park border to match the entrance monument sign at the Minneapolis border that was installed in
2019 with the Brooklyn Boulevard Corridor project.
Park Playground Equipment Replacement – 2020 through 2022
Proposed replacement includes replacing park playground equipment over a three year period. A total of 20
parks located within Brooklyn Center contain 21 separate playground equipment areas, 18 that are
maintained by the City and three that are maintained by the adjacent schools. Six playgrounds are
scheduled for replacement each year over the three year period. An assessment of the playground
equipment will need to be completed to determine replacement priority. 2020: Bellvue, Freeway,
Northport, Centennial West, Orchard, Firehouse Parks. 2021: West Palmer, Riverdale, Grandview, Lions,
Marlin, Evergreen exercise area. Depending on the vendor we may be able to purchase the equipment the
year before install for tremendous savings (40 percent). Maybe program these for 2020-2022 with each
being a two year project (purchase in 2019, build in 2020 etc. for three years).
Miscellaneous Park Parking Lot Mill and Overlay - 2022
This project includes performing a 1.5” mill and overlay on the parking lots of Orchard Lane Park, Palmer
Lake Park, East Palmer Park and the northwest parking lot of Northport Park. An evaluation of the curb
and gutter will be performed for each parking lot to include miscellaneous curb replacements and
pedestrian curb ramps will also be updated to current standards as needed. Replacement of the trail from
the Palmer Lake parking lot to the Lake will also be included with this project.
West River Road, Arboretum, Freeway, Palmer Lake and Northport Trails Replacements - 2022
Replace the bituminous trail along West River Road from 73rd Avenue to 66th Avenue. A ten-foot wide
trail section is proposed. The status of this project was reevaluated in 2017, pending possible jurisdictional
transfer of the trail from the City to the Three Rivers Park District as part of their regional West Mississippi
River Trail development. Proposed replacement of the trail system within the fenced Arboretum area.
Remove existing bituminous and replace with a new eight-foot wide bituminous trail. Replace the trail
system within Freeway Park. An eight-foot wide trail section is proposed. This project will need to be
coordinated with the reorganization of the Mound Cemetery and Freeway Park properties in consideration
of the leased area from the cemetery. Resurface the existing trail system extending around Palmer Lake
including the parking lots at the nature area and east Palmer. This trail was last reconstructed in 2005 with
Project Summaries Page | 57
2020-2034 Capital Improvement Program
an expected maximum service life of 15 to 20 years due to the soil stability issues within the park area.
Replace the trail system within Northport Park. An eight-foot wide trail section is proposed.
Evergreen Park Scoreboard Improvements - 2023
Proposed construction includes installing new scoreboards at the two softball fields, one at baseball field
and replacement of the scoreboard at the soccer/football field.
Centennial Park Softball Field Improvements - 2024
The Centennial Park softball fields experience settlement due to the underlying organic soils. Over the
years, settlement has occurred approximately one-foot. This is evident in the fact that the light base
foundations within the ball field areas have generally held their original elevations and are higher than the
surrounding ground. Due to the proximity to Shingle Creek and the low-lying areas, this settlement causes
increased flooding and drainage issues. The proposed plan includes raising the ball fields one to two-feet
and replacement of any necessary appurtenances including irrigation systems, draintile, fences,
bituminous/concrete trails and other paved areas. A feasibility and geotechnical study will be performed
prior to evaluate options of the flood plain, frequent flooding and continuous ongoing field settlement.
Proposed construction includes replacement of the two scoreboards at the two softball fields at Centennial
Park (east).
Park Name Sign Replacement - 2025
This project includes the replacement of all 30 park name signs in all of the City Parks.
Hockey Rink Rehabilitation/Replacements - 2026
Proposed rehabilitation includes resurfacing five existing rinks with other miscellaneous rink repairs. An
assessment of the rink appurtenances will need to be completed to determine replacement needs. The rink
located at Northport Park will be further evaluated with the Northport Park improvements and master
planning being conducted in connection with the Northport School rehabilitation.
Irrigation Systems Rehabilitation/Replacements - 2026
The City’s irrigation systems are located as follows: Evergreen Park, Centennial Park, Northport Park,
Grandview Park, 69th Avenue, Public Works Garage Facility, West Fire Station, Shingle Creek Parkway,
53rd Avenue (Bellvue area), Xerxes Avenue, Bass Lake Road and County Road 57. The proposed
rehabilitation project includes rehabilitation of the Evergreen Park and the 69th Avenue systems, which
were installed in 1986 and 1989 respectively.
Softball/Baseball Fence Replacement - 2027
Replace the line and outfield fences at West Palmer Lake Park.
69th Avenue Trail Reconstruction – 2027
Replace the trail system along 69th Avenue from Brooklyn Boulevard to West Palmer Lake Drive. A nine-
foot wide trail section is proposed.
69th Avenue Landscape Rehabilitation - 2027
Proposed construction would include irrigation updates and replacing the landscape plantings and sod along
69th Avenue from Brooklyn Boulevard to West Palmer Lake Drive.
Park Trail and Parking Lot Lighting Improvements - 2028
Replace trail and parking lot lights with LED fixtures, fiberglass poles, and new wire in conduit in the
following parks: Evergreen, Bellvue, Lions, Centennial East and Centennial West. Work would also
include replacing the electrical cabinets in Bellvue and Lions parks.
Park Bleacher Replacement - 2031
Replace six 5-row and seven 3-row bleachers used in various parks.
Project Summaries Page | 58
2020-2034 Capital Improvement Program
Park Bleacher Replacement - 2032
Replace four 10-row bleachers used in Centennial Park (softball and soccer).
Evergreen Park Football/Soccer Field Improvements - 2033
Proposed improvements around the soccer/football field include fence replacement, evaluation of the
bleachers for replacement and miscellaneous improvements to the announcers/scorers booth. Aesthetic
improvements around the field will include replacement of trees and shrubs that are impacted by the fence
replacement as needed.
Miscellaneous Projects and Improvements
Bass Lake Road at Xerxes Avenue Traffic Signal ADA Upgrades - 2020
The proposed project includes ADA upgrades at the intersection of Bass Lake Road and Xerxes Avenue.
This is a joint project with Hennepin County.
Brine Equipment Project - 2020
The City of Brooklyn Center purchases brine for pre-wetting from the City of Brooklyn Park. This poses
logistical challenges as the City of Brooklyn Center must purchase and transport the brine to its faculties.
The City of Brooklyn Center also needs to plan well in advance with the City of Brooklyn Park to ensure
sufficient brine is on hand for upcoming and future storms for both Cities. The proposed project includes
purchasing brine making equipment that would help Brooklyn Center to efficiently make brine for the City
and allows for greater flexibility in pre-wetting operations. This will also help the City to continue to focus
on less chloride use within the City while still providing residents with safe driving conditions.
Miscellaneous Retaining Wall Replacements - 2020
The proposed project includes replacing the retaining wall at the Lilac Drive curve just south of County
Road 57 at 2121 Lilac Drive with wet cast stone retaining wall and replacing the retaining walls located at
the south end of Azelia Avenue (dead end turnaround location) with wet cast stone retaining walls. The
project also includes replacing the retaining walls at Northport Drive/Bass Lake Road and in front of
Mound Cemetery with a keystone type retaining wall.
Brooklyn Boulevard Corridor Projects 8, 9 and 10 (Bass Lake Road to Interstate 94) - 2021
The proposed Brooklyn Boulevard reconstruction/modernization project will improve roadway safety,
enhance traffic operations, reduce access points and provide improved bicycle and pedestrian facilities for a
0.8-mile segment of the corridor in Brooklyn Center between Bass Lake Road (County Road 10) and
Interstate 94. The project will enhance bicycle and pedestrian travel by adding a trail, improving sidewalks,
transit stops, adding streetscaping and landscaping and improving the functionality of intersections with
modified turn lanes and access control throughout the corridor. Overhead utilities will be moved
underground. The City completed the Brooklyn Boulevard Corridor Study in 2013 to guide the
reconstruction and redevelopment of this corridor. This project consists of Project Nos. 8, 9 and 10 from
the Corridor Study. The funding partnership and proportions are to be determined in the future but are
anticipated to include federal funding, Hennepin County funding, and City funding.
TH 252/66th Avenue Interchange and 70th Avenue Pedestrian Overpass - 2023
The proposed interchange and overpass project will improve roadway safety, enhance traffic operations,
reduce access points and provide improved bicycle and pedestrian facilities, converting the southerly
portion of TH 252 to a freeway. The City completed the TH 252 Feasibility Study in 2016 to guide
converting this corridor to a freeway. The funding partnership and proportions are to be determined in the
future but are anticipated to include federal funding, City funding and other regional legislative funding.
Emergency Responder Radio Replacement (Police/Fire/PW) - 2028
The emergency responder radios were all replaced in 2017. This project cost includes the full replacement
of emergency responder radios within the Police, Fire and Public Works Departments.
Project Summaries Page | 59
2020-2034 Capital Improvement Program
Retaining Wall Replacements (Miscellaneous Locations) - 2029
Replacement of miscellaneous retaining walls at numerous locations within the City’s right-of-way
(Brooklyn Boulevard, Dupont Avenue, 57th Avenue and 69th Avenue). A full evaluation will be performed
subsequently.
Self Contained Breathing Apparatus (SCBA) Replacement (Fire) - 2033
The Self Contained Breathing Apparatus (SCBA) equipment was last replaced in 2018. This project cost
includes the full replacement of SCBA equipment within the Fire Department.
Housing and
Redevelopment Authority
City Hall - Council Chambers
December 2, 2019
AGE NDA
1.Call to Order
The City Council requests that attendees turn off cell phones and pagers during the meeting. A
copy of the full City Council packet, including HRA (Housing and Redevelopment Authority), is
available to the public. The packet ring binder is located at the entrance of the council
chambers.
2.Roll Call
3.Approval of Agenda and Consent Agenda
The following items are considered to be routine by the Housing and Redevelopment Authority
(HRA) and will been acted by one motion. There will be no separate disc ussion of these items
unless a Commissioner so requests, in whic h event the item will be removed from the consent
agenda and considered at the end of Commission Consideration I tems.
a.Approval of Minutes
- Motion to approve the minutes for:
September 23, 2019
4.Commission Consideration Items
a.Resolutions A pproving the F inal Market Value L evy and Budget
1. Resolution Establishing a Property Tax Levy for the Purpose of
Defraying the Cost of Operation, Providing Informational Services and
Relocation Assistance Pursuant to the Provisions of Minnesota Statutes
Chapter 469.033 for the Housing and Redevelopment Authority of Brooklyn
Center, Minnesota, for fiscal Year 2020
- Motion to adopt resolution
2. Resolution Approving the Final Budget for the Housing and
Redevelopment Authority of Brooklyn Center, Minnesota, Pursuant to
Minnesota Statutes Chapter 469
- Motion to adopt resolution
5.Adjournment
Housing and R edevelopment A uthority
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :D r. Reggie Edwards, D eputy C ity M anager
BY:Barb S uciu, C ity C lerk
S U B J E C T:A pproval of Minutes
B ackground:
AT TA C H M E N TS :
D escrip.on U pload D ate Type
M inutes 9-23-19 11/27/2019 Backup M aterial
09/23/19 -1- DRAFT
MINUTES OF THE PROCEEDINGS OF THE
HOUSING AND REDEVELOPMENT AUTHORITY
OF THE CITY OF BROOKLYN CENTER IN THE COUNTY OF
HENNEPIN AND THE STATE OF MINNESOTA
REGULAR SESSION
SEPTEMBER 23, 2019
CITY HALL – COUNCIL CHAMBERS
1. CALL TO ORDER
The Brooklyn Center Housing and Redevelopment Authority (HRA) met in Regular Session
called to order by Chair Mike Elliott at 10:13 p.m.
2. ROLL CALL
Chair Mike Elliott and Commissioners Marquita Butler, April Graves, Kris Lawrence-Anderson,
and Dan Ryan. Also present were Executive Director Curt Boganey, Deputy City Manager
Reggie Edwards, Director of Fiscal & Support Services Nate Reinhardt, Community
Development Director Meg Beekman, City Attorney Troy Gilchrist, and City Clerk Barb Suciu.
3. APPROVAL OF AGENDA AND CONSENT AGENDA
Commissioner Graves moved, and Commissioner Ryan seconded approval of the Agenda and
Consent Agenda, and the following item was approved:
3a. APPROVAL OF MINUTES
1. December 3, 2018 – Regular Session
Motion passed unanimously.
4. COMMISSION CONSIDERATION ITEMS
4a. HRA PRELIMINARY 2020 PROPERTY TAX LEVY AND BUDGET
Executive Director Curt Boganey stated the Housing and Redevelopment Authority (HRA)
Property Tax Levy and Budget were reviewed by Mr. Reinhardt during the Regular Meeting. He
added the levy is used to fund the operations of the Economic Development Authority (EDA).
He noted City Staff recommends the adoption of both Resolutions.
Commissioner Ryan moved, and Commissioner Lawrence-Anderson seconded to adopt HRA
RESOLUTION NO. 2019-001 Establishing a Preliminary Property Tax Levy Payable in 2020
for the Housing and Redevelopment Authority of Brooklyn Center, Minnesota.
Chair Elliott voted against the same. Motion carried.
09/23/19 -2- DRAFT
Commissioner Ryan moved, and Commissioner Lawrence-Anderson seconded to adopt of HRA
RESOLUTION NO. 2019-002 Approving the Preliminary Budget for the Housing and
Redevelopment Authority of Brooklyn Center, Minnesota Pursuant to Minnesota Statutes
Chapter 469.
Motion passed unanimously.
Commissioner Graves stated a recent discussion at a Metropolitan Council Land Use Advisory
Committee meeting, on which she serves, related to HRA levies and how they are being used.
She added she would like to have a better understanding of the HRA levy and how it is applied
in Brooklyn Center. She requested that this issue be discussed at an upcoming Work Session.
Mr. Boganey stated a presentation on this issue is planned for an upcoming EDA meeting.
5. ADJOURNMENT
Commissioner Graves moved, and Commissioner Butler seconded adjournment of the Housing
and Redevelopment Authority meeting at 10:16 p.m.
Motion passed unanimously.
Housing and R edevelopment A uthority
DAT E:12/2/2019
TO :C ity C ouncil
F R O M:C urt Boganey, City Manager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D irector
S U B J E C T:Res olu,ons A pproving the F inal Market Value L evy and Budget
B ackground:
S trategic Priories and Values:
Resident Economic S tability
AT TA C H M E N TS :
D escrip,on U pload D ate Type
Res olu,on levy 2020 11/27/2019 Resolu,on Le4er
Res olu,on budget 2020 11/27/2019 Resolu,on Le4er
Commissioner introduced the following resolution and moved its
adoption:
HRA RESOLUTION NO.
RESOLUTION ESTABLISHING A PROPERTY TAX LEVY FOR THE
PURPOSE OF DEFRAYING THE COST OF OPERATION, PROVIDING
INFORMATIONAL SERVICES AND RELOCATION ASSISTANCE
PURSUANT TO THE PROVISIONS OF MINNESOTA STATUTES CHAPTER
469.033 FOR THE HOUSING AND REDEVELOPMENT AUTHORITY OF
BROOKLYN CENTER, MINNESOTA, FOR FISCAL YEAR 2020
WHEREAS, Minnesota Statutes require that the final property tax levy be
provided to the Hennepin County Auditor no later than December 30, 2019 for taxes payable in
calendar year 2020; and
WHEREAS, the Housing and Redevelopment Authority of Brooklyn Center,
Minnesota pursuant to the provisions of Minnesota Statutes 469.033, Subdivision 6, must certify
a final property tax levy resolution to the City Council of the City of Brooklyn Center.
NOW, THEREFORE, BE IT RESOLVED by the Housing and Redevelopment
Authority of Brooklyn Center, Minnesota that a special tax is hereby levied on all taxable real
and personal property within the City of Brooklyn Center at the rate of 0.01813% of the total
market value of real and personal property situated within the corporate limits of the City of
Brooklyn Center that is not exempted by law.
BE IT FURTHER RESOLVED that the property tax levied under this resolution
be used for the operations and activities of the Housing and Redevelopment Authority of
Brooklyn Center, Minnesota pursuant to Minnesota Statutes Chapter 469.001 to 469.047.
December 2, 2019
Date Chair
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Commissioner introduced the following resolution and moved its
adoption:
HRA RESOLUTION NO.
RESOLUTION APPROVING THE FINAL BUDGET FOR THE
HOUSING AND REDEVELOPMENT AUTHORITY OF BROOKLYN
CENTER, MINNESOTA PURSUANT TO MINNESOTA STATUTES
CHAPTER 469
WHEREAS, the Housing and Redevelopment Authority of Brooklyn
Center, Minnesota has considered the final budget for Fiscal Year 2020.
NOW, THEREFORE, BE IT RESOLVED by the Housing and
Redevelopment Authority of Brooklyn Center, Minnesota that revenues and
appropriations for the Housing and Redevelopment Authority are hereby adopted as
follows:
Housing and Redevelopment Authority
Revenues
Property Taxes $ 405,069
Total Housing and Redevelopment Authority $ 405,069
Appropriations
Transfer to EDA Fund $ 405,069
Total Housing and Redevelopment Authority $405,069
December 2, 2019
Date Chair
The motion for the adoption of the foregoing resolution was duly seconded by member
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
E conomic Development
Authority
City Hall - C ouncil
Chambers
December 2, 2019
AGE NDA
1.C all to Order
The C ity Council requests that attendees turn off cell phones and pagers during the meeting. A
copy of the full City Council packet, including E D A (Economic Development Authority ), is
available to the public . The packet ring binder is located at the entranc e of the council
chambers.
2.Roll Call
3.Approval of Consent Agenda
The following items are considered to be routine by the Ec onomic Development Authority
(E D A ) and will been acted by one motion. There will be no separate discussion of these items
unless a Commissioner so requests, in whic h event the item will be removed from the c onsent
agenda and considered at the end of C ommission Consideration I tems.
a.A pproval of Minutes
- Motion to approve the mi nutes for:
November 12, 2019
4.C ommission C onsideration Items
a.Resolution Approving the F inal Budget f or the Economic D evelopment
A uthority of Brooklyn Center, Minnesota, for F iscal Year 2020
- Motion to approve resoluti on
5.Adjournment
E conomic Development A uthority
DAT E:1 2 /2/2 0 1 9
TO :C ity Council
F R O M:C ur t Boganey, C ity M anager
T H R O U G H :D r. Reggie Edw ards , D eputy C ity M anager
BY:Barb S uciu, City Clerk
S U B J E C T:A pprov al of M inutes
B ackground:
S trate gic Priories and Values:
O pera.onal E xcellence
AT TA C H M E N TS :
D escrip.on Upload D ate Ty pe
M inutes 11-1 2 -1 9 11/27/2019 Backup M aterial
11/12/19 -1- DRAFT
MINUTES OF THE PROCEEDINGS OF THE
ECONOMIC DEVELOPMENT AUTHORITY
OF THE CITY OF BROOKLYN CENTER
IN THE COUNTY OF HENNEPIN AND THE
STATE OF MINNESOTA
REGULAR SESSION
NOVEMBER 12, 2019
CITY HALL – COUNCIL CHAMBERS
1. CALL TO ORDER
The Brooklyn Center Economic Development Authority (EDA) met in Regular Session called to
order by President Mike Elliott at 8:14 p.m.
2. ROLL CALL
President Mike Elliott and Commissioners April Graves, Kris Lawrence-Anderson, and Dan
Ryan. Commissioner Marquita Butler was absent and excused. Also present were Executive
Director Curt Boganey, Community Development Director Meg Beekman, City Attorney Troy
Gilchrist, and Mary Mullen, TimeSaver Off Site Secretarial, Inc.
3. APPROVAL OF AGENDA AND CONSENT AGENDA
Commissioner Ryan moved, and Commissioner Graves seconded to approve the Agenda and
Consent Agenda, and the following item was approved:
3a. APPROVAL OF MINUTES
1. September 9, 2019 – EDA Regular Session
3b. RESOLUTION NO. 2019-20 AUTHORIZING THE CITY OF BROOKLYN
CENTER ECONOMIC DEVELOPMENT AUTHORITY (EDA) TO
ENTER INTO AN AGREEMENT WITH FLIK INTERNATIONAL CORP
FOR FOOD SERVICE MANAGEMENT AT THE EARLE BROWN
HERITAGE CENTER
Motion passed unanimously.
4. COMMISSION CONSIDERATION ITEMS
-None.
5. ADJOURNMENT
11/12/19 -2- DRAFT
Commissioner Ryan moved, and Commissioner Lawrence-Anderson seconded adjournment of
the Economic Development Authority meeting at 8:16 p.m.
Motion passed unanimously.
E conomic Development A uthority
DAT E:1 2 /2/2 0 1 9
TO :C ity Council
F R O M:C ur t Boganey, C ity M anager
T H R O U G H :N/A
BY:A ndrew S plinter, I nterim F inance D ir ector
S U B J E C T:Res olu,on A pprov ing the F inal Budget for the Economic D evelopment A uthority of
Br ookly n Center, M innesota, for F is cal Year 2020
B ackground:
AT TA C H M E N TS :
D escrip,on Upload D ate Ty pe
Res olu,on 2 0 2 0 11/27/2019 Resolu,on L e3er
Commissioner introduced the following resolution
and moved its adoption:
EDA RESOLUTION NO.
RESOLUTION APPROVING THE FINAL BUDGET FOR THE ECONOMIC
DEVELOPMENT AUTHORITY OF BROOKLYN CENTER, MINNESOTA,
FOR FISCAL YEAR 2020
WHEREAS, the Economic Development Authority of Brooklyn Center,
Minnesota, has considered the final budget for Fiscal Year 2020.
NOW, THEREFORE, BE IT RESOLVED by the Economic Development
Authority of Brooklyn Center, Minnesota, that revenues and appropriations for the Economic
Development Authority for the 2020 fiscal year are hereby adopted as follows:
Economic Development Authority
Revenues
Miscellaneous Revenue
Other Financing Sources
$ 91,076
405,069
Total Economic Development Authority $ 496,145
Appropriations
EDA Operations $ 475,088
Total Economic Development Authority $ 475,088
December 2, 2019
Date President
The motion for the adoption of the foregoing resolution was duly seconded by Commissioner
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.